Facilities UpdateFacilities UpdateSite ImprovementsSite Improvements
Encinitas Union School DistrictEncinitas Union School DistrictSeptember 5, 2006September 5, 2006
CapriCapri• New HVAC system• New campus entrance w/ student
drop-off / pick-up• Playground asphalt replacement
and regrade.• Moved in one relocatable to house
Media Center during construction • Next steps
– Landscaping and irrigation at front of site
– New marquee– Parking area– Media Center– Outdoor patio– Elevator– New stucco and painting
El Camino CreekEl Camino Creek
• Completed three cottage-style classrooms
• Next steps– Sandblast and repaint
stairways
– Replant slopes
Flora VistaFlora Vista
• Preschool addition– Added two offices and one
classroom– Replaced carpet with VCT– Replaced existing toilets
• Remodeled main office• Remodeled principal’s office• Replaced school roof• Replaced lunch shade shelter• Sandblast and repaint windows• Next steps
– Remodel existing storage– Add tack board to interior
hallways– Replace asphalt (06-07)– Paint exterior of school (06-07)
La Costa HeightsLa Costa Heights
• Completing two new bathrooms
• Added relocatable classroom• Next steps
– Replace old playground equipment
– Replace safety surfacing on playgrounds
– Convert relocatables at back of site to cottage-style classrooms
– Add modular cottage at front of site
Mission EstanciaMission Estancia
• Remodeled new computer room
• Next steps– Replace tiles on outside walls – Move relocatables to south
side of site and convert to cottage-style classrooms
– Replace school roof (solar?) (06-07)
Ocean KnollOcean Knoll
• Remodel auditorium• Remodel office entry• Conversion of HVAC
plant to storage room• New ball wall• Playground asphalt
recycled and replaced• Next steps
– Add school sign– Asphalt striping
Olivenhain PioneerOlivenhain Pioneer
• Added nine cottage-style classrooms on east side of site
• Added three bathrooms• Replaced carpet, tile, and
painted throughout site• Next steps
– Complete sink in existing art room
– Replace school roof (solar?) (06-07)
– Replace HVAC (07-08)
Park Dale LanePark Dale Lane
• Office renovation
• Next steps– Add modular
cottage at east side of site
Paul Ecke CentralPaul Ecke Central
• Renovate teacher’s lounge into kitchen and workroom
• New computer lab• Replaced old portable classroom
w/ cottage-style classroom• Next steps
– Remodel auditorium– Add three classrooms adjacent to
auditorium– Improve perimeter along Vulcan– Add student drop-off/pick-up on
Vulcan– Renovate parking on west side of
site