Expanding Your Universe with Middleware Russell Bryant, Integration Architect – Groundswell...

35
Expanding Your Universe with Middleware Russell Bryant, Integration Architect – Groundswell Technology Group Sue Shaw, Group Lead – ERP Solutions, Cenovus Energy Inc. May 17, 2012 Calgary Oracle User Group

Transcript of Expanding Your Universe with Middleware Russell Bryant, Integration Architect – Groundswell...

Page 1: Expanding Your Universe with Middleware Russell Bryant, Integration Architect – Groundswell Technology Group Sue Shaw, Group Lead – ERP Solutions, Cenovus.

Expanding Your Universe with Middleware

Russell Bryant, Integration Architect – Groundswell Technology Group

Sue Shaw, Group Lead – ERP Solutions, Cenovus Energy Inc. May 17, 2012 Calgary Oracle User Group

Page 2: Expanding Your Universe with Middleware Russell Bryant, Integration Architect – Groundswell Technology Group Sue Shaw, Group Lead – ERP Solutions, Cenovus.

• Who is Cenovus

• Cenovus ERP Implementation Program Overview

• Cenovus ERP Environment Overview

• Who is Groundswell

• Current Integration Status

• Challenges

• Integration Templates

• Benefits and Lessons Learned

Agenda

Page 3: Expanding Your Universe with Middleware Russell Bryant, Integration Architect – Groundswell Technology Group Sue Shaw, Group Lead – ERP Solutions, Cenovus.

Forward-looking informationThis presentation contains certain forward-looking statements and other information (collectively “forward-looking information”) about our current expectations, estimates and projections, made in light of our experience and perception of historical trends. Forward-looking information in this presentation is identified by words such as “anticipate”, “believe”, “expect”, “plan”, “forecast” or “F”, “target”, “project”, “could”, “focus”, “vision”, “goal”, “milestone”, “proposed”, “scheduled”, “outlook”, “potential”, “may” or similar expressions and includes suggestions of future outcomes, including statements about our growth strategy and related schedules, projected future value or net asset value, forecast operating and financial results, planned capital expenditures, expected future production, including the timing, stability or growth thereof, anticipated finding and development costs, expected reserves and contingent, prospective or in-place resources estimates, potential dividends and dividend growth strategy, anticipated timelines for future regulatory, partner or internal approvals, forecasted commodity prices, future use and development of technology and projected increasing shareholder value. Readers are cautioned not to place undue reliance on forward-looking information as our actual results may differ materially from those expressed or implied.

2012 guidance is based on an average diluted number of shares outstanding of approximately 759 million. It assumes WTI of US$90.00/bbl; Western Canada Select of US$75.00/bbl; NYMEX of US$3.50/MMBtu; AECO of $3.10/GJ; Chicago 3-2-1 Crack Spread of US$14.50; and exchange rate of $0.975 US$/C$. For the period 2013 to 2021 assumptions include WTI of US$85.00-US$105.00/bbl; Western Canada Select of US$71.00-US$85.00/bbl; NYMEX of US$4.00-US$6.00/MMBtu; AECO of $3.30-$5.25/GJ; Chicago 3-2-1 crack spread of US$9.00; exchange rate of $0.98-$1.07 US$/C$; and average number of shares outstanding of approximately 752 million.

Developing forward-looking information involves reliance on a number of assumptions and consideration of certain risks and uncertainties, some of which are specific to Cenovus and others that apply to the industry generally. The factors or assumptions on which the forward-looking information is based include: assumptions inherent in our current guidance, available at www.cenovus.com; our projected capital investment levels, the flexibility of capital spending plans and the associated source of funding; estimates of quantities of oil, bitumen, natural gas and liquids from properties and other sources not currently classified as proved; ability to obtain necessary regulatory and partner approvals; the successful and timely implementation of capital projects; our ability to generate sufficient cash flow from operations to meet our current and future obligations; and other risks and uncertainties described from time to time in the filings we make with securities regulatory authorities. The risk factors and uncertainties that could cause our actual results to differ materially, include: volatility of and assumptions regarding oil and gas prices; the effectiveness of our risk management program, including the impact of derivative financial instruments and our access to various sources of capital; accuracy of cost estimates; fluctuations in commodity prices, currency and interest rates; fluctuations in product supply and demand; market competition, including from alternative energy sources; risks inherent in our marketing operations, including credit risks; maintaining a desirable ratio of debt to adjusted EBITDA and debt to capitalization; our ability to access external sources of debt and equity capital; success of hedging strategies; accuracy of our reserves, resources and future production estimates; our ability to replace and expand oil and gas reserves; the ability of us and ConocoPhillips to maintain our relationship and to successfully manage and operate our integrated heavy oil business; reliability of our assets; potential disruption or unexpected technical difficulties in developing new products and manufacturing processes; refining and marketing margins; potential failure of new products to achieve acceptance in the market; unexpected cost increases or technical difficulties in constructing or modifying manufacturing or refining facilities; unexpected difficulties in manufacturing, transporting or refining of crude oil into petroleum and chemical products at two refineries; risks associated with technology and its application to our business; the timing and the costs of well and pipeline construction; our ability to secure adequate product transportation; changes in the regulatory framework in any of the locations in which we operate, including changes to the regulatory approval process and land-use designations, royalty, tax, environmental, greenhouse gas, carbon and other laws or regulations, or changes to the interpretation of such laws and regulations, as adopted or proposed, the impact thereof and the costs associated with compliance; the expected impact and timing of various accounting pronouncements, rule changes and standards on our business, our financial results and our consolidated financial statements; changes in the general economic, market and business conditions; the political and economic conditions in the countries in which we operate; the occurrence of unexpected events such as war, terrorist threats and the instability resulting therefrom; and risks associated with existing and potential future lawsuits, indemnification obligations and regulatory actions against us.

The forward-looking information contained in this presentation, including the underlying assumptions, risks and uncertainties, are made as of the date hereof. For a full discussion of our material risk factors, see “Risk Factors” in our 2011 Annual Information Form and “Risk Management” in our most recent Management’s Discussion and Analysis, available at www.sedar.com and www.cenovus.com.

Page 4: Expanding Your Universe with Middleware Russell Bryant, Integration Architect – Groundswell Technology Group Sue Shaw, Group Lead – ERP Solutions, Cenovus.

Oil & gas information & non-GAAP measuresOil & gas information The contingent resources estimates, effective December 31, 2011, and the discovered bitumen initially-in-place estimates, effective December 31, 2009, were prepared by McDaniel & Associates Consultants Ltd., an independent qualified reserves evaluator, and are based on definitions contained in the Canadian Oil and Gas Evaluation Handbook. For further discussion regarding our (i) contingent resources, see our 2011 Annual Information Form (AIF) and (ii) our total bitumen initially-in-place and all subcategories thereof, see our June 16, 2010 news release, available on SEDAR at www.sedar.com and at www.cenovus.com. Actual resources may be greater than or less than the estimates provided.

• Discovered Bitumen Initially-In-Place (56 Bbbls) is that quantity of bitumen that is estimated, as of a given date, to be contained in known accumulations prior to production. The recoverable portion of discovered bitumen initially-in-place includes production, reserves, and contingent resources; the remainder is categorized as unrecoverable. BIIP estimates include unrecoverable volumes and are not an estimate of the volume of the substances that will ultimately be recovered. There is no certainty that it will be commercially viable to produce any portion of the estimate.

Contingent Resources are those quantities of bitumen estimated, as of a given date, to be potentially recoverable from known accumulations using established technology or technology under development, but which are not currently considered to be commercially recoverable due to one or more contingencies. Contingencies may include such factors as economic, legal, environmental, political and regulatory matters or a lack of markets. It is also appropriate to classify as contingent resources the estimated discovered recoverable quantities associated with a project in the early evaluation stage. The estimate of contingent resources has not been adjusted for risk based on the chance of development.

• Economic contingent resources (8.2 Bbbls) are those contingent resources that are currently economically recoverable based on specific forecasts of commodity prices and costs. In Cenovus’s case, contingent resources were evaluated using the same commodity price assumptions that were used for the 2011 reserves evaluation, which comply with NI 51-101 requirements. Best estimate is considered to be the best estimate of the quantity of resources that will actually be recovered. It is equally likely that the actual remaining quantities recovered will be greater or less than the best estimate. Those resources that fall within the best estimate have a 50% confidence level that the actual quantities recovered will equal or exceed the estimate.

Contingent resources are estimated using volumetric calculations of the in-place quantities, combined with performance from analog reservoirs. Contingencies which must be overcome to enable the reclassification of contingent resources as reserves can be categorized as economic, non-technical and technical. The Canadian Oil and Gas Evaluation Handbook identifies non-technical contingencies as legal, environmental, political and regulatory matters or a lack of markets. The contingencies applicable to our contingent resources are not categorized as economic and for the most part are due to regulatory approval of development projects at our properties, partner sanction and adequate capital funding within five years.

Additional information relating to our oil and gas reserves and resources is presented in our AIF, available at www.sedar.com and on our website at www.cenovus.com. Certain natural gas volumes have been converted to barrels of oil equivalent (BOE) on the basis of one barrel (bbl) to six thousand cubic feet (Mcf). BOE may be misleading, particularly if used in isolation. A conversion ratio of one bbl to six Mcf is based on an energy equivalency conversion method primarily applicable at the burner tip and does not represent value equivalency at the well head.

Non-GAAP measures This presentation may contain references to non-GAAP measures as identified herein. These measures have been described and presented in order to provide shareholders and potential investors with additional information regarding Cenovus’s liquidity and its ability to generate funds to finance its operations. Readers are encouraged to review our Third Quarter Report to Shareholders, available at www.cenovus.com for a full discussion of the use of each measure.TM is a trademark of Cenovus Energy Inc.

Page 5: Expanding Your Universe with Middleware Russell Bryant, Integration Architect – Groundswell Technology Group Sue Shaw, Group Lead – ERP Solutions, Cenovus.

2011 Verts

ALBERTA

SASKATCHEWAN

Borealis Region

Christina Lake Region

Foster Creek Region

Pelican Lake Region

Weyburn

Shaunavon

VikingBakken

Alberta oil & gas

MANITOBA

Cenovus Overview

Tickers – TSX, NYSE CVE

Enterprise value $32 billion

Shares outstanding 754 MM

2012F production

Oil & NGLs 163 Mbbls/d

Natural gas 588 MMcf/d

2011 proved & probable reserves 2.7 BBOE

Bitumen

Economic contingent resources* 8.2 Bbbls

Discovered bitumen initially-in-place* 56 Bbbls

Lease rights** 1.5 MM net acres

P&NG rights 6.1 MM net acres

Refining capacity 226 Mbbls/d

Values are approximate. Forecast production based on midpoints of 2012 guidance dated December 7, 2011. Cenovus land and bitumen estimates at December 31, 2011.*See advisory.**Includes an additional 0.5 million net acres of exclusive lease rights to lease on our behalf and our assignees behalf.

S5

Page 6: Expanding Your Universe with Middleware Russell Bryant, Integration Architect – Groundswell Technology Group Sue Shaw, Group Lead – ERP Solutions, Cenovus.

Steam Assisted Gravity Drainage

Christina Lake

Foster Creek - Steam Assisted Gravity Drainage - SAGD

External link to SAGD Video:http://www.cenovus.com/videos/operations/sagd.wmv

Internal link here:

Page 7: Expanding Your Universe with Middleware Russell Bryant, Integration Architect – Groundswell Technology Group Sue Shaw, Group Lead – ERP Solutions, Cenovus.

Forecasts shown are net to Cenovus based on December 7, 2011 guidance document. See advisory.

Foster Creek 2012 Forecast

• 53 – 57 Mbbls/d of production

• $650 – $700 MM of capital

• $11.25 – $12.45/bbl operating cost

• 2.0 – 2.2 SOR

For entertaining view of Cenovus on the Jon Stewart Daily Show go here: http://vimeo.com/25242270Or search on ‘oilverlords’

Page 8: Expanding Your Universe with Middleware Russell Bryant, Integration Architect – Groundswell Technology Group Sue Shaw, Group Lead – ERP Solutions, Cenovus.

Supply ChainManagement

HREnterpriseOne Project Scope: Deliver integrated processes and

systems comprising the following

business areas

Finance Technology

CapitalProjects

AssetManagement

One Cenovus Project

January2011

July 201218 months

Program Key Drivers:

• Obsolescence of current ERP both Compliance and Business Risk

• Growth in capital spending & asset base

• Positioning Cenovus to Support Growth

Cenovus ERP Implementation

Program Overview

Page 9: Expanding Your Universe with Middleware Russell Bryant, Integration Architect – Groundswell Technology Group Sue Shaw, Group Lead – ERP Solutions, Cenovus.

Supply Chain Management & Capital

Projects

Asset Management Human Resources & Finance

• Greenfield Implementation

• Implementation of JDE 9.0 for procurement and commitments

• Upgrade of Primavera P6 for Capital Projects Scheduling

• Implementation of Proof of Concept of Primavera PCM for Capital Projects Cost Control

• Migration from JDE Xe to Maximo

• Data cleansing, migration, validation

• 16 new integrations between JDE 9.0 and Maximo via Oracle Fusion Middleware

• Custom developed Approvals Portal

• Upgrade from JDE Xe to JDE 9.0

• Data cleansing and migration – reduction of 2 TB of data

• Migration of apprx. 50 integrations to work with JDE 9.0, many very complex

• Implementation of ERP Workspace with Sharepoint

ERP Implementation Facts

Page 10: Expanding Your Universe with Middleware Russell Bryant, Integration Architect – Groundswell Technology Group Sue Shaw, Group Lead – ERP Solutions, Cenovus.

ERP Environment

• General:• Approximately 6500 users, 250 concurrent• Mostly 7x24 support required with 2 monthly scheduled outages• 9 Head office buildings in Calgary, 18 Field sites• 133 interfaces

• 47 existing (Tibco, DBLink, etc), 47 UBEs, 32 new SOA and ETL, 7 BPM/SOA• Infrastructure:

• Will be using WebLogic, AIX 6.1 with LPARs, UNIX• Will be on IBM P770s (24-way, 512gb of RAM with NAS disk)• PD DB is 3.2TB, F0911 is 360m + archived 250m

• JDEdwards specific challenges: • Over 1000 custom and modified major objects (Apps/UBEs/Web

Services)• Translates to over 5700 objects• 1200 of the objects come from P2Energy Entelligent Solution and QSoftware

Page 11: Expanding Your Universe with Middleware Russell Bryant, Integration Architect – Groundswell Technology Group Sue Shaw, Group Lead – ERP Solutions, Cenovus.

ERP Architecture

J DEPDDTAPointer to J DESYSPD (SVM, Sec, DD)

PD900 Pathcode

J DE PD900 –

Production

J DEPDARCPointer to J DESYSPD (SVM, Sec, DD)

PD900 Pathcode

J DE PDARC900 – Archive

OFMW LABSOA – Sandbox

OFMW SOATQA & OSBTQA –

Quality Assurance

OFMW TSTSOA & TSTOSB – Testing

OFMW SOAPROD & OSBPROD – Production

text textStandalone Environment Environment on Promotion Path

J DEPSDTAPointer to J DESYSTS (SVM, Sec, DD)

PS900 Pathcode

J DEFNDTAPointer to J DESYSTS (SVM, Sec, DD)

PY900 Pathcode

J DEDVDTAPointer to J DESYSTS (SVM, Sec, DD)

DV900 Pathcode

J DEQADTAPointer to J DESYSTS (SVM, Sec, DD)

QA900 Pathcode

J DEPYDTAPointer to J DESYSTS (SVM, Sec, DD)

PY900 Pathcode

J DE DV900 - Development

J DE PY900 – I ntegrated

Testing

J DE FN900 – Month End

J DE PS900 - Pristine

J DE QA900 – Quality

Assurance

J DETRDTAPointer to J DESYSTS (SVM, Sec, DD)

TR900 Pathcode - Cloned

J DE TR900 - Training

OFMW SOA Lab

J DEPDDTAPointer to J DESYSPD – Self standing E1 install

PD900 Pathcode – Self Standing

J DE - Lab

Maximo - Lab

ORATRN11

App JVMs:trnREP01trnINT01trnAUI01

Maximo TR - Training

ORATQA08

App JVMs:pocAdminServer

Maximo TS – Testing

Maximo DV - Development

ORATST03

App JVMs:tstREP0[12]tstINT0[12]tstAUI0[12]

Maximo SND - Sandbox

Maximo POC - Concept

Maximo PD – Production

TBD ORADEV44

App JVMs:devREP01devINT01devAUI01

Page 1

E1 Environments

ORADEV39

App JVMs:sndAdminServer

ORATQA50

App JVMs:qasREP0[12]qasINT0[12]qasAUI0[12]

ORAPRD24

App JVMs:prdREP0[12]prdINT0[12]prdAUI0[12]prdREP1[12]prdINT1[12]prdAUI1[12]

Maximo QA – Quality

Assurance

OFMW DEVSOA & DEVOSB –

Development

Page 12: Expanding Your Universe with Middleware Russell Bryant, Integration Architect – Groundswell Technology Group Sue Shaw, Group Lead – ERP Solutions, Cenovus.

• “We make everything work together, so everything works”

• Integration and Middleware; Strategic and Tactical

• BI and Information Management (Strategic and Tactical)

• Based in Calgary, Alberta; clients all over western Canada

• Service provider for Cenovus, responsible for integration and Information Management strategy, oversight and delivery

Groundswell Group

Page 13: Expanding Your Universe with Middleware Russell Bryant, Integration Architect – Groundswell Technology Group Sue Shaw, Group Lead – ERP Solutions, Cenovus.

• All sorts:

• TIBCO (Pub/Sub, request/reply, etc)

• ETL

• File-based store and forward

• Direct database connection

• Many custom scripts and programs

• Some on radar, many out of sight

• Total: 191; JDE related: 164

Integration tools in Use

Page 14: Expanding Your Universe with Middleware Russell Bryant, Integration Architect – Groundswell Technology Group Sue Shaw, Group Lead – ERP Solutions, Cenovus.

Current vs Planned Integrations

Page 15: Expanding Your Universe with Middleware Russell Bryant, Integration Architect – Groundswell Technology Group Sue Shaw, Group Lead – ERP Solutions, Cenovus.

•Black Box ERP – JDE, Primavera, Maximo

•Agility and Adaptability

•Reduce complexity, increase maintainability

•Simplify technical stack

•Align solutions with vision and roadmaps

•Support Cenovus growth plans

•Reduce Architecture Debt

Integrations Objectives

Page 16: Expanding Your Universe with Middleware Russell Bryant, Integration Architect – Groundswell Technology Group Sue Shaw, Group Lead – ERP Solutions, Cenovus.

•Embracing new technologies & architectural standards

•Conversion of many existing integrations

•Untangling the web of tightly-coupled point-to-point

•Managing various roadmaps, business and technical

Integration Challenges

Page 17: Expanding Your Universe with Middleware Russell Bryant, Integration Architect – Groundswell Technology Group Sue Shaw, Group Lead – ERP Solutions, Cenovus.

•Point-to-point integrations – complexity, impedes agility

•Lack of common schemas, business functions and services

•Too many diverse approaches and technologies

•Tight-coupling through direct database connections

•Many integrations outside of governance and oversight

Past Mistakes

Page 18: Expanding Your Universe with Middleware Russell Bryant, Integration Architect – Groundswell Technology Group Sue Shaw, Group Lead – ERP Solutions, Cenovus.

• Multiple stakeholders with different maturity levels

• Managing different agendas and roadmaps

• Negotiating and communicating integration approach

• Evangelizing standards and best practices

Project Challenges

Page 19: Expanding Your Universe with Middleware Russell Bryant, Integration Architect – Groundswell Technology Group Sue Shaw, Group Lead – ERP Solutions, Cenovus.

• Similar to a Pattern

• Facilitates communication:

• Common language

• Describes characteristics of integration approaches

• Aligned with Standards and Best Practices

• Facilitates governance and oversight

Integration Templates

Page 20: Expanding Your Universe with Middleware Russell Bryant, Integration Architect – Groundswell Technology Group Sue Shaw, Group Lead – ERP Solutions, Cenovus.

• Describes the integration approach

• When it is appropriate for use

• Pros & Cons / Issues

• Impact to stakeholder

What is a template?

Integration Templates

Page 21: Expanding Your Universe with Middleware Russell Bryant, Integration Architect – Groundswell Technology Group Sue Shaw, Group Lead – ERP Solutions, Cenovus.

•Appropriate template choice by stakeholders

•Each integration categorized into a template

•No quibbling about the details – focus is on categorization

•Exceptions can be identified and dealt with

How do you choose a template?

Integration Templates

Page 22: Expanding Your Universe with Middleware Russell Bryant, Integration Architect – Groundswell Technology Group Sue Shaw, Group Lead – ERP Solutions, Cenovus.

•Application to Application - Oracle FMW•Z-Tables Bulk Load into JDE •Store-and-Forward (File based)•Workflow – Oracle FMW with logic•Database to database staged through data repository•Database to database batch ETL through data repository•Direct DB connection – No data repository (only when necessary)

Seven Templates for Cenovus

Integration Templates

Page 23: Expanding Your Universe with Middleware Russell Bryant, Integration Architect – Groundswell Technology Group Sue Shaw, Group Lead – ERP Solutions, Cenovus.

Name:•Application to Application (Template Example)When to Use:•2 or more systems need to collaborate on business functionality•Payload is of a size appropriate for message based integration•Business logic involved in satisfying the request of the calling system•Information needs to be current & exchanged in timely mannerPros•Convenient on-demand access of data in real-time•Validation and access control is provided•Transformation of data into a common view supports reuseCons•Integration development is more involved than other methodsIssues•There may be more endpoint development work

Integration Templates

Page 24: Expanding Your Universe with Middleware Russell Bryant, Integration Architect – Groundswell Technology Group Sue Shaw, Group Lead – ERP Solutions, Cenovus.

Name:•Database to Database Batch (Template Example)When to Use:•Data does not need to be instantly up to date•Each system has its own data repository•Data shared is typically master data, not transactional•No complex business rules are involved in movement of dataPros•Loose coupling through staging area•Governance of data•Well understood in CenovusCons•Data Latency•Unable to address complex rulesIssues•Requires oversight to manage ETL dependencies

Integration Templates

Page 25: Expanding Your Universe with Middleware Russell Bryant, Integration Architect – Groundswell Technology Group Sue Shaw, Group Lead – ERP Solutions, Cenovus.

Z-Tables Bulk Load into JDE

Integration Templates

Page 26: Expanding Your Universe with Middleware Russell Bryant, Integration Architect – Groundswell Technology Group Sue Shaw, Group Lead – ERP Solutions, Cenovus.

Store-and-Forward (File based)

Integration Templates

Page 27: Expanding Your Universe with Middleware Russell Bryant, Integration Architect – Groundswell Technology Group Sue Shaw, Group Lead – ERP Solutions, Cenovus.

Workflow – Oracle FMW

Integration Templates

Page 28: Expanding Your Universe with Middleware Russell Bryant, Integration Architect – Groundswell Technology Group Sue Shaw, Group Lead – ERP Solutions, Cenovus.

Database to Database Staged through data repository

Integration Templates

Page 29: Expanding Your Universe with Middleware Russell Bryant, Integration Architect – Groundswell Technology Group Sue Shaw, Group Lead – ERP Solutions, Cenovus.

Direct DB Connection – No data repository (Restricted)

Integration Templates

Page 30: Expanding Your Universe with Middleware Russell Bryant, Integration Architect – Groundswell Technology Group Sue Shaw, Group Lead – ERP Solutions, Cenovus.

• Streamlines process for selection, change, & signoff approach

• Less time on how, more time on what

• Impacts and repercussions understood

• Allows stakeholders of all types to use common language

• Facilitates governance and oversight

• Ensures adherence to standards and best practices

• Promotes dialog with respect to integration vision

Benefits:

Integration Templates

Page 31: Expanding Your Universe with Middleware Russell Bryant, Integration Architect – Groundswell Technology Group Sue Shaw, Group Lead – ERP Solutions, Cenovus.

• Many integrations were implemented other than planned

• Some direction changes were very late in the schedule

• Templates offer the “short-hand” necessary for change negotiation

• Prioritization of requests important

• Regular communication of status crucial

• Governance committee made up of key stakeholders to help provide direction

• Formalized a sign-off process

Managing Change

Page 32: Expanding Your Universe with Middleware Russell Bryant, Integration Architect – Groundswell Technology Group Sue Shaw, Group Lead – ERP Solutions, Cenovus.

• Should have socialized the templates in a formal way at first

• Misunderstanding of architectural direction created noise

• Do not confuse with “Integration Pattern”

• Template definition should not be a moving target

• Early architecture work should include patterns and templates

• Communicate early and often with all stakeholders, IT and Business

Lessons Learned

Page 33: Expanding Your Universe with Middleware Russell Bryant, Integration Architect – Groundswell Technology Group Sue Shaw, Group Lead – ERP Solutions, Cenovus.

Current, Planned and Actual Integrations

Page 34: Expanding Your Universe with Middleware Russell Bryant, Integration Architect – Groundswell Technology Group Sue Shaw, Group Lead – ERP Solutions, Cenovus.

Questions?

Page 35: Expanding Your Universe with Middleware Russell Bryant, Integration Architect – Groundswell Technology Group Sue Shaw, Group Lead – ERP Solutions, Cenovus.

Example of bulleted slide (32 pt.)

• Main bullets should begin with a capital letter and have no punctuation at the end (24 pt.)

• sub-bullets should begin with a lowercase letter and have no punctuation at the end (20 pt.)

• third bullets should begin with a lowercase letter and have no punctuation at the end (18 pt.)

PPT guide try to limit each slide to six lines and six words per line

Left align footnote (12 pt.) and place above the dotted line