Sr. No. Description Unit
1 2 3
A
1 PER S/S
2 Earth Filling & Site Levelling
ame o or : reng en ng s r ' on- - - -
0011 3 S'&station !or"s - )artl4 o'tdoor t4pes'&station * 25 16 73A *wit$ 00 3 o'tdoor t4pe&a4 2 nos. and 11 3 &a4 indoor t4pe 8 Nos.
Civil works: Design, supply of all aterial, !&P,
la"our et# for the following #ivil works #oplete asper !S
Soil $nvestigation & Contour Survey of Su"stationarea as per !e#hni#al Spe#i%#ation
-
7/23/2019 Erection BOQ - Saran
2/338
a
0 S'
9 (tr
Earth work in PSS site with or)inary soil *vi)e#lassi%#ation of soil ite + - o"taine) fro "orrowpits free fro logs, stups, roots, ru""ish or anyother ingre)ients likely to )eteriorate or a.e#t the
sta"ility of the *'00 eter %lling #onsi)ere) si1e20340- site surfa#e in#lu)ing "reaking the #lo)sa5iu to 20 ' #u"e, pla#ing the earth inlayers not e5#ee)ing 667 in loose thi#kness,rough )ressing in#lu)ing #ost of #utting an)reoving shru"s, roots falling in "orrow area all#oplete as per approve) )esign & te#hni#alspe#i%#ation an) as per )ire#tion of Engineer inCharge *payent will "e a)e as per a#tualreuireent per #u"i# eter-
Cu"i#(eters
ntiwe)e) treatent an) stone sprea)ing inswit#hyar) area e5#lu)ing roa), Ca"le tren#h,Drainage et# *Stone Sprea)ing 2 in#hes over 4in#hes lean #eent #on#rete layer as per te#hni#alspe#i%#ation, approve) )esgn an) )rawing an) asper )ire#ton of Engineer in Charge' *payent will "ea)e as per a#tual reuireent per Suare eter-
Constru#tion of 8oun)ary 9all in#lu)ing 8ar"e) 9ireFen#ing on (S angle over the 8oun)ary 9all an)one ate per Su"station, in#lu)ing Supply,Fa"ri#ation, Fi5ing, Painting all #oplete as perapprove) Drawing & !e#hni#al Spe#i%#ation an) asper )ire#ton of Engineer in Charge in all ;;/ k-*0'74 #t per pole-'
; long 76 g/tr' Rail Pole *Painte) with 6 #oat Re)o5i)e, 6 #oat l+Paint an) /2th part of the Rail pole fro"otto with 8la#k enael paint #f Repute) ake-
in#lu)ing %5ing of RCC/Stone 8ase plate *70070000- with #eent #on#reting foun)ation an) top opping*:4:>- *0'27 #t per pole-'
PSC Pole I (tr 400 g in#lu)ing %5ing of RCC 8ase plate*7005700500 - with "ri#k "last or "oul)er re%lling*70N )epth of pole pit- an) raing foun)ation with
e5#avate) soil with pouring water as reuire) as pers#ope of work , approve) )rawing & te#hni#alspe#i%#ation' Fi5ing of Danger 8oar) on DP/!P/FP & Polenu"ering'
Ere#tion of galvanise) fa"ri#ate) steel aterials+Channels, angle, @ats for over hea) line stru#tures "yprovi)ing an) using 8olts, Buts, 9asher et# as per
approve) )rawing an) !S
-
7/23/2019 Erection BOQ - Saran
31/338
9 C(
Set
; Set
Earthing
a Set
& Set
8 Set
Ere#tion, testing an) #oissioning of CSR 9olfCon)u#tor in#lu)ing i) point ointing sleeves %5ing an)
upering, "in)ing of #on)u#tor with pin insulator an))is# insulator "y provi)ing an) using luiniu tape at
DP an) all #ut+points an) angle points "y using P Clapet#' as reuire) * CH k line length of ; phase#on)u#tor-
Ere#tion, testing an) #oissioning of ;; < por#elainDis# insulator ?0 B along with =9 %ttings #oplete in allrespe#t as per !S & approve) )rawings'
Ere#tion, !esting an) Coissioning of ;; < por#elainPin $nsulators with $ P$B #oplete in all respe#t as per !S& approve) )rawings'
E5#avation, Ere#ting, !esting an) Coissioning of Pipetype untreate) earthing "y provi)ing & using > S9 $wire for #onne#tions #oplete in all respe#t an) approve))rawing as per !S'
E5#avation, Ere#ting, !esting an) Coissioning of Coiltype untreate) earthing "y provi)ing & using > S9 $wire for #onne#tions #oplete in all respe#t an)approve) )rawing as per !S'
E5#avation, Foun)ation an) ere#tion of galvanise) StaySet #oplete in all respe#t as per supply s#he)ule "yprovi)ing 0'6 #u #eent #on#rete *:4:>- PCCfoun)ations as per s#ope of work, spe#i%#ations an)approve) )rawings'
-
7/23/2019 Erection BOQ - Saran
32/338
-
7/23/2019 Erection BOQ - Saran
33/338
-
7/23/2019 Erection BOQ - Saran
34/338
-
7/23/2019 Erection BOQ - Saran
35/338
-
7/23/2019 Erection BOQ - Saran
36/338
-
7/23/2019 Erection BOQ - Saran
37/338
8 Set
I Set
S'&-Total
@
1 C
6
a Bo'
0 g
E5#avation an) ere#tion of galvanise) Stay Set asper supply s#he)ule "y provi)ing 0'6 #u #eent#on#rete *:4:>- PCC foun)ations as per s#ope ofwork, spe#i%#ations an) approve) )rawings'
Ere#tion, !esting an) Coissioning of 6 k< 8Swit#h along with Support $nsulators, 8ase Channel)own Pipe, r#ing =orns et#' #oplete as perte#hni#al spe#i%#ations, s#ope of works an)approve) )rawings
11 3 >ines on 10 7 2 g 7 +ail )ole wit$ A/S+Dog /ond'ctor *Do'&le /irc'it
Survey, route alignent & pole spotting, preparationof survey report after approval of Engineer+in+#harge& re)ressal of RA9 issues'
E5#avation of pit, foun)ation, ere#tion of followingSupport for < overhea) line "y installing )anger"oar) an) "ar"e) wire on DP/!P/FP stru#ture an)pole nu"ering as per s#ope of work, approve))rawings an) te#hni#al spe#i%#ations:
; long 76 g/tr' Rail Pole *Painte) with 6 #oatRe) o5i)e, 6 #oat l+Paint an) /2th part of the Railpole fro "otto with 8la#k enael paint #fRepute) ake- in#lu)ing %5ing of *RCC 8ase Plateof si1e 7005700500 '/Stone 8ase Plate of Si1e4705470570- with #eent #on#reting foun)ationan) top opping *:4:>- *0'27 #t per pole-'
Ere#tion of galvanise) fa"ri#ate) steel aterials+Channels, angle, @ats for over hea) line stru#tures "yusing 8olts, Buts, 9asher et# as per approve))rawing an) !S
-
7/23/2019 Erection BOQ - Saran
38/338
-
7/23/2019 Erection BOQ - Saran
39/338
1 C
6
a Bo'
0 g
9 C(
Set
; Set
Survey, route alignent & pole spotting, preparationof survey report after approval of Engineer+in+#harge& re)ressal of RA9 issues'
E5#avation of pit, foun)ation, ere#tion of following
Support for < overhea) line "y installing )anger"oar) an) "ar"e) wire on DP/!P/FP stru#ture an)pole nu"ering as per s#ope of work, approve))rawings an) te#hni#al spe#i%#ations:
PSC Pole I (tr 400 g in#lu)ing %5ing of *RCC 8asePlate of si1e 7005700500 '/Stone 8ase Plate ofSi1e 4705470570- with "ri#k "last or "oul)erre%lling *70N )epth of pole pit- an) raing
foun)ation with e5#avate) soil with pouring water asreuire) as per s#ope of work , approve) )rawing &te#hni#al spe#i%#ation' Fi5ing of Danger 8oar) onDP/!P/FP & Pole nu"ering'
Ere#tion of galvanise) fa"ri#ate) steel aterials+Channels, angle, @ats for over hea) line stru#tures "yusing 8olts, Buts, 9asher et# as per approve))rawing an) !S
Ere#tion, testing an) #oissioning of CSR DogCon)u#tor in#lu)ing i) point ointing sleeves %5ingan) upering, "in)ing of #on)u#tor with pininsulator an) )is# insulator "y provi)ing an) usingluiniu tape at DP an) all #ut+points an) anglepoints "y using P Clap et#' in#lu)ing %5ing &%tting of Dan1er "oar), "ar"e) wire at DP/!P/FP asreuire) * CH k line length of ; phase#on)u#tor-
Ere#tion, testing an) #oissioning of - PCC foun)ations as per s#ope ofwork, spe#i%#ations an) approve) )rawings'
Ere#tion, !esting an) Coissioning of 6 k< 8Swit#h along with Support $nsulators, 8ase Channel)own Pipe, r#ing =orns et#' #oplete as perte#hni#al spe#i%#ations, s#ope of works an)approve) )rawings
11 3 >ines on < mtr.966 "gs )S/ pole wit$ A/S++a&&it cond'ctor
Survey, route alignent & pole spotting, preparationof survey report after approval of Engineer+in+#harge& re)ressal of RA9 issues'
E5#avation of pit, foun)ation, ere#tion of followingSupport for < overhea) line "y installing )anger
"oar) an) "ar"e) wire on DP/!P/FP stru#ture an)pole nu"ering as per s#ope of work, approve))rawings an) te#hni#al spe#i%#ations:
-
7/23/2019 Erection BOQ - Saran
41/338
a Bo'
0 g
9 C(
Set
; Set
Earthing
a Set
PSC Pole I (tr 400 g in#lu)ing %5ing of *RCC 8asePlate of si1e 7005700500 '/Stone 8ase Plate ofSi1e 4705470570- with "ri#k "last or "oul)erre%lling *70N )epth of pole pit- an) raingfoun)ation with e5#avate) soil with pouring water as
reuire) as per s#ope of work , approve) )rawing &te#hni#al spe#i%#ation' Fi5ing of Danger 8oar) onDP/!P/FP & Pole nu"ering'
Ere#tion of galvanise) fa"ri#ate) steel aterials+Channels, angle, @ats for over hea) line stru#tures "yusing 8olts, Buts, 9asher et# as per approve))rawing an) !S
Ere#tion, testing an) #oissioning of CSR Ra""itCon)u#tor in#lu)ing i) point ointing sleeves %5ingan) upering, "in)ing of #on)u#tor with pininsulator an) )is# insulator "y provi)ing an) usingluiniu tape at DP an) all #ut+points an) anglepoints "y using P Clap et#' in#lu)ing %5ing &%tting of Dan1er "oar), "ar"e) wire at DP/!P/FP asreuire) * CH k line length of ; phase#on)u#tor-
Ere#tion, testing an) #oissioning of
-
7/23/2019 Erection BOQ - Saran
42/338
-
7/23/2019 Erection BOQ - Saran
43/338
0 g
9 C(
Set
; Set
Earthing
a Set
& Set
8 Set
Ere#tion of galvanise) fa"ri#ate) steel aterials+Channels, angle, @ats for over hea) line stru#tures "yusing 8olts, Buts, 9asher et# as per approve))rawing an) !S
Ere#tion, testing an) #oissioning of CSR Ra""itCon)u#tor in#lu)ing i) point ointing sleeves %5ingan) upering, "in)ing of #on)u#tor with pininsulator an) )is# insulator "y provi)ing an) usingluiniu tape at DP an) all #ut+points an) anglepoints "y using P Clap et#' in#lu)ing %5ing &%tting of Dan1er "oar), "ar"e) wire at DP/!P/FP asreuire) * CH k line length of ; phase#on)u#tor-
Ere#tion, testing an) #oissioning of ine !it$ A/S+ Dog/ond'ctor on < mtr. 966 "g )S/ pole
Survey, route alignent & pole spotting, preparationof survey report , $nventory after approval ofEngineer+in+#harge & re)ressal of RA9 issues'
E5#avation of pit, foun)ation, ere#tion of followingSupport for < overhea) line "y provi)ing an)installing )anger "oar) an) "ar"e) 9ires on
DP/!P/FP Stru#tures an) pole nu"ering as pers#ope of work, approve) )rawings an) !e#hni#alspe#i%#ations:
PSC Pole I (tr 400 g in#lu)ing %5ing of *RCC 8asePlate of si1e 7005700500 '/Stone 8ase Plate ofSi1e 4705470570-- with "ri#k "last or "oul)erre%lling *70N )epth of pole pit- an) raingfoun)ation with e5#avate) soil with pouring water as
reuire) as per s#ope of work , approve) )rawing &te#hni#al spe#i%#ation' Fi5ing of Danger 8oar) onDP/!P/FP & Pole nu"ering'
-
7/23/2019 Erection BOQ - Saran
49/338
0 g
9 C(
Set
; Set
Earthing
a Set
& Set
8 Set
Ere#tion of galvanise) fa"ri#ate) steel aterials+Channels, angle, @ats for over hea) line stru#tures "yusing 8olts, Buts, 9asher et# as per approve))rawing an) !S
Ere#tion, testing an) #oissioning of CSR DogCon)u#tor in#lu)ing i) point ointing sleeves %5ingan) upering, "in)ing *"y provi)ing & using l'tape- of #on)u#tor with pin insulator an) )is#insulator at DP an) all #ut+points an) angle points "yprovi)ing an) using P Clap et#' as reuire) *CH k line length of ; phase #on)u#tor-
Ere#tion, testing an) #oissioning of ine !it$ A/S+
+a&&it /ond'ctor on )S/ )ole
Survey, route alignent & pole spotting, preparationof survey report , $nventory after approval ofEngineer+in+#harge & re)ressal of RA9 issues'
E5#avation of pit, foun)ation, ere#tion of followingSupport for < overhea) line "y provi)ing an)installing )anger "oar) an) "ar"e) 9ires onDP/!P/FP Stru#tures an) pole nu"ering as per
s#ope of work, approve) )rawings an) !e#hni#alspe#i%#ations:
PSC Pole I (tr 400 g in#lu)ing %5ing of *RCC 8asePlate of si1e 7005700500 '/Stone 8ase Plate ofSi1e 4705470570- with "ri#k "last or "oul)erre%lling *70N )epth of pole pit- an) raingfoun)ation with e5#avate) soil with pouring water asreuire) as per s#ope of work , approve) )rawing &te#hni#al spe#i%#ation' Fi5ing of Danger 8oar) onDP/!P/FP & Pole nu"ering'
-
7/23/2019 Erection BOQ - Saran
51/338
" Bo
0 g
9 C(
Set
; Set
Earthing
a Set
& Set
PSC Pole > (tr 600 g in#lu)ing %5ing of RCC 8aseplate *7005700500 - with "ri#k "last or "oul)erre%lling *70N )epth of pole pit- an) raingfoun)ation with e5#avate) soil with pouring water asreuire) as per s#ope of work , approve) )rawing &
te#hni#al spe#i%#ation' Fi5ing of Danger 8oar) onDP/!P/FP & Pole nu"ering'
Ere#tion of galvanise) fa"ri#ate) steel aterials+Channels, angle, @ats for over hea) line stru#tures "yusing 8olts, Buts, 9asher et# as per approve))rawing an) !S
Ere#tion, testing an) #oissioning of CSR Ra""itCon)u#tor in#lu)ing i) point ointing sleeves %5ingan) upering, "in)ing *"y provi)ing & using l'tape- of #on)u#tor with pin insulator an) )is#insulator at DP an) all #ut+points an) angle points "yprovi)ing an) using P Clap et#' as reuire) *CH k line length of ; phase #on)u#tor-
Ere#tion, testing an) #oissioning of - PCC foun)ations as per s#ope of work,spe#i%#ations an) approve) )rawings'
Disentling of e5isting )efe#tive/)aage) pole+support *Rail/oist/tu"ular-,#on)u#tor an) other)isantle) line aterials fro e5isting line an))evolution of the )isentle) pole, stru#ture,#on)u#tor an) other line aterials in#lu)ing storage,han)ling, insuran#e, loa)ing, unloa)ing,transportation to )esignate) store of Mtility as perthe )ire#tion of Engineer+in+#harge an) han)ing over
the pole an) other )isentle) aterial to the storeof Mtility with propoer a##ounting as per theinventory'
Ere#tion, testing, #oissioning of k< (eteringsyste along with Stati# !rive#tor Energy (eteralongwith #o"ine) C!+ P! etering unit
-
7/23/2019 Erection BOQ - Saran
53/338
(s
S'& Total
T 11 3 (a4 =5tension
1 (!
2 Set
Laying,terination, Ere#tion, !esting oissioning of < gra)e ;+#ore ;00 SLPE power #a"le *Dou"le Cir#uit- for un)ergroun)Railway Crossing in#lu)ing using ointing/!erinationit, $ pipe, C$ pipe, #laps, #one#tors "olts, nuts,%5ing an) %tting of anti+#li"ing )evi#e with alla##essories,Earthing in all respe#t et#' #oplete inall respe#t as per !S, approve) )rawing
E5#avation, ere#tion, #eent #on#rete foun)ation,
ere#tion, testing an) #oissioning of all type ofstru#tures i'e' antry/Swing "us/isolator/
-
7/23/2019 Erection BOQ - Saran
54/338
-
7/23/2019 Erection BOQ - Saran
55/338
8 Set
< (tr
S'&-Total
U /apacitor (an"s
1
a 600
-
7/23/2019 Erection BOQ - Saran
56/338
-
7/23/2019 Erection BOQ - Saran
57/338
7
; < 47 B Dis# $nsulator with har)ware %ttings Set
Set
8 Sets
< Bo
16 Per DSS
Ere#tion, %5ing an) %tting, !esting an)Coissioning of Por#elain $nsulators with ountinghar)ware %ttings et#' #oplete in all respe#t as per!S an) approve) )rawing'
Ere#tion, !esting an) Coissioning of 6k S9 for #onne#tionsas per s#ope of work, approve) )rawings an)te#hni#al spe#i%#ations'* SetH ; Bos earthing perD!-
-
7/23/2019 Erection BOQ - Saran
58/338
-
7/23/2019 Erection BOQ - Saran
59/338
a Bo
9 g
; < 47 B Dis# $nsulator with har)ware %ttings Set
Set
8 Sets
PSC Pole I (tr 400 g in#lu)ing %5ing of *RCC 8asePlate of si1e 7005700500 '/Stone 8ase Plate ofSi1e 4705470570- with "ri#k "last or "oul)erre%lling *70N )epth of pole pit- an) raingfoun)ation with e5#avate) soil with pouring water as
reuire) as per s#ope of work as per approve))rawing & te#hni#al spe#i%#ation'
Ere#tion, %5ing an) %tting of galvanise) fa"ri#ate)steel aterials+ #hannel, angle, @ats of various si1efor D!stru#tures with "olts, nuts an) washers et#'#oplete in all respe#t as per !S an) approve))rawing'
Ere#tion, %5ing an) %tting, !esting an)
Coissioning of Por#elain $nsulators with ountinghar)ware %ttings et#' #oplete in all respe#t as per!S an) approve) )rawing'
Ere#tion, !esting an) Coissioning of 6k
-
7/23/2019 Erection BOQ - Saran
60/338
< Bo
16 Per DSS
11 Per D!
12 Set
S'&-Total
Ere#tion, testing an) Coissioning of L!Distri"ution "o5 with L!C! eter *C! Ratio 400/7 -with "ar type C!s+ 400/7 etering, l+8us "ar of)euate Si1e an) L! #ontrol e#hanis an)#onne#tions fro L< 8ushings to L!D8 an) L!D8 to L!line with Ca"les "y provi)ing an) using Lugs,9asheret#' #oplete in all respe#t with one no' Af !P(CC8as per te#hni#al spe#i%#ations for !hree Phase 600 S9 for #onne#tionsas per s#ope of work, approve) )rawings an)te#hni#al spe#i%#ations'* SetH ; Bos earthing perD!-
Ere#tion, testing an) #oissioning of CSR DogCon)u#tor for upering "y provi)ing an) using l
tape P Claps, "i+etalli#/l #onne#tors, har)wareet# as reuire) #oplete in all respe#t for#oissioning of DSS'
E5#avation an) ere#tion of galvanise) Stay Set asper supply s#he)ule "y provi)ing 0'6 #u #eent#on#rete *:4:>- PCC foun)ations as per s#ope ofwork, spe#i%#ations an) approve) )rawings'
Distri&'tion Transormer S'&stations 166 3Aon < 7tr. 966 "g )S/ )ole
-
7/23/2019 Erection BOQ - Saran
61/338
a !hree Phase 00
-
7/23/2019 Erection BOQ - Saran
62/338
Set
; Sets
? Bo
8 Per DSS
I Per D!
Ere#tion, !esting an) Coissioning of 6k S9 for #onne#tionsas per s#ope of work, approve) )rawings an)te#hni#al spe#i%#ations'* SetH ; Bos earthing perD!-
Ere#tion, testing an) #oissioning of CSR Ra""itCon)u#tor for upering "y provi)ing an) using l!ape P Claps, "i+etalli#/l #onne#tors, har)wareet# as reuire) #oplete in all respe#t for#oissioning of DSS'
-
7/23/2019 Erection BOQ - Saran
63/338
0 Set
S'&-Total
E
a !hree Phase 00
-
7/23/2019 Erection BOQ - Saran
64/338
-
7/23/2019 Erection BOQ - Saran
65/338
-
7/23/2019 Erection BOQ - Saran
66/338
-
7/23/2019 Erection BOQ - Saran
67/338
? Bo
8 Per DSS
I Per D!
0 Set
S'&-Total
AA
Ere#tion, testing an) Coissioning of L!Distri"ution "o5 with L!C! eter *C! Ratio 600/7 -with "ar type C!s+ 600/7 etering, l+8us "ar of)euate Si1e an) L! #ontrol e#hanis an)#onne#tions fro L< 8ushings to L!D8 an) L!D8 to L!line with Ca"les "y provi)ing an) using Lugs,9asheret#' #oplete in all respe#t with one no' Af !P(CC8as per te#hni#al spe#i%#ations for !hree Phase 00 S9 for #onne#tionsas per s#ope of work, approve) )rawings an)te#hni#al spe#i%#ations'* SetH ; Bos earthing perD!-
Ere#tion, testing an) #oissioning of CSR Ra""it
Con)u#tor for upering "y provi)ing P Claps, "i+etalli# #onne#tors, har)ware et# as reuire)#oplete in all respe#t for #oissioning of DSS'
E5#avation an) ere#tion of galvanise) Stay Set asper supply s#he)ule "y provi)ing 0'6 #u #eent#on#rete *:4:>- PCC foun)ations as per s#ope ofwork, spe#i%#ations an) approve) )rawings'
A'gmentation o 166 3A Distri&'tionTransormer &4 266 3A new Distri&'tionTransormer
-
7/23/2019 Erection BOQ - Saran
68/338
a !hree Phase 600
-
7/23/2019 Erection BOQ - Saran
69/338
1
a !hree Phase 00
-
7/23/2019 Erection BOQ - Saran
70/338
& Bo'
2 Set
0 g
9 Set
Sets
PSC Pole > (tr 600 g in#lu)ing %5ing of *RCC 8asePlate of si1e 7005700500 '/Stone 8ase Plate ofSi1e 4705470570- with "ri#k "last or "oul)erre%lling *70N )epth of pole pit- an) raingfoun)ation with e5#avate) soil with pouring water as
reuire) as per s#ope of work , approve) )rawing &te#hni#al spe#i%#ation' Fi5ing of Danger 8oar) onDP/!P/FP & Pole nu"ering'
Ere#tion, testing an) Coissioning of ;+pole,Distri"ution Class I
-
7/23/2019 Erection BOQ - Saran
71/338
; Per DSS
Per D!
8 Set
< Per D!
S'& Total
A=
1 Route Survey CKms
E5#avation, ere#tion, testing an) #oissioning of aset of ; Bos pipe earthing using 40 )ia $ pipe;000 long, as per $S 2 an) as per REC#onstru#tion )rawings #oplete with =/w an) lugset# "y provi)ing #har#oal, salt,/8ituen Clay inalternate layers an) $ 9ires > S9 for #onne#tionsas per s#ope of work, approve) )rawings an)te#hni#al spe#i%#ations'* SetH ; Bos earthing perD!-
Ere#tion, testing an) #oissioning of L! "us "ar)istri"ution syste with kit+kat #oplete an)upering Conne#tions of < si)e #oplete "y
provi)ing & using P #lap/ #onne#tors in allrespe#t for #ossioning of DSS'
E5#avation an) ere#tion of galvanise) Stay Set asper supply s#he)ule "y provi)ing 0'6 #u #eent#on#rete *:4:>- PCC foun)ations as per s#ope ofwork, spe#i%#ations an) approve) )rawings'
Disentling of e5isting )isentle) aterials an))evolution of the )isantle) aterials i'e!ransforer angle, #hannel, #lap, 8 Swit#h, =fuse Set et#' in#lu)ing storage, han)ling, insuran#e,loa)ing, unloa)ing, transportation to store of Mtilityas per the )ire#tion of Engineer+in+#harge withpropoer a##ounting as per the inventory'
/onstr'ction o 0 )$ase 9 !ire >T >ine on 87,
266 g )S/ wit$ A/S+ !easel /ond'ctor in3ertical conCg'ration
-
7/23/2019 Erection BOQ - Saran
72/338
-
7/23/2019 Erection BOQ - Saran
73/338
2 No
3 CKM
4 Kg
5 Set
6 Nos0
S'&-Total
PSC Pole > (tr 600 g in#lu)ing %5ing of *RCC 8asePlate of si1e 7005700500 '/Stone 8ase Plate ofSi1e 4705470570- with "ri#k "last or "oul)erre%lling *70N )epth of pole pit- an) raingfoun)ation with e5#avate) soil with pouring water as
reuire) as per s#ope of work as per approve))rawing & te#hni#al spe#i%#ation'
Ere#tion, testing an) #oissioning of CSR 9easelCon)u#tor in#lu)ing i) point ointing *"y provi)ingan) using P #laps, l !ape- an) upering ,"in)ing of #on)u#tor with insulator, "in)ing wire,%5ing an) %tting of L! P
-
7/23/2019 Erection BOQ - Saran
74/338
AG
1 Route Survey Kms
2 No
3 CKM
4 Kg
5 Set
6 Nos0
S'&-Total
/onstr'ction o 0 )$ase 9 !ire >T >ine on 87,266 g )S/ wit$ A/S+ +a&&it /ond'ctor in?oriHontal conCg'ration
PSC Pole > (tr 600 g in#lu)ing %5ing of *RCC 8asePlate of si1e 7005700500 '/Stone 8ase Plate ofSi1e 4705470570- with "ri#k "last or "oul)erre%lling *70N )epth of pole pit- an) raingfoun)ation with e5#avate) soil with pouring water asreuire) as per s#ope of work as per approve))rawing & te#hni#al spe#i%#ation'
Erection, testing and commissioning of CSR Ra&&it Conductorinc"uding mid #oint $ointing %&y #roviding and using '( c"am#s, ")a#e* and $um#ering , &inding of conductor +it insu"ator, &inding+ire, fi-ing and fitting of .) '/C #ase s#acers etc0 com#"ete ina"" res#ect0 %1 CKm 1 m "ine "engt of 4 #ase conductor*
Erection of ga"vanised fa&ricated stee" materia"s: ang"e, f"ats forover ead "ine structures &y using ;o"ts, Nuts, !aser etc as #era##roved dra+ing and )S
E-cavation and erection of ga"vanised Stay Set +it 5-1 mmstay c"am#, .) stay guy insu"ator, nut &o"ts, turn &uc"es, 10 m"ong, 16 mm diameter so"id (S stay rod 712 S!( dia (8stranded +ire &y using Stone stay #"ate 45-45-5 mm Stay#"ate foundations as #er sco#e of +or, s#ecifications anda##roved dra+ings0
S#ira" ty#e earting as #er REC construction dra+ing 9:1 inc"udingsu##"y of a"" materia"s "ie S!( (080 +ire c"ose"y +ound aving
115 turns, 5mm dia 45mm "ong coi" %untreated +itoutcarcoa" sa"t* in a"" ty#e of soi" inc"uding e-cavation, refi""ing +iteart, fi-ing of &o"ts, nuts, +asers for connection +it #o"esu##ort7 meta"ic #art a"" com#"ete as #er )S direction ofEngineer:in carge %individua" #o"e earting*
-
7/23/2019 Erection BOQ - Saran
75/338
A?
1 Route Survey CKms
2 No
3 CKM
4 Kg
5 Set
6 Nos0
+7 o 0-)$, 9 !ire >T line wit$ A/S+ +a&&itcond'ctor
PSC Pole > (tr 600 g in#lu)ing %5ing of *RCC 8asePlate of si1e 7005700500 '/Stone 8ase Plate ofSi1e 4705470570- with "ri#k "last or "oul)erre%lling *70N )epth of pole pit- an) raingfoun)ation with e5#avate) soil with pouring water asreuire) as per s#ope of work as per approve))rawing & te#hni#al spe#i%#ation'
Erection, testing and commissioning of CSR Ra&&it Conductorinc"uding mid #oint $ointing %&y #roviding and using '( c"am#s, ")a#e* and $um#ering , &inding of conductor +it insu"ator, &inding+ire, fi-ing and fitting of .) '/C #ase s#acers etc0 com#"ete ina"" res#ect0 %1 CKm 1 m "ine "engt of 4 #ase conductor*
Erection of ga"vanised fa&ricated stee" materia"s: ang"e, f"ats forover ead "ine structures &y using ;o"ts, Nuts, !aser etc as #era##roved dra+ing and )S
E-cavation and erection of ga"vanised Stay Set +it 5-1 mmstay c"am#, .) stay guy insu"ator, nut &o"ts, turn &uc"es, 10 m"ong, 16 mm diameter so"id (S stay rod 712 S!( dia (8stranded +ire &y using Stone stay #"ate 45-45-5 mm Stay#"ate foundations as #er sco#e of +or, s#ecifications anda##roved dra+ings0
S#ira" ty#e earting as #er REC construction dra+ing 9:1 inc"udingsu##"y of a"" materia"s "ie S!( (080 +ire c"ose"y +ound aving115 turns, 5mm dia 45mm "ong coi" %untreated +itoutcarcoa" sa"t* in a"" ty#e of soi" inc"uding e-cavation, refi""ing +it
eart, fi-ing of &o"ts, nuts, +asers for connection +it #o"esu##ort7 meta"ic #art a"" com#"ete as #er )S direction ofEngineer:in carge %individua" #o"e earting*
-
7/23/2019 Erection BOQ - Saran
76/338
Ck
S'&-Total
AI1 Route Survey CKms
2 No
3 CKM
4 Kg
Disentling of e5isting )efe#tive/)aage) pole+support *Rail/oist/tu"ular-,#on)u#tor an) other)isantle) line aterials fro e5isting line an))evolution of the )isentle) pole, stru#ture,#on)u#tor an) other line aterials in#lu)ing storage,han)ling, insuran#e, loa)ing, unloa)ing,transportation to )esignate) store of Mtility as perthe )ire#tion of Engineer+in+#harge an) han)ing overthe pole an) other )isentle) aterial to the storeof Mtility with propoer a##ounting as per theinventory'
+7 o 0-)$, 9 !ire >T line wit$ A/S+ !easel
cond'ctor
PSC Pole > (tr 600 g in#lu)ing %5ing of *RCC 8asePlate of si1e 7005700500 '/Stone 8ase Plate ofSi1e 4705470570- with "ri#k "last or "oul)erre%lling *70N )epth of pole pit- an) raingfoun)ation with e5#avate) soil with pouring water asreuire) as per s#ope of work as per approve))rawing & te#hni#al spe#i%#ation'
Erection, testing and commissioning of CSR !ease" Conductorinc"uding mid #oint $ointing %&y #roviding and using '( c"am#s, ")a#e* and $um#ering , &inding of conductor +it insu"ator, &inding+ire, fi-ing and fitting of .) '/C #ase s#acers etc0 com#"ete ina"" res#ect0 %1 CKm 1 m "ine "engt of 4 #ase conductor*
Erection of ga"vanised fa&ricated stee" materia"s: ang"e, f"ats for
over ead "ine structures &y using ;o"ts, Nuts, !aser etc as #era##roved dra+ing and )S
-
7/23/2019 Erection BOQ - Saran
77/338
5 Set
6 Nos0
Ck
S'&-Total
A@
1 Route Survey CKms
2 No
E-cavation and erection of ga"vanised Stay Set +it 5-1 mmstay c"am#, .) stay guy insu"ator, nut &o"ts, turn &uc"es, 10 m"ong, 16 mm diameter so"id (S stay rod 712 S!( dia (8stranded +ire &y using Stone stay #"ate 45-45-5 mm Stay#"ate foundations as #er sco#e of +or, s#ecifications anda##roved dra+ings0
S#ira" ty#e earting as #er REC construction dra+ing 9:1 inc"udingsu##"y of a"" materia"s "ie S!( (080 +ire c"ose"y +ound aving115 turns, 5mm dia 45mm "ong coi" %untreated +itoutcarcoa" sa"t* in a"" ty#e of soi" inc"uding e-cavation, refi""ing +iteart, fi-ing of &o"ts, nuts, +asers for connection +it #o"esu##ort7 meta"ic #art a"" com#"ete as #er )S direction ofEngineer:in carge %individua" #o"e earting*
Disentling of e5isting )efe#tive/)aage) pole+support *Rail/oist/tu"ular-,#on)u#tor an) other)isantle) line aterials fro e5isting line an))evolution of the )isentle) pole, stru#ture,#on)u#tor an) other line aterials in#lu)ing storage,han)ling, insuran#e, loa)ing, unloa)ing,transportation to )esignate) store of Mtility as perthe )ire#tion of Engineer+in+#harge an) han)ing over
the pole an) other )isentle) aterial to the storeof Mtility with propoer a##ounting as per theinventory'
+7 o e5isting Single p$ase 2 p$ase linewit$ /onBersion in to T$ree )$ase , 9 wire >ine&4 A/S+ !easel cond'ctor
'SC 'o"e Mtr 2 Kg inc"uding fi-ing of %RCC ;ase '"ate of si
-
7/23/2019 Erection BOQ - Saran
78/338
3 CKM
4 Kg
5 Set
6 Nos0
Ck
S'&-Total
Erection, testing and commissioning of CSR !ease" Conductor+it fi-ing fitting of sac"e7 #in insu"ator inc"uding mid #oint
$ointing %&y #roviding and using '( c"am#s, " )a#e* and$um#ering , &inding of conductor +it insu"ator, &inding +ire, fi-ingand fitting of .) '/C #ase s#acers etc0 com#"ete in a"" res#ect0
%1 CKm 1 m "ine "engt of 4 #ase conductor *
Erection of ga"vanised fa&ricated stee" materia"s: ang"e, f"ats forover ead "ine structures &y using ;o"ts, Nuts, !aser etc as #era##roved dra+ing and )S
E-cavation and erection of ga"vanised Stay Set +it 5-1 mmstay c"am#, .) stay guy insu"ator, nut &o"ts, turn &uc"es, 10 m"ong, 16 mm diameter so"id (S stay rod 712 S!( dia (8
stranded +ire &y using Stone stay #"ate 45-45-5 mm Stay#"ate foundations as #er sco#e of +or, s#ecifications anda##roved dra+ings0
S#ira" ty#e earting as #er REC construction dra+ing 9:1 inc"udingsu##"y of a"" materia"s "ie S!( (080 +ire c"ose"y +ound aving115 turns, 5mm dia 45mm "ong coi" %untreated +itoutcarcoa" sa"t* in a"" ty#e of soi" inc"uding e-cavation, refi""ing +iteart, fi-ing of &o"ts, nuts, +asers for connection +it #o"esu##ort7 meta"ic #art a"" com#"ete as #er )S direction of
Engineer:in carge %individua" #o"e earting*
Disentling of e5isting )efe#tive/)aage) pole+support *Rail/oist/tu"ular-,#on)u#tor an) other)isantle) line aterials fro e5isting line an))evolution of the )isentle) pole, stru#ture,#on)u#tor an) other line aterials in#lu)ing storage,han)ling, insuran#e, loa)ing, unloa)ing,
transportation to )esignate) store of Mtility as perthe )ire#tion of Engineer+in+#harge an) han)ing overthe pole an) other )isentle) aterial to the storeof Mtility with propoer a##ounting as per theinventory'
-
7/23/2019 Erection BOQ - Saran
79/338
A
1 C
2
a Bo
; Set
=rection, testing commissioning o New >T >ineon 0 p$ase A(/ 0
-
7/23/2019 Erection BOQ - Saran
80/338
9 Set
7
a Ck
S'& Total
A>
1 C
2
$nstallation, testing an) #oissioning ofCoil Earthing "y provi)ing $ wire no'+>S9for #onne#tions with nuts, "olts an) washersas per s#ope of work, te#hni#al spe#i%#ations
an) approve) )rawings an) RECSpe#i%#ation*untreate)-'
Ere#tion, testing an) Coissioning of L!Line on 8 Ca"les: *average span 40 to 47 appro5'- in#lu)ing all ere#tion a##essoriesreuire) for su##essful ere#tion of 8 Ca"le
Coplete in all respe#t as per approve))rawing an) !e#hni#al Spe#i%#ation et# asreuire) as per s#ope for work for8ran#hing/terination et#'
; phase 8C O; I7S PhaseQK5?0S (essenger #u Beutral wireQ
=rection, testing commissioning o New >T >ineon 0 p$ase A(/ 0 6SJ mm K)$aseLMK156SJ mm 7essenger c'm Ne'tral wireL
Survey, route alignent & pole spotting,preparation of survey report , $nventory afterapproval of Engineer+in+#harge & re)ressal ofRA9 issues'
E5#avation of pit, foun)ation, ere#tion offollowing Support for L! line an) polenu"ering as per s#ope of work, approve))rawings an) !e#hni#al spe#i%#ations:
-
7/23/2019 Erection BOQ - Saran
81/338
a Bo
; Set
9 Set
7
PSC Pole > (tr 600 g in#lu)ing %5ing of*RCC 8ase Plate of si1e 7005700500'/Stone 8ase Plate of Si1e4705470570- with "ri#k "last or "oul)erre%lling *70N )epth of pole pit- an) raingfoun)ation with e5#avate) soil with pouringwater as reuire) as per s#ope of work ,approve) )rawing & te#hni#al spe#i%#ation'
E-cavation and erection of ga"vanised Stay Set +it 5-1 mmstay c"am#, .) stay guy insu"ator, nut &o"ts, turn &uc"es, 10 m
"ong, 16 mm diameter so"id (S stay rod 712 S!( dia (8stranded +ire &y using Stone stay #"ate 45-45-5 mm Stay#"ate foundations as #er sco#e of +or, s#ecifications anda##roved dra+ings0
$nstallation, testing an) #oissioning ofCoil Earthing "y provi)ing $ wire no'+>S9for #onne#tions with nuts, "olts an) washersas per s#ope of work, te#hni#al spe#i%#ations
an) approve) )rawings an) RECSpe#i%#ation*untreate)-'
Ere#tion, testing an) Coissioning of L!Line on 8 Ca"les: *average span 40 to 47 appro5'- in#lu)ing all ere#tion a##essoriesreuire) for su##essful ere#tion of 8 Ca"leCoplete in all respe#t as per approve))rawing an) !e#hni#al Spe#i%#ation et# asreuire) as per s#ope for work for8ran#hing/terination et#'
-
7/23/2019 Erection BOQ - Saran
82/338
a Ck
S'& Total
A7
1 C
2
a Bo
; Set
; phase 8C O; ?0S PhaseQK570S (essenger #u Beutral wireQ
=rection, testing commissioning o New >T >ineon 0 p$ase A(/ 0 6 SJ mm K)$aseLMK150SJ mm 7essenger c'm Ne'tral wireL
Survey, route alignent & pole spotting,preparation of survey report , $nventory afterapproval of Engineer+in+#harge & re)ressal ofRA9 issues'
E5#avation of pit, foun)ation, ere#tion offollowing Support for L! line an) polenu"ering as per s#ope of work, approve))rawings an) !e#hni#al spe#i%#ations:
PSC Pole > (tr 600 g in#lu)ing %5ing of*RCC 8ase Plate of si1e 7005700500
'/Stone 8ase Plate of Si1e4705470570- with "ri#k "last or "oul)erre%lling *70N )epth of pole pit- an) raingfoun)ation with e5#avate) soil with pouringwater as reuire) as per s#ope of work ,approve) )rawing & te#hni#al spe#i%#ation'
E-cavation and erection of ga"vanised Stay Set +it 5-1 mmstay c"am#, .) stay guy insu"ator, nut &o"ts, turn &uc"es, 10 m"ong, 16 mm diameter so"id (S stay rod 712 S!( dia (8stranded +ire &y using Stone stay #"ate 45-45-5 mm Stay#"ate foundations as #er sco#e of +or, s#ecifications anda##roved dra+ings0
-
7/23/2019 Erection BOQ - Saran
83/338
9 Set
7
a Ck
S'& Total
AN
1 C
2
$nstallation, testing an) #oissioning ofCoil Earthing "y provi)ing $ wire no'+>S9for #onne#tions with nuts, "olts an) washersas per s#ope of work, te#hni#al spe#i%#ations
an) approve) )rawings an) RECSpe#i%#ation*untreate)-'
Ere#tion, testing an) Coissioning of L!Line on 8 Ca"les: *average span 40 to 47 appro5'- in#lu)ing all ere#tion a##essoriesreuire) for su##essful ere#tion of 8 Ca"le
Coplete in all respe#t as per approve))rawing an) !e#hni#al Spe#i%#ation et# asreuire) as per s#ope for work for8ran#hing/terination et#'
; phase 8C O; 70S PhaseQK5;7S (essenger #u Beutral wireQ
New >T >ine on 1 p$ase A(/ 11; SJ mmK)$aseL M K152 SJ mm 7essenger c'mNe'tral wireL
Survey, route alignent & pole spotting,preparation of survey report , $nventory afterapproval of Engineer+in+#harge & re)ressal ofRA9 issues'
E5#avation of pit, foun)ation, ere#tion offollowing Support for L! line an) polenu"ering as per s#ope of work, approve))rawings an) !e#hni#al spe#i%#ations:
-
7/23/2019 Erection BOQ - Saran
84/338
a Bo
; Set
9 Set
7
PSC Pole > (tr 600 g in#lu)ing %5ing of*RCC 8ase Plate of si1e 7005700500'/Stone 8ase Plate of Si1e4705470570- with "ri#k "last or "oul)erre%lling *70N )epth of pole pit- an) raingfoun)ation with e5#avate) soil with pouringwater as reuire) as per s#ope of work ,approve) )rawing & te#hni#al spe#i%#ation'
E-cavation and erection of ga"vanised Stay Set +it 5-1 mmstay c"am#, .) stay guy insu"ator, nut &o"ts, turn &uc"es, 10 m
"ong, 16 mm diameter so"id (S stay rod 712 S!( dia (8stranded +ire &y using Stone stay #"ate 45-45-5 mm Stay#"ate foundations as #er sco#e of +or, s#ecifications anda##roved dra+ings0
$nstallation, testing an) #oissioning ofCoil Earthing "y provi)ing $ wire no'+>S9for #onne#tions with nuts, "olts an) washersas per s#ope of work, te#hni#al spe#i%#ations
an) approve) )rawings an) RECSpe#i%#ation*untreate)-'
Ere#tion, testing an) Coissioning of L!Line on 8 Ca"les: *average span 40 to 47 appro5'- in#lu)ing all ere#tion a##essoriesreuire) for su##essful ere#tion of 8 Ca"leCoplete in all respe#t as per approve))rawing an) !e#hni#al Spe#i%#ation et# asreuire) as per s#ope for work for8ran#hing/terination et#'
-
7/23/2019 Erection BOQ - Saran
85/338
a Ck
S'& Total
Total
(A>A
(A
a !hree Phase 600
-
7/23/2019 Erection BOQ - Saran
86/338
6 per D!
S'&-Total
(/
a !hree Phase 2;
-
7/23/2019 Erection BOQ - Saran
87/338
0 g
4
a < 47 B Dis# $nsulator with har)ware %ttings Set
Set
; Sets
? Bo
Ere#tion, %5ing an) %tting of galvanise) fa"ri#ate)steel aterials+ #hannel, angle, @ats of various si1efor D!stru#tures with "olts, nuts an) washers et#'#oplete in all respe#t as per !S an) approve))rawing'
Ere#tion, %5ing an) %tting, !esting an)Coissioning of Por#elain $nsulators with ountinghar)ware %ttings et#' #oplete in all respe#t as per!S an) approve) )rawing'
Ere#tion, !esting an) Coissioning of 6k
-
7/23/2019 Erection BOQ - Saran
88/338
8 Per DSS
I Per D!
0 Set
S'&-Total
(D
a !hree Phase 00 S9 for #onne#tionsas per s#ope of work, approve) )rawings an)te#hni#al spe#i%#ations'* SetH ; Bos earthing perD!-
Ere#tion, testing an) #oissioning of CSR Ra""itCon)u#tor for upering "y provi)ing P Claps, "i+etalli# #onne#tors, har)ware et# as reuire)
#oplete in all respe#t for #oissioning of DSS'
E5#avation an) ere#tion of galvanise) Stay Set asper supply s#he)ule "y provi)ing 0'6 #u #eent#on#rete *:4:>- PCC foun)ations as per s#ope ofwork, spe#i%#ations an) approve) )rawings'
Distri&'tion Transormer S'&stations 166 3Aon 8 7tr. 266 "g )S/ )ole &4 +eleased DT
Ere#tion, !esting an) Coissioning of 70 =1,/0'4;;
-
7/23/2019 Erection BOQ - Saran
89/338
;
a Bo
0 g
4
a < 47 B Dis# $nsulator with har)ware %ttings Set
Set
; Sets
=5caBation o pit, o'ndation, erection oollowing S'pport or DSS and installation wit$DT n'm&ering as per scope o wor", approBeddrawings and speciCcations:
PSC Pole > (tr 600 g in#lu)ing %5ing of *RCC 8asePlate of si1e 7005700500 '/Stone 8ase Plate ofSi1e 4705470570- with "ri#k "last or "oul)erre%lling *70N )epth of pole pit- an) raingfoun)ation with e5#avate) soil with pouring water asreuire) as per s#ope of work as per approve))rawing & te#hni#al spe#i%#ation'
Ere#tion, %5ing an) %tting of galvanise) fa"ri#ate)steel aterials+ #hannel, angle, @ats of various si1e
for D!stru#tures with "olts, nuts an) washers et#'#oplete in all respe#t as per !S an) approve))rawing'
Ere#tion, %5ing an) %tting, !esting an)Coissioning of Por#elain $nsulators with ountinghar)ware %ttings et#' #oplete in all respe#t as per!S an) approve) )rawing'
Ere#tion, !esting an) Coissioning of 6k
-
7/23/2019 Erection BOQ - Saran
90/338
? Bo
8 Per DSS
I Per D!
0 Set
S'&-Total
(=
Ere#tion, testing an) Coissioning of L!Distri"ution "o5 with L!C! eter *C! Ratio 600/7 -with "ar type C!s+ 600/7 etering, l+8us "ar of)euate Si1e an) L! #ontrol e#hanis an)#onne#tions fro L< 8ushings to L!D8 an) L!D8 to L!line with Ca"les "y provi)ing an) using Lugs,9asheret#' #oplete in all respe#t with one no' Af !P(CC8as per te#hni#al spe#i%#ations for !hree Phase 00 S9 for #onne#tionsas per s#ope of work, approve) )rawings an)te#hni#al spe#i%#ations'* SetH ; Bos earthing perD!-
Ere#tion, testing an) #oissioning of CSR Ra""it
Con)u#tor for upering "y provi)ing P Claps, "i+etalli# #onne#tors, har)ware et# as reuire)#oplete in all respe#t for #oissioning of DSS'
E5#avation an) ere#tion of galvanise) Stay Set asper supply s#he)ule "y provi)ing 0'6 #u #eent#on#rete *:4:>- PCC foun)ations as per s#ope ofwork, spe#i%#ations an) approve) )rawings'
Distri&'tion Transormer S'&stations ;0 3Aon 8 7tr. )S/ pole &4 +elease DT
-
7/23/2019 Erection BOQ - Saran
91/338
a !hree Phase 2;
-
7/23/2019 Erection BOQ - Saran
92/338
Set
; Sets
? Bo
8 Per DSS
I Per D!
Ere#tion, !esting an) Coissioning of 6k S9 for #onne#tionsas per s#ope of work, approve) )rawings an)te#hni#al spe#i%#ations'* SetH ; Bos earthing perD!-
Ere#tion, testing an) #oissioning of CSR Ra""itCon)u#tor for upering "y provi)ing P Claps, "i+etalli# #onne#tors, har)ware et# as reuire)#oplete in all respe#t for #oissioning of DSS'
-
7/23/2019 Erection BOQ - Saran
93/338
0 Set
S'&-Total
( + 7 o =5isting Distri&'tion S'&stations
1
a Bo'
& Bo'
2 Set
E5#avation an) ere#tion of galvanise) Stay Set asper supply s#he)ule "y provi)ing 0'6 #u #eent#on#rete *:4:>- PCC foun)ations as per s#ope ofwork, spe#i%#ations an) approve) )rawings'
E5#avation of pit, foun)ation, ere#tion of followingSupport for < overhea) line "y provi)ing an)installing )anger "oar) an) "ar"e) 9ires onDP/!P/FP Stru#tures an) D! nu"ering as per s#opeof work, approve) )rawings an) !e#hni#alspe#i%#ations: for
PSC Pole I (tr 400 g in#lu)ing %5ing of *RCC 8asePlate of si1e 7005700500 '/Stone 8ase Plate ofSi1e 4705470570- with "ri#k "last or "oul)erre%lling *70N )epth of pole pit- an) raingfoun)ation with e5#avate) soil with pouring water asreuire) as per s#ope of work , approve) )rawing &te#hni#al spe#i%#ation' Fi5ing of Danger 8oar) onDP/!P/FP & Pole nu"ering'
PSC Pole > (tr 600 g in#lu)ing %5ing of *RCC 8asePlate of si1e 7005700500 '/Stone 8ase Plate ofSi1e 4705470570- with "ri#k "last or "oul)erre%lling *70N )epth of pole pit- an) raingfoun)ation with e5#avate) soil with pouring water asreuire) as per s#ope of work , approve) )rawing &te#hni#al spe#i%#ation' Fi5ing of Danger 8oar) onDP/!P/FP & Pole nu"ering'
Ere#tion, testing an) Coissioning of ;+pole,Distri"ution Class I
-
7/23/2019 Erection BOQ - Saran
94/338
0 g
9 Set
Sets
; Per DSS
Per D!
8 Set
Ere#tion, %5ing an) %tting of galvanise) pre+fa"ri#ate) steel aterials+ #hannel, angle, @ats ofvarious si1e for D! stru#tures with "olts, nuts an)washers et#' #oplete in all respe#t as per !S an)approve) )rawing'
Ere#tion, !esting an) Coissioning of 6k
-
7/23/2019 Erection BOQ - Saran
95/338
< Per D!
S'& Total
(G
1 C
2
a Bo
; Set
Disentling of e5isting )isentle) aterials an))evolution of the )isantle) aterials i'e!ransforer angle, #hannel, #lap, 8 Swit#h, =fuse Set et#' in#lu)ing storage, han)ling, insuran#e,loa)ing, unloa)ing, transportation to store of Mtility
as per the )ire#tion of Engineer+in+#harge withpropoer a##ounting as per the inventory'
=rection, testing commissioning o New >T >ineon 0 p$ase A(/ 0
-
7/23/2019 Erection BOQ - Saran
96/338
9 Set
7
a Ck
S'& Total
(?
1 C
2
a Bo
$nstallation, testing an) #oissioning of CoilEarthing "y provi)ing $ wire no'+>S9 for#onne#tions with nuts, "olts an) washers as pers#ope of work, te#hni#al spe#i%#ations an) approve))rawings an) REC Spe#i%#ation*untreate)-'
Ere#tion, testing an) Coissioning of L! Line on 8Ca"les: *average span 40 to 47 appro5'- in#lu)ingall ere#tion a##essories reuire) for su##essfulere#tion of 8 Ca"le Coplete in all respe#t as perapprove) )rawing an) !e#hni#al Spe#i%#ation et# asreuire) as per s#ope for work for8ran#hing/terination et#'
; phase 8C O; I7S PhaseQK5?0 S (essenger #u Beutral wireQ
=rection, testing commissioning o New >T >ineon 0 p$ase A(/ 0 6SJ mm K)$aseLMK156SJ mm 7essenger c'm Ne'tral wireL
Survey, route alignent & pole spotting, preparationof survey report , $nventory after approval ofEngineer+in+#harge & re)ressal of RA9 issues'
E5#avation of pit, foun)ation, ere#tion of followingSupport for L! line an) pole nu"ering as per s#opeof work, approve) )rawings an) !e#hni#alspe#i%#ations:
PSC Pole > (tr 600 g in#lu)ing %5ing of *RCC 8asePlate of si1e 7005700500 '/Stone 8ase Plate of
Si1e 4705470570- with "ri#k "last or "oul)erre%lling *70N )epth of pole pit- an) raingfoun)ation with e5#avate) soil with pouring water asreuire) as per s#ope of work , approve) )rawing &te#hni#al spe#i%#ation'
-
7/23/2019 Erection BOQ - Saran
97/338
; Set
9 Set
7
a Ck
S'& Total
(I
C
6
E-cavation and erection of ga"vanised Stay Set +it 5-1 mmstay c"am#, .) stay guy insu"ator, nut &o"ts, turn &uc"es, 10 m"ong, 16 mm diameter so"id (S stay rod 712 S!( dia (8stranded +ire &y using Stone stay #"ate 45-45-5 mm Stay#"ate foundations as #er sco#e of +or, s#ecifications anda##roved dra+ings0
$nstallation, testing an) #oissioning of CoilEarthing "y provi)ing $ wire no'+>S9 for#onne#tions with nuts, "olts an) washers as pers#ope of work, te#hni#al spe#i%#ations an) approve))rawings an) REC Spe#i%#ation*untreate)-'
Ere#tion, testing an) Coissioning of L! Line on 8Ca"les: *average span 40 to 47 appro5'- in#lu)ingall ere#tion a##essories reuire) for su##essfulere#tion of 8 Ca"le Coplete in all respe#t as perapprove) )rawing an) !e#hni#al Spe#i%#ation et# asreuire) as per s#ope for work for8ran#hing/terination et#'
; phase 8C O; ?0S PhaseQK570 S (essenger #u Beutral wireQ
=rection, testing commissioning o New >T >ineon 0 p$ase A(/ 0 6 SJ mm K)$aseLMK150SJ mm 7essenger c'm Ne'tral wireL
Survey, route alignent & pole spotting, preparationof survey report , $nventory after approval ofEngineer+in+#harge & re)ressal of RA9 issues'
E5#avation of pit, foun)ation, ere#tion of followingSupport for L! line an) pole nu"ering as per s#opeof work, approve) )rawings an) !e#hni#alspe#i%#ations:
-
7/23/2019 Erection BOQ - Saran
98/338
a Bo
; Set
4 Set
7
a Ck
S'& Total
(@
1 Route Survey Kms
PSC Pole > (tr 600 g in#lu)ing %5ing of *RCC 8asePlate of si1e 7005700500 '/Stone 8ase Plate ofSi1e 4705470570- with "ri#k "last or "oul)erre%lling *70N )epth of pole pit- an) raingfoun)ation with e5#avate) soil with pouring water as
reuire) as per s#ope of work , approve) )rawing &te#hni#al spe#i%#ation'
E-cavation and erection of ga"vanised Stay Set +it 5-1 mmstay c"am#, .) stay guy insu"ator, nut &o"ts, turn &uc"es, 10 m"ong, 16 mm diameter so"id (S stay rod 712 S!( dia (8stranded +ire &y using Stone stay #"ate 45-45-5 mm Stay#"ate foundations as #er sco#e of +or, s#ecifications anda##roved dra+ings0
$nstallation, testing an) #oissioning of CoilEarthing "y provi)ing $ wire no'+>S9 for#onne#tions with nuts, "olts an) washers as pers#ope of work, te#hni#al spe#i%#ations an) approve))rawings an) REC Spe#i%#ation*untreate)-'
Ere#tion, testing an) Coissioning of L! Line on 8Ca"les: *average span 40 to 47 appro5'- in#lu)ing
all ere#tion a##essories reuire) for su##essfulere#tion of 8 Ca"le Coplete in all respe#t as perapprove) )rawing an) !e#hni#al Spe#i%#ation et# asreuire) as per s#ope for work for8ran#hing/terination et#'
; phase 8C O; 70S PhaseQK5;7 S (essenger #u Beutral wireQ
/onstr'ction o 0 )$ase 9 !ire >T >ine on 87,266 g )S/ wit$ A/S+ !easel /ond'ctor in3ertical conCg'ration
-
7/23/2019 Erection BOQ - Saran
99/338
2 No
4 CKM
5 Kg
6 Set
Set
S'&-Total
(
1 Route Survey Kms
'SC 'o"e Mtr 2 Kg inc"uding fi-ing of %RCC ;ase '"ate of si
-
7/23/2019 Erection BOQ - Saran
100/338
2 No
3 CKM
4 Kg
5 Set
6 Nos0
S'&-Total
(>
1 Route Survey Kms
'SC 'o"e Mtr 2 Kg inc"uding fi-ing of %RCC ;ase '"ate of si
-
7/23/2019 Erection BOQ - Saran
101/338
2 No
3 CKM
4 Kg
5 Set
6 Nos0
S'&-Total(7 G'arding o 00 11 3 line
1 #er s#an
'SC 'o"e Mtr 2 Kg inc"uding fi-ing of %RCC ;ase '"ate of si
-
7/23/2019 Erection BOQ - Saran
102/338
-
7/23/2019 Erection BOQ - Saran
103/338
Special )l/A
1 C
2
a Bo
; Set
9 Set
7
+7 o e5isting oBer$ead 11 3 >ine &4 0 p$ase A(/0126 M 1 166 SJ.mm
Survey, route alignent & pole spotting, preparationof survey report , $nventory after approval of
Engineer+in+#harge & re)ressal of RA9 issues'
E5#avation of pit, foun)ation, ere#tion of followingSupport for < line an) pole nu"ering as pers#ope of work, approve) )rawings an) !e#hni#alspe#i%#ations:
PSC Pole I (tr 400 g in#lu)ing %5ing of *RCC 8asePlate of si1e 7005700500 '/Stone 8ase Plate ofSi1e 4705470570- with "ri#k "last or "oul)er
re%lling *70N )epth of pole pit- an) raingfoun)ation with e5#avate) soil with pouring water asreuire) as per s#ope of work , approve) )rawing &te#hni#al spe#i%#ation'
E5#avation an) ere#tion of galvanise) Stay Set with7050 stay #lap, stay guy insulator, nut "olts,turn "u#kles, '> long, 2 )iaeter soli) Sstay ro) & ?/6 S9 )ia $ stran)e) wire "yprovi)ing 0'6 #u #eent #on#rete *:4:>- an)600560052 Stay plate foun)ations as per s#opeof work, spe#i%#ations an) approve) )rawings'
$nstallation, testing an) #oissioning of CoilEarthing "y provi)ing $ wire no'+>S9 for#onne#tions with nuts, "olts an) washers as pers#ope of work, te#hni#al spe#i%#ations an) approve))rawings an) REC Spe#i%#ation'
Ere#tion, testing an) Coissioning of < Line on8 Ca"les in#lu)ing all ere#tion a##essories reuire)for su##essful ere#tion of 8 Ca"le Coplete in allrespe#t as per approve) )rawing an) !e#hni#alSpe#i%#ation et# as reuire) as per s#ope for workfor 8ran#hing/terination et#'
-
7/23/2019 Erection BOQ - Saran
104/338
a Ck
2 Ck
S'& Total
/(
1 C
2
a Bo
; phase 8C O; 60 S PhaseQK 00S
Disentling of e5isting )efe#tive/)aage) pole+support *Rail/oist/tu"ular-,#on)u#tor an) other
)isantle) line aterials fro e5isting line an))evolution of the )isentle) pole, stru#ture,#on)u#tor an) other line aterials in#lu)ing storage,han)ling, insuran#e, loa)ing, unloa)ing,transportation to )esignate) store of Mtility as perthe )ire#tion of Engineer+in+#harge an) han)ing overthe all )isentle) aterial to the store of Mtility withpropoer a##ounting as per the inventory'
+7 o e5isting oBer$ead 11 3 >ine &4 0p$ase A(/ 06 M 1 6 SJ.mm
Survey, route alignent & pole spotting, preparationof survey report , $nventory after approval ofEngineer+in+#harge & re)ressal of RA9 issues'
E5#avation of pit, foun)ation, ere#tion of followingSupport for < line an) pole nu"ering as pers#ope of work, approve) )rawings an) !e#hni#al
spe#i%#ations:
PSC Pole I (tr 400 g in#lu)ing %5ing of *RCC 8asePlate of si1e 7005700500 '/Stone 8ase Plate ofSi1e 4705470570- with "ri#k "last or "oul)erre%lling *70N )epth of pole pit- an) raingfoun)ation with e5#avate) soil with pouring water asreuire) as per s#ope of work , approve) )rawing &te#hni#al spe#i%#ation'
-
7/23/2019 Erection BOQ - Saran
105/338
; Set
9 Set
7
a Ck
2 Ck
S'& Total
//
E5#avation an) ere#tion of galvanise) Stay Set with7050 stay #lap, stay guy insulator, nut "olts,turn "u#kles, '> long, 2 )iaeter soli) Sstay ro) & ?/6 S9 )ia $ stran)e) wire "yprovi)ing 0'6 #u #eent #on#rete *:4:>- an)
600560052 Stay plate foun)ations as per s#opeof work, spe#i%#ations an) approve) )rawings'
$nstallation, testing an) #oissioning of CoilEarthing "y provi)ing $ wire no'+>S9 for#onne#tions with nuts, "olts an) washers as pers#ope of work, te#hni#al spe#i%#ations an) approve))rawings an) REC Spe#i%#ation'
Ere#tion, testing an) Coissioning of < Line on8 Ca"les in#lu)ing all ere#tion a##essories reuire)for su##essful ere#tion of 8 Ca"le Coplete in allrespe#t as per approve) )rawing an) !e#hni#alSpe#i%#ation et# as reuire) as per s#ope for workfor 8ran#hing/terination et#'
; phase 8C O; ?0 S PhaseQK ?0S
Disentling of e5isting )efe#tive/)aage) pole+support *Rail/oist/tu"ular-,#on)u#tor an) other)isantle) line aterials fro e5isting line an))evolution of the )isentle) pole, stru#ture,#on)u#tor an) other line aterials in#lu)ing storage,han)ling, insuran#e, loa)ing, unloa)ing,transportation to )esignate) store of Mtility as perthe )ire#tion of Engineer+in+#harge an) han)ing overthe all )isentle) aterial to the store of Mtility with
propoer a##ounting as per the inventory'
+7 o e5isting oBer$ead 11 3 >ine &4 0 p$ase A(/00 M 16 SJ.mm
-
7/23/2019 Erection BOQ - Saran
106/338
1 C
2
a Bo
; Set
9 Set
7
a Ck
Survey, route alignent & pole spotting, preparationof survey report , $nventory after approval ofEngineer+in+#harge & re)ressal of RA9 issues'
E5#avation of pit, foun)ation, ere#tion of followingSupport for < line an) pole nu"ering as pers#ope of work, approve) )rawings an) !e#hni#alspe#i%#ations:
PSC Pole I (tr 400 g in#lu)ing %5ing of *RCC 8asePlate of si1e 7005700500 '/Stone 8ase Plate ofSi1e 4705470570-with "ri#k "last or "oul)erre%lling *70N )epth of pole pit- an) raingfoun)ation with e5#avate) soil with pouring water asreuire) as per s#ope of work , approve) )rawing &te#hni#al spe#i%#ation'
E5#avation an) ere#tion of galvanise) Stay Set with7050 stay #lap, stay guy insulator, nut "olts,turn "u#kles, '> long, 2 )iaeter soli) Sstay ro) & ?/6 S9 )ia $ stran)e) wire "yprovi)ing 0'6 #u #eent #on#rete *:4:>- an)600560052 Stay plate foun)ations as per s#opeof work, spe#i%#ations an) approve) )rawings'
$nstallation, testing an) #oissioning of CoilEarthing "y provi)ing $ wire no'+>S9 for#onne#tions with nuts, "olts an) washers as pers#ope of work, te#hni#al spe#i%#ations an) approve))rawings an) REC Spe#i%#ation'
Ere#tion, testing an) Coissioning of < Line on8 Ca"les in#lu)ing all ere#tion a##essories reuire)for su##essful ere#tion of 8 Ca"le Coplete in allrespe#t as per approve) )rawing an) !e#hni#alSpe#i%#ation et# as reuire) as per s#ope for workfor 8ran#hing/terination et#'
; phase 8C O; ;7 S PhaseQK ?0S
-
7/23/2019 Erection BOQ - Saran
107/338
2 Ck
S'& Total
/D
1 C
2
a Bo
Disentling of e5isting )efe#tive/)aage) pole+support *Rail/oist/tu"ular-,#on)u#tor an) other)isantle) line aterials fro e5isting line an))evolution of the )isentle) pole, stru#ture,
#on)u#tor an) other line aterials in#lu)ing storage,han)ling, insuran#e, loa)ing, unloa)ing,transportation to )esignate) store of Mtility as perthe )ire#tion of Engineer+in+#harge an) han)ing overthe all )isentle) aterial to the store of Mtility withpropoer a##ounting as per the inventory'
+ 7 o >T >ine on 0 p$ase A(/ 0
-
7/23/2019 Erection BOQ - Saran
108/338
; Set
9 Set
7
a Ck
E-cavation and erection of ga"vanised Stay Set +it 5-1 mmstay c"am#, .) stay guy insu"ator, nut &o"ts, turn &uc"es, 10 m"ong, 16 mm diameter so"id (S stay rod 712 S!( dia (8stranded +ire &y using Stone stay #"ate 45-45-5 mm Stay#"ate foundations as #er sco#e of +or, s#ecifications anda##roved dra+ings0
$nstallation, testing an) #oissioning ofCoil Earthing "y provi)ing $ wire no'+>S9for #onne#tions with nuts, "olts an) washersas per s#ope of work, te#hni#al spe#i%#ationsan) approve) )rawings an) RECSpe#i%#ation*untreate)-'
Ere#tion, testing an) Coissioning of L!Line on 8 Ca"les: *average span 40 to 47 appro5'- in#lu)ing all ere#tion a##essoriesreuire) for su##essful ere#tion of 8 Ca"leCoplete in all respe#t as per approve))rawing an) !e#hni#al Spe#i%#ation et# as
reuire) as per s#ope for work for8ran#hing/terination et#'
; phase 8C O; I7S PhaseQK5?0S (essenger #u Beutral wireQ
-
7/23/2019 Erection BOQ - Saran
109/338
2 Ck
S'& Total
/=
1 C
2
a Bo
Disentling of e5isting )efe#tive/)aage) pole+support *Rail/oist/tu"ular-,#on)u#tor an) other)isantle) line aterials fro e5isting line an))evolution of the )isentle) pole, stru#ture,
#on)u#tor an) other line aterials in#lu)ing storage,han)ling, insuran#e, loa)ing, unloa)ing,transportation to )esignate) store of Mtility as perthe )ire#tion of Engineer+in+#harge an) han)ing overthe all )isentle) aterial to the store of Mtility withpropoer a##ounting as per the inventory'
+ 7 o >T >ine on 0 p$ase A(/ 0 6SJ mm
K)$aseLMK156 SJ mm 7essenger c'mNe'tral wireL
Survey, route alignent & pole spotting,preparation of survey report , $nventory afterapproval of Engineer+in+#harge & re)ressal ofRA9 issues'
E5#avation of pit, foun)ation, ere#tion offollowing Support for L! line an) polenu"ering as per s#ope of work, approve))rawings an) !e#hni#al spe#i%#ations:
PSC Pole > (tr 600 g in#lu)ing %5ing of*RCC 8ase Plate of si1e 7005700500'/Stone 8ase Plate of Si1e4705470570- with "ri#k "last or "oul)erre%lling *70N )epth of pole pit- an) raingfoun)ation with e5#avate) soil with pouringwater as reuire) as per s#ope of work ,approve) )rawing & te#hni#al spe#i%#ation'
-
7/23/2019 Erection BOQ - Saran
110/338
; Set
9 Set
7
a Ck
E-cavation and erection of ga"vanised Stay Set +it 5-1 mmstay c"am#, .) stay guy insu"ator, nut &o"ts, turn &uc"es, 10 m"ong, 16 mm diameter so"id (S stay rod 712 S!( dia (8stranded +ire &y using Stone stay #"ate 45-45-5 mm Stay#"ate foundations as #er sco#e of +or, s#ecifications anda##roved dra+ings0
$nstallation, testing an) #oissioning ofCoil Earthing "y provi)ing $ wire no'+>S9for #onne#tions with nuts, "olts an) washersas per s#ope of work, te#hni#al spe#i%#ationsan) approve) )rawings an) RECSpe#i%#ation*untreate)-'
Ere#tion, testing an) Coissioning of L!Line on 8 Ca"les: *average span 40 to 47 appro5'- in#lu)ing all ere#tion a##essoriesreuire) for su##essful ere#tion of 8 Ca"leCoplete in all respe#t as per approve))rawing an) !e#hni#al Spe#i%#ation et# as
reuire) as per s#ope for work for8ran#hing/terination et#'
; phase 8C O; ?0S PhaseQK570S (essenger #u Beutral wireQ
-
7/23/2019 Erection BOQ - Saran
111/338
2 Ck
S'& Total
/
1 C
2
a Bo
Disentling of e5isting )efe#tive/)aage) pole+support *Rail/oist/tu"ular-,#on)u#tor an) other)isantle) line aterials fro e5isting line an))evolution of the )isentle) pole, stru#ture,
#on)u#tor an) other line aterials in#lu)ing storage,han)ling, insuran#e, loa)ing, unloa)ing,transportation to )esignate) store of Mtility as perthe )ire#tion of Engineer+in+#harge an) han)ing overthe all )isentle) aterial to the store of Mtility withpropoer a##ounting as per the inventory'
+ 7 o >T >ine on 0 p$ase A(/ 0 6SJ mm
K)$aseLMK150 SJ mm 7essenger c'mNe'tral wireL
Survey, route alignent & pole spotting,preparation of survey report , $nventory afterapproval of Engineer+in+#harge & re)ressal ofRA9 issues'
E5#avation of pit, foun)ation, ere#tion offollowing Support for L! line an) polenu"ering as per s#ope of work, approve))rawings an) !e#hni#al spe#i%#ations:
PSC Pole > (tr 600 g in#lu)ing %5ing of*RCC 8ase Plate of si1e 7005700500'/Stone 8ase Plate of Si1e4705470570- with "ri#k "last or "oul)erre%lling *70N )epth of pole pit- an) raingfoun)ation with e5#avate) soil with pouringwater as reuire) as per s#ope of work ,approve) )rawing & te#hni#al spe#i%#ation'
-
7/23/2019 Erection BOQ - Saran
112/338
; Set
9 Set
7
a Ck
E-cavation and erection of ga"vanised Stay Set +it 5-1 mmstay c"am#, .) stay guy insu"ator, nut &o"ts, turn &uc"es, 10 m"ong, 16 mm diameter so"id (S stay rod 712 S!( dia (8stranded +ire &y using Stone stay #"ate 45-45-5 mm Stay#"ate foundations as #er sco#e of +or, s#ecifications anda##roved dra+ings0
$nstallation, testing an) #oissioning ofCoil Earthing "y provi)ing $ wire no'+>S9for #onne#tions with nuts, "olts an) washersas per s#ope of work, te#hni#al spe#i%#ationsan) approve) )rawings an) RECSpe#i%#ation*untreate)-'
Ere#tion, testing an) Coissioning of L!Line on 8 Ca"les: *average span 40 to 47 appro5'- in#lu)ing all ere#tion a##essoriesreuire) for su##essful ere#tion of 8 Ca"leCoplete in all respe#t as per approve))rawing an) !e#hni#al Spe#i%#ation et# as
reuire) as per s#ope for work for8ran#hing/terination et#'
; phase 8C O; 70S PhaseQK5;7S (essenger #u Beutral wireQ
-
7/23/2019 Erection BOQ - Saran
113/338
2 Ck
S'& Total
!otal Part C
ran) !A!L
Disentling of e5isting )efe#tive/)aage) pole+support *Rail/oist/tu"ular-,#on)u#tor an) other)isantle) line aterials fro e5isting line an))evolution of the )isentle) pole, stru#ture,
#on)u#tor an) other line aterials in#lu)ing storage,han)ling, insuran#e, loa)ing, unloa)ing,transportation to )esignate) store of Mtility as perthe )ire#tion of Engineer+in+#harge an) han)ing overthe all )isentle) aterial to the store of Mtility withpropoer a##ounting as per the inventory'
-
7/23/2019 Erection BOQ - Saran
114/338
edule 3: Erection Price Component
: Saran, Siwan and Gopalganj
6
NIT No:- 200 )+N()D/>2619
4 5 6 7 8 8=5+6+7 9
6 6 1 6 1
1 0 0 0
e wor n ar n er pec a an ase
Unit'antit4
t4. orDistrictSaran
t4. orDistrictSiwan
t4. orDistrict
Gopalganj
t4. orDistrict
Total'antit4
Unit )riceor
=rection
-
7/23/2019 Erection BOQ - Saran
115/338
2966 0 0 6400 0 6400
;66 0 0 200 0 200
266 0 0 600 0 600
-
7/23/2019 Erection BOQ - Saran
116/338
96 0 0 40 0 40
1;6 0 0 20 0 20
126 0 0 60 0 60
-
7/23/2019 Erection BOQ - Saran
117/338
6 0 0 70 0 70
;6 0 0 20 0 20
16 0 0 0 0 0
6 0 0 70 0 70
-
7/23/2019 Erection BOQ - Saran
118/338
1 0 0 0
2 0 0 6 0 6
-
7/23/2019 Erection BOQ - Saran
119/338
1 0 0 0
1; 0 0 2 0 2
9 0 0 4 0 4
-
7/23/2019 Erection BOQ - Saran
120/338
2 0 0 6 0 6
2 0 0 6 0 6
< 0 0 I 0 I
9 0 0 4 0 4
-
7/23/2019 Erection BOQ - Saran
121/338
< 0 0 I 0 I
2 0 0 6 0 6
2 0 0 6 0 6
< 0 0 I 0 I
1 0 0 0
-
7/23/2019 Erection BOQ - Saran
122/338
1 0 0 0
1 0 0 0
1 0 0 0
1 0 0 0
2 0 0 6 0 6
2 0 0 6 0 6
-
7/23/2019 Erection BOQ - Saran
123/338
6. 0 0 0'7 0 0'7
96 0 0 40 0 40
1 0 0 0
1 0 0 0
1 0 0 0
-
7/23/2019 Erection BOQ - Saran
124/338
6 0 0 0 0 0
2 0 0 6 0 6
1 0 0 0
6. 0 0 0'7 0 0'7
6.< 0 0 0'I 0 0'I
6.1 0 0 0' 0 0'
< 0 0 I 0 I
6 0 0 70 0 70
6 6 1 6 1
-
7/23/2019 Erection BOQ - Saran
125/338
1 0 0 0 0
2966 0 0 6400 0 6400 0
;66 0 0 200 0 200 0
266 0 0 600 0 600 0
-
7/23/2019 Erection BOQ - Saran
126/338
96 0 0 40 0 40 0
1;6 0 0 20 0 20 0
126 0 0 60 0 60 0
-
7/23/2019 Erection BOQ - Saran
127/338
6 0 0 70 0 70 0
0
;6 0 0 20 0 20 0
16 0 0 0 0 0 0
6 0 0 70 0 70 0
-
7/23/2019 Erection BOQ - Saran
128/338
1 0 0 0 0
2 0 0 6 0 6
-
7/23/2019 Erection BOQ - Saran
129/338
1 0 0 0 0
19 0 0 4 0 4 0
9 0 0 4 0 4 0
-
7/23/2019 Erection BOQ - Saran
130/338
0
2 0 0 6 0 6 0
2 0 0 6 0 6 0
< 0 0 I 0 I 0
9 0 0 4 0 4 0
-
7/23/2019 Erection BOQ - Saran
131/338
0 0 7 0 7 0
2 0 0 6 0 6 0
0
2 0 0 6 0 6 0
0 0 7 0 7 0
1 0 0 0 0
-
7/23/2019 Erection BOQ - Saran
132/338
1 0 0 0 0
1 0 0 0 0
1 0 0 0 0
1 0 0 0 0
0
2 0 0 6 0 6 0
2 0 0 6 0 6 0
-
7/23/2019 Erection BOQ - Saran
133/338
6. 0 0 0'7 0 0'7 0
96 0 0 40 0 40 0
1 0 0 0 0
1 0 0 0 0
1 0 0 0 0
0
-
7/23/2019 Erection BOQ - Saran
134/338
2 0 0 6 0 6 0
6 0 0 0 0 0 0
1 0 0 0 0
0
6. 0 0 0'7 0 0'7 0
6.; 0 0 0'2 0 0'2 0
6.1 0 0 0' 0 0' 0
0 0 7 0 7 0
6 0 0 70 0 70 0
6 6 6 6 0
1 6 1 6 6
-16 73A 1 6 6 6
6 6 6 6 0
Addl. 73A
Addl.1673A
0.1-1673A
-
7/23/2019 Erection BOQ - Saran
135/338
6 6 6 6 0
1 6 6 6
6 6 6 6 0
Total 0 6 1 6 4
67 67 0 0 0 2 0
67 67 0 0 0 2 0
7 7 0 0 0 0
0.11.;- 73A
0.1-
73A*+eleased
1.;-73A
*+eleased
-
7/23/2019 Erection BOQ - Saran
136/338
-
7/23/2019 Erection BOQ - Saran
137/338
0 0 0 1
6 0 0 0 2
0 0 0 1
2. 6'7 0 0 0 2. 0
-
7/23/2019 Erection BOQ - Saran
138/338
0 0 2 0
0 0 2 0
6 6 0 6 0 9 0
-
7/23/2019 Erection BOQ - Saran
139/338
0 0 2
0 0 2
0 0 2
-
7/23/2019 Erection BOQ - Saran
140/338
0 0 2
2 6 0 6 0 9
1 ; 0 0 9
02 6 8 6 116
;6 0 ?> 0 0
-
7/23/2019 Erection BOQ - Saran
141/338
> 7?2 0 404 0 I>0
?00 66400 0 74200 0 ??000
;6 0 ?> 0 0
2 I6 0 42> 0 220
7 2;6 0 ;I?> 0 720
;6 0 ?> 0 0
-
7/23/2019 Erection BOQ - Saran
142/338
2 76 0 64> 0 ?20
2 I6 0 42> 0 220
0' ; 0 > 0 0
2; 6 6 00
62 0 ? 0 ;; 0
-
7/23/2019 Erection BOQ - Saran
143/338
7 ;0 0 ;7 0 27
6 76 0 4 0 22 0
62 0 ? 0 ;;
;00 ?>00 0 600 0 II00 0
-
7/23/2019 Erection BOQ - Saran
144/338
62 0 ? 0 ;; 0
2 72 0 46 0 I> 0
;0 ?>0 0 60 0 II0 0
62 0 ? 0 ;; 0
> 60> 0 72 0 624 0
2 72 0 46 0 I> 0
-
7/23/2019 Erection BOQ - Saran
145/338
-
7/23/2019 Erection BOQ - Saran
146/338
0 6 0 ; 0
6 6 0 4 0 2 0
0 6 0 ; 0
0 6 0 ; 0
-
7/23/2019 Erection BOQ - Saran
147/338
0 6 0 ;
2 2 0 6 0 > 0
7 7 0 0 0 7 0
0 0 0
-
7/23/2019 Erection BOQ - Saran
148/338
7 0 0 7 0 7
0 > 0 I
0 > 0 I
';; 0 ?'> 0 6I';
1 ';; 0 ?'> 0 6I';
-
7/23/2019 Erection BOQ - Saran
149/338
1; > 0 6>7 0 422 0
92 4>7'67 0 ?727 0 6;>0'67 0
1 ';; 0 ?'> 0 6I';
; 2?'I> 0 02'> 0 ?4'?>
9 70I'>7 0 >0 0 ;0'>7
1 0 > 0 6I 0
19 7I 0 64I 0 40> 0
-
7/23/2019 Erection BOQ - Saran
150/338
; 2> 0 0? 0 ?7 0
6.1 0 6 0 ;
';; 0 ?'> 0 6I';
1 ';; 0 ?'> 0 6I'; 0
26 66? 0 ;72 0 7>; 0
1166 642; 0 I7>0 0 ;604; 0
-
7/23/2019 Erection BOQ - Saran
151/338
2 66'22 0 ;7'2 0 7>'62 0
12 ;2 0 64 0 ;70 0
119 6I6 0 606I 0 ;;6 0
1 0 > 0 6I 0
18 604 0 ;60 0 764 0
8 I 0 46 0 6;; 0
?I'; 0 64'2 0 60;'I
-
7/23/2019 Erection BOQ - Saran
152/338
1 ?I'; 0 64'2 0 60;'I 0
26 7>2 0 64I6 0 40?> 0
0; 6>I44'7 0 474?I 0 ?446;'7 0
1 ?I'; 0 64'2 0 60;'I 0
; 4?2 0 ?4> 0 66; 0
4760 0 ?06 0 266 0
-
7/23/2019 Erection BOQ - Saran
153/338
0 0 0 0 0 0
1 ?I 0 67 0 604 0
18 46? 0 664; 0 ;2?0 0
; 4?2 0 ?4> 0 66; 0
6.1 > 0 6 0 60 0
?0'72 0 ;>'07 0 ;0>'2
1 ?0'72 0 ;>'07 0 ;0>'2 0
-
7/23/2019 Erection BOQ - Saran
154/338
18 ;0?0 0 64>7 0 7777 0
0; 26674'4 0 70;>>'67 0 6246'27 0
1 ?0'72 0 ;>'07 0 ;0>'2
; 06;';2 0 >6>'; 0 >7'22 0
1 >2I>'72 0 ?040'77 0 7?;I' 0
0
1 ? 0 ;> 0 ;0I 0
-
7/23/2019 Erection BOQ - Saran
155/338
1; 6?6I 0 660I 0 4I;> 0
; 06; 0 >6> 0 >76 0
6.1 ? 0 4 0 ; 0
677'>4 0 60?'0> 0 426'I6
1 677'>4 0 60?'0> 0 426'I6 0
18 4207 0 ;?6? 0 >;;;
-
7/23/2019 Erection BOQ - Saran
156/338
0; I;;>'2 0 ?77>4'6 0 2>I27'> 0
1 677'>4 0 60?'0> 0 426'I6 0
; 7;7'04 0 646'4> 0 6???'76 0
1 ;04?'>4 0 072'0> 0 6;20>'I6 0
1 672 0 60? 0 42; 0
1; 40I; 0 ;;; 0 ?40? 0
; 7;7 0 646 0 6??> 0
-
7/23/2019 Erection BOQ - Saran
157/338
6.1 62 0 6 0 42 0
0 0 0 0 0
1 0 0 0 0 0 0
18 0 0 0 0 0 0
0; 0 0 0 0 0 0
-
7/23/2019 Erection BOQ - Saran
158/338
1 0 0 0 0 0
; 0 0 0 0 0 0
1 0 0 0 0 0 0
1 0 0 0 0 0 0
1; 0 0 0 0 0 0
; 0 0 0 0 0 0
6.1 0 0 0 0 0 0
-
7/23/2019 Erection BOQ - Saran
159/338
0 0 0 0 0
1 0 0 0 0 0
1 0 0 0 0 0 0
2 0 0 0 0 0 0
6 0 0 0 0 0 0
-
7/23/2019 Erection BOQ - Saran
160/338
1 0 0 0 0 0 0
0 0 0 0 0 0 0
1 0 0 0 0 0 0
1 0 0 0 0 0 0
0 0 0 0 0 0 0
2 0 0 0 0 0 0
-
7/23/2019 Erection BOQ - Saran
161/338
-
7/23/2019 Erection BOQ - Saran
162/338
6 0 0 0 0 0 0
1 0 0 0 0 0 0
0 0 0 0 0 0 0
18 0 0 0 0 0 0
1 0 0 0 0 0 0
0 0 0 0 0 0 0
2 0 0 0 0 0 0
-
7/23/2019 Erection BOQ - Saran
163/338
1 0 0 0 0 0 0
74 0 4; 0 I?
1 74 0 4; 0 I? 0
0 26 0 6I 0 6I 0
-
7/23/2019 Erection BOQ - Saran
164/338
2 0> 0 >2 0 I4 0
16 >00 0 2470 0 4770 0
1 74 0 4; 0 I? 0
0 26 0 6I 0 6I 0
1 >0 0 247 0 477 0
6 0 0 0 0 0 0
6?0 0 67 0 4>7 0
-
7/23/2019 Erection BOQ - Saran
165/338
2 0> 0 >2 0 I4 0
1 74 0 4; 0 I? 0
4 0 66 0 ;2
4 0 66 0 ;2
1 6 6 6 1
-
7/23/2019 Erection BOQ - Saran
166/338
0'7 0'7 0 0 0 0'7
6 9 6 '4 0 22?' 0
2 ?;?4 0 7I2> 0 ;;46 0
10 ;2>'? 0 6I>'4 0 22?' 0
2 ?;?40 0 7I2>0 0 ;;460 0
5 >4;'7 0 4I6 0 ;;;7'7 0
1 ;2>? 0 6I>4 0 22? 0
-
7/23/2019 Erection BOQ - Saran
188/338
-
7/23/2019 Erection BOQ - Saran
189/338
1 66'2> 0 >'64 0 40'I6
2. 0
6 ;?7'6 0 677;'2 0 7?6>'> 0
-
7/23/2019 Erection BOQ - Saran
190/338
2 02 0 >7 0 I 0
5 627 0 6; 0 4?? 0
1 76'I6 0 46'72 0 I7'4> 0
16
-
7/23/2019 Erection BOQ - Saran
191/338
-
7/23/2019 Erection BOQ - Saran
192/338
.98 6 ;.6; 6 10.9
?'4> 0 2'02 0 ;'74 0
67 >? 0 76 0 ;;I 0
2 44'>> 0 ;2 0 > 0
-
7/23/2019 Erection BOQ - Saran
193/338
-
7/23/2019 Erection BOQ - Saran
194/338
67 ;4I'67 0 6?> 0 26? 0
2 >;'>6 0 2? 0 70 0
2 >;'>6 0 2? 0 70 0
-
7/23/2019 Erection BOQ - Saran
195/338
;'I? 0 ' 0 67'0>
2.08 6 92.9 6
-
7/23/2019 Erection BOQ - Saran
196/338
-
7/23/2019 Erection BOQ - Saran
197/338
67 67 0 67 0 70 0
2 2 0 2 0 6 0
2 2 0 2 0 6 0
-
7/23/2019 Erection BOQ - Saran
198/338
0 0 6
/= )A+T % )?AS=-I
91 6 00 6 9
4 0 ;; 0 ?4 0
4 0 ;; 0 ?4 0
21 6 11 6 02
6 0 0 ;6 0
-
7/23/2019 Erection BOQ - Saran
199/338
0 0 0 ;6 0
6 6 6 6 6
0 0 0 0 0 0
0 0 0 0 0 0
0
6 0 0 0 0 0 0
-
7/23/2019 Erection BOQ - Saran
200/338
-
7/23/2019 Erection BOQ - Saran
201/338
-
7/23/2019 Erection BOQ - Saran
202/338
6 6> 0 6 0 ;0 0
670 ;700 0 670 0 ;?70 0
; 46 0 ; 0 47 0
4 0 0 7 0
4 0 0 7 0
-
7/23/2019 Erection BOQ - Saran
203/338
4 0 0 7 0
4 0 0 7 0
4 0 0 7 0
6 6> 0 6 0 ;0 0
6 6 6 6 6
-
7/23/2019 Erection BOQ - Saran
204/338
0 0 0 0 0
0 0 0 0 0 0
0
6 0 0 0 0 0 0
670 0 0 0 0 0 0
0
; 0 0 0 0 0 0
-
7/23/2019 Erection BOQ - Saran
205/338
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
-
7/23/2019 Erection BOQ - Saran
206/338
6 0 0 0 0 0 0
86 6 6 6 1;66
6.6 4; 0 ;> 0 >0 0
6.6 4; 0 ;> 0 >0 0
0'7 467 0 ;?7 0 >00 0
-
7/23/2019 Erection BOQ - Saran
207/338
;0 67700 0 66700 0 4>000 0
0'?7 2;> 0 72; 0 600 0
0'7 467 0 ;?7 0 >00 0
>70 0 ?70 0 200 0
>70 0 ?70 0 200 0
>70 0 ?70 0 200 0
-
7/23/2019 Erection BOQ - Saran
208/338
>70 0 ?70 0 200 0
9.1 6 2.90 6 ;.0
4'0 6'4; 0 2'7; 0
67 06'7 0 2 0 2; 0
2 64'2 0 7 0 ;I 0
-
7/23/2019 Erection BOQ - Saran
209/338
2 64'2 0 7 0 ;I 0
4' 0 6'4; 0 2'7; 0
.21 6 0.8; 6 11.6
?'6 0 ;'>2 0 '0? 0
67 >0'67 0 I? 0 6?? 0
-
7/23/2019 Erection BOQ - Saran
210/338
2 4;'62 0 6; 0 22 0
2 4;'62 0 6; 0 22 0
?'6 0 ;'>2 0 '0? 0
28.0 6 1.61 6 9.9
6>'?; 0 ?'0 0 47'?4 0
-
7/23/2019 Erection BOQ - Saran
211/338
67 ?>'67 0 467 0 44 0
2 ?6';> 0 06 0 6?4 0
2 ?6';> 0 06 0 6?4 0
6>'?; 0 ?'0 0 47'?4 0
12.
-
7/23/2019 Erection BOQ - Saran
212/338
2 67I 0 7; 0 46 0
10 6'I; 0 ?'27 0 60'7> 0
5 242'7 0 ;>6'7 0 06I 0
5 27 0 ;> 0 0; 0
1 6I 0 ?? 0 602 0
06.1; 6 1.8; 6 98.62
1 ;0'2 0 ?'>2 0 4>'06 0
-
7/23/2019 Erection BOQ - Saran
213/338
2 20; 0 ;7? 0 I20 0
10 ;0'2 0 ?'>2 0 4>'06 0
2 20;6 0 ;7?6 0 I204 0
6 > 0 0? 0 6>> 0
1 ;06 0 ?I 0 4>0 0
18.9 6 16.
-
7/23/2019 Erection BOQ - Saran
214/338
2 ;2I 0 6I 0 7>> 0
10 >'4? 0 0'I4 0 6I'4 0
2 ;2I4 0 6>> 0 7>>6 0
5 I6 0 77 0 4? 0
1 >7 0 0I 0 6I4 0
166 6 166 6 266
1 00 0 00 0 600
-
7/23/2019 Erection BOQ - Saran
215/338
-
7/23/2019 Erection BOQ - Saran
216/338
n *(+G )$ase-II )A+T-/< 1.2 6 1.2
1 I ? '6 0 ?'6 0
16 I0 ?0 6 0 ?6 0
4 ;2 6> 7 0 2I 0
0 I0 ?0 6 0 ?6 0
-
7/23/2019 Erection BOQ - Saran
217/338
I ? '6 0 ?'6
1 I ? '6 0 ?'6 0
< 1.2 6 1.2
1 I ? '6 0 ?'6 0
16 I0 ?0 6 0 ?6 0
-
7/23/2019 Erection BOQ - Saran
218/338
4 ;2 6> 7 0 2I 0
0 I0 ?0 6 0 ?6 0
I ? '6 0 ?'6
1 I ? '6 0 ?'6 0
2 21 0.; 6 1.;
-
7/23/2019 Erection BOQ - Saran
219/338
1 6? 6 ;'2 0 7'2 0
16 6?0 60 ;2 0 72 0
4 0> >4 4 0 602 0
0 6?0 60 ;2 0 72 0
6? 6 ;'2 0 7'2
-
7/23/2019 Erection BOQ - Saran
220/338
1 6? 6 ;'2 0 7'2 0
2 8 ; 6 18;
1 ?6 7> 72 0 >2 0
16 ?60 7>0 720 0 >20 0
-
7/23/2019 Erection BOQ - Saran
221/338
; 4;6 ;4> ;;2 0 2 0
; 4;6 ;4> ;;2 0 2 0
1 ?6 7> 72 0 >2 0
-
7/23/2019 Erection BOQ - Saran
222/338
1 ?6 7> 72 0 >2 0
186 19 196 6 9;
>0 47 40 0 427 0
0 >00 470 400 0 4270 0
-
7/23/2019 Erection BOQ - Saran
223/338
2 0>0 >?0 >40 0 6?I0 0
2 0>0 >?0 >40 0 6?I0 0
>0 47 40 0 427 0
-
7/23/2019 Erection BOQ - Saran
224/338
>0 47 40 0 427 0
168 8 89 6 2 >? >4 0 6?I 0
0 0>0 >?0 >40 0 6?I0 0
-
7/23/2019 Erection BOQ - Saran
225/338
-
7/23/2019 Erection BOQ - Saran
226/338
0> >? >4 0 6?I 0
-
7/23/2019 Erection BOQ - Saran
227/338
-
7/23/2019 Erection BOQ - Saran
228/338
6 6
6 6
6 6
-
7/23/2019 Erection BOQ - Saran
229/338
6 6
6 6
6 6
-
7/23/2019 Erection BOQ - Saran
230/338
6 6
6 6
6 6
6 6
-
7/23/2019 Erection BOQ - Saran
231/338
6 6
6 6
-
7/23/2019 Erection BOQ - Saran
232/338
-
7/23/2019 Erection BOQ - Saran
233/338
6 6
6 6
6 6
6 6
-
7/23/2019 Erection BOQ - Saran
234/338
6 6
6 6
6 6
6 6
6 6
-
7/23/2019 Erection BOQ - Saran
235/338
-
7/23/2019 Erection BOQ - Saran
236/338
6 6
6 6
6 6
6 6
6 6
6
-
7/23/2019 Erection BOQ - Saran
237/338
6 6
6 6
6 6
6 6
6 6
6 6
6 6
6 6
6
-
7/23/2019 Erection BOQ - Saran
238/338
0 6 6
0 6 6
0 6 6
0 6 6
-
7/23/2019 Erection BOQ - Saran
239/338
0 6 6
0 6 6
0 6 6
-
7/23/2019 Erection BOQ - Saran
240/338
0 6 6
0
0 6 6
0 6 6
0 6 6
-
7/23/2019 Erection BOQ - Saran
241/338
0 6 6
6 6
-
7/23/2019 Erection BOQ - Saran
242/338
0 6 6
0 6 6
0 6 6
-
7/23/2019 Erection BOQ - Saran
243/338
0
0 6 6
0 6 6
0 6 6
0 6 6
-
7/23/2019 Erection BOQ - Saran
244/338
0 6 6
0 6 6
0
0 6 6
0 6 6
0 6 6
-
7/23/2019 Erection BOQ - Saran
245/338
0 6 6
0 6 6
0 6 6
0 6 6
0
0 6 6
0 6 6
-
7/23/2019 Erection BOQ - Saran
246/338
-
7/23/2019 Erection BOQ - Saran
247/338
0 6 6
0 6 6
0 6 6
0
0 6 6
0 6 6
0 6 6
0 6 6
0 6 6
6
-
7/23/2019 Erection BOQ - Saran
248/338
0 6 6
0 6 6
0 6 6
-
7/23/2019 Erection BOQ - Saran
249/338
0 6 6
6 6
0 6 6
0 6 6
-
7/23/2019 Erection BOQ - Saran
250/338
-
7/23/2019 Erection BOQ - Saran
251/338
0 6 6
6 6
0 6 6
0 6 6
-
7/23/2019 Erection BOQ - Saran
252/338
6 6
6 6
6 6
-
7/23/2019 Erection BOQ - Saran
253/338
-
7/23/2019 Erection BOQ - Saran
254/338
6 6
6 6
6 6
6 6
6 6
6 6
-
7/23/2019 Erection BOQ - Saran
255/338
6 6
6 6
0 6 6
6
0 6 6
-
7/23/2019 Erection BOQ - Saran
256/338
-
7/23/2019 Erection BOQ - Saran
257/338
0 6 6
0 6 6
0 6 6
0 6 6
0 6 6
0 6 6
-
7/23/2019 Erection BOQ - Saran
258/338
6 6
6
0 6 6
0 6 6
-
7/23/2019 Erection BOQ - Saran
259/338
0 6 6
0 6 6
0 6 6
0 6 6
-
7/23/2019 Erection BOQ - Saran
260/338
6 6
0 6 6
0 6 6
6
-
7/23/2019 Erection BOQ - Saran
261/338
6 6
6
6 6
6
6 6
-
7/23/2019 Erection BOQ - Saran
262/338
0 6 6
0 6 6
6 6
6 6
6 6
0 6 6
0 6 6
-
7/23/2019 Erection BOQ - Saran
263/338
-
7/23/2019 Erection BOQ - Saran
264/338
0 6 6
0 6 6
0 6 6
0 6 6
0 6 6
0 6 6
6
-
7/23/2019 Erection BOQ - Saran
265/338
0 6 6
0 6 6
0 6 6
0 6 6
0 6 6
0 6 6
-
7/23/2019 Erection BOQ - Saran
266/338
0 6 6
0 6 6
0 6 6
0 6 6
0 6 6
6
0 6 6
-
7/23/2019 Erection BOQ - Saran
267/338
0 6 6
0 6 6
6 6
0 6 6
0 6 6
0
0 6 6
-
7/23/2019 Erection BOQ - Saran
268/338
0 6 6
0 6 6
0 6 6
6
0 6 6
6 6
-
7/23/2019 Erection BOQ - Saran
269/338
0 6 6
0 6 6
0 6 6
0 6 6
0 6 6
0 6 6
0 6 6
-
7/23/2019 Erection BOQ - Saran
270/338
0 6 6
6
0 6 6
0 6 6
0 6 6
-
7/23/2019 Erection BOQ - Saran
271/338
6 6
0 6 6
0 6 6
0 6 6
0 6 6
0 6 6
0 6 6
-
7/23/2019 Erection BOQ - Saran
272/338
6
6 6
0 6 6
0 6 6
0 6 6
-
7/23/2019 Erection BOQ - Saran
273/338
0 6 6
0 6 6
0 6 6
0 6 6
0 6 6
0 6 6
-
7/23/2019 Erection BOQ - Saran
274/338
6 6
6
0 6 6
0 6 6
-
7/23/2019 Erection BOQ - Saran
275/338
0 6 6
0 6 6
0 6 6
0 6 6
0 6 6
0 6 6
0 6 6
-
7/23/2019 Erection BOQ - Saran
276/338
0 6 6
6
0 6 6
0 6 6
-
7/23/2019 Erection BOQ - Saran
277/338
0 6 6
0 6 6
0 6 6
0 6 6
0 6 6
0 6 6
0 6 6
-
7/23/2019 Erection BOQ - Saran
278/338
0 6 6
0 6 6
6
6 6
6
-
7/23/2019 Erection BOQ - Saran
279/338
6 6
6
0 6 6
6 6
-
7/23/2019 Erection BOQ - Saran
280/338
0 6 6
0 6 6
0 6 6
0 6 6
6 6
-
7/23/2019 Erection BOQ - Saran
281/338
0 6 6
0 6 6
6
6 6
6 6
-
7/23/2019 Erection BOQ - Saran
282/338
6
6 6
6 6
0 6 6
0 6 6
-
7/23/2019 Erection BOQ - Saran
283/338
0 6 6
6 6
6 6
6 6
6 6
-
7/23/2019 Erection BOQ - Saran
284/338
6 6
0 6 6
6
0 6 6
0 6 6
-
7/23/2019 Erection BOQ - Saran
285/338
0 6 6
0 6 6
0 6 6
0 6 6
0 6 6
-
7/23/2019 Erection BOQ - Saran
286/338
0 6 6
0 6 6
0 6 6
0 6 6
6
-
7/23/2019 Erection BOQ - Saran
287/338
6 6
0 6 6
0
0 6 6
0 6 6
0 6 6
-
7/23/2019 Erection BOQ - Saran
288/338
0 6 6
0 6 6
6 6
0 6 6
6 6
-
7/23/2019 Erection BOQ - Saran
289/338
0 6 6
6
0 6 6
0 6 6
0 6 6
-
7/23/2019 Erection BOQ - Saran
290/338
0 6 6
0 6 6
0 6 6
0 6 6
0 6 6
-
7/23/2019 Erection BOQ - Saran
291/338
0 6 6
0 6 6
0 6 6
6
6 6
0 6 6
-
7/23/2019 Erection BOQ - Saran
292/338
0 6 6
0 6 6
0 6 6
0 6 6
0 6 6
-
7/23/2019 Erection BOQ - Saran
293/338
0 6 6
0 6 6
0 6 6
0 6 6
6
-
7/23/2019 Erection BOQ - Saran
294/338
0 6 6
6 6
6
0 6 6
6 6
6
-
7/23/2019 Erection BOQ - Saran
295/338
6 6
0 6 6
6
6 6 6
-
7/23/2019 Erection BOQ - Saran
296/338
6 6 6
0 6 6
0 6 6
0 6 6
0 6 6
-
7/23/2019 Erection BOQ - Saran
297/338
0 6 6
6 6
0 6 6
6 6
6
6 6
-
7/23/2019 Erection BOQ - Saran
298/338
0 6 6
6 6
0 6 6
6 6
0 6 6
6
0 6 6
-
7/23/2019 Erection BOQ - Saran
299/338
0 6 6
0 6 6
0 6 6
0 6 6
0 6 6
6
-
7/23/2019 Erection BOQ - Saran
300/338
0 6 6
0 6 6
0 6 6
0 6 6
0 6 6
0 6 6
6
-
7/23/2019 Erection BOQ - Saran
301/338
6 6
0 6 6
0 6 6
0 6 6
0 6 6
0 6 6
-
7/23/2019 Erection BOQ - Saran
302/338
6 6
6
0 6 6
0 6 6
0 6 6
0 6 6
-
7/23/2019 Erection BOQ - Saran
303/338
0 6 6
0 6 6
0 6 6
6
0 6 6
0 6 6
-
7/23/2019 Erection BOQ - Saran
304/338
0 6 6
0 6 6
0 6 6
0 6 6
0 6 6
6
-
7/23/2019 Erection BOQ - Saran
305/338
0 6 6
0 6 6
0 6 6
-
7/23/2019 Erection BOQ - Saran
306/338
0 6 6
6 6
6
0 6 6
-
7/23/2019 Erection BOQ - Saran
307/338
0 6 6
0 6 6
0 6 6
-
7/23/2019 Erection BOQ - Saran
308/338
6 6
6
0 6 6
0 6 6
0 6 6
-
7/23/2019 Erection BOQ - Saran
309/338
0 6 6
6 6
6
0 6 6
-
7/23/2019 Erection BOQ - Saran
310/338
0 6 6
0 6 6
0 6 6
-
7/23/2019 Erection BOQ - Saran
311/338
6 6
6
6
0 6 6
0 6 6
6
0 6 6
-
7/23/2019 Erection BOQ - Saran
312/338
0 6 6
6
0 6 6
0 6 6
0
0 6 6
-
7/23/2019 Erection BOQ - Saran
313/338
0 6 6
0
0 6 6
0 6 6
0 6 6
0 6 6
-
7/23/2019 Erection BOQ - Saran
314/338
0 6 6
0 6 6
0 6 6
6
6 6
0 6 6
-
7/23/2019 Erection BOQ - Saran
315/338
0 6 6
0 6 6
0 6 6
0 6 6
0 6 6
-
7/23/2019 Erection BOQ - Saran
316/338
0 6 6
0 6 6
0 6 6
0 6 6
6
-
7/23/2019 Erection BOQ - Saran
317/338
6 6
0 6 6
0
0 6 6
0 6 6
0
0 6 6
-
7/23/2019 Erection BOQ - Saran