Erection BOQ - Saran

download Erection BOQ - Saran

of 339

Transcript of Erection BOQ - Saran

  • 7/23/2019 Erection BOQ - Saran

    1/338

    Sc

    Districts

    Bidder's Name & Address:

    Sr. No. Description Unit

    1 2 3

    A

    1 PER S/S

    2 Earth Filling & Site Levelling

    ame o or : reng en ng s r ' on- - - -

    0011 3 S'&station !or"s - )artl4 o'tdoor t4pes'&station * 25 16 73A *wit$ 00 3 o'tdoor t4pe&a4 2 nos. and 11 3 &a4 indoor t4pe 8 Nos.

    Civil works: Design, supply of all aterial, !&P,

    la"our et# for the following #ivil works #oplete asper !S

    Soil $nvestigation & Contour Survey of Su"stationarea as per !e#hni#al Spe#i%#ation

  • 7/23/2019 Erection BOQ - Saran

    2/338

    a

    0 S'

    9 (tr

    Earth work in PSS site with or)inary soil *vi)e#lassi%#ation of soil ite + - o"taine) fro "orrowpits free fro logs, stups, roots, ru""ish or anyother ingre)ients likely to )eteriorate or a.e#t the

    sta"ility of the *'00 eter %lling #onsi)ere) si1e20340- site surfa#e in#lu)ing "reaking the #lo)sa5iu to 20 ' #u"e, pla#ing the earth inlayers not e5#ee)ing 667 in loose thi#kness,rough )ressing in#lu)ing #ost of #utting an)reoving shru"s, roots falling in "orrow area all#oplete as per approve) )esign & te#hni#alspe#i%#ation an) as per )ire#tion of Engineer inCharge *payent will "e a)e as per a#tualreuireent per #u"i# eter-

    Cu"i#(eters

    ntiwe)e) treatent an) stone sprea)ing inswit#hyar) area e5#lu)ing roa), Ca"le tren#h,Drainage et# *Stone Sprea)ing 2 in#hes over 4in#hes lean #eent #on#rete layer as per te#hni#alspe#i%#ation, approve) )esgn an) )rawing an) asper )ire#ton of Engineer in Charge' *payent will "ea)e as per a#tual reuireent per Suare eter-

    Constru#tion of 8oun)ary 9all in#lu)ing 8ar"e) 9ireFen#ing on (S angle over the 8oun)ary 9all an)one ate per Su"station, in#lu)ing Supply,Fa"ri#ation, Fi5ing, Painting all #oplete as perapprove) Drawing & !e#hni#al Spe#i%#ation an) asper )ire#ton of Engineer in Charge in all ;;/ k-*0'74 #t per pole-'

    ; long 76 g/tr' Rail Pole *Painte) with 6 #oat Re)o5i)e, 6 #oat l+Paint an) /2th part of the Rail pole fro"otto with 8la#k enael paint #f Repute) ake-

    in#lu)ing %5ing of RCC/Stone 8ase plate *70070000- with #eent #on#reting foun)ation an) top opping*:4:>- *0'27 #t per pole-'

    PSC Pole I (tr 400 g in#lu)ing %5ing of RCC 8ase plate*7005700500 - with "ri#k "last or "oul)er re%lling*70N )epth of pole pit- an) raing foun)ation with

    e5#avate) soil with pouring water as reuire) as pers#ope of work , approve) )rawing & te#hni#alspe#i%#ation' Fi5ing of Danger 8oar) on DP/!P/FP & Polenu"ering'

    Ere#tion of galvanise) fa"ri#ate) steel aterials+Channels, angle, @ats for over hea) line stru#tures "yprovi)ing an) using 8olts, Buts, 9asher et# as per

    approve) )rawing an) !S

  • 7/23/2019 Erection BOQ - Saran

    31/338

    9 C(

    Set

    ; Set

    Earthing

    a Set

    & Set

    8 Set

    Ere#tion, testing an) #oissioning of CSR 9olfCon)u#tor in#lu)ing i) point ointing sleeves %5ing an)

    upering, "in)ing of #on)u#tor with pin insulator an))is# insulator "y provi)ing an) using luiniu tape at

    DP an) all #ut+points an) angle points "y using P Clapet#' as reuire) * CH k line length of ; phase#on)u#tor-

    Ere#tion, testing an) #oissioning of ;; < por#elainDis# insulator ?0 B along with =9 %ttings #oplete in allrespe#t as per !S & approve) )rawings'

    Ere#tion, !esting an) Coissioning of ;; < por#elainPin $nsulators with $ P$B #oplete in all respe#t as per !S& approve) )rawings'

    E5#avation, Ere#ting, !esting an) Coissioning of Pipetype untreate) earthing "y provi)ing & using > S9 $wire for #onne#tions #oplete in all respe#t an) approve))rawing as per !S'

    E5#avation, Ere#ting, !esting an) Coissioning of Coiltype untreate) earthing "y provi)ing & using > S9 $wire for #onne#tions #oplete in all respe#t an)approve) )rawing as per !S'

    E5#avation, Foun)ation an) ere#tion of galvanise) StaySet #oplete in all respe#t as per supply s#he)ule "yprovi)ing 0'6 #u #eent #on#rete *:4:>- PCCfoun)ations as per s#ope of work, spe#i%#ations an)approve) )rawings'

  • 7/23/2019 Erection BOQ - Saran

    32/338

  • 7/23/2019 Erection BOQ - Saran

    33/338

  • 7/23/2019 Erection BOQ - Saran

    34/338

  • 7/23/2019 Erection BOQ - Saran

    35/338

  • 7/23/2019 Erection BOQ - Saran

    36/338

  • 7/23/2019 Erection BOQ - Saran

    37/338

    8 Set

    I Set

    S'&-Total

    @

    1 C

    6

    a Bo'

    0 g

    E5#avation an) ere#tion of galvanise) Stay Set asper supply s#he)ule "y provi)ing 0'6 #u #eent#on#rete *:4:>- PCC foun)ations as per s#ope ofwork, spe#i%#ations an) approve) )rawings'

    Ere#tion, !esting an) Coissioning of 6 k< 8Swit#h along with Support $nsulators, 8ase Channel)own Pipe, r#ing =orns et#' #oplete as perte#hni#al spe#i%#ations, s#ope of works an)approve) )rawings

    11 3 >ines on 10 7 2 g 7 +ail )ole wit$ A/S+Dog /ond'ctor *Do'&le /irc'it

    Survey, route alignent & pole spotting, preparationof survey report after approval of Engineer+in+#harge& re)ressal of RA9 issues'

    E5#avation of pit, foun)ation, ere#tion of followingSupport for < overhea) line "y installing )anger"oar) an) "ar"e) wire on DP/!P/FP stru#ture an)pole nu"ering as per s#ope of work, approve))rawings an) te#hni#al spe#i%#ations:

    ; long 76 g/tr' Rail Pole *Painte) with 6 #oatRe) o5i)e, 6 #oat l+Paint an) /2th part of the Railpole fro "otto with 8la#k enael paint #fRepute) ake- in#lu)ing %5ing of *RCC 8ase Plateof si1e 7005700500 '/Stone 8ase Plate of Si1e4705470570- with #eent #on#reting foun)ationan) top opping *:4:>- *0'27 #t per pole-'

    Ere#tion of galvanise) fa"ri#ate) steel aterials+Channels, angle, @ats for over hea) line stru#tures "yusing 8olts, Buts, 9asher et# as per approve))rawing an) !S

  • 7/23/2019 Erection BOQ - Saran

    38/338

  • 7/23/2019 Erection BOQ - Saran

    39/338

    1 C

    6

    a Bo'

    0 g

    9 C(

    Set

    ; Set

    Survey, route alignent & pole spotting, preparationof survey report after approval of Engineer+in+#harge& re)ressal of RA9 issues'

    E5#avation of pit, foun)ation, ere#tion of following

    Support for < overhea) line "y installing )anger"oar) an) "ar"e) wire on DP/!P/FP stru#ture an)pole nu"ering as per s#ope of work, approve))rawings an) te#hni#al spe#i%#ations:

    PSC Pole I (tr 400 g in#lu)ing %5ing of *RCC 8asePlate of si1e 7005700500 '/Stone 8ase Plate ofSi1e 4705470570- with "ri#k "last or "oul)erre%lling *70N )epth of pole pit- an) raing

    foun)ation with e5#avate) soil with pouring water asreuire) as per s#ope of work , approve) )rawing &te#hni#al spe#i%#ation' Fi5ing of Danger 8oar) onDP/!P/FP & Pole nu"ering'

    Ere#tion of galvanise) fa"ri#ate) steel aterials+Channels, angle, @ats for over hea) line stru#tures "yusing 8olts, Buts, 9asher et# as per approve))rawing an) !S

    Ere#tion, testing an) #oissioning of CSR DogCon)u#tor in#lu)ing i) point ointing sleeves %5ingan) upering, "in)ing of #on)u#tor with pininsulator an) )is# insulator "y provi)ing an) usingluiniu tape at DP an) all #ut+points an) anglepoints "y using P Clap et#' in#lu)ing %5ing &%tting of Dan1er "oar), "ar"e) wire at DP/!P/FP asreuire) * CH k line length of ; phase#on)u#tor-

    Ere#tion, testing an) #oissioning of - PCC foun)ations as per s#ope ofwork, spe#i%#ations an) approve) )rawings'

    Ere#tion, !esting an) Coissioning of 6 k< 8Swit#h along with Support $nsulators, 8ase Channel)own Pipe, r#ing =orns et#' #oplete as perte#hni#al spe#i%#ations, s#ope of works an)approve) )rawings

    11 3 >ines on < mtr.966 "gs )S/ pole wit$ A/S++a&&it cond'ctor

    Survey, route alignent & pole spotting, preparationof survey report after approval of Engineer+in+#harge& re)ressal of RA9 issues'

    E5#avation of pit, foun)ation, ere#tion of followingSupport for < overhea) line "y installing )anger

    "oar) an) "ar"e) wire on DP/!P/FP stru#ture an)pole nu"ering as per s#ope of work, approve))rawings an) te#hni#al spe#i%#ations:

  • 7/23/2019 Erection BOQ - Saran

    41/338

    a Bo'

    0 g

    9 C(

    Set

    ; Set

    Earthing

    a Set

    PSC Pole I (tr 400 g in#lu)ing %5ing of *RCC 8asePlate of si1e 7005700500 '/Stone 8ase Plate ofSi1e 4705470570- with "ri#k "last or "oul)erre%lling *70N )epth of pole pit- an) raingfoun)ation with e5#avate) soil with pouring water as

    reuire) as per s#ope of work , approve) )rawing &te#hni#al spe#i%#ation' Fi5ing of Danger 8oar) onDP/!P/FP & Pole nu"ering'

    Ere#tion of galvanise) fa"ri#ate) steel aterials+Channels, angle, @ats for over hea) line stru#tures "yusing 8olts, Buts, 9asher et# as per approve))rawing an) !S

    Ere#tion, testing an) #oissioning of CSR Ra""itCon)u#tor in#lu)ing i) point ointing sleeves %5ingan) upering, "in)ing of #on)u#tor with pininsulator an) )is# insulator "y provi)ing an) usingluiniu tape at DP an) all #ut+points an) anglepoints "y using P Clap et#' in#lu)ing %5ing &%tting of Dan1er "oar), "ar"e) wire at DP/!P/FP asreuire) * CH k line length of ; phase#on)u#tor-

    Ere#tion, testing an) #oissioning of

  • 7/23/2019 Erection BOQ - Saran

    42/338

  • 7/23/2019 Erection BOQ - Saran

    43/338

    0 g

    9 C(

    Set

    ; Set

    Earthing

    a Set

    & Set

    8 Set

    Ere#tion of galvanise) fa"ri#ate) steel aterials+Channels, angle, @ats for over hea) line stru#tures "yusing 8olts, Buts, 9asher et# as per approve))rawing an) !S

    Ere#tion, testing an) #oissioning of CSR Ra""itCon)u#tor in#lu)ing i) point ointing sleeves %5ingan) upering, "in)ing of #on)u#tor with pininsulator an) )is# insulator "y provi)ing an) usingluiniu tape at DP an) all #ut+points an) anglepoints "y using P Clap et#' in#lu)ing %5ing &%tting of Dan1er "oar), "ar"e) wire at DP/!P/FP asreuire) * CH k line length of ; phase#on)u#tor-

    Ere#tion, testing an) #oissioning of ine !it$ A/S+ Dog/ond'ctor on < mtr. 966 "g )S/ pole

    Survey, route alignent & pole spotting, preparationof survey report , $nventory after approval ofEngineer+in+#harge & re)ressal of RA9 issues'

    E5#avation of pit, foun)ation, ere#tion of followingSupport for < overhea) line "y provi)ing an)installing )anger "oar) an) "ar"e) 9ires on

    DP/!P/FP Stru#tures an) pole nu"ering as pers#ope of work, approve) )rawings an) !e#hni#alspe#i%#ations:

    PSC Pole I (tr 400 g in#lu)ing %5ing of *RCC 8asePlate of si1e 7005700500 '/Stone 8ase Plate ofSi1e 4705470570-- with "ri#k "last or "oul)erre%lling *70N )epth of pole pit- an) raingfoun)ation with e5#avate) soil with pouring water as

    reuire) as per s#ope of work , approve) )rawing &te#hni#al spe#i%#ation' Fi5ing of Danger 8oar) onDP/!P/FP & Pole nu"ering'

  • 7/23/2019 Erection BOQ - Saran

    49/338

    0 g

    9 C(

    Set

    ; Set

    Earthing

    a Set

    & Set

    8 Set

    Ere#tion of galvanise) fa"ri#ate) steel aterials+Channels, angle, @ats for over hea) line stru#tures "yusing 8olts, Buts, 9asher et# as per approve))rawing an) !S

    Ere#tion, testing an) #oissioning of CSR DogCon)u#tor in#lu)ing i) point ointing sleeves %5ingan) upering, "in)ing *"y provi)ing & using l'tape- of #on)u#tor with pin insulator an) )is#insulator at DP an) all #ut+points an) angle points "yprovi)ing an) using P Clap et#' as reuire) *CH k line length of ; phase #on)u#tor-

    Ere#tion, testing an) #oissioning of ine !it$ A/S+

    +a&&it /ond'ctor on )S/ )ole

    Survey, route alignent & pole spotting, preparationof survey report , $nventory after approval ofEngineer+in+#harge & re)ressal of RA9 issues'

    E5#avation of pit, foun)ation, ere#tion of followingSupport for < overhea) line "y provi)ing an)installing )anger "oar) an) "ar"e) 9ires onDP/!P/FP Stru#tures an) pole nu"ering as per

    s#ope of work, approve) )rawings an) !e#hni#alspe#i%#ations:

    PSC Pole I (tr 400 g in#lu)ing %5ing of *RCC 8asePlate of si1e 7005700500 '/Stone 8ase Plate ofSi1e 4705470570- with "ri#k "last or "oul)erre%lling *70N )epth of pole pit- an) raingfoun)ation with e5#avate) soil with pouring water asreuire) as per s#ope of work , approve) )rawing &te#hni#al spe#i%#ation' Fi5ing of Danger 8oar) onDP/!P/FP & Pole nu"ering'

  • 7/23/2019 Erection BOQ - Saran

    51/338

    " Bo

    0 g

    9 C(

    Set

    ; Set

    Earthing

    a Set

    & Set

    PSC Pole > (tr 600 g in#lu)ing %5ing of RCC 8aseplate *7005700500 - with "ri#k "last or "oul)erre%lling *70N )epth of pole pit- an) raingfoun)ation with e5#avate) soil with pouring water asreuire) as per s#ope of work , approve) )rawing &

    te#hni#al spe#i%#ation' Fi5ing of Danger 8oar) onDP/!P/FP & Pole nu"ering'

    Ere#tion of galvanise) fa"ri#ate) steel aterials+Channels, angle, @ats for over hea) line stru#tures "yusing 8olts, Buts, 9asher et# as per approve))rawing an) !S

    Ere#tion, testing an) #oissioning of CSR Ra""itCon)u#tor in#lu)ing i) point ointing sleeves %5ingan) upering, "in)ing *"y provi)ing & using l'tape- of #on)u#tor with pin insulator an) )is#insulator at DP an) all #ut+points an) angle points "yprovi)ing an) using P Clap et#' as reuire) *CH k line length of ; phase #on)u#tor-

    Ere#tion, testing an) #oissioning of - PCC foun)ations as per s#ope of work,spe#i%#ations an) approve) )rawings'

    Disentling of e5isting )efe#tive/)aage) pole+support *Rail/oist/tu"ular-,#on)u#tor an) other)isantle) line aterials fro e5isting line an))evolution of the )isentle) pole, stru#ture,#on)u#tor an) other line aterials in#lu)ing storage,han)ling, insuran#e, loa)ing, unloa)ing,transportation to )esignate) store of Mtility as perthe )ire#tion of Engineer+in+#harge an) han)ing over

    the pole an) other )isentle) aterial to the storeof Mtility with propoer a##ounting as per theinventory'

    Ere#tion, testing, #oissioning of k< (eteringsyste along with Stati# !rive#tor Energy (eteralongwith #o"ine) C!+ P! etering unit

  • 7/23/2019 Erection BOQ - Saran

    53/338

    (s

    S'& Total

    T 11 3 (a4 =5tension

    1 (!

    2 Set

    Laying,terination, Ere#tion, !esting oissioning of < gra)e ;+#ore ;00 SLPE power #a"le *Dou"le Cir#uit- for un)ergroun)Railway Crossing in#lu)ing using ointing/!erinationit, $ pipe, C$ pipe, #laps, #one#tors "olts, nuts,%5ing an) %tting of anti+#li"ing )evi#e with alla##essories,Earthing in all respe#t et#' #oplete inall respe#t as per !S, approve) )rawing

    E5#avation, ere#tion, #eent #on#rete foun)ation,

    ere#tion, testing an) #oissioning of all type ofstru#tures i'e' antry/Swing "us/isolator/

  • 7/23/2019 Erection BOQ - Saran

    54/338

  • 7/23/2019 Erection BOQ - Saran

    55/338

    8 Set

    < (tr

    S'&-Total

    U /apacitor (an"s

    1

    a 600

  • 7/23/2019 Erection BOQ - Saran

    56/338

  • 7/23/2019 Erection BOQ - Saran

    57/338

    7

    ; < 47 B Dis# $nsulator with har)ware %ttings Set

    Set

    8 Sets

    < Bo

    16 Per DSS

    Ere#tion, %5ing an) %tting, !esting an)Coissioning of Por#elain $nsulators with ountinghar)ware %ttings et#' #oplete in all respe#t as per!S an) approve) )rawing'

    Ere#tion, !esting an) Coissioning of 6k S9 for #onne#tionsas per s#ope of work, approve) )rawings an)te#hni#al spe#i%#ations'* SetH ; Bos earthing perD!-

  • 7/23/2019 Erection BOQ - Saran

    58/338

  • 7/23/2019 Erection BOQ - Saran

    59/338

    a Bo

    9 g

    ; < 47 B Dis# $nsulator with har)ware %ttings Set

    Set

    8 Sets

    PSC Pole I (tr 400 g in#lu)ing %5ing of *RCC 8asePlate of si1e 7005700500 '/Stone 8ase Plate ofSi1e 4705470570- with "ri#k "last or "oul)erre%lling *70N )epth of pole pit- an) raingfoun)ation with e5#avate) soil with pouring water as

    reuire) as per s#ope of work as per approve))rawing & te#hni#al spe#i%#ation'

    Ere#tion, %5ing an) %tting of galvanise) fa"ri#ate)steel aterials+ #hannel, angle, @ats of various si1efor D!stru#tures with "olts, nuts an) washers et#'#oplete in all respe#t as per !S an) approve))rawing'

    Ere#tion, %5ing an) %tting, !esting an)

    Coissioning of Por#elain $nsulators with ountinghar)ware %ttings et#' #oplete in all respe#t as per!S an) approve) )rawing'

    Ere#tion, !esting an) Coissioning of 6k

  • 7/23/2019 Erection BOQ - Saran

    60/338

    < Bo

    16 Per DSS

    11 Per D!

    12 Set

    S'&-Total

    Ere#tion, testing an) Coissioning of L!Distri"ution "o5 with L!C! eter *C! Ratio 400/7 -with "ar type C!s+ 400/7 etering, l+8us "ar of)euate Si1e an) L! #ontrol e#hanis an)#onne#tions fro L< 8ushings to L!D8 an) L!D8 to L!line with Ca"les "y provi)ing an) using Lugs,9asheret#' #oplete in all respe#t with one no' Af !P(CC8as per te#hni#al spe#i%#ations for !hree Phase 600 S9 for #onne#tionsas per s#ope of work, approve) )rawings an)te#hni#al spe#i%#ations'* SetH ; Bos earthing perD!-

    Ere#tion, testing an) #oissioning of CSR DogCon)u#tor for upering "y provi)ing an) using l

    tape P Claps, "i+etalli#/l #onne#tors, har)wareet# as reuire) #oplete in all respe#t for#oissioning of DSS'

    E5#avation an) ere#tion of galvanise) Stay Set asper supply s#he)ule "y provi)ing 0'6 #u #eent#on#rete *:4:>- PCC foun)ations as per s#ope ofwork, spe#i%#ations an) approve) )rawings'

    Distri&'tion Transormer S'&stations 166 3Aon < 7tr. 966 "g )S/ )ole

  • 7/23/2019 Erection BOQ - Saran

    61/338

    a !hree Phase 00

  • 7/23/2019 Erection BOQ - Saran

    62/338

    Set

    ; Sets

    ? Bo

    8 Per DSS

    I Per D!

    Ere#tion, !esting an) Coissioning of 6k S9 for #onne#tionsas per s#ope of work, approve) )rawings an)te#hni#al spe#i%#ations'* SetH ; Bos earthing perD!-

    Ere#tion, testing an) #oissioning of CSR Ra""itCon)u#tor for upering "y provi)ing an) using l!ape P Claps, "i+etalli#/l #onne#tors, har)wareet# as reuire) #oplete in all respe#t for#oissioning of DSS'

  • 7/23/2019 Erection BOQ - Saran

    63/338

    0 Set

    S'&-Total

    E

    a !hree Phase 00

  • 7/23/2019 Erection BOQ - Saran

    64/338

  • 7/23/2019 Erection BOQ - Saran

    65/338

  • 7/23/2019 Erection BOQ - Saran

    66/338

  • 7/23/2019 Erection BOQ - Saran

    67/338

    ? Bo

    8 Per DSS

    I Per D!

    0 Set

    S'&-Total

    AA

    Ere#tion, testing an) Coissioning of L!Distri"ution "o5 with L!C! eter *C! Ratio 600/7 -with "ar type C!s+ 600/7 etering, l+8us "ar of)euate Si1e an) L! #ontrol e#hanis an)#onne#tions fro L< 8ushings to L!D8 an) L!D8 to L!line with Ca"les "y provi)ing an) using Lugs,9asheret#' #oplete in all respe#t with one no' Af !P(CC8as per te#hni#al spe#i%#ations for !hree Phase 00 S9 for #onne#tionsas per s#ope of work, approve) )rawings an)te#hni#al spe#i%#ations'* SetH ; Bos earthing perD!-

    Ere#tion, testing an) #oissioning of CSR Ra""it

    Con)u#tor for upering "y provi)ing P Claps, "i+etalli# #onne#tors, har)ware et# as reuire)#oplete in all respe#t for #oissioning of DSS'

    E5#avation an) ere#tion of galvanise) Stay Set asper supply s#he)ule "y provi)ing 0'6 #u #eent#on#rete *:4:>- PCC foun)ations as per s#ope ofwork, spe#i%#ations an) approve) )rawings'

    A'gmentation o 166 3A Distri&'tionTransormer &4 266 3A new Distri&'tionTransormer

  • 7/23/2019 Erection BOQ - Saran

    68/338

    a !hree Phase 600

  • 7/23/2019 Erection BOQ - Saran

    69/338

    1

    a !hree Phase 00

  • 7/23/2019 Erection BOQ - Saran

    70/338

    & Bo'

    2 Set

    0 g

    9 Set

    Sets

    PSC Pole > (tr 600 g in#lu)ing %5ing of *RCC 8asePlate of si1e 7005700500 '/Stone 8ase Plate ofSi1e 4705470570- with "ri#k "last or "oul)erre%lling *70N )epth of pole pit- an) raingfoun)ation with e5#avate) soil with pouring water as

    reuire) as per s#ope of work , approve) )rawing &te#hni#al spe#i%#ation' Fi5ing of Danger 8oar) onDP/!P/FP & Pole nu"ering'

    Ere#tion, testing an) Coissioning of ;+pole,Distri"ution Class I

  • 7/23/2019 Erection BOQ - Saran

    71/338

    ; Per DSS

    Per D!

    8 Set

    < Per D!

    S'& Total

    A=

    1 Route Survey CKms

    E5#avation, ere#tion, testing an) #oissioning of aset of ; Bos pipe earthing using 40 )ia $ pipe;000 long, as per $S 2 an) as per REC#onstru#tion )rawings #oplete with =/w an) lugset# "y provi)ing #har#oal, salt,/8ituen Clay inalternate layers an) $ 9ires > S9 for #onne#tionsas per s#ope of work, approve) )rawings an)te#hni#al spe#i%#ations'* SetH ; Bos earthing perD!-

    Ere#tion, testing an) #oissioning of L! "us "ar)istri"ution syste with kit+kat #oplete an)upering Conne#tions of < si)e #oplete "y

    provi)ing & using P #lap/ #onne#tors in allrespe#t for #ossioning of DSS'

    E5#avation an) ere#tion of galvanise) Stay Set asper supply s#he)ule "y provi)ing 0'6 #u #eent#on#rete *:4:>- PCC foun)ations as per s#ope ofwork, spe#i%#ations an) approve) )rawings'

    Disentling of e5isting )isentle) aterials an))evolution of the )isantle) aterials i'e!ransforer angle, #hannel, #lap, 8 Swit#h, =fuse Set et#' in#lu)ing storage, han)ling, insuran#e,loa)ing, unloa)ing, transportation to store of Mtilityas per the )ire#tion of Engineer+in+#harge withpropoer a##ounting as per the inventory'

    /onstr'ction o 0 )$ase 9 !ire >T >ine on 87,

    266 g )S/ wit$ A/S+ !easel /ond'ctor in3ertical conCg'ration

  • 7/23/2019 Erection BOQ - Saran

    72/338

  • 7/23/2019 Erection BOQ - Saran

    73/338

    2 No

    3 CKM

    4 Kg

    5 Set

    6 Nos0

    S'&-Total

    PSC Pole > (tr 600 g in#lu)ing %5ing of *RCC 8asePlate of si1e 7005700500 '/Stone 8ase Plate ofSi1e 4705470570- with "ri#k "last or "oul)erre%lling *70N )epth of pole pit- an) raingfoun)ation with e5#avate) soil with pouring water as

    reuire) as per s#ope of work as per approve))rawing & te#hni#al spe#i%#ation'

    Ere#tion, testing an) #oissioning of CSR 9easelCon)u#tor in#lu)ing i) point ointing *"y provi)ingan) using P #laps, l !ape- an) upering ,"in)ing of #on)u#tor with insulator, "in)ing wire,%5ing an) %tting of L! P

  • 7/23/2019 Erection BOQ - Saran

    74/338

    AG

    1 Route Survey Kms

    2 No

    3 CKM

    4 Kg

    5 Set

    6 Nos0

    S'&-Total

    /onstr'ction o 0 )$ase 9 !ire >T >ine on 87,266 g )S/ wit$ A/S+ +a&&it /ond'ctor in?oriHontal conCg'ration

    PSC Pole > (tr 600 g in#lu)ing %5ing of *RCC 8asePlate of si1e 7005700500 '/Stone 8ase Plate ofSi1e 4705470570- with "ri#k "last or "oul)erre%lling *70N )epth of pole pit- an) raingfoun)ation with e5#avate) soil with pouring water asreuire) as per s#ope of work as per approve))rawing & te#hni#al spe#i%#ation'

    Erection, testing and commissioning of CSR Ra&&it Conductorinc"uding mid #oint $ointing %&y #roviding and using '( c"am#s, ")a#e* and $um#ering , &inding of conductor +it insu"ator, &inding+ire, fi-ing and fitting of .) '/C #ase s#acers etc0 com#"ete ina"" res#ect0 %1 CKm 1 m "ine "engt of 4 #ase conductor*

    Erection of ga"vanised fa&ricated stee" materia"s: ang"e, f"ats forover ead "ine structures &y using ;o"ts, Nuts, !aser etc as #era##roved dra+ing and )S

    E-cavation and erection of ga"vanised Stay Set +it 5-1 mmstay c"am#, .) stay guy insu"ator, nut &o"ts, turn &uc"es, 10 m"ong, 16 mm diameter so"id (S stay rod 712 S!( dia (8stranded +ire &y using Stone stay #"ate 45-45-5 mm Stay#"ate foundations as #er sco#e of +or, s#ecifications anda##roved dra+ings0

    S#ira" ty#e earting as #er REC construction dra+ing 9:1 inc"udingsu##"y of a"" materia"s "ie S!( (080 +ire c"ose"y +ound aving

    115 turns, 5mm dia 45mm "ong coi" %untreated +itoutcarcoa" sa"t* in a"" ty#e of soi" inc"uding e-cavation, refi""ing +iteart, fi-ing of &o"ts, nuts, +asers for connection +it #o"esu##ort7 meta"ic #art a"" com#"ete as #er )S direction ofEngineer:in carge %individua" #o"e earting*

  • 7/23/2019 Erection BOQ - Saran

    75/338

    A?

    1 Route Survey CKms

    2 No

    3 CKM

    4 Kg

    5 Set

    6 Nos0

    +7 o 0-)$, 9 !ire >T line wit$ A/S+ +a&&itcond'ctor

    PSC Pole > (tr 600 g in#lu)ing %5ing of *RCC 8asePlate of si1e 7005700500 '/Stone 8ase Plate ofSi1e 4705470570- with "ri#k "last or "oul)erre%lling *70N )epth of pole pit- an) raingfoun)ation with e5#avate) soil with pouring water asreuire) as per s#ope of work as per approve))rawing & te#hni#al spe#i%#ation'

    Erection, testing and commissioning of CSR Ra&&it Conductorinc"uding mid #oint $ointing %&y #roviding and using '( c"am#s, ")a#e* and $um#ering , &inding of conductor +it insu"ator, &inding+ire, fi-ing and fitting of .) '/C #ase s#acers etc0 com#"ete ina"" res#ect0 %1 CKm 1 m "ine "engt of 4 #ase conductor*

    Erection of ga"vanised fa&ricated stee" materia"s: ang"e, f"ats forover ead "ine structures &y using ;o"ts, Nuts, !aser etc as #era##roved dra+ing and )S

    E-cavation and erection of ga"vanised Stay Set +it 5-1 mmstay c"am#, .) stay guy insu"ator, nut &o"ts, turn &uc"es, 10 m"ong, 16 mm diameter so"id (S stay rod 712 S!( dia (8stranded +ire &y using Stone stay #"ate 45-45-5 mm Stay#"ate foundations as #er sco#e of +or, s#ecifications anda##roved dra+ings0

    S#ira" ty#e earting as #er REC construction dra+ing 9:1 inc"udingsu##"y of a"" materia"s "ie S!( (080 +ire c"ose"y +ound aving115 turns, 5mm dia 45mm "ong coi" %untreated +itoutcarcoa" sa"t* in a"" ty#e of soi" inc"uding e-cavation, refi""ing +it

    eart, fi-ing of &o"ts, nuts, +asers for connection +it #o"esu##ort7 meta"ic #art a"" com#"ete as #er )S direction ofEngineer:in carge %individua" #o"e earting*

  • 7/23/2019 Erection BOQ - Saran

    76/338

    Ck

    S'&-Total

    AI1 Route Survey CKms

    2 No

    3 CKM

    4 Kg

    Disentling of e5isting )efe#tive/)aage) pole+support *Rail/oist/tu"ular-,#on)u#tor an) other)isantle) line aterials fro e5isting line an))evolution of the )isentle) pole, stru#ture,#on)u#tor an) other line aterials in#lu)ing storage,han)ling, insuran#e, loa)ing, unloa)ing,transportation to )esignate) store of Mtility as perthe )ire#tion of Engineer+in+#harge an) han)ing overthe pole an) other )isentle) aterial to the storeof Mtility with propoer a##ounting as per theinventory'

    +7 o 0-)$, 9 !ire >T line wit$ A/S+ !easel

    cond'ctor

    PSC Pole > (tr 600 g in#lu)ing %5ing of *RCC 8asePlate of si1e 7005700500 '/Stone 8ase Plate ofSi1e 4705470570- with "ri#k "last or "oul)erre%lling *70N )epth of pole pit- an) raingfoun)ation with e5#avate) soil with pouring water asreuire) as per s#ope of work as per approve))rawing & te#hni#al spe#i%#ation'

    Erection, testing and commissioning of CSR !ease" Conductorinc"uding mid #oint $ointing %&y #roviding and using '( c"am#s, ")a#e* and $um#ering , &inding of conductor +it insu"ator, &inding+ire, fi-ing and fitting of .) '/C #ase s#acers etc0 com#"ete ina"" res#ect0 %1 CKm 1 m "ine "engt of 4 #ase conductor*

    Erection of ga"vanised fa&ricated stee" materia"s: ang"e, f"ats for

    over ead "ine structures &y using ;o"ts, Nuts, !aser etc as #era##roved dra+ing and )S

  • 7/23/2019 Erection BOQ - Saran

    77/338

    5 Set

    6 Nos0

    Ck

    S'&-Total

    A@

    1 Route Survey CKms

    2 No

    E-cavation and erection of ga"vanised Stay Set +it 5-1 mmstay c"am#, .) stay guy insu"ator, nut &o"ts, turn &uc"es, 10 m"ong, 16 mm diameter so"id (S stay rod 712 S!( dia (8stranded +ire &y using Stone stay #"ate 45-45-5 mm Stay#"ate foundations as #er sco#e of +or, s#ecifications anda##roved dra+ings0

    S#ira" ty#e earting as #er REC construction dra+ing 9:1 inc"udingsu##"y of a"" materia"s "ie S!( (080 +ire c"ose"y +ound aving115 turns, 5mm dia 45mm "ong coi" %untreated +itoutcarcoa" sa"t* in a"" ty#e of soi" inc"uding e-cavation, refi""ing +iteart, fi-ing of &o"ts, nuts, +asers for connection +it #o"esu##ort7 meta"ic #art a"" com#"ete as #er )S direction ofEngineer:in carge %individua" #o"e earting*

    Disentling of e5isting )efe#tive/)aage) pole+support *Rail/oist/tu"ular-,#on)u#tor an) other)isantle) line aterials fro e5isting line an))evolution of the )isentle) pole, stru#ture,#on)u#tor an) other line aterials in#lu)ing storage,han)ling, insuran#e, loa)ing, unloa)ing,transportation to )esignate) store of Mtility as perthe )ire#tion of Engineer+in+#harge an) han)ing over

    the pole an) other )isentle) aterial to the storeof Mtility with propoer a##ounting as per theinventory'

    +7 o e5isting Single p$ase 2 p$ase linewit$ /onBersion in to T$ree )$ase , 9 wire >ine&4 A/S+ !easel cond'ctor

    'SC 'o"e Mtr 2 Kg inc"uding fi-ing of %RCC ;ase '"ate of si

  • 7/23/2019 Erection BOQ - Saran

    78/338

    3 CKM

    4 Kg

    5 Set

    6 Nos0

    Ck

    S'&-Total

    Erection, testing and commissioning of CSR !ease" Conductor+it fi-ing fitting of sac"e7 #in insu"ator inc"uding mid #oint

    $ointing %&y #roviding and using '( c"am#s, " )a#e* and$um#ering , &inding of conductor +it insu"ator, &inding +ire, fi-ingand fitting of .) '/C #ase s#acers etc0 com#"ete in a"" res#ect0

    %1 CKm 1 m "ine "engt of 4 #ase conductor *

    Erection of ga"vanised fa&ricated stee" materia"s: ang"e, f"ats forover ead "ine structures &y using ;o"ts, Nuts, !aser etc as #era##roved dra+ing and )S

    E-cavation and erection of ga"vanised Stay Set +it 5-1 mmstay c"am#, .) stay guy insu"ator, nut &o"ts, turn &uc"es, 10 m"ong, 16 mm diameter so"id (S stay rod 712 S!( dia (8

    stranded +ire &y using Stone stay #"ate 45-45-5 mm Stay#"ate foundations as #er sco#e of +or, s#ecifications anda##roved dra+ings0

    S#ira" ty#e earting as #er REC construction dra+ing 9:1 inc"udingsu##"y of a"" materia"s "ie S!( (080 +ire c"ose"y +ound aving115 turns, 5mm dia 45mm "ong coi" %untreated +itoutcarcoa" sa"t* in a"" ty#e of soi" inc"uding e-cavation, refi""ing +iteart, fi-ing of &o"ts, nuts, +asers for connection +it #o"esu##ort7 meta"ic #art a"" com#"ete as #er )S direction of

    Engineer:in carge %individua" #o"e earting*

    Disentling of e5isting )efe#tive/)aage) pole+support *Rail/oist/tu"ular-,#on)u#tor an) other)isantle) line aterials fro e5isting line an))evolution of the )isentle) pole, stru#ture,#on)u#tor an) other line aterials in#lu)ing storage,han)ling, insuran#e, loa)ing, unloa)ing,

    transportation to )esignate) store of Mtility as perthe )ire#tion of Engineer+in+#harge an) han)ing overthe pole an) other )isentle) aterial to the storeof Mtility with propoer a##ounting as per theinventory'

  • 7/23/2019 Erection BOQ - Saran

    79/338

    A

    1 C

    2

    a Bo

    ; Set

    =rection, testing commissioning o New >T >ineon 0 p$ase A(/ 0

  • 7/23/2019 Erection BOQ - Saran

    80/338

    9 Set

    7

    a Ck

    S'& Total

    A>

    1 C

    2

    $nstallation, testing an) #oissioning ofCoil Earthing "y provi)ing $ wire no'+>S9for #onne#tions with nuts, "olts an) washersas per s#ope of work, te#hni#al spe#i%#ations

    an) approve) )rawings an) RECSpe#i%#ation*untreate)-'

    Ere#tion, testing an) Coissioning of L!Line on 8 Ca"les: *average span 40 to 47 appro5'- in#lu)ing all ere#tion a##essoriesreuire) for su##essful ere#tion of 8 Ca"le

    Coplete in all respe#t as per approve))rawing an) !e#hni#al Spe#i%#ation et# asreuire) as per s#ope for work for8ran#hing/terination et#'

    ; phase 8C O; I7S PhaseQK5?0S (essenger #u Beutral wireQ

    =rection, testing commissioning o New >T >ineon 0 p$ase A(/ 0 6SJ mm K)$aseLMK156SJ mm 7essenger c'm Ne'tral wireL

    Survey, route alignent & pole spotting,preparation of survey report , $nventory afterapproval of Engineer+in+#harge & re)ressal ofRA9 issues'

    E5#avation of pit, foun)ation, ere#tion offollowing Support for L! line an) polenu"ering as per s#ope of work, approve))rawings an) !e#hni#al spe#i%#ations:

  • 7/23/2019 Erection BOQ - Saran

    81/338

    a Bo

    ; Set

    9 Set

    7

    PSC Pole > (tr 600 g in#lu)ing %5ing of*RCC 8ase Plate of si1e 7005700500'/Stone 8ase Plate of Si1e4705470570- with "ri#k "last or "oul)erre%lling *70N )epth of pole pit- an) raingfoun)ation with e5#avate) soil with pouringwater as reuire) as per s#ope of work ,approve) )rawing & te#hni#al spe#i%#ation'

    E-cavation and erection of ga"vanised Stay Set +it 5-1 mmstay c"am#, .) stay guy insu"ator, nut &o"ts, turn &uc"es, 10 m

    "ong, 16 mm diameter so"id (S stay rod 712 S!( dia (8stranded +ire &y using Stone stay #"ate 45-45-5 mm Stay#"ate foundations as #er sco#e of +or, s#ecifications anda##roved dra+ings0

    $nstallation, testing an) #oissioning ofCoil Earthing "y provi)ing $ wire no'+>S9for #onne#tions with nuts, "olts an) washersas per s#ope of work, te#hni#al spe#i%#ations

    an) approve) )rawings an) RECSpe#i%#ation*untreate)-'

    Ere#tion, testing an) Coissioning of L!Line on 8 Ca"les: *average span 40 to 47 appro5'- in#lu)ing all ere#tion a##essoriesreuire) for su##essful ere#tion of 8 Ca"leCoplete in all respe#t as per approve))rawing an) !e#hni#al Spe#i%#ation et# asreuire) as per s#ope for work for8ran#hing/terination et#'

  • 7/23/2019 Erection BOQ - Saran

    82/338

    a Ck

    S'& Total

    A7

    1 C

    2

    a Bo

    ; Set

    ; phase 8C O; ?0S PhaseQK570S (essenger #u Beutral wireQ

    =rection, testing commissioning o New >T >ineon 0 p$ase A(/ 0 6 SJ mm K)$aseLMK150SJ mm 7essenger c'm Ne'tral wireL

    Survey, route alignent & pole spotting,preparation of survey report , $nventory afterapproval of Engineer+in+#harge & re)ressal ofRA9 issues'

    E5#avation of pit, foun)ation, ere#tion offollowing Support for L! line an) polenu"ering as per s#ope of work, approve))rawings an) !e#hni#al spe#i%#ations:

    PSC Pole > (tr 600 g in#lu)ing %5ing of*RCC 8ase Plate of si1e 7005700500

    '/Stone 8ase Plate of Si1e4705470570- with "ri#k "last or "oul)erre%lling *70N )epth of pole pit- an) raingfoun)ation with e5#avate) soil with pouringwater as reuire) as per s#ope of work ,approve) )rawing & te#hni#al spe#i%#ation'

    E-cavation and erection of ga"vanised Stay Set +it 5-1 mmstay c"am#, .) stay guy insu"ator, nut &o"ts, turn &uc"es, 10 m"ong, 16 mm diameter so"id (S stay rod 712 S!( dia (8stranded +ire &y using Stone stay #"ate 45-45-5 mm Stay#"ate foundations as #er sco#e of +or, s#ecifications anda##roved dra+ings0

  • 7/23/2019 Erection BOQ - Saran

    83/338

    9 Set

    7

    a Ck

    S'& Total

    AN

    1 C

    2

    $nstallation, testing an) #oissioning ofCoil Earthing "y provi)ing $ wire no'+>S9for #onne#tions with nuts, "olts an) washersas per s#ope of work, te#hni#al spe#i%#ations

    an) approve) )rawings an) RECSpe#i%#ation*untreate)-'

    Ere#tion, testing an) Coissioning of L!Line on 8 Ca"les: *average span 40 to 47 appro5'- in#lu)ing all ere#tion a##essoriesreuire) for su##essful ere#tion of 8 Ca"le

    Coplete in all respe#t as per approve))rawing an) !e#hni#al Spe#i%#ation et# asreuire) as per s#ope for work for8ran#hing/terination et#'

    ; phase 8C O; 70S PhaseQK5;7S (essenger #u Beutral wireQ

    New >T >ine on 1 p$ase A(/ 11; SJ mmK)$aseL M K152 SJ mm 7essenger c'mNe'tral wireL

    Survey, route alignent & pole spotting,preparation of survey report , $nventory afterapproval of Engineer+in+#harge & re)ressal ofRA9 issues'

    E5#avation of pit, foun)ation, ere#tion offollowing Support for L! line an) polenu"ering as per s#ope of work, approve))rawings an) !e#hni#al spe#i%#ations:

  • 7/23/2019 Erection BOQ - Saran

    84/338

    a Bo

    ; Set

    9 Set

    7

    PSC Pole > (tr 600 g in#lu)ing %5ing of*RCC 8ase Plate of si1e 7005700500'/Stone 8ase Plate of Si1e4705470570- with "ri#k "last or "oul)erre%lling *70N )epth of pole pit- an) raingfoun)ation with e5#avate) soil with pouringwater as reuire) as per s#ope of work ,approve) )rawing & te#hni#al spe#i%#ation'

    E-cavation and erection of ga"vanised Stay Set +it 5-1 mmstay c"am#, .) stay guy insu"ator, nut &o"ts, turn &uc"es, 10 m

    "ong, 16 mm diameter so"id (S stay rod 712 S!( dia (8stranded +ire &y using Stone stay #"ate 45-45-5 mm Stay#"ate foundations as #er sco#e of +or, s#ecifications anda##roved dra+ings0

    $nstallation, testing an) #oissioning ofCoil Earthing "y provi)ing $ wire no'+>S9for #onne#tions with nuts, "olts an) washersas per s#ope of work, te#hni#al spe#i%#ations

    an) approve) )rawings an) RECSpe#i%#ation*untreate)-'

    Ere#tion, testing an) Coissioning of L!Line on 8 Ca"les: *average span 40 to 47 appro5'- in#lu)ing all ere#tion a##essoriesreuire) for su##essful ere#tion of 8 Ca"leCoplete in all respe#t as per approve))rawing an) !e#hni#al Spe#i%#ation et# asreuire) as per s#ope for work for8ran#hing/terination et#'

  • 7/23/2019 Erection BOQ - Saran

    85/338

    a Ck

    S'& Total

    Total

    (A>A

    (A

    a !hree Phase 600

  • 7/23/2019 Erection BOQ - Saran

    86/338

    6 per D!

    S'&-Total

    (/

    a !hree Phase 2;

  • 7/23/2019 Erection BOQ - Saran

    87/338

    0 g

    4

    a < 47 B Dis# $nsulator with har)ware %ttings Set

    Set

    ; Sets

    ? Bo

    Ere#tion, %5ing an) %tting of galvanise) fa"ri#ate)steel aterials+ #hannel, angle, @ats of various si1efor D!stru#tures with "olts, nuts an) washers et#'#oplete in all respe#t as per !S an) approve))rawing'

    Ere#tion, %5ing an) %tting, !esting an)Coissioning of Por#elain $nsulators with ountinghar)ware %ttings et#' #oplete in all respe#t as per!S an) approve) )rawing'

    Ere#tion, !esting an) Coissioning of 6k

  • 7/23/2019 Erection BOQ - Saran

    88/338

    8 Per DSS

    I Per D!

    0 Set

    S'&-Total

    (D

    a !hree Phase 00 S9 for #onne#tionsas per s#ope of work, approve) )rawings an)te#hni#al spe#i%#ations'* SetH ; Bos earthing perD!-

    Ere#tion, testing an) #oissioning of CSR Ra""itCon)u#tor for upering "y provi)ing P Claps, "i+etalli# #onne#tors, har)ware et# as reuire)

    #oplete in all respe#t for #oissioning of DSS'

    E5#avation an) ere#tion of galvanise) Stay Set asper supply s#he)ule "y provi)ing 0'6 #u #eent#on#rete *:4:>- PCC foun)ations as per s#ope ofwork, spe#i%#ations an) approve) )rawings'

    Distri&'tion Transormer S'&stations 166 3Aon 8 7tr. 266 "g )S/ )ole &4 +eleased DT

    Ere#tion, !esting an) Coissioning of 70 =1,/0'4;;

  • 7/23/2019 Erection BOQ - Saran

    89/338

    ;

    a Bo

    0 g

    4

    a < 47 B Dis# $nsulator with har)ware %ttings Set

    Set

    ; Sets

    =5caBation o pit, o'ndation, erection oollowing S'pport or DSS and installation wit$DT n'm&ering as per scope o wor", approBeddrawings and speciCcations:

    PSC Pole > (tr 600 g in#lu)ing %5ing of *RCC 8asePlate of si1e 7005700500 '/Stone 8ase Plate ofSi1e 4705470570- with "ri#k "last or "oul)erre%lling *70N )epth of pole pit- an) raingfoun)ation with e5#avate) soil with pouring water asreuire) as per s#ope of work as per approve))rawing & te#hni#al spe#i%#ation'

    Ere#tion, %5ing an) %tting of galvanise) fa"ri#ate)steel aterials+ #hannel, angle, @ats of various si1e

    for D!stru#tures with "olts, nuts an) washers et#'#oplete in all respe#t as per !S an) approve))rawing'

    Ere#tion, %5ing an) %tting, !esting an)Coissioning of Por#elain $nsulators with ountinghar)ware %ttings et#' #oplete in all respe#t as per!S an) approve) )rawing'

    Ere#tion, !esting an) Coissioning of 6k

  • 7/23/2019 Erection BOQ - Saran

    90/338

    ? Bo

    8 Per DSS

    I Per D!

    0 Set

    S'&-Total

    (=

    Ere#tion, testing an) Coissioning of L!Distri"ution "o5 with L!C! eter *C! Ratio 600/7 -with "ar type C!s+ 600/7 etering, l+8us "ar of)euate Si1e an) L! #ontrol e#hanis an)#onne#tions fro L< 8ushings to L!D8 an) L!D8 to L!line with Ca"les "y provi)ing an) using Lugs,9asheret#' #oplete in all respe#t with one no' Af !P(CC8as per te#hni#al spe#i%#ations for !hree Phase 00 S9 for #onne#tionsas per s#ope of work, approve) )rawings an)te#hni#al spe#i%#ations'* SetH ; Bos earthing perD!-

    Ere#tion, testing an) #oissioning of CSR Ra""it

    Con)u#tor for upering "y provi)ing P Claps, "i+etalli# #onne#tors, har)ware et# as reuire)#oplete in all respe#t for #oissioning of DSS'

    E5#avation an) ere#tion of galvanise) Stay Set asper supply s#he)ule "y provi)ing 0'6 #u #eent#on#rete *:4:>- PCC foun)ations as per s#ope ofwork, spe#i%#ations an) approve) )rawings'

    Distri&'tion Transormer S'&stations ;0 3Aon 8 7tr. )S/ pole &4 +elease DT

  • 7/23/2019 Erection BOQ - Saran

    91/338

    a !hree Phase 2;

  • 7/23/2019 Erection BOQ - Saran

    92/338

    Set

    ; Sets

    ? Bo

    8 Per DSS

    I Per D!

    Ere#tion, !esting an) Coissioning of 6k S9 for #onne#tionsas per s#ope of work, approve) )rawings an)te#hni#al spe#i%#ations'* SetH ; Bos earthing perD!-

    Ere#tion, testing an) #oissioning of CSR Ra""itCon)u#tor for upering "y provi)ing P Claps, "i+etalli# #onne#tors, har)ware et# as reuire)#oplete in all respe#t for #oissioning of DSS'

  • 7/23/2019 Erection BOQ - Saran

    93/338

    0 Set

    S'&-Total

    ( + 7 o =5isting Distri&'tion S'&stations

    1

    a Bo'

    & Bo'

    2 Set

    E5#avation an) ere#tion of galvanise) Stay Set asper supply s#he)ule "y provi)ing 0'6 #u #eent#on#rete *:4:>- PCC foun)ations as per s#ope ofwork, spe#i%#ations an) approve) )rawings'

    E5#avation of pit, foun)ation, ere#tion of followingSupport for < overhea) line "y provi)ing an)installing )anger "oar) an) "ar"e) 9ires onDP/!P/FP Stru#tures an) D! nu"ering as per s#opeof work, approve) )rawings an) !e#hni#alspe#i%#ations: for

    PSC Pole I (tr 400 g in#lu)ing %5ing of *RCC 8asePlate of si1e 7005700500 '/Stone 8ase Plate ofSi1e 4705470570- with "ri#k "last or "oul)erre%lling *70N )epth of pole pit- an) raingfoun)ation with e5#avate) soil with pouring water asreuire) as per s#ope of work , approve) )rawing &te#hni#al spe#i%#ation' Fi5ing of Danger 8oar) onDP/!P/FP & Pole nu"ering'

    PSC Pole > (tr 600 g in#lu)ing %5ing of *RCC 8asePlate of si1e 7005700500 '/Stone 8ase Plate ofSi1e 4705470570- with "ri#k "last or "oul)erre%lling *70N )epth of pole pit- an) raingfoun)ation with e5#avate) soil with pouring water asreuire) as per s#ope of work , approve) )rawing &te#hni#al spe#i%#ation' Fi5ing of Danger 8oar) onDP/!P/FP & Pole nu"ering'

    Ere#tion, testing an) Coissioning of ;+pole,Distri"ution Class I

  • 7/23/2019 Erection BOQ - Saran

    94/338

    0 g

    9 Set

    Sets

    ; Per DSS

    Per D!

    8 Set

    Ere#tion, %5ing an) %tting of galvanise) pre+fa"ri#ate) steel aterials+ #hannel, angle, @ats ofvarious si1e for D! stru#tures with "olts, nuts an)washers et#' #oplete in all respe#t as per !S an)approve) )rawing'

    Ere#tion, !esting an) Coissioning of 6k

  • 7/23/2019 Erection BOQ - Saran

    95/338

    < Per D!

    S'& Total

    (G

    1 C

    2

    a Bo

    ; Set

    Disentling of e5isting )isentle) aterials an))evolution of the )isantle) aterials i'e!ransforer angle, #hannel, #lap, 8 Swit#h, =fuse Set et#' in#lu)ing storage, han)ling, insuran#e,loa)ing, unloa)ing, transportation to store of Mtility

    as per the )ire#tion of Engineer+in+#harge withpropoer a##ounting as per the inventory'

    =rection, testing commissioning o New >T >ineon 0 p$ase A(/ 0

  • 7/23/2019 Erection BOQ - Saran

    96/338

    9 Set

    7

    a Ck

    S'& Total

    (?

    1 C

    2

    a Bo

    $nstallation, testing an) #oissioning of CoilEarthing "y provi)ing $ wire no'+>S9 for#onne#tions with nuts, "olts an) washers as pers#ope of work, te#hni#al spe#i%#ations an) approve))rawings an) REC Spe#i%#ation*untreate)-'

    Ere#tion, testing an) Coissioning of L! Line on 8Ca"les: *average span 40 to 47 appro5'- in#lu)ingall ere#tion a##essories reuire) for su##essfulere#tion of 8 Ca"le Coplete in all respe#t as perapprove) )rawing an) !e#hni#al Spe#i%#ation et# asreuire) as per s#ope for work for8ran#hing/terination et#'

    ; phase 8C O; I7S PhaseQK5?0 S (essenger #u Beutral wireQ

    =rection, testing commissioning o New >T >ineon 0 p$ase A(/ 0 6SJ mm K)$aseLMK156SJ mm 7essenger c'm Ne'tral wireL

    Survey, route alignent & pole spotting, preparationof survey report , $nventory after approval ofEngineer+in+#harge & re)ressal of RA9 issues'

    E5#avation of pit, foun)ation, ere#tion of followingSupport for L! line an) pole nu"ering as per s#opeof work, approve) )rawings an) !e#hni#alspe#i%#ations:

    PSC Pole > (tr 600 g in#lu)ing %5ing of *RCC 8asePlate of si1e 7005700500 '/Stone 8ase Plate of

    Si1e 4705470570- with "ri#k "last or "oul)erre%lling *70N )epth of pole pit- an) raingfoun)ation with e5#avate) soil with pouring water asreuire) as per s#ope of work , approve) )rawing &te#hni#al spe#i%#ation'

  • 7/23/2019 Erection BOQ - Saran

    97/338

    ; Set

    9 Set

    7

    a Ck

    S'& Total

    (I

    C

    6

    E-cavation and erection of ga"vanised Stay Set +it 5-1 mmstay c"am#, .) stay guy insu"ator, nut &o"ts, turn &uc"es, 10 m"ong, 16 mm diameter so"id (S stay rod 712 S!( dia (8stranded +ire &y using Stone stay #"ate 45-45-5 mm Stay#"ate foundations as #er sco#e of +or, s#ecifications anda##roved dra+ings0

    $nstallation, testing an) #oissioning of CoilEarthing "y provi)ing $ wire no'+>S9 for#onne#tions with nuts, "olts an) washers as pers#ope of work, te#hni#al spe#i%#ations an) approve))rawings an) REC Spe#i%#ation*untreate)-'

    Ere#tion, testing an) Coissioning of L! Line on 8Ca"les: *average span 40 to 47 appro5'- in#lu)ingall ere#tion a##essories reuire) for su##essfulere#tion of 8 Ca"le Coplete in all respe#t as perapprove) )rawing an) !e#hni#al Spe#i%#ation et# asreuire) as per s#ope for work for8ran#hing/terination et#'

    ; phase 8C O; ?0S PhaseQK570 S (essenger #u Beutral wireQ

    =rection, testing commissioning o New >T >ineon 0 p$ase A(/ 0 6 SJ mm K)$aseLMK150SJ mm 7essenger c'm Ne'tral wireL

    Survey, route alignent & pole spotting, preparationof survey report , $nventory after approval ofEngineer+in+#harge & re)ressal of RA9 issues'

    E5#avation of pit, foun)ation, ere#tion of followingSupport for L! line an) pole nu"ering as per s#opeof work, approve) )rawings an) !e#hni#alspe#i%#ations:

  • 7/23/2019 Erection BOQ - Saran

    98/338

    a Bo

    ; Set

    4 Set

    7

    a Ck

    S'& Total

    (@

    1 Route Survey Kms

    PSC Pole > (tr 600 g in#lu)ing %5ing of *RCC 8asePlate of si1e 7005700500 '/Stone 8ase Plate ofSi1e 4705470570- with "ri#k "last or "oul)erre%lling *70N )epth of pole pit- an) raingfoun)ation with e5#avate) soil with pouring water as

    reuire) as per s#ope of work , approve) )rawing &te#hni#al spe#i%#ation'

    E-cavation and erection of ga"vanised Stay Set +it 5-1 mmstay c"am#, .) stay guy insu"ator, nut &o"ts, turn &uc"es, 10 m"ong, 16 mm diameter so"id (S stay rod 712 S!( dia (8stranded +ire &y using Stone stay #"ate 45-45-5 mm Stay#"ate foundations as #er sco#e of +or, s#ecifications anda##roved dra+ings0

    $nstallation, testing an) #oissioning of CoilEarthing "y provi)ing $ wire no'+>S9 for#onne#tions with nuts, "olts an) washers as pers#ope of work, te#hni#al spe#i%#ations an) approve))rawings an) REC Spe#i%#ation*untreate)-'

    Ere#tion, testing an) Coissioning of L! Line on 8Ca"les: *average span 40 to 47 appro5'- in#lu)ing

    all ere#tion a##essories reuire) for su##essfulere#tion of 8 Ca"le Coplete in all respe#t as perapprove) )rawing an) !e#hni#al Spe#i%#ation et# asreuire) as per s#ope for work for8ran#hing/terination et#'

    ; phase 8C O; 70S PhaseQK5;7 S (essenger #u Beutral wireQ

    /onstr'ction o 0 )$ase 9 !ire >T >ine on 87,266 g )S/ wit$ A/S+ !easel /ond'ctor in3ertical conCg'ration

  • 7/23/2019 Erection BOQ - Saran

    99/338

    2 No

    4 CKM

    5 Kg

    6 Set

    Set

    S'&-Total

    (

    1 Route Survey Kms

    'SC 'o"e Mtr 2 Kg inc"uding fi-ing of %RCC ;ase '"ate of si

  • 7/23/2019 Erection BOQ - Saran

    100/338

    2 No

    3 CKM

    4 Kg

    5 Set

    6 Nos0

    S'&-Total

    (>

    1 Route Survey Kms

    'SC 'o"e Mtr 2 Kg inc"uding fi-ing of %RCC ;ase '"ate of si

  • 7/23/2019 Erection BOQ - Saran

    101/338

    2 No

    3 CKM

    4 Kg

    5 Set

    6 Nos0

    S'&-Total(7 G'arding o 00 11 3 line

    1 #er s#an

    'SC 'o"e Mtr 2 Kg inc"uding fi-ing of %RCC ;ase '"ate of si

  • 7/23/2019 Erection BOQ - Saran

    102/338

  • 7/23/2019 Erection BOQ - Saran

    103/338

    Special )l/A

    1 C

    2

    a Bo

    ; Set

    9 Set

    7

    +7 o e5isting oBer$ead 11 3 >ine &4 0 p$ase A(/0126 M 1 166 SJ.mm

    Survey, route alignent & pole spotting, preparationof survey report , $nventory after approval of

    Engineer+in+#harge & re)ressal of RA9 issues'

    E5#avation of pit, foun)ation, ere#tion of followingSupport for < line an) pole nu"ering as pers#ope of work, approve) )rawings an) !e#hni#alspe#i%#ations:

    PSC Pole I (tr 400 g in#lu)ing %5ing of *RCC 8asePlate of si1e 7005700500 '/Stone 8ase Plate ofSi1e 4705470570- with "ri#k "last or "oul)er

    re%lling *70N )epth of pole pit- an) raingfoun)ation with e5#avate) soil with pouring water asreuire) as per s#ope of work , approve) )rawing &te#hni#al spe#i%#ation'

    E5#avation an) ere#tion of galvanise) Stay Set with7050 stay #lap, stay guy insulator, nut "olts,turn "u#kles, '> long, 2 )iaeter soli) Sstay ro) & ?/6 S9 )ia $ stran)e) wire "yprovi)ing 0'6 #u #eent #on#rete *:4:>- an)600560052 Stay plate foun)ations as per s#opeof work, spe#i%#ations an) approve) )rawings'

    $nstallation, testing an) #oissioning of CoilEarthing "y provi)ing $ wire no'+>S9 for#onne#tions with nuts, "olts an) washers as pers#ope of work, te#hni#al spe#i%#ations an) approve))rawings an) REC Spe#i%#ation'

    Ere#tion, testing an) Coissioning of < Line on8 Ca"les in#lu)ing all ere#tion a##essories reuire)for su##essful ere#tion of 8 Ca"le Coplete in allrespe#t as per approve) )rawing an) !e#hni#alSpe#i%#ation et# as reuire) as per s#ope for workfor 8ran#hing/terination et#'

  • 7/23/2019 Erection BOQ - Saran

    104/338

    a Ck

    2 Ck

    S'& Total

    /(

    1 C

    2

    a Bo

    ; phase 8C O; 60 S PhaseQK 00S

    Disentling of e5isting )efe#tive/)aage) pole+support *Rail/oist/tu"ular-,#on)u#tor an) other

    )isantle) line aterials fro e5isting line an))evolution of the )isentle) pole, stru#ture,#on)u#tor an) other line aterials in#lu)ing storage,han)ling, insuran#e, loa)ing, unloa)ing,transportation to )esignate) store of Mtility as perthe )ire#tion of Engineer+in+#harge an) han)ing overthe all )isentle) aterial to the store of Mtility withpropoer a##ounting as per the inventory'

    +7 o e5isting oBer$ead 11 3 >ine &4 0p$ase A(/ 06 M 1 6 SJ.mm

    Survey, route alignent & pole spotting, preparationof survey report , $nventory after approval ofEngineer+in+#harge & re)ressal of RA9 issues'

    E5#avation of pit, foun)ation, ere#tion of followingSupport for < line an) pole nu"ering as pers#ope of work, approve) )rawings an) !e#hni#al

    spe#i%#ations:

    PSC Pole I (tr 400 g in#lu)ing %5ing of *RCC 8asePlate of si1e 7005700500 '/Stone 8ase Plate ofSi1e 4705470570- with "ri#k "last or "oul)erre%lling *70N )epth of pole pit- an) raingfoun)ation with e5#avate) soil with pouring water asreuire) as per s#ope of work , approve) )rawing &te#hni#al spe#i%#ation'

  • 7/23/2019 Erection BOQ - Saran

    105/338

    ; Set

    9 Set

    7

    a Ck

    2 Ck

    S'& Total

    //

    E5#avation an) ere#tion of galvanise) Stay Set with7050 stay #lap, stay guy insulator, nut "olts,turn "u#kles, '> long, 2 )iaeter soli) Sstay ro) & ?/6 S9 )ia $ stran)e) wire "yprovi)ing 0'6 #u #eent #on#rete *:4:>- an)

    600560052 Stay plate foun)ations as per s#opeof work, spe#i%#ations an) approve) )rawings'

    $nstallation, testing an) #oissioning of CoilEarthing "y provi)ing $ wire no'+>S9 for#onne#tions with nuts, "olts an) washers as pers#ope of work, te#hni#al spe#i%#ations an) approve))rawings an) REC Spe#i%#ation'

    Ere#tion, testing an) Coissioning of < Line on8 Ca"les in#lu)ing all ere#tion a##essories reuire)for su##essful ere#tion of 8 Ca"le Coplete in allrespe#t as per approve) )rawing an) !e#hni#alSpe#i%#ation et# as reuire) as per s#ope for workfor 8ran#hing/terination et#'

    ; phase 8C O; ?0 S PhaseQK ?0S

    Disentling of e5isting )efe#tive/)aage) pole+support *Rail/oist/tu"ular-,#on)u#tor an) other)isantle) line aterials fro e5isting line an))evolution of the )isentle) pole, stru#ture,#on)u#tor an) other line aterials in#lu)ing storage,han)ling, insuran#e, loa)ing, unloa)ing,transportation to )esignate) store of Mtility as perthe )ire#tion of Engineer+in+#harge an) han)ing overthe all )isentle) aterial to the store of Mtility with

    propoer a##ounting as per the inventory'

    +7 o e5isting oBer$ead 11 3 >ine &4 0 p$ase A(/00 M 16 SJ.mm

  • 7/23/2019 Erection BOQ - Saran

    106/338

    1 C

    2

    a Bo

    ; Set

    9 Set

    7

    a Ck

    Survey, route alignent & pole spotting, preparationof survey report , $nventory after approval ofEngineer+in+#harge & re)ressal of RA9 issues'

    E5#avation of pit, foun)ation, ere#tion of followingSupport for < line an) pole nu"ering as pers#ope of work, approve) )rawings an) !e#hni#alspe#i%#ations:

    PSC Pole I (tr 400 g in#lu)ing %5ing of *RCC 8asePlate of si1e 7005700500 '/Stone 8ase Plate ofSi1e 4705470570-with "ri#k "last or "oul)erre%lling *70N )epth of pole pit- an) raingfoun)ation with e5#avate) soil with pouring water asreuire) as per s#ope of work , approve) )rawing &te#hni#al spe#i%#ation'

    E5#avation an) ere#tion of galvanise) Stay Set with7050 stay #lap, stay guy insulator, nut "olts,turn "u#kles, '> long, 2 )iaeter soli) Sstay ro) & ?/6 S9 )ia $ stran)e) wire "yprovi)ing 0'6 #u #eent #on#rete *:4:>- an)600560052 Stay plate foun)ations as per s#opeof work, spe#i%#ations an) approve) )rawings'

    $nstallation, testing an) #oissioning of CoilEarthing "y provi)ing $ wire no'+>S9 for#onne#tions with nuts, "olts an) washers as pers#ope of work, te#hni#al spe#i%#ations an) approve))rawings an) REC Spe#i%#ation'

    Ere#tion, testing an) Coissioning of < Line on8 Ca"les in#lu)ing all ere#tion a##essories reuire)for su##essful ere#tion of 8 Ca"le Coplete in allrespe#t as per approve) )rawing an) !e#hni#alSpe#i%#ation et# as reuire) as per s#ope for workfor 8ran#hing/terination et#'

    ; phase 8C O; ;7 S PhaseQK ?0S

  • 7/23/2019 Erection BOQ - Saran

    107/338

    2 Ck

    S'& Total

    /D

    1 C

    2

    a Bo

    Disentling of e5isting )efe#tive/)aage) pole+support *Rail/oist/tu"ular-,#on)u#tor an) other)isantle) line aterials fro e5isting line an))evolution of the )isentle) pole, stru#ture,

    #on)u#tor an) other line aterials in#lu)ing storage,han)ling, insuran#e, loa)ing, unloa)ing,transportation to )esignate) store of Mtility as perthe )ire#tion of Engineer+in+#harge an) han)ing overthe all )isentle) aterial to the store of Mtility withpropoer a##ounting as per the inventory'

    + 7 o >T >ine on 0 p$ase A(/ 0

  • 7/23/2019 Erection BOQ - Saran

    108/338

    ; Set

    9 Set

    7

    a Ck

    E-cavation and erection of ga"vanised Stay Set +it 5-1 mmstay c"am#, .) stay guy insu"ator, nut &o"ts, turn &uc"es, 10 m"ong, 16 mm diameter so"id (S stay rod 712 S!( dia (8stranded +ire &y using Stone stay #"ate 45-45-5 mm Stay#"ate foundations as #er sco#e of +or, s#ecifications anda##roved dra+ings0

    $nstallation, testing an) #oissioning ofCoil Earthing "y provi)ing $ wire no'+>S9for #onne#tions with nuts, "olts an) washersas per s#ope of work, te#hni#al spe#i%#ationsan) approve) )rawings an) RECSpe#i%#ation*untreate)-'

    Ere#tion, testing an) Coissioning of L!Line on 8 Ca"les: *average span 40 to 47 appro5'- in#lu)ing all ere#tion a##essoriesreuire) for su##essful ere#tion of 8 Ca"leCoplete in all respe#t as per approve))rawing an) !e#hni#al Spe#i%#ation et# as

    reuire) as per s#ope for work for8ran#hing/terination et#'

    ; phase 8C O; I7S PhaseQK5?0S (essenger #u Beutral wireQ

  • 7/23/2019 Erection BOQ - Saran

    109/338

    2 Ck

    S'& Total

    /=

    1 C

    2

    a Bo

    Disentling of e5isting )efe#tive/)aage) pole+support *Rail/oist/tu"ular-,#on)u#tor an) other)isantle) line aterials fro e5isting line an))evolution of the )isentle) pole, stru#ture,

    #on)u#tor an) other line aterials in#lu)ing storage,han)ling, insuran#e, loa)ing, unloa)ing,transportation to )esignate) store of Mtility as perthe )ire#tion of Engineer+in+#harge an) han)ing overthe all )isentle) aterial to the store of Mtility withpropoer a##ounting as per the inventory'

    + 7 o >T >ine on 0 p$ase A(/ 0 6SJ mm

    K)$aseLMK156 SJ mm 7essenger c'mNe'tral wireL

    Survey, route alignent & pole spotting,preparation of survey report , $nventory afterapproval of Engineer+in+#harge & re)ressal ofRA9 issues'

    E5#avation of pit, foun)ation, ere#tion offollowing Support for L! line an) polenu"ering as per s#ope of work, approve))rawings an) !e#hni#al spe#i%#ations:

    PSC Pole > (tr 600 g in#lu)ing %5ing of*RCC 8ase Plate of si1e 7005700500'/Stone 8ase Plate of Si1e4705470570- with "ri#k "last or "oul)erre%lling *70N )epth of pole pit- an) raingfoun)ation with e5#avate) soil with pouringwater as reuire) as per s#ope of work ,approve) )rawing & te#hni#al spe#i%#ation'

  • 7/23/2019 Erection BOQ - Saran

    110/338

    ; Set

    9 Set

    7

    a Ck

    E-cavation and erection of ga"vanised Stay Set +it 5-1 mmstay c"am#, .) stay guy insu"ator, nut &o"ts, turn &uc"es, 10 m"ong, 16 mm diameter so"id (S stay rod 712 S!( dia (8stranded +ire &y using Stone stay #"ate 45-45-5 mm Stay#"ate foundations as #er sco#e of +or, s#ecifications anda##roved dra+ings0

    $nstallation, testing an) #oissioning ofCoil Earthing "y provi)ing $ wire no'+>S9for #onne#tions with nuts, "olts an) washersas per s#ope of work, te#hni#al spe#i%#ationsan) approve) )rawings an) RECSpe#i%#ation*untreate)-'

    Ere#tion, testing an) Coissioning of L!Line on 8 Ca"les: *average span 40 to 47 appro5'- in#lu)ing all ere#tion a##essoriesreuire) for su##essful ere#tion of 8 Ca"leCoplete in all respe#t as per approve))rawing an) !e#hni#al Spe#i%#ation et# as

    reuire) as per s#ope for work for8ran#hing/terination et#'

    ; phase 8C O; ?0S PhaseQK570S (essenger #u Beutral wireQ

  • 7/23/2019 Erection BOQ - Saran

    111/338

    2 Ck

    S'& Total

    /

    1 C

    2

    a Bo

    Disentling of e5isting )efe#tive/)aage) pole+support *Rail/oist/tu"ular-,#on)u#tor an) other)isantle) line aterials fro e5isting line an))evolution of the )isentle) pole, stru#ture,

    #on)u#tor an) other line aterials in#lu)ing storage,han)ling, insuran#e, loa)ing, unloa)ing,transportation to )esignate) store of Mtility as perthe )ire#tion of Engineer+in+#harge an) han)ing overthe all )isentle) aterial to the store of Mtility withpropoer a##ounting as per the inventory'

    + 7 o >T >ine on 0 p$ase A(/ 0 6SJ mm

    K)$aseLMK150 SJ mm 7essenger c'mNe'tral wireL

    Survey, route alignent & pole spotting,preparation of survey report , $nventory afterapproval of Engineer+in+#harge & re)ressal ofRA9 issues'

    E5#avation of pit, foun)ation, ere#tion offollowing Support for L! line an) polenu"ering as per s#ope of work, approve))rawings an) !e#hni#al spe#i%#ations:

    PSC Pole > (tr 600 g in#lu)ing %5ing of*RCC 8ase Plate of si1e 7005700500'/Stone 8ase Plate of Si1e4705470570- with "ri#k "last or "oul)erre%lling *70N )epth of pole pit- an) raingfoun)ation with e5#avate) soil with pouringwater as reuire) as per s#ope of work ,approve) )rawing & te#hni#al spe#i%#ation'

  • 7/23/2019 Erection BOQ - Saran

    112/338

    ; Set

    9 Set

    7

    a Ck

    E-cavation and erection of ga"vanised Stay Set +it 5-1 mmstay c"am#, .) stay guy insu"ator, nut &o"ts, turn &uc"es, 10 m"ong, 16 mm diameter so"id (S stay rod 712 S!( dia (8stranded +ire &y using Stone stay #"ate 45-45-5 mm Stay#"ate foundations as #er sco#e of +or, s#ecifications anda##roved dra+ings0

    $nstallation, testing an) #oissioning ofCoil Earthing "y provi)ing $ wire no'+>S9for #onne#tions with nuts, "olts an) washersas per s#ope of work, te#hni#al spe#i%#ationsan) approve) )rawings an) RECSpe#i%#ation*untreate)-'

    Ere#tion, testing an) Coissioning of L!Line on 8 Ca"les: *average span 40 to 47 appro5'- in#lu)ing all ere#tion a##essoriesreuire) for su##essful ere#tion of 8 Ca"leCoplete in all respe#t as per approve))rawing an) !e#hni#al Spe#i%#ation et# as

    reuire) as per s#ope for work for8ran#hing/terination et#'

    ; phase 8C O; 70S PhaseQK5;7S (essenger #u Beutral wireQ

  • 7/23/2019 Erection BOQ - Saran

    113/338

    2 Ck

    S'& Total

    !otal Part C

    ran) !A!L

    Disentling of e5isting )efe#tive/)aage) pole+support *Rail/oist/tu"ular-,#on)u#tor an) other)isantle) line aterials fro e5isting line an))evolution of the )isentle) pole, stru#ture,

    #on)u#tor an) other line aterials in#lu)ing storage,han)ling, insuran#e, loa)ing, unloa)ing,transportation to )esignate) store of Mtility as perthe )ire#tion of Engineer+in+#harge an) han)ing overthe all )isentle) aterial to the store of Mtility withpropoer a##ounting as per the inventory'

  • 7/23/2019 Erection BOQ - Saran

    114/338

    edule 3: Erection Price Component

    : Saran, Siwan and Gopalganj

    6

    NIT No:- 200 )+N()D/>2619

    4 5 6 7 8 8=5+6+7 9

    6 6 1 6 1

    1 0 0 0

    e wor n ar n er pec a an ase

    Unit'antit4

    t4. orDistrictSaran

    t4. orDistrictSiwan

    t4. orDistrict

    Gopalganj

    t4. orDistrict

    Total'antit4

    Unit )riceor

    =rection

  • 7/23/2019 Erection BOQ - Saran

    115/338

    2966 0 0 6400 0 6400

    ;66 0 0 200 0 200

    266 0 0 600 0 600

  • 7/23/2019 Erection BOQ - Saran

    116/338

    96 0 0 40 0 40

    1;6 0 0 20 0 20

    126 0 0 60 0 60

  • 7/23/2019 Erection BOQ - Saran

    117/338

    6 0 0 70 0 70

    ;6 0 0 20 0 20

    16 0 0 0 0 0

    6 0 0 70 0 70

  • 7/23/2019 Erection BOQ - Saran

    118/338

    1 0 0 0

    2 0 0 6 0 6

  • 7/23/2019 Erection BOQ - Saran

    119/338

    1 0 0 0

    1; 0 0 2 0 2

    9 0 0 4 0 4

  • 7/23/2019 Erection BOQ - Saran

    120/338

    2 0 0 6 0 6

    2 0 0 6 0 6

    < 0 0 I 0 I

    9 0 0 4 0 4

  • 7/23/2019 Erection BOQ - Saran

    121/338

    < 0 0 I 0 I

    2 0 0 6 0 6

    2 0 0 6 0 6

    < 0 0 I 0 I

    1 0 0 0

  • 7/23/2019 Erection BOQ - Saran

    122/338

    1 0 0 0

    1 0 0 0

    1 0 0 0

    1 0 0 0

    2 0 0 6 0 6

    2 0 0 6 0 6

  • 7/23/2019 Erection BOQ - Saran

    123/338

    6. 0 0 0'7 0 0'7

    96 0 0 40 0 40

    1 0 0 0

    1 0 0 0

    1 0 0 0

  • 7/23/2019 Erection BOQ - Saran

    124/338

    6 0 0 0 0 0

    2 0 0 6 0 6

    1 0 0 0

    6. 0 0 0'7 0 0'7

    6.< 0 0 0'I 0 0'I

    6.1 0 0 0' 0 0'

    < 0 0 I 0 I

    6 0 0 70 0 70

    6 6 1 6 1

  • 7/23/2019 Erection BOQ - Saran

    125/338

    1 0 0 0 0

    2966 0 0 6400 0 6400 0

    ;66 0 0 200 0 200 0

    266 0 0 600 0 600 0

  • 7/23/2019 Erection BOQ - Saran

    126/338

    96 0 0 40 0 40 0

    1;6 0 0 20 0 20 0

    126 0 0 60 0 60 0

  • 7/23/2019 Erection BOQ - Saran

    127/338

    6 0 0 70 0 70 0

    0

    ;6 0 0 20 0 20 0

    16 0 0 0 0 0 0

    6 0 0 70 0 70 0

  • 7/23/2019 Erection BOQ - Saran

    128/338

    1 0 0 0 0

    2 0 0 6 0 6

  • 7/23/2019 Erection BOQ - Saran

    129/338

    1 0 0 0 0

    19 0 0 4 0 4 0

    9 0 0 4 0 4 0

  • 7/23/2019 Erection BOQ - Saran

    130/338

    0

    2 0 0 6 0 6 0

    2 0 0 6 0 6 0

    < 0 0 I 0 I 0

    9 0 0 4 0 4 0

  • 7/23/2019 Erection BOQ - Saran

    131/338

    0 0 7 0 7 0

    2 0 0 6 0 6 0

    0

    2 0 0 6 0 6 0

    0 0 7 0 7 0

    1 0 0 0 0

  • 7/23/2019 Erection BOQ - Saran

    132/338

    1 0 0 0 0

    1 0 0 0 0

    1 0 0 0 0

    1 0 0 0 0

    0

    2 0 0 6 0 6 0

    2 0 0 6 0 6 0

  • 7/23/2019 Erection BOQ - Saran

    133/338

    6. 0 0 0'7 0 0'7 0

    96 0 0 40 0 40 0

    1 0 0 0 0

    1 0 0 0 0

    1 0 0 0 0

    0

  • 7/23/2019 Erection BOQ - Saran

    134/338

    2 0 0 6 0 6 0

    6 0 0 0 0 0 0

    1 0 0 0 0

    0

    6. 0 0 0'7 0 0'7 0

    6.; 0 0 0'2 0 0'2 0

    6.1 0 0 0' 0 0' 0

    0 0 7 0 7 0

    6 0 0 70 0 70 0

    6 6 6 6 0

    1 6 1 6 6

    -16 73A 1 6 6 6

    6 6 6 6 0

    Addl. 73A

    Addl.1673A

    0.1-1673A

  • 7/23/2019 Erection BOQ - Saran

    135/338

    6 6 6 6 0

    1 6 6 6

    6 6 6 6 0

    Total 0 6 1 6 4

    67 67 0 0 0 2 0

    67 67 0 0 0 2 0

    7 7 0 0 0 0

    0.11.;- 73A

    0.1-

    73A*+eleased

    1.;-73A

    *+eleased

  • 7/23/2019 Erection BOQ - Saran

    136/338

  • 7/23/2019 Erection BOQ - Saran

    137/338

    0 0 0 1

    6 0 0 0 2

    0 0 0 1

    2. 6'7 0 0 0 2. 0

  • 7/23/2019 Erection BOQ - Saran

    138/338

    0 0 2 0

    0 0 2 0

    6 6 0 6 0 9 0

  • 7/23/2019 Erection BOQ - Saran

    139/338

    0 0 2

    0 0 2

    0 0 2

  • 7/23/2019 Erection BOQ - Saran

    140/338

    0 0 2

    2 6 0 6 0 9

    1 ; 0 0 9

    02 6 8 6 116

    ;6 0 ?> 0 0

  • 7/23/2019 Erection BOQ - Saran

    141/338

    > 7?2 0 404 0 I>0

    ?00 66400 0 74200 0 ??000

    ;6 0 ?> 0 0

    2 I6 0 42> 0 220

    7 2;6 0 ;I?> 0 720

    ;6 0 ?> 0 0

  • 7/23/2019 Erection BOQ - Saran

    142/338

    2 76 0 64> 0 ?20

    2 I6 0 42> 0 220

    0' ; 0 > 0 0

    2; 6 6 00

    62 0 ? 0 ;; 0

  • 7/23/2019 Erection BOQ - Saran

    143/338

    7 ;0 0 ;7 0 27

    6 76 0 4 0 22 0

    62 0 ? 0 ;;

    ;00 ?>00 0 600 0 II00 0

  • 7/23/2019 Erection BOQ - Saran

    144/338

    62 0 ? 0 ;; 0

    2 72 0 46 0 I> 0

    ;0 ?>0 0 60 0 II0 0

    62 0 ? 0 ;; 0

    > 60> 0 72 0 624 0

    2 72 0 46 0 I> 0

  • 7/23/2019 Erection BOQ - Saran

    145/338

  • 7/23/2019 Erection BOQ - Saran

    146/338

    0 6 0 ; 0

    6 6 0 4 0 2 0

    0 6 0 ; 0

    0 6 0 ; 0

  • 7/23/2019 Erection BOQ - Saran

    147/338

    0 6 0 ;

    2 2 0 6 0 > 0

    7 7 0 0 0 7 0

    0 0 0

  • 7/23/2019 Erection BOQ - Saran

    148/338

    7 0 0 7 0 7

    0 > 0 I

    0 > 0 I

    ';; 0 ?'> 0 6I';

    1 ';; 0 ?'> 0 6I';

  • 7/23/2019 Erection BOQ - Saran

    149/338

    1; > 0 6>7 0 422 0

    92 4>7'67 0 ?727 0 6;>0'67 0

    1 ';; 0 ?'> 0 6I';

    ; 2?'I> 0 02'> 0 ?4'?>

    9 70I'>7 0 >0 0 ;0'>7

    1 0 > 0 6I 0

    19 7I 0 64I 0 40> 0

  • 7/23/2019 Erection BOQ - Saran

    150/338

    ; 2> 0 0? 0 ?7 0

    6.1 0 6 0 ;

    ';; 0 ?'> 0 6I';

    1 ';; 0 ?'> 0 6I'; 0

    26 66? 0 ;72 0 7>; 0

    1166 642; 0 I7>0 0 ;604; 0

  • 7/23/2019 Erection BOQ - Saran

    151/338

    2 66'22 0 ;7'2 0 7>'62 0

    12 ;2 0 64 0 ;70 0

    119 6I6 0 606I 0 ;;6 0

    1 0 > 0 6I 0

    18 604 0 ;60 0 764 0

    8 I 0 46 0 6;; 0

    ?I'; 0 64'2 0 60;'I

  • 7/23/2019 Erection BOQ - Saran

    152/338

    1 ?I'; 0 64'2 0 60;'I 0

    26 7>2 0 64I6 0 40?> 0

    0; 6>I44'7 0 474?I 0 ?446;'7 0

    1 ?I'; 0 64'2 0 60;'I 0

    ; 4?2 0 ?4> 0 66; 0

    4760 0 ?06 0 266 0

  • 7/23/2019 Erection BOQ - Saran

    153/338

    0 0 0 0 0 0

    1 ?I 0 67 0 604 0

    18 46? 0 664; 0 ;2?0 0

    ; 4?2 0 ?4> 0 66; 0

    6.1 > 0 6 0 60 0

    ?0'72 0 ;>'07 0 ;0>'2

    1 ?0'72 0 ;>'07 0 ;0>'2 0

  • 7/23/2019 Erection BOQ - Saran

    154/338

    18 ;0?0 0 64>7 0 7777 0

    0; 26674'4 0 70;>>'67 0 6246'27 0

    1 ?0'72 0 ;>'07 0 ;0>'2

    ; 06;';2 0 >6>'; 0 >7'22 0

    1 >2I>'72 0 ?040'77 0 7?;I' 0

    0

    1 ? 0 ;> 0 ;0I 0

  • 7/23/2019 Erection BOQ - Saran

    155/338

    1; 6?6I 0 660I 0 4I;> 0

    ; 06; 0 >6> 0 >76 0

    6.1 ? 0 4 0 ; 0

    677'>4 0 60?'0> 0 426'I6

    1 677'>4 0 60?'0> 0 426'I6 0

    18 4207 0 ;?6? 0 >;;;

  • 7/23/2019 Erection BOQ - Saran

    156/338

    0; I;;>'2 0 ?77>4'6 0 2>I27'> 0

    1 677'>4 0 60?'0> 0 426'I6 0

    ; 7;7'04 0 646'4> 0 6???'76 0

    1 ;04?'>4 0 072'0> 0 6;20>'I6 0

    1 672 0 60? 0 42; 0

    1; 40I; 0 ;;; 0 ?40? 0

    ; 7;7 0 646 0 6??> 0

  • 7/23/2019 Erection BOQ - Saran

    157/338

    6.1 62 0 6 0 42 0

    0 0 0 0 0

    1 0 0 0 0 0 0

    18 0 0 0 0 0 0

    0; 0 0 0 0 0 0

  • 7/23/2019 Erection BOQ - Saran

    158/338

    1 0 0 0 0 0

    ; 0 0 0 0 0 0

    1 0 0 0 0 0 0

    1 0 0 0 0 0 0

    1; 0 0 0 0 0 0

    ; 0 0 0 0 0 0

    6.1 0 0 0 0 0 0

  • 7/23/2019 Erection BOQ - Saran

    159/338

    0 0 0 0 0

    1 0 0 0 0 0

    1 0 0 0 0 0 0

    2 0 0 0 0 0 0

    6 0 0 0 0 0 0

  • 7/23/2019 Erection BOQ - Saran

    160/338

    1 0 0 0 0 0 0

    0 0 0 0 0 0 0

    1 0 0 0 0 0 0

    1 0 0 0 0 0 0

    0 0 0 0 0 0 0

    2 0 0 0 0 0 0

  • 7/23/2019 Erection BOQ - Saran

    161/338

  • 7/23/2019 Erection BOQ - Saran

    162/338

    6 0 0 0 0 0 0

    1 0 0 0 0 0 0

    0 0 0 0 0 0 0

    18 0 0 0 0 0 0

    1 0 0 0 0 0 0

    0 0 0 0 0 0 0

    2 0 0 0 0 0 0

  • 7/23/2019 Erection BOQ - Saran

    163/338

    1 0 0 0 0 0 0

    74 0 4; 0 I?

    1 74 0 4; 0 I? 0

    0 26 0 6I 0 6I 0

  • 7/23/2019 Erection BOQ - Saran

    164/338

    2 0> 0 >2 0 I4 0

    16 >00 0 2470 0 4770 0

    1 74 0 4; 0 I? 0

    0 26 0 6I 0 6I 0

    1 >0 0 247 0 477 0

    6 0 0 0 0 0 0

    6?0 0 67 0 4>7 0

  • 7/23/2019 Erection BOQ - Saran

    165/338

    2 0> 0 >2 0 I4 0

    1 74 0 4; 0 I? 0

    4 0 66 0 ;2

    4 0 66 0 ;2

    1 6 6 6 1

  • 7/23/2019 Erection BOQ - Saran

    166/338

    0'7 0'7 0 0 0 0'7

    6 9 6 '4 0 22?' 0

    2 ?;?4 0 7I2> 0 ;;46 0

    10 ;2>'? 0 6I>'4 0 22?' 0

    2 ?;?40 0 7I2>0 0 ;;460 0

    5 >4;'7 0 4I6 0 ;;;7'7 0

    1 ;2>? 0 6I>4 0 22? 0

  • 7/23/2019 Erection BOQ - Saran

    188/338

  • 7/23/2019 Erection BOQ - Saran

    189/338

    1 66'2> 0 >'64 0 40'I6

    2. 0

    6 ;?7'6 0 677;'2 0 7?6>'> 0

  • 7/23/2019 Erection BOQ - Saran

    190/338

    2 02 0 >7 0 I 0

    5 627 0 6; 0 4?? 0

    1 76'I6 0 46'72 0 I7'4> 0

    16

  • 7/23/2019 Erection BOQ - Saran

    191/338

  • 7/23/2019 Erection BOQ - Saran

    192/338

    .98 6 ;.6; 6 10.9

    ?'4> 0 2'02 0 ;'74 0

    67 >? 0 76 0 ;;I 0

    2 44'>> 0 ;2 0 > 0

  • 7/23/2019 Erection BOQ - Saran

    193/338

  • 7/23/2019 Erection BOQ - Saran

    194/338

    67 ;4I'67 0 6?> 0 26? 0

    2 >;'>6 0 2? 0 70 0

    2 >;'>6 0 2? 0 70 0

  • 7/23/2019 Erection BOQ - Saran

    195/338

    ;'I? 0 ' 0 67'0>

    2.08 6 92.9 6

  • 7/23/2019 Erection BOQ - Saran

    196/338

  • 7/23/2019 Erection BOQ - Saran

    197/338

    67 67 0 67 0 70 0

    2 2 0 2 0 6 0

    2 2 0 2 0 6 0

  • 7/23/2019 Erection BOQ - Saran

    198/338

    0 0 6

    /= )A+T % )?AS=-I

    91 6 00 6 9

    4 0 ;; 0 ?4 0

    4 0 ;; 0 ?4 0

    21 6 11 6 02

    6 0 0 ;6 0

  • 7/23/2019 Erection BOQ - Saran

    199/338

    0 0 0 ;6 0

    6 6 6 6 6

    0 0 0 0 0 0

    0 0 0 0 0 0

    0

    6 0 0 0 0 0 0

  • 7/23/2019 Erection BOQ - Saran

    200/338

  • 7/23/2019 Erection BOQ - Saran

    201/338

  • 7/23/2019 Erection BOQ - Saran

    202/338

    6 6> 0 6 0 ;0 0

    670 ;700 0 670 0 ;?70 0

    ; 46 0 ; 0 47 0

    4 0 0 7 0

    4 0 0 7 0

  • 7/23/2019 Erection BOQ - Saran

    203/338

    4 0 0 7 0

    4 0 0 7 0

    4 0 0 7 0

    6 6> 0 6 0 ;0 0

    6 6 6 6 6

  • 7/23/2019 Erection BOQ - Saran

    204/338

    0 0 0 0 0

    0 0 0 0 0 0

    0

    6 0 0 0 0 0 0

    670 0 0 0 0 0 0

    0

    ; 0 0 0 0 0 0

  • 7/23/2019 Erection BOQ - Saran

    205/338

    0 0 0 0 0 0

    0 0 0 0 0 0

    0 0 0 0 0 0

    0 0 0 0 0 0

    0 0 0 0 0 0

  • 7/23/2019 Erection BOQ - Saran

    206/338

    6 0 0 0 0 0 0

    86 6 6 6 1;66

    6.6 4; 0 ;> 0 >0 0

    6.6 4; 0 ;> 0 >0 0

    0'7 467 0 ;?7 0 >00 0

  • 7/23/2019 Erection BOQ - Saran

    207/338

    ;0 67700 0 66700 0 4>000 0

    0'?7 2;> 0 72; 0 600 0

    0'7 467 0 ;?7 0 >00 0

    >70 0 ?70 0 200 0

    >70 0 ?70 0 200 0

    >70 0 ?70 0 200 0

  • 7/23/2019 Erection BOQ - Saran

    208/338

    >70 0 ?70 0 200 0

    9.1 6 2.90 6 ;.0

    4'0 6'4; 0 2'7; 0

    67 06'7 0 2 0 2; 0

    2 64'2 0 7 0 ;I 0

  • 7/23/2019 Erection BOQ - Saran

    209/338

    2 64'2 0 7 0 ;I 0

    4' 0 6'4; 0 2'7; 0

    .21 6 0.8; 6 11.6

    ?'6 0 ;'>2 0 '0? 0

    67 >0'67 0 I? 0 6?? 0

  • 7/23/2019 Erection BOQ - Saran

    210/338

    2 4;'62 0 6; 0 22 0

    2 4;'62 0 6; 0 22 0

    ?'6 0 ;'>2 0 '0? 0

    28.0 6 1.61 6 9.9

    6>'?; 0 ?'0 0 47'?4 0

  • 7/23/2019 Erection BOQ - Saran

    211/338

    67 ?>'67 0 467 0 44 0

    2 ?6';> 0 06 0 6?4 0

    2 ?6';> 0 06 0 6?4 0

    6>'?; 0 ?'0 0 47'?4 0

    12.

  • 7/23/2019 Erection BOQ - Saran

    212/338

    2 67I 0 7; 0 46 0

    10 6'I; 0 ?'27 0 60'7> 0

    5 242'7 0 ;>6'7 0 06I 0

    5 27 0 ;> 0 0; 0

    1 6I 0 ?? 0 602 0

    06.1; 6 1.8; 6 98.62

    1 ;0'2 0 ?'>2 0 4>'06 0

  • 7/23/2019 Erection BOQ - Saran

    213/338

    2 20; 0 ;7? 0 I20 0

    10 ;0'2 0 ?'>2 0 4>'06 0

    2 20;6 0 ;7?6 0 I204 0

    6 > 0 0? 0 6>> 0

    1 ;06 0 ?I 0 4>0 0

    18.9 6 16.

  • 7/23/2019 Erection BOQ - Saran

    214/338

    2 ;2I 0 6I 0 7>> 0

    10 >'4? 0 0'I4 0 6I'4 0

    2 ;2I4 0 6>> 0 7>>6 0

    5 I6 0 77 0 4? 0

    1 >7 0 0I 0 6I4 0

    166 6 166 6 266

    1 00 0 00 0 600

  • 7/23/2019 Erection BOQ - Saran

    215/338

  • 7/23/2019 Erection BOQ - Saran

    216/338

    n *(+G )$ase-II )A+T-/< 1.2 6 1.2

    1 I ? '6 0 ?'6 0

    16 I0 ?0 6 0 ?6 0

    4 ;2 6> 7 0 2I 0

    0 I0 ?0 6 0 ?6 0

  • 7/23/2019 Erection BOQ - Saran

    217/338

    I ? '6 0 ?'6

    1 I ? '6 0 ?'6 0

    < 1.2 6 1.2

    1 I ? '6 0 ?'6 0

    16 I0 ?0 6 0 ?6 0

  • 7/23/2019 Erection BOQ - Saran

    218/338

    4 ;2 6> 7 0 2I 0

    0 I0 ?0 6 0 ?6 0

    I ? '6 0 ?'6

    1 I ? '6 0 ?'6 0

    2 21 0.; 6 1.;

  • 7/23/2019 Erection BOQ - Saran

    219/338

    1 6? 6 ;'2 0 7'2 0

    16 6?0 60 ;2 0 72 0

    4 0> >4 4 0 602 0

    0 6?0 60 ;2 0 72 0

    6? 6 ;'2 0 7'2

  • 7/23/2019 Erection BOQ - Saran

    220/338

    1 6? 6 ;'2 0 7'2 0

    2 8 ; 6 18;

    1 ?6 7> 72 0 >2 0

    16 ?60 7>0 720 0 >20 0

  • 7/23/2019 Erection BOQ - Saran

    221/338

    ; 4;6 ;4> ;;2 0 2 0

    ; 4;6 ;4> ;;2 0 2 0

    1 ?6 7> 72 0 >2 0

  • 7/23/2019 Erection BOQ - Saran

    222/338

    1 ?6 7> 72 0 >2 0

    186 19 196 6 9;

    >0 47 40 0 427 0

    0 >00 470 400 0 4270 0

  • 7/23/2019 Erection BOQ - Saran

    223/338

    2 0>0 >?0 >40 0 6?I0 0

    2 0>0 >?0 >40 0 6?I0 0

    >0 47 40 0 427 0

  • 7/23/2019 Erection BOQ - Saran

    224/338

    >0 47 40 0 427 0

    168 8 89 6 2 >? >4 0 6?I 0

    0 0>0 >?0 >40 0 6?I0 0

  • 7/23/2019 Erection BOQ - Saran

    225/338

  • 7/23/2019 Erection BOQ - Saran

    226/338

    0> >? >4 0 6?I 0

  • 7/23/2019 Erection BOQ - Saran

    227/338

  • 7/23/2019 Erection BOQ - Saran

    228/338

    6 6

    6 6

    6 6

  • 7/23/2019 Erection BOQ - Saran

    229/338

    6 6

    6 6

    6 6

  • 7/23/2019 Erection BOQ - Saran

    230/338

    6 6

    6 6

    6 6

    6 6

  • 7/23/2019 Erection BOQ - Saran

    231/338

    6 6

    6 6

  • 7/23/2019 Erection BOQ - Saran

    232/338

  • 7/23/2019 Erection BOQ - Saran

    233/338

    6 6

    6 6

    6 6

    6 6

  • 7/23/2019 Erection BOQ - Saran

    234/338

    6 6

    6 6

    6 6

    6 6

    6 6

  • 7/23/2019 Erection BOQ - Saran

    235/338

  • 7/23/2019 Erection BOQ - Saran

    236/338

    6 6

    6 6

    6 6

    6 6

    6 6

    6

  • 7/23/2019 Erection BOQ - Saran

    237/338

    6 6

    6 6

    6 6

    6 6

    6 6

    6 6

    6 6

    6 6

    6

  • 7/23/2019 Erection BOQ - Saran

    238/338

    0 6 6

    0 6 6

    0 6 6

    0 6 6

  • 7/23/2019 Erection BOQ - Saran

    239/338

    0 6 6

    0 6 6

    0 6 6

  • 7/23/2019 Erection BOQ - Saran

    240/338

    0 6 6

    0

    0 6 6

    0 6 6

    0 6 6

  • 7/23/2019 Erection BOQ - Saran

    241/338

    0 6 6

    6 6

  • 7/23/2019 Erection BOQ - Saran

    242/338

    0 6 6

    0 6 6

    0 6 6

  • 7/23/2019 Erection BOQ - Saran

    243/338

    0

    0 6 6

    0 6 6

    0 6 6

    0 6 6

  • 7/23/2019 Erection BOQ - Saran

    244/338

    0 6 6

    0 6 6

    0

    0 6 6

    0 6 6

    0 6 6

  • 7/23/2019 Erection BOQ - Saran

    245/338

    0 6 6

    0 6 6

    0 6 6

    0 6 6

    0

    0 6 6

    0 6 6

  • 7/23/2019 Erection BOQ - Saran

    246/338

  • 7/23/2019 Erection BOQ - Saran

    247/338

    0 6 6

    0 6 6

    0 6 6

    0

    0 6 6

    0 6 6

    0 6 6

    0 6 6

    0 6 6

    6

  • 7/23/2019 Erection BOQ - Saran

    248/338

    0 6 6

    0 6 6

    0 6 6

  • 7/23/2019 Erection BOQ - Saran

    249/338

    0 6 6

    6 6

    0 6 6

    0 6 6

  • 7/23/2019 Erection BOQ - Saran

    250/338

  • 7/23/2019 Erection BOQ - Saran

    251/338

    0 6 6

    6 6

    0 6 6

    0 6 6

  • 7/23/2019 Erection BOQ - Saran

    252/338

    6 6

    6 6

    6 6

  • 7/23/2019 Erection BOQ - Saran

    253/338

  • 7/23/2019 Erection BOQ - Saran

    254/338

    6 6

    6 6

    6 6

    6 6

    6 6

    6 6

  • 7/23/2019 Erection BOQ - Saran

    255/338

    6 6

    6 6

    0 6 6

    6

    0 6 6

  • 7/23/2019 Erection BOQ - Saran

    256/338

  • 7/23/2019 Erection BOQ - Saran

    257/338

    0 6 6

    0 6 6

    0 6 6

    0 6 6

    0 6 6

    0 6 6

  • 7/23/2019 Erection BOQ - Saran

    258/338

    6 6

    6

    0 6 6

    0 6 6

  • 7/23/2019 Erection BOQ - Saran

    259/338

    0 6 6

    0 6 6

    0 6 6

    0 6 6

  • 7/23/2019 Erection BOQ - Saran

    260/338

    6 6

    0 6 6

    0 6 6

    6

  • 7/23/2019 Erection BOQ - Saran

    261/338

    6 6

    6

    6 6

    6

    6 6

  • 7/23/2019 Erection BOQ - Saran

    262/338

    0 6 6

    0 6 6

    6 6

    6 6

    6 6

    0 6 6

    0 6 6

  • 7/23/2019 Erection BOQ - Saran

    263/338

  • 7/23/2019 Erection BOQ - Saran

    264/338

    0 6 6

    0 6 6

    0 6 6

    0 6 6

    0 6 6

    0 6 6

    6

  • 7/23/2019 Erection BOQ - Saran

    265/338

    0 6 6

    0 6 6

    0 6 6

    0 6 6

    0 6 6

    0 6 6

  • 7/23/2019 Erection BOQ - Saran

    266/338

    0 6 6

    0 6 6

    0 6 6

    0 6 6

    0 6 6

    6

    0 6 6

  • 7/23/2019 Erection BOQ - Saran

    267/338

    0 6 6

    0 6 6

    6 6

    0 6 6

    0 6 6

    0

    0 6 6

  • 7/23/2019 Erection BOQ - Saran

    268/338

    0 6 6

    0 6 6

    0 6 6

    6

    0 6 6

    6 6

  • 7/23/2019 Erection BOQ - Saran

    269/338

    0 6 6

    0 6 6

    0 6 6

    0 6 6

    0 6 6

    0 6 6

    0 6 6

  • 7/23/2019 Erection BOQ - Saran

    270/338

    0 6 6

    6

    0 6 6

    0 6 6

    0 6 6

  • 7/23/2019 Erection BOQ - Saran

    271/338

    6 6

    0 6 6

    0 6 6

    0 6 6

    0 6 6

    0 6 6

    0 6 6

  • 7/23/2019 Erection BOQ - Saran

    272/338

    6

    6 6

    0 6 6

    0 6 6

    0 6 6

  • 7/23/2019 Erection BOQ - Saran

    273/338

    0 6 6

    0 6 6

    0 6 6

    0 6 6

    0 6 6

    0 6 6

  • 7/23/2019 Erection BOQ - Saran

    274/338

    6 6

    6

    0 6 6

    0 6 6

  • 7/23/2019 Erection BOQ - Saran

    275/338

    0 6 6

    0 6 6

    0 6 6

    0 6 6

    0 6 6

    0 6 6

    0 6 6

  • 7/23/2019 Erection BOQ - Saran

    276/338

    0 6 6

    6

    0 6 6

    0 6 6

  • 7/23/2019 Erection BOQ - Saran

    277/338

    0 6 6

    0 6 6

    0 6 6

    0 6 6

    0 6 6

    0 6 6

    0 6 6

  • 7/23/2019 Erection BOQ - Saran

    278/338

    0 6 6

    0 6 6

    6

    6 6

    6

  • 7/23/2019 Erection BOQ - Saran

    279/338

    6 6

    6

    0 6 6

    6 6

  • 7/23/2019 Erection BOQ - Saran

    280/338

    0 6 6

    0 6 6

    0 6 6

    0 6 6

    6 6

  • 7/23/2019 Erection BOQ - Saran

    281/338

    0 6 6

    0 6 6

    6

    6 6

    6 6

  • 7/23/2019 Erection BOQ - Saran

    282/338

    6

    6 6

    6 6

    0 6 6

    0 6 6

  • 7/23/2019 Erection BOQ - Saran

    283/338

    0 6 6

    6 6

    6 6

    6 6

    6 6

  • 7/23/2019 Erection BOQ - Saran

    284/338

    6 6

    0 6 6

    6

    0 6 6

    0 6 6

  • 7/23/2019 Erection BOQ - Saran

    285/338

    0 6 6

    0 6 6

    0 6 6

    0 6 6

    0 6 6

  • 7/23/2019 Erection BOQ - Saran

    286/338

    0 6 6

    0 6 6

    0 6 6

    0 6 6

    6

  • 7/23/2019 Erection BOQ - Saran

    287/338

    6 6

    0 6 6

    0

    0 6 6

    0 6 6

    0 6 6

  • 7/23/2019 Erection BOQ - Saran

    288/338

    0 6 6

    0 6 6

    6 6

    0 6 6

    6 6

  • 7/23/2019 Erection BOQ - Saran

    289/338

    0 6 6

    6

    0 6 6

    0 6 6

    0 6 6

  • 7/23/2019 Erection BOQ - Saran

    290/338

    0 6 6

    0 6 6

    0 6 6

    0 6 6

    0 6 6

  • 7/23/2019 Erection BOQ - Saran

    291/338

    0 6 6

    0 6 6

    0 6 6

    6

    6 6

    0 6 6

  • 7/23/2019 Erection BOQ - Saran

    292/338

    0 6 6

    0 6 6

    0 6 6

    0 6 6

    0 6 6

  • 7/23/2019 Erection BOQ - Saran

    293/338

    0 6 6

    0 6 6

    0 6 6

    0 6 6

    6

  • 7/23/2019 Erection BOQ - Saran

    294/338

    0 6 6

    6 6

    6

    0 6 6

    6 6

    6

  • 7/23/2019 Erection BOQ - Saran

    295/338

    6 6

    0 6 6

    6

    6 6 6

  • 7/23/2019 Erection BOQ - Saran

    296/338

    6 6 6

    0 6 6

    0 6 6

    0 6 6

    0 6 6

  • 7/23/2019 Erection BOQ - Saran

    297/338

    0 6 6

    6 6

    0 6 6

    6 6

    6

    6 6

  • 7/23/2019 Erection BOQ - Saran

    298/338

    0 6 6

    6 6

    0 6 6

    6 6

    0 6 6

    6

    0 6 6

  • 7/23/2019 Erection BOQ - Saran

    299/338

    0 6 6

    0 6 6

    0 6 6

    0 6 6

    0 6 6

    6

  • 7/23/2019 Erection BOQ - Saran

    300/338

    0 6 6

    0 6 6

    0 6 6

    0 6 6

    0 6 6

    0 6 6

    6

  • 7/23/2019 Erection BOQ - Saran

    301/338

    6 6

    0 6 6

    0 6 6

    0 6 6

    0 6 6

    0 6 6

  • 7/23/2019 Erection BOQ - Saran

    302/338

    6 6

    6

    0 6 6

    0 6 6

    0 6 6

    0 6 6

  • 7/23/2019 Erection BOQ - Saran

    303/338

    0 6 6

    0 6 6

    0 6 6

    6

    0 6 6

    0 6 6

  • 7/23/2019 Erection BOQ - Saran

    304/338

    0 6 6

    0 6 6

    0 6 6

    0 6 6

    0 6 6

    6

  • 7/23/2019 Erection BOQ - Saran

    305/338

    0 6 6

    0 6 6

    0 6 6

  • 7/23/2019 Erection BOQ - Saran

    306/338

    0 6 6

    6 6

    6

    0 6 6

  • 7/23/2019 Erection BOQ - Saran

    307/338

    0 6 6

    0 6 6

    0 6 6

  • 7/23/2019 Erection BOQ - Saran

    308/338

    6 6

    6

    0 6 6

    0 6 6

    0 6 6

  • 7/23/2019 Erection BOQ - Saran

    309/338

    0 6 6

    6 6

    6

    0 6 6

  • 7/23/2019 Erection BOQ - Saran

    310/338

    0 6 6

    0 6 6

    0 6 6

  • 7/23/2019 Erection BOQ - Saran

    311/338

    6 6

    6

    6

    0 6 6

    0 6 6

    6

    0 6 6

  • 7/23/2019 Erection BOQ - Saran

    312/338

    0 6 6

    6

    0 6 6

    0 6 6

    0

    0 6 6

  • 7/23/2019 Erection BOQ - Saran

    313/338

    0 6 6

    0

    0 6 6

    0 6 6

    0 6 6

    0 6 6

  • 7/23/2019 Erection BOQ - Saran

    314/338

    0 6 6

    0 6 6

    0 6 6

    6

    6 6

    0 6 6

  • 7/23/2019 Erection BOQ - Saran

    315/338

    0 6 6

    0 6 6

    0 6 6

    0 6 6

    0 6 6

  • 7/23/2019 Erection BOQ - Saran

    316/338

    0 6 6

    0 6 6

    0 6 6

    0 6 6

    6

  • 7/23/2019 Erection BOQ - Saran

    317/338

    6 6

    0 6 6

    0

    0 6 6

    0 6 6

    0

    0 6 6

  • 7/23/2019 Erection BOQ - Saran