EETD Environmental Health and Safety Monthly Metrics February, 2013.
EETD Environmental Health and Safety Monthly Metrics January, 2013.
-
Upload
wesley-nicholson -
Category
Documents
-
view
214 -
download
1
Transcript of EETD Environmental Health and Safety Monthly Metrics January, 2013.
EETDEnvironmental Health and Safety Monthly Metrics
January, 2013
EETD Accidents- 1/13
Type Date Dept. Description Severity Status
Slip, Trip, Fall
1/10/13 DIV Employee tripped over a construction hose while crossing street near B26.
First Aid Only Closed
Repetitive Motion
1/25/13 EAEI Employee experiencing wrist pain. Health Services visit.
Recordable Open- Ergonomics evaluation
EETD Accidents- By Type
Dec '11 Jan '12 Feb '12 Mar '12 Apr '12 May '12 Jun '12 Jul '12 Aug '12 Sep '12 Oct '12 Nov '12 Dec '12 Jan '13
Strain-Arm/Hand NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN
Strain-Back/Leg NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN
Repetitive NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN 1
Fracture/Break NaN NaN 1 NaN NaN NaN NaN NaN NaN NaN NaN 2 NaN NaN
Chem Contact NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN 1 NaN NaN NaN
Burn NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN
Contusion NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN 1
Cut/Abrasion NaN NaN NaN 2 NaN 1 NaN NaN NaN NaN NaN NaN 1 NaN
Eye NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN
Respiratory NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN
Other NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN NaN
0.5
1.5
2.5
Fracture/Break
Fracture/BreakCut/Abrasion
Cut/Abrasion Cut/AbrasionChem Contact Repetitive
Contusion
EETD Accidents- Severity
De
c '1
1
Jan
'12
Fe
b '1
2
Ma
r '1
2
Ap
r '1
2
Ma
y '1
2
Jun
'12
Jul '
12
Au
g '1
2
Se
p '1
2
Oct
'12
No
v '1
2
De
c '1
2
Jan
'130
1
2
3
First Aid Recordable Lost Work
Note: Two accidents in Nov ’12 not considered OSHA reportable, but may be compensable
Emergency Incidents- 1/13
Date Incident Area Status
No EETD-related incidents in January
Ergonomic Assessments- By Month
Dec '11 Jan '12 Feb '12 Mar '12 Apr '12 May '12 Jun '12 Jul '12 Aug '12 Sep '12 Oct '12 Nov '12 Dec '12 Jan '13
Completed 5 4 5 8 3 3 4 4 7 3 4 0 3 1
Open 0 0 0 0 0 0 0 0 0 1 1 1 2 3
0.5
1.5
2.5
3.5
4.5
5.5
6.5
7.5
8.5
9.5
Ass
essm
ents
Open EETD Ergonomic Assessments
Date Requested
Dept. Type Status
1/28/13 EAEI Team Response In Progress
1/14/13 DIV Discomfort Actions Pending
1/2/13 BTUS Discomfort Actions Pending
12/15/12 DIV Preventative Actions Pending
12/13/12 BTUS Discomfort In Progress
11/26/12 ESDR Preventative Actions Pending
10/29/12 BTUS Discomfort In Progress
9/25/12 ESDR Discomfort Actions Pending
3
2
2
1
Open Assessments by Dept.
DIVBTUSESDREAEI
EETD Job Hazard Analysis- Incomplete
Dec '11 Jan '12 Feb '12 Mar '12 Apr '12 May '12 Jun '12 Jul '12 Aug '12 Sep '12 Oct '12 Nov '12 Dec '12 Jan '13
<1 month
7 6 4 6 3 9 8 9 23 12 4 7 6 5
2 month
0 0 0 0 0 1 0 1 3 4 1 2 0 1
>3 month
0 0 0 0 0 0 0 0 0 0 0 0 0 0
2.5
7.5
12.5
17.5
22.5
27.5
JH
A’s
Du
e
Job Hazard Analysis- % Completion
Dec '11 Jan '12 Feb '12 Mar '12 Apr '12 May '12 Jun '12 Jul '12 Aug '12 Sep '12 Oct '12 Nov '12 Dec '12 Jan '1380
82
84
86
88
90
92
94
96
98
10099 99 99 99
99.5
9899 99
9697
9998
99 99
94 94 94 94 94 94 94 9493 93
9493 93 93
EETD % LBNL %
%
EETD Incomplete Training Assignments
Dec '11 Jan '12 Feb '12 Mar '12 Apr '12 May '12 Jun '12 Jul '12 Aug '12 Sep '12 Oct '12 Nov '12 Dec '12 Jan '130
50
100
150
200
250
300
350 328
282
181
137 138
176159
176
148169
191
144126 116
Incomplete Assignments
Training % Completion Status
Dec '11 Jan '12 Feb '12 Mar '12 Apr '12 May '12 Jun '12 Jul '12 Aug '12 Sep '12 Oct '12 Nov '12 Dec '12 Jan '1380
82
84
86
88
90
92
94
96
98
100
95 95
9798 98
97 97 9797.5
97 9798 98 98
95 9596 96 96
9596
9594
95 9594
95 95
EETD % LBNL %
%
Incomplete Training by Course Type(Total Incomplete Assignments = 116)
Ergonomics; 27
Fire Extinguisher; 23
Cyber Security; 15
Supervisor; 8
Electrical/LOTO; 7
GERT; 6
Conflict of Interest; 5
Other; 5
Chemical Hygiene; 4
Safety Overview; 3 Hosting Foreign; 3Trafficking; 3
Laser; 2Cryo; 2Pressure; 1 Hazardous Waste; 1 Ladder; 1
Incomplete Training Assignments (Total = 116)
Open Assignments by Dept.
EAEI; 51
ESDR; 47
BTUS; 12
DIV; 6
Open Assignments by Hire Date
< 1 Month 2 to 6 Months
6 to 12 Month
> 1 Year0
10
20
30
40
50
60
44
13
5
54
Assignments
EETD Incomplete Training Assignments
Affilia
te
Caree
r
Term
App
t.
Stude
nt A
sst.
Post D
oc.
GSRA
Reh R
etire
Facul
ty
Lim
ited
Contra
ctor
Visit R
esea
rch
0
10
20
30
40
50
60
48
27
12 12 103 2 2 0 0 0
Incomplete Assignments by Job Type
<1 Month
1-2 Months
>2 Months
0 5 10 15 20 25 30 35
32
4
5
Renewal Training Assignments- 41 Total
Satellite Accumulation Area (SAA) Overall Compliance
Oct '11 Jan '12 Apr '12 Jul '12 Oct '12 Jan '1380
90
100
92.693.9
96.995.6 95.9
97.5
% Compliance
% Compliance
Satellite Accumulation Area (SAA) Issues
SAA
ID S
ign
Inco
rrec
t
SAA
Loca
tion
Inco
rrec
t
Raw
Mat
eria
ls in
SAA
Was
te L
abel
Not
Com
plet
e
No
Flam
mab
le W
aste
Con
t...
No
Seco
ndar
y Co
ntai
nmen
t
Inco
mpa
tible
Was
te
Cont
aine
rs N
ot C
lose
d an
d...
Accu
mul
ation
>27
5 D
ays
Lab
Insp
ectio
n Lo
gs O
utd.
..
0
2
4
6
8
10
12
14
Oct '11Jan '12Apr '12Jul '12Oct '12Jan '13
Cumulative Satellite Accumulation Area Issues(FY Q1 ’12 – Q2 ‘13)
34
32
6
5
53
11 1
Waste Labelling Issues
Lab Inspection Logs Outdated
Accumulation >275 Days
SAA ID Sign Incorrect
Flammable Waste Container Wrong
Containers Not Closed and Sealed
Raw Materials in SAA
No Secondary Containment
Incompatible Waste Storage
SAA Location Incorrect
Corrective Action Reports (CATS)- 1/13
CAT # Date Description Lead Status
No open EETD CATS items at this time
Activity Hazard Documents (AHD)- 1/13
AHD Description Status Location PI
3764 Hydrogen Bromide/ Bromine
Completed- Annual Review/Update
70-257 A. Weber
171 Lithium Use Completed- Full EHS 3- year review
70-295, 70-299
V. Battaglia
214 Lithium Use Completed- Change PI from Richardson to Chen
62-314, 320, 350
G. Chen
Audits and Inspection Status
Type Date Lead Status
Self Assessment- Lab Area Housekeeping
1/30/13 Deputy Dept. Heads Ops. and Safety Manager
Walkthroughs of B62 and B70 completed. Compiling observations.
Self Assessment- BTUS Office Areas
February BTUS Deputy Dept. Head Ops.
Check sheet being reviewed prior to walkthrough of B90 areas.
Quarterly SAA Inspections- All EETD Labs
1/28/13 Safety Manager
Completed
Significant Safety Achievements- 1/13
• Worked with Engineering Division and Electrical Safety SME regarding safety improvements to particle sampler boxes.
• Quarterly SAA inspections were completed of all EETD areas.• Two EETD Safety Alerts were issued: “Razor Blade Safety”
and “Electrical Equipment NRTL Requirements.”• Approvals were obtained for off-site transport of a
compressed gas cylinder under DOT Materials of Trade exemptions.
• Lab tours were given to Alameda County Fire Department crews in Buildings 62 and 70 for emergency pre-planning.
• Work is proceeding on the new EETD safety website.• Continued work on removing old chemicals and gas cylinders
from EETD lab areas.
Short Term Safety Outlook- 2/13
• Complete the “lab housekeeping” self-assessment project and submit final report.
• Hold a “Electrical Equipment Safety- NRTL” seminar for EETD researchers.
• Deploy the new “Field Work Hazard Assessment” form within EETD.
• Approximately 500 “old chemicals” will be removed from EETD lab areas. More removals are being planned.
• Deploy the new EETD Safety website.• Follow-up on hood sash repair issues in lab areas.• Start work on the “On the Job Training” self-assessment
project.