CRUISE TERMINAL ADVISORY PANEL Meeting of April 19, 2007.

11
CRUISE TERMINAL ADVISORY PANEL Meeting of April 19, 2007

Transcript of CRUISE TERMINAL ADVISORY PANEL Meeting of April 19, 2007.

Page 1: CRUISE TERMINAL ADVISORY PANEL Meeting of April 19, 2007.

CRUISE TERMINAL ADVISORY PANEL

Meeting of

April 19, 2007

Page 2: CRUISE TERMINAL ADVISORY PANEL Meeting of April 19, 2007.

Berth LOA ─ 1,300 ft.

$135k (East)

5 -10,000 cu.yds

Avg. Annual Dredge Costs

PIER 94 / 96

Page 3: CRUISE TERMINAL ADVISORY PANEL Meeting of April 19, 2007.

Berth LOA ─ 1,138 ft.

Berth LOA ─ 2,317 ft.

Berth LO

A ─

1,296 ft.

$500 k (All berths + Approach)

110 - 125,000 cu.yds

Avg. Annual Dredge CostsPIER 80

Page 4: CRUISE TERMINAL ADVISORY PANEL Meeting of April 19, 2007.

Berth LO

A ─

1,300 ft.

- Unknown -

Avg. Annual Dredge Costs

PIER 70

Page 5: CRUISE TERMINAL ADVISORY PANEL Meeting of April 19, 2007.

Berth LO

A ─

1,000 ft.

Berth LOA ─ 1,300 ft.

$0 k ─ (East)

$? k ─ (South)

Avg. Annual Dredge Costs

PIER 50

Page 6: CRUISE TERMINAL ADVISORY PANEL Meeting of April 19, 2007.

Ber th LO

A ─

623 ft.

$0 (East)

Avg. Annual Dredge Costs

PIERS 30 / 32

Page 7: CRUISE TERMINAL ADVISORY PANEL Meeting of April 19, 2007.
Page 8: CRUISE TERMINAL ADVISORY PANEL Meeting of April 19, 2007.

Ber

th

LO

A

1,35

8 ft

. $750k ─ (East)30 – 40,000 cu.yds

Avg. Annual Dredge Costs

PIER 27

Page 9: CRUISE TERMINAL ADVISORY PANEL Meeting of April 19, 2007.
Page 10: CRUISE TERMINAL ADVISORY PANEL Meeting of April 19, 2007.

$870k ─ (East)

$480k ─ (West)

50-65,000 cu.yds

Ber

th L

OA

1,

055

ft.

Ber

th L

OA

─ 8

07 f

t.

Avg. Annual Dredge Costs

PIER 35

Page 11: CRUISE TERMINAL ADVISORY PANEL Meeting of April 19, 2007.