CRUISE TERMINAL September 25, 2007 ADVISORY PANEL FINDINGS.

18
CRUISE TERMINAL CRUISE TERMINAL September 25, 2007 September 25, 2007 ADVISORY PANEL ADVISORY PANEL FINDINGS FINDINGS

Transcript of CRUISE TERMINAL September 25, 2007 ADVISORY PANEL FINDINGS.

Page 1: CRUISE TERMINAL September 25, 2007 ADVISORY PANEL FINDINGS.

CRUISE TERMINALCRUISE TERMINAL

September 25, 2007September 25, 2007

ADVISORY PANELADVISORY PANEL

FINDINGSFINDINGS

Page 2: CRUISE TERMINAL September 25, 2007 ADVISORY PANEL FINDINGS.

Advisory Panel ConsiderationsAdvisory Panel Considerations

History & Future of San Francisco History & Future of San Francisco Cruise BusinessCruise Business

• San Francisco in the World marketSan Francisco in the World market• Demand forecastDemand forecast• Economic & community benefits to the CityEconomic & community benefits to the City• Cruise industry standards and expectationsCruise industry standards and expectations• Does San Francisco need a new terminal?Does San Francisco need a new terminal?• If soIf so ─ ─ WHERE ?WHERE ? ── HOW MUCH ? HOW MUCH ? ── HOW TO FINANCE ?HOW TO FINANCE ?

── Can it be phased?Can it be phased?── What should we do now?What should we do now?

Page 3: CRUISE TERMINAL September 25, 2007 ADVISORY PANEL FINDINGS.

The Facts The Facts

• Two public-private partnership attempts to build Two public-private partnership attempts to build new terminal have failed. new terminal have failed.

• Port needs new terminal:Port needs new terminal:1. Based on demand, size of ships, and cruise industry expectations.1. Based on demand, size of ships, and cruise industry expectations.

2. Brings tourist dollars. Enhances City’s reputation as a world 2. Brings tourist dollars. Enhances City’s reputation as a world class, class, waterfront city. Preserves maritime industry; Jobs. waterfront city. Preserves maritime industry; Jobs.

Pier 35 is substandard.Pier 35 is substandard.Only a 5-7 year life.Only a 5-7 year life.

Page 4: CRUISE TERMINAL September 25, 2007 ADVISORY PANEL FINDINGS.

The Current Situation at Pier 35 The Current Situation at Pier 35

• Needs pier substructure Needs pier substructure

and improved shed. and improved shed.

• Only 5-7 years of life Only 5-7 years of life

remaining. remaining.

• Does not meet current Does not meet current

industry standards. industry standards.

• Requires major investment: Requires major investment:

Pier is too short, aprons too Pier is too short, aprons too

narrow, shed too small. narrow, shed too small.

Page 5: CRUISE TERMINAL September 25, 2007 ADVISORY PANEL FINDINGS.

Other Piers Studied Other Piers Studied • Pier 30-32 optimal as a Pier 30-32 optimal as a

two-berth facility.two-berth facility.

Pro: Pro: No dredging on No dredging on

Eastern face Eastern face

Con: Con: Seismic retrofit Seismic retrofit

cost prohibitive. cost prohibitive.

• Some Southern Waterfront Some Southern Waterfront

piers may be promising, but piers may be promising, but

not viable in short-term.not viable in short-term.

Page 6: CRUISE TERMINAL September 25, 2007 ADVISORY PANEL FINDINGS.

Pier Conclusion: 27 Pier Conclusion: 27 • ProsPros::

• Has been used as Has been used as

back-up berth.back-up berth.

• Adequate berth length. Adequate berth length.

• Large pier shed. Large pier shed.

• Pier in good shape. Pier in good shape.

• Possibility of Pier 29 Possibility of Pier 29

as future berthas future berth

• ConsCons:: needs dredging / needs dredging /

only one berth.only one berth.

Page 7: CRUISE TERMINAL September 25, 2007 ADVISORY PANEL FINDINGS.

Pier 27 Options Pier 27 Options

• Minimal improvements:Minimal improvements:

Will not meet Will not meet

industry industry

standards.standards.

$22–26 million$22–26 million..

Page 8: CRUISE TERMINAL September 25, 2007 ADVISORY PANEL FINDINGS.

Pier 27 Options Pier 27 Options

• Acceptable improvements:Acceptable improvements:

A functional terminal A functional terminal

meeting industry standards. meeting industry standards.

$50–60 million$50–60 million..

Page 9: CRUISE TERMINAL September 25, 2007 ADVISORY PANEL FINDINGS.

Pier 27 Options Pier 27 Options

• Optimal improvements:Optimal improvements:

Two berth facility. Two berth facility.

$100 million$100 million..

Page 10: CRUISE TERMINAL September 25, 2007 ADVISORY PANEL FINDINGS.

Pier 27 Options Pier 27 Options

• Advisory Panel recommends Option 2: Advisory Panel recommends Option 2:

Acceptable ImprovementsAcceptable Improvements

Page 11: CRUISE TERMINAL September 25, 2007 ADVISORY PANEL FINDINGS.

Pier 27 FundingPier 27 Funding

• $18 million from condo project sale $18 million from condo project sale

proceeds for new terminal. proceeds for new terminal.

• Potential revenue to finance:Potential revenue to finance:

Raise passenger feesRaise passenger fees

Special eventsSpecial events

City tax revenueCity tax revenue

Page 12: CRUISE TERMINAL September 25, 2007 ADVISORY PANEL FINDINGS.

Next Steps Next Steps

Develop & design funding planDevelop & design funding plan

Build one-berth terminal and explore Build one-berth terminal and explore

secondary berths in short-term.secondary berths in short-term.

Develop a longer-term cruise Develop a longer-term cruise

berthing strategy.berthing strategy.

Page 13: CRUISE TERMINAL September 25, 2007 ADVISORY PANEL FINDINGS.

Advisory Panel Advisory Panel FINAL RECOMMENDATIONSFINAL RECOMMENDATIONS

1. San Francisco needs a 1. San Francisco needs a

new cruise terminal new cruise terminal

2. Pier 35 must 2. Pier 35 must

be replacedbe replaced

3. Commence 3. Commence

immediately with a immediately with a

replacement replacement

of the primary berthof the primary berth

Page 14: CRUISE TERMINAL September 25, 2007 ADVISORY PANEL FINDINGS.

Advisory Panel Advisory Panel FINAL RECOMMENDATIONSFINAL RECOMMENDATIONS

4. Designate Pier 27 as the 4. Designate Pier 27 as the

primary berthprimary berth

5. Commence development 5. Commence development

of primary berth design of primary berth design

6. Develop primary6. Develop primary

berth financingberth financing

Page 15: CRUISE TERMINAL September 25, 2007 ADVISORY PANEL FINDINGS.

7. 7. Identify short-term implementation Identify short-term implementation

of secondary berthsof secondary berths

8. 8. Develop longer-term berthingDevelop longer-term berthing

strategystrategy

9. 9. Implement Implement

shore side powershore side power

10.10. Re-affirm Re-affirm

open space in South Beach & open space in South Beach &

Northeast WaterfrontNortheast Waterfront

FINAL RECOMMENDATIONSFINAL RECOMMENDATIONS

Page 16: CRUISE TERMINAL September 25, 2007 ADVISORY PANEL FINDINGS.

CRUISE TERMINALCRUISE TERMINALADVISORY PANELADVISORY PANEL

Frankie Lee ∙ Former Port Commissioner/

(Chair) SOHA Engineering

Steve Falk ∙ San Francisco Chamber of (Vice

(Chair) Commerce

William Adams ∙ International Longshore &

Warehouse Union

Joe D’Alessandro ∙ San Francisco Convention and

Visitors Bureau

Page 17: CRUISE TERMINAL September 25, 2007 ADVISORY PANEL FINDINGS.

CRUISE TERMINALCRUISE TERMINALADVISORY PANELADVISORY PANEL

Ellen Johnck ∙ Bay Planning Coalition

Redmond Kernan ∙ RFK Associates

Bruce Krumrine ∙ Princess Cruises

John Martin ∙ San Francisco Airport

Stefano Pinna ∙ Metro Cruise Services

Ben Rosenfield ∙ City Administrator’s Office

Michael Sweet ∙ McNutt & Litteneker, LLP/

Rincon Pt-South Beach CAC

Page 18: CRUISE TERMINAL September 25, 2007 ADVISORY PANEL FINDINGS.

Thank YouThank You