Overview
Incorporated in 1971, Om Metals Infraprojects Ltd. is a leadingISO 9001 Engineering Construction company with a strongpresence in the Hydropower sector and experience spanningmore than 3 decades
Engaged in diversified activities such as execution of turnkeyHydro-mechanical contracts for Hydropower & Irrigation projects,Real Estate development and Infrastructure projects
Successfully executed more than 55 Hydro-mechanical contractsfor Hydro-power & Irrigation projects across the country, valuedat more than USD 500 M
De-risked its business model with acquisitions in the corebusiness and foraying into Real Estate and Infrastructure sector(port and SEZ)
www.ommetals.com 2
Incorporated in 1971, Om Metals Infraprojects Ltd. is a leadingISO 9001 Engineering Construction company with a strongpresence in the Hydropower sector and experience spanningmore than 3 decades
Engaged in diversified activities such as execution of turnkeyHydro-mechanical contracts for Hydropower & Irrigation projects,Real Estate development and Infrastructure projects
Successfully executed more than 55 Hydro-mechanical contractsfor Hydro-power & Irrigation projects across the country, valuedat more than USD 500 M
De-risked its business model with acquisitions in the corebusiness and foraying into Real Estate and Infrastructure sector(port and SEZ)
Key Achievements
In span of 35 years, Kothari Group has transformed into amultifaceted organization with market capitalization of more thanUSD 125 M in year 2007
Om Metals has grossed in engineering sector alone a turnover ofUSD 300 M and is now targeting a turnover of USD 500 M
Achieved a leading position in the field of execution of turnkeycontracts for Hydro mechanical equipment for Irrigation andHydropower projects
More than 50 Irrigation and Hydro Power projects successfullycompleted across the nation and abroad
Currently involved in execution of Hydro-mechanical contracts ofmore than 2900 MW of Hydro-power projects
www.ommetals.com 3
In span of 35 years, Kothari Group has transformed into amultifaceted organization with market capitalization of more thanUSD 125 M in year 2007
Om Metals has grossed in engineering sector alone a turnover ofUSD 300 M and is now targeting a turnover of USD 500 M
Achieved a leading position in the field of execution of turnkeycontracts for Hydro mechanical equipment for Irrigation andHydropower projects
More than 50 Irrigation and Hydro Power projects successfullycompleted across the nation and abroad
Currently involved in execution of Hydro-mechanical contracts ofmore than 2900 MW of Hydro-power projects
Key Achievements (Cont’d.)
All recent engineering construction contracts for HE projectscompleted within or even AHEAD of schedule
Various other Projects including Multiplex Cinema Projectcommissioned in record period of 6 months
Employing more than 250 managerial & technical personnel and1500 skilled manpower
Bagged prestigious contracts from organization like World Bank,NTPC, Ministry of External Affairs, NHPC, NEEPCO and others
Profit making company since its inception
www.ommetals.com 4
All recent engineering construction contracts for HE projectscompleted within or even AHEAD of schedule
Various other Projects including Multiplex Cinema Projectcommissioned in record period of 6 months
Employing more than 250 managerial & technical personnel and1500 skilled manpower
Bagged prestigious contracts from organization like World Bank,NTPC, Ministry of External Affairs, NHPC, NEEPCO and others
Profit making company since its inception
Group Business ActivitiesHotels
Luxurious suites,International standardswith homely atmosphere
www.ommetals.com 5
A 4 Star Business Hotel withRevolving Restaurant at Jaipur
Fantabulous view of the Citywith traditional delicacies at
the Revolving Restaurant
Group Business ActivitiesCommercial Complexes and Multiplexes
Multiplex Cinema
www.ommetals.com 6
Family Entertainment Complex
Multiplex Cinema
Group Business ActivitiesTownships & Automobile
Group has ventured into realestates and township
development in various cities
Townships
www.ommetals.com 7
Group has ventured into realestates and township
development in various cities Automobile
State’s largestAutomobile 3 S Dealership
Other Business Interests
Real Estate
– Residential townships and apartments in Mumbai, Kota, Hyderabad(1.4 mn sq ft)
– Commercial complexes & Retail space in Mumbai, NCR, Jaipur & Kota(1.0 mn sq ft)
– IT Parks at Jaipur and Mumbai (1.5 mn sq ft)
– Hotel, Multiplex and a 3-S Toyota facility
Infrastructure
– Sea Port : Deep water sea port at Pondicherry
– SEZ : Multi product SEZ at Pondicherry
www.ommetals.com 8
Real Estate
– Residential townships and apartments in Mumbai, Kota, Hyderabad(1.4 mn sq ft)
– Commercial complexes & Retail space in Mumbai, NCR, Jaipur & Kota(1.0 mn sq ft)
– IT Parks at Jaipur and Mumbai (1.5 mn sq ft)
– Hotel, Multiplex and a 3-S Toyota facility
Infrastructure
– Sea Port : Deep water sea port at Pondicherry
– SEZ : Multi product SEZ at Pondicherry
Group Philanthropic Activities
Education
www.ommetals.com 9
Om Kothari Foundation, a charitable trust is Engagedin philanthropic, social services & runs Various
educational institutes
Promoters
Dr T C Kothari, Founder and Chairman (82 yrs)
– Dr Kothari is a first generation entrepreneur who founded Om Metals in 1967. Hestarted the company with meagre resources and has seen it grow into a Rs. 5billion enterprise
– At age of 75 he completed Doctorate in Philosophy and still plays an active role inoverall strategy of the company
Mr C P Kothari, Managing Director and CEO (61 yrs)
– C P Kothari has been with the company for over 35 years and has been playing akey role in the overall growth of the company. He has also been a Director on theboard of RIICO
– He holds a Bachelors degree in Commerce
Mr D P Kothari, Director (55 years)
– D P Kothari has immense experience in the execution of turnkey contracts. Heheads the technical and execution group within the company and has been theback bone in all the ventures of the company
– He holds a Bachelors Degree in Mechanical Engineering
Mr Sunil Kothari, Director (42 years)
– Sunil Kothari has over 20 years of experience and is responsible for the Financialmatters of the company
– He holds a Bachelors degree in Commerce & Masters in Business Administration
www.ommetals.com 10
Dr T C Kothari, Founder and Chairman (82 yrs)
– Dr Kothari is a first generation entrepreneur who founded Om Metals in 1967. Hestarted the company with meagre resources and has seen it grow into a Rs. 5billion enterprise
– At age of 75 he completed Doctorate in Philosophy and still plays an active role inoverall strategy of the company
Mr C P Kothari, Managing Director and CEO (61 yrs)
– C P Kothari has been with the company for over 35 years and has been playing akey role in the overall growth of the company. He has also been a Director on theboard of RIICO
– He holds a Bachelors degree in Commerce
Mr D P Kothari, Director (55 years)
– D P Kothari has immense experience in the execution of turnkey contracts. Heheads the technical and execution group within the company and has been theback bone in all the ventures of the company
– He holds a Bachelors Degree in Mechanical Engineering
Mr Sunil Kothari, Director (42 years)
– Sunil Kothari has over 20 years of experience and is responsible for the Financialmatters of the company
– He holds a Bachelors degree in Commerce & Masters in Business Administration
Om Metals – Heavy Engineering Construction
Om MetalsInfraprojects is thelargest company in
the execution ofturnkey contracts for
hydro mechanicalequipments in India
and amongst thelargest in the world
Design and Detailed Engineering
Procuring Raw Material & Bought-outEquipments
Transporting the Raw Material to theProject Sites / Manufacturing Facilities
Mobilization of Plant & Machinery
www.ommetals.com 11
Om MetalsInfraprojects is thelargest company in
the execution ofturnkey contracts for
hydro mechanicalequipments in India
and amongst thelargest in the world
Inspection by the Project Authorities
Manufacturing as per the Approved Design
Installation
Testing & Commissioning
Servicing during Contractual &Defect Liability Period
Om Metals – Heavy Engineering Construction
Our Product Portfolio
Radial Gates
Stop Log Gates
Hoists & Liftingequipments
Vertical Gates
Gantry Cranes
Trash Racks & TRCM
Penstocks & Steel Liners
Control equipment,automization & SCADA
www.ommetals.com 12
Our Product Portfolio
Radial Gates
Stop Log Gates
Hoists & Liftingequipments
Vertical Gates
Gantry Cranes
Trash Racks & TRCM
Penstocks & Steel Liners
Control equipment,automization & SCADA
Om Metals – Heavy Engineering Construction
Gantry Crane
Hoist
Typical layout of a dam
www.ommetals.com 13
Stoplog Gate
Radial Gate
Dam
Milestones and Achievements
Om Metals has executed the works of theworld’s largest Vertical Lift gates
www.ommetals.com 15
Kol Dam Project
Client – NTPC
Size – 7.5m X 14m X 115m
Milestones and Achievements
Om Metals has alsoexecuted works of oneof the World’s largest
Radial gates
www.ommetals.com 16
Om Metals has consistently completed projects ahead of contractualschedules and earned incentives / rewards for early completion.
Gosikhurd DamClient – VIDC, MaharashtraSize – 18.3m X 16.5m X 16.5m
Our strengths
Established presence with more than 35 years of successful trackrecord by executing more than 50 projects
Dedicated team associated with company since its inceptionensuring they possess required experience and skills to executehydro-power projects in the most adverse conditions
Manpower strength of 450 people comprising 350 semi skilledtechnocrats & 100 highly qualified professionals who accuratelymap the needs of every project
Robust engineering skills & know how enables the company toexecute projects of varied magnitude and complexity : rangingfrom 45 MW to 1000 MW of power generation
Expertise in turnkey execution enables us to provide a gamut ofhydro-mechanical equipments & spanning equipment supply,guarantee maintenance & services – one stop shop for clients
Competent team to acclamatize & work in hilly terrain,inaccessible & disturbed regions under adverse conditions
www.ommetals.com 17
Established presence with more than 35 years of successful trackrecord by executing more than 50 projects
Dedicated team associated with company since its inceptionensuring they possess required experience and skills to executehydro-power projects in the most adverse conditions
Manpower strength of 450 people comprising 350 semi skilledtechnocrats & 100 highly qualified professionals who accuratelymap the needs of every project
Robust engineering skills & know how enables the company toexecute projects of varied magnitude and complexity : rangingfrom 45 MW to 1000 MW of power generation
Expertise in turnkey execution enables us to provide a gamut ofhydro-mechanical equipments & spanning equipment supply,guarantee maintenance & services – one stop shop for clients
Competent team to acclamatize & work in hilly terrain,inaccessible & disturbed regions under adverse conditions
Order Book & Financial Performance
Turnover (Rs. Cr.)
0
50
100
150
2004-05 2005-06 2006-07
PAT (Rs. Cr.)
05
10152025
2004-05 2005-06 2006-07
Project Project AuthorityContract
Value(Rs. Cr)
GosikhurdProject
VIDC (Govt. OfMaharashtra 148.41
Kameng H.E.Project (600MW)
NEEPCO (ArunachalPradesh) 236.6
Koldam Project(800MW)
NTPC (HimachalPradesh) 55
Sewa H.E.Project (120MW)
NHPC (Jammu &Kashmir) 22.84
Uri II H.E.Project(240MW)
NHPC (Jammu &Kashmir) 58.86
www.ommetals.com 18
Market Cap (Rs. Cr.)
0100200300400500
2004-05 2005-06 2006-07
* PAT includes Rs. 7.5 Cr extraordinaryincome in 2005-06
** Contract of Rs. 117 Cr already executed
PAT (Rs. Cr.)
05
10152025
2004-05 2005-06 2006-07*
Uri II H.E.Project(240MW)
NHPC (Jammu &Kashmir) 58.86
Teesta LowDam IV H.E.P.(160MW)
NHPC (WestBengal) 98.16
Parbati III H.E.Project (520MW)
NHPC (HimachalPradesh) 96.23
Chamera III H.E.Project (231MW)
NHPC (HimachalPradesh) 66.86
Total 782.96**
Koldam Hydro Electric Project (4x200 MW)Himachal Pradesh, India
ClientClient NTPC Limited (Government of India), World’s 5th
Largest Energy Company
ProjectProject 800 MW Hydro Power Project
LocationLocation Located around 150 kms. From Chandigarh in NorthernIndia.
Period ofPeriod ofCompletionCompletion
46 months
www.ommetals.com 19
Diversion Tunnel Gates
Koldam Hydro Electric Project (4x200 MW)Himachal Pradesh, India
ScopeScope Work involves Designing, Detailed Engineering,Manufacturing, Transportation, Installation andCommissioning of all hydro-mechanical equipments.
World’s largest Vertical Lift Gates for Diversion Tunnelsmeasuring 6.5 M (Width) x 14 M (Height) with actingwater head of 115 M operated using 700 mm Dia, 17 Mlong & 800 MT capacity hydraulic hoist.
Spillway Radial Crest gates of size 17.1 M (Width) x 17.74M (Height) making it one of the largest Radial gates inthe world. Radial gates consist of a flap gate of size 14M(Width) x 3M (Height).
www.ommetals.com 20
Work involves Designing, Detailed Engineering,Manufacturing, Transportation, Installation andCommissioning of all hydro-mechanical equipments.
World’s largest Vertical Lift Gates for Diversion Tunnelsmeasuring 6.5 M (Width) x 14 M (Height) with actingwater head of 115 M operated using 700 mm Dia, 17 Mlong & 800 MT capacity hydraulic hoist.
Spillway Radial Crest gates of size 17.1 M (Width) x 17.74M (Height) making it one of the largest Radial gates inthe world. Radial gates consist of a flap gate of size 14M(Width) x 3M (Height).
Challenges &Challenges &AchievementsAchievements
First of its kind, size & capacity installed in India.
Design of gates was very complicated without anyprecedence in India.
Installation & commissioning work of the World’s LargestVertical lift gates completed in record time of 2 months.
Kurichu Hydro Electric Project (60 MW)Bhutan
ClientClient National Hydro-Electric Power Corporation Limited,Government of India
ProjectProject 60 MW Hydro Power Project being developed by NHPC (AGovernment of India undertaking) as an aid by Governmentof India to Government of Bhutan via The Ministry ofExternal Affairs
LocationLocation Located around 450 kms. from Indian border coveringtreacherous mountainous & remote terrain in easternBhutan
www.ommetals.com 22
Located around 450 kms. from Indian border coveringtreacherous mountainous & remote terrain in easternBhutan
Period ofPeriod ofCompletionCompletion
24 months from 1999 to 2001
Kurichu Hydro Electric Project (60 MW)Bhutan
ScopeScope Design, Engineering, Manufacturing, Supply, Installationand Commissioning of 5 submerged Radial gates of size10.5 M (Width) x 14 M (Height) (Water head – 26M)operated with 2x165 T Hydraulic Hoists, Stoplog gate,Gantry Crane and other gates.
Challenges &Challenges &AchievementsAchievements
The project was located in a foreign country with alltopographical, geographical & logistics difficulties andaverage road width of 5M in Bhutan
Almost 350 foreign workers were deployed in Bhutan dueto non availability of skilled local manpower in Bhutan
Om Metals was awarded a bonus of 25% of the totalcontract value for early completion of work.
www.ommetals.com 23
The project was located in a foreign country with alltopographical, geographical & logistics difficulties andaverage road width of 5M in Bhutan
Almost 350 foreign workers were deployed in Bhutan dueto non availability of skilled local manpower in Bhutan
Om Metals was awarded a bonus of 25% of the totalcontract value for early completion of work.
Total TonnageTotal Tonnageof Projectof Project
2000 MT
Upper Krishna ProjectAlmatti Dam, Karnataka (India)
ClientClient Krishna Bhagya Jal Nigam Limited, Government ofKarnataka, India
ProjectProject Multipurpose Project belonging to Government ofKarnataka.
Serving dual purposes of Irrigation & Hydro Electric Powergeneration.
LocationLocation Remotely located at around 500 kms. North of Bangalore insouthern India.
Period ofPeriod ofCompletionCompletion
24 months from 1998 to 2000
www.ommetals.com 24
Period ofPeriod ofCompletionCompletion
24 months from 1998 to 2000
Upper Krishna ProjectAlmatti Dam, Karnataka (India)
ScopeScope Design, Engineering, Fabrication, Supply, Erection,Installation, Testing and Commissioning of 14 nos. ofRadial Crest Gates of size 15.00 M (Width) x 15.24 M(Height) with 2nos. Hydraulic Hoists of 115 T Capacity(Each) along with Remote Control, SCADA system andCCTV arrangements for the spillway of Almatti Dam
AchievementsAchievements Installation, Testing & Commissioning of the work wascompleted in a record time of six months
www.ommetals.com 25
Total TonnageTotal Tonnageof Projectof Project
3000 T
Upper Krishna ProjectAlmatti Dam, Karnataka (India)
A very long spanA large quantum of work
www.ommetals.com 26
Chappi Irrigation ProjectJhalawar, Rajasthan (India)
ClientClient Irrigation Department, Government of Rajasthan, India
ProjectProject Irrigation project built for the purpose of supplying waterfor domestic & agricultural purposes
LocationLocation Located around 70 kms. From Kota Rajasthan in centralIndia
www.ommetals.com 28
Chappi Irrigation ProjectJhalawar, Rajasthan (India)
ScopeScope Design, Fabrication, Supply, Installation, Testing andCommissioning of 13 nos. Vertical Lift gates of size 11.5M (Width) x 7.2 M (Height) including mechanical ropedrum hoists, 2 sets of Stoplog gates, Gantry Crane andother allied works.
Period ofPeriod ofCompletionCompletion
36 months from 1997 to 2000
Total TonnageTotal Tonnageof Projectof Project
1000 MT
www.ommetals.com 29
Total TonnageTotal Tonnageof Projectof Project
Prakasam Barrage ProjectVijayawada, Andhra Pradesh (India)
Large multipurpose 55 year Old Irrigation Barrage
Vertical Lift Gates of size 12.87 M x 3.66M – 70 nos. old rustedgates to be replaced with new ones
World Bank aided project – Tight construction schedule withheavy daily penalties for delays
Project connecting twin cities with heavy traffic on Barrage
Reservoir depletion not permitted
No provision for Stoplog gates thus making replacement evenmore difficult – Floating Bulkhead Gate designed for easingspeedy replacement
www.ommetals.com 30
Large multipurpose 55 year Old Irrigation Barrage
Vertical Lift Gates of size 12.87 M x 3.66M – 70 nos. old rustedgates to be replaced with new ones
World Bank aided project – Tight construction schedule withheavy daily penalties for delays
Project connecting twin cities with heavy traffic on Barrage
Reservoir depletion not permitted
No provision for Stoplog gates thus making replacement evenmore difficult – Floating Bulkhead Gate designed for easingspeedy replacement
ScopeScope Fabrication, Supply, erection, Testing & Commissioning – 70Nos. Vertical Gates of size of 12.87 m x 3.66 m includingFluro Rubber Seals for sides and flat rubber seals for bottom.Wt : 1200.00 MT completed in 2003
Prakasam Barrage ProjectVijayawada, Andhra Pradesh (India)
A totally rustedsection
www.ommetals.com 31
Rusted gates
A totally rustedsection
Prakasam Barrage ProjectVijayawada, Andhra Pradesh (India)
Replacement ofSill Beam
www.ommetals.com 32
Newly fabricated &Erected gate
Prakasam Barrage ProjectVijayawada, Andhra Pradesh (India)
Replacement work being carried out whilekeeping same old Hoisting Arrangement
www.ommetals.com 33
Value Creation
Contributing to the development of society through charitable &educational initiatives
Successfully completed critical replacement & repair work for thelifeline barrage connecting Guntur & Vijaywada for World Bank
Creating potential employment opportunities for over 2000 people
Enhancing manpower skill sets through continuous training
Enhanced Shareholder’s wealth through returns of over 2500% inlast 3 years
Tax to exchequer increased ten folds
Contributing to the economy by facilitating early generation ofpower & irrigation
www.ommetals.com 41
Contributing to the development of society through charitable &educational initiatives
Successfully completed critical replacement & repair work for thelifeline barrage connecting Guntur & Vijaywada for World Bank
Creating potential employment opportunities for over 2000 people
Enhancing manpower skill sets through continuous training
Enhanced Shareholder’s wealth through returns of over 2500% inlast 3 years
Tax to exchequer increased ten folds
Contributing to the economy by facilitating early generation ofpower & irrigation
Om Kothari Foundation, acharitable trust is engaged in
philanthropic, social services &runs various educational
institutes
Future Direction
Expanding product profile to address electro-mechanicalequipment segment & attain larger share of Hydro-powerbusiness
Enlarge global footprint through acquisitions and strategic JointVentures in the core business
Establish presence in varied structural steel design & fabricationworks in bridges, large building constructions & heavy engineeringworks
Expand in key & strategic real estate projects and have a panIndia presence
www.ommetals.com 42
Expanding product profile to address electro-mechanicalequipment segment & attain larger share of Hydro-powerbusiness
Enlarge global footprint through acquisitions and strategic JointVentures in the core business
Establish presence in varied structural steel design & fabricationworks in bridges, large building constructions & heavy engineeringworks
Expand in key & strategic real estate projects and have a panIndia presence
Contact Information
Om Metals Infraprojects Ltd.Om Metals Infraprojects Ltd.
Address NBCC Plaza, 4th floor, Tower 3, Sector -5
Pushp Vihar, Saket
New Delhi – 110017, India.
Telephone 91-11-29565552 to 54
Fax 91-11-29565551
www.ommetals.com 43
Email [email protected]
Website www.ommetals.com
Contact Person Mr. Vikas Kothari, Executive Director
Mobile: 91-9811068101
Email: [email protected]