DESIGN OF BOX CULVERT
Size of Haunch =Box length C/L to u/s side =Box length C/L to d/s side =Distance between box & drop wall =Distance between box & curtain wall =
Length of curtain & drop wall =
Density of Soil (Saturated) =Density of Concrete =Angle of Internal friction =Density of Water =Clear cover on all faces =
Intensity of Surcharge =Spacing of Haunch bars =Thickness & Projection of L.C =
Depth of Over-burden soil @ Centre =Maximum Foundation Pressure =Length of Box =
DATA FOR DESIGNClear Span =Clear Height =Bed Level(Top of W.C) =Formation Level =
-
8/13/2019 BOX CULVERT Spread Sheet
2/20
GENERAL DATABed Slope =H.F.L =ASSUMPTIONS
Grade of Concrete =Weight of Track & Ballast =Ballast Cushion =Loading Standard =Thickness of Wearing Coat =Grade of Steel =Equivalent U.D.L =
Formation Width =RESULTSThickness of Top Slab =Thickness of Bottom Slab =Thickness of Vertical Wall =
Effective Span =
Effective Height =
Per. tesile stress in Steel
GENERAL :
Coe of Active Earth Pres'reEffective SpanHeight of SurchargeClear Disperson WidthTotal FillC . D . A
-
8/13/2019 BOX CULVERT Spread Sheet
3/20
Equivalent U.D.LDEAD LOAD
Weight of Top SlabWeight of Earth
Weight of Track & Ballast
Total Dead Load
LIVE LOADEffective SpanEffective Height
Equivalent U.D.L. with CDALive Load
Total Load on Top SlabTotal Load on Bottom Slab (Incl. W.C. weight&
TOTAL PRESSURE ON SOIL
Reaction from Bottom Slab
Water Weight
Total PressureBearing Capacity Shouldnot be less than
SIDE PRESSUREHeight From F.L. to Centreof Top SlabHeight From F.L. to Centreof Bottom Slab
-
8/13/2019 BOX CULVERT Spread Sheet
4/20
Disprn Width for Top SlabDisprn Width for Bott Slab
Density of Submerged Soil
ure of Soil @ TopLat..Presure of Soil @ Bot
Side Pressure @ Centre ofTop Slab ( Lat.Pr. due to D.L + L.L + E.Pr.)Side Pressure @ Centre of
Bottom Slab ( Lat.Pr. due to D.L + L.L + E.Pr.)
Side Pressure @ centre of Top Slab(Lat.Pr.dueSide Pressure @ centre of Bottom Slab(Lat.Pr.d
MOMENTSMab
McdMadMda
DISTRIBUTION FACTORSi abi ad
i cdi da
MOMENTS @ CENTREMc abMc cdMc ad,bc
-
8/13/2019 BOX CULVERT Spread Sheet
5/20
DESIGN CONSTANTSPerm.Bending StressN.A. constant
L.A. constantM.R. constant
NET MOMENT @ CENTREFor Top SlabFor Bottom SlabFor Vertical Wall (Max +ve @ Center)For Vertical Wall (Max -ve @ Center)
DESIGNTOP SLAB :
MomentDepth requiredOverall depthDepth provided
Effective DepthAst required @ EdgeAst required @ CenterSpacing of Bars @ EdgeSpacing of Bars @ Center
*** Provided Spacing @ Center
BOTTOM SLAB :
MomentDepth requiredOverall depthDepth provided
-
8/13/2019 BOX CULVERT Spread Sheet
6/20
Effective DepthAst required @ EdgeAst required @ CenterSpacing of Bars @ Edge
Spacing of Bars @ CenterProvided Spacing
VERTICAL WALL :
MomentDepth required
Overall depthDepth providedEffective DepthAst required @ Edge for -ve MomentAst required @ Center for -ve MomentAst required @ Center for +ve Moment
Minimum dia requiredSuggested diaSpacing of BarsProvided SpacingMinimum Area of Main Steel
DISTRIBUTION STEEL
Area of SteelNo. of BarsMinimum dia requiredSuggested diaSpacing of BarsProvided Spacing
-
8/13/2019 BOX CULVERT Spread Sheet
7/20
SHEAR CALCULATIONS1) @ Face of wallClear span
EUDL FOR SHEAREUDL With CDALive LoadTl. load on top slabTl. load on bot slab
a) Top Slab
Shear ForceShear StressPercentage of SteelPermissible Shear StressBalance Shear Force
b) Bottom SlabShear ForceShear StressPercentage of SteelPermissible Shear StressBalance Shear Force
c) Vertical WallShear ForceShear StressPercentage of SteelPermissible Shear StressBalance Shear Force
-
8/13/2019 BOX CULVERT Spread Sheet
8/20
DESIGN OF SHEAR LINKSa) Top Slab :Spacing of distributors (Twice)No of links /metre
Spacing along Box reqd.Spacing provided:i) Along Boxii) Along span
b) Bottom Slab :
Spacing of distributors (Twice)No of links /metreSpacing along Box reqd.Spacing provided:i) Along Boxii) Along span
c) Vertical Wall :Spacing of Main barsNo of bars /metreSpacing along spanSpacing provided:i) Along Boxii) Along span
2) Check for shear after haunchClear spanEUDL FOR SHEAREUDL With CDALive Load
-
8/13/2019 BOX CULVERT Spread Sheet
9/20
Tl. load on top slabTl. load on bot slab
a) Top Slab
Shear ForceShear StressPercentage of SteelPermissible Shear StressBalance Shear Force
b) Bottom SlabShear ForceShear StressPercentage of SteelPermissible Shear StressBalance Shear Force
c) Vertical WallShear ForceShear StressPercentage of SteelPermissible Shear StressBalance Shear Force
DESIGN OF SHEAR LINKS
a) Top Slab :Spacing of distributors (Twice)No of links /metreSpacing along Box reqd.Spacing provided:i) Along Box
-
8/13/2019 BOX CULVERT Spread Sheet
10/20
ii) Along span
b) Bottom Slab :
Spacing of distributors (Twice)No of links /metreSpacing along Box reqd.Spacing provided:i) Along Boxii) Along span
c) Vertical Wall :Spacing of Main barsNo of bars /metreSpacing along spanSpacing provided:i) Along Boxii) Along span
-
8/13/2019 BOX CULVERT Spread Sheet
11/20
200 mm5.525 m5.750 m3.469 m3.333 m
9.540 m
1.900 t/cum2.500 t/cum
35 Degrees1.000 t/cum
50 mm
15.800 t/m200 mm
0.10 m
1.080 m15 t/sq.m
11.275 m
2.000 m1.500 m
152.610 m155.390 m
-
8/13/2019 BOX CULVERT Spread Sheet
12/20
1 IN 1000.000
M 255.500 t/m0.350 mHMLS
0.150 mFe 415
60.000 t
6.950 m
35 cm35 cm35 cm
2.350 m
1.850 m
= 2000 Kg/sq.cm
= 0.542= 2.400 m= 1.115 m= 5.215 m= 1.465 m= 0.406 m
-
8/13/2019 BOX CULVERT Spread Sheet
13/20
= 60.000 t
= 0.875 t/sqm= 2.118 t/sqm
= 1.131 t/sqm----------------
= 4.124 t/sqm----------------
= 2.400 m= 1.900
= 84.353 t= 6.740 t/sqm
= 10.864 t/sqm= 13.192 t/sqm
= 13.192 t/sqm== 1.350 t/sqm
= 14.542 t/sqm
= 15.000 t/sqm
= 1.315 m
= 3.215 m
-
8/13/2019 BOX CULVERT Spread Sheet
14/20
= 4.315 m= 6.215 m
= 0.900 t/cum
= 1.354 t/sqm= 3.310 t/sqm
= 4.029 t/sqm
= 5.168 t/sqm
= 2.045 t/sqm= 3.790 t/sqm
= 5.214 t-m
= 6.332 t-m= 1.349 t-m= 1.418 t-m
= 0.442= 0.558
= 0.442= 0.558
= 7.822 t-m= 9.498 t-m= 2.075 t-m
-
8/13/2019 BOX CULVERT Spread Sheet
15/20
== 0.319
= 0.894= 11.521
= 4.437 t-m= 5.215 t-m= -1.758 t-m= -2.725
= 4.796 t-m= 20.404 cm= 26.404 cm= 35.000 cm
= 29.000 cm= 6.661 sq cm= 9.25392381= 47.162 cm
33.949= 25.000 cm
= 5.580 t-m= 22.007 cm= 28.007 cm= 35.000 cm
-
8/13/2019 BOX CULVERT Spread Sheet
16/20
= 29.000 cm= 8.387 sq cm
10.765= 37.457 cm
29.183= 25.000 cm
= 4.347 t-m= 19.425 cm
= 25.425 cm= 35.000 cm= 29.000 cm= 8.387 sq cm
5.25734526
= 14.6142643 mm= 12 mm= 37.457 cm= 20.000 cm=
= 2.625 sq cm= 3.342= 8.17588381 mm= 10 mm= 29.920 cm= 20.000 cm
-
8/13/2019 BOX CULVERT Spread Sheet
17/20
2.000 m
= 77.440 t= 108.871 t= 7.732 t/sqm= 11.856 t/sqm= 14.200 t/sqm
= 12.008 t= 2.451 Kg/sq cm= 0.231 %= 2.123 Kg/sq.cm= 1602.712 Kg
= 14.345 t= 2.927 Kg/sq cm= 0.231 %= 2.123 Kg/sq.cm= 3939.740 Kg
= 4.099 t= 0.837 Kg/sq cm= 0.231 %= 2.123 Kg/sq.cm= -6305.871 Kg
-
8/13/2019 BOX CULVERT Spread Sheet
18/20
= 200.000 mm= 5.000
= 260.752 mm
= 200.000 mm= 200.000 mm
= 200.000 mm= 5.000= 260.752 mm
= 200.000 mm= 200.000 mm
= 200.000 mm= 5.000= 260.752 mm
= 200.000 mm= 200.000 mm
2.000 m= 77.440 t= 108.871 t= 7.732 t/sqm
-
8/13/2019 BOX CULVERT Spread Sheet
19/20
= 11.856 t/sqm= 14.200 t/sqm
= 9.636 t= 3.323 Kg/sq cm= 0.390 %= 2.748 Kg/sq.cm= 1667.348 Kg
= 11.505 t= 3.967 Kg/sq cm= 0.390 %= 2.748 Kg/sq.cm= 3535.627 Kg
= 3.134 t= 1.081 Kg/sq cm= 0.390 %= 2.748 Kg/sq.cm= -4835.311 Kg
= 200.000 mm= 5.000= 217.500 mm
= 200.000 mm
-
8/13/2019 BOX CULVERT Spread Sheet
20/20
= 200.000 mm
= 200.000 mm= 5.000= 217.500 mm
= 200.000 mm= 200.000 mm
= 200.000 mm= 5.000= 217.500 mm
= 200.000 mm= 200.000 mm