    Description of Item Unit Quantity Unit Rate Total

    1 Earth work in excavation in all kinds of soil for foundation trenches

    including. layout, providing center lines, local bench-mark pillars, leveling,

    ramming and preparing the base, f ixing bamboo spikes and marking layout

    with chalk powder, providing necessary tools and plants, protecting and

    maintaining the trench dry etc., stacking, cleaning the excavated earth at a

    safe distance out of the area enclosed by the layout etc. all complete and

    accepted by the Engineer, subject to submit method statement of carrying out

    excavation work to the Engineer for approval. However,Engineers approval

    shall not relieve the contractor of his responsibilities and obligations under thecontract.

    Cum 2,015.00 270.00 544,050.00

    Layout and marking for earthwork in excavation in foundation accepted by

    the Engineer. [Plinth area of the structure shall be considered for

    measurement]

    Earthwork in excavation in foundation trenches up to 1.5 m depth and

    maximum 10 m lead: in soft clayey soil / loose sand / silt

    2 One layer of brick flat soling in foundation or in floor with first class or

    picked jhama bricks including preparation of bed and filling the interstices with

    local sand, leveling etc. complete and accepted by the Engineer.

    sqm. 660 375.00 247,500.00

    3 Earth filling in foundation trenches and plinth in 150 mm layers with

    carted earth carried by truck or any other means loading and unloading atboth ends including leveling, watering and consolidating including local

    carr iage each layer up to finished level including cost of water and test

    (carried from beyond 300 m) etc. all complete and accepted by the Engineer.

    For other than Dhaka, Ctg., Sylhet, Rajshahi, Barishal, Khulna metropolitan

    area and N'ganj district

    1350 180.00 243,000.00

    4 Exposed brick works (for exterior wall without outside plaster) with

    special quality sorted out first class bricks, very carefully laid in cement sand

    (F.M. 1.2) mortar (1:4)) in superstructure with uniform width and depth joints,

    true to vertical and horizontal l ines including raking out joints scaffolding,

    soaking the bricks at least for 24 hours before use, washing and screening of

    sand. Curing at least for 7 days and high class flush pointing with cement

    sand (F.M. 1.2) mortar (1:1) including cost of water, electr icity and other

    charges etc all complete and accepted by the Engineer.(Cement: CEM-II/A-M)

    In round floor

    cum 260 5,750.00 1,495,000.00

    5 125 mm brick works with first class bricks in cement sand (F.M. 1.2)

    mortar (1:4) and making bond with connected walls including necessary

    scaffolding, raking out joints, cleaning and soaking the bricks for at least 24

    hours before use and washing of sand curing at least for 7 days in all floors

    including cost of water, electricity and other charges etc. all complete and

    accepted by the Engineer.

    (Cement: CEM-II/A-M)

    sqm. 2030 725.00 1,471,750.00

    6 Reinforced cement concrete works using steel shutter with minimum

    cement content relates to mix ratio 1:1.5:3 having minimum f 'cr = 30 Mpa,

    and satisfying a specified compressive strength fc = 25 Mpa at 28 days on

    standard cylinders as per standard practice of Code ACI/BNBC/ASTM &

    Cement conforming to BDS EN-197-1-CEM 1 (32.5 to 52.5 N) / ASTM-C 150

    Type I , best quality Sylhet sand or coarse sand of equivalent F.M. 2.2 and

    20 mm down wel l graded stone chips conforming to ASTM C-33, making,

    placing shutter in posit ion and maintaining true to plumb, making shutter

    water-tight properly, placing reinforcement in position; mixing with standard

    mixer machine with hopper, fed by standard measuring boxes, casting in

    forms, compacting by v ibrator machine and cur ing at least for 28 days,

    removing centering-shuttering including cost of water, electricity, testing and

    other charges etc. all complete approved and accepted by the Engineer.

    (Rate is excluding the cost of reinforcement and i ts fabricat ion, binding,

    welding and placing)

  • 8/13/2019 BOQ Option 01

    2/4

    2Item

    No

    Description of Item Unit Quantity Unit Rate Total

    Individual and continuous footings of column at plinth level.

    i Concrete cum 170 8,250.00 1,402,500.00

    ii Formwork/shuttering, prop and necessary supports etc. (steel) sqm. 480 575.00 276,000.00

    7 Reinforced cement concrete works using steel shutter with minimum

    cement content relates to mix ratio 1:1.5:3 having minimum f'cr = 30 Mpa,

    and satisfying a specified compressive strength fc = 25 Mpa at 28 days onstandard cylinders as per standard practice of Code ACI/BNBC/ASTM &

    Cement conforming to BDS EN-197-1-CEM 1 (32.5 to 52.5 N) / ASTM-C 150

    Type I , best quality Sylhet sand or coarse sand of equivalent F.M. 2.2 and

    20 mm down wel l graded stone chips conforming to ASTM C-33, making,

    placing shutter in posit ion and maintaining true to plumb, making shutter

    water-tight properly, placing reinforcement in position; mixing with standard

    mixer machine with hopper, fed by standard measuring boxes, casting in

    forms, compacting by v ibrator machine and cur ing at least for 28 days,

    removing centering-shuttering including cost of water, electricity, testing and

    other charges etc. all complete approved and accepted by the Engineer.

    (Rate is excluding the cost of reinforcement and i ts fabricat ion, binding,

    welding and placing)

    Foundation beam

    i Concrete cum 158 8,950.00 1,414,100.00

    ii Formwork/shuttering, prop and necessary supports etc. (Steel) sqm. 1730 575.00 994,750.00

    8 Reinforced cement concrete works using steel shutter with minimum

    cement content relates to mix ratio 1:1.5:3 having minimum f'cr = 30 Mpa,

    and satisfying a specified compressive strength fc = 25 Mpa at 28 days on

    standard cylinders as per standard practice of Code ACI/BNBC/ASTM &

    Cement conforming to BDS EN-197-1-CEM 1 (32.5 to 52.5 N) / ASTM-C 150

    Type I , best quality Sylhet sand or coarse sand of equivalent F.M. 2.2 and

    20 mm down wel l graded stone chips conforming to ASTM C-33, making,placing shutter in posit ion and maintaining true to plumb, making shutter

    water-tight properly, placing reinforcement in position; mixing with standard

    mixer machine with hopper, fed by standard measuring boxes, casting in

    forms, compacting by v ibrator machine and cur ing at least for 28 days,

    removing centering-shuttering including cost of water, electricity, testing and

    other charges etc. all complete approved and accepted by the Engineer.

    (Rate is excluding the cost of reinforcement and i ts fabricat ion, binding,

    welding and placing)

    Pedestals, column, column capitals, lift walls and walls

    i Concrete, Ground floor & below plinth level 160 9,250.00 1,480,000.00

    ii Formwork/Shuttering, prop and Necessary supports etc (Steel) 2080 575.00 1,196,000.00

    9 Supplying, fabricat ion and fixing to details as per design deformed bar

    reinforcement in concrete in accordance with BDS 1313 : 1991 standard

    including straightening and cleaning rust, i f any, bending and binding in

    posit ion including supply of G.I. wires etc. complete in all respects and

    accepted by the Engineer.

    Per 100

    Kg

    780 8,100.00 6,318,000.00

    400-grade deformed bar with minimum fy = 400 MPa & tensile strength at

    least 460 MPa: up to ground floor

  • 8/13/2019 BOQ Option 01

    3/4

    3Item

    No

    Description of Item Unit Quantity Unit Rate Total

    10 Minimum 12 mm thick cement sand (F.M. 1.2) plasterwith neat cement

    finishing to plinth wall (1:4) with cement up to 150 mm below ground level

    with neat cement finishing including washing of sand, finishing the edges and

    corners and curing at least for 7 days, cost of water, electr icity and other

    charges etc. all complete in all respect as per drawing and accepted by the

    Engineer.

    (Cement: CEM-II/A-M)

    Ground floor.

    sqm 2750 225.00 618,750.00

    11 Minimum 12 mm thick cement sand (F.M. 1.2) plaster (1:4) with fresh

    cement to wall both inner-and outer surface, f inishing the corner and edges

    including washing of sand cleaning the surface, scaffolding and curing at

    least for 7 days, cost of water, electricity and other charges etc. all complete

    in all respect as per drawing and accepted by the Engineer.

    (Cement: CEM-II/A-M)

    Ground floor.

    sqm 4880 325.00 1,586,000.00

    12 Cement Paint of approved quality and colour delivered from authorized local

    agent of the manufacturer in a sealed container, made from water based

    powder mixed with water (1:1), applying first coat, curing the same after six

    hours for 24 hours, second coat applied and curing the same for 7 (seven)

    days etc, taking care and cleaning the surface fully from grease, oily

    substances, old paints, l ime wash, fungus, algae etc., sand papering the

    surface before applying 1st and 2nd coat, complete inc luding cost of

    electricity, water and other changes etc. complete in all floors and accepted

    by the Engineer.

    sqm. 4880 125.00 610,000.00

    13 Supplying, fitting and fixing 12 BWG barbed wire (2 ply, 4 points) in fencing

    work @ 150 mm c/c in both horizontally and vertically, supported by 38 x

    38 x 6 mm M.S. angle post (300 mm embedded in R.C.C. or in brick work

    with a cement concrete base of 75 x 75 x 300 mm) 600 mm vertical and 450

    mm inclined or as per requirement @ 2.4 m c/c inc luding straighten ing,

    binding the jo ints with 18 BWG wire making holes in the angle etc. in /c

    supplying of all necessary materials complete in all respect and accepted by

    the Engineer.

    (Rate is excluding the cost of R.C.C or brick work or C.C. which is to be paid

    as per corresponding items in the schedule)

    sqm 1070 850.00 909,500.00

    14 sqm. 13.5 7,950.00 107,325.00Supplying, fitting, fixing, and installation of Ordinary type M.S. gate(double leaf)of any design and shape with 38 x 38 x 6 mm M.S. Angleouter frame having 16 mm dia M.S. rod placed vertically @ 75 mm c/c. atbottom part and top part (arrows) and also placed horizontally at bottom forinterconnection of 16 mm dia M.S. rod placed vertically as per design, thetop part covered with 18 BWG M.S. sheet and fixed with 4 Nos. 38 x 6 mmF.I. bars placed diagonally and 4 Nos. 38 x 6 mm F.I. bars placedhorizontally and vertically all passing through the center, providing lockingarrangements on 3 mm thick M.S. plate one for main gate and one forminimum 300 x 1025 mm pocket gate with 38 x 38 x 6 mm M.S. angle and16 mm dia M.S. rod placed vertically @ 75 mm c/c, providing 38 x 38 x 6mm M.S. angle clamps fitted and fixed with the outer frame of the maingate, the clamp being embedded in R.C.C. or R.C.C. core pillar with cementconcrete (1:2:4) in masonry including cutting holes and mending good the

    damages, finishing, curing etc. including riveting, welding as and wherenecessary, painting two coats with approved quality of synthetic enamelpaint over a coat of priming of anti-corrosive paint etc. all complete as perdrawing, design and accepted by the Engineer.(Rate is excluding the cost of paint).

  • 8/13/2019 BOQ Option 01

    4/4

    4Item

    No

    Description of Item Unit Quantity Unit Rate Total

    15 Painting to door and window frames and shutters in two coats with approved

    best quality and colour ofsynthetic enamel paint delivered from authorized

    local agent of the manufacturer in a sealed container, having highly water

    resistant, high bondibilty, f lexible, using specific brand thinner applied by

    brass/roller/spray over a coat of priming elapsing time for drying including

    surface cleaning from dust, oil or dirt, smoothening, finishing and polishing

    with sand paper and necessary tools, scaffolding, testing charges etc. all

    complete in all floors approved and accepted by the Engineer.

    sqm. 30 170.00 5,100.00

    Total 20,919,325.00

    Inword: BDT. Two crore nine lakh ninteen thousand three hundred &

    twenty five only.