SISTEMA DE MUESTREO PROYECTO: 36 CC BAJA CALIFORNIA III ID.: 1AM8-PA-14.E020457.000030 ID2. : RE V.: 1 HOJA 1 DE 3 ANEXO I : Detalle del alcance ALCANCE BÁSICO_ SISTEMA DE MUESTRO BCIII QTY ALCANCES DESIGN Engineering for supply --- Coordination with others --- MATERIALS & EQUIPMENT Equipments, modules and materials (1) --- HRSG and Common Services Conditioning Rack 1 HRSG and Common Services Analysis Rack 1 Auxiliary Boiler Conditioning Rack 1 Auxiliary Boiler Analysis Rack 1 Demi Water Analysis Rack 1 Condenser and Circulating Water Analysis Rack 1 Electrical and Control Cabinet 1 Sample Extraction Pumps (if required) Alarm panel --- Laboratory basin --- Eye-washe --- Container for the Supply (a) 2 Enclosure --- Air-conditioning system --- Interconnecting piping between equipments (2) --- Consumables (first filling) --- Anchoring bolts --- MANUFACTURING Manufacturing at factory --- Test at factory --- Equipment coatings --- Inspections at factory --- TRANSPORTATION Packaging --- Transport to plant (complete) --- Exworks (Loaded and lashed) --- DAP in Baja California III work site. 1 CONSTRUCTION & ERECTION Main supports and hangers (3) --- Equipment final painting (4) --- Equipment insulation (4) --- COMMISSIONING Commissioning Supervisor (5 DAYS) ---

description

zxczxc

Transcript of 1am8-19-Qu_-fa-iicem-4001 Rev00 Sistema de Muestreo Anexo i

  • SISTEMA DE MUESTREO

    PROYECTO: 36 CC BAJA CALIFORNIA III

    ID.: 1AM8-PA-14.E020457.000030 ID2.:

    REV.:

    1 HOJA 1 DE 3

    ANEXO I : Detalle del alcance

    ALCANCE BSICO_ SISTEMA DE MUESTRO BCIII QTY

    ALCANCES

    DESIGN

    Engineering for supply ---

    Coordination with others ---

    MATERIALS & EQUIPMENT

    Equipments, modules and materials (1) ---

    HRSG and Common Services Conditioning Rack 1

    HRSG and Common Services Analysis Rack 1

    Auxiliary Boiler Conditioning Rack 1

    Auxiliary Boiler Analysis Rack 1

    Demi Water Analysis Rack 1

    Condenser and Circulating Water Analysis Rack 1

    Electrical and Control Cabinet 1

    Sample Extraction Pumps (if required)

    Alarm panel ---

    Laboratory basin ---

    Eye-washe ---

    Container for the Supply (a) 2

    Enclosure ---

    Air-conditioning system ---

    Interconnecting piping between equipments (2) ---

    Consumables (first filling) ---

    Anchoring bolts ---

    MANUFACTURING

    Manufacturing at factory ---

    Test at factory ---

    Equipment coatings ---

    Inspections at factory ---

    TRANSPORTATION

    Packaging ---

    Transport to plant (complete) ---

    Exworks (Loaded and lashed) ---

    DAP in Baja California III work site. 1

    CONSTRUCTION & ERECTION

    Main supports and hangers (3) ---

    Equipment final painting (4) ---

    Equipment insulation (4) ---

    COMMISSIONING

    Commissioning Supervisor (5 DAYS) ---

  • SISTEMA DE MUESTREO

    PROYECTO: 36 CC BAJA CALIFORNIA III

    ID.: 1AM8-PA-14.E020457.000030 ID2.:

    REV.:

    1 HOJA 2 DE 3

    Commissioning Supervisor (USD/day) (5)

    Mobililization (USD/journey)

    Accomodation and living expenses (USD/day)

    Other commissioning supervision costs (6)

    Commissioning spare parts 1

    Consumables for commissioning 1

    Acceptance test supervision at site(including instrumentation) 1

    LEGALIZATION

    Design and Official documentation as required by authorities ---

    Special Certificates ---

    MISCELLANEOUS

    Training at Site ---

    Training in Spanish language 1

    Training course documentation in Spanish language 1

    Documentation ---

    Documentation during project (English or Spanish language) ---

    Final documentation (English or Spanish language) ---

    O&M Manuals and other manuals (Spanish language) (11) 1

    Quality control ---

    Guarantees and penalties (7) ---

    OPERATION & MAINTENANCE (8)

    Special tools 1

  • SISTEMA DE MUESTREO

    PROYECTO: 36 CC BAJA CALIFORNIA III

    ID.: 1AM8-PA-14.E020457.000030 ID2.:

    REV.:

    1 HOJA 3 DE 3

    OPCIONALES

    OPCIONALES_ SISTEMA DE MUESTRO BCIII

    CFR in Ensenada port. 1 12.125,00 USD

    FOB (loaded and stowed, export port to be indicated) 1 3.600,00 USD

    Acceptance test at site 1 12.864,00 USD

    Test instruments 1 N/A

    Extended Warranties ---

    Extended Warranties valid up to 16/08/2018 1 27.300,00 USD

    Extended Warranties per month after 16/08/2018 1 1.800,00 USD

    Consumables 1

    Spare parts for two years 1 5.307,00 USD

    Maintenance Services ---

    Technician service cost (including accomodation, ...) per day 990,00 USD

    Mobililization (USD/journey) 1.900,00 USD

    Maintenance contract 1

    Erection Supervisor (5) (2 weeks) USD --- 12500 USD

    Erection Supervisor (USD/day) (5) YES 950 USD

    Mobililization (USD/journey) YES 2200 USD

    Accomodation and living expenses (USD/day) YES 350 USD

    Other erection supervision costs (6) YES 0