SHEET INDEX SHEET No. DESCRIPTION 1. COVER SHEET - GENERAL NOTES, SHEET INDEX AND LEGEND 2. ENGINEERING PLAN SHEET 3. OSD TANK SECTION AND DETAILS 4. RETAINING WALL DETAILS 5. SOIL & WATER MANAGEMENT PLAN 6. SOIL & WATER MANAGEMENT DETAILS A1 BARKER RYAN STEWART TOTAL PROJECT SOLUTIONS PLANNING - PROJECT MANAGEMENT - ENGINEERING - CERTIFICATION SYDNEY P: 02 9659 0005 CENTRAL COAST P: 02 4325 5255 HUNTER P: 02 4966 8388 brs.com.au [email protected] ABN: 26 134 067 842 LOCATION OF WORKS LOCALITY SKETCH NOT TO SCALE PROJECT NUMBER: SY18011C11 Council Ref: REV C NORTH EXISTING SERVICES EX. STORMWATER DRAINAGE LINE EX. OVERHEAD POWERLINE EX. WATERMAIN EX. TELSTRA EX. RECYCLE WATER EX. GAS RCW RCW BLACKTOWN CITY COUNCIL PROPOSED RESIDENTIAL DEVELOPMENT 165 GUNTAWONG ROAD, ROUSE HILL LOT 1 DRAINAGE DESIGN PLANS Prepared for: THE BATHLA GROUP Pty Ltd 1. ALL WORKS SHALL BE CARRIED OUT IN ACCORDANCE WITH BLACKTOWN CITY COUNCIL'S DCP REQUIREMENTS AND ENGINEERING GUIDE FOR DEVELOPMENT & CIVIL WORKS SPECIFICATION AND/OR AS DIRECTED BY THEIR REPRESENTATIVE. 2. THE CONTRACTOR IS TO IDENTIFY, LOCATE AND LEVEL ALL EXISTING SERVICES PRIOR TO THE COMMENCEMENT OF CONSTRUCTION WORKS AND WHERE NECESSARY MAKE ARRANGEMENTS WITH THE RELEVANT AUTHORITY TO RELOCATE OR ADJUST WHERE NECESSARY. ALL UTILITY ADJUSTMENTS ARE AT THE DEVELOPERS EXPENSE. 3. COUNCIL'S TREE PRESERVATION ORDER MUST BE OBSERVED AND NO TREE SHALL BE FELLED, LOPPED OR REMOVED WITHOUT THE PRIOR APPROVAL OF COUNCIL. 4. ALL WORKS SHALL BE UNDERTAKEN IN ACCORDANCE WITH THE WORK HEALTH & SAFETY ACT 2011 AND ALL RELEVANT OCCUPATIONAL HEALTH & SAFETY POLICIES AND REGULATIONS. 5. DIMENSIONS SHALL NOT BE SCALED FROM THE PLANS. CLARIFICATION OF DIMENSIONS SHALL BE SOUGHT FROM THE SUPERINTENDENT OR REFERRED TO THE DESIGNER. 6. SURVEY MARKS SHOWN THUS SHALL BE MAINTAINED AT ALL TIMES. WHERE RETENTION IS NOT POSSIBLE THE ENGINEER SHALL BE NOTIFIED AND CONSENT RECEIVED PRIOR TO THEIR REMOVAL. 7. ALL NEW WORK IS TO MAKE A SMOOTH JUNCTION WITH EXISTING CONDITIONS. 8. THE CONTRACTOR IS NOT TO ENTER UPON NOR DO ANY WORK WITHIN OR ON ADJACENT LANDS WITHOUT THE PRIOR APPROVAL OF THE SUPERINTENDENT AND THE WRITTEN PERMISSION OF THE OWNERS. 9. SEDIMENT MEASURES SHALL BE IMPLEMENTED PRIOR TO SOIL DISTURBANCE IN KEEPING WITH THE 4th EDITION OF LANDCOMS "SOILS AND CONSTRUCTION - MANAGING URBAN STORMWATER" MARCH 2004 TO THE SATISFACTION OF COUNCIL'S REPRESENTATIVE AND AS SHOWN IN THESE DRAWINGS. 10. THE CONTRACTOR SHALL CLEAR AND DISPOSE OF ONLY THOSE TREES THAT ARE CONDEMNED BY THE PLANS. COUNCIL'S TREE PRESERVATION ORDER SHALL BE OBSERVED AND NO TREE SHALL BE FELLED, LOPPED OR REMOVED WITHOUT PRIOR APPROVAL. 11. THE CONTRACTOR SHALL CLEAR THE SITE BY REMOVING ALL RUBBISH, FENCES, OUT HOUSES, CAR BODIES, DEBRIS, ETC. THE CONTRACTOR SHALL NOT DISPOSE OF ANY DEBRIS BY BURNING OFF IN AN OPEN FIRE. 12. UNSOUND MATERIALS AS DETERMINED BY COUNCIL'S REPRESENTATIVE SHALL BE REMOVED FROM ROADS AND LOTS PRIOR TO ANY FILLING. 13. ALL SITE REGRADING AREAS SHALL BE GRADED TO THE SATISFACTION OF COUNCIL'S REPRESENTATIVE. THE CONTRACTOR SHALL TAKE LEVELS ON THE EXISTING SURFACE AFTER STRIPPING TOPSOIL AND PRIOR TO COMMENCING ANY FILL OPERATIONS. 14. SURPLUS EXCAVATED MATERIAL SHALL BE PLACED OR DISPOSED OF IN ACCORDANCE WITH THE CONTRACT, OR AS DIRECTED BY THE SUPERINTENDENT. 15. ALL SITE FILLING SHALL BE PLACED IN LAYERS NOT EXCEEDING 300mm AND COMPACTED IN ACCORDANCE WITH COUNCIL'S SPECIFICATION AND BE TESTED AT THE REQUIRED INTERAVLS BY AN APPROVED N.A.T.A. GEOTECHNICAL LABORATORY. 16. MINIMUM 150mm THICK TOPSOIL SHALL BE SPREAD ON ALL FOOTPATHS, BERMS, BATTERS AND SITE REGRADING AREAS. EXCESS TOPSOIL SHALL BE DISPOSED OF AS DIRECTED BY THE SUPERINTENDENT. 17. ALL LAND DISTURBED BY EARTHWORKS SHALL BE SPRAY-GRASSED, OR SIMILARLY TREATED TO ESTABLISH GRASS COVER. SEED MIXTURES ARE TO BE APPROVED BY COUNCIL PRIOR TO SPRAYING. ALL GRASSED AREAS SHALL BE REGULARLY WATERED AND MAINTAINED UNTIL EXPIRATION OF THE MAINTENANCE PERIOD. 18. THE CONTRACTOR SHALL MAINTAIN DUST CONTROL THROUGHOUT THE DURATION OF THE PROJECT. 19. ALL PITS DEEPER THAN 1.2m SHALL HAVE STEP IRONS PROVIDED IN ACCORDANCE WITH COUNCIL'S STANDARDS. 20. ALL DRAINAGE LINES THROUGH LOTS SHALL BE CONTAINED WITHIN THEIR EASEMENTS AND CONFORM WITH COUNCIL'S STANDARDS. 21. ALL DRAINAGE LINES ON HIGH SIDE AND UNDER ROADS SHALL BE BACKFILLED WITH SHARP SAND AND HAVE 3.0m OF AGRICULTURAL LINE WRAPPED IN AN APPROVED FILTER FABRIC, DISCHARGING INTO THE DOWNSTREAM PIT AND AS DIRECTED BY COUNCIL. 22. SUBSOIL DRAINS SHALL BE CONSTRUCTED TO THE SATISFACTION OF COUNCIL'S REPRESENTATIVE. 23. PRECAST KERB INLET LINTELS SHALL BE USED ON GULLY PITS. GRATES SHALL BE "WELDLOK" TYPE GG 78-51 OR APPROVED EQUIVALENT. 24. PROVIDE VEHICULAR ENTRIES IN KERB AND GUTTER WHERE SHOWN OR WHERE DIRECTED BY THE SUPERINTENDANT. 25. GUIDE POSTS SHALL BE 100mm X 50mm HARDWOOD, PAINTED WHITE WITH REFLECTORS. 26. ERECT STREET NAME SIGNS, CONDUIT WARNING SIGNS AND NO THROUGH ROAD SIGNS WHERE SHOWN OR WHERE DIRECTED BY COUNCIL'S REPRESENTATIVE. 27. CONDUITS SHALL BE LAID WHERE REQUIRED BY RELEVANT AUTHORITIES AFTER POSITIONS HAVE BEEN DETERMINED BY THE RELEVANT AUTHORITIES AND BEFORE FINAL A.C. IS LAID 28. POSITION OF CONDUITS SHALL BE MARKED ON THE KERB. 29. FELLED TREES SHALL BE SALVAGED FOR RE-USE AS WOODCHIP MULCH OR LOG FORM FOR SITE REHABILITATION, NON-SALVAGEABLE MATERIAL SUCH AS STUMPS AND ROOTS SHALL BE DISPOSED OF OFF SITE. 30. THE CONTRACTOR SHALL PROVIDE MINIMUM 24 HOURS NOTICE TO COUNCIL'S REPRESENTATIVE FOR ALL INSPECTIONS. 31. THE CONTRACTOR SHALL MAINTAIN SERVICES AND ALL WEATHER ACCESS AT ALL TIMES TO THE ADJOINING PROPERTIES. 32. THE CONTRACTOR SHALL UNDERTAKE TRAFFIC CONTROL MEASURES TO COUNCIL'S SATISFACTION AND SHALL DISPLAY ALL APPROPRIATE WARNING SIGNS THROUGHOUT THE DURATION OF CONSTRUCTION. 33. ALL NATURAL SURFACE DATA HAS BEEN DETERMINED BY TERRAIN MODELLING. ALL CONSTRUCTION SITE WORKS MUST BE CARRIED OUT USING THE BENCH MARKS SHOWN ON THESE DRAWINGS. 34. 100yr FLOW PATHS TO BE FORMED AT TIME OF CONSTRUCTION. 35. STRUCTURAL CERTIFICATION REQUIRED FOR CONSTRUCTION OF MAJOR AND NON-STANDARD STRUCTURES. 36. DRIVEWAYS/LAYBACKS TO HAVE MINIMUM 1m CLEARANCE FROM POWER AND LIGHT POLES AND STORMWATER DRAINS AND 6m CLEARANCE FROM KERB RETURN TP's 37. VEHICULAR CROSSINGS TO BE 4.5m WIDE AT KERB AND GUTTER. 38. ALL STREET NAME POLES & LIGHT POLES SHALL BE BLACK POWDER COATED IN ACCORDANCE WITH BLACKTOWN CITY COUNCIL'S ENGINEERING GUIDE FOR DEVELOPMENT CONDITION 5.5.4. 39. ALL DISTURBED AREAS & STOCKPILES TO BE STABILISED WITHIN 14 DAYS. 40. PROVIDE 300mm WIDE STRIP OF TURF BEHIND KERB & 1m WIDE AROUND ALL SURFACE INLET PITS. GENERAL NOTES 41. THE HOURS OF ANY OFFENSIVE NOISE-GENERATING DEVELOPMENT WORKS SHALL BE LIMITED TO BETWEEN 7:00am TO 6:00pm, MONDAYS TO FRIDAYS & 8:00am TO 1:00pm SATURDAYS WITH NO SUCH WORK TO BE UNDERTAKEN AT ANY TIME ON SUNDAYS OR PUBLIC HOLIDAYS 42. ONCE 60% OF THE UPSTREAM LOTS ARE FULLY DEVELOPED THE IMMEDIATE BIORETENTION ELEMENTS TOGETHER WITH THE TEMPORARY PROTECTION MEASURES FOR THE BIORETENTION AREA ARE TO BE INSTALLED. ONCE THESE ELEMENTS ARE INSTALLED, OPERATIONAL AND CERTIFIED BY AN ENGINEER REGISTERED ON NER THAT THEY ARE CONSTRUCTED IN ACCORDANCE WITH THE APPROVED PLAN, THE INTERMEDIATE BIORETENTION CONSTRUCTION BOND CAN BE RELEASED. 43. THE TEMPORARY PROTECTION MEASURES FOR THE BIORETENTION AREA ARE NOT REMOVED, NOR THE FILTER AREA OF THE BASIN PLANTED OUT UNTIL A MINIMUM OF 90% OF THE UPSTREAM CATCHMENT DRAINING TO THE BASIN IS FULLY DEVELOPED INCLUDING LANDSCAPING AS AGREED WITH COUNCIL. ONCE 90% OF THE UPSTREAM CATCHMENT IS DEVELOPED, THE BIORETENTION BASINS MUST BE COMPLETED WITHIN SIX MONTHS. 44. PROVIDE A ROOF WATER OUTLET TO KERB FOR EACH PROPOSED LOT THAT DRAINS TO THE STREET. 45. ALL STREET NAME POLES & LIGHT POLES SHALL BE BLACK POWDER COATED IN ACCORDANCE WITH BLACKTOWN CITY COUNCIL'S ENGINEERING GUIDE FOR DEVELOPMENT. 46. ALL DISTURBED AREAS & STOCKPILES ARE TO BE STABILISED WITHIN 14 DAYS. 47. PROVIDE 300mm WIDE TURF STRIPS BEHIND ALL KERBS & 1m WIDE AROUND ALL SURFACE INLET PITS. 48. ALL UTILITY ADJUSTMENTS ARE TO BE UNDERTAKEN AT THE DEVELOPERS EXPENSE. 49. SERVICE CONDUITS ARE TO BE PLACED WHERE REQUIRED BY THE RELEVANT AUTHORITIES. 50. DRIVEWAYS/LAYBACKS TO HAVE MINIMUM 1.0m CLEARANCE FROM POWER AND LIGHT POLES AND STORMWATER DRAINS, AND 6m CLEARANCE FROM KERB RETURN TP's CLARKE STREET GUNTAWONG ROAD TALLAWONG ROAD STORMWATER DRAINAGE PIT WITH ENVIROPOD EP AP1 16 BP1 21 CP1 22 PIT TYP 'A' - 450mm x 450mm GRATED SURFACE INLET PIT LOT 1 PIT NUMBER PIT PIT TYP 'B' - 600mm x 600mm GRATED SURFACE INLET PIT LOT 1 PIT NUMBER PIT PIT TYP 'C' - 900mm x 900mm GRATED SURFACE INLET PIT LOT 1 PIT NUMBER PIT CONSTRUCT NEW LAYBACK AND DRIVEWAY CROSSING IN ACCORDANCE WITH BLACKTOWN COUNCIL STANDARDS AND REQUIREMENTS. NOTE VC GTD CONSTRUCT 150mm WIDE GRATED TRENCH DRAIN AND RETICULATED TO STORMWATER PIT IN THE BACKYARD IN EACH LOT WHERE LABEL TO ENSURE IT DRAINS THROUGH WATER QUALITY DEVICE (SF) . PROVIDE HEAVY DUTY GRATE AND FRAME. ALL ROOF DRAINAGE TO BE RETICULATED TO RAINWATER RE-USE TANKS AND OVERFLOW TO BE CONNECTED TO BACKYARD PIT. EP PROVIDE ENVIROPOD TO NOMINATED STORMWATER PITS DP1 22 PIT TYP 'D' - (1.8m LINTEL) KERB INLET PIT 900mm x 900mm GRATED SURFACE INLET PIT LOT 1 PIT NUMBER PIT RWT EP1 22 PIT TYP 'E' - ACCESS PIT 900mm x 900mm SEALED PIT LOT 1 PIT NUMBER PIT > > 24 FUTURE STORMWATER PIPE INSTALL (BRICKED OFF FOR FUTURE CONNECTION) ROOF DRAINAGE LINE PROPOSED DRAINAGE LINE EXISTING DRAINAGE LINE NATURAL SURFACE CONTOUR DESIGN SURFACE CONTOUR TABLE DRAIN EXISTING HEADWALL PROPOSED HEADWALL LIMIT OF WORKS PIT NUMBER SUBSOIL DRAINAGE LINE GRATED SURFACE INLET PIT SEALED PIT KERB INLET PIT RETAINING WALL LEGEND PIT 1/2 SS LIMIT OF CONSTRUCTION

Transcript of 06 SWMP Details - Home - Blacktown City

Page 1: 06 SWMP Details - Home - Blacktown City

SHEET INDEX

SHEET No. DESCRIPTION

1. COVER SHEET - GENERAL NOTES, SHEET INDEX AND LEGEND

2. ENGINEERING PLAN SHEET

3. OSD TANK SECTION AND DETAILS

4. RETAINING WALL DETAILS

5. SOIL & WATER MANAGEMENT PLAN

6. SOIL & WATER MANAGEMENT DETAILS

A1

BARKER

RYAN

STEWART

TOTAL PROJECT SOLUTIONSPLANNING - PROJECT MANAGEMENT - ENGINEERING - CERTIFICATION

SYDNEYP: 02 9659 0005

CENTRAL COASTP: 02 4325 5255

HUNTERP: 02 4966 8388

[email protected]

ABN: 26 134 067 842

LOCATION OF WORKS

LOCALITY SKETCH

NOT TO SCALE

PROJECT NUMBER: SY18011C11

Council Ref:

REV C

NO

RT

H

EXISTING SERVICES

EX. STORMWATER DRAINAGE LINE

EX. OVERHEAD POWERLINE

EX. WATERMAIN

EX. TELSTRA

EX. RECYCLE WATER

EX. GAS

RCW RCW

BLACKTOWN CITY COUNCILPROPOSED RESIDENTIAL DEVELOPMENT

165 GUNTAWONG ROAD, ROUSE HILL

LOT 1 DRAINAGE DESIGN PLANSPrepared for: THE BATHLA GROUP Pty Ltd

1. ALL WORKS SHALL BE CARRIED OUT IN ACCORDANCE WITH BLACKTOWN CITY COUNCIL'S DCP

REQUIREMENTS AND ENGINEERING GUIDE FOR DEVELOPMENT & CIVIL WORKS SPECIFICATION

AND/OR AS DIRECTED BY THEIR REPRESENTATIVE.

2. THE CONTRACTOR IS TO IDENTIFY, LOCATE AND LEVEL ALL EXISTING SERVICES PRIOR TO THE

COMMENCEMENT OF CONSTRUCTION WORKS AND WHERE NECESSARY MAKE ARRANGEMENTS WITH

THE RELEVANT AUTHORITY TO RELOCATE OR ADJUST WHERE NECESSARY. ALL UTILITY

ADJUSTMENTS ARE AT THE DEVELOPERS EXPENSE.

3. COUNCIL'S TREE PRESERVATION ORDER MUST BE OBSERVED AND NO TREE SHALL BE FELLED,

LOPPED OR REMOVED WITHOUT THE PRIOR APPROVAL OF COUNCIL.

4. ALL WORKS SHALL BE UNDERTAKEN IN ACCORDANCE WITH THE WORK HEALTH & SAFETY ACT 2011

AND ALL RELEVANT OCCUPATIONAL HEALTH & SAFETY POLICIES AND REGULATIONS.

5. DIMENSIONS SHALL NOT BE SCALED FROM THE PLANS. CLARIFICATION OF DIMENSIONS SHALL BE

SOUGHT FROM THE SUPERINTENDENT OR REFERRED TO THE DESIGNER.

6. SURVEY MARKS SHOWN THUS SHALL BE MAINTAINED AT ALL TIMES. WHERE RETENTION IS NOT

POSSIBLE THE ENGINEER SHALL BE NOTIFIED AND CONSENT RECEIVED PRIOR TO THEIR REMOVAL.

7. ALL NEW WORK IS TO MAKE A SMOOTH JUNCTION WITH EXISTING CONDITIONS.

8. THE CONTRACTOR IS NOT TO ENTER UPON NOR DO ANY WORK WITHIN OR ON ADJACENT LANDS

WITHOUT THE PRIOR APPROVAL OF THE SUPERINTENDENT AND THE WRITTEN PERMISSION OF THE

OWNERS.

9. SEDIMENT MEASURES SHALL BE IMPLEMENTED PRIOR TO SOIL DISTURBANCE IN KEEPING WITH THE

4th EDITION OF LANDCOMS "SOILS AND CONSTRUCTION - MANAGING URBAN STORMWATER" MARCH

2004 TO THE SATISFACTION OF COUNCIL'S REPRESENTATIVE AND AS SHOWN IN THESE DRAWINGS.

10. THE CONTRACTOR SHALL CLEAR AND DISPOSE OF ONLY THOSE TREES THAT ARE CONDEMNED BY

THE PLANS. COUNCIL'S TREE PRESERVATION ORDER SHALL BE OBSERVED AND NO TREE SHALL BE

FELLED, LOPPED OR REMOVED WITHOUT PRIOR APPROVAL.

11. THE CONTRACTOR SHALL CLEAR THE SITE BY REMOVING ALL RUBBISH, FENCES, OUT HOUSES, CAR

BODIES, DEBRIS, ETC. THE CONTRACTOR SHALL NOT DISPOSE OF ANY DEBRIS BY BURNING OFF IN AN

OPEN FIRE.

12. UNSOUND MATERIALS AS DETERMINED BY COUNCIL'S REPRESENTATIVE SHALL BE REMOVED FROM

ROADS AND LOTS PRIOR TO ANY FILLING.

13. ALL SITE REGRADING AREAS SHALL BE GRADED TO THE SATISFACTION OF COUNCIL'S

REPRESENTATIVE. THE CONTRACTOR SHALL TAKE LEVELS ON THE EXISTING SURFACE AFTER

STRIPPING TOPSOIL AND PRIOR TO COMMENCING ANY FILL OPERATIONS.

14. SURPLUS EXCAVATED MATERIAL SHALL BE PLACED OR DISPOSED OF IN ACCORDANCE WITH THE

CONTRACT, OR AS DIRECTED BY THE SUPERINTENDENT.

15. ALL SITE FILLING SHALL BE PLACED IN LAYERS NOT EXCEEDING 300mm AND COMPACTED IN

ACCORDANCE WITH COUNCIL'S SPECIFICATION AND BE TESTED AT THE REQUIRED INTERAVLS BY AN

APPROVED N.A.T.A. GEOTECHNICAL LABORATORY.

16. MINIMUM 150mm THICK TOPSOIL SHALL BE SPREAD ON ALL FOOTPATHS, BERMS, BATTERS AND SITE

REGRADING AREAS. EXCESS TOPSOIL SHALL BE DISPOSED OF AS DIRECTED BY THE

SUPERINTENDENT.

17. ALL LAND DISTURBED BY EARTHWORKS SHALL BE SPRAY-GRASSED, OR SIMILARLY TREATED TO

ESTABLISH GRASS COVER. SEED MIXTURES ARE TO BE APPROVED BY COUNCIL PRIOR TO SPRAYING.

ALL GRASSED AREAS SHALL BE REGULARLY WATERED AND MAINTAINED UNTIL EXPIRATION OF THE

MAINTENANCE PERIOD.

18. THE CONTRACTOR SHALL MAINTAIN DUST CONTROL THROUGHOUT THE DURATION OF THE PROJECT.

19. ALL PITS DEEPER THAN 1.2m SHALL HAVE STEP IRONS PROVIDED IN ACCORDANCE WITH COUNCIL'S

STANDARDS.

20. ALL DRAINAGE LINES THROUGH LOTS SHALL BE CONTAINED WITHIN THEIR EASEMENTS AND

CONFORM WITH COUNCIL'S STANDARDS.

21. ALL DRAINAGE LINES ON HIGH SIDE AND UNDER ROADS SHALL BE BACKFILLED WITH SHARP SAND

AND HAVE 3.0m OF AGRICULTURAL LINE WRAPPED IN AN APPROVED FILTER FABRIC, DISCHARGING

INTO THE DOWNSTREAM PIT AND AS DIRECTED BY COUNCIL.

22. SUBSOIL DRAINS SHALL BE CONSTRUCTED TO THE SATISFACTION OF COUNCIL'S REPRESENTATIVE.

23. PRECAST KERB INLET LINTELS SHALL BE USED ON GULLY PITS. GRATES SHALL BE "WELDLOK" TYPE

GG 78-51 OR APPROVED EQUIVALENT.

24. PROVIDE VEHICULAR ENTRIES IN KERB AND GUTTER WHERE SHOWN OR WHERE DIRECTED BY THE

SUPERINTENDANT.

25. GUIDE POSTS SHALL BE 100mm X 50mm HARDWOOD, PAINTED WHITE WITH REFLECTORS.

26. ERECT STREET NAME SIGNS, CONDUIT WARNING SIGNS AND NO THROUGH ROAD SIGNS WHERE

SHOWN OR WHERE DIRECTED BY COUNCIL'S REPRESENTATIVE.

27. CONDUITS SHALL BE LAID WHERE REQUIRED BY RELEVANT AUTHORITIES AFTER POSITIONS HAVE

BEEN DETERMINED BY THE RELEVANT AUTHORITIES AND BEFORE FINAL A.C. IS LAID

28. POSITION OF CONDUITS SHALL BE MARKED ON THE KERB.

29. FELLED TREES SHALL BE SALVAGED FOR RE-USE AS WOODCHIP MULCH OR LOG FORM FOR SITE

REHABILITATION, NON-SALVAGEABLE MATERIAL SUCH AS STUMPS AND ROOTS SHALL BE DISPOSED

OF OFF SITE.

30. THE CONTRACTOR SHALL PROVIDE MINIMUM 24 HOURS NOTICE TO COUNCIL'S REPRESENTATIVE FOR

ALL INSPECTIONS.

31. THE CONTRACTOR SHALL MAINTAIN SERVICES AND ALL WEATHER ACCESS AT ALL TIMES TO THE

ADJOINING PROPERTIES.

32. THE CONTRACTOR SHALL UNDERTAKE TRAFFIC CONTROL MEASURES TO COUNCIL'S SATISFACTION

AND SHALL DISPLAY ALL APPROPRIATE WARNING SIGNS THROUGHOUT THE DURATION OF

CONSTRUCTION.

33. ALL NATURAL SURFACE DATA HAS BEEN DETERMINED BY TERRAIN MODELLING. ALL CONSTRUCTION

SITE WORKS MUST BE CARRIED OUT USING THE BENCH MARKS SHOWN ON THESE DRAWINGS.

34. 100yr FLOW PATHS TO BE FORMED AT TIME OF CONSTRUCTION.

35. STRUCTURAL CERTIFICATION REQUIRED FOR CONSTRUCTION OF MAJOR AND NON-STANDARD

STRUCTURES.

36. DRIVEWAYS/LAYBACKS TO HAVE MINIMUM 1m CLEARANCE FROM POWER AND LIGHT POLES AND

STORMWATER DRAINS AND 6m CLEARANCE FROM KERB RETURN TP's

37. VEHICULAR CROSSINGS TO BE 4.5m WIDE AT KERB AND GUTTER.

38. ALL STREET NAME POLES & LIGHT POLES SHALL BE BLACK POWDER COATED IN ACCORDANCE WITH

BLACKTOWN CITY COUNCIL'S ENGINEERING GUIDE FOR DEVELOPMENT CONDITION 5.5.4.

39. ALL DISTURBED AREAS & STOCKPILES TO BE STABILISED WITHIN 14 DAYS.

40. PROVIDE 300mm WIDE STRIP OF TURF BEHIND KERB & 1m WIDE AROUND ALL SURFACE INLET PITS.

GENERAL NOTES

41. THE HOURS OF ANY OFFENSIVE NOISE-GENERATING DEVELOPMENT

WORKS SHALL BE LIMITED TO BETWEEN 7:00am TO 6:00pm, MONDAYS

TO FRIDAYS & 8:00am TO 1:00pm SATURDAYS WITH NO SUCH WORK

TO BE UNDERTAKEN AT ANY TIME ON SUNDAYS OR PUBLIC

HOLIDAYS

42. ONCE 60% OF THE UPSTREAM LOTS ARE FULLY DEVELOPED THE

IMMEDIATE BIORETENTION ELEMENTS TOGETHER WITH THE

TEMPORARY PROTECTION MEASURES FOR THE BIORETENTION

AREA ARE TO BE INSTALLED. ONCE THESE ELEMENTS ARE

INSTALLED, OPERATIONAL AND CERTIFIED BY AN ENGINEER

REGISTERED ON NER THAT THEY ARE CONSTRUCTED IN

ACCORDANCE WITH THE APPROVED PLAN, THE INTERMEDIATE

BIORETENTION CONSTRUCTION BOND CAN BE RELEASED.

43. THE TEMPORARY PROTECTION MEASURES FOR THE BIORETENTION

AREA ARE NOT REMOVED, NOR THE FILTER AREA OF THE BASIN

PLANTED OUT UNTIL A MINIMUM OF 90% OF THE UPSTREAM

CATCHMENT DRAINING TO THE BASIN IS FULLY DEVELOPED

INCLUDING LANDSCAPING AS AGREED WITH COUNCIL. ONCE 90% OF

THE UPSTREAM CATCHMENT IS DEVELOPED, THE BIORETENTION

BASINS MUST BE COMPLETED WITHIN SIX MONTHS.

44. PROVIDE A ROOF WATER OUTLET TO KERB FOR EACH PROPOSED

LOT THAT DRAINS TO THE STREET.

45. ALL STREET NAME POLES & LIGHT POLES SHALL BE BLACK POWDER

COATED IN ACCORDANCE WITH BLACKTOWN CITY COUNCIL'S

ENGINEERING GUIDE FOR DEVELOPMENT.

46. ALL DISTURBED AREAS & STOCKPILES ARE TO BE STABILISED

WITHIN 14 DAYS.

47. PROVIDE 300mm WIDE TURF STRIPS BEHIND ALL KERBS & 1m WIDE

AROUND ALL SURFACE INLET PITS.

48. ALL UTILITY ADJUSTMENTS ARE TO BE UNDERTAKEN AT THE

DEVELOPERS EXPENSE.

49. SERVICE CONDUITS ARE TO BE PLACED WHERE REQUIRED BY THE

RELEVANT AUTHORITIES.

50. DRIVEWAYS/LAYBACKS TO HAVE MINIMUM 1.0m CLEARANCE FROM

POWER AND LIGHT POLES AND STORMWATER DRAINS, AND 6m

CLEARANCE FROM KERB RETURN TP's

C

L

A

R

K

E

S

T

R

E

E

T

G

U

N

T

A

W

O

N

G

R

O

A

D

T

A

L

L

A

W

O

N

G

R

O

A

D

STORMWATER DRAINAGE

PIT WITH ENVIROPOD

EP

AP116

BP121

CP122

PIT TYP 'A' - 450mm x 450mm GRATED SURFACE INLET PIT

LOT 1

PIT NUMBER

PIT

PIT TYP 'B' - 600mm x 600mm GRATED SURFACE INLET PIT

LOT 1

PIT NUMBER

PIT

PIT TYP 'C' - 900mm x 900mm GRATED SURFACE INLET PIT

LOT 1

PIT NUMBER

PIT

CONSTRUCT NEW LAYBACK AND DRIVEWAY

CROSSING IN ACCORDANCE WITH BLACKTOWN COUNCIL

STANDARDS AND REQUIREMENTS.

NOTE

VC

GTD

CONSTRUCT 150mm WIDE GRATED

TRENCH DRAIN AND RETICULATED TO STORMWATER PIT IN THE BACKYARD IN EACH

LOT WHERE LABEL TO ENSURE IT DRAINS THROUGH WATER QUALITY DEVICE (SF) .

PROVIDE HEAVY DUTY GRATE AND FRAME.

ALL ROOF DRAINAGE TO BE RETICULATED TO RAINWATER

RE-USE TANKS AND OVERFLOW TO BE CONNECTED TO

BACKYARD PIT.

EPPROVIDE ENVIROPOD TO NOMINATED STORMWATER PITS

DP122

PIT TYP 'D' - (1.8m LINTEL) KERB INLET PIT

900mm x 900mm GRATED SURFACE INLET PIT

LOT 1

PIT NUMBER

PIT

RWT

EP122

PIT TYP 'E' - ACCESS PIT

900mm x 900mm SEALED PIT

LOT 1

PIT NUMBER

PIT

> >

24

FUTURE STORMWATER PIPE INSTALL

(BRICKED OFF FOR FUTURE CONNECTION)

ROOF DRAINAGE LINE

PROPOSED DRAINAGE LINE

EXISTING DRAINAGE LINE

NATURAL SURFACE CONTOUR

DESIGN SURFACE CONTOUR

TABLE DRAIN

EXISTING HEADWALL

PROPOSED HEADWALL

LIMIT OF WORKS

PIT NUMBER

SUBSOIL DRAINAGE LINE

GRATED SURFACE INLET PIT

SEALED PIT

KERB INLET PIT

RETAINING WALL

LEGEND

PIT 1/2

SS

LIMIT OF CONSTRUCTION

Page 2: 06 SWMP Details - Home - Blacktown City

1 15

1 14

5 1

GUNTAWONG ROAD

RO

AD

01

18

W

ID

E

TA

LLA

WO

NG

R

OA

D

1 13

CH 0.00

CH 20.00

CH 40.00

CH 60.00

CH 80.00

CH

0

.0

0

RO

AD

01

18

W

ID

E

NOTE:

PROVIDE WET WELL & PUMP FROM

BASEMENT TO AS3500.3-2003 SECTION 9.3

(SUBJECT TO DETAILED DESIGN)

GROUND

FFL63.5

GROUND

FFL62.5

GROUND

FFL61.5

GROUND

FFL62.5

Ø225mm @1%

Ø225m

m @

1%

Ø150m

m @

1%

Ø150m

m @

1%

Ø300mm @1%

Ø150mm @1%

Ø

2

2

5

m

m

@

1

%

Ø225m

m @

1%

Ø225m

m @

1%

Ø225m

m @

1%

Ø150m

m @

5%

Ø150mm @1%

ABOVEGROUND BIO BASIN

PROVIDE 15m² ABOVEGROUND BIOBASIN

IN ACCORDANCE WITH COUNCIL

REQUIREMENTS - SEE DETAIL SHEET 3

PIT 5/1

KERB INLET PIT

SL. 61.0

IL. 58.44

SS

FP

PROPOSED 4 STOREY MIXED

USE APARTMENT BLOCK

AP1 1

AP1 7

AP1 6AP1 10

BP1 11

CP1 12

BP1 13

AP1 24

CP1 14

EP1 15

EP1 16

EP1 17

EP1 18

EP1 19

EP1 21

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

EP

BP1 28

BP1 25

BP1 26

AP1 23

AP1 29

AP1 30

CP1 48

CP1 49

CP1 20

AP1 51 AP1 50 AP1 47AP1 46

AP1 41

AP1 44

AP1 39

AP1 38

AP1 35

AP1 34

TOW 62.50

6

2

.

4

3

6

2

.

4

4

6

2

.

3

4

6

2

.

1

9

6

2

.

2

8

61.41

61.12

TOW 64.08

62.00

BASEMENT

FFL58.50

TOW 65.71

IL 61.9

6

3

.

3

5

6

3

.

3

5

6

3

.

3

0

6

2

.

3

5

IL 61.78

TOW 65.01

63.35

BOW 63.50

BOW 62.50

BOW 63.50

6

2

.

3

5

TOW 63.38

6

2

.

3

5

Ø150mm @1%

6

2

.2

5

62.25

6

2

.

2

7

IL 61.53

BOW 62.30

62.35

BOW 62.30

IL 61.39

62.40

IL 61.29

IL 61.22

6

2

.2

0

6

1

.9

0

6

1

.6

0

6

1

.3

0

6

1

.1

0

TOW 61.10

BOW 60.63

TOW 61.10

AP1 32

IL 62.90

IL 61.90

BOW 62.50

TOW 63.40

IL 61.68

6

3

.3

5

6

2

.3

5

6

2

.3

5

6

2

.

3

5

6

2

.

3

5

6

1

.

4

0

TOW 61.3

TOW 66.00

BOW 63.40

TOW 63.60

BP1 43

CP1 40

BOW 62.40

BOW 62.35

IL 61.35

TOW 62.50

BOW 62.35

6

2

.

3

5

61.70

6

1

.

7

0

IL 61.00

IL 61.04

BOW 60.00

BOW 60.40

BOW 61.40

CP1 45

6

1

.

1

5

UNDERGROUND OSD STORAGE

PROVIDE 237m³ UNDERGROUND OSD STORAGE WITH

OUTLET TO PIT 5/1

IL 60.10

IL 59.90

IL 58.50

6

1

.

0

5

6

2

.

4

0

6

2

.

3

5

6

3

.

4

0

6

2

.

3

0

6

1

.3

5

6

2

.

4

0

6

1

.

3

0

IL 61.9

IL 60.74

IL 61.10

1

3

2

3

RETAINING WALL HEIGHT TO BY

ADJUSTED UPON FUTURE

RECONSTRUCTION OF

GUNTAWONG ROAD (BY OTHERS)

SEE FUTURE TOW LEVELS

DRIVEWAY DRAINAGE TO BE

CONNECTED INTO BASEMENT

DRAINAGE SYSTEM

BP1 36

63.35

6

3

.3

5

TOW 64.42

AP1 3

TOW 64.49

BOW 63.40

BOW 63.40

6

3

.

3

5

Ø150mm @1%

CP1 2

EP

IL 62.9

63.40

CP1 4

TOW 63.84

TOW 63.81

BOW 62.40

6

2

.

3

5

BP1 5

BOW 62.40

62.40

62.40

TOW 63.63

TOW 63.67

BOW 62.40

BOW 62.40

BP1 9

IL 61.60

61.52

TOW 63.71

EP

BP1 37

63.35

6

3

.3

5

EP

6

2

.

3

5

BP1 8

FUTURE TOW 64.24

FUTURE TOW 64.24

FUTURE TOW 64.16

FUTURE TOW 64.15

TOW 65.83

TOW 65.79

FUTURE TOW 64.25

TOW 65.51

FUTURE TOW 64.24

TOW 65.46

FUTURE TOW 64.00

TOW 64.25

FUTURE TOW 64.04

TOW 64.38

BOW 62.35

63.40

63.40

62.40

62.40

TOW 63.95

6

1

.

4

0

61.40

61.35

6

1

.

3

0

6

3

.

3

0

6

2

.

3

0

TG

TG

62.35

BOW 62.40

6

1

.

3

0

6

1

.

4

0

6

1

.3

5

6

2

.3

0

TOW 63.40

Ø150mm @1%

TG 62.35

BP1 27

61.40

AP1 31

AP1 33

EP

Ø150mm @1%

TG 61.30

RETAINING WALL HEIGHT TO BY

ADJUSTED UPON FUTURE

RECONSTRUCTION OF GUNTAWONG

ROAD (BY OTHERS)

SEE FUTURE TOW LEVELS

RETAINING WALL HEIGHT TO BY

ADJUSTED UPON FUTURE

RECONSTRUCTION OF GUNTAWONG

ROAD (BY OTHERS)

SEE FUTURE TOW LEVELS

BOW 63.40

BOW 63.40

63.30

BOW 63.40

EP

BP1 42

62.40

Ø150m

m @

1%

Ø150m

m @

1%

Ø225mm @1%

Ø375mm @1%

IL 62.81

IL 61.80

IL 61.72

IL 60.83

IL 60.62

STORMFILTER CHAMBER

PROVIDE 10 STORMFILTER CARTRIDGES

WITHIN CHAMBER OF DIMENSION 3.2M X 1.8M

STORMFILTER CHAMBER

PROVIDE 6 STORMFILTER CARTRIDGES

WITHIN CHAMBER OF DIMENSION 3.2M X 1.8M

N

O

R

T

H

N

O

R

T

H

Designed:

Drawn:

Checked:

A1

Plan

Horiz.

Vert.

X-Sect.

Designed:

Drawn:

Checked:

Scales:

Datum:

Client:

Plan No.

REV.File Ref.

SHEET OF SHEETS

A1

BARKER

RYAN

STEWART

TOTAL PROJECT SOLUTIONSPLANNING - PROJECT MANAGEMENT - ENGINEERING - CERTIFICATION

SYDNEYP: 02 9659 0005

CENTRAL COASTP: 02 4325 5255

HUNTERP: 02 4966 8388

[email protected]

ABN: 26 134 067 842

ENGINEERING PLAN SHEET

SY18011C1102

2

JB/JT

JB

RW

1:200

A.H.D.

METRES

1:200

2016128404

A

REV DATEAMENDMENT

FIRST ISSUE1/06/18

C5

SY180011C11c.dwg

BATHLA GROUP

PTY LTD

165 GUNTAWONG ROAD, ROUSE HILL

PROPOSED SUBDIVISION

ISSUED

JB

B

DA ISSUE6/07/18

JT

C

ARCHITECTURAL PLANS AMENDED31/07/18

JT

CONCEPT DESIGN ONLY

SUBJECT TO FINAL DESIGN

NOT TO BE USED FOR

CONSTRUCTION

NOTES

1. DESIGN AND CONSTRUCT VEHICLE CROSSING AT DRIVEWAY LOCATIONS

IN ACCORDANCE WITH BLACKTOWN CITY COUNCIL STANDARD DRAWING

A(BS) 103S & DRIVEWAY RAMPS IN ACCORDANCE WITH AS 2890.1-2004

2. DESIGN AND CONSTRUCTION OF STORMWATER SERVICE AND INLET PITS

TO BE IN ACCORDANCE WITH COUNCIL'S STANDARD DRAWINGS

A(BS)106M, A(BS)107M, A(BS)108M AND A(BS)109M

3. ALL RETAINING WALLS TO HAVE FENCING AND/OR HANDRAILS INSTALLED

AS REQUIRED AS PER RELEVANT AUSTRALIAN STANDARDS OR COUNCIL

SPECIFICATIONS.

NOTE:

ALL ROOFWATER & COURTYARD SURFACE WATER IS TO BE

DIRECTED THROUGH WATER QUALITY TREATMENT SYSTEM

BEFORE DISCHARGE INTO OSD (SUBJECT TO DETAILED DESIGN)

REFER STORMWATER MANAGEMENT REPORT

Page 3: 06 SWMP Details - Home - Blacktown City

TWL 60.745

WL 60.15

CL1 RL 58.75

CL2 RL 58.70

UNDERGROUND ON-SITE

DETENTION STORAGE TANK

TANK = 4m (W) x 35m (L)

VOLUME REQUIRED (100yr) = 236.4m³

VOLUME PROVIDED = 240.8m³

LOT 1 - OSD TANK

NOT TO SCALE

1

1

DISCHARGE

CONTROL PIT

900mm x 900mm

GSIP

*AVERAGE BOTTTOM OF TANK

FALL 1%

RL 58.75

Ø78.5mm ORIFICE PLATE

Ø132.5mm ORIFICE PLATE

NOTE:

ACCESS GRATES TO BE

PROVIDED TO MEET MAXIMUM

REACH REQUIREMENTS OF

BLACKTOWN CITY COUNCIL

ON-SITE DETENTION TANK TO BE IN

ACCORDANCE WITH STRUCTURAL

ENGINEERS DETAILS.

Ø375mm OUTLET

NOTE:

PROVIDE STEP IRONS EVERY

300mm WHERE DEPTH >1200mm

IL. 58.50

INLET

OVERFLOW WEIR RL 60.2

150mm FALSE FLOOR

RL 59.25m

RL 59.1

FALL 1%

ENERGY DISSIPATOR AS PER

FILTER SUPPLIERS SPECIFICATION

PROVIDE 10 STORMFILTER

CARTRIDGES IN 1.8m x 3.2m FILTER

CHAMBER FOR ALL FLOWS INTO

TANK

CARTRIDGE FILTERS TO

SUPPLIERS SPECIFICATION

900mm x 900mm

GSIP

RL 61.2

TRASH SCREEN

TRASH SCREEN

TWL 60.745

DISCHARGE

CONTROL PIT

900mm x 900mm

GSIP

INLET

OVERFLOW WEIR RL 59.9

150mm FALSE FLOOR

RL 58.95m

RL 58.75

ENERGY DISSIPATOR AS PER

FILTER SUPPLIERS SPECIFICATION

CARTRIDGE FILTERS TO

SUPPLIERS SPECIFICATION

900mm x 900mm

GSIP

RL 59.9

LOT 1 - OSD TANK

NOT TO SCALE

2

1

FALL 1%

PROVIDE 6 STORMFILTER

CARTRIDGES IN 1.8m x 3.2m FILTER

CHAMBER FOR ALL FLOWS INTO

TANK

0.3

0.0

5

0.3

0.1

5

300mm CLEAN FILTER MEDIA

50mm CLEAN COURSE SAND

300mm SUBMERGED CLEAN

SAND & CARBON SOURCE

150mm GRAVEL

Ø100mm PERFORATED SUBSOIL LINE

BIORETENTION AREA

FILTER MEDIA TO COMPRISE OF SANDY LOAM MATERIAL WITH

SATURATED HYDRAULIC CONDUCTIVITY OF 200mm/hr, TN CONTENT

OF 800mg/kg, ORTHOPHOSPHATE CONTENT OF 40.0mg/kg, ORGANIC

MATTER CONTENT LESS THAN 5% (w/w), ph BETWEEN 5.5 & 7.5 &

ELECTRICAL CONDUCTIVITY BELOW 1.2ds/m

BIO FILTER TO BE LANDSCAPED WITH PLANTS THAT PREFERABLY HAVE

EXTENSIVE FIBROUS ROOT SYSTEMS AND MUST TOLERATE PERIODS OF

DRYNESS & INUNDATION. BIO-RETENTION SYSTEMS PERFORM BEST

WITH DEEP ROOTING PLANTS - BEST SPECIES INCLUDE (BUT ARE NOT

LIMITED TO) CAREX, MELALEUCA, JUNCUS, GOODENIA & FICINIA

SUBMERGED ZONE MATERIAL TO COMPRISE OF MEDIUM TO

COARSE SAND WITH CARBON SOURCE OF 5% MULCH & 5%

HARDWOOD CHIPS (APPROX. 6mm GRADING) BY VOLUME

TYPICAL RECIPE FOR SUBMERGED ZONE FILTER MEDIA (PER 100L)

= 98L SAND (BY VOLUME) + 500g READILY BIODEGRADABLE

MATERIAL SUCH AS SUGAR-CANE MULCH (PREFERABLY LOW IN

NITROGEN & PHOSPHURUS + 1.5kg HARDWOOD CHIPS

SECTION

1:25 HORIZONTAL

1:25 VERTICAL

B

1

TO BE LINED WITH IMPERMEABLE MEMBRANE

SUCH AS HDPE OR APPROVED EQUIVALENT

TWL 61.3

PIT

900 x 900mm GSIP

BIORETENTION AREA

Ø100mm PERFORATED SUBSOIL

LINE @0.5% TO CONNECT TO PIT

SUBSOIL RISER 100mm

ABOVE SURFACE

SECTION

1:25 HORIZONTAL

1:25 VERTICAL

A

1

61.0

61.4

225mm @1%

225mm @1%

SURFACE

Designed:

Drawn:

Checked:

A1

Plan

Horiz.

Vert.

X-Sect.

Designed:

Drawn:

Checked:

Scales:

Datum:

Client:

Plan No.

REV.File Ref.

SHEET OF SHEETS

A1

BARKER

RYAN

STEWART

TOTAL PROJECT SOLUTIONSPLANNING - PROJECT MANAGEMENT - ENGINEERING - CERTIFICATION

SYDNEYP: 02 9659 0005

CENTRAL COASTP: 02 4325 5255

HUNTERP: 02 4966 8388

[email protected]

ABN: 26 134 067 842

OSD TANK SECTION AND DETAILS

SY18011C1103

3

JB/JT

JB

RW

1:25

A.H.D.

METRES

0.5 2.01.51.00.50 2.5

1:25

A

REV DATEAMENDMENT

FIRST ISSUE1/06/18

C5

SY180011C11c.dwg

BATHLA GROUP

PTY LTD

165 GUNTAWONG ROAD, ROUSE HILL

PROPOSED SUBDIVISION

ISSUED

JB

B

DA ISSUE6/07/18

JT

C

ARCHITECTURAL PLANS AMENDED31/07/18

JT

CONCEPT DESIGN ONLY

SUBJECT TO FINAL DESIGN

NOT TO BE USED FOR

CONSTRUCTION

Page 4: 06 SWMP Details - Home - Blacktown City

TOTAL

(mm)

H

HEIGHT

800

1000

1200

1400

1600

1800

2000

WALL HEIGHT

150

SERIES

200

SERIES

300

SERIES

HEIGHT OF BLOCKWORK

800

1000

1200

-

-

-

-

-

-

-

1400

1600

1800

2000

-

-

-

-

V-BARS

N12 @ 400

N12 @ 400

N12 @ 400

N12 @ 400

N16 @ 400

N16 @ 400

N16 @ 200

K-BARS

-

-

-

-

-

-

REINFORCEMENT

LEVEL

800

1000

1100

1300

1400

1600

MAX 1 IN 4

SLOPE

1200

1350

1500

1700

2000

2200

WITH FOLLOWING

1700

WIDTH, B (mm)

2500

BASE DIMENSIONS

2200 - 1400 800 N16 @ 400 N16 @ 400 1900 2800

-

-

-

AND

X-BARS

-

BACKFILL CONDITIONS

DESIGN GUIDELINES FOR REINFORCED & CORE

FILLED RETAINING WALLS BASE TYPE 1

45

0 M

IN

. L

AP

H =

8

00

TO

1

20

0

20

0

180

B

35

0

LONGITUDINAL

REINFORCEMENT:

N12 IN ALTERNATE

COURSES

COMMENCING FROM

TOP COURSE.

OMIT ON TOP OF

CLEAN-OUT BLOCK

140

SLOPING BACKFILL

OR SURCHARGE

CAPPING

N12 @ 400 CTS

X BARS

V BARS

N12 @ 400

190

H =

1

40

0

TO

2

00

0

60

0 M

IN

. L

AP

40

0

230

B

25

0

LONGITUDINAL REINFORCEMENT:

N12 IN ALTERNATE COURSES

COMMENCING FROM TOP COURSE.

OMIT ON TOP OF CLEAN-OUT BLOCK

LAP 500 WHERE REQUIRED

CAPPING

V BARS

N16 @ 400

330

B

30

0

X BARS

N16 @ 400

OPTIONAL

CAPPING

55

0

HE

IG

HT

O

F

29

0m

m B

LO

CK

S

45

0 M

IN

. L

AP

HE

IG

HT

O

F

19

0m

m B

LO

CK

S

H =

2

20

0

TO

3

40

0

290

LONGITUDINAL REINFORCEMENT:

N12 IN ALTERNATE COURSES

COMMENCING FROM TOP

COURSE. OMIT ON TOP OF

CLEAN-OUT BLOCK

LAP 500 WHERE REQUIRED

VERTICAL REINFORCEMENT:

N12 @ 400 CTS

K BARS

V BARS

REINFORCED & CORE FILLED RETAINING WALLS TYPE 1

Ø100mm AG LINE IN FILTER SOCK

SURROUNDED BY 300mm OF 20mm

GRAVEL - FALL MINIMUM 0.5% TO OUTLET

FREE DRAINING

BACKFILL MATERIAL

WATERPROOF FACE OF WALL

DISH DRAIN

200mm WIDE GRAVEL FILL FREE OF FINES WITH

GEOTEXTILE BETWEEN BACKFILL MATERIAL

ALL CORES

FULLY GROUTED

Ø100mm AG LINE IN FILTER SOCK

SURROUNDED BY 300mm OF 20mm

GRAVEL - FALL MINIMUM 0.5% TO OUTLET

FREE DRAINING

BACKFILL MATERIAL

WATERPROOF FACE OF WALL

200mm WIDE GRAVEL FILL FREE OF FINES WITH

GEOTEXTILE BETWEEN BACKFILL MATERIAL

Ø100mm AG LINE IN FILTER SOCK

SURROUNDED BY 300mm OF 20mm

GRAVEL - FALL MINIMUM 0.5% TO OUTLET

FREE DRAINING

BACKFILL MATERIAL

WATERPROOF FACE OF WALL

200mm WIDE GRAVEL FILL FREE OF FINES WITH

GEOTEXTILE BETWEEN BACKFILL MATERIAL

1.8m MAX HIGH SOLID FENCE

DESIGNED & SUPPLIED BY OTHERS.

REFER ENGINEER FOR CONNECTION

COORDINATION.

X BARS

N12 @ 400 CTS

190

2400 - 1600 800 N16 @ 400 N16 @ 400 2000 3100

2600 - 1600 1000 N20 @ 400 N20 @ 400 2200 3300

BD

Y

100

BD

Y

100

BD

Y

100

2800 - 1600 N20 @ 400 2400 3600

3000 - 1800 1200 N16 @ 200 N16 @ 200 2600 3900

1200 N20 @ 400

3200 - 1800 1400 N20 @ 200 N20 @ 200 2800 4200

3400 - 2000 1400 N20 @ 200 N20 @ 200 2900 4500

CLEANOUT BLOCK

ALL FOOTINGS FOUNDED ON

NATURAL STIFF GROUND

(200kPa MIN.) ALL

FOUNDATIONS MUST BE

INSPECTED BY

GEOTECHNICAL ENGINEER

PRIOR TO CONCRETE POUR

ALL FOOTINGS FOUNDED ON

NATURAL STIFF GROUND

(200kPa MIN.) ALL

FOUNDATIONS MUST BE

INSPECTED BY

GEOTECHNICAL ENGINEER

PRIOR TO CONCRETE POUR

CLEANOUT BLOCK

Ø100mm AG LINE IN FILTER SOCK

SURROUNDED BY 300mm OF 20mm

GRAVEL - FALL MINIMUM 0.5% TO OUTLET

CLEANOUT BLOCK

NOTE:

ALL STEEL AS PLACED MUST

BE INSPECTED BY THE

CERTIFYING ENGINEER

INTERNAL ROADWAY OR FOOTPATH

INTERNAL ROADWAY OR FOOTPATH

INTERNAL ROADWAY OR FOOTPATH

Designed:

Drawn:

Checked:

A1

Plan

Horiz.

Vert.

X-Sect.

Designed:

Drawn:

Checked:

Scales:

Datum:

Client:

Plan No.

REV.File Ref.

SHEET OF SHEETS

A1

BARKER

RYAN

STEWART

TOTAL PROJECT SOLUTIONSPLANNING - PROJECT MANAGEMENT - ENGINEERING - CERTIFICATION

SYDNEYP: 02 9659 0005

CENTRAL COASTP: 02 4325 5255

HUNTERP: 02 4966 8388

[email protected]

ABN: 26 134 067 842

RETAINING WALL DETAILS

SY18011C1104

4

JB/JT

JB

RW

1:25

A.H.D.

A

REV DATEAMENDMENT

FIRST ISSUE1/06/18

C5

SY180011C11c.dwg

BATHLA GROUP

PTY LTD

165 GUNTAWONG ROAD, ROUSE HILL

PROPOSED SUBDIVISION

ISSUED

JB

B

DA ISSUE6/07/18

JT

C

ARCHITECTURAL PLANS AMENDED31/07/18

JT

CONCEPT DESIGN ONLY

SUBJECT TO FINAL DESIGN

NOT TO BE USED FOR

CONSTRUCTION

Page 5: 06 SWMP Details - Home - Blacktown City

N

O

R

T

H

N

O

R

T

H

1 15

1 14

5 1

RO

AD

01

18

W

ID

E

TA

LLA

WO

NG

R

OA

D

1 13

CH 20.00

CH 40.00

CH 60.00

CH 80.00

RO

AD

01

18

W

ID

E

SEDIMENT BUILT UP TO

BE REGULARLY REMOVED

DURING CONSTRUCTION.

(TYPICAL TO ALL)

PROVIDE STAKED HAY BALES

WRAPPED IN GEO-FABRIC AROUND

TEMPORARY PUMP TO PREVENT

INFILTRATION. (TYPICAL TO ALL)

DISCHARGE TO HAY BALE FILTER ONLY

WHEN DISCHARGE IS CLEAR AND

SETTLED WITH A SEDIMENT CONTENT

OF LESS THAN 50mg/L.

SS

FP

PROVIDE SHAKER PAD DURING CONSTRUCTION TO

ENSURE REMOVAL OF SEDIMENT, DEBRIS, SOIL AND

OTHER POLLUTANTS FROM VEHICLES BEFORE

LEAVING THE SITE - SEE DETAIL SHEET 6

RAMP DOWN

DIRECT OVERLAND FLOW PATH

TOWARDS SEDIMENT CVONTROL

MEASURES.

DIRECT OVERLAND FLOW PATH TOWARDS

SEDIMENT CONTROL MEASURES.

CONSTRUCT SEDIMENT FENCE AROUND SITE

PERIMETER AS SHOWN (REFER DETAIL). CONTRACTOR

IDENTIFY ROCKY AREAS AND APPLY HALE BALE

PROTECTION OR SIMILAR MEASURES IF SILT FENCE

CANNOT BE PLACED.

PROVIDE Ø20 HT/SV AT VEHICLE DUST

SHAKE DOWN COMPLETE WITH

BACKFLOW PREVENTION IN

ACCORDANCE WITH AS.3500. WASH DOWN

ALL VEHICLES PRIOR TO EXITING SITE

BASEMENT EXCAVATION OUTLINE

BASEMENT EXCAVATION OUTLINE

BA

SE

ME

NT

E

XC

AV

AT

IO

N O

UT

LIN

E

BA

SE

ME

NT

E

XC

AV

AT

IO

N O

UT

LIN

E

DIRECT OVERLAND FLOW PATH

TOWARDS SEDIMENT CVONTROL

MEASURES.

PROVIDE SURFACE INLET PIT SEDIMENT FILTERS TO

ALL GRATED PITS IN COURTYARD AREAS

Designed:

Drawn:

Checked:

A1

Plan

Horiz.

Vert.

X-Sect.

Designed:

Drawn:

Checked:

Scales:

Datum:

Client:

Plan No.

REV.File Ref.

SHEET OF SHEETS

A1

BARKER

RYAN

STEWART

TOTAL PROJECT SOLUTIONSPLANNING - PROJECT MANAGEMENT - ENGINEERING - CERTIFICATION

SYDNEYP: 02 9659 0005

CENTRAL COASTP: 02 4325 5255

HUNTERP: 02 4966 8388

[email protected]

ABN: 26 134 067 842

SOIL & WATER MANAGEMENT PLAN

SY18011C1105

5

JB

JB

JT

1:200

A.H.D.

METRES

1:200

2016128404

1. PRIOR TO THE COMMENCEMENT OF SITE DISTURBANCE, THE CONTRACTOR SHALL ESTABLISH ALL NECESSARY EROSION AND

SEDIMENTATION CONTROL MEASURES IN ACCORDANCE WITH THIS PLAN, COUNCIL'S "CIVIL WORKS SPECIFICATION, PART 2

-CONSTRUCTION", AND THE NSW DEPARTMENT OF HOUSING'S PUBLICATION "MANAGING URBAN STORMWATER - SOILS AND

CONSTRUCTION".

2. THE LOCATION OF EROSION AND SEDIMENTATION CONTROL DEVICES SHOWN ON THIS PLAN ARE INDICATIVE ONLY AND SHOULD BE

ADJUSTED TO SUIT SITE CONDITIONS.

3. WHERE WORKS ARE DELAYED OR IN ABEYANCE AND DISTURBED AREAS ARE LIKELY TO BE EXPOSED FOR A PERIOD OF TWO

MONTHS OR MORE, TEMPORARY REHABILITATION WORKS SHALL BE UNDERTAKEN TO PROTECT THE SITE.

4. ALL DISTURBED AREAS SHALL BE TOPSOILED, SEEDED AND MULCHED WITHIN 2O DAYS OF THE COMPLETION OF THE WORKS.

5. ALL AREAS WITH SLOPES STEEPER THAN 12% (1 in 8) SHALL BE STRAW MULCHED IN CONJUNCTION WITH SEEDING, OR TURFED.

6. SILT BARRIERS LOCATED AROUND KERB INLET AND ROAD PITS SHALL BE REINSTATED FOLLOWING ROAD PAVING WORKS IF IT IS

LIKELY THAT UNDISTURBED AREAS WILL STILL DRAIN TO THE PIT.

7. SANDBAGS SHALL BE PLACED ACROSS THE END OF ROAD CONSTRUCTION AT THE COMPLETION OF EACH DAYS WORK TO PREVENT

EROSION OF THE CONSTRUCTED MATERIAL.

8. THE CONTRACTOR SHALL CONDUCT WEEKLY INSPECTIONS OF THE SITE TO ENSURE THAT ALL DEVICES AND REHABILITATION AREAS

HAVE BEEN ADEQUATELY MAINTAINED. THE CONTRACTOR SHALL ALSO KEEP A LOG BOOK DETAILING SUCH INSPECTIONS, AND

RECORDING RAINFALL EVENTS AND OTHER RELEVANT EVENTS.

9. TOPSOIL SHALL BE STOCKPILED IN THE LOCATIONS SHOWN ON THIS PLAN OR AS DIRECTED BY COUNCIL'S ENGINEER. WHERE IT IS

LIKELY THAT STOCKPILES WILL REMAIN IN PLACE FOR A PERIOD EXCEEDING 4 WEEKS, THEN THE STOCKPILE SHALL BE STABILISED

BY SEEDING OR EQUIVALENT METHODS.

10. ALL REVEGETATION WORKS ARE TO BE MAINTAINED, INCLUDING WATERING AND MOWING WHERE NECESSARY UNTIL THE

COMPLETION OF THE MAINTENANCE PERIOD.

11. THE MOVEMENT OF VEHICULAR TRAFFIC ON THE SITE SHALL BE CONFINED TO DESIGNATED AREAS DURING CONSTRUCTION WORKS.

VEHICULAR ACCESS SHALL BE DENIED TO AREAS TO BE LEFT UNDISTURBED.

12. SITE ACCESS SHALL BE LIMITED TO THE LOCATIONS SHOWN ON THIS PLAN. SHAKE-DOWN AREAS SHALL BE CONSTRUCTED AS

SHOWN.

13. DURING CONSTRUCTION WORKS, DUST CONTROL MEASURES SHALL BE IMPLEMENTED TO MINIMISE THE AMOUNT OF DUST

GENERATED FROM THE SITE. THESE MEASURES TO BE IMPLEMENTED TO COUNCIL'S SATISFACTION.

14. MAINTENANCE AND CLEANING OF CONSTRUCTION PLANT SHALL BE CARRIED OUT IN AN AREA WHERE RUNOFF CAN BE CONTAINED

AND APPROPRIATELY TREATED AND DISPOSED OF.

15. ALL EROSION AND SEDIMENTATION CONTROL DEVICES SHALL REMAIN IN PLACE UNTIL ALL DISTURBED AREAS HAVE ADEQUATELY

REGENERATED. THIS STAGE SHALL BE DETERMINED BY THE CERTIFIER.

EROSION AND SEDIMENTATION CONTROL NOTES

STABILISED SITE ACCESS

AT ENTRANCE TO WORKS

SURFACE INLET PIT

SEDIMENT TRAP

SEDIMENT FENCE

LEGEND

HAY BALE SEDIMENT TRAP

CONCEPT DESIGN ONLY

SUBJECT TO FINAL DESIGN

NOT TO BE USED FOR

CONSTRUCTION

Page 6: 06 SWMP Details - Home - Blacktown City

STRAW BALE & CRUSHED ROCK SEDIMENT FILTER

STRAW BALES STAKED

TO GROUND. (REFER TO

STRAW BALE DETAIL)

CRUCHED ROCK OUTLET TO

HALF THE HEIGHT OF BALES.

SILT

F

EN

CE

DR

AIN

20000 M

AX

. C

EN

TR

ES

PR

OP

ER

TY

B

OU

ND

AR

Y

CA

TC

H

HAY BALES

2.0m

CATCH DRAIN DETAIL

DISTURBED AREA

DIRECTION OF FLOW

1.5m STAR PICKETS AT

MAX. 3m CENTRES

UNDISTURBED AREA

500mm TO 600mm

600mm MIN.

1.5m STAR PICKETS

AT MAX. 3m CENTRES

SELF-SUPPORTING

GEOTEXTILE

DIRECTION OF FLOW

ON SOIL, 150mm X 100mm

TRENCH WITH COMPACTED

BACKFILL AND ON ROCK, SET

INTO REINFORCED CONCRETE

SECTION DETAIL

CONSTRUCTION NOTES

1. CONSTRUCT SEDIMENT FENCE AS CLOSE AS POSSIBLE TO PARRALLEL TO THE

CONTOURS OF THE SITE.

2. DRIVE 1.5m LONG STAR PICKETS INTO GROUND 2.5 METRES APART (MAX.)

3. DIG A 150mm DEEP TRENCH ALONG THE UPSLOPE LINE OF THE FENCE FOR THE

BOTTOM OF THE FABRIC TO BE ENTRENCHED.

4. FIX SELF-SUPPORTING GEOTEXTILE TO UPSLOPE SIDE OF POSTS WITH WIRE

TIES OR AS RECOMMENDED BY GEOTEXTILE MANUFACTURER.

5. JOIN SECTIONS OF FABRIC AT A SUPPORT POST WITH A 150mm OVERLAP.

6. BACKFILL THE TRENCH OVER THE BASE OF THE FABRIC AND COMPACT IT

THOROUGHLY OVER THE GEOTEXTILE.

SEDIMENT FENCE

EXISTING ROADWAY

P

R

O

P

E

R

T

Y

B

O

U

N

D

A

R

Y

DGB 20 ROADBASE OR

30mm AGGREGATE

M

I

N

.

L

E

N

G

T

H

6

M

E

T

R

E

S

M

IN

. W

ID

T

H

3

M

E

T

R

E

S

CONSTRUCTION SITE

300mm MIN.

200mm MIN.

RUNOFF DIRECTED TO

SEDIMENT TRAP/FENCE

GEOTEXTILE FABRIC DESIGNED TO PREVENT

INTERMIXING OF SUBGRADE AND BASE

MATERIALS AND TO MAINTAIN GOOD

PROPERTIES OF THE SUB-BASE LAYERS.

GEOFABRIC MAY BE A WOVEN OR NEEDLE

PUNCHED PRODUCT WITH A MINIMUM CBR

BURST STRENGTH (AS3706.4-90) OF 2500 N

CONSTRUCTION NOTES

1. STRIP TOPSOIL AND LEVEL SITE.

2. COMPACT SUBGRADE.

3. COVER AREA WITH NEEDLE-PUNCHED GEOTEXTILE.

4. CONSTRUCT 200mm THICK PAD OVER GEOTEXTILE USING

ROADBASE OR 30mm AGGREGATE. MINIMUM LENGTH 15 METRES OR

TO BUILDING ALIGNMENT. MINIMUM WIDTH 3 METRES.

5. CONSTRUCT HUMP IMMEDIATELY WITHIN BOUNDARY TO DIVERT

WATER TO A SEDIMENT FENCE OR OTHER SEDIMENT TRAP.

STABILISED SITE ACCESS

SURFACE INLET PIT SEDIMENT TRAP

BURIED FABRIC

WITH SEDIMENT

FILTER FABRIC

GEOTEXTILE

RUNOFF WATER

WITH GRATE

DROP INLET

STAKES

GEOTEXTILE

FILTER FABRIC

WATER

FILTERED

STAKES

CONSTRUCTION NOTES

INSTALL FILTERS TO KERB INLET ONLY AT SAG POINTS.

FABRICATE A SLEEVE MADE FROM GEOTEXTILE OR WIRE MESH LONGER THAN THE LENGTH OF

THE INLET PIT AND FILL IT WITH 25mm TO 50mm GRAVEL.

FORM AN ELLIPTICAL CROSS-SECTION ABOUT 150mm HIGH X 400mm WIDE.

PLACE THE FILTER AT THE OPENING LEAVING AT LEAST A 100mm SPACE BETWEEN IT AND THE

KERB INLET MAINTAIN THE OPENING WITH SPACER BLOCKS.

FORM A SEAL WITH THE KERB TO PREVENT SEDIMENT BYPASSING FILTER.

SANDBAGS FILLED WITH GRAVEL CAN SUBSTITUTE FOR THE MESH OR GEOTEXTILE PROVIDING

THEY ARE PLACED SO THAT THEY FIRMLY ABUT EACH OTHER AND SEDIMENT-LADEN WATERS

CANNOT PASS BETWEEN.

1.

2.

3.

4.

5.

6.

TIMBER SPACER TO SUIT

KERB-SIDE INLET

GRAVEL-FILLED WIRE MESH

OR GEOTEXTILE "SAUSAGE"

TIMBER SPACER TO SUIT

OVERFLOW

RUNOFF WATER

WITH SEDIMENT

SEDIMENT

GRAVEL-FILLED WIRE MESH

OR GEOTEXTILE "SAUSAGE"

FILTERED WATER

MESH & GRAVEL INLET "SAUSAGE" FILTER

0.1m DEEP

DRAINAGE AREA 0.4 ha MAX. SLOPE GRADIENT 1:2

MAX. SLOPE LENGTH 40m MAX.

STAKES DRIVEN 0.6m INTO

THE GROUND

ANGLE FIRST STAKE TOWARDS

PREVIOUSLY LAID STRAW BALE

DISTURBED AREA

UNDISTURBED AREA

D

IR

E

C

T

IO

N

O

F

F

L

O

W

STRAW BALE SEDIMENT FILTER

FLO

W

EARTH BANK

2

:

1

S

L

O

P

E

(

m

a

x

.

)

SEDIMENT FENCE

2

:

1

S

L

O

P

E

(

m

a

x

.

)

CONSTRUCTION NOTES

1. WHERE POSSIBLE LOCATE STOCKPILE AT LEAST 5 METRES FROM

EXISTING VEGETATION, CONCENTRATED WATER FLOWS, ROADS, HAZARD

AREAS AND MIN. 1.5m AWAY FROM EMBANKMENTS.

2. CONSTRUCT ON THE CONTOUR AS A LOW, FLAT ELONGATED MOUND.

3. WHERE THERE IS SUFFICIENT AREA TOPSOIL STOCKPILES SHALL BE LESS

THAN 2 METRES IN HEIGHT.

4. REHABILITATE IN ACCORDANCE WITH THE SWMP/ESCP.

5. CONSTRUCT EARTH BANK (STANDARD DRAWING 5-5) ON THE UPSLOPE

SIDE TO DIVERT RUN OFF AROUND THE STOCKPILE AND A SEDIMENT FENCE

(STANDARD DRAWING 6-8) 1 TO 2 METRES DOWNSLOPE OF STOCKPILE.

STABILISE

STOCKPILE SURFACE

TOPSOIL STOCKPILE

CONSTRUCTION NOTES

FABRICATE A SLEEVE MADE FROM GEOTEXTILE OR WIRE MESH AND FILL IT WITH 25mm TO

50mm GRAVEL.

FORM AN ELLIPTICAL CROSS-SECTION ABOUT 150mm HIGH X 400mm WIDE.

FORM A SEAL WITH THE KERB TO PREVENT SEDIMENT BYPASSING FILTER.

SANDBAGS FILLED WITH GRAVEL CAN SUBSTITUTE FOR THE MESH OR GEOTEXTILE PROVIDING

THEY ARE PLACED SO THAT THEY FIRMLY ABUT EACH OTHER AND SEDIMENT-LADEN WATERS

CANNOT PASS BETWEEN.

1.

2.

3.

4.

KERB OUTLET

GRAVEL-FILLED WIRE MESH

OR GEOTEXTILE "SAUSAGE"

MESH & GRAVEL FILTER "SAUSAGE" BARRIER

VEHICLE DUST SHAKE DOWN DETAIL

FOOTPATH

3000

300

CRUSHED AGGREGATE

MIN. 50mm

PUMP

PUMP PICKUP

SPRAY SLURRY

ON SURFACE

PERFORATED BARREL

CONTAINING GYPSUM

FLOCCULATION DETAIL

NOTE:

1. FLOCCULATION TO BE USED IF

WATER IS NOT CLEAR (IE:

SEDIMENT GREATER THAN 50 mg/L)

PRIOR TO DISCHARGING FROM

TEMPORARY PUMP OUT

2. FOR RATES & AGENTS SEE

APPENDIX E OF HOUSING NSW

"MANAGING URBAN SW SOILS &

CONSTRUCTION".

Designed:

Drawn:

Checked:

A1

Plan

Horiz.

Vert.

X-Sect.

Designed:

Drawn:

Checked:

Scales:

Datum:

Client:

Plan No.

REV.File Ref.

SHEET OF SHEETS

A1

BARKER

RYAN

STEWART

TOTAL PROJECT SOLUTIONSPLANNING - PROJECT MANAGEMENT - ENGINEERING - CERTIFICATION

SYDNEYP: 02 9659 0005

CENTRAL COASTP: 02 4325 5255

HUNTERP: 02 4966 8388

[email protected]

ABN: 26 134 067 842

SOIL & WATER MANAGEMENT DETAILS

SY18011C1106

6

JB/JT

JB

RW

A.H.D.

AutoCAD SHX Text
0.2m
AutoCAD SHX Text
BOUNDARY LINE