Post on 14-May-2018
Kochi Metro Rail Ltd.-6th Floor interior works at Revenue Tower
1
Tender document for providing cubicles & cabins,
plumbing, electrical, air conditioning, interior and
furnishing works in 6th floor of Revenue Tower for
Kochi Metro Rail Ltd.
KOCHI METRO RAIL LTD.,
Regd Office: 8th Floor, Revenue Towers,
Park Avenue, Kochi - 682 011
Website: www.kochimetro.org
Kochi Metro Rail Ltd.-6th Floor interior works at Revenue Tower
2
KOCHI METRO RAIL LTD
TENDER FOR PROVIDING CUBICLES & CABINS, PLUMBING,
ELECTRICAL, AIR CONDITIONING, INTERIOR AND
FURNISHING WORKS IN 6th FLOOR OF REVENUE TOWER FOR
KOCHI METRO RAIL LTD.
Name and address
of tenderer:
Last Date &Time of
Submission of tender: 25.10.2013 14:00 Hrs.
Total No. of Sheets
Tender Documents -52 Nos.
BOQ – 51 Nos.
ARCHITECTS:
M/s MATHEW & SAIRA
Cochin – 16
Phone: 2363934/2373934
Date: …...............
Kochi Metro Rail Ltd.-6th Floor interior works at Revenue Tower
3
CONTENTS
1. TENDER NOTICE
2. SUBMISSION OF TENDER
3. SPECIAL CONDITIONS OF CONTRACT
4. GENERALCONDITIONS OF CONTRACT
5. MISCELLANEOUS INFORMATION
6. SPECIFICATION FOR ELECTRIFICATION
7. SPECIFICATIONS & CONDITIONS FOR AIR CONDITIONING
8. LIST OF APPROVED MATERIALS
9. FORMS
10. BILL OF QUANTITIES WITH DRAWINGS
Kochi Metro Rail Ltd.-6th Floor interior works at Revenue Tower
4
KOCHI METRO RAIL LTD
TENDER FOR PROVIDING CUBICLES & CABINS, PLUMBING,
ELECTRICAL, AIR CONDITIONING, INTERIOR AND
FURNISHING WORKS IN 6th FLOOR OF REVENUE TOWER FOR
KOCHI METRO RAIL LTD.
Job No: KMRL/PRJ/6th FLOOR/115/2013 Date: 20.09.2013
TENDER NOTICE
Sealed item rate price bid are invited from competent, experienced and financially sound
contractors by the undersigned for executing – construction of cubicles & cabins, plumbing, electrical,
air conditioning, interior and furnishing works in 6th floor of revenue tower for Kochi Metro Rail Ltd.
Name of Work : Construction of cubicles & cabins, plumbing,
electrical, air conditioning, interior and
furnishing, works in 6th floor of revenue tower for
Kochi Metro Rail Ltd
EMD : Rs. 2.5 Lakh in the form of DD
Cost of Non-refundable Processing fees : Demand draft of Rs.15000/- drawn in favour of
Kochi Metro Rail Ltd payable at Kochi
Time of completion : 75 Days
Last date & time of submission of Tender : 25.10.2013; 14:00 Hrs, Kochi Metro Rail Ltd,
Revenue Tower,8th Floor, Kochi
Tender Opening : 25.10.2013; 16:00 Hrs, Kochi Metro Rail Ltd,
Revenue Tower,8th Floor, Kochi
Kochi Metro Rail Ltd.-6th Floor interior works at Revenue Tower
5
Opening of Financial bid from among the :
short listed tenderers
29.10.2013; 16:00 Hrs. at Kochi Metro Rail Ltd.
Eligibility Criteria : 1. Tenderer should have executed satisfactorily at-
least one job of similar kind and valuing not
less than 40 lakh during the last 3 years in
Government or public sector undertaking/
reputed private firm.
2. Tenderer should have minimum 5 yrs.
experience in relevant field.
3. The Tenderer must have an average annual
turnover of not less than INR 2 Crores during
the last three financial year ending 31st March
2013.
4. Valid eligible Documents should be submitted
along with tender.
Availability of tender form : Tender documents can be downloaded from the
official website of the KMRL : www.kochimetro.org
on or after 04.10.2013
Site visit and Pre-bid meeting : 11.10.2013; 11:00 Hrs. at Kochi Metro Rail Ltd.
Note: - Financial offer of the qualified tenderers will only be opened
Kochi Metro Rail Ltd.-6th Floor interior works at Revenue Tower
6
SUBMISSION OF TENDER
Tender should be submitted in sealed envelope with following details.
1. COVER NO. I: It should contain a Covering Letter and Processing Fee. At top of the cover,
please describe COVER NO. I containing covering letter and Processing Fee.
a. Covering Letter must be as per the format provided in Formats- Form I
b. Letter of Offer must be as per the format provided in Formats- Forms II
c. A non-refundable amount of Rs. 15,000 (Rupees fifteen thousand only) towards the cost
of processing fee in the form of a Demand draft or a Pay Order drawn in favour of Kochi
Metro Rail Ltd., payable at Kochi has to be enclosed.
d. An earnest money deposit (EMD) of Rs 2,50,000 (Rupees two lakh fifty thousand only)
is required to be submitted by the Tenderer in the form of Demand Draft/ Bankers
Cheque drawn in favour of Kochi Metro Rail Ltd. payable at Kochi
2. COVER NO. II: It should contain the details of the Organization. At the top of the cover, please
describe COVER NO. II containing details of the organization
a. This document must include a general background of the organization along with other
details of the organization including credentials of key persons as per the format
provided in the Tender (Formats - Form IV). Enclose the mandatory supporting
documents listed in format.
b. The Tenderer must also provide the financial details of the organization as per format provided
in the tender (Formats – Form V). Enclose the mandatory supporting documents listed in
format. Tenderers may provide details (client organization, nature / scope of the project,
project value) of similar project experience as per format provided in the Tender
(Formats - Form VI&VII) requirement. Enclose the mandatory supporting documents
listed in format.
3. COVER NO. III: It should contain the Quoted BOQs of cubicles & cabins, plumbing, electrical,
air conditioning, interior and furnishing along with the Summary sheet as per format attached.
At the top of the cover, please describe COVER NO. III containing Financial Proposal
4. COVER NO. IV: It should contain all Covers ie. Cover No.I, Cover No.II and Cover No.III
Tenderer must submit this Cover No.4 on or before the last date of submission of the tender.
Note: Non-submission of processing fees and EMD will lead to dis-qualification of the tenderer.
Kochi Metro Rail Ltd.-6th Floor interior works at Revenue Tower
7
SPECIAL CONDITIONS OF CONTRACT
1. AUTHORIZED SIGNATORY & POWER OF ATTORNEY
All pages of bidding documents shall be initiated at the lower right hand corner or
signed wherever required. Power of attorney in the name of persons who have the signed tender
document to be attached.
2. EARNEST MONEY DEPOSIT
EMD for Rs 2,50,000/- (Rupees two laks and fifty thousand only) in the form of demand
draft drawn in favour of Kochi Metro Rail Ltd, payable at Kochi from any schedule/
nationalized bank and should be submitted along with the Tender. The name of work / job
number should be super scribed on the envelope. After tender opening last 3 tenderer’s EMD
will be retained with authority after execution of agreement it will be returned to others.
EMD of the first three lowest tenderers will be released only after the finalization and
execution of contract agreement with the successful bidder. EMD of the successful tenderer
shall be adjusted against initial security deposit. EMD deposited by other unsuccessful tenders
will be refunded by way of handing over the original Demand Draft/ Bankers Cheque. Under
any circumstances, Kochi Metro Rail Ltd. will not be liable to pay any interest on the EMD.
Forfeiture of EMD: EMD of a tenderer will be forfeited, if the tenderer withdraws or
amends its tender or derogates from the tender in any respect within the period of validity of its
tender. Further, if the successful tenderer fails to furnish the required performance security
within the specified period, its EMD will be forfeited
3. INITIAL SECURITY DEPOSIT/ SECURITY DEPOSIT
Successful Tenderer shall have to furnish a bank guarantee for an amount equivalent to 5% of
the total value of the contract towards initial security deposit, less the EMD, within 7 days of
awarding of the work.
4. Every contractor is expected before quoting his rates to inspect the site of proposed works and
discuss with concerned engineer in charge. He should also inspect the source of materials, their
quality and availability .The materials must strictly comply with the relevant specifications.
Samples of materials as specified shall be submitted for the approval of the KMRL, before
supplying at the site.
Kochi Metro Rail Ltd.-6th Floor interior works at Revenue Tower
8
5. RETENTION AMOUNT
Payments of the work executed will be made on presentation of the bill in triplicate,
subject to a minimum amount of Rs 2000000 (Rupees Twenty Lakhs only) . 10% of the value of
bill will be deducted from the bill as security deposit for any defective workmanship and 50% of
the amount so deducted will be released on satisfactory completion of works and balance 50%
will be after 12 months from the completion date of the work, to the entire satisfaction of the
project manager.
6. COMMENCEMENT AND COMPLETION OF THE WORK
The successful contractor should commence work within 7 (Seven) days of issue of the
letter of acceptance and complete the entire work within 75 days from the date of
commencement of work. In case the work is not completed in time due to contractor’s failure,
liquidated damages at the rate of 1% per week of the total contract value, subject to a maximum
of 10% will be recovered from the contractor.
7. VALIDITY OF TENDER
The rates quoted by Tenderer shall be valid for 90 days, and if tender is accepted rates
will be valued for the entire duration of the project.
8. Bidder should quote both in figures as well as words (in English) the rates given and amount.
9. Rates quoted against each item will be firm throughout the contract.
10. The contractor shall not in any case after the acceptance of a contract rate be paid any extra
charges for lead involved in transport of materials to the site of work, erection and hire of T&P,
sheds materials, royalty for earth, boulders, metal & sand etc., or for any other reason in case the
contractor is found later on to have misjudged the materials available. All taxes including octroi,
toll tax or any other taxes etc., shall be payable by the contractor and any claim whatsoever in
this respect shall not be entertained.
11. No alteration which had been made by the contractor in the Notice of the Tender, instructions
to the contractors, the contract form, the conditions of the contract ,the specifications and
quantities accompanying the same shall not be accepted, if any such alterations had been made
or any special conditions had been attached, the tender is liable to the rejected.
12. The acceptance of the tender will rest with the KMRL who does not bind itself to accept the
lowest tender and reserves to itself the authority to reject any or all tenders received, without
Kochi Metro Rail Ltd.-6th Floor interior works at Revenue Tower
9
assigning any reason. All tenders in whom any of the prescribed conditions are not fulfilled or
are incomplete in any respect are liable to be rejected.
13. The work shall be carried out with the directions and supervision and in stages desired by
KMRL or authorized representatives of the KMRL. On acceptance of the tender the contractor
shall intimate the name of his accredited representative of the KMRL and carrying out the works
without any damages.
14. The contractor or his representative shall depute a qualified Engineer and such other office
personnel as may be required for the efficient execution of works.
15. No part of the contract shall be sublet without the written permission of KMRL nor shall
transfer be made by power of attorney – authorizing others to receive payments on behalf of the
contractors
16. Tender shall remain open for acceptance for a period 90 days from the date of opening to tender
documents.
17. Construction power shall be arranged by the contractor at his own cost. If arranged by KMRL,
its cost will be recovered from the contractor. The contractor has to find a suitable place with
prior approval of the concern Engineer of KMRL for the storage of all types of materials,
working place and storing place. No claim will be entertained for extra cost on account of this.
18. Contractor shall have to provide all safety appliances to their works while working at height at
his own cost and follow all regulation and all statutory provisions also covering the working
areas etc in force .He shall be liable to incur all the expenses in consequence thereof and KMRL
is in no way responsible for any damages arising out of this work contract. The contractor shall
indemnify the KMRL for all kinds of injury or death on account of any labour engaged by the
contractor as well as property of the KMRL at the site of work. The contractors in this regard
shall pay any compensation. The contractor shall be responsible for all implications under
labour Laws and Act of Kerala State and central Government (Including fire insurance).
19. The contractor shall be totally responsible for any damage to the building, building material and
his materials ,equipment, caused due to fire, rain, flood, storm, or any other natural calamities at
the site of work during construction period .Also, he should keep all materials in his custody ;
KMRL is not responsible for any thefts.
20. All works of operations and use of materials shall be as per specifications mentioned only as the
directions of the representative of the KMRL .After breaking the distressed/ damaged structural
Kochi Metro Rail Ltd.-6th Floor interior works at Revenue Tower
10
members and cleaning the rusting of reinforcement steel,. Same will be shown to the
representative of the KMRL before repairing and photographs of the same if required are to be
provided by the contractor.
21. The measurement of each item executed will be verified jointly and the payment shall be made
within 30 days of submission of bill.
22. The contractor shall at all times abide by the instructions, directions given in respect of the
materials, workmanship etc.
23. Statutory compliance – contractor shall be responsible for complying with the applicable
laws/bye laws/Regulations in force from time to time .Contractor shall have to bear all statutory
liabilities as applicable to his workers/personnel engaged by home for the job. Nothing will be
paid extra in this regard. If KMRL pays any amount in this regard, the same amount will be
deducted from the bill.
24. Contractor shall have to arrange insurance covers for the workers/personnel engaged by him for
the job. Also he will be responsible for all the dues of the workers/personnel engaged by him
including the liabilities if any towards workmen compensation or under any other law.
25. Contractor is required to cause the demolition of any sub – standard work in respect of materials
and workmanship or both .The contractor must abide by all such instructions. Loss due to such
demolition, if any, shall be borne by the contractor only.
26. The contractor shall maintain ,” site order book” at site where all instructions by the KMRL
repetitive shall be recorded and the contractor shall abide by such instructions and sign the
book against each such instructions after compliance thereof .
27. Liquidated damage – In case of non – completion of the work within stipulated period, the
contractor would be liable to pay penalty at the rate of 1.0% of the contract value per week or
part thereof to a maximum of 10% of the total amount of work.
28. The contractor will purchase Insurance policy equivalent to the amount of work for a period of
75 days from the date start of works. The Contractor shall be responsible for all injury to
persons, animals or things, and for all structural damage to property which may arise from the
operation or neglect of himself or of any nominated sub-contractor or any employee of either,
whether such injury or damage arises from carelessness, accident or any other cause whatever in
any way connected with the carrying out of this contract. This clause shall be held to
include inter -alia any damage to buildings, whether immediately adjacent or otherwise, and any
Kochi Metro Rail Ltd.-6th Floor interior works at Revenue Tower
11
damage to roads, streets, foot paths, bridges, or way as well as all damage caused to the
buildings and works forming the subject of this contract by forest, rain, wind or other
inclemency of weather.
The contractor shall reinstate all damages of every sort mentioned in this clause, so as to deliver
up the whole of the contract works complete and perfect in every respect and so as to make or
otherwise satisfy all claims or damage to the property of third parties. The owner shall be
entitled to deduct the amount of any damage, compensation, costs charges and expenses arising
or arising from or in respect of, any such claims or damage from any or all sum due or become
due to contractor without prejudice to the Owner’s other rights in respect thereof.
Necessary workman’s compensation and Contractors All Risk Policy (CAR) Policy equivalent
to the amount of work for a period of 75 days from the date of start of works.
29. The contractor will quote the rates considering the prevailing taxes and KMRL reserves the
right to ask for original purchase receipt of any material brought to the site.
30. The contractor will provide analysis of rate for any item quoted if so desired by the KMRL.
After completion of the work all the scaffolding materials are to be dismantled and removed
from the premises of the KMRL. All the derbies are to be removed and to be dumped in a
dumped in a dump yard duly approved by the Kochi Co Operation with his own arrangement of
transportation by the contractor. All the surplus materials of the contractor are to be removed
and the site is to be cleaned in all respects and to be handed over to the KMRL. No extra
payment will be made in this regard. Virtual completion certificate will be issued only after such
action.
31. Each page of the Tender Documents should be signed by the person or persons submitting the
tender in token of his/their having acquainted himself/themselves with the Conditions of
Contract. General Specifications, Special Condition, etc., as laid down. Any tender with any of
the documents not so signed will be rejected.
32. The contractor should note that, unless otherwise stated the tender is strictly on item rate basis
and their attention is drawn to the fact that, rates for each and every item should be correct,
workable and self – supporting .The quantities in the schedule of quantities approximately
indicate the total extent of work but may vary to an extent and may even be omitted thus altering
the aggregate value of the contract .No claim shall be entertained on this account. The contractor
shall bring it to the notice of the KMRL in case of any extra items not mentioned in the schedule
Kochi Metro Rail Ltd.-6th Floor interior works at Revenue Tower
12
of quantities during the course of the work and shall only carry out same on written approval
from the KMRL.
33. The successful tenderer must co – operate with other contractors appointed by the KMRL to
precede the work smoothly with least possible delay and to the satisfaction of the KMRL’S
Consultant.
34. KMRL reserves the right to terminate the contract if the contractor fails to execute the job
within the specified period or fails to keep the program of the work given by the contractor and
approved by the KMRL.
Mode of Payment (Electronic Media Only): Payment shall be made as per the conditions of this
contract through electronic mode only to the designated bank account of the tenderer, properly
supported by running Bills for actual quantity jointly measured as the work progresses.
35. The contractor shall provide suitable protection system to external windows so as to avoid
damages inside the office area, entry of dust, breaking of window glass panes etc. The entire
scaffolding shall be covered with cloth or curtain to avoid any accident due to fall of loose
materials or debris.
Kochi Metro Rail Ltd.-6th Floor interior works at Revenue Tower
13
GENERAL CONDITIONS OF CONTRACT
1. In case of any dispute as to the mode of measurement to be adopted for any item of the work not
specially covered in the tender document, the mode of measurement as per Indian standard
specification No. 1200 latest modification thereof shall be followed. If the contractor carries out
working multiple shifts with the permission of the client and he will have to observe all
government rules and laws and shall pay to his labour fair wages in accordance with current
labour and acts. No extra payment shall be payable to him by the owner on his account till the
time of completion of the total project including any extensions, which may be allowed by the
owner. For all disputes arising out of or in connection with this work shall be deemed to have
arisen in Kochi and only the court in Kerala will have the Jurisdiction to determine the same.
2. RATE OF PROGRESS
If for any reason which does not entitled the contractor to an extension of time, the rate
of progress of the works or any section is at any time, in the opinion of Owner/architect, too
slow to comply with the time for completion owner /architect shall so notify Contractor who
shall thereupon take such steps as are necessary, subject to the consent of the owner/architect, to
expedite progress so as to comply with the time for completion. The contractor shall not be
entitled to any additional payment for taking such steps. If, as a result of any notice given by the
Owner /architect under the clause, the contractor considers that it is necessary to do any work at
night or on locally recognized days of rest, he shall be entitled to seek the consent of the
Owner/architect to do so.
The contractor shall on the written order of the Owner /Architect suspend the progress of the
works or any part thereof for such time or times and in such manner as the Owner/Architect may
consider necessary and shall during such suspension properly protect and secure the work so far
as is necessary in the opinion of the owner/architect. The extra cost including all running wages
to be paid on the site, salaries, depreciation and maintenance of plant on site costs and general
overheads costs of the contract incurred by the contractor in giving effect to the
Owner/Architect’s inductions under this clause shall be borne and paid by the owner unless such
suspension is
i) Otherwise provided for in the contract or
Kochi Metro Rail Ltd.-6th Floor interior works at Revenue Tower
14
ii) Necessary for the proper execution of the work or by reason of the weather conditions
affecting the safety or quality of the works or by some default on the part of the
contractor or
iii) Necessary for the safety of the works or any part thereof.
Provided that the contractor shall not be entitled to recover any such extra cost unless he gives
notice in writing of his intention to claim to the Owner / architect within 28 days of the owner
/architect’s order, the Owner/architect shall settle and determine such extra payment to be made
to the contractor in respect of such claim as shall in the opinion of the Owner/architect be fair
and reasonable.
If on the written order of the Owner / architect the progress of the works or any part there of
shall be suspended for a period of , or consecutive periods amounting in all to 90 days or if the
owner /architect having previously issued is suspension order for a period which has lasted less
than 90 days shall within less than expiration of that period of suspension issue a further
suspension order either in respect of whole of the works or (where the previous suspension
order has affected only a part )affecting or including that part then and in any such case the
contractor may server a written notice on the owner /architect requiring permission within 28
days from the receipt hereof to proceed with the works or that part thereof in regard to which
progress is suspended and if such permission if not granted within that time the contractor by a
further written notice so served may (but is not bound to ) elect to treat suspension where it
affects part only the works as an omission of such part or where it affects the whole works as an
abandonment of the contract by the owner /architect.
3. CLARIFICATION AND INTERPRETATIONS OF DRAWINGS/ DOCUMENTS
Should there be any discrepancy due to incomplete description/ ambiguity of omission in
the drawings and other documents weather original or supplementary during the contract , found
during currency of the installation work , the contractor shall immediately on observing the
same , draw the attention of the Owner/architect whose decisions will be final and binding on
the Contractor.
Clarifications required or discrepancies if any, not at by the contractor in the various drawings
supplied by the architects must be obtained before execution of work failing which decisions of
the Architect shall be final and binding on the contractor.
Kochi Metro Rail Ltd.-6th Floor interior works at Revenue Tower
15
MISCELLANEOUS INFORMATION
1. DRAWINGS
Drawings accompanying the tender documents are indicative of the scope of work and issued for
tendering purpose only. Detailed construction drawings on the basis of which actual execution of the
work is to be proceeded will be furnished to the contractor progressively based on the program evolved
after the award of the work. Any revision in the drawings during the construction shall be
accommodated without any extra cost.
2. EXTRA ITEMS
Rates for the extra items, if any, shall be approved by the project manager before executing the
item. The labour rate for such calculations shall be based on the prevailing cost of each category of
labour in / around Cochin. The decision of the Project Manager regarding such labour rates and
material costs shall be final and binding on the contractor. No extra work should be carried out without
written permission and approved rate.
3. CONSTRUCTION EQUIPMENT
The contractor shall without prejudice to his overall responsibilities to execute and complete the
work as per specifications and time schedule, progressively deploy adequate euipments and tools and
tackles and augment the same as decided by the Owner / Architect depending on the exigencies of the
work so as to suit the construction schedule. The bidder shall submit a list of equipments he proposes to
deploy for the subject work along with deployment schedule as per proposal form given in the Comp.
Price Bidding document.
4. SITE ORGANIZATION
Subject to the provisions in the Comp. Price Bidding document and without prejudice to
contractors liabilities and responsibilities to provide adequate, qualified and skilled personal and the
work, contractor shall deploy site organization and augment the same as decided by the Owner /
Architect depending on the exigencies of work. The Comp. Price Bidding shall submit the details of
minimum site organization proposed by him, as per proposal form given in the tender document.
5. CO-ORDINATIONS WITH OTHER AGENCIES
Work shall be carried out in such a manner that the work of other agencies operating at the site
is not hampered due to any action of the contractor. Proper co-ordination with other agencies will be
contractor's responsibility. Contractor shall ensure that the works of the other contractors are not held up
Kochi Metro Rail Ltd.-6th Floor interior works at Revenue Tower
16
due to non completion of his part of work. In case of any dispute the decision of the Owner / Architect
shall be final and binding on the contractor.
6. DEFECT LIABILITY PERIOD
The contractor shall maintain the work for a period of twelve month from the date of issue of
work completion certificate or the expiry of the next following monsoon whichever is later and if any
damage shall happen to the work while in progress or after completion from any cause whatever or any
imperfection or defect becomes apparent either in the materials supplied by the contractor or in the
workmanship within a period of twelve months from the date of issue of completion certificate or the
expiry of the next following monsoon whichever is later, the contractor shall make the same good at
his own expenses or in default, the owner/architect may cause the same to be made good by other
workmen and deduct expenses (of which the expenses of the decision of the owner/architect shall be
final) from any sums that may be then or at any time thereafter become due to the contractor or from his
security deposit.
During the defects liability period the contractor shall be responsible for any defects in materials
workmanship in the works and shall remedy the same at his own cost entire satisfaction of the
owner/architect. Final security deposit shall not be released till the final certificates is issued by the
owner/architect.
7. CONTRACT
The entire work covered by this document shall be treated as work contract. Bidder should quote
for this work accordingly. The quoted prices should include all taxes, duties, octroi, excise, freight etc.
whatsoever save those payable by way of sales tax on works contract covered under clause below and
the prices shall remain firm for the contract period or extended period if any.
8. STIPULATIONS AND DEVIATIONS TO TENDER CLAUSES
Bidders are advised to submit quotations strictly based on the terms and conditions and
specifications contained in the Comp. Price Bidding document and not to stipulate any deviations.
However if it becomes unavoidable, deviations should be stipulated with reference to the clause
number para and page number of the Comp. Price Bidding document in the proforma given in the
Comp. Price Bidding document.
9. ABNORMAL RATES
The contractor is expected to quote the rate for each item after the careful analysis of Course
involved for the performance of the complete item considering all specifications and conditions of
Kochi Metro Rail Ltd.-6th Floor interior works at Revenue Tower
17
contract these will void a loss of profit or gain in case or curtailment or change of specification for any
item. In case , it is noticed that the rate quoted by the bidder for any items are unusually high or
unusually low it will be sufficient cause for the rejection of the tender unless the owner is convinced
about the reasonable less of the rates on scrutiny of the analysis for such rate to be furnished by the
bidder on demand. Not with standing anything therein stated, the rates once accepted by the owner shall
be final and shall not be subjected to any claim either on account of unworkability of rates or on any
other ground whatsoever.
10. SCHEDULE OF QUANTITIES/RATES.
The quantities shown against the varies items are only approximate and may vary to any extend
individually subject to relevant clause the general conditions of contract. Any increases or decreases in
the quantities shall not form the basis for alteration of rates quoted and accepted including where low
high/ rates have been quoted by the successful bidder.
The owner reserves the right to interpolate or extrapolate the rates for any new item of work not finding
a place in schedule of quantities, for similar items of lower and or higher magnitude available in the
schedule of the quantities.
Kochi Metro Rail Ltd.-6th Floor interior works at Revenue Tower
18
SPECIFICATION FOR ELECTRIFICATION
1. SCOPE
This covers the all Specification for the electrical installation associated with the proposed Office
for KMRL at 6th Floor of Revenue Tower. The installation shall be carried out in accordance with Indian
Electricity Rules, relevant statutory requirements, applicable engineering standards and specific
requirement included in this booklet.
2. SITE CONDITIONS
Temperature : Maximum 420C
Minimum 160c
Humidity : Around 85% at max. temperature
Rainfall : Around 1200mm per annum.
Altitude : Less than 500 meters from MSL
3. ELECTRIC SUPPLY PARTICULARS
4. STANDARDS
The installation and components thereon shall conform to the requirements of following specifications:-
NBC 2005 National Building Code
IS: 732 Code of practice for Electrical wiring
IS: 4064 Load break switches
IS: 2516 MCCBs & ACBs
IS: 2559 Air break Contactors
IS: 1248 Electrical indicating instruments
IS: 2705 Electrical indicating instruments
Nominal voltage : 415 Volts
Voltage variation limits : +/- 10%.
Frequency : 50 Hertz
Frequency variation limits : +/- 3%.
Number of wires : 3 phase and Neutral
Neutral earthing : Solidly earthed
Fault level : 31MVA(max) at 415V
Control supply : 240 Volts AC
Kochi Metro Rail Ltd.-6th Floor interior works at Revenue Tower
19
IS : 4237 General requirements for switchgear
IS: 3047 Code of practice for Earthing.
The installation & equipment offered shall further conform to standards stipulated by supply authorities,
CEIG Kerala and any other statutory bodies. Modifications if any suggested by the authorities during their
inspection shall be carried out at site without any extra cost.
5. DRAWINGS
Following drawings & Documents will form a part of this tender document:-
a. SINGLE LINE DIAGRAM ACE/122/110/R2
b. LIGHTING LAYOUT ACE/122/111/R1
c. FLOOR RACEWAY LAYOUT ACE/122/112
d. SOCKET OUTLET LAYOUT ACE/122/114
e. BILL OF QUANTITES 13 Pages Contractor shall prepare all drawings required to be submitted to the Electrical Inspectorate / KSEB /
any other statutory bodies and obtain necessary approvals.
6. BILL OF QUANTITIES
The quantities mentioned in the bill of quantities are for the guidance of the bidder to quote.
The client/consultant do not in any way guarantee that the actual work will exactly correspond to the
quantities now indicated. It shall be the contractor’s responsibility to procure only requisite quantity.
The client reserves the right to add/delete any portion of the work within the project site.
7. TESTING
All equipment included in contractor’s scope of supply shall be tested at manufacturer’s works
before delivery and necessary test certificates shall be submitted. All performance tests shall be carried
out after the installation in the presence of client/consultant.
8. SPECIFIC REQUIREMENTS
a. If any discrepancy found between BOQ, Specification & Drawings then details as per BOQ will
be prevailing.
b. Electrical contractor shall have a valid ‘Class A’ license from the Kerala state Electricity
licensing Board.
c. Electrical contractor shall deploy a full time supervisor with valid supervisory license at site.
d. Contractor shall work in coordination with other agencies involved in the project.
Kochi Metro Rail Ltd.-6th Floor interior works at Revenue Tower
20
e. Obtaining statutory approval from CEIG Kerala and KSEB with necessary power
sanction will be an integral part of this contract. All necessary documents including the
drawings for approval shall be prepared by the contractor.
The installation shall deem to have taken over by the client when:-
1. Entire installation is physically tested in the presence of client / consultant and
results were to be satisfactory.
2. Obtaining final approval from CEIG / KSEB, including rectification of any
defects pointed out during the inspection and
3. Contractor submits set of ‘AS BUILT’ drawings covering layouts and wiring
diagram for the scope of work covered.
4. Contractor submits completion certificate.
The defect liability period will start once contractor has completed all formalities as above.
The installation and accessories shall be guaranteed for satisfactory operation for a period 12 months
from the date of commissioning. Any defects noticed during this period shall be rectified free of cost.
9. SAFETY MEASURE
The following points shall be strictly complied with:-
1. All electrically operated hand tools shall be of the double insulated type.
2. All hand tools shall have insulated handle.
3. Safety belt to be used when working at a height of 3mt and above from ground.
4. Properly designed ladders/scaffolding shall be used while working at heights.
5. RCCB/ELCB to be provided in the construction power distribution network.
6. Welding machine shall have proper terminal box for cable termination and earthing.
10. SWITCHBOARDS
Type of construction :
Cubicle, Compartmentalized, totally enclosed,
Floor/wall mounting, Freestanding, Single
front, Single bus, on draw-out
Thickness of sheet steel :
2mm for body/door/equipment mounting frame
and 1.6mm for barriers
Kochi Metro Rail Ltd.-6th Floor interior works at Revenue Tower
21
Base frame : Fabricated from ISMC 75
Degree of protection : Dust and Vermin proof – IP 54
Height of the switchboard : Not more than 2200mm.
Maximum operating height : Not more than 1800mm
Minimum operating height : Not less than 450mm
Type of doors/covers :
Hinged doors with concealed hinges for
switchgear compartments & cable alleys.
Bolted covers for bus bar compartment
Cable entry : Front side. Top / bottom.
Paint finish :
Powder coated or stoved synthetic
enamel of approved colour
Thickness of paint finish : Not less than 50 microns
Maintenance of components : From the front side only
Type of name plates : Anodized aluminum with engravings
Miscellaneous: • Length of shipping section less than 2.5M
• Hardware shall be high tensile zinc
passivated type
• Spring washers for all bus bar joints,
Equipment fixing and terminals
• Endless neoprene gaskets to be provided
on all doors and covers
• Continuous earth bus of 25x6mm copper
• External Feeder identification marking to
be done
Safety Features: • All live parts to be totally shrouded.
• Wiring shall be finger touch proof.
• Bus bar to be sleeved with heat
shrinkable colour coded PVC sleeves
• Door interlocks for switches.
• Pad locking facility for switches
Kochi Metro Rail Ltd.-6th Floor interior works at Revenue Tower
22
• Component mounted door shall be
earthed
• Danger board on live parts covers.
Bus bar:
Material: Electrolytic grade AL / Copper
Supports: SMC/DMC/FRP.
Current density: Not more than 0.8 Amp/Sq.mm
Short time rating: 25KA for 1 Sec.
Clearances: 50mm clear between phases and 25mm clear
between phase to neutral and phase to earth.
Wiring : • Internal wiring for metering and protection
shall be carried out using 660V grade PVC
insulated multistrand copper conductors.
For control and signalling minimum size
shall be 1.5Sq.mm.For CT circuits wire
size shall be 2.5 Sq.mm.
• Each wire shall be terminated with tinned
copper lug at separate terminal, identified
at both ends by yellow colour ferrules
• Shorting links shall be provided for all
CT terminals
• Rubber grommets shall be provided
wherever required, so that metal parts shall
not come in contact with any power or
control wire/cable.
Inspection & Testing: • During fabrication, switchgear shall be
subject to inspection by client or by any
other agency authorised by the client
• Once the fabrication and assembly of the
Kochi Metro Rail Ltd.-6th Floor interior works at Revenue Tower
23
switchgear is completed supplier shall
arrange for an acceptance test.
• A general visual check covering
dimensional checks, verification of
feeders, wiring, bus bars, etc.
• Manual and electrical operation of all
components
• High voltage test at 2.5kV.
• Insulation resistance check before and
after high voltage test
• Supplier shall furnish a test certificate
covering all the test result
Feeder details :
Feeder details shall be as per single line diagram
and Bill of Quantities.
Guarantee : The switchgear and accessories shall be
guaranteed for satisfactory operation for a period
12 months from the date of commissioning. Any
defects noticed during this period shall be rectified
free of cost
Documentation
Following drawings shall be submitted for
approval and ‘AS BUILT’ drawings shall be
submitted after completion of the installation.
• Overall size of the switchboard along
with the bid
• GA arrangement of the switchboard
• Single line diagram and control wiring
diagram if any
11. ISOLATORS
This shall be of fault making load break type and motor duty with sheet steel enclosure.
Operating handle /front drive shall have door interlock. Pad locking facility to be provided for
Kochi Metro Rail Ltd.-6th Floor interior works at Revenue Tower
24
operating handle so that switch can be kept locked in the off position. All live parts shall have
shrouding. Sufficient room for cable entry to be provided.
12. EARTHING
a. A TNS type of earthing with separate neutral and safety earth conductor running through out to
be adopted for the installation.
b. Ring main conductor shall be 25x3mm Electrolytic grade copper. This ring main conductor
will be laid out to interconnect all earth electrodes and various earth benches throughout in the
installation.
c. In outdoor area above ring main can be buried in an excavated trench. Depth of laying shall be
not less than 600mm. For indoor installation conductors shall be neatly clamped to the
supporting system. Suitable clamps shall be used to install the earth conductor. Direct fixing
using screws/bolts not permitted.
d. The material for earthing shall be electrolytic grade bare copper. The end connection shall be
of bolted type with suitable crimping type terminal lugs.
e. All equipment receiving three-phase connection shall have double earthing and single-phase
equipment shall have single earthing.
f. All cable glands shall be earthed using earth tag/ copper clamps and suitable size bare copper
conductor. All non-current carrying metal parts shall be connected to the earthing system using
bonding conductors.
g. Earthing conductor size shall be decided based on the size of the phase conductor and this is as
follows:-
1. Up to 16Sq.mm copper (Phase conductor) Earth conductor size shall be
16Sq.mm.
2. Above 16Sq.mm size of Earth conductor shall be half of phase conductor.
3. Suitable de-rating shall be provided when Aluminum conductor is used as
phase conductor whereas copper is the earth conductor.
h. Metal Conduits if any shall be earthed separately near the MCB DB. All non –current carrying
metal parts shall be connected to the earthing system.
Kochi Metro Rail Ltd.-6th Floor interior works at Revenue Tower
25
i. Each load center will have an earth bench suitably located and each switch board/ DB safety
earthing shall be connected to the above bench and bench in turn will get connected to the ring
main conductor.
j. Wherever joints or tap off are required from the ring main, that area to be properly tinned. Lap
joints in the conductors shall be with 50mm of overlap.
k. All earth electrodes shall be prepared as per BIS and typical drawings enclosed. This shall
include 3meter long 13mm thick cast iron pipe, test link, brick masonry chamber, heavy duty
cast iron chamber cover etc All hardware shall be SS only. Name plate showing earth electrode
details such as name, type, earth resistance, date of maintenance etc. to be provided inside the
chamber.
13. LT CABLES
a. The LT power cable above 6 Sq.mm area shall be of the Aluminum conductor and lower sizes
shall be of copper conductor.
b. This shall be of 1.1kV grade, PVC/XLPE insulated, PVC sheathed, galvanized tape/wire
armored and PVC served suitable for underground laying.
c. The Aluminum conductor used shall be of electrolytic grade, 99% purity. Whereas copper
conductor shall be made out of 99.9% pure copper.
d. The conductor shall be of circular/sector shaped and internal insulation of individual conductor
shall be color coded.
e. Cables shall be visually inspected and insulation resistance test shall be conducted before
commencing the installation.
f. Sharp bends and kinks shall be avoided in the installation. Bending radius shall not be less than
12 times the diameter of the cable. Cable shall be laid one beside the other and not on top of
each other. Adequate extra lengths shall be provided near all the terminations.
g. Identification tags made out of Aluminum bearing cable number and size shall be provided at
either ends of the feeder cable.
h. Cable glands shall be single compression SIBG type made out of extruded brass and cadmium
plated. End termination shall be of crimping type Al or Cu depending on the conductor type.
Cable glands shall have earth tag and it shall be securely connected to the earthing system via
earth bench.
Kochi Metro Rail Ltd.-6th Floor interior works at Revenue Tower
26
i. Strict coordination to be provided between size of cable and rating of the up stream protection
device and also with the earthing conductor as specified in earthing above.
14. CABLE TRAYS & SUPPORTING STEEL
Cable trays shall be ladder type fabricated out of MS channels / angles / strips etc. size of the
sections shall be as per cable tray dimensions and number of cables it has to carry. However
minimum thickness of the section shall be 3mm. typical details are shown in the drawing
enclosed. Trays shall be painted with 1 coat of primer and 2 coats of synthetic enamel. Trays and
supporting system shall be designed to withstand the total weight and without any deformation.
Steel frame work duly painted shall be used for supporting switch boards DBs etc. also ISMC
100/40 may be installed across the substation/ switch room trenches as a bridge and switchboards
has to be installed to it.
15. MCBs, RCCBs, & MCB DBs
a. The MCBs shall be DIN rail mounting, bimetallic magnetic type. This shall have minimum fault
interrupting capacity of 10kA.
b. RCCBs shall be DIN rail mounting type and have a sensitivity of 30/100mA, two/four pole as
specified. The tripping time shall not be more than 30ms. This shall have short circuit protection
if specified.
c. MCB DB shall be wall mounting type factory assembled. DB shall be dust proof with double
door arrangement and suitable for concealed/surface mounting. Door shall have good quality
gaskets and hinges. This shall be suitable for either TP/SP MCB outgoing (vertical) or only SP
MCB outgoing (horizontal) as required.
d. All circuits shall be neatly terminated to the corresponding terminals and proper dressing inside
the DB shall be carried out. Circuit identification ferrules to be provided for each conductors of
a circuit.
e. Horizontal DB shall have three separate neutral and earth bus/terminal strip. The DB shall be
supplied with suitable Copper Bus bar of 63A rating and interconnection.
f. Horizontal DB shall have earth leakage circuit breaker provided at each of the 3 phases and a 4P
MCB / Isolator for the main incomer.
g. The DBs shall have knock out cable entry at top and bottom and earthing terminals.
Kochi Metro Rail Ltd.-6th Floor interior works at Revenue Tower
27
h. Circuit identification, feeder identification and cable size shall be suitably marked on the DB
after the installation.
i. Only 30mA Earth leakage circuit breakers shall be used at user level final circuits.
j. Where ever cables cannot be glanded on to the DB because of specific site conditions a separate
factory made cable entry box (adaptor) shall be provided.
16. CONDUITS
a. Unless otherwise specified all conduits used concealed in RCC slab shall be heavy duty PVC
and medium duty PVC for concealed in brick masonry work. All accessories shall be of same
type compatible each other. Black color conduits are preferred for electrical services. All
conduits shall have ISI mark.
b. Maximum number of wires that can be drawn through a specified size of conduit is as follows:-
Cross sectional
Area in Sq.mm
Size of Conduit in mm
20 25 32 38
1.5 5 10 14
2.5 5 8 12
4.0 3 8 10 6.0 2 5 8
c. Conductors carrying different supply voltage shall be drawn through separate conduits.
d. Only bends shall be used wherever conduits take right angle deviation and no Elbows are
permitted. The above bends shall be of inspection type in the critical location for the ease of
maintenance. Cut ends of conduit shall have no sharp edges or burrs to avoid insulation damage
while pulling.
e. Conduits used in concealed RCC slabs shall be laid on the finished centering over the
reinforcement bars and tied to the bars at every 600mm. using GI tie wire.
f. Where ever conduits are required to embed in walls, same shall be cut to make conduit grooves
to appropriate depth using cutting machines and conduits shall be fixed by means of saddles or
pipe hooks at regular intervals. Horizontal conduit grooves shall be avoided as far as possible.
Contractor shall make good the conduit grooves on the wall by covering with cement mortar.
Top edge of the conduit shall be at least 20mm below the finished surface of the wall.
Kochi Metro Rail Ltd.-6th Floor interior works at Revenue Tower
28
g. For surface wiring, conduits shall be fixed by heavy gauge saddles to the wall etc., with GI
screws. The spacing between the fixing saddles shall not be more than one meter. However,
when there are accessories/fittings, saddles shall be fixed both sides at a distance of 300mm
from the center of the fitting.
h. Bends shall be avoided as far as possible in the concealed conduiting and all curves should be
maintained by bending the conduit itself with a long radius for easy drawing of wires.
i. The entire system of conduits after the installation shall be checked for mechanical and
continuity. Metal Conduit system shall permanently connected to the earth grid properly by
means of suitable earth clamps.
17. WIREWAY TRUNKING
a. Wire way trunking shall be fabricated out of 1.6mm thick CRCA sheet with proper jigs and
fixtures to get consistent dimensional accuracy.
b. This shall comprise of totally enclosed ‘C’ type channel with screwed or push fit type of front
cover all hardware used shall be of good quality zinc passivated type.
c. Prior to painting this shall be properly pre-treated preferably by seven-tank process and shall be
powder coated with an approved shade.
d. Cable clamping provision at regular intervals of not more than 500mm shall be made inside the
wire way. Further 25mm dia knock out entries shall be provided at every 1000mm on top and
bottom.
e. This shall be installed as surface/ concealed mounting in the wall / floor. The installation rate
shall include necessary floor / wall chasing and finishing after the installation of wire way.
18. WIRING
a. Maximum number of wires than can be drawn through a specified size of conduit is shown
above and this limit shall not be exceeded. Different circuits shall be used for Power and
Lighting. & UPS.
b. Each circuit shall have phase neutral and earth conductor. Looping of earth and neutral
conductor between different circuits are not permitted. Size of the neutral and earth conductor
shall be same as the phase conductor. Wires shall be with copper conductor, fire retardant low
smoke type. Conductor shall be bright annealed and properly bunched together to form a
concentric shape.
Kochi Metro Rail Ltd.-6th Floor interior works at Revenue Tower
29
c. Each circuit inside the DB shall have circuit identification marking at both ends i.e. DB side and
switch box end. Neutral conductor shall be terminated to the neutral bar of that particular phase
and same as the case of earth conductor. Phase conductor shall be directly connected to the
corresponding MCB.
d. It is highly essential to protect each circuit using appropriate capacity MCBs at
e. DB. Following guide lines shall be ensured:-
1) 1.5Sq.mm Copper wiring - 6A MCB.
2) 2.5Sq.mm Copper wiring - 10A MCB
3) 4.0Sq.mm Copper wiring - 16A MCB
4) 6.0Sq.mm Copper wiring - 20A MCB
j. 5) 10Sq.mm Copper wiring - 25A MCB
k. Wiring shall be colour coded and properly ferruled with yellow colour ferrules. As far as
possible looping system shall be adopted and tap off joints to be avoided.
l. Circuit wiring shall mean wiring from MCBDB to switch boxes/socket outlets. Point wiring
shall mean wiring from switch box to light / fan points. This shall include conduits switches,
front plate, GI/coated switch boxes, 1.5Sq.mm wiring, junction boxes, drop wiring (wiring from
ceiling junction box to light fixture) including earth wire, steel reinforced flexible conduit with
glands for drop wiring etc. All accessories required for a good quality installation shall be
included
19. SWITCHES & SOCKETS
a. All switches, sockets & accessories shall be decorative modular type or as specified in the bill of
quantities. Metal boxes are preferred over PVC.
b. All sockets shall have safety shutters to prevent inadvertent contact.
c. Wherever switch boxes has to be of concealed type, only metal boxes made by the same
manufacturer of switches / sockets shall be used. All metal switch boxes shall be suitably
earthed. The end termination shall be with crimping type copper cable lugs.
d. PVC switch boxes shall be used where surface mounting option is required.
Kochi Metro Rail Ltd.-6th Floor interior works at Revenue Tower
30
e. Switchboxes shall be recess mounted in the wall. Circuit identification with suitable permanent
marking shall be provided on each switch box. Required knock outs only shall be opened for
conduit entry.
f. Extra care shall be ensured while installation so that ‘plumb’ and ‘level’ shall be properly
maintained.
g. Front edge of the switchbox shall be in line with finished surface (after plastering) of the wall.
h. Switch boxes shall be earthed using the earth conductor of respective circuit wiring.
i. Height (from FFL) of Light switches shall be 125cms or as specified in the drawings.
j. Switchboxes shall be generally located 15cms from the edge of any door/window or as per the
aesthetic requirement as the case may be.
k. Only one circuit shall be terminated in one switchbox. If more number of circuits are required at
one location separate switchboxes shall be installed side by side.
l. At least one blank space shall be provided in each switchbox.
m. Switches shall be provided only on the phase conductor never on a neutral conductor.
20. INDUSTRIAL PLUG & SOCKETS
a. This shall be of heavy duty type with 3 pin for single phase supply and 5 pin for three phase
supply. Sockets shall have either metallic or thermo plastic enclosure complete with interlocked
rotary switch of appropriate rating as required.
b. Interlocking will be such a way that plug cannot be removed from the socket when switch is on
closed position. This shall have instant locking with screw less clamping arrangement.
c. Mechanism shall ensure earth connection shall be establish first while connecting plug to socket
and while removing earth connection should break after phase and neutral.
d. All terminals shall have captive screws with ¾ rotation. And unit shall be color coded to
distinguish single phase and three phase supply.
21. LUMINAIRES
a. Luminaire shall be free issue item by the clients. Contractor shall receive it from site store and
installed as marked in the drawings.
b. Surface mounting Luminaires shall be directly installed to the ceiling / wall using GI anchor
fasteners
c. Recess mounting luminaire shall be installed using suitable arrangements like suspension chains
from ceiling slab and weight of the luminaire shall not be transferred to the false ceiling grid.
Kochi Metro Rail Ltd.-6th Floor interior works at Revenue Tower
31
d. For installation where false ceiling is provided, it is preferred to have a common supporting
system for conduits and luminaires. Contractor may coordinate with interior work contractor for
any such method.
e. Threaded type of suspension system is preferred over steel bracket.
f. Earthing of the Luminaire body using respective earth conductor of point wiring shall be
ensured.
g. Steel reinforced Flexible conduits with glands shall be used for drop wiring (between ceiling
junction box and luminaire) for recess mounting type.
22. FANS
a. All fans shall be 5 star rated.
b. Ceiling fans shall be three blade totally enclosed type with capacitor start and run suitable for
240volts single phase 50Hz supply.
c. This shall be of double ball bearing type 1200 / 1400 mm sweep as the case may be complete
with suspension rod canopies and mounting bushes.
d. Wall mounting fans shall be 450mm sweep 3 blade low noise type and with oscillating
mechanism and shall comprise mounting bracket wire guard for the blades and in built regulator
for speed control.
e. Exhaust fans shall be 3000mm dia 900 RPM 3 blade low noise type. This shall complete with
mounting ring bracket, wire guard for the blades and bird screen.
23. PREAMBLE TO BILL OF QUANTITIES
a. The bidder shall carefully go through the tender documents and quote the unit price, which shall
be inclusive of all installation accessories and consumables. No extra amount will be paid for
any incidental, contingent work and materials.
b. The quantities indicated cover the probable quantities of work involved and are for the guidance
of the bidder. The order arising out of this inquiry will be an unit rate contract and not a
lumpsum one .The owner, however, does not in any way guarantee that the actual work involved
would correspond to the quantities indicated in the tender.
c. No change in unit rate will be allowed for any change in quantity or for any other reason
whatsoever.
d. All measurements will be carried out in metric units.
Kochi Metro Rail Ltd.-6th Floor interior works at Revenue Tower
32
e. The rates quoted shall include all taxes, duties, packing, forwarding, freight and unloading
charges.
f. The installation charges shall be inclusive of the cost of shifting materials from the Stores,
unpacking, installation on foundations as specified elsewhere, supply of hardware, consumables
and any minor Civil works involved.
g. The installation rate for cables shall include shifting of cable drums, unwinding and laying as
per engineering standards all labor supervision, routine testing, consumables such as
identification tags, clamps etc. However, the cost shall exclude steel supports, installation of
trays and cable termination.
h. The supply rate quoted for cable termination shall include single compression brass cable gland,
crimping type lugs earth tag for gland earthing. The installation rate shall include all
consumables and labor.
i. The installation rate of all switchboards shall exclude the cost of cable termination, but shall
include the cost of shifting, leveling, grouting with necessary hardware and consumables and
conducting all pre commissioning tests as per statute / Specified above.
j. Installation rate for all switch board, DBs & switch box shall include proper neat legible feeder
identification marking and circuit identification.
k. The installation rate of wiring shall include the cost of all necessary hardware and consumables
required for fixing the conduits / conduit accessories, drawing, P.V.C insulated copper wires
and end termination.
l. The rate for installation of earthing conductors shall include drilling holes for equipment
terminations, cost of lugs for earthing wires, suitable fixing clamps and SS hardware.
m. All testing charges for the Equipment shall be include in the installation rate of the respective
equipment.
n. The cost of steel framework, supporting the structure, etc. required for the Switchboards shall
not be include in the installation price. The same shall be separately quoted under the Head
Supply and installation of supporting steel
Kochi Metro Rail Ltd.-6th Floor interior works at Revenue Tower
33
SPECIFICATION AND CONDITIONS FOR AIR CONDITIONING
1. CONDITIONS IN CONJUNCTION WITH OTHER DOCUMENTS
Conditions of contract shall be read in conjunction with the Technical specifications, Drawings,
schedule of quantities and other documents forming part of this contract wherever the context so
requires.
2. MAKE AND OTHER DETAILS OF MATERIALS
The contractor shall furnish a list of makes selected from the list of approved makes indicated in
the tender as well as other details of various materials he proposes to use on the work and this would be
subject to the approval of the HVAC Consulting Engineer.
3. SHOP DRAWING
The Contractor shall submit to the HVAC Consultant detailed dimensioned shop drawings
covering all items of ducting and diffusers, piping and valves, AHU location ,plant room, electrical
layouts etc. No fabrication and installation should be put into execution until these shop drawings are
approved by HVAC Consultant. The Contractor shall submit in duplicate the shop drawings prepared by
him for checking and variation by the HVAC consultant. The Contractor shall then submit in duplicate
corrected shop drawings for final approval.
4. TESTING
The Contractor shall solely be responsible for the testing and commissioning of those works
covered by this specification in compliance with standard procedure.
5. SITE WORK CO-ORDINATION
The HVAC Contractor should co-ordinate with all the others works being carried out at the site
so that conflicts are foreseen in advance. The work program at the site should be prepared in advance
and planned based on the completion date mentioned. If any information / work front / drawings are not
available at the time of carrying out the work, these are to be informed to the Owner / Consultant
immediately.
6. EXCLUDED ITEMS OF WORK
The under mentioned works shall be arranged by the owner. However, the contractor shall
furnish necessary drawings/instruction at appropriate times to enable the owner to arrange for the same.
a. Provisions of A/C,1/3-phase 230/400v,50Hz.4 wire supply terminating in the air
conditioning contractors switch board/panel as given in the drawing.
Kochi Metro Rail Ltd.-6th Floor interior works at Revenue Tower
34
b. All masonry and builder’s work such as provision of suitable plant room, AHU room
with adequate lighting and concrete supporting arrangement for Outdoor units and
complete civil work.
c. Carpentry work such as false ceiling, work involved in duct concealment etc.
d. Shading for glasses wherever possible.
e. Making the air conditioning room air tight.
f. Insulation for exposed roof.
g. All electrical works.
7. PROJECT DESCRIPTION
Condensing Units and Air Handling Units has been designed to provide thermal environmental
control for Proposed KOCHI METRO RAIL CORPORATION. The designated air-conditioned space
with comfort cooling so as to maintain inside conditions of Dry Bulb Temperature (DBT) of 24 ± 1 ° C,
and not more than 60% Relative Humidity.
8. SYSTEM DESCRIPTION.
The air conditioned areas and their respective tonnages is given in the Basis of Design.
Thermally insulated supply air ducts shall be installed in the ceiling spaces. Conditioned air shall be
directly discharged through supply air grilles/diffusers.
SPLIT UNITS
1. CABINET
The split units/Packaged units shall have metal cabinet of 1.6mm thick (16 Gauge) galvanized
sheet steel. The body should be machine pressed and adequately stiffened. The body should be
chemically treated for corrosion resistance and epoxy powder coated. The evaporator unit shall be
ceiling suspended.
2. COMPRESSOR
All compressors shall be hermetically sealed scroll type of suitable capacities. Compressor shall
be suitable for freon refrigerant. The compressor shall be electrically interlocked with indoor and
outdoor fan motors, HP/LP cutouts and thermostat in the evaporator.
3. CONDENSER (AIR COOLED)
Kochi Metro Rail Ltd.-6th Floor interior works at Revenue Tower
35
The coils shall be made of copper hydraulically bonded with aluminium fins. The tubes shall
have a minimum of 9.5mm outer diameter, firmly bonded with aluminium fins spaced at 12-14 fins /
inch. The air velocity across the face of the coil shall not exceed 200 m/min. The coils shall be designed
for a maximum working pressure of 35 kg / sq. cm. The condensor coil shall be protected on the open
end by a wire mesh duly powder coated / plastic coated.
4. EVAPORATOR COIL
The coils shall be made of copper hydraulically bonded with aluminium fins. The coils shall be
hydrophilic in nature. The tubes shall have a minimum of 9.5mm outer diameter, firmly bonded with
aluminium fins spaced at 12-14 fins / inch. The air velocity across the face of the coil shall not exceed
170 m/min. The coils shall be designed for a maximum working pressure of 35 kg / sq. cm. The circuit
should include a thermostatic expansion valve/capillary tube, distributor, liquid strainer, suction line
shut off valve and liquid line shut off valve.
5. CONDENSOR MOTOR
The condensor motor shall be of IP –55 rating.
6. REFRIGERATION PIPING AND ACCESSORIES
Only hard drawn copper shall be used in piping with brass fittings wherever required. Brazing
shall be with silver copper phosphorous alloy. Horizontal lines shall have a grading of at least 1:250
away from the compressor and towards condenser to prevent gravity draining of oil to compressor.
Liquid lines shall be sized to ensure that flashing of liquid refrigerant does not occur. The circuit should
include a thermostatic expansion valve, distributors, liquid strainer, de-hydrator and liquid lines shut off
valve and suction line shut off valve.
Leaks shall be tested with soap solution at a minimum pressure of 21 kg / sq. cm. After all leaks have
been repaired, system shall be tested with the test pressure maintained for a period of not less than 8
hours. No measurable drop in pressure should be detected after the pressure readings are adjusted for
temperature changes. After satisfactory completion of the pressure test, the system shall be evacuated to
reduce the pressure to 0.1 Kg/Sq.cm. for a period of 6 hours and vacuum broken. A vacuum pump
connected to the refrigeration system shall be used to create the vacuum and the installed compressor
shall not be used to create the purpose. The system shall again be evacuated and a vacuum of 0.01
Kg/Sq.cm. maintain for 24 hours before charging with correct quantity of refrigerant and oil. The
system shall be operated for 12 hours and then again tested for leaks.
7. DRAIN PIPING
Kochi Metro Rail Ltd.-6th Floor interior works at Revenue Tower
36
Drain pipe shall be of 32mm dia. PVC pipes. All evaporator units shall be provided with
independent drain lines with suitable U traps. The drain shall be taken to the nearest exit points.
8. FAN
Fan section including wheel and housing shall be of heavy gauge steel / aluminium. Fans shall
be centrifugal, forward curved multi-blade type. Fan housing shall have inlets and guide vanes for
smooth air flow. Fans shall be complete with drive motor .The fans should be statically and dynamically
balanced. The fan motor should be resilient mounted. The fan should deliver a static pressure of 20mm.
9. DAMPERS
All fresh air intakes shall be provided with dampers. The fan outlets should be controllable with
a damper. The supply collars, wherever mentioned, shall be provided with collar dampers.
10. FILTERS
All evaporator units shall be provided with air filters capable of filtration unto 20 microns. The
filters shall be of washable synthetic fiber type.
11. CONTROL PANEL
All units shall have independent electrical control panels housing contactors, overload relays,
Voltage cutouts, time delays, interlocks, strip connectors, indication lamps, and control fuse. The
control Panel shall be housed inside a cabinet which shall be fixed at a convenient spot on the plywood
boxing.
12. THERMOSTAT
The thermostat shall be control wired with the control panel and shall be placed in the return
air path inside the boxing.
13. INSTALLATION
Adequate vibration isolation using rubber / neoprene pads / vibration springs in order to reduce
transmission of vibrations to the floor shall be provided for all condensing units.
14. TESTING
Split units after installation shall be tested for its conformity to specifications. Units shall also be
tested for the rated capacity and power consumption.
Kochi Metro Rail Ltd.-6th Floor interior works at Revenue Tower
37
TEST RESULTS
The following readings shall be recorded hourly during the tests and capacity of the plant shall be
computed.
1. COMPRESSOR
a. Suction pressure - Kg/Cm2 (psi)
b. Discharge Pressure - Kg/Cm2 (psi)
c. Rated capacity - HP
d. Rated Volts - Volts
e. Rated current - Amps
f. Power Consumption at - KWHr
2. CONDENSER
a. Refrigerant condensing pressure - Kg/cm2 (psi)
b. Refrigerant condensing Tempr. - C (F)
c. Entering air tempr. - C (F)
d. Leaving air tempr. - C (F)
e. Pressure drop through condenser - Kg/cm2 (psi)
3. MOTOR
a. Rated Horse Power - HP
b. Rated Volts - Volts
c. Rated Current - Amps
d. Actual current - Amps
e. Actual Volts - Volts
f. Starting current - Amps
g. Power factor –
4. SUPPLY AIR GRILLES
a. Area of Grill - m2 (Sft)
b. Velocity - M/S (FPM)
c. Air flow rate - M3/Hr
Kochi Metro Rail Ltd.-6th Floor interior works at Revenue Tower
38
d. Temperature DB - C (F)
e. Temperature WB - C (F)
5. FILTERS
a. Total area - m2 (Sft)
b. Effective area - m2 (Sft)
c. Velocity of air - M/S (CFM)
The observations of the test shall be recorded for each item separately.
Kochi Metro Rail Ltd.-6th Floor interior works at Revenue Tower
39
LIST OF APPROVED BRAND NAMES
All material specified in the schedule of quantities, specifications and conditions of contract
must conform to the following brand names, be factory made and be of first quality, BIS /IS marked
wherever available. Fabricated items shall be manufactured in accordance with the CPWD / ISI
specifications and be first quality. Samples of all materials to be used must be submitted and got
approved before actual procurement and Owner / Architect reserves the right to select any of the brand
names specified herein for use.
Sl.No
. MATERIAL DESCRIPTION
BRAND / TRADE NAME OR EQUIVALENT
APPROVED BY ENGINEER IN CHARGE
1 Paints ASIAN, ICI, BERGER, JOTUN OR EQUIVALENT
APPROVED BY ENGINEER IN CHARGE
2 Water proof paint APEX, WEATHER PROOF PAINT OR EQUIVALENT
APPROVED BY ENGINEER IN CHARGE
3 Locks GODREJ, DORMA OR EQUIVALENT APPROVED
BY ENGINEER IN CHARGE
4 Terrazzo tiles (Paving) EUROCON , SCORPIO, SIREX OR EQUIVALENT
APPROVED BY ENGINEER IN CHARGE
5 Ceramic tiles KAJARIA, JOHNSON,ORIENT OR EQUIVALENT
APPROVED BY ENGINEER IN CHARGE
6 White Cement BIRLA, J.K OR EQUIVALENT APPROVED BY
ENGINEER IN CHARGE
7 Ordinary Portland Cement
(43/53 Grade)
ULTRATECH, ZUARI, CORAMANDAL, RAMCOOR
EQUIVALENT APPROVED BY ENGINEER IN
CHARGE
8 Steel Reinforcement Bars
KAIRALI, VIZAG, METCON (ISI TMT)OR
EQUIVALENT APPROVED BY ENGINEER IN
CHARGE
9 Structural steel sections TISCO, SAIL OR EQUIVALENT APPROVED BY
Kochi Metro Rail Ltd.-6th Floor interior works at Revenue Tower
40
ENGINEER IN CHARGE
10 Stone Aggregate( Blue/Black) LOCALLY APPROVED OR EQUIVALENT
APPROVED BY ENGINEER IN CHARGE
11 Blocks/ Bricks & Brick Tiles LOCALLY BEST AVAILABLE OR EQUIVALENT
APPROVED BY ENGINEER IN CHARGE
12 Anti-Termite Treatment TERMEX OR EQUIVALENT APPROVED BY
ENGINEER IN CHARGE
13 Water Proof Shuttering
Plywood
INDIAN PLYWOOD MFG.LTD, NATIONAL
PLYWOOD, DURO, GREENPLY OR EQUIVALENT
APPROVED BY ENGINEER IN CHARGE
14 Teak Wood
1ST CLASS BURMA TEAK OR GHANA TEAK ,
KERALA TEAK OR EQUIVALENT APPROVED BY
ENGINEER IN CHARGE
15 Flush Doors (ISI) JACSONS, GODEREJ OR EQUIVALENT APPROVED
BY ENGINEER IN CHARGE
16 Rolling shutters KANIYAMPURAM OR EQUIVALENT APPROVED
BY ENGINEER IN CHARGE
17 Laminates GREEN LAM OR EQUIVALENT APPROVED BY
ENGINEER IN CHARGE
18 Water proofing FOSROC, DR. FIXIT, ROFF OR EQUIVALENT
APPROVED BY ENGINEER IN CHARGE
19 Aluminum Sections HINDALCO, JINDAL OR EQUIVALENT APPROVED
BY ENGINEER IN CHARGE
20 Glass SAINT GOBIN OR EQUIVALENT APPROVED BY
ENGINEER IN CHARGE
21 Board & Ply GREEN PLY, DURO, CENTURY OR EQUIVALENT
APPROVED BY ENGINEER IN CHARGE
Note: - For any other item required to be incorporated in work, sample shall be got approved from the
Owner / Architect before actual procurement and commencement of that item of work.
Kochi Metro Rail Ltd.-6th Floor interior works at Revenue Tower
41
FORMATS
Kochi Metro Rail Ltd.-6th Floor interior works at Revenue Tower
42
FORM I
COVERING LETTER
(Company letterhead) [Date]
To,
General Manager (Civil)
Revenue Tower, 8th Floor,
Park Avenue,
Ernakulam – 11
Dear Sir,
Ref: Construction of cubicles & cabins, plumbing, electrical, air conditioning, interior and
furnishing, works in 6th floor of revenue tower for Kochi Metro Rail Ltd
Having examined the tender, the receipt of which is hereby duly acknowledged, we, the undersigned,
submit a tender in response to the Tender invited for Construction of cubicles & cabins, plumbing,
electrical, air conditioning, interior and furnishing, works in 6th floor of revenue tower for Kochi Metro
Rail Ltd.
We attach hereto the tender document as detailed, which constitutes our proposal.
Primary and Secondary contacts for our company are:
Primary Contact Secondary Contact
Name:
Title:
Company Name:
Address:
Phone:
Mobile:
Kochi Metro Rail Ltd.-6th Floor interior works at Revenue Tower
43
Fax:
E-mail:
We confirm that the information contained in this bid or any part thereof, including its exhibits, and
other documents and instruments delivered or to be delivered to Kochi Metro Rail Limited (KMRL) is
true, accurate, verifiable and complete. This bid includes all information necessary to ensure that the
statements therein do not in whole or in part mislead the department in its short-listing process.
We fully understand and agree to comply that on verification, if any of the information provided here is
found to be misleading the short listing process, we are liable to be dismissed from the selection process
or termination of the contract during the project, if selected to do so, for Construction of cubicles &
cabins, plumbing, electrical, air conditioning, interior and furnishing, works in 6th floor of revenue
tower for Kochi Metro Rail Ltd.
We agree for unconditional acceptance of all the terms and conditions set out in the tender document.
It is hereby confirmed that I/We are entitled to act on behalf of our company/ corporation/ firm/
organization and empowered to sign this document as well as such other documents, which may be
required in this connection.
Dated this Day of 2013
(Signature) (In the capacity of)
(Name)
Duly authorized to sign the Tender for and on behalf of:
(Name and Address of Company) Seal/Stamp of bidder
Kochi Metro Rail Ltd.-6th Floor interior works at Revenue Tower
44
FORM II
LETTER OF OFFER
General Manager (civil)
Kochi Metro Rail Limited,
Revenue Tower, 8th Floor,
Park Avenue, Ernakulam – 11
Dear Sir,
Having examined the specifications and schedule of quantities relating to the works specified
in the memorandum herein after set out and having visited and examined the site of works specified in
the said memorandum and having acquired the requisite information's relating thereto as affecting the
tender , I/we hereby offer to execute the works specified in the said memorandum at the rate mentioned
in the schedule of quantities and in accordance with all respects with the specification and instructions
in writing referred to the conditions of tender, the Articles of Agreement, Special Conditions, Schedule
of quantities and condition of contract and with such materials as are provided for , buy and in all other
respects in accordance with such conditions so far as they may be applicable.
Memorandum
Sl.no Description of work Construction of cubicles & cabins,
plumbing, electrical, air conditioning,
interior and furnishing, works in 6th floor of
revenue tower for Kochi Metro Rail Ltd
1 Earnest Money Deposit Rs. 2.5 Lakhs
2 Percentage if any to be deducted from each
bill (Retention Money)
10% amount of each running bill till the
end of defect liability period.
3 Defect Liability Period 12 months from the date of virtual
completion.
4 Liquidated damages on delay 1.0% of the contract value per week or
part thereof subject to maximum 10 % of
the total bill value.
5 Completion Period 75 days from the date of work order
Kochi Metro Rail Ltd.-6th Floor interior works at Revenue Tower
45
6 Taxes Rates are inclusive of all taxes
Payment Terms:
(a) 90% of the order value as progressive payment.
(b) 10% of the order value shall be paid after the defect liability period.
2. Should this tender be accepted, I/we hereby agree to and fulfill the terms and provisions of the
said conditions of contract annexed here to far as they may be applicable or in default. Thereof to
forfeit the EMD and pay to the Kochi Metro Rail Ltd. the amount mentioned in the said conditions.
I/we have deposited a sum of Rs.............../- (Rupees................ Lakhs only) as earnest money (DD/pay
order No.................... dated …............. drawn in the bank.....................................) with the Kochi Metro
Rail Ltd which amount will not bear any interest. Should I/we fail to execute the contract when called
upon to do so. I/we do the hereby agree that this sum shall be forfeited to Kochi Metro Rail Ltd.
Name of the partner of the firm (tenderer)
Authorized
Signatory (signature with seal)
Date:
Place
Kochi Metro Rail Ltd.-6th Floor interior works at Revenue Tower
46
FORM – III
AGREEMENT
(Form of Agreement to be executed on Rs. 100/- Stamp paper)
Agreement made on the ……………… day of ………………………..between KMRL (hereinafter
called the ‘owner’) of the one part and
………………………………………………………………………………………….(Hereinafter
called the ‘contractor’) of the other part.
Whereas the owner is desirous of constructing a cubicles & cabins, plumbing, electrical, air
conditioning, interior and furnishing works in revenue tower for Kochi Metro Rail Limited.(hereinafter
called ‘the work’) at Kochi, Ernakulam as per drawings and bill of quantities showing and describing
the work to be done to be prepared by under the direction of Kochi Metro Rail LTD.
And whereas the contractor has supplied the owner with a fully priced copy of the bill of quantities
(hereinafter referred to ‘the contract bills’).
And whereas the contract drawings and the contract bills have been signed by on behalf of the parties
here and given to Kochi Metro Rail LTD.
NOW IT IS HEREBY AGREED AS FOLLOWS
1. For the consideration hereinafter mentioned the contractor upon and subject to the conditions
annexed carry out and complete the work shown upon the contract drawings and described by or
referred to in the contract bills and the said conditions.
2.The owner will pay the contractor the sum of Rs……………………………….(Rupees
………………………………………………………………………………………………Sum as shall
become payable here in under at the times and in the manner specified in the general conditions and its
annexed conditions.
3.The term ‘the Architect’ in the said conditions shall mean the said Mr. Saira Mathew, Regd.
Architect , M/s. Mathew & Saira,XXXIX/4184 -A, Ravipuram, Off. M.G. Road, Cochin - 16 or in the
Kochi Metro Rail Ltd.-6th Floor interior works at Revenue Tower
47
event of his death or ceasing to the Architect for the purpose of this contract, such other person as the
owner shall nominate for the purpose, not being a person to whom the contractor shall object for
reasons, considered to be sufficient by an arbitrator appointed in accordance with said conditions.
Provided always that no person subsequently appointed to be the architect under this contract shall be
entitled to disregard or over rule any certificate of opinions of decision of approval or instruction given
or expressed by the Architect for time being.
4. The contract is an ‘item rate contract’ and the rate for each item of work is as per the rates quoted
by the contractor
5. The said conditions shall be read and construed as forming part of this Agreement, and the parties
here shall respectively abide by, submit themselves to the conditions and perform the agreements on
their parts respectively in such condition contained.
as WITNESS our hands this day of
Signed by the owner OWNER
In the presence of
Witness (1)
Name:
Address:
Witness (2)
Name:
Address:
Signed by the said contractor CONTRACTOR
In the presence of
Witness (1)
Name:
Kochi Metro Rail Ltd.-6th Floor interior works at Revenue Tower
48
Address:
Witness (2)
Name:
Address:
Kochi Metro Rail Ltd.-6th Floor interior works at Revenue Tower
49
FORM IV
BIO – DATA OF SITE IN CHARGE & KEY PERSONNEL
Name of Work: Construction of cubicles & cabins, plumbing, electrical, air
conditioning, interior and furnishing works in 6th floor of
revenue tower for Kochi Metro Rail Ltd.
Name of Bidder:
Schedule of Proposed Site Organization.
The tenderer is to indicate here the proposed site organization he proposes to set up for execution of the
work .It is understood that this will be augmented form time to time depending on the requirements for
timely completion of work, as directed by owner/Architect.
Bio – Data of Site in charge & Key Personnel
(Signature of Bidder)
Kochi Metro Rail Ltd.-6th Floor interior works at Revenue Tower
50
FORM V
FINANCIAL INFORMATION
Financial Information
FY 2010-11 FY 2011-12 FY 2012-13
Annual turnover (in INR crores)
Other Relevant Information
Mandatory Supporting Documents:
Auditor Certified financial statements for the relevant financial years as above (Please include only the sections on
P&L, revenue and the assets, not the entire balance sheet.)
Kochi Metro Rail Ltd.-6th Floor interior works at Revenue Tower
51
FORM VI
CONCURRENT COMMITMENTS OF THE BIDDER
Name of Work: Construction of cubicles & cabins, plumbing,
electrical, air conditioning, interior and furnishing works in 6th
floor of revenue tower for Kochi Metro Rail Ltd.
Name of Bidder:
Concurrent Commitments of the Bidder
Certified that above Information is correct
Signature with seal
Kochi Metro Rail Ltd.-6th Floor interior works at Revenue Tower
52
FORM VII
DETAILS OF SIMILAR WORKS DONE DURING PAST 5 YEARS (CERTIFICATES TO
BE ATTACHED)
Name of Work: Construction of cubicles & cabins, plumbing electrical, air
conditioning, interior and furnishing works in 6th floor of
revenue tower for Kochi Metro Rail Ltd.
Name of Bidder:
Details of similar works done during past 5 years
Certified that above Information is correct
(Signature of Bidder)
Kochi Metro Rail Ltd.-6th Floor interior works at Revenue Tower
53
BILL OF QUANTITIES
Kochi Metro Rail Ltd.-6th Floor interior works at Revenue Tower
54
KOCHI METRO RAIL LTD.
Name of work : Tender for cubicles & cabins,Plumbing,Interior and furnishing works in 6th floor of Revenue tower for KMR Ltd.
SUMMARY OF BOQ
Sl. No. Description Amount
I CIVIL & INTERIOR WORKS
II MODULAR FURNITURE & CHAIRS
III ELECTRICAL WORKS
IV AIRCONDITIONING WORKS
GRAND TOTAL
Kochi Metro Rail Ltd.-6th Floor interior works at Revenue Tower
55
KOCHI METRO RAIL LIMITED
BOQ - INTERIOR WORKS
Name of work : Tender for cubicles & cabins, Plumbing, Interior and furnishing works in 6th floor of Revenue tower for KMR Ltd.
Sl.
No
Qty. Description Unit Rate in Amount
Figures words
1 2 3 4 5 6 7
1.DEMOLISHING WORKS
a) 213 Removing all existing partitions from the floor including
glass partition , steel frames, existing partition doors,
laminates etc. including clearing and removal from site(
Visit site before quoting)
M2
2. PAINTING
a) 852 Surface finishing -Wall painting with plastic Emulsion
paint with putty finish of approved quality as specified (ISI
marked) of required shade to give an even shade including
brushing the surface clean of all dirt, dust and sand papered
smooth in dining, electrical, wash , toilet, office area,
cabins, Meeting room wherever required. The rate
includes the cost of all materials, labour charges , cleaning
etc., complete.
M2
b) 70 Painting the ceiling and sides of beam with distemper of
approved quality as specified (ISI marked) of required
shade to give an even shade including brushing the surface
clean of all dirt, dust and sand papered smooth in dining,
electrical, wash , toilet, wherever required. The rate
includes the cost of all materials, labour charges etc.
complete.(Refer drawing)(False ceiling painting excluded.)
M2
c) 87 Painting with synthetic enamel paint 2 coats to give an
even shade including cleaning of the surface of the dirt ,
M2
Kochi Metro Rail Ltd.-6th Floor interior works at Revenue Tower
56
dust & rust sand papering etc. over a priming coat
wherever required with ivory coloured enamel paint
complete all around MS handrail. The rate includes the
cost of all materials, labour charges etc. complete.(Refer
drawing)
d) Border work (5”) with synthetic enamel paint 2 coats as per
the drawing and approval from Architect ( Entrance door
area, Display wall) including cleaning of the surface of the
dirt , dust & rust sand papering etc. over a priming coat
wherever required with coloured enamel paint complete .
The rate includes the cost of all materials, labour charges
etc. complete.(Refer drawing)
i) 40 Length of 31/2” Green laminate strip ( CENTURY LIME
GREEN 275)
RM
ii) 40 Length of 11/2” Blue laminate strip (CENTURY BLUE
BLUISH 3241)
RM
e) 102 Cleaning existing glass and frame inside and touch-up of
enamel paint on steel frame inside.The rate includes the
cost of all materials, labour charges etc. complete.(Refer
site condition)
M2
f) 32 Providing textured surface special design plaster finished
with design rollers or cement spray and painted over in
shades specified by architect as directed on Entry side wall
and rear side wall . The rate includes the cost of all
materials, labour charges etc. complete.
M2
3. PARTITIONS
a) FULLY GLAZED PARTITIONS ON TOP AND
BOTTOM ALUMINIUM FRAMES
i) Partition using glass 12mm thick , removable & reusable
glass panels of size 8'x3' fixed on top & bottom
Aluminium powder coated frames of Twin style section
Kochi Metro Rail Ltd.-6th Floor interior works at Revenue Tower
57
of size 4”x2” of desired colour (ivory) , heavy duty
Aluminium Twin style section of size 4”x2” full height
upto RCC ceiling level from finished floor level, and
provide a section of Twin style of size 4”x2” at 240 level
also, fixed at the False ceiling (Gypsum ceiling) level& fix
to the ceiling frames at 2' interval above the false ceiling
level using box section Aluminium powder coated Twin
style section of size 4”x2” for strenth and inserting
toughened glass 12mm as 8'x3' panels vertical without
horizontal sections supported on top & bottom Aluminium
section. . The rate includes the cost of all materials, labour
etc, complete.(Refer drawing sheet No:5)
a) 53 Framing (340 cm height) M2
b) 127 Plain float glass 12mm thick (240 cm height) M2
ii) 222 Supplying and fixing frosted Sticker for glass partition
area as per approval from the Architect. The rate includes
the cost of all materials, labour etc, complete.(Refer
drawing for design detail, sheet No:5)
M2
b) INTERLOCKING CEMENT PARTITIONS
i) 105 Providing and fixing of 52mm thick Interlocking Cement
sandwich panels for internal wall partitions in pantry, store
room , server room and wherever required by fixing to the
RCC ceiling height of partitions 340cm , having dry
density 780 kgs per cum mean weight not less than 36 kgs
per SqM made out of two 4 mm thick fibre reinforced
cement sheets on either side of the light weight concrete
core composed of Portland cement binders, silicaceous and
micaceous material aggregate with tongue and groove
arrangement. The bottom of the panel shall be fixed to the
floor using channel made up of 0.9 mm thick GI channels
of size 14x50x25 mm fixed to the existing floor with 6x60
M2
Kochi Metro Rail Ltd.-6th Floor interior works at Revenue Tower
58
mm nylon self expansion screws at 600 mm C/C, and top
of the panel fixed to the ceiling with ceiling channel made
up of 0.9 mm thick GI channels of size 38x50x38 mm. All
the tongue and groove joints of the panels have to be
properly cleaned and the recessed area of the panels have to
be flushed using suitable material and fibre tape.Puttying
and rubbing the joints and including gap filling between
Interlocking partition. The rate includes cost of 50mm
Interlocking Cement sandwich panels, GI Floor and
ceiling channel, expansion screws, puttying & rubbing ,
the joints etc. all work complete.
ii) 196 Providing and fixing of 52mm thick Interlocking Cement
sandwich panels for internal Modular partitions office area
height of partition is 1350mm, free standing , strength
attained by the 90 degree turn in sections having dry
density 780 kgs per cum mean weight not less than 36 kgs
per SqM made out of two 4 mm thick fibre reinforced
cement sheets on either side of the light weight concrete
core composed of Portland cement binders, silicaceous and
micaceous material aggregate with tongue and groove
arrangement. The bottom of the panel shall be fixed to the
floor using channel made up of 0.9 mm thick GI channels
of size 14x50x25 mm fixed to the existing floor with 6x60
mm nylon self expansion screws at 600 mm C/C, and top
of the panel free standing with the ceiling channel on top
made up of 0.9 mm thick GI channels of size 38x50x38
mm. All the tongue and groove joints of the panels have to
be properly cleaned and the recessed area of the panels
have to be flushed using suitable material and fibre
tape.The side & Top cover providing with 1/2” thick
(12mm) strip Mahagony wood 55mm wide. Puttying and
M2
Kochi Metro Rail Ltd.-6th Floor interior works at Revenue Tower
59
rubbing the joints and including gap filling between
Interlocking partition. The rate includes the cost of all
materials, labour ,puttying & rubbing the joints etc, all
work complete.
iii) 393 Puttying & Painting Modular Partitions using plastic
emulsion paint of any reputed company of ISI grade
special white colour two coats polishing Mahagony wood -
55 cm wide & 12mm thick Walnut colour (CENTURY
NICE WOOD 712 N ) The rate includes the cost of all
materials, puttying & painting, labour charges etc.
complete.
M2
iv) Providing & Fixing 1mm thick Laminate strip on the
Cement panel partition in two shades Green & Blue as per
the Metro colour scheme 31/2” wide Green Colour, and
11/2” wide Blue Colour on the finished Interlocking
Cement panels as wherever suggested in the drawing.A
Grey colour laminate strip 31/2” wide is also to be
provided on selected area. (Refer 3D View drawing)The
rate includes the cost of all materials, fixing, by glueing &
edge cleaning labour charges etc. complete.
a) 225 Length of 31/2” Green laminate strip ( CENTURY LIME
GREEN 275)
RM
b) 225 Length of 11/2” Blue laminate strip (CENTURY BLUE
BLUISH 3241)
RM
c) 120 Length of 31/2” Grey laminate strip (CENTURY BLUISH
GREY 234)
RM
v) 124 Polishing Mahagony wood on top & side of Modular
partition 55cm wide 12mm thick to Walnut colour. The
rate includes the cost of all materials, labour charges etc.
complete.
M2
Kochi Metro Rail Ltd.-6th Floor interior works at Revenue Tower
60
4. DOOR
a) FULLY GLAZED DOOR
Providing and fixing glazed doors (max. size 0.9 x2.40m)
using 12mm thick toughned glass as per drawings , fixed
in top & bottom Aluminium frames of Twin style section
of size 4”x2” in powder-coated Aluminium of desired
colour including good quality, heavy duty Aluminium
section full height(2.40m) SS door handles, 3/4” pipe,
height of handle 45cm & bend length 4” etc both inside
and outside. complete, including cost of floor spring. The
doors are to be fixed on floor & top frame both side swing
using floor spring & top auto closing pivot hinge . A
locking system has to be considered for all doors.The rate
includes the cost of all materials,lock, labour charges etc.
complete.(Refer drawing sheet No:5 )
i) 26 Door- 90x240 (12Nos.) toughned glass M2
ii) 4 Door- 150x240 (Rear) toughened glass 2 shutters of 75cm
each (1No)
M2
iii) 5 Door- 200x240 (Front) toughened glass 2 shutters of 90cm
each (1No.)
M2
b) 10.8
8
Providing and fixing two plywood boxes in 12mm ply of
size 25cmx25cm ( square) from floor to false ceiling
height and finished in Walnut colour laminate shade
(CENTURY NICE WOOD 712 N ) and edges finished in
hard wood rounded reapers.
M2
c) 9 Providing & fixing door shutters (max. size 0.90mx2.20m)
of the same pattern and finish of double skin partitions in
HW frames, 6mm thick marine ply with HW lippings on
all exposed edges and finished with 2 coats of enamel
paint over 1 coat primer & putty for smooth finish to suit
the openings provided , including cost of heavy duty SS
Nos.
Kochi Metro Rail Ltd.-6th Floor interior works at Revenue Tower
61
hinges, lock and all necessary fittings and fixtures ,
including the cost of door closers.The rate includes the cost
of all materials, labour charges etc. complete.
d) 9 Providing and fixing door frames in the wall openings
provided with well seasoned, good quality wooden sections
(100mmx 60mm) including cost of hold fasts etc.
complete.The rate includes the cost of all materials, labour
, fixing charges and sanding & finishing the door frames
in enamel paint walnut shade etc. complete.(Refer
drawing)
Nos.
5. FALSE CEILING
a) 648 Fabricating M/S Seamless suspended ceiling stepped in 2
levels, floating edge effect which includes G.I Perimeter
channels and suspending G.I Intermediate channels fixed
with G.I cleat and steel expansion of fasteners. The grid
should be suspended by strap wire/rod at 1200mm c/c Spl
clips , screws and bolts and nuts also used to connect
ceiling angle to the intermediate channels. Ceiling sections
are then fixed to the intermediate channel with the help of
connection clip and in direction perpendicular to the
intermediate channel. 12.5mm INDIA GYPSUM BOARD
is then screw fixed to ceiling section with drywall screws at
centres. The lypboard should be fixed from bottom, Finally
the boards are to be jointed with filling and finishing the
tapered and square edges of the boards with joining
compound, joint fibre netted tape and drywall topcoat as
primer 2 coats for smooth finish.Provision should be given
for A/c grills, Light fittings , fire fighting , channel music
etc. as required and puttied and finished with 3 coats of
Acrylic emulsion paint special grade of required colours in
(2 shade) white (Special white) & grey (Winter moon
M2
Kochi Metro Rail Ltd.-6th Floor interior works at Revenue Tower
62
8258, Asian paints colour spectra ) and a terracotta ( RED
RED X118 or RODEO X117) to match the colour of the
insert tile on the floor and to match the colour scheme of
the interior. Locating and providing for existing fire
hydrant nozzles. The rate includes the cost of all materials,
labour charges etc. complete.(Refer drawing sheet No: 2&
5, 3D View)
b) 54 Fabricating M/S Seamless suspended ceiling PVC Boarder
, which includes G.I Perimeter channels and suspending
G.I Intermediate channels fixed with G.I cleat and steel
expansion of fasteners. The grid should be suspended by
strap wire/rod at 1200mm c/c Spl clips , screws and bolts
and nuts also used to connect ceiling angle to the
intermediate channels. Ceiling sections are then fixed to
the intermediate channel with the help of connection clip
and in direction perpendicular to the intermediate channel.
PVC BORDER-STRIP 45cm wide , with grooves
horizontal , in grey colour, is then screw fixed to ceiling
section with drywall screws at centres. The board should be
fixing from bottom. The beadings are to be lock jointed.
An edge cornice work of the same material to be provided
for smooth finish.Provision should be given for A/c grills,
Light fittings , fire fighting , channel music etc. as
required and finished well. Locating and providing for
existing fire hydrant nozzles. The rate includes the cost of
all materials, labour charges etc. complete.(Refer drawing)
M2
c) False ceiling vertical portion
120 Fabricating M/S Seamless suspended ceiling stepped in 2
levels, floating edge effect which includes G.I Perimeter
channels and suspending G.I Intermediate channels fixed
with G.I cleat and steel expansion of fasteners. The grid
M2
Kochi Metro Rail Ltd.-6th Floor interior works at Revenue Tower
63
should be suspended by strap wire/rod at 1200mm c/c Spl
clips , screws and bolts and nuts also used to connect
ceiling angle to the intermediate channels. Ceiling sections
are then fixed to the intermediate channel with the help of
connection clip and in direction perpendicular to the
intermediate channel. 12.5mm PVC Verticals to close the
False ceiling is then screw fixed to ceiling section with
drywall screws at centres. The ceiling should be fixed
from bottom, Finally the boards are to be jointed with
filling and finishing the tapered and square edges of the
boards with joining compound, joint fibre netted tape and
drywall topcoat as primer 2 coats for smooth
finish.Provision should be given for A/c grills, Light
fittings , fire fighting , channel music etc. as required and
finished with 3 coats of Acrylic emulsion paint of required
colours (2 shade) to match the colour scheme of the
interior.The rate includes the cost of all materials, labour
charges etc. complete.(Refer drawing sheet No:5)
d) 114 Fabricating M/S Seamless suspended PVC ceiling for
toilets and pantry , which includes G.I Perimeter channels
and suspending G.I Intermediate channels fixed with G.I
cleat and steel expansion of fasteners. The grid should be
suspended by strap wire/rod at 1200mm c/c Spl clips ,
screws and bolts and nuts also used to connect ceiling
angle to the intermediate channels. Ceiling sections are
then fixed to the intermediate channel with the help of
connection clip and in direction perpendicular to the
intermediate channel. PVC ceiling sheet is then screw to
ceiling section with drywall screws at centres. The board
should be fixed from bottom. The beadings are to be lock
jointed. Light fittings , fire fighting etc. as required and
M2
Kochi Metro Rail Ltd.-6th Floor interior works at Revenue Tower
64
finished well.The rate includes the cost of all materials,
labour charges etc. complete.
e) 120 Fabricating fixing a PVC water collection pipe with
minimum slope touching the external glass facade, cutting
the pvc edges to be Seamless to the glass facade edge & a
drain pipe 4”, half round dia at collecting points to drain
collected water to the nearest toilet floor trap. The rate
includes cost of material, stiffeners, supports , labour etc.
complete.
RM
6. POP CORNICE
a) 60 Cornice of size 75x50mm to be made in plaster of paris as
per approved design using glass fibre as reinforcement.
The moulding to be fixed to the walls by using Aries brass
body wood screen at 45cm c/c. Including painting as per
design colour.The rate includes the cost of all materials,
labour charges etc. complete.
RM
7. BEADING
a) 20 Beeding & grooving in POP , specification (as per item
No: 6a Cornice )and painted as per design colour on
existing pillars & Ceiling, the beadings are to be jointed
with filling and finishing the tapered and square edges of
the boards with joining compound , joint fibre netted tape
and drywall topcoat as primer 2 coats for smooth finish and
with 3 coats of Acrylic emulsion paint of required colour
(white) to match the colour scheme of the interior.Beadings
to be provided (Refer drawing) on the centre core
specification as before but finishing with terracotta shade
Texture paint- spectrum or equivalent. Puttying & painting
over the beading using 2 coats of white & terracota on this
ceiling.The rate includes the cost of all materials, labour
charges etc. complete.(Refer 3D drawing sheet No:25)
RM
Kochi Metro Rail Ltd.-6th Floor interior works at Revenue Tower
65
b) 10 Remodeling pillars of size 35x35cm using 11/2”x11/2”
Hard wood corner beadings and inserting 1mm thick
Terracotta colour laminate 1mm thick with groovings on
6mm marine ply.The rate includes the cost of all materials,
labour charges etc. complete.(Refer 3D drawing sheet
No:25)
M2
8. FLOORING
a) 276 Floor cutting work to laying of Data cables wherever
required .The rate includes the cost of all materials, labour
charges etc. complete.
RM
b) 276 Floor cutting and insert of strip tile of contrast colour 4”
width in Reception & Central passage laid in cm 15 mm
thick 1:4 mix fixed in latecrete. The edges wherever cut
should be pointing using the necessary colour.(Basic price
of tile 50/-sft)The rate includes the cost of all materials,
labour , fixing charges etc. complete.(Refer 3D drawing,
sheet No:30)
RM
c) 239 Providing and fixing 6mm Hylam sheet 8” wide white
colour and the necessary reapers and fasteners for sealing
the gap of floor and external glass facade top & bottom for
good finish
RM
9. GLASS DISPLAY WALL
6 Display Wall (240x240 size) – Providing a multifunctional
display wall free standing 8mm sandwich glass with a
5mm gap between two 8mm sandwich glass panel fixed on
hardwood sections 50mmx 25mm, the size of the
sandwich panel is 8'x3' vertically errected as two panels &
the design of the route of the metro rail to be draw &
highlighted with LED lighting , to light up the metro rail
pattern & the metro station in colour light of red & yellow
LED single lights. The logo of Kochi Metro to be
M2
Kochi Metro Rail Ltd.-6th Floor interior works at Revenue Tower
66
embossed on front glass. The rate includes the cost of all
materials and labour charges etc. complete.( Refer drawing
Sheet No:-5)
10. LOUVERED VERTICAL BLINDS
170 Providing louvered vertical blinds of ISI Grade , Reputed
company double colour finish with necessary fasteners and
spacers on Aluminium rails with nylon fittings and tiltable
and foldable arrangements as a covering for outside
glazing of Vista or equivalent brand in specified shade
after approval from the architect including all labour and
materials complete.
M2
11. STORAGE CUPBOARDS
a) 9 Storage Units (340x90x210cms) using 12mm Marine grade
plywood of ISI Grading as boxing height 210 width 340
and depth 90cm and shutters using 12mm thick multiwood
3 shutters with 4 plywood racks each , 3 drawers etc.
complete. The plywood and multiwood is to be puttied and
painted in two coats enamel paint mat finish. The edges of
the plywood has to be finished using matching colour
tape.The rate includes cost of automatic closing hinges,
locks , handles etc. complete. Edges finished drawer unit
using good quality ISI branded adhesives , metallic heavy
duty draw slides on good quality nylon bushes for easily
movement. Rates should include labour and materials ,
polishing etc. complete. ( Refer drawing, sheet No: 4)
M2
b) 7.5 Storage Units(300x90x210) using 19mm Marine grade
plywood of ISI Grading as boxing height 210 width 300
and depth 90cm and shutters using 12mm thick multiwood
6 shutters with A0 drawing sheet hangers and one row of
bottom racks. The plywood and multiwood is to be puttied
and painted in two coats enamel paint mat finish. The
M2
Kochi Metro Rail Ltd.-6th Floor interior works at Revenue Tower
67
edges of the plywood has to be finished using matching
colour tape.The rate includes cost of automatic closing
hinges, locks , handles etc. complete. Edges finished
drawer unit using good quality ISI branded adhesives ,
metallic heavy duty draw slides on good quality nylon
bushes for easily movement. Rates should include labour
and materials , polishing etc. complete.
12. PANTRY
a) PANTRY COUNTER FOR DINING
i) 9.5 Providing a pantry counter for dining at a height of 75cm
from finish floor level and a width of 60cms on MS
angular sections 11/2”x11/2” of ISI standard with a
diagonal strut for support connecting the two right angles
flanges at an interval of 75cms etc. spacing and laying rich
black granite slab 20mm thick on a Marine ply base fixing
using screws and adhesives. The granite slab shall project
from the Marine Ply base by two inches and edges shall be
double nosing and rounded to half circle. A footrest shall
be provided on 3” MS pipe vertical support welded and 2”
dia fixed at a height of 30cm from finished floor level. The
rate shall include cost of all materials including granite
double nosing , edge rounding enamel painting over MS
sections & pipes and edge back of the plywood puttied and
painted all materials and labour complete. (Basic cost of
granite 160/sft) ( Refer drawing, sheet No: 3)
M2
ii) TILE DADO
10 White or Coloured Ceramic glazed Tiles in Dado on
12mm thick cement plaster (1 Cement: 3 Coarse sand) 1:3
base and jointed with white Cement slurry.(Basic price of
tile Rs.35/-sft.) including border tiles. The rate includes the
cost of all materials, labour charges etc. complete.
M2
Kochi Metro Rail Ltd.-6th Floor interior works at Revenue Tower
68
b) PANTRY COUNTER IN KITCHEN AREA
i) TOP SHELF (490cmx40cm width x 80cm height)
4.5 Supplying and fabrication pantry top cabinet shutters using
19mm multiwood (40cm width) shutters and top and
bottom using 19mm Marine ply .The inner vertical &
horizontal partitions are done by using 12mm thick
marine ply (two racks )and back partitions are done by
using 6mm thick marine ply respectively.The plywood and
multiwood is to be puttied and painted in two coats enamel
paint mat finish.The rate includes cost of automatic closing
hinges, locks , handles etc. complete. Edges finished using
good quality tape and good sliding systems. Rates should
include labour and materials , painting etc. complete.
M2
ii) BOTTOM SHELF(490cm x60cm width x 90cm height)
5 Supplying and fabrication pantry bottom cabinet shutters
using 19mm multiwood (40cmwidth) shutter and top and
bottom using 19mm Marine ply .The inner vertical &
horizontal partitions are done by using 12mm thick
marine ply (two racks )and back partitions are done by
using 6mm thick marine ply respectively bottom shelf
should lifted by giving skirting of 10cm height.The
plywood and multiwood is to be puttied and painted in two
coats enamel paint mat finish.The rate includes cost of
automatic closing hinges, locks , handles etc.
complete.Edges finished using good quality tape and good
sliding systems. Edges finished drawer unit using good
quality ISI branded adhesives , metallic heavy duty draw
slides on good quality nylon bushes for easily movement.
Rates should include labour and materials , polishing etc.
complete.
M2
Kochi Metro Rail Ltd.-6th Floor interior works at Revenue Tower
69
iii) GRANITE SLAB
3 Providing granite slab for pantry area using galaxy black
granite slab 20mm thick on top of bottom shelf using
adhesives .The granite slab shall project from the marine
ply base by 2 inches and edges shall be double nosing
rounded to halft circle with cut out for sink and hole for
gas . The rate shall include cost of all materials including
granite double nosing , edge rounding enamel painting over
MS sections & pipes and edge back of the plywood puttied
and painted all materials and labour complete.(Basic cost
of granite is 160/sft.)
M2
iv) TILE DADO
4 White or Coloured Ceramic glazed Tiles in Dado on
12mm thick cement plaster (1 Cement: 3 Coarse sand) 1:3
base and jointed with white Cement slurry.(Basic price of
tile Rs.35/-sft.) including border tiles. The rate includes the
cost of all materials, labour charges etc. complete.
M2
v) SINK
1 Supplying and fixing SS Single bowl sink with
drain(1040mm x 545mm) supprted by CI /MS brackets,CP
cast brass bottle trap with extension piece,rubber
adaptor,wall flange ,union ,CP brass chain rubber plug ,and
making good the slab (Nirali/ Diamond). The plumbing
connections are to be taken from the existing toilet
connections. The rate includes all related plumbing works
materals and labour also.
No.
vi) SINK COCK
2 Supplying and fixing sink cock with CP wall flange,
overhead swinging cast spout with aerator complete as
required (Cera ,Hindware) .The rate includes all materials
including plumbing works and fittings and labour charges
Nos.
Kochi Metro Rail Ltd.-6th Floor interior works at Revenue Tower
70
etc..complete
c) PANTRY WASH AREA
i) WASH
3 Providing wash counter at a height of 90cm from finish
floor level and a width of 60cm on MS angular sections 1
1/2" x 1 1/2" of ISI standard with a diagonal strut for
support connecting the two right angles flanges at an
interval of 75 cm etc.spacing and laying galaxy black
granite slab 20mm thick on a marine ply base fixing using
screws and adhesives .The granite slab shall project from
the marine ply base by 2 inches and edges shall be double
nosing rounded to halft circle with cut out for wash basin
.The rate shall include cost of all materials including
granite double nosing , edge rounding enamel painting over
MS sections & pipes and edge back of the plywood puttied
and painted all materials and labour complete.(Basic cost
of granite is 160/sft.)
M2
ii) TILE DADO
2 White or Coloured Ceramic glazed Tiles in Dado on
12mm thick cement plaster (1 Cement: 3 Coarse sand) 1:3
base and jointed with white Cement slurry.(Basic price of
tile Rs.35/-sft.) including border tiles. The rate includes the
cost of all materials, labour charges etc. complete.
M2
ii) WASH BASIN
4 Supplying and fixing in position of counter below wash
basin (size 63cm x 50cm) with CI bracket painted
white,32mm dia CP brass waste ,CP brass chain with
rubber plug ,32mm dia CP brass bottle trap with extension
piece ,wall flanges and rubber adapters for waste
connection complete including cutting and making good
the slab wherever required(Hindware,Cera).The plumbing
No.
Kochi Metro Rail Ltd.-6th Floor interior works at Revenue Tower
71
connections are to be taken from the existing toilet
connections. The rate includes all related plumbing works
materals and labour also.
iii) PILLAR TAP
4 Supplying and fixing brass C.P. pillar tap complete with
all accessories(Cera/Hindware)The rate includes all
materials including plumbing works and fittings and
labour charges etc..complete
No.
13 INTERIOR SOFT SCAPE ELEMENTS
a) RECEPTION AREA
i) RECEPTION COUNTER
4 Supplying and Fabricating a reception counter having a
depth 60cms and height 105cms. The front of the table is
covered with 19mm thick ply boxing, & curved area with
flexy ply on Hard wood frames & both sides with flexy ply
& 2” wood finish Mica CENTURY- NICE WOOD 712 N
& combination of 6”SS Mica CENTURY -silver mini
squares (1001 MS )& glass fixing using 11/2” SS pipe
supports as per design. The inner of the table also with
wood finish Mica.Hardwood lipping on all exposed edges
& plywood & with keyboard tray and open CPU rack
below the monitor, counter shelves with shutters wherever
required (one unit per person, one CPU rack , one key
board tray , one MDU , one shelf + drawer) using good
quality ISI branded adhesives and spring hinges for shelf
shutters on the counter and metallic draw slides on good
quality nylon bushes for easy movement. Rates should
include labour and materials complete, and finished
completely. (One side length only) ( Refer drawing,
sheet No: 3)
M2
Kochi Metro Rail Ltd.-6th Floor interior works at Revenue Tower
72
ii) WORKING COUNTER (for Printer/ sacnner etc.)
a) TOP SHELF (300cmx40cm width x 80cm height)
3 Supplying , fabricating and fixing of top shelf & sliding
shutters using 19mm multiwood at the top and bottom and
the inner vertical and horizontal partitions are done by
using 12mm thick marine ply (two racks )and back
partitions are done by using 6mm thick marine ply
respectively.The plywood and multiwood is to be puttied
and painted in two coats enamel paint mat finish white
colour.The rate includes cost of automatic closing hinges,
locks , handles etc. complete. Edges finished using good
quality tape and good sliding systems. Rates should include
labour and materials , painting etc. complete.( Refer
drawing, sheet No: 3)
M2
b) COUNTER & BOTTOM SHELF (300cm x70cm width x
70cm height)
3.5 Supplying , fabricating and fixing Bottom counter at a
height of 70cm from finish floor level and a width of
70cms on MS angular sections 11/2”x11/2” of ISI
standard with a diagonal strut for support connecting the
two right angles flanges size 60cms bothways at an interval
of 45cms etc. spacing and laying white granite slab 20mm
thick on a 12mm Marine ply base fixing using screws and
adhesives. The granite slab shall project from the Marine
Ply base by two inches and edges shall be double nosing
and rounded to half circle. A footrest shall be provided on
3” MS pipe vertical support welded and 2” dia fixed at a
height of 15cm from finished floor level for two people.
Openable shutters using 19mm multiwood (50cmwidth)
.The inner vertical & horizontal partitions are done by
using 12mm thick marine ply (two racks )and top &
M2
Kochi Metro Rail Ltd.-6th Floor interior works at Revenue Tower
73
bottom back partitions are done by using 6mm thick
marine ply respectively, bottom shelf should lifted by
giving skirting of 10cm height.The plywood and
multiwood is to be puttied and painted in two coats enamel
paint mat finish white colour. The rate includes cost of
automatic closing hinges, locks , handles etc. complete.
Two drawers to be provided for two people with multiword
, vertical racks with12mm marine ply to be adequately
provided to vertical supports. Edges finished using good
quality tape and good sliding systems. Edges finished
drawer unit using good quality ISI branded adhesives ,
metallic heavy duty draw slides on good quality nylon
bushes for easily movement. Rates should include labour
and materials , painting etc. complete.(Refer drawing)
3 Supplying , fabricating and fixing of top shelf & sliding
shutters using 19mm multiwood at the top and bottom and
the inner vertical and horizontal partitions are done by
using 12mm thick marine ply (two racks )and back
partitions are done by using 6mm thick marine ply
respectively.The plywood and multiwood is to be puttied
and painted in two coats enamel paint mat finish white
colour.The rate includes cost of automatic closing hinges,
locks , handles etc. complete. Edges finished using good
quality tape and good sliding systems. Rates should include
labour and materials , painting etc. complete.( Refer
drawing, sheet No: 3)
M2
c) 1 Supplying a glass drafting foldable table for A0 sheet size
with necessary accessories and also a drafting set square,
sliding ruler complete.
No
iii) SS KEY INSERT PILLAR
2 Fabricating a pillar for inserting the Punching unit of the M2
Kochi Metro Rail Ltd.-6th Floor interior works at Revenue Tower
74
pillar is 8”x 4” from finish floor level to RCC ceiling
height of 3.4 metres in 12mm Marine ply boxing and
finishing 1mm stainless steel finish Mica (CENTURY -
silver mini squares 1001MS) from top to bottom . The
necessary provision for key insert gadget shall be provided
and all works completed, The cable provision to the gadget
is also to be considered while fixing the pillar. The
plywood and Mica should be ISI grade. Rates should
include labour and materials complete(excluding punching
unit)
iv) CENTER TABLE
2 A center table of size 100 x 100 cms L Shaped ply
finished in ducco paint . A Rectangular shape wooden base
in ducco paint and the top is finished with 12 mm thcik
bevelled glass with plants inserts 3 bunches each in the
Rectangular shaped cut out on 3/4” white or coloured
pebbles. . The base of the cone is finished with steel patta.
Refer drawing. Rates should include labour and materials
complete. (2 tables)( Refer drawing, sheet No: 7)
M2
b) OFFICE AREA
i) CORNER LANDSCAPE BOXES
a) 14.5 Providing landscaped boxes allround in the plan at all
four corner 2 feet height using 12mm boxing & 8mm
Flexy ply curved pot shaped boxing and finishing using
1mm thick stainless steel finish Mica SILVER BRUSH
1001 BR ISI grade & edges finished in Hardwood reapers
all around & filling a height of 8” width filling with white
and yellow marble chips 1/2” to 3/4” size and inserting 5
feet tall artificial palms 2 nos. each (ie. 2X4 = 8 Nos. ) & 3
bundles of green creepers (ie. 3X4=12nos.) The size of
plywood boxing is 113cmx150cm & height 60cm. The top
M2
Kochi Metro Rail Ltd.-6th Floor interior works at Revenue Tower
75
edges are rounded like a cone & rounded 11/2” hard wood
beadings 2 rounds are to be given on top edge. The Rate
includes abour and materials etc. complete. (Refer
drawing for Sheet No:6).
b) 2.1 Rectangular landscape Boxes:- Providing landscape boxes
in between the centre modular seating, wherever glass
facade towards lift, in pot shaped boxing and finishing
using 1mm thick stainless steel finish Mica ISI grade &
edges finished in Hardwood reapers all around & filling a
height of 8” width filling with white and yellow marble
chips 1/2” to 3/4” size and inserting 5 feet tall artificial
palms 2 nos. each (ie. 2X4 = 8 Nos. ) & 3 bundles of green
creepers (ie. 3X4=12nos.) The size of plywood boxing is
113cmx150cm & height 60cm. The Rate includes abour
and materials etc. complete. (Refer draawing for Details).
M2
c) 1.8 Providing Landscape box in the lounge area under the
display wall , floor level 6” open boxing top covered in
moulded hard wood finished in laminate CENTURY-
NICE wood 712 N and filling with pebbles of 4”, 3” in
white and green colour and 3 bunched of creeper plants
isert. The Rate includes abour and materials etc.
complete. (Refer drawing for Details).
M2
d) 0.6 Providing a Landscape box back of reception counter
quarter curve in flexy ply 2' height edges moulded and
rounded , finished in SS laminate 6”SS Mica (CENTURY
-silver mini squares 1001 MS )and inserting pebbles of
size 4”,5” in white colour with foliage plant of height 5'
and two bunhes of creepers. The Rate includes abour and
materials etc. complete. (Refer drawing sheet No:6).
M2
e) 0.72 Providing two box type side tables (40cmx40cmx45cm) in
the lounge area made in 12mm ply boxing finished in
M2
Kochi Metro Rail Ltd.-6th Floor interior works at Revenue Tower
76
wooden laminate. The Rate includes abour and materials
etc. complete. (Refer drawing for Details).
f) FRONT LANDSCAPING , LOGO AND NAME BOARD
i) 3.4 Fabricating Landscape box 12mm marine ply boxing SS
mica finish all sides edge tape work , 8” height from
finished floor level filled with 4”to 6” size coloured
smooth pebbles and six bunches of plant inserts.
Rm
ii) 1 Over Texture painted surface providing a Logo in stainless
steel 30x30cm SS sheet and lettering in SS each letter size
6”x6” “KOCHI METRO RAIL LIMITED “ in stainless
steel and fix to the wall wherever required.
Nos.
14 TERRACOTTA MURAL WORK
14 Erecting a Terracotta mural work on 1/2” plywood base
300x240cms size on edge Hardwood reapers 11/2”x1”
moulded and grued all around 6'x4' sheet and fixing mural
by nylon grip plugs and screwing as per design approved
by the Architect . The rate includes the cost of materials
and labour etc.
M2
15 2 STRIP MIRROR WORK
Providing Strip Mirror work 8 inch wide both wise on two
protruding corners from false ceiling level 2 finished floor
level to be arranged on marine ply based on SS struds as
per drawing on two faces fixed to the wall beveled edges.
The mirrors to be fixed on finished wall surface. The rate
includes cost of all labours, materials and fixing etc.
complete.
M2
16 7 Supplying and fixing Name Plates using S.S finish with
Blue & Green letters & border of size 30x10cm as
approved by the Architect. The rate includes the cost of all
materials, labour charges etc. complete.
Nos.
17 4 Supplying and fixing Readymade signage boards S S finish Nos.
Kochi Metro Rail Ltd.-6th Floor interior works at Revenue Tower
77
with green & blue border and arrow sign showing route to
fire escape stair & Exit of size 30x10 cm as approved by
the Architect. The rate includes the cost of all materials,
labour charges etc. complete.
18 36 Providing & fixing Pin up boards for all modular partitions
of size 40x60 cm , Pin up boards covered with green fabric
( Logo green ) for each person. The rate includes the cost
of all materials, labour charges etc. complete.
Nos.
19i
)
3 Supplying and providing , fixing on the RCC ceiling using
iron Belt clamps all around Tank in 2 places, ready made
pvc/ equivalent tank of capacity 750 ltrs as Over head
tank. The rate includes all materials including all
plumbing works ie. Plumbing line from the main
connection and provide a tap separately for eachtanks and
fittings and labour charges etc. complete .
Nos.
ii) PILLAR TAP
3 Supplying and fixing brass C.P. pillar tap complete with
all accessories(Cera/Hindware).The rate includes all
materials including plumbing works and fittings and
labour charges etc.complete
Nos.
TOTAL
Kochi Metro Rail Ltd.-6th Floor interior works at Revenue Tower
78
BOQ – MODULAR FURNITURES
Kochi Metro Rail Ltd.-6th Floor interior works at Revenue Tower
79
KOCHI METRO RAIL LIMITED
(BOQ - MODULAR FURNITURE)
Name of work: Supply and Fixing Modular office partitions & Furniture for KMRL office
Sl.
No
Qt
y
Description Unit Rate in
Amount
Figures Words
Supplying and fixing the following as per the drawings and
catalogue /detail drawing ,manufactures specifications or
similar approved items like Godrej, PSL or similar existing
at the present office with working drawings and as directed
by the Engineer in charge
1 G.M Cabins
5 Free standing table ,Height of workstation - 725 H,Table top
pre lam 25mm thk particle board and bottom backed with
laminate of 0.6mm minimum thickness .All the edges of the
work surface shall be provided with machine pressed 2mm
thick PVC lipping supported on PLB legs & Modesty , Main
Table with PLB Top of size 1800 mm x 90mm,side top -
size 1200mm x 600mm,Metal Key Board Tray ,CPU
Trolley,3D Movable Pedestal (2 box+ 1f)-685ht x
380dx500d. All the materials have to be approved brand like
Godrej or equivalent etc. and as per the directions of
Engineers in charge at site .(Refer drawing sheet No:7 )
Nos.
2 Directors
2 Free standing Table ,Height of the work station -725H,Tavle
tops is Pre lam 25mm thk particle board and bottom backed
with laminate of 0.6mm minimum thickness .All the edges
of the work surface shall be provided with machine pressed
Nos.
Kochi Metro Rail Ltd.-6th Floor interior works at Revenue Tower
80
2mm thick PVC lipping supported on PLB legs & Modesty,
Main Table with PLB top of size 1800mmx750mm, Side
unit with Sliding Door Unit of Size 750mm x
450mmX750ht,Metal Key Board Tray, CPU Trolley ,3D
Movable Pedestal(2 box + 1f) - 685ht x380dx500d.All the
materials have to be approved brand like Godrej or
equivalent etc. and as per the directions of Engineers in
charge at site. (Refer drawing sheet No:7 ).
3 DM'S Desks
12 Free Standing Table , Height of the workstation -
725H,Table tops is Pre lam 25mm thk particle board and
bottom backed with laminate of 0.6mm minimum
thickness .All the edges of the work surface shall be
provided with machine pressed 2mm thick PVC lipping
supported on PLB legs & Modesty, Main Table with PLB
top of size 1550mm x 600mm,450mmX 1200ht,Lower are
in Laminate Finish, Electricals & Data are considered below
the table top ,Metal Key Board Tray, CPU Trolley,3D
Movable Pedestal (2 box + 1f) - 685htx 380dx 500d.All the
materials have to be approved brand like Godrej or
equivalent etc. and as per the directions of Engineers in
charge at site.(Refer drawing sheet No:8 )
Nos.
4 DGM
8 Free Standing Top, Height of the Work Station - 725 H,
Table tops is pre lam 25mm thk particle board and bottom
backed with laminate of 0.6mm minimum thickness .All
the edges of the work surface shall be provided with
machine pressed 2mm thick PVC lipping supported on PLB
legs & Modesty, Main Table with PLB top of size 1800mm
x 600 mm, Side uniot with Sliding Door Unit of Size
900mm x 450mm X750ht,Lower are in Laminate Finish,
Nos.
Kochi Metro Rail Ltd.-6th Floor interior works at Revenue Tower
81
,Electricals & Data are considered below the table top,
Metal Key Board Tray, CPU Trolley,3D Movable Pedestal
(2 box+ 1f)-685ht x 380dx500d.All the materials have to be
approved brand like Godrej or equivalent etc. and as per the
directions of Engineers in charge at site.(Refer drawing
sheet No:7 )
5 MANAGER
4 Free Standing Top , Height of the Workstation - 7252 H,
Table tops is Pre lam 25mm thk thk particle board and
bottom backed with laminate of 0.6mm minimum
thickness .All the edges of the work surface shall be
provided with machine pressed 2mm thick PVC lipping
supported on PLB legs & Modesty, Main Table with PLB
top of size 1650mm x 600mm,Side Unit with Sliding Door
Unit of size 900mm x 450mmX 750ht ,Lower are in
Laminate Finish,, Electricals & Data are considered below
the table top, Metal Key Board Tray, CPU Trolley,3D
Movable Pedestal (2 box + 1f)- 685 ht x 380dx500d.All the
materials have to be approved brand like Godrej or
equivalent etc. and as per the directions of Engineers in
charge at site.(Refer drawing sheet No:7 )
Nos.
6 AM
22 Free Standing Top, Height of the Workstation - 725 H,
Table Tops is pre lam 25mm thk thk particle board and
bottom backed with laminate of 0.6mm minimum
thickness .All the edges of the work surface shall be
provided with machine pressed 2mm thick PVC lipping
supported on PLB legs & Modesty, Main Table with PLB
Top of size 1350mm x 600mm, Lower are in Laminate
Finish, Electricals & Data are considered below the table
top, Metal Key Board Tray, CPU Trolley, 3D Movable
Nos.
Kochi Metro Rail Ltd.-6th Floor interior works at Revenue Tower
82
Pedestal (2 box+1f)-685htx380dx500d.All the materials
have to be approved brand like Godrej or equivalent etc. and
as per the directions of Engineers in charge at site. (Refer
drawing sheet No: 8)
7 PS
2 Free Standing Table, Height of the work station -
725H,Table tops is pre lam25mm thk thk particle board and
bottom backed with laminate of 0.6mm minimum
thickness .All the edges of the work surface shall be
provided with machine pressed 2mm thick PVC lipping
supported on PLB legs & Modesty ,Main Table with PLB
top of size 1500mm x 900mm,Side Unit with Sliding Door
Unit of Size 900mm x x 450mmX750 ht, Metal Key Board
Tray, CPU Trolley .All the materials have to be approved
brand like Godrej or equivalent etc. and as per the directions
of Engineers in charge at site. (Refer drawing sheet No: 8)
Nos.
8 CONFERENCE TABLE (8 Seater): Table Top is made of
prelam 25mm thick thk particle board and bottom backed
with laminate of 0.6mm minimum thickness .All the edges
of the work surface shall be provided with machine pressed
2mm thick PVC lipping ,PPB understructure with wire
management Provisions. All the materials have to be
approved brand like Godrej or equivalent etc. and as per the
directions of Engineers incharge at site.
1 Conference Table of size 2000mm w x 1000mm d x 725
Ht (Refer drawing sheet No:9 )
Nos.
9 CONFERENCE TABLE ( 14 Seater) Table Top is made
of prelam 25mm thick thk particle board and bottom
backed with laminate of 0.6mm minimum thickness .All
the edges of the work surface shall be provided with
machine pressed 2mm thick PVC lipping ,PPB
Kochi Metro Rail Ltd.-6th Floor interior works at Revenue Tower
83
understructure with wire management Provisions.All the
materials have to be approved brand like Godrej or
equivalent etc. and as per the directions of Engineers
incharge at site.
1 Conference Table of size 4000mm w x 1000mm d x 725
Ht
Nos.
10 Medium height Storages: Storage made of 18mm Thick
PLB with Sliding Door units including all necessary hinges
and accessories like Locks,Handles.(location near
workstation area & beside Pantry). All sections to be pre
lam 18mm thick particle board all side backed with 0.6mm
laminate white or grey colour . The rate include cost of
materials labour charge etc. complete. (Refer drawing sheet
No:8 )
c1 16 Storage with sliding door unit of size 1350mmhtx 900mm w
x 450mm d
Nos.
c2 22 Storage with sliding door unit of size 1350htx1200wx450 d Nos.
c2 6 Storage with sliding Door Unit of Size 2100 mm ht
x1200mm w x 450mm d(750ht with sliding door storage
and remaining 1350 ht hinged door storage with door center
glass)All sections to be pre lam 18mm thick particle board
all side backed with 0.6mm laminate white or grey colour .
The rate include cost of materials labour charge etc.
complete. (Refer drawing sheet No:8 )
Nos.
c3 2 Storage with sliding door unit of size 1800mm ht x 1200mm
w x 450mm d
Nos.
TOTAL
II CHAIRS
Supplying the following Furniture as per the catalogue
attached or similar approved manufactures and as directed
by the Engineer incharge
Kochi Metro Rail Ltd.-6th Floor interior works at Revenue Tower
84
1 DIRECTORS CHAIR
2 High back chairs ,MS arm with powder coated ,chrome
base, gas lift-100mm ,castor wheel-38/50,PU leather
lite,tilting,dimensions,500mm width,480mm depth,750mm
height from seat ,1160mm min. height from ground
NOS
2 GM'S CHAIRS
5 High back chairs ,MS arm with powder coated ,chrome
base, gas lift-100mm ,castor wheel-38/50,PU leather
lite,tilting,dimensions,500mm width,480mm depth,650mm
height from seat ,1060mm min. height from ground
NOS
3 OFFICERS CHAIRS
49 Medium back chairs ,Adjustable arm, nylonbase, gas lift-
100mm ,castor wheel-28/60,PU Moulded seat cushion with
cover ,net back frame ,tilting,dimensions,465mm
width,430mm depth,450mm height from seat ,810mm min.
height from ground
NOS
4 VISITORS CHAIRS
43 Visitors chairs MS pipe stand ,PP arm, ,PU Moulded seat
cushion & U-Foam back cushion,PP back inner & outer seat
cover ,Fabric powder coated ,dimensions,455mm
width,460mm depth,470mm height from seat ,900mm
min.height from ground
NOS
5 PANTRY CHAIRS
21 Café chair, PP shell pipe frame ,powder coated
,dimensions,400mm width,470mm depth,465mm height
from seat 900mm min. height from ground
NOS
TOTAL FOR CHAIRS
GRAND TOTAL
Kochi Metro Rail Ltd.-6th Floor interior works at Revenue Tower
85
BOQ - ELECTRIFICATION
Kochi Metro Rail Ltd.-6th Floor interior works at Revenue Tower
86
KOCHI METRO RAIL LIMITED
(BOQ - ELECTRIFICATION)
Name of work : Tender for Electrification works in 6th floor of Revenue tower for KMR ltd.
Sl.
no. Qty Item description Unit
Rate in Amount
Figures Words
1.0 LT SWITCHBOARD
1
1
415V, 3Ph, 4Wire, Compartmentalized Switchboards
made out of 2mm thick sheet steel duly painted/powder
coated. MCCBs otherwise specified shall be 35kA,
current limiting type Adjustable O/L & fixed S/C
releases & Isolation duty. All rubber gaskets shall be
high quality and cubicle door lock shall be single turn
type with key. Any control wiring used shall be with
minimum 1.5 sq.mm PVC insulated copper wiring with
MCB protection. Design shall have all statutory
approvals. Kwh meters & CTs shall be tested at CEIG
approved test labs & Test certificates shall be furnished.
All as per standard specifications and as approved
No
LT SWITCH BOARD #1
This switchboard shall be installed in the existing
160KVA substation at ground floor. Bidder is requested
to visit the site before submitting the offer.
Incomer Type 1
Each complete with :-
1No.250A, 35ka FP MCCB with user adjustable
thermal magnetic overload setting,1 set of LED type
phase indicating lamps, Bus Interconnections, wiring,
terminals, earthing neutral link, Cable chamber and all
complete with.
Kochi Metro Rail Ltd.-6th Floor interior works at Revenue Tower
87
Incomer Type 2
1no. 200A FP load break Switch, 1 set of LED type
phase indicating lamps, Bus Interconnections, earthing ,
terminals, Cable chamber and all complete with.
Automatic Transfer Switch
1no.250A 4P Motorized Change Over switch ABB type
# OTM250E4WCM230C. Bus Interconnections,
earthing , terminals, control wiring and all complete
with.
Bus Bar:-
250A, 35kA, TP &N , Aluminum with heat shrinkable
PVC sleeves on SMC supports. Bus bar current density
shall not be more than 0.8A / sq.mm
Outgoing Type 1 :- > Quantity 2Nos.
Each with Following:-
1No.160A, 35ka TP MCCB with user adjustable
thermal magnetic overload setting of 120-160A , Bus
Interconnections, all wiring, terminals, earthing neutral
link, Cable chamber and all complete with.
2 LT SWITCHBOARD # 2
Incomer > Quantity 1No.
Each complete with :-
1No.160A, 35ka TP MCCB with user adjustable
thermal magnetic overload setting of 120-160A and
shunt trip coil, 1no. Earth Leakage relay of Leakage
current setting 0-3000mA, tripping time setting 0-
180sec with compatible core balancing current
transformer, 1 set of LED type phase indicating lamps,
1No. Multifunction meter displaying basic electrical
parameters including kwh with 3nos.120/5 Class1
10VA resin cast CTs. Bus Interconnections, wiring,
Kochi Metro Rail Ltd.-6th Floor interior works at Revenue Tower
88
terminals, earthing, Cable chamber and all complete
with.
Bus Bar:-
200A, 35kA, TP &N , Aluminum with heat shrinkable
PVC sleeves on SMC supports. Bus bar current density
shall not be more than 0.8A / sq.mm
Outgoing Type 1 :- > Quantity 2 Nos.
Each with Following:-
1No.100A, 35ka TP MCCB with user adjustable
thermal magnetic overload setting of 63-80A, , Bus
Interconnections, wiring, terminals, earthing neutral
link, Cable chamber and all complete with.
Outgoing Type 2 :- > Quantity 8Nos.
Each with Following:-
1 1no. 63 / 40A 10KA FP MCB and suitable size Copper
wiring interconnections, earthing, terminals, Cable
chamber and all complete with.
No
2 LT CABLES
1.1kV PVC / XLPE insulated armored under ground
cables with aluminum / copper conductor. Type
AYFY/YRY/ YY To be laid through excavated cable
trenches / trays etc. using suitable GI spacer saddle MS
clamps brackets. All as per standard specifications and
as approved
1 10 3.5C x 185 Sq.mm AYFY Mts
2 80 3.5C x 120 Sq.mm AYFY Mts
3 0 3.5C x 70 Sq.mm AYFY Mts
4 150 4C x 35 Sq.mm AYFY Mts
5 70 3C x 25 Sq.mm AYFY Mts
6 100 4C x 16 Sq.mm AYFY Mts
7 100 4C x 6 Sq.mm AYFY Mts
Kochi Metro Rail Ltd.-6th Floor interior works at Revenue Tower
89
8 200 2C x 6 Sq.mm AYFY Mts
9 0 4C x4 Sq.mm YRY (CU. Conductor) Mts
10 0 4C x 2.5 Sq.mm YRY (CU. Conductor) Mts
11 20 1C x 50 Sq.mm YY (CU. Conductor) Mts
12 50 1C x 25 Sq.mm YY (CU. Conductor) Mts
3 LT CABLE TERMINATION
Cable termination using single compression brass cable
Glands Crimping type tinned Cu Lugs and GI hardware.
Rate include cost of gland earthing. All as per standard
specifications and as approved
1 2 3.5C x 185 Sq.mm AYFY Nos.
2 4 3.5C x 120 Sq.mm AYFY Nos.
3 0 3.5C x 70 Sq.mm AYFY Nos.
4 8 4C x 35 Sq.mm AYFY Nos.
5 6 3C x 25 Sq.mm AYFY Nos.
6 8 4C x 16 Sq.mm AYFY Nos.
7 28 4C x 6 Sq.mm AYFY Nos.
8 48 2C x 6 Sq.mm AYFY Nos.
9 0 4C x4 Sq.mm YRY (CU. Conductor) Nos.
10 0 4C x 2.5 Sq.mm YRY (CU. Conductor) Nos.
11 4 1C x 50 Sq.mm YY (CU. Conductor) Nos.
12 10 1C x 25 Sq.mm YY (CU. Conductor) Nos.
4 EARTHING
Following Cast Iron plate / Pipe type Earth Electrodes
& Copper Earthing Conductors. Earth pit shall be
complete with brick masonry chamber of size
(0.65x0.65x0.5)Mts, cast iron heavy duty hinged
chamber cover painted with black epoxy paint, salt,
charcoal, brackets, hardware etc. All hardware used
shall be Stainless steel only. The Earthing conductor to
Kochi Metro Rail Ltd.-6th Floor interior works at Revenue Tower
90
be laid in already existing sleeves / wall / cable tray
etc. using suitable GI clamps All conductor Joints shall
be with 50mm overlap and duly tinned All hardware
used shall be ISI Stainless steel only.
1 1 9mm thick, 100mm dia,3000mm long Cast Iron , pipe
type Earth Electrode with all complete with.
Nos.
2 100 20x3mm Electrolytic Copper Earth conductor. Mts
3 200 8 SWG bare Electrolytic grade Copper wire. Mts
4 50 10 SWG bare Electrolytic grade Copper wire Mts
5 200 12 SWG bare Electrolytic grade Copper wire Mts
6 0 14 SWG bare Electrolytic grade Copper wire Mts
7 100 Termination of above 8/10/12/14 SWG copper wire
using crimping type Copper lugs.
Nos.
5 MCBDBs, MCBs, RCCBs
240/415V, 1/3Ph,Double door Metal clad factory
assembled MCB Distribution board,10ka MCBs &
30mA RCCBs. Rate shall include CABLE END BOX,
all GI hardware, civil works as required for DB
installation, wiring and dressing inside the DB,
interconnection, ferruling and termination of I/c & O/g
circuits. All as per standard specifications and as
approved
1 8 1way FP MCB enclosure. No.
2 13 1way DP MCB enclosure. Nos.
3 1 Double door IP 42, 4 way TPN Vertical MCB DB
suitable for MCCB incomer and SP/TP MCB
outgoings. Legrnad type 60 77 90
No.
4 3 Double door IP 42, 4 way TPN Vertical MCB DB
suitable for RCCB/FP MCB incomer and SP/TP MCB
outgoings. Legrnad type 60 77 50
No.
Kochi Metro Rail Ltd.-6th Floor interior works at Revenue Tower
91
5 1 Double door IP 42, 4 way TPN 7 segment phase
segregated MCB DB suitable for FP MCB Main
incomer, DP RCCB phase incomer and SP MCB
outgoings. Legrnad type 60 78 35
No.
6 4 Double door IP 42, 6 way TPN 7 segment phase
segregated MCB DB suitable for FP MCB Main
incomer, DP RCCB phase incomer and SP MCB
outgoings. Legrnad type 60 78 36
Nos.
7 2 Double door IP 42, 8 way TPN 7 segment phase
segregated MCB DB suitable for FP MCB Main
incomer, DP RCCB phase incomer and SP MCB
outgoings. Legrnad type 60 78 37
Nos.
8 1 Double door IP 42, 12 way SPN MCB DB suitable
for DP RCCB incomer, and SP MCB outgoings.
Legrnad type 60 77 12
Nos.
9 1 100A, 16Ka, 3P MCCB. Legrand type 62 53 20 No.
10 76 6-32A SP MCBs 'C' curve Nos.
11 76 6-32A SP MCBs 'D' curve Nos.
12 0 6-32A TP MCBs 'C' curve Nos.
13 7 6-32A TP MCBs 'D' curve Nos.
14 13 32A DP MCB type ISOLATOR Nos.
15 3 63A DP MCB type ISOLATOR Nos.
16 8 32A FP MCB type ISOLATOR Nos.
17 8 63A FP MCB type ISOLATOR Nos.
18 12 40A 30mA DP RCCB Nos.
19 9 63A 30mA DP Enhanced immunity RCCB Legrand
type 60 21 70
Nos.
20 3 63A 100mA FP RCCB Nos.
6 FABRICATED CABLE TRAYS & SUPPORTING
STEEL
Kochi Metro Rail Ltd.-6th Floor interior works at Revenue Tower
92
1 500 Over head supporting system for Cables & other
services fabricated out of MS channels, angles, strips
duly painted with red oxide primer and 2 coats of epoxy
paint
Kgs
2 500 Supporting system for switchboards, DBs & other
services fabricated out of MS channels, angles, strips
duly painted with red oxide primer and 2 coats of epoxy
paint
Kgs
3 200 Fabricated & painted enclosure made out out of 2mm
thick sheet steel to be used as draw boxes, junction
boxes, terminal boxes as per specific site requirement.
Kgs
7 PVC CONDUITS
ISI (M) Duty PVC Conduits with all accessories like
bends, Junction boxes, etc. Rate shall include laying of
conduits for concealed/surface wiring in slabs steel
sections / cable trays / brick masonry walls using
suitable spacer saddle /MS clamps, Rate shall include
wall chasing and rough finishing using non shrink
cement mortar wherever required.
1 1300 20 mm Dia PVC conduiting Mts.
2 1000 25 mm Dia PVC conduiting Mts.
3 300 32 mm Dia PVC conduiting Mts.
3 700 25 mm Flat flexible PVC sleeve Mts.
4 50 20mm Dia steel reinforced flexible conduit finolex type Mts.
5 50 32mm Dia steel reinforced flexible conduit finolex type Mts.
6 10 Glanding of 20 / 25 mm flexible conduit using
compatible PVC glands
Nos.
8 FLOOR RACE WAYS
Walkable Floor Race ways for communication cabling
with all accessories like junction boxes, TEE, bends etc
Kochi Metro Rail Ltd.-6th Floor interior works at Revenue Tower
93
fabricated out of 2mm thick sheet steel with C type
screwed top cover of 3.15 mm thick complete with
suitable stiffeners for additional rigidity and duly
painted with red oxide primer and 2 coats of epoxy
paint of shade RAL 7032 Knock outs with High Grade
Neoprene gaskets shall be provided as per site
conditions for cable entry/ exit. Cable clamping facility
to be provided at every 1000mm interval. All hardware
used shall be SS only. Rate shall include necessary floor
chasing to required depth and non shrink cement plaster
finishing after race way installation.
1 50 25 mm Wide x 25 mm Depth Mts.
2 50 50 mm Wide x 50 mm Depth Mts.
3 30 100 mm Wide x 50 mm Depth Mts.
4 20 150 mm Wide x 50 mm Depth Mts.
5 20 300 mm Wide x 50 mm Depth Mts.
9 WIRE WAY TRUNKING
PVC wire way trunking with one partition and push fit
cover complete with all accessories like Tees, Juction,
Adjustable internal / external / right angle bends,
Reduser, End cap, Clip-on type separation partition
etc.This shall be Legrand make DLP plastic drunking.
1 10 105 x 50 mm DLP plastic trunking with one clip-on
partition (two compartments)
Mts.
2 0 150 x 50 mm DLP plastic trunking with one clip-on
partition (two compartments)
Mts.
3 0 195 x 50 mm DLP plastic trunking with one clip-on
partition (two compartments)
Mts.
10 WIRING
660V grade PVC insulated FRLS multistrand flexible
Kochi Metro Rail Ltd.-6th Floor interior works at Revenue Tower
94
copper conductor wire to be drawn through already laid
PVC conduit system.Cost of PVC conduit not to
include.
1 2500 1 Run of 1.5 Sq.mm PVC Cu.wire. Mts.
2 3000 1 Run of 2.5 Sq.mm PVC Cu.wire. Mts.
3 1000 1 Run of 4 Sq.mm PVC Cu.wire. Mts
4 150 1 Run of 6 Sq.mm PVC Cu.wire. Mts
11 POINT WIRING WITH PVC CONDUIT
Point wiring using concealed / surface Medium duty
PVC conduits and accessories like bend, Junction boxes
all neatly clamped using proper supports, clamps etc
Fan Hook boxes, Blank plates steal reinforced flexible
PVC conduit with PVC glanding at both ends for drop
wiring (for luminaire connection) 1.5 Sq.mm PVC
Copper wire for switch control, Neutral & Earth
conductor. Decorative modular switches of Legrand
Mosaic make and compatible plates, steel boxes etc.as
required all complete with. Average route length for
light point shall be 12 Mts. Generally light points has to
be installed in false ceiling area.
1 65 1No. Ceiling / Wall Light /Exhaust Fan point controlled
by 1No. 6A SP switch.
Nos.
2 30 2Nos. Ceiling / Wall Light point controlled by 1No. 6A
SP switch.
Nos.
3 15 3Nos. Ceiling / Wall Light point controlled by 1No. 6A
SP switch.
Nos.
4 0 Rate for any additional point above 3 Nos.Light point
Controlled by 1no.6A switch.
No.
5 2 1No. Fan point controlled by 1No. 6A SP switch &
120watts step type electronic Regulator.
Nos.
Kochi Metro Rail Ltd.-6th Floor interior works at Revenue Tower
95
12 SWITCHES & SOCKETS
Modular decorative socket outlets of Legrand Mosaic
make and compatible PVC / metal switch boxes in
surface / recess mounted. Rate to include cost of GI
hardware zinc passivated steel box, front plate,
switches sockets etc including ferruling & termination
all complete with.Generally sockets shall be installed
on ready made work stations.
1 60 2Nos 6A, 3 Pin socket controlled by 1No16A SP
switch.(8 Module)
Nos.
2 60 1x6A, 5Pin socket controlled by 1 no. 6A SP switch.(3
Module)
Nos.
3 10 1x16A, 6 Pin socket controlled by 1no.16A SP
switch.(4 Module)
Nos.
13 INDUSTRIAL PLUG&SOCKET
Factory assembled Interlocked plug & socket with IP
44 . Rate to include cost of GI hardware interlocked
switches sockets etc including ferruling & termination
of I/C,O/G . This shall be Legrand TEMPRA complete
with suitable mounting box. Unit shall be recess/surface
mounting type.
1 2 240V, 16A,1Ph 2P & earth Industrial plug &
socket.Legrand type # 057221
Nos.
2 2 415V, 32A, 3Ph, 4P & earth Industrial plug &
socket.Legrand type # 057234
Nos.
14 LUMINARIES
Following fluorescent /compact fluorescent luminaries
with lamps and high frequency electronic ballast. Rate
to include all GI hardware, suspension chain
termination and interconnection. Generally luminaires
Kochi Metro Rail Ltd.-6th Floor interior works at Revenue Tower
96
shall be installed in false ceiling area.
1 65 4x14W,T5, recess mounted decorative mirror optics
Luminaire. Philips type TBS869 4xTL5 14W EBP D8
Nos.
2 50 2x11W, CFL recess mounted down lighter. Philips
type FBS518 2x PLS/2P 11W
Nos.
3 16 1x60W, GLS recess mounted down lighter. Philips
type DNS 622
Nos.
4 20 1X28W T5 Fluorescent Rail with HF ballast Philips
type TMS122 M 1xTL528W EBT
Nos.
5 5 Decorative wall light FL 800/320 Nos.
6 60 5 meter spool IP 20 non integral flexible LED Strip
light. 4.8Watts per meter Wipro type LS06-005
Nos.
7 60 240V / 12V Constant voltage LED driver. Wipro type
LG40-024
Nos.
15 FANS
Following Ceiling / Wall Fans to operate on 240V
single phase AC supply.. Rate to include all GI
hardware, other installation material and termination.
Finger touch proof wire mesh guard on both side for
exhaust fans to be provided.
1 0 3 blade, 1200mm sweep, 380RPM Ceiling Fan having
min air delivery 220 (cub. mtr per min)
Nos.
2 4 3 blade 400 mm sweep, 1300 rpm Wall mounting Fan
having minimum air delivery 70 cub. mtr per min. This
shall be Crompton Greaves HIGH FLO
Nos.
3 6 3 blade 225 mm sweep, 1300 rpm Exhaust Fan having
minimum air delivery 800 cub. mtr per min. This shall
be Crompton Greaves DRIFTAIR
Nos.
16 STATUTORY APPROVAL
1 Liason charges for Obtaining approvals from KSEB and
Electrical Inspectorate for the electrical installation
Nos.
Kochi Metro Rail Ltd.-6th Floor interior works at Revenue Tower
97
including required power sanction, preparation and
approval of required drawings, arranging inspection by
authorities.
17 ALTERATION WORKS
1 1 Necessary alterations / additions required to convert
existing 125 KVA Krilosker make manually operated
electric start / stop DG set to AMF type including 3
attempt engine start / stop controller, AMF control unit,
auxiliary relays, Control switches, Lockable Auto /
Manual switch wiring etc. This shall be installed inside
the existing in built DG control panel. Any
modification in the engine governer / controll shall be
carried out. Bidder is requested to visit the site before
submitting the offer.
Nos.
2 20 Supply & Installation of 3.5C x 120 Sq.mm AYFY
cable from existing 125 KVA DG to proposed LT
Switchboard # 1 at ground floor including necessary
trenching to a depth of 800mm, 100mm class B GI pipe
sleeve at road crossing and back filling and finishing
the surface to the original finish. Bidder is requested to
visit the site before submitting the offer.
Mts.
3 1 Disconnection, removal of existing 3.5C x 185 Sq.mm
AYFY cable from existing 160KVA transformer and
reconnecting to proposed LT Switchboard #1 located in
the substation. Bidder is requested to visit the site
before submitting the offer.
Nos.
18 DATA NETWORK - PASSIVE COMPONENTS
1 2500 CAT 6, 4 pair UTP cable to be laid through already
installed floor race ways. Make - AMP / TYCO
Mts.
2 60 Termination of above CAT 6 cable at both ends as
required.
Nos.
Kochi Metro Rail Ltd.-6th Floor interior works at Revenue Tower
98
3 1 CAT 6, 2U, 48 port fully loaded modular straight jack
patch panel having 1.6 mm thick CRCA sheet of RAL
9005 colour shade cabinet, 48 x RJ 45 Female interface
/ ports, Phospher Bronze Tin plated terminals,
Identification plates for port allocation and cable
management facility all complete with. Make - AMP /
TYCO
Set
4 1 CAT 6, 1U, 24 port fully loaded modular straight jack
patch panel having 1.6 mm thick CRCA sheet of RAL
9005 colour shade cabinet, 24 x RJ 45 Female interface
/ ports, Phosphor Bronze Tin plated terminals,
Identification plates for port allocation and cable
management facility all complete with. Make - AMP /
TYCO
Set
5 60 CAT 6, 4 Feet, SL Series Patch Cords (to be used at
Rack Side). Make - AMP / TYCO
Nos.
6 60 CAT 6, 7 Feet, SL Series Patch Cords (to be used at
user Side). Make - AMP / TYCO
Nos.
7 60 1NO. CAT 6 Information outlet with 2-port Shuttered
faceplate white colour. Make - AMP / TYCO
Nos.
8 1 18 U, 600mm Deep Side Openable Double Section
wall mounted Rack with 1.6mm thick CRCA sheet of
RAL 7032 colour shade, toughened glass front door,
Removable front and side panels with locking
provision, Adjustable Mounting rails at Front and Back,
Cooling FAN, 2Nos 6 x 6 Amps socket outlets,
Hardware Kit ,Cable Manager complete with all
accessories suitable for mounting above patch panels.
Make - RITTAL. Rate shall include all cable
management and dressing.
Set
Kochi Metro Rail Ltd.-6th Floor interior works at Revenue Tower
99
19 VOICE NETWORK - VOIP PASSIVE
COMPONENTS
1 2500 CAT 5e, 4 pair UTP cable to be laid through already
installed floor race ways. Make - AMP / TYCO
Mts.
2 60 Termination of above CAT 5e cable at both ends as
required.
Nos.
3 1 CAT 5e, 2U, 48 port fully loaded modular straight jack
patch panel having 1.6 mm thick CRCA sheet of RAL
9005 colour shade cabinet, 48 x RJ 45 Female interface
/ ports, Phosphor Bronze Tin plated terminals,
Identification plates for port allocation and cable
management facility all complete with. Make - AMP /
TYCO
Set
4 1 CAT 5e, 1U, 24 port fully loaded modular straight jack
patch panel having 1.6 mm thick CRCA sheet of RAL
9005 colour shade cabinet, 24 x RJ 45 Female interface
/ ports, Phosphor Bronze Tin plated terminals,
Identification plates for port allocation and cable
management facility all complete with. Make - AMP /
TYCO
Set
5 60 CAT 5e, 4 Feet,SL Series Patch Cords (to be used at
RacK Side). Make - AMP / TYCO
Nos.
6 60 CAT 5e Information outlet to be installed in already
installed face plate as per item 16.7 Make - AMP /
TYCO
Nos.
8 1 18 U, 600mm Deep Side Openable Double Section
wall mounted Rack with toughened glass front door,
Removable front and side panels with locking
provision, Adjustable Mounting rails at Front and Back,
Cooling FAN, 2Nos 6 x 6 Amps socket outlets,
Hardware Kit ,Cable Manager complete with all
Set
Kochi Metro Rail Ltd.-6th Floor interior works at Revenue Tower
100
accessories suitable for mounting above patch panels.
Make - RITTAL. Rate shall include all cable
management and dressing.
TOTAL Rs.
Kochi Metro Rail Ltd.-6th Floor interior works at Revenue Tower
101
BOQ – AIR CONDITIONING
Kochi Metro Rail Ltd.-6th Floor interior works at Revenue Tower
102
KOCHIN METRO RAIL LIMITED
(BOQ - AIR CONDITIONING)
Name of work : Tender for Air conditioning works in 6th floor of Revenue tower for KMR ltd.
Sl.No Qty Description Unit Rate in Amount
Figures words
1 2 3 4 5 6 7
1 3 Supply of Carrier Media Cassette Air conditioner
4.0Tr
Nos.
2 4 Supply of Carrier media Cassette Air conditioner
3.0Tr
Nos.
3 2 Supply of Carrier media Cassette Air conditioner
2.5Tr
Nos.
4 1 Supply of Carrier media Cassette Air conditioner
2.0Tr
Nos.
5 10 Supply of Carrier media Cassette Air conditioner
1.5Tr
Nos.
6 1 Supply of Carrier media Hi-wall split Air conditioner
2.0Tr
Nos.
Total of Equipment
Description for Low side ancillary works
7 185 Refrigerant piping with Arma flex & White tape
Insulation 4.0Tr, 3.0Tr, 2.5Tr,2.0Tr Cassette A.C
pipe size 5/8,3/8 with 18 guage
Rmt.
8 185 Refrigerant piping with Arma flex & White tape
Insulation 1.5Tr A.C pipe size 1/2 , 1/4 with 18 guage
Rmt.
9 16 Refrigerant piping with Arma flex & White tape
Insulation 2.0Tr split A.C pipe size 5/8,3/8 with 24
guage
Rmt.
Kochi Metro Rail Ltd.-6th Floor interior works at Revenue Tower
103
10 160 Electrical Cabling With Insulation for 4.0Tr Cassette
A.C
Rmt.
11 160 Electrical Cabling With Insulation for 3.0Tr Cassette
A.C
Rmt.
12 30 Electrical Cabling With Insulation for 2.5Tr Cassette
A.C
Rmt.
13 24 Electrical Cabling With Insulation for 2.0.0Tr
Cassette A.C
Rmt.
14 180 Electrical Cabling With Insulation for 1.5Tr Cassette
A.C
Rmt.
15 18 Electrical Cabling With Insulation for 2.0Tr Split A.C Rmt.
16 125 Total drainage pipe for all Machines with polyfoam
insulation
Rmt.
17 3 Cat Walk Stand for Out Door Units Nos.
TOTAL
`
SERVICE LIFT
EWCTOILET
EWCTOILET
GENTS TOILETBLOCK
KITCHEN CHUTE
EXHAUSTED FAN
4MMAC SHEET
IN 1"X4"ANGLE FRAME
30CM EXISTING SLAB
PARAPET 10CM TH120HT
SKID PROOF CERAMIC
TILE FLOORING
EWCTOILET
CORRIDOR
TREAD - 30RISE - 15
SKID PROOF CERAMIC
TILE FLOORING
PARAPET 10CM TH120HT
SKID PROOF CERAMIC
TILE FLOORINGFULL HEIGHT PARTITION
PANTRY290X260
MEETING ROOM
790X350297 SFT
MEETING ROOM
450X455220 SFT
CF2100X200
CF1400X100
GM'S CABIN265 x 290( 82 SFT )
DGM
UPS / SERVER ROOM400 x 250107 SFT
MANAGER
MANAGER
MANAGER
DGM
AGM
DGM DGM
DGM
MANAGER
DMDMDMDM
DM DM DM DM
DGM
STORE ROOM345 x 230
85 SFT
DRAWING STORAGE(A0 SHEETS)
C3 C3
195 CM WIDE PASSAGE
180
CM W
IDE
PASS
AGE
180
CM W
IDE
PASS
AGE
DM
DM
DM
DM
GM' CABIN225 x 335(80 SFT )
115 CM WIDE PASSAGE
120 CM WIDE PASSAGE
120
CM W
IDE
PASS
AGE
120
CM W
IDE
PASS
AGE
120
CM W
IDE
PASS
AGE
120
CM W
IDE
PASS
AGE
ENTRY
C2 C2
C4
C4
C4
C2
C2
DRAFTING TABLE
LIBRARY220 x 365
86 SFT
PROJECTS
DINING HALL490 x 520274 SFT
81 SFT
AM
AM
AM AM
AMAM
AM
AMAM
AM
AM
AM
DISPLAY LANDSCAPEFEATURE
PUNCHING UNIT
755 x 390
AM
AM
C2
C2
C2
C2
GM' CABIN220 x 335(80 SFT )
DIRECTOR'S CABIN335X495(178 SFT)
GM'S CABIN265 x 290( 82 SFT )
GM' CABIN
220 x 360(80 SFT )
SYSTEMS
C4
C4
DIRECTOR'S CABIN335X495(178 SFT)
BUFFER SPACE680 x 410299 SFT
440 x 360
LOUNGE486 SFT
C4
160
CM W
IDE
PASS
AGE
C2
C2
C2 C2 C2 C2 C2
C2 C2 C2 C2
C2
C2
EWCTOILET
LADIES TOILETBLOCK
120 CM WIDE PASSAGE
115 CM WIDE PASSAGE
120 CM WIDE PASSAGE
180 CM WIDE PASSAGE
DISPATCH AREA470 x 230116 SFT
OFF MG ROAD
KOCHI - 16.RAVIPURAM
39/4186-A
ARCHITECTS
INTERIORLAYOUT
DRAWING :
KOCHI METRORAIL OFFICE
PROJECT :
DATE - 05.09.2013
DRAWN BY - Ar. CHRIS
CHECKED BY -
REVISION - 5
DIRECTOR'S CABIN
DGM / AGM CABIN
MANAGER'S CABIN
DM'S CABIN
C1
C2
AM'S DESK
PS- DESK
CABINET (120X135)
CF1
CF2
CONFERENCE TABLE100X400
CONFERENCE TABLE100X200
RD RECEPTION DESK
NOSFURNITURES
LEGEND
02
08
04
12
22
02
21
1
1
1
APPROVED BY -
GM'S CABIN 05
CABINET (90X135)
C3 CABINET (120X180) 2
16
C4 CABINET (120X210) 6
DRAWING NO : 1
C1
C1
C1
C1
C1C1C1C1
C1
C1
C1
C1
C1 C1 C1 C1
AM AM
180 CM WIDE PASSAGE
120 CM WIDE PASSAGE
115 CM WIDE PASSAGE
120 CM WIDE PASSAGE
LADIES TOILETBLOCK
EWCTOILET
C2
C2
C2C2C2C2
C2C2C2C2C2
C2
C2
160
CM W
IDE
PASS
AGE
C4
486 SFTLOUNGE
440 x 360
299 SFT680 x 410
BUFFER SPACE
DIRECTOR'S CABIN335X495(178 SFT)
C4
C4
SYSTEMS
220 x 360(80 SFT )
GM' CABIN
GM'S CABIN265 x 290( 82 SFT )
DIRECTOR'S CABIN335X495(178 SFT)
220 x 335(80 SFT )
GM' CABIN
C2
C2
C2
C2
AM
AM
755 x 390
PUNCHING UNIT
LANDSCAPEFEATUREDISPLAY
AM
AM
AM
AM AM
AM
AM AM
AMAM
AM
AM
81 SFT
DINING HALL490 x 520274 SFT
PROJECTS
LIBR
ARY
DRAFTING TABLE
C2
C2
C4
C4
C4
C2C2
ENTRY
120
CM W
IDE
PASS
AGE
120
CM W
IDE
PASS
AGE
120
CM W
IDE
PASS
AGE
120
CM W
IDE
PASS
AGE
120 CM WIDE PASSAGE
115 CM WIDE PASSAGE
225 x 335(80 SFT )
GM' CABIN
DM
DM
DM
DM
180
CM W
IDE
PASS
AGE
180
CM W
IDE
PASS
AGE
195 CM WIDE PASSAGE
C3C3
DRAWING STORAGE(A0 SHEETS)
STORE ROOM345 x 23085 SFT
DGM
DMDMDMDM
DM DM DM DM
MANAGER
DGM
DGMDGM
AGM
DGM
MANAGER
MANAGER
MANAGER
UPS / SERVER ROOM400 x 250107 SFT
DGM
GM'S CABIN265 x 290( 82 SFT )
CF1400X100
CF2100X200
450X455220 SFT
MEETING ROOM
790X350297 SFT
MEETING ROOM
290X260PANTRY
FULL HEIGHT PARTITIONSKID PROOF CERAMIC
TILE FLOORING
PARAPET 10CM TH120HT
SKID PROOF CERAMIC
TILE FLOORING
TREAD - 30RISE - 15
CORRIDOR
EWCTOILET
SKID PROOF CERAMIC
TILE FLOORING
PARAPET 10CM TH120HT
30CM EXISTING SLAB
4MMAC SHEET
IN 1"X4"ANGLE FRAME
EXHAUSTED FAN
KITCHEN CHUTE
GENTS TOILETBLOCK
EWCTOILET
EWCTOILET
SERVICE LIFT
OFF MG ROAD
KOCHI - 16.RAVIPURAM
39/4186-A
ARCHITECTS
FALSE CEILINGLAYOUT
DRAWING :
KOCHI METRORAIL OFFICE
PROJECT :
DATE - 05.09.2013
DRAWN BY - Ar. CHRIS
CHECKED BY -
REVISION - 5
DIRECTOR'S CABIN
DGM / AGM CABIN
MANAGER'S CABIN
DM'S CABIN
C1
C2
AM'S DESK
PS- DESK
CABINET (120X135)
CF1
CF2
CONFERENCE TABLE100X400
CONFERENCE TABLE100X200
RD RECEPTION DESK
NOSFURNITURES
LEGEND
02
08
04
12
22
02
21
1
1
1
APPROVED BY -
GM'S CABIN 05
CABINET (90X135)
C3 CABINET (120X180) 2
16
C4 CABINET (120X210) 6
+240CM
+240CM
+240CM
+240CM +240CM +240CM
+240CM
+225CM
+225CM
+225CM
+225CM
+225CM
+225CM
+225CM
+225CM
+240CM
+240CM
+240CM
+225CM
+225CM +225CM
+240CM +225CM +225CM
+240CM
+225CM
+225CM
SLOPE TOWARDS TOILET
SLOPE TOWARDS TOILET
SLOPE TOWARDS TOILETSLOPE TOWARDS TOILET
SLOPE TOWARDS TOILET
A
TYPICAL FALSE CEILING DETAIL
DETAIL B
B
RCC SLAB
TROUGH TO DRAINSEEPAGE WATER
PVC CEILING
RCC SLAB
GYPSUM BOARD12.5 MM THK
COVE LIGHTING
GYPSUM BOARDCEILING12.5MM THK
SUPPORTINGMEMBER
(DETAIL A)
+225CM
+240 LVL
+225 LVL
+240 LVL
+225 LVL
GLAZED -EXTERIORCURTAIN WALL(ELEVATION)PVC VERTICAL
PVC CORNICE
SUPPORTINGMEMBER
LEGEND :
GYPSUM BOARDFALSE CEILING
PVCFALSE CEILING
+240CM
+240CM
+240CM
NOTE :1. 3D VIEWS CEILING DETAIL ONLY APPROXIMATE, REFER 2D DRAWINGS FOR EXECUTION.2. ALL HEIGHTS ARE MEASURED FROM F.F.L
8MM THKHIGH LAM. SHEET
+225CM
DRAWING NO - 2
OFF MG ROAD
KOCHI - 16.RAVIPURAM
39/4186-A
ARCHITECTS
FURNITUREDETAILS
DRAWING :
KOCHI METRORAIL OFFICE
PROJECT :
DRAWING NO- 3
DRAWN BY - Ar.NEETHU
CHECKED BY -
REVISION - 5
APPROVED BY -
RECEPTION TABLEPLAN
FRONT ELEVATION
REAR ELEVATION
DINING HALL TABLEDIMENSIONS
DISPATCH AREA TABLEPLAN
ELEVATION
false ceilinglevel
at 240cm
112'' dia SS Pipe
supports of ht 30cms
wooden laminateCENTURY-thar dessert
(774)
SS laminate of 6'' htCENTURY-silver mini
squares(1001 MS
top shelves
DATE -08.08.2013
)6
19mm thk multiwoodshutters
19mm thk multiwoodracks
20mm thk rich black granite slab
3'' dia MS pipefootrest
wooden laminateCENTURY-nicewood
(712 N )1
floor level
OFF MG ROAD
KOCHI - 16.RAVIPURAM
39/4186-A
ARCHITECTS
FURNITUREDETAILS
DRAWING :
KOCHI METRORAIL OFFICE
PROJECT :
DATE -08.08.2013
DRAWN BY - Ar.NEETHU
CHECKED BY -
REVISION - 5
APPROVED BY -
PLAN
DRAWING STORAGE(A0 SHEETS)ELEVATION
PLAN
DINNING HALL STORAGEELEVATION
DRAWING NO-4
OFF MG ROAD
KOCHI - 16.RAVIPURAM
39/4186-A
ARCHITECTS
DRAWING :
KOCHI METRORAIL OFFICE
PROJECT :
DATE -08 .08.2013
DRAWN BY - Ar.NEETHU
CHECKED BY -
REVISION - 5
APPROVED BY -
PLAN
GLASSPARTITION
DETAIL
EXTERNAL GLASSFACADE
90CM BEAMHEIGHT
POP CEILINGPVC CEILING
STRIP
GUTTER FORDRAINING WATER
DRAWING NO-5
ENTRY
DISPLAY LANDSCAPEFEATURE
PUNCHING UNIT
LOUNGE486 SFT
SECTION X
SIDE A
FROSTED GLASS DETAIL(PLAN)
DISPLAY WALL
3FTX8FT GLASS
3FTX8FT GLASS
TYPICAL FALSECEILING SECTIONSECTION X
PVC CORNICE
8mm thk glass
8mm thk glass
gap to fix Led light
60mmx18mmnicewood laminate
8mm thk glass8mm thk glass
metro rail map with stations lit with LED lights
ELEVATION
DISPLAY WALLDETAIL OF DISPLAY
WALL PANELLING(DETAIL A)
ME
ET
ING
RO
OM
450X455
220 SFT
CF2
100X200
SIDE A
ELEVATION
aluminium frame
existing column
glass partition
frostedglass
FROSTED GLASSDETAIL
wooden laminateCENTURY-nicewood
(712 N )
3ftX8ft glass
3ftX8ft glass
CENTRE TABLE DETAIL
SIDE TABLE DETAIL
DETAIL A
OFF MG ROAD
KOCHI - 16.RAVIPURAM
39/4186-A
ARCHITECTS
PLANTER BOXDETAILS
DRAWING :
KOCHI METRORAIL OFFICE
PROJECT :
DATE -08.08.2013
DRAWN BY - Ar.NEETHU
CHECKED BY -
REVISION - 5
APPROVED BY -
OC1
MANAGERC1
OC1
DM DMDETAIL A
DETAIL B
DETAIL APLAN
DETAIL BPLAN
ELEVATION
ELEVATION
DRAWING NO- 6
hardwoodbeeding(century
laminate-nicewood712N
DISPLAY
PEBBLE BOX BELOW DISPLAYWALL(PLAN)
PLANTER BOX BEHIND RECEPTIONDESK(PLAN)
ELEVATION
SS LAMINATE
1 )hardwoodbeeding(century
laminate-nicewood712N 1 )
SS laminateCENTURY-silver mini
squares(1001 MS )6
hardwoodbeeding(century
laminate-nicewood712N 1 )
hardwoodbeeding(century
laminate-nicewood712N 1 )
OFF MG ROAD
KOCHI - 16.RAVIPURAM
39/4186-A
ARCHITECTS
FURNITUREDETAILS
DRAWING :
KOCHI METRORAIL OFFICE
PROJECT :
DATE -08.08.2013
DRAWN BY - Ar.NEETHU
CHECKED BY -
REVISION - 5
APPROVED BY -
pedestalCPU rack keyboard tray
DIRECTOR'S desk
pedestal
keyboard tray
GM'S desk
pedestal
CPU rack
keyboard tray
storage
DGM'S desk MANAGER's desk
pedestal
keyboardtray
DRAWING NO- 7C1
OFF MG ROAD
KOCHI - 16.RAVIPURAM
39/4186-A
ARCHITECTS
FURNITUREDETAILS
DRAWING :
KOCHI METRORAIL OFFICE
PROJECT :
DATE -08.08.2013
DRAWN BY - Ar.NEETHU
CHECKED BY -
REVISION - 5
APPROVED BY -
pedestal
cabinet
DM's Desk
CPU rack
keyboardtray
PS Desk
pedestalkeyboard
tray
RECEPTION Desk
PLAN PLAN
SLIDING DOOR FILING CABINET C1
90X135
SLIDING DOOR FILING CABINET C2
120X135
ELEVATION ELEVATIONELEVATION
PLAN
SLIDING DOOR FILING CABINET C3
120X180
AM's Desk
DRAWING NO- 8
OFF MG ROAD
KOCHI - 16.RAVIPURAM
39/4186-A
ARCHITECTS
CONFERENCETABLE DETAILS
DRAWING :
KOCHI METRORAIL OFFICE
PROJECT :
DATE -08.08.2013
DRAWN BY - Ar.NEETHU
CHECKED BY -
REVISION - 5
APPROVED BY -
MEETING ROOM
790X350297 SFT
MEETING ROOM
450X455220 SFT
CF2100X200
CF1400X100
C3 C3
160
CM W
IDE
PASS
AGE
CF1400X100
CONFERENCE TABLE 1400X100
CONFERENCE TABLE 2100X200
CF2100X200
DRAWING NO- 9
TOILET
TOILETTOILET
TOILET
OFF MG ROAD
KOCHI - 16.RAVIPURAM
39/4186-A
ARCHITECTS
ACLAYOUT
DRAWING :
KOCHI METRORAIL OFFICE
PROJECT :
DATE -05.07.2013
DRAWN BY - MASS
CHECKED BY -
REVISION - 5
APPROVED BY -
180 CM WIDE PASSAGE
120 CM WIDE PASSAGE
115 CM WIDE PASSAGE
120 CM WIDE PASSAGE
LADIES TOILETBLOCK
EWCTOILET
C2
C2
C2C2C2C2
C2C2C2C2C2
C2
C2
160
CM W
IDE
PASS
AGE
C2
486 SFTLOUNGE
440 x 360
299 SFT680 x 410
BUFFER SPACE
DIRECTOR'S CABIN335X495(178 SFT)
C2
C2
SYSTEMS
220 x 360(80 SFT )
GM' CABIN
GM'S CABIN265 x 290( 82 SFT )
DIRECTOR'S CABIN335X495(178 SFT)
220 x 335(80 SFT )
GM' CABIN
C2
C2
C2
C2
AM
AM
755 x 390
PUNCHING UNIT
LANDSCAPEFEATUREDISPLAY
AM
AM
AM
AM AM
AM
AM AM
AMAM
AM
AM
81 SFT
DINING HALL490 x 520274 SFT
PROJECTS
LIBR
ARY
DRAFTING TABLE
C2
C2
C2
C2
C2
C2C2
ENTRY
120
CM W
IDE
PASS
AGE
120
CM W
IDE
PASS
AGE
120
CM W
IDE
PASS
AGE
120
CM W
IDE
PASS
AGE
120 CM WIDE PASSAGE
115 CM WIDE PASSAGE
225 x 335(80 SFT )
GM' CABIN
DM
DM
DM
DM
180
CM W
IDE
PASS
AGE
180
CM W
IDE
PASS
AGE
195 CM WIDE PASSAGE
C3C3
DRAWING STORAGE(A0 SHEETS)
STORE ROOM345 x 23085 SFT
DGM
DMDMDMDM
DM DM DM DM
MANAGER
DGM
DGMDGM
AGM
DGM
MANAGER
MANAGER
MANAGER
UPS / SERVER ROOM400 x 250107 SFT
DGM
GM'S CABIN265 x 290( 82 SFT )
CF1400X100
CF2100X200
450X455220 SFT
MEETING ROOM
790X350297 SFT
MEETING ROOM
290X260PANTRY
FULL HEIGHT PARTITIONSKID PROOF CERAMIC
TILE FLOORING
PARAPET 10CM TH120HT
SKID PROOF CERAMIC
TILE FLOORING
TREAD - 30RISE - 15
CORRIDOR
EWCTOILET
SKID PROOF CERAMIC
TILE FLOORING
PARAPET 10CM TH120HT
30CM EXISTING SLAB
4MMAC SHEET
IN 1"X4"ANGLE FRAME
EXHAUSTED FAN
KITCHEN CHUTE
GENTS TOILETBLOCK
EWCTOILET
EWCTOILET
SERVICE LIFT
DIRECTOR'S CABIN
DGM / AGM CABIN
MANAGER'S CABIN
DM'S CABIN
C1
C2
AM'S DESK
PS- DESK
CABINET (120X135)
CF1
CF2
CONFERENCE TABLE100X400
CONFERENCE TABLE100X200
RD RECEPTION DESK
NOSFURNITURES
LEGEND
02
08
04
12
22
02
21
1
1
1
GM'S CABIN 05
CABINET (90X135)
C3 CABINET (120X180) 2
16
C4 CABINET (120X210) 6
OFF MG ROAD
KOCHI - 16.RAVIPURAM
39/4186-A
ARCHITECTS
ACSPECIFICATION
DRAWING :
KOCHI METRORAIL OFFICE
PROJECT :
DATE -01.08.2013
DRAWN BY - MASS
CHECKED BY -
REVISION - 3
APPROVED BY -
MACHINE TYPE TONNAGE (TR) QUANTITY
CASSETTE 4 3 NOS
3 4 NOS
2.5 2 NOS
LIQUID SIDE PIPE SIZE CABLE 1.5 SQMM
CASSETTE
CASSETTE
CASSETTE
CASSETTE
HIGH WALL SPLIT
2
1.5
2
1 NO
1 NO
SUPPLY REQUIRED NEAR
OUTDOOR
OUTDOOR
OUTDOOR
OUTDOOR
OUTDOOR
INDOOR
POWER SUPPLY
3 PHASE
3 PHASE
1 PHASE
1 PHASE
1 PHASE
1 PHASE
GAS SIDE PIPE SIZE
3/8" 5/8"
3/8" 5/8"
3/8" 5/8"
3/8" 5/8"
1/4" 1/2"
1/4" 1/2"
PIPE LENGTH
190 Mtr
190 Mtr
16 Mtr
160 Mtr 4 CORE &
160 Mtr 3 CORE
50 Mtr 4 CORE
18 Mtr 4 CORE
24 Mtr 4 CORE
220 Mtr 4 CORE
PIPE SIZE LENGTH IN Mtr. INSULATION REQUIREMENT
1" DIA 90
351.5" DIA
YES
YES
2" DIA YES
AC DRAIN PIPE DETAILS
20
10 NOS
DIRECTOR'S CABIN
DGM / AGM CABIN
MANAGER'S CABIN
DM'S CABIN
C1
C2
AM'S DESK
PS- DESK
CABINET (120X135)
CF1
CF2
CONFERENCE TABLE100X400
CONFERENCE TABLE100X200
RD RECEPTION DESK
NOSFURNITURES
LEGEND
02
08
04
12
22
02
21
1
1
1
GM'S CABIN 05
CABINET (90X135)
C3 CABINET (120X180) 2
16
C4 CABINET (120X210) 6