Transcript of REPUBLIQUE DU SENEGAL Un Peuple – Un But – Une Foi
TitlePlan Sénégal Emergent IV FORUM ON INCLUSIVE AND SUSTAINABLE
INDUSTRIAL DEVELOPMENT
Vienna – Austria --------- 30 NOVEMBER / 1st DECEMBER 2015
REPUBLIQUE DU SENEGAL Un Peuple – Un But – Une Foi
3
Technology
CONSISTENT ALIGNMENT BETWEEN THE PCP & THE PSE ………..
…………VERTICAL AND HORIZONTAL COMPONENTS
4
6
• Follow-up of implementation by the MSPSE/BOS
• Involvement of different sectorial Ministries
• UNIDO’s interventions with different stakeholders
Central dynamic
Ministry of Industry
PRIME MINISTER’s
II. Alignment of the PCP with the PSE
III. PCP coordination and management
IV. Deliverables and impact for Senegal
V. Main challenges
8
4 | Summary of UNIDO’s TA impact within the framework of the
PCP-SEN
Enhanced visibility to promote international investors and
partnership mobilization
Leadership at the highest level – Sensitization on the central role
of industry for economic development
Improved feasability of projects
Accelerated implementation of projects
One-stop shop for investors Regulatory constraints Lack of
transparency and
confusion of roles of national institutions
Lack of clarity and complexity in incentive schemes offered to
investors
Fragmentation of efforts without tangible results
4 | Impact analysis of UNIDO’s TA on PSE projects (1/2)
Management and Governance
The current impact of UNIDO’s interventions
Proposal of a model for management and administration based on
international best practices
Management based on the creation of a public-private business
entity, involving the private sector and clarifying the roles and
responsibilities of each stakeholder (APIX, APROSI, HAZES, DGPU,
etc)
Proposal of a modern and simplified
incentive package (tax aspect, labor legislation, etc.)
Structuring of the transformation of Diamniadio into a Special
Economic Zone
PCP Component Industrial park
Key figures & milestones Mobilization of USD 32 million of
public
financing for developing phase 1 Current construction on 13ha with
the
establishment of two standard workshops expected in 2016 4
Delegation visits of Chinese
businessmen with the aim of relocating in Senegal February 2016:
establishment of the first
garments factory (C&H Garments)
4 | Pictures of constructions in progress in the industrial park
site Beginning of construction in May 2015
11
Industrial development limited to PSE flagship projects (industrial
park, PARI industriel initiative, and other industrial
projects)
Absence of a genuine industrial policy
4 | Impact analysis of UNIDO’s TA on PSE projects (2/2)
GIFIUD – Industrial policy
Scientific study based on the revealed comparative advantage (RCA),
showing the existing potential within three sectors: horticulture
and commercial agriculture, apparel (garments) and leather
products
Capacity building of the national task force, established to work
jointly with UNIDO
PCP Components Agro-poles - GIFIUD
Launch of the agro-poles
Definition of the strategic vision and of general principles for
the agro-poles within the framework of the Plan Sénégal Emergent
(PSE)
Preliminary targeting of establishment sites without substantial
elements on value chain selection and integrated activities
Study covering the following aspects: – Function of the agro-poles
(modules,
value chains, covered sites) – Financing requirement – Proposal of
an implementation plan Substantial contributions for
decision-
making for the operational launch of the project
12
Agenda
II. Alignment of the PCP with the PSE
III. PCP coordination and management
IV. Deliverables and impact for Senegal
V. Main challenges
13
5 | Main challenges to be met to maximize the results (1/2)
Envisaged activities to address the identified challenges within
the PCP
Inclusion of the environmental and energy dimensions
Establishment of partnerships and mobilization of resources for the
PSE industrial components
Pursuit and diversification of delegations comprised of foreign
industrial companies visiting Senegal (4 in 2015)
Establishment of a public-private dialogue platform to enhance the
involvement of the national private sector
Higher involvement of the private sector within the framework of
the industrial park of Diamniadio
Definition of a Partnership and Funds mobilization strategy under
the guidance of an experienced national consultant
Organization of a Partner and Donor Roundtable (mid- December
2015)
Establishment of a Partner and Donor Working Group, under the
auspices of the Ministry of Economy and Finance
GEF Integrated Programme on Sustainable Cities in Senegal:
Diamniadio as a sustainable city model in West Africa, attracting
quality investments
Increase of UNIDO’s environmental project portfolio in Senegal:
greening of value chains, eco-industrial parks, e- waste
management, etc.
14
5 | Main challenges to be met to maximize the results (2/2)
Finalization of the incentive package for Diamniadio Tailored and
personalized support industrial companies in
the framework of their establishment by APIX and the BOS Targeted
roadshows to build strategic partnerships Investment promotion
within PCP vertical integration
Deeper involvement of Government institutions (Prime Minister
Office, BOS – Presidency -, Ministry of Industry, Ministry of
Finance) to better mobilize national institutions
UNIDO’s facilitator and coordinator role to mobilize the private
sector and;
UNIDO’s facilitator and coordinator role to mobilize technical and
financial partners: sensitization, mobilization and catalyst of
interventions
Strengthening of promotion activities for industrial projects
Improvement of the overall PCP coordination
Several laws to amend and decrees to enact based on the findings of
the technical teams
Necessity to adopt a transitional solution while waiting for the
enactment of legislation (e.g. transformation of Diamniadio into a
SEZ)
Ownership and implementation of legislation by the Government
Accelerated adoption of legislation
Envisaged activities to address the identified challenges within
the PCP
15
Agenda
II. Alignment of the PCP with the PSE
III. PCP coordination and management
IV. Deliverables and impact for Senegal
V. Main challenges
16
PURSUIT OF THE TECHNICAL ASSISTANCE ON THE PSE PRIORITY INDUSTRIAL
PROJECTS
Operationalization of phase I of the Diamniadio Industrial
platform: – Amendments and additions to the legal, regulatory
provisions on IIP, and a clearer
framework for investors; – Operationalization of the public-private
entity for the development, the
management and administration of Diamniadio – Support for the
establishment of international industrial companies within
the
platform Technical support for financing phase II in Diamniadio and
investment
promotion Preliminary studies for the 2nd industrial platform
Integrated industrial platforms
Integrated and competitive agro-poles
Implementation of the various feasibility studies for establishing
the 1st integrated and competitive agro-poles – Establishment of
business and investment plans for the agro-poles – Technical
feasibility studies and environmental and social impact assessments
– Operationalization of the functional content;
Technical support to local SMEs through subcontracting, upgrading
and cluster development – Profiling and benchmarking of mining
companies to develop subcontracting; – Start of specific and global
upgrading for identified potential suppliers; – Pursuit and
expansion of the cluster programme and networks in the Hub.
17
PURSUIT OF THE IMPLEMENTATION OF CROSS-CUTTING PCP-SEN
COMPONENT
Pursuit of the implementation of the local cluster development
programme Implementation of SME and value chain Upgrading
Programmes Support to the PSE flagship reform – youth
entrepreneurship Programme:
Inclusive Development and Entrepreneurship for All (IDEA)
Private sector development
Environment and energy
GEF integrated programme on e-waste management and sustainable
cities Climate Technology Centre and Network (CTCN) and Partnership
for Action on
Green Economy (PAGE) projects Greening of identified agro value
chains as part of the establishment of agro-
poles and the establishment of eco-industrial parks as part of the
technical assistance for IIP
The establishment of renewable energy and energy efficiency
technologies and services within the IIPs and the agro-poles
Implementation of a quality infrastructure upgrading programme in
Senegal within the framework of ECOWAS regional quality system
programme
18
LAUNCH OF NEW PCP-SEN COMPONENTS TO STRENGTHEN THE PSE
OPERATIONALIZATION
Implementation of Investment Monitoring Programme: – Senegal
Investor Survey for ISID – Establishment of Investment Monitoring
Platform; – Capacity building for APIX and relevant national
institutions;
Technical support to the vertical interventions though investment
promotion
Investment promotion
South-south and triangular industrial cooperation
Science, Technology and Innovation
Support to the PSE flagship project “Corridors Céréaliers” –
Implementation of a pilot cooperation project on rice production
and transformation for Food Security in Senegal
Institutionalization of South-south and triangular industrial
cooperation in Senegal
Development of Senegalese capacities in innovation and productivity
: – Survey of Senegal’s national System of Innovation; – National
Firm-Level Innovation Study & Productivity Analysis; –
Establishment of a National Innovation & Productivity
Observatory.
19
ENSURE AN EFFICIENT, INTEGRATED AND COORDINATED IMPLEMENTAION
Pursue on the work achieved by the PCP-SEN Steering Committee: –
Overall supervision and strategic guidance on the PCP-SEN –
Consensus building among PCP-SEN key stakeholders – Follow-up and
recommendations on PCP-SEN milestones
PCP-SEN coordination
Technical and financial partner mobilization
Monitoring & Evaluation
The operationalization of the Partner and Donor Working Group –
Overall coordination of technical and financial partners’
activities on PSE industrial
part; – Operationalization of the Partnership and Funds
mobilization strategy – Expansion of the group to new members; –
Operationalization of financing mechanisms dedicated to PSE
industrial part – Dialogue platform on issues related to inclusive
and sustainable industrial
development Adaptation of a monitoring and evaluation framework for
operationalizing the
PSE industrial part – Sensitization workshop between UNIDO, the
Government of Senegal and technical
and financial partners – Capacity building of the BOS and relevant
national institutions
20
SHARING THE PCP MODEL
5th ISID Forum jointly organized with UNIDO and the Governments of
Ethiopia and Senegal coupled with regional workshop to demonstrate
the relevance of the PCP model for African industrialization
PCP-SEN major events
Expression of gratitude and encouragement for their involvement,
team-spirit and dedication PCP-SEN
Technical Team
Plan Sénégal Emergent
CONSISTENT ALIGNMENT BETWEEN THE PCP & THE PSE ………..
…………VERTICAL AND HORIZONTAL COMPONENTS
Slide Number 5
Slide Number 8
4 | Summary of UNIDO’s TA impact within the framework of the
PCP-SEN
4 | Impact analysis of UNIDO’s TA on PSE projects (1/2)
4 | Pictures of constructions in progress in the industrial park
site Beginning of construction in May 2015
4 | Impact analysis of UNIDO’s TA on PSE projects (2/2)
Slide Number 13
5 | Main challenges to be met to maximize the results (1/2)
5 | Main challenges to be met to maximize the results (2/2)
Slide Number 16
Slide Number 17
Slide Number 18
Slide Number 19
Slide Number 20
Slide Number 21
Slide Number 22