PLANNING - London Borough of Hounslow€¦ · Kitchen Laundry Plant Room Refuse Store Guest Suite...

Post on 28-Jun-2020

3 views 0 download

Transcript of PLANNING - London Borough of Hounslow€¦ · Kitchen Laundry Plant Room Refuse Store Guest Suite...

1 Bed Apt50.1 m²

1 Bed Apt50.1 m²

1 Bed Apt50.1 m²

1 Bed Apt50.1 m²

1 Bed Apt50.1 m²

1 Bed Apt54.3 m²

HousingOffice

L.D Staff

MeetingCommunity

Room

RegenKitchen

Laundry

Plant Room

RefuseStore

Guest Suite

ActivityRoom

CommunalLounge

MeetingRoom

ChangingPlaces

WC

WCCareOffice

Hairdressers/ TherapyTherapy

L.D Lounge

ActivityRoom

WC

1 Bed Apt66.2 m²

WC

1 Bed Apt66.2 m²

1 Bed Apt66.2 m²

1 Bed Apt66.2 m²

1 Bed Apt66.2 m²

1 Bed Apt66.2 m²

1 Bed Apt66.2 m²

1 Bed Apt66.2 m²

1 Bed Apt54.3 m²

1 Bed Apt54.3 m²

1 Bed Apt54.3 m²

1 Bed Apt54.3 m²

1 Bed Apt54.3 m²

1 Bed Apt54.3 m²

1 Bed Apt54.5 m²

2 Bed Apt68.0 m²

2 Bed Apt68.0 m²

1 Bed Apt54.3 m²

1 Bed Apt54.3 m²

1 Bed Apt54.3 m²

1 Bed Apt54.3 m²

1 Bed Apt54.3 m²

1 Bed Apt54.3 m²

Canopy Above

Activity Area

Lobby

Reception Area

Void above

Glazed roof above

Glazed roof above

DementiaOffice

St.

St.

WCStaircase 2

Staircase 3

Staircase 6

Staircase 4

Staircase 5

LiftLift

Staircase 1

DementiaLounge /Activity/Dining

Dementia Garden

Communal Garden

Learning DisabilitesGarden

Lift

(15 no. of bins)

Main Entrance

Mai

nten

ance

St.

ElectricalIntake

Cleaner's St.

Comms

Platform Lift

Corridor

1 Bed Apt66.2 m²

RefuseHolding

Rev Date Description Dwn Ckd

Designed with reference to the surveys, information and reports listed:Topo Survey : CUB-RBS-WD-0081 & CUB-RBS-WD-0082Utility Survey : CUB-RBS-WD-0091 & CUB-RBS-WD-0092Tree Survey : TCP-BP

CDM REGULATIONS 2015. All current drawings and specifications for theproject must be read in conjunction with the Designer's Hazard andEnvironment Assessment Record. All intellectual property rights reserved.

Scale @ A1

Date

Checked

Drawn

1 : 250

REV FAG

RVP

Feb-2016 Ground Floor Plan

Blenheim Extra Care, Feltham

PRELIMINARY

H494 - PRP - DR - A - 1002

0m 10m 20m5m 15m

E 04/05/16 One of the lifts changed into 8 person lift. AG RVPF 02/06/16 Ext. cycle store added, Lobby size increased, Disabled toilet doors

amended to open outwards; Staircase 2 and 4 - Dry Risers omitted assprinklers specified to suit FE comments; Extra Care and LearningDisabilities Apartments - Bathroom's secondary door omitted,Dementia Apartments - Bathroom's secondary door added.

MHS AR

SUBJECT TO P

LANNIN

G CONSENT

LaurieG
Stamp
LaurieG
Cloud
LaurieG
Callout
Doors shown here - are these part of a cupboard or should they be removed
LaurieG
Cloud
LaurieG
Callout
Car Charging points to be shown on parking layout
LaurieG
Ellipse
LaurieG
Line
LaurieG
Text Box
GML 06/06/16

2 Bed Apt68.0 m²

2 Bed Apt68.0 m²

2 Bed Apt68.0 m²

1 Bed Apt54.5 m²

1 Bed Apt54.3 m²

1 Bed Apt54.3 m²

1 Bed Apt54.3 m²

1 Bed Apt54.3 m²

1 Bed Apt54.3 m²

1 Bed Apt54.3 m²

1 Bed Apt54.3 m²

1 Bed Apt54.3 m²

1 Bed Apt54.3 m²

1 Bed Apt54.3 m²

1 Bed Apt54.3 m²

1 Bed Apt54.3 m²

1 Bed Apt54.3 m²

1 Bed Apt54.3 m²

1 Bed Apt54.3 m²

1 Bed Apt54.3 m²

1 Bed Apt54.3 m²

1 Bed Apt50.1 m²

1 Bed Apt50.1 m²

1 Bed Apt50.1 m²

1 Bed Apt50.1 m²

1 Bed Apt50.1 m²

1 Bed Apt54.3 m²

1 Bed Apt54.3 m²

1 Bed Apt54.3 m²

1 Bed Apt54.3 m²

1 Bed Apt54.3 m²

1 Bed Apt54.3 m²

1 Bed Apt54.3 m²

1 Bed Apt54.3 m²

1 Bed Apt54.3 m²

1 Bed Apt54.3 m²

1 Bed Apt54.3 m²

1 Bed Apt54.3 m²

RefuseHolding

St.

StaffChange /

Rest

DementiaLounge /Activity/Dining

ActivityRoom

Canopy

Void

Glass Roof

Glass Roof

Lift Lift

Staircase 4

Staircase 5

Staircase 3

Staircase 6

Staircase 2

Staircase 1

Lift

Platform LiftSt.

WC

Access Deck

Access Deck

Acce

ss D

eckAc

cess

Dec

k

Acce

ss D

eck

Cleaner's St.

Rev Date Description Dwn Ckd

Designed with reference to the surveys, information and reports listed:Topo Survey : CUB-RBS-WD-0081 & CUB-RBS-WD-0082Utility Survey : CUB-RBS-WD-0091 & CUB-RBS-WD-0092Tree Survey : TCP-BP

CDM REGULATIONS 2015. All current drawings and specifications for theproject must be read in conjunction with the Designer's Hazard andEnvironment Assessment Record. All intellectual property rights reserved.

Scale @ A1

Date

Checked

Drawn

1 : 250

REV EAG / RVP

CC

Feb-2016 First Floor Plan

Blenheim Extra Care, Feltham

PRELIMINARY

H494 - PRP - DR - A - 10030m 10m 20m5m 15m

D 04/05/16 One of the lifts changed into 8 person lift. AG RVPE 02/06/16 Ext. cycle store added, Lobby size increased, Disabled toilet doors

amended to open outwards; Staircase 2 and 4 - Dry Risers omitted assprinklers specified to suit FE comments; Extra Care and LearningDisabilities Apartments - Bathroom's secondary door omitted,Dementia Apartments - Bathroom's secondary door added.

MHS AR

SUBJECT TO P

LANNIN

G CONSENT

LaurieG
Stamp
LaurieG
Ellipse
LaurieG
Line
LaurieG
Text Box
GML 06/06/16

1 Bed Apt54.3 m²

1 Bed Apt54.3 m²

1 Bed Apt54.3 m²

1 Bed Apt54.3 m²

1 Bed Apt54.3 m²

1 Bed Apt54.3 m²

1 Bed Apt54.3 m²

1 Bed Apt54.3 m²

1 Bed Apt54.3 m²

1 Bed Apt54.3 m²

1 Bed Apt54.3 m²

1 Bed Apt54.3 m²

1 Bed Apt54.3 m²

1 Bed Apt54.3 m²

1 Bed Apt54.3 m²

1 Bed Apt54.3 m²

2 Bed Apt68.0 m²

2 Bed Apt68.0 m²

2 Bed Apt68.0 m²

1 Bed Apt54.5 m²

1 Bed Apt54.3 m²

1 Bed Apt54.3 m²

1 Bed Apt54.3 m²

1 Bed Apt54.3 m²

1 Bed Apt54.3 m²

1 Bed Apt54.3 m²

RefuseHolding

St.

AssistedBathroom

Roof

Roof

Roof

Staircase 4

Staircase 5

Staircase 3

Staircase 6

Lift

Lift Lift

Glass Roof

Access Deck

Access Deck

Acce

ss D

eckAc

cess

Dec

k

Acce

ss D

eck

Cleaner's St.

ActivityRoom

Glass Roof

Rev Date Description Dwn Ckd

Designed with reference to the surveys, information and reports listed:Topo Survey : CUB-RBS-WD-0081 & CUB-RBS-WD-0082Utility Survey : CUB-RBS-WD-0091 & CUB-RBS-WD-0092Tree Survey : TCP-BP

CDM REGULATIONS 2015. All current drawings and specifications for theproject must be read in conjunction with the Designer's Hazard andEnvironment Assessment Record. All intellectual property rights reserved.

Scale @ A1

Date

Checked

Drawn

1 : 250

REV EAG / RVP

CC

Feb-2016 Second Floor Plan

Blenheim Extra Care, Feltham

PRELIMINARY

H494 - PRP - DR - A - 10040m 10m 20m5m 15m

D 04/05/16 One of the lifts changed into 8 person lift. AG RVPE 02/06/16 Ext. cycle store added, Lobby size increased, Disabled toilet doors

amended to open outwards; Staircase 2 and 4 - Dry Risers omitted assprinklers specified to suit FE comments; Extra Care and LearningDisabilities Apartments - Bathroom's secondary door omitted,Dementia Apartments - Bathroom's secondary door added.

MHS AR

SUBJECT TO P

LANNIN

G CONSENT

LaurieG
Stamp
LaurieG
Ellipse
LaurieG
Line
LaurieG
Text Box
GML 06/06/16

Rev Date Description Dwn Ckd

Designed with reference to the surveys, information and reports listed:Topo Survey : CUB-RBS-WD-0081 & CUB-RBS-WD-0082Utility Survey : CUB-RBS-WD-0091 & CUB-RBS-WD-0092Tree Survey : TCP-BP

CDM REGULATIONS 2015. All current drawings and specifications for theproject must be read in conjunction with the Designer's Hazard andEnvironment Assessment Record. All intellectual property rights reserved.

Scale @ A1

Date

Checked

Drawn

REV -AG/RVP/MHS

CC

Feb-2016 Elevations 01

Blenheim Extra Care, Feltham

PRELIMINARY1 : 200

H494 - PRP - DR - A - 1020

1 : 20001 - Elevation towards Main Entrance

Elevation 01

1 : 20002 - Elevation from Shore Close

Elev

atio

n 02

1 : 20003 - Elevation from Blenheim Park

Elevation 03

0m 5m 10m 15m

- 31/05/16 First Issue

SUBJECT TO P

LANNIN

G CONSENT

LaurieG
Stamp
LaurieG
Ellipse
LaurieG
Line
LaurieG
Text Box
GML 06/06/16