PLANNING - London Borough of Hounslow€¦ · Kitchen Laundry Plant Room Refuse Store Guest Suite...
Transcript of PLANNING - London Borough of Hounslow€¦ · Kitchen Laundry Plant Room Refuse Store Guest Suite...
1 Bed Apt50.1 m²
1 Bed Apt50.1 m²
1 Bed Apt50.1 m²
1 Bed Apt50.1 m²
1 Bed Apt50.1 m²
1 Bed Apt54.3 m²
HousingOffice
L.D Staff
MeetingCommunity
Room
RegenKitchen
Laundry
Plant Room
RefuseStore
Guest Suite
ActivityRoom
CommunalLounge
MeetingRoom
ChangingPlaces
WC
WCCareOffice
Hairdressers/ TherapyTherapy
L.D Lounge
ActivityRoom
WC
1 Bed Apt66.2 m²
WC
1 Bed Apt66.2 m²
1 Bed Apt66.2 m²
1 Bed Apt66.2 m²
1 Bed Apt66.2 m²
1 Bed Apt66.2 m²
1 Bed Apt66.2 m²
1 Bed Apt66.2 m²
1 Bed Apt54.3 m²
1 Bed Apt54.3 m²
1 Bed Apt54.3 m²
1 Bed Apt54.3 m²
1 Bed Apt54.3 m²
1 Bed Apt54.3 m²
1 Bed Apt54.5 m²
2 Bed Apt68.0 m²
2 Bed Apt68.0 m²
1 Bed Apt54.3 m²
1 Bed Apt54.3 m²
1 Bed Apt54.3 m²
1 Bed Apt54.3 m²
1 Bed Apt54.3 m²
1 Bed Apt54.3 m²
Canopy Above
Activity Area
Lobby
Reception Area
Void above
Glazed roof above
Glazed roof above
DementiaOffice
St.
St.
WCStaircase 2
Staircase 3
Staircase 6
Staircase 4
Staircase 5
LiftLift
Staircase 1
DementiaLounge /Activity/Dining
Dementia Garden
Communal Garden
Learning DisabilitesGarden
Lift
(15 no. of bins)
Main Entrance
Mai
nten
ance
St.
ElectricalIntake
Cleaner's St.
Comms
Platform Lift
Corridor
1 Bed Apt66.2 m²
RefuseHolding
Rev Date Description Dwn Ckd
Designed with reference to the surveys, information and reports listed:Topo Survey : CUB-RBS-WD-0081 & CUB-RBS-WD-0082Utility Survey : CUB-RBS-WD-0091 & CUB-RBS-WD-0092Tree Survey : TCP-BP
CDM REGULATIONS 2015. All current drawings and specifications for theproject must be read in conjunction with the Designer's Hazard andEnvironment Assessment Record. All intellectual property rights reserved.
Scale @ A1
Date
Checked
Drawn
1 : 250
REV FAG
RVP
Feb-2016 Ground Floor Plan
Blenheim Extra Care, Feltham
PRELIMINARY
H494 - PRP - DR - A - 1002
0m 10m 20m5m 15m
E 04/05/16 One of the lifts changed into 8 person lift. AG RVPF 02/06/16 Ext. cycle store added, Lobby size increased, Disabled toilet doors
amended to open outwards; Staircase 2 and 4 - Dry Risers omitted assprinklers specified to suit FE comments; Extra Care and LearningDisabilities Apartments - Bathroom's secondary door omitted,Dementia Apartments - Bathroom's secondary door added.
MHS AR
SUBJECT TO P
LANNIN
G CONSENT
2 Bed Apt68.0 m²
2 Bed Apt68.0 m²
2 Bed Apt68.0 m²
1 Bed Apt54.5 m²
1 Bed Apt54.3 m²
1 Bed Apt54.3 m²
1 Bed Apt54.3 m²
1 Bed Apt54.3 m²
1 Bed Apt54.3 m²
1 Bed Apt54.3 m²
1 Bed Apt54.3 m²
1 Bed Apt54.3 m²
1 Bed Apt54.3 m²
1 Bed Apt54.3 m²
1 Bed Apt54.3 m²
1 Bed Apt54.3 m²
1 Bed Apt54.3 m²
1 Bed Apt54.3 m²
1 Bed Apt54.3 m²
1 Bed Apt54.3 m²
1 Bed Apt54.3 m²
1 Bed Apt50.1 m²
1 Bed Apt50.1 m²
1 Bed Apt50.1 m²
1 Bed Apt50.1 m²
1 Bed Apt50.1 m²
1 Bed Apt54.3 m²
1 Bed Apt54.3 m²
1 Bed Apt54.3 m²
1 Bed Apt54.3 m²
1 Bed Apt54.3 m²
1 Bed Apt54.3 m²
1 Bed Apt54.3 m²
1 Bed Apt54.3 m²
1 Bed Apt54.3 m²
1 Bed Apt54.3 m²
1 Bed Apt54.3 m²
1 Bed Apt54.3 m²
RefuseHolding
St.
StaffChange /
Rest
DementiaLounge /Activity/Dining
ActivityRoom
Canopy
Void
Glass Roof
Glass Roof
Lift Lift
Staircase 4
Staircase 5
Staircase 3
Staircase 6
Staircase 2
Staircase 1
Lift
Platform LiftSt.
WC
Access Deck
Access Deck
Acce
ss D
eckAc
cess
Dec
k
Acce
ss D
eck
Cleaner's St.
Rev Date Description Dwn Ckd
Designed with reference to the surveys, information and reports listed:Topo Survey : CUB-RBS-WD-0081 & CUB-RBS-WD-0082Utility Survey : CUB-RBS-WD-0091 & CUB-RBS-WD-0092Tree Survey : TCP-BP
CDM REGULATIONS 2015. All current drawings and specifications for theproject must be read in conjunction with the Designer's Hazard andEnvironment Assessment Record. All intellectual property rights reserved.
Scale @ A1
Date
Checked
Drawn
1 : 250
REV EAG / RVP
CC
Feb-2016 First Floor Plan
Blenheim Extra Care, Feltham
PRELIMINARY
H494 - PRP - DR - A - 10030m 10m 20m5m 15m
D 04/05/16 One of the lifts changed into 8 person lift. AG RVPE 02/06/16 Ext. cycle store added, Lobby size increased, Disabled toilet doors
amended to open outwards; Staircase 2 and 4 - Dry Risers omitted assprinklers specified to suit FE comments; Extra Care and LearningDisabilities Apartments - Bathroom's secondary door omitted,Dementia Apartments - Bathroom's secondary door added.
MHS AR
SUBJECT TO P
LANNIN
G CONSENT
1 Bed Apt54.3 m²
1 Bed Apt54.3 m²
1 Bed Apt54.3 m²
1 Bed Apt54.3 m²
1 Bed Apt54.3 m²
1 Bed Apt54.3 m²
1 Bed Apt54.3 m²
1 Bed Apt54.3 m²
1 Bed Apt54.3 m²
1 Bed Apt54.3 m²
1 Bed Apt54.3 m²
1 Bed Apt54.3 m²
1 Bed Apt54.3 m²
1 Bed Apt54.3 m²
1 Bed Apt54.3 m²
1 Bed Apt54.3 m²
2 Bed Apt68.0 m²
2 Bed Apt68.0 m²
2 Bed Apt68.0 m²
1 Bed Apt54.5 m²
1 Bed Apt54.3 m²
1 Bed Apt54.3 m²
1 Bed Apt54.3 m²
1 Bed Apt54.3 m²
1 Bed Apt54.3 m²
1 Bed Apt54.3 m²
RefuseHolding
St.
AssistedBathroom
Roof
Roof
Roof
Staircase 4
Staircase 5
Staircase 3
Staircase 6
Lift
Lift Lift
Glass Roof
Access Deck
Access Deck
Acce
ss D
eckAc
cess
Dec
k
Acce
ss D
eck
Cleaner's St.
ActivityRoom
Glass Roof
Rev Date Description Dwn Ckd
Designed with reference to the surveys, information and reports listed:Topo Survey : CUB-RBS-WD-0081 & CUB-RBS-WD-0082Utility Survey : CUB-RBS-WD-0091 & CUB-RBS-WD-0092Tree Survey : TCP-BP
CDM REGULATIONS 2015. All current drawings and specifications for theproject must be read in conjunction with the Designer's Hazard andEnvironment Assessment Record. All intellectual property rights reserved.
Scale @ A1
Date
Checked
Drawn
1 : 250
REV EAG / RVP
CC
Feb-2016 Second Floor Plan
Blenheim Extra Care, Feltham
PRELIMINARY
H494 - PRP - DR - A - 10040m 10m 20m5m 15m
D 04/05/16 One of the lifts changed into 8 person lift. AG RVPE 02/06/16 Ext. cycle store added, Lobby size increased, Disabled toilet doors
amended to open outwards; Staircase 2 and 4 - Dry Risers omitted assprinklers specified to suit FE comments; Extra Care and LearningDisabilities Apartments - Bathroom's secondary door omitted,Dementia Apartments - Bathroom's secondary door added.
MHS AR
SUBJECT TO P
LANNIN
G CONSENT
Rev Date Description Dwn Ckd
Designed with reference to the surveys, information and reports listed:Topo Survey : CUB-RBS-WD-0081 & CUB-RBS-WD-0082Utility Survey : CUB-RBS-WD-0091 & CUB-RBS-WD-0092Tree Survey : TCP-BP
CDM REGULATIONS 2015. All current drawings and specifications for theproject must be read in conjunction with the Designer's Hazard andEnvironment Assessment Record. All intellectual property rights reserved.
Scale @ A1
Date
Checked
Drawn
REV -AG/RVP/MHS
CC
Feb-2016 Elevations 01
Blenheim Extra Care, Feltham
PRELIMINARY1 : 200
H494 - PRP - DR - A - 1020
1 : 20001 - Elevation towards Main Entrance
Elevation 01
1 : 20002 - Elevation from Shore Close
Elev
atio
n 02
1 : 20003 - Elevation from Blenheim Park
Elevation 03
0m 5m 10m 15m
- 31/05/16 First Issue
SUBJECT TO P
LANNIN
G CONSENT