Post on 12-Feb-2016
description
eSTORAGE
WP 2 Progress & Results
28/10/2013Jean-Christophe PasselergueOlivier De l’Hermuzière
A consortium of energy-industry leaders
and academic researchersAlgoé, a management consultancy.
Alstom, a leading power generation and grid
equipment and solutions company.
DNV KEMA, the global expert in energy and
sustainability consultancy.
EDF, the world’s largest producer of
electricity.
Elia, one of Europe’s leading electricity
transmission system operators.
Imperial College, a provider of world-class
education and research. © 2013 eStorage 228/10/2013
© 2013 eStorage 3
Agenda1. Objectives & Organization2. Results and Progress3. Next Year Actions4. Critical Success Factors5. Q&A Session
28/10/2013 3
© 2013 eStorage 4
WP2 Objectives
Existing limitations
• Classic Pumped Storage Hydro Plants (PSP) not flexible enough to– contribute to portfolio energy balance management– provide Ancillary Services such as secondary regulation when in
pumping mode – participate efficiently in Balancing Mechanism when in pumping mode
WP Objectives• Implement new market rules and associated incentives schemes related
to storage in a context of large renewable resources integration• Demonstrate the criticality of IT tools in enabling the deployment and
efficient use of storage systems in the framework of Smart Energy Networks
Year 1 Objectives
• Review and demonstrate the existing tools to the WP partners• Identification of current operational process and constraints• Prepare a flexible framework for WP2 development WP2
28/10/2013
On/Off Pumping mode
Flexible Generation mode
© 2013 eStorage 5
WP
5C
omm
unic
atio
n
WP1Pumped Hydro
Storage Upgrade in Variable Speed
T1.1 Performance and Service Targets
T1.2Unit design & Model
Test
T1.3 Conversion to Variable
Speed of Hydro Plant Unit
T1.4 Hydro Plant unit
monitoring
WP4Exploitation
T4.1 Feasibility and technical cost benchmark PSP sites in EU
WP
6M
anag
emen
t
DEMO
WP2Smart Energy Networks
& IT Tools
T2.1 System Specifications
T2.2 IT tools for more continuous
energy trading markets
DEMO
WP3Benefits of Storage and Regulatory
Framework & Market Design
T3.1 Development Scenarios and Role of Storage for the Future EU Electricity
System
T3.2 Economic and Environmental Value of
Storage in the Future EU electricity Systems
T3.4Regulatory Recommendations for Storage
in European Market Rules
T3.3Obstacles for the integration of Storage in
Current EU Regulatory and Market framework
RTD
OTH
ER
MG
T
OTHER
T2.3 Smart Dispatch Storage PSP
Work Packages Organization
28/10/2013
© 2013 eStorage 6
WP2 Organization
28/10/2013
Smart Energy Networks & IT
Tools
T2.1 System Specifications
T2.2 IT Tools for more continuous trading market
T2.3 Smart Dispatch Storage
PSP
Identification of Needs
Functionnal Specification
Detailed Specification
System Architecture & Interoperability
Standard Interface &
ProtocolData Model
Development Integration
Test & Validation
Detailed Specification
System Architecture & Interoperability
Standard Interface &
ProtocolData Model
Development Integration
Test & Validation
ICL, ELIA, AGR EDF, AHF, AGR
© 2013 eStorage 7
Results & ProgressReview and demonstrate the existing tools to the WP partners
• WP2.1 & WP2.2 : extension of e-terramarket entso-e suite, focusing on the Market Clearing Engine• WP2.3 : extension of the IPO (Intra-day Plant Optimization) module (from e-terrageneration product)• WP2 KOM : demo of e-terramarket entso-e and e-terrageneration to the partners
Business operations and constraints analysis
• WP2.3 : Meeting with EDF « DOAAT » in St Denis in Feb 7th
• WP2.3 : Meeting with EDF « conduite » in Lyon in July 5th
• WP2.1 & WP2.2 : Coordination with WP3&4:
– Participation at the WP3 KOM in March 26th
– Redefinition of WP2 schedule in coordination with WP3 milestones and deliverables
Preparation of a flexible framework for WP2 development
• Purchase of third-party development licenses for the optimization modules : AIMMS (mathematical modeling software) & CPLEX (solver)
• On-going set-up of the optimization module framework that will facilitate the development and integration of var-speed PSP models and market models
28/10/2013
© 2013 eStorage 8
Next Year Actions
28/10/2013
General
• Project Management (internal & consortium)• Actively participate to the other Working Group
WP2.1 & WP 2.2 – IT tools for more continuous trading market
• Follow-up WP3 development in view of the interim WP3 report expected in M24• Start to work on first specification “Market Model and associated clearing rules”• Completing the framework setup and build base balancing market models (offers and
bids, ancillary services requirement, power balance clearing and congestion management)
WP2.3 – Smart Dispatch Storage PSP
• Get varspeed PSP data and characteristics to build and implement a var-speed PSP mathematical model in the IPO module (technical part only)
• Produce a high level project note specification to describe the scope, proposed optimization tool and expected results
• Deliver a first version of adapted eSTORAGE IPO in 2014 (not an official deliverable)
© 2013 eStorage 9
Critical Success Factors
28/10/2013
• Availability of physical and commercial model data to get meaningful and representative results
• Availability of adapted market rules for implementation on market management system
• Identify the place and role of the optimization tool within the actual EDF business process
• Get acceptance and support from EDF exploitation team to implement meaningful demonstrator
© 2013 eStorage 1028/10/2013