eStorage First Annual Workshop Arnhem, NL 30, Oct. 2013 Olivier Teller

description

eStorage First Annual Workshop. Arnhem, NL. 30, Oct. 2013. Olivier Teller. Energy challenges for the 21 st century. 30 Oct., 2013. Geopolitics tensions. Global warming. Governments want to secure their reserves and achieve energy independence. Increase in prices. - PowerPoint PPT Presentation

Transcript of eStorage First Annual Workshop

Slide 1

eStorage First Annual WorkshopArnhem, NL

30, Oct. 2013

Olivier Teller

Energy challenges for the 21st century30 Oct., 20132

Geopolitics tensionsGlobal warmingIncrease in pricesGovernments want to secure their reserves and achieve energy independence. The EC 20-20-20 package aims to increase the share of renewable energies to 20% in the European energy mix by 2020. 2013 eStorage

NGrid operators & the constraint ofintermittent renewables30 Oct., 2013

Grid operatorsBalance the supply & demand of electricityConstantly control grid parameters (voltage, frequency) to avoid outages.Solar & wind powerIntermittentNo direct storage solutionImpact grid stabilityNot optimized, often a loss of a free GHG-free powerGRID CHALLENGESFaster plant regulationIncrease regulation capacityStore renewable power produced when not enough demand 2013 eStorage

NA reliable large-scale storage solution: Pumped Hydro Storage Plants (PSPs)30 Oct., 2013

2013 eStorage

N Improving PSPs: Variable speed technology30 Oct., 2013

Benefits:Additional flexibility: frequency regulation possible in both modesIncreased performance: increased turbine life, higher operation mode

Fixed speedVariable speed 2013 eStorage

N5Our goal is to deploy variable speed PSPs across the EU and to enhance grid management systems to improve renewable energy management.eStorage

A EC-funded consortiumEnergy companiesConsulting firms

321

University

6Use another slide disposition again eStorage logo is too bigEuropean PSP installed Fleet30 Oct., 2013193019521957196219671972197719821987199219972006Year CommissioningInstalled power10,000 MW20,000 MW30,000 MW40,000 MW>30 year old by 2020:Huge opportunity for upgrade 2013 eStorage

NeStorage Project - ObjectivesDemonstrate technical & economic feasibility of upgrading an existing PSP to variable speed technologyEnhance the functionality of IT systems to develop grid management solutions in line with real time market systemsPropose changes to the market and regulatory frameworks and support appropriate business models for flexible energy storageDevelop and assess technologies which enables additional capacity for flexible load balancing by upgrading European pumped storage plants

2013 eStorage

NeStorage focusPSP upgrade to variable speed

Smart energy networks and IT tools

Storage benefits, regulatory framework & market designResults exploitationConversion of 75% of the 40 GW of PSPs installed in the EU to variable speedHighlight the value of PSPs to encourage their developmentGrid management in line with real time markets

Unit test at Le Cheylas, France 2013 eStorage

NDispatching of variable speed unit

Specification and development of IT tool to optimize plant operationDemonstrate Smart dispatch system for variable speed unitsProve value of power variation in pump mode (ancillary services)Demonstrate advantages for conversion of installed PSP units

Value integration of additional flexibilityOutline the business models for flexible energy storage in the EU market context Develop new market rules and associated incentives schemes in a context of renewable resources integration System specification and simulation of an energy management systemDemonstrate potential for installation of new variable speed PSP

9graphic chart not respected for title and bullet pointsNeeds eStorage color codesRework the design as we don't need twice the estorage logo

eStorage benefits all electricity stakeholders

2013 eStorage

NConclusionThe integration of renewable power generation requires large investments for further development of the transmission and distribution infrastructureNew facilities for production, storage, distribution and consumption must support a higher flexibility of the entire electrical energy systemCommon and clear market rules and associated incentive schemes have to be developed to enable the necessary investmentsIn the eStorage project the feasibility of a flexible large-scale energy storage in combination with an innovative market approach will be demonstrated