DIAMOND MINING PROJECT, PANNA(M.P.)

Post on 12-Apr-2017

88 views 2 download

Transcript of DIAMOND MINING PROJECT, PANNA(M.P.)

A VOCATION TRAINING REPORT

ONDIAMOND MINING PROJECT,

PANNA (M.P.)

PRESENTED BY:-ASHISH KU.VISHWAKARMA

CONTENTS• 1. INTRODUCTION• 2. HOW TO REACH MINE• 3. MINE PROFILE• 4. geology• 5. SURVEY • 6. MINE PLAN• 7. unit operation of mines • 8. processing plant • 9. civil work• 10. environmental work• 11. SAFETY FEATURE• 12. accidental case• 13. reference

INTRODUCTION

DIAMOND MINING PROJECT

MAJHGAWAN, PANNA IS A PROJECT OF NATIONAL MINERAL DEVELOPMENT CORPORATION (NMDC)

HOW TO REACH THE MINES

MINE PROFILE• year OF OPENING • NUMBER OF BENCHES• LEASeHOLD AREA• RL OF SURFACE• RL OF BOTTOM• WIDTH OF BENCHES• HEIGHT OF BENCHES• DEPTH OF MINES• INCIDENCE OF DIAMOND• TYPE OF DIAMOND• BLASTING PATTERN• EXPLOSIVE USED• PER BLASTING COAL PRODUCED• TYPE OF MACHINE USED

GEOLOGY• Main intact-• Type of Deposit• Type of material• Overburden• Super group

SURVEY• RL.• BENCHES• DEPTH• INSTRUMENT USED• SHAFT INFORMATION

MINE PLAN• Tailing dump• Stock piles• Scale of mine plan• Mining lease• Other neccesary things

UNIT OPERATION OF MINES• DRILLLING• BLASTING• LOADING• HAULING

DRILLING

•Drill machine.•Depth of drilling.•Burden & spacing.•Diameter of holes.•Time required for one hole.

BLASTING• Types of explosive used.

• Stemming.

• Connection

LOADING• Shovel 1.No of shovel 2.Capacity of shovel 3. Operation• Loader 1.No of loader 2.Capacity of shovel 3.Operation

HAULING• DUMPER 1.No of dumper 2.Capacity of dumper 3. Types of brake

PROCESSING PLANT

CIVIL WORK

ENVIRONMENTAL WORK • Panna tiger reserve• Three test are conducted 1.Ground water monitoring 2.water quality 3.Environmental quality monitoring a.Noise b.Surface water quality c.Ambient air quality

ACCIDENTAL ANALYSISS.N YEAR FATAL SERIOUS REPORTABLE

01. 2011 - - -

02. 2012 - - -

03. 2013 - - -

04. 2014 - - -

05. 2015 - - -

06. 2016 - - -

THANKING YOU