A VOCATION TRAINING REPORT ON UNDERGROUND COAL MINES S.E.C.L. CHURCHA (R.O.)

A VOCATION TRAINING REPORTONDIAMOND MINING PROJECT,PANNA (M.P.)

PRESENTED BY:-ASHISH KU.VISHWAKARMA

CONTENTS1. INTRODUCTION2. HOW TO REACH MINE3. MINE PROFILE4. geology5. SURVEY 6. MINE PLAN7. unit operation of mines 8. processing plant 9. civil work10. environmental work11. SAFETY FEATURE12. accidental case13. reference

INTRODUCTION

DIAMOND MINING PROJECT MAJHGAWAN, PANNA IS A PROJECT OF NATIONAL MINERAL DEVELOPMENT CORPORATION (NMDC)

HOW TO REACH THE MINES

MINE PROFILE

year OF OPENING NUMBER OF BENCHESLEASeHOLD AREARL OF SURFACERL OF BOTTOMWIDTH OF BENCHESHEIGHT OF BENCHESDEPTH OF MINESINCIDENCE OF DIAMONDTYPE OF DIAMONDBLASTING PATTERNEXPLOSIVE USEDPER BLASTING COAL PRODUCEDTYPE OF MACHINE USED

GEOLOGYMain intact-Type of DepositType of materialOverburdenSuper group

SURVEYRL.BENCHESDEPTHINSTRUMENT USED SHAFT INFORMATION

MINE PLANTailing dump Stock pilesScale of mine planMining leaseOther neccesary things

UNIT OPERATION OF MINESDRILLLINGBLASTINGLOADINGHAULING

DRILLING

Drill machine.Depth of drilling.Burden & spacing.Diameter of holes.Time required for one hole.

BLASTINGTypes of explosive used.

Stemming.

Connection

LOADINGShovel 1.No of shovel 2.Capacity of shovel 3. Operation Loader 1.No of loader 2.Capacity of shovel 3.Operation

HAULINGDUMPER 1.No of dumper 2.Capacity of dumper 3. Types of brake

PROCESSING PLANT

CIVIL WORK

ENVIRONMENTAL WORK Panna tiger reserveThree test are conducted 1.Ground water monitoring 2.water quality 3.Environmental quality monitoring a.Noise b.Surface water quality c.Ambient air quality

ACCIDENTAL ANALYSISS.N YEAR FATAL SERIOUS REPORTABLE01.2011 - - -02.2012 - - -03.2013 - - -04.2014 - - -05.2015 - - -06.2016 - - -

THANKING YOU