Cobo Center summer 2013

Post on 18-Jul-2015

109 views 1 download

Tags:

Transcript of Cobo Center summer 2013

Construction Timeline Update

• 30,000 square-foot Atrium (Labor Day 2013)

• 40,000 square-foot Grand Ballroom and 25,000

square-feet of new meeting rooms (Labor Day ‘13)

New Food Court/Cyber Café

8,000 square foot kitchen with tasting room

• Level 3 Function Space and Offices (12/2013)

• Two exterior video walls (12/2013)

• Project completion early 2015

tvsdesign May 16, 2013

COBO CENTER – ATRIUM

tvsdesign May 16, 2013

COBO CENTER – JUNIOR BALLROOMS PREFUNCTION

tvsdesign May 16, 2013

COBO CENTER – SOUTH CONCOURSE 124 LEVEL