371

Post on 15-Feb-2016

2 views 0 download

description

371 howo

Transcript of 371

HOWO HOWO‐371 ON HIGHWAY REAR DUMP TRUCK ‐‐ RIGID BODY

BDT‐R‐304

Start Date ‐‐‐ End Date ‐‐‐ Total Calendar  9 Hours achieve

Frequent Down 1 times

Transmission UB1 MECHANICUB2 MATERIAL / PARTSUB3 FACILITIES / TOOLSUB4 3rd PARTY

18## ## ltr/hr

14 ## ## BDWN ###

7 ## ## STBY/NO WO 0 Transmission3,5 ## ## OPRT 0

POPULATION HOWO-371 5 units

## ## by DURATION hours by FREQUENCIES times

WEEK PERIOD 1

2

3

4

5 25‐Dec

7‐Dec

13‐Dec

19‐Dec

25‐Dec

31‐Dec

108 108 0 0

1‐Dec

7‐Dec

13‐Dec

19‐Dec

‐                       

‐                       10 Day Service

10 Day Service

10 Day Service

‐                       

‐                       

1,67                 

‐                       

UB1 UB2 UB3 UB4

FLEET DELAY HOURS

80% 94% 100% 100% 100%

<42360<42353<42346

1              

FLEET WEEK HOURS DOWN

SCHEDULE

TOP 5 PROBLEM frqUTILIZATION - UA

(%)

0,0%

HIGH

MIDDLELOWLOW

times

0,0%

1‐Dec 10‐Dec

TOP 5 PROBLEM durTOTAL DOWN (hours)

0

AVAILABILITY - PA (%)

MTBF (hours)MTTR (hours)

216,000,0%

hours %

50,0%50,0%

216,00    

DELAY MAINTENANCE (compare to down)

UNSCHEDULE 0,0% 216,00 0,00

BDT‐R‐304

WEEK#DIV/0!

AVAILABILITY - PA (%)

79,8%

79,8%

‐            ‐            ‐            48,0     169,7   

54321

‐                       

0,0%

####

0,0% 100,0%

1                 216,00            

‐                       

Hydraulic Plant 1                 

10 Day Service

10 Day Service

10 Day Service

10 Day Service

10 Day Service

‐                       

0 ltr

10 Day Service ‐                  

10 Day Service ‐                  

FLEET - TOP PROBLEM TREND

10 Day Service ‐                  

10 Day Service ‐                  

10 Day Service ‐                  

10 Day Service ‐                  

10 Day Service ‐                  

10 Day Service ‐                  

Hydraulic Plant

Transmission Hydraulic Plant

Unit Code

BDT‐R‐304

BDT‐R‐302

BDT‐R‐209

BDT‐R‐208

79,8%94,3% 100,0% 100,0% 100,0%

0%

20%

40%

60%

80%

100%

1 2 3 4 5

FLEET PA WEEK (%)

WEEK

108,0  108,0 

‐ ‐

UB1 UB2 UB3 UB4

PT. MUARA BUKIT BILLITONPLANT Department

Key Performance Indicator ‐ UNIT

PA graph

FUEL CONSUMPTION

BDWN100%

STBY/NO WORK

0%

OPRT0%

HOURS DISTRIBUTION

0,00%

85,71%

100,00% 100,00% 100,00%

1 2 3 4 5

Weekly PA (%)

Key Performance Indicator ‐ FLEET

PA graph

on target / achieve

out of target / bad