371

1
HOWO HOWO‐371 ON HIGHWAY REAR DUMP TRUCK ‐‐ RIGID BODY BDT‐R‐304 Start Date ‐‐‐ End Date ‐‐‐ Total Calendar 9 Hours achieve Frequent Down 1 times Transmission UB1 MECHANIC UB2 MATERIAL / PARTS UB3 FACILITIES / TOOLS UB4 3rd PARTY 18 ## ## ltr/hr 14 ## ## BDWN ### 7 ## ## STBY/NO WO 0 Transmission 3,5 ## ## OPRT 0 POPULATION HOWO-371 5 units ## ## by DURATION hours by FREQUENCIES times WEEK PERIOD 1 2 3 4 5 25‐Dec 7‐Dec 13‐Dec 19‐Dec 25‐Dec 31‐Dec 108 108 0 0 1‐Dec 7‐Dec 13‐Dec 19‐Dec 10 Day Service 10 Day Service 10 Day Service 1,67 UB1 UB2 UB3 UB4 FLEET DELAY HOURS 80% 94% 100% 100% 100% <42360 <42353 <42346 1 FLEET WEEK HOURS DOWN SCHEDULE TOP 5 PROBLEM frq UTILIZATION - UA (%) 0,0% HIGH MIDDLE LOW LOW times 0,0% 1‐Dec 10‐Dec TOP 5 PROBLEM dur TOTAL DOWN (hours) 0 AVAILABILITY - PA (%) MTBF (hours) MTTR (hours) 216,00 0,0% hours % 50,0% 50,0% 216,00 DELAY MAINTENANCE (compare to down) UNSCHEDULE 0,0% 216,00 0,00 BDT‐R‐304 WEEK #DIV/0! AVAILABILITY - PA (%) 79,8% 48,0 169,7 5 4 3 2 1 #### 0,0% 100,0% 1 216,00 Hydraulic Plant 1 10 Day Service 10 Day Service 10 Day Service 10 Day Service 10 Day Service 0 ltr 10 Day Service 10 Day Service FLEET - TOP PROBLEM TREND 10 Day Service 10 Day Service 10 Day Service 10 Day Service 10 Day Service 10 Day Service Hydraulic Plant Transmission Hydraulic Plant Unit Code BDT‐R‐304 BDT‐R‐302 BDT‐R‐209 BDT‐R‐208 79,8% 94,3% 100,0% 100,0% 100,0% 0% 20% 40% 60% 80% 100% 1 2 3 4 5 FLEET PA WEEK (%) WEEK 108,0 108,0 UB1 UB2 UB3 UB4 PT. MUARA BUKIT BILLITON PLANT Department Key Performance Indicator ‐ UNIT PA graph FUEL CONSUMPTION BDWN 100% STBY/NO WORK 0% OPRT 0% HOURS DISTRIBUTION 0,00% 85,71% 100,00% 100,00% 100,00% 1 2 3 4 5 Weekly PA (%) Key Performance Indicator ‐ FLEET PA graph on target / achieve out of target / bad

description

371 howo

Transcript of 371

Page 1: 371

HOWO HOWO‐371 ON HIGHWAY REAR DUMP TRUCK ‐‐ RIGID BODY

BDT‐R‐304

Start Date ‐‐‐ End Date ‐‐‐ Total Calendar  9 Hours achieve

Frequent Down 1 times

Transmission UB1 MECHANICUB2 MATERIAL / PARTSUB3 FACILITIES / TOOLSUB4 3rd PARTY

18## ## ltr/hr

14 ## ## BDWN ###

7 ## ## STBY/NO WO 0 Transmission3,5 ## ## OPRT 0

POPULATION HOWO-371 5 units

## ## by DURATION hours by FREQUENCIES times

WEEK PERIOD 1

2

3

4

5 25‐Dec

7‐Dec

13‐Dec

19‐Dec

25‐Dec

31‐Dec

108 108 0 0

1‐Dec

7‐Dec

13‐Dec

19‐Dec

‐                       

‐                       10 Day Service

10 Day Service

10 Day Service

‐                       

‐                       

1,67                 

‐                       

UB1 UB2 UB3 UB4

FLEET DELAY HOURS

80% 94% 100% 100% 100%

<42360<42353<42346

1              

FLEET WEEK HOURS DOWN

SCHEDULE

TOP 5 PROBLEM frqUTILIZATION - UA

(%)

0,0%

HIGH

MIDDLELOWLOW

times

0,0%

1‐Dec 10‐Dec

TOP 5 PROBLEM durTOTAL DOWN (hours)

0

AVAILABILITY - PA (%)

MTBF (hours)MTTR (hours)

216,000,0%

hours %

50,0%50,0%

216,00    

DELAY MAINTENANCE (compare to down)

UNSCHEDULE 0,0% 216,00 0,00

BDT‐R‐304

WEEK#DIV/0!

AVAILABILITY - PA (%)

79,8%

79,8%

‐            ‐            ‐            48,0     169,7   

54321

‐                       

0,0%

####

0,0% 100,0%

1                 216,00            

‐                       

Hydraulic Plant 1                 

10 Day Service

10 Day Service

10 Day Service

10 Day Service

10 Day Service

‐                       

0 ltr

10 Day Service ‐                  

10 Day Service ‐                  

FLEET - TOP PROBLEM TREND

10 Day Service ‐                  

10 Day Service ‐                  

10 Day Service ‐                  

10 Day Service ‐                  

10 Day Service ‐                  

10 Day Service ‐                  

Hydraulic Plant

Transmission Hydraulic Plant

Unit Code

BDT‐R‐304

BDT‐R‐302

BDT‐R‐209

BDT‐R‐208

79,8%94,3% 100,0% 100,0% 100,0%

0%

20%

40%

60%

80%

100%

1 2 3 4 5

FLEET PA WEEK (%)

WEEK

108,0  108,0 

‐ ‐

UB1 UB2 UB3 UB4

PT. MUARA BUKIT BILLITONPLANT Department

Key Performance Indicator ‐ UNIT

PA graph

FUEL CONSUMPTION

BDWN100%

STBY/NO WORK

0%

OPRT0%

HOURS DISTRIBUTION

0,00%

85,71%

100,00% 100,00% 100,00%

1 2 3 4 5

Weekly PA (%)

Key Performance Indicator ‐ FLEET

PA graph

on target / achieve

out of target / bad