Important Facts
Under the Kyoto Protocol overall reductionfor CO2 emissions needs to fall by 20% by2020.
Up to 50% of CO2 emissions related to
residential and commercial buildings is fromelectricity consumption.
If newly constructed buildings performexactly as existing buildings the result by2020 will be an increase in electricityconsumption of 22%.
8/6/2019 01 Bas & Green Gt2
3/46
Important Facts
In order to reach a fall in consumption of20% by 2020 the following has to happen:
1- All new buildings constructed toconsume 50% less energy
2- 1 in 10 existing buildings to reduceconsumption by 30% each year
The ability to meet targets by simply
persuading people to act differently ordeploy new energy saving or energy efficienttechnology is unlikely to succeed.
8/6/2019 01 Bas & Green Gt2
4/46
Important Concepts
Power is nothing without control. If you cant measure it, you cant monitor it.
If you cant monitor it , you cant control it.
If you cant control it, you cant manage it. Management & Control is the KEY to energy
Efficiency
It will cost a lot less to save energy for the
future rather than investing in renewableenergy
8/6/2019 01 Bas & Green Gt2
5/46
Outline
What is a BMS BMS & Green Buildings
BMS Role in Delivering Energy Efficiency
BMS Role in Delivering Water Efficiency BMS Role in Delivering IEQ
BMS Commissioning Process
BMS Role in attaining LEED Certification
BMS Case Study
Discussion and Questions
8/6/2019 01 Bas & Green Gt2
6/46
What is a BMS
What is a BMS
8/6/2019 01 Bas & Green Gt2
7/46
What is a BMS
Benefits of BMS
Energy Management
Supervisory Monitoring & Control Alarm Management
Historical Trends & Logging
Remote View from the Internet Integration & Intelligent Buildings
8/6/2019 01 Bas & Green Gt2
8/46
BMS & Green Buildings
Greenor sustainablebuilding practicesthat help reduce overall energy use andcreate healthier and more efficient buildings
BMS System main role is to do exactly what is
mentioned above
8/6/2019 01 Bas & Green Gt2
9/46
BMS & Green Buildings
BMS & Green Buildings
8/6/2019 01 Bas & Green Gt2
10/46
BMS Role in DeliveringEnergy Efficiency
BMS Role in DeliveringEnergy Efficiency
8/6/2019 01 Bas & Green Gt2
11/46
BMS Role in DeliveringEnergy Efficiency
Energy represents the single largestcontrollable operating expense for officebuildings, typically contributing as much as a
third of a buildings variable expenses.
Only 10% of commercial buildings have aBMS installed
Less than 10% of commercial buildings haveautomated lighting control
8/6/2019 01 Bas & Green Gt2
12/46
BMS Role in DeliveringEnergy Efficiency
A potential of 10 30% of energy savingsexists through installing BMS in buildingsand fully commission them.
8/6/2019 01 Bas & Green Gt2
13/46
BMS Role in DeliveringEnergy Efficiency
BMS can save energy through a variety ofmethods, including:
1- Reduction of Equipment Runtime2- Efficient Unloading of Equipment
3- Automated Fault Detection
4- Monitoring & Targeting
5- Load Shedding
8/6/2019 01 Bas & Green Gt2
14/46
BMS Role in DeliveringWater Efficiency
BMS Role in DeliveringWater Efficiency
8/6/2019 01 Bas & Green Gt2
15/46
BMS Role in DeliveringWater Efficiency
BMS can deliver building water efficiency intwo main areas:-
1- Landscape Irrigation.2- Water Leak Detection
8/6/2019 01 Bas & Green Gt2
16/46
BMS Role in DeliveringWater Efficiency
BMS can control Landscape Irrigation in thefollowing ways:-
1- Open/Close valves for a set duration for aset number of periods per week anddepending on the time of the day and theweather conditions
2- Adding Moisture Sensors
8/6/2019 01 Bas & Green Gt2
17/46
BMS Role in DeliveringWater Efficiency
BMS can monitor if there are water leaks inthe building in the following ways:-
1- Installing Water Leak Detectors
2- Monitoring the Water pressure in closedloop hydronic systems
3- Monitoring Water Tanks levels so that
overflow does not occur4- Monitoring the characteristics of
Wastewater treatment plants
8/6/2019 01 Bas & Green Gt2
18/46
BMS Role in DeliveringIEQ
BMS Role in Delivering IEQ(Indoor Environment Quality)
8/6/2019 01 Bas & Green Gt2
19/46
BMS Role in DeliveringIEQ
Factors regulated by BMS that impact IEQinclude operative temperature, relativehumidity, outdoor air flow rates and light
levels. They can be categorized as follows:-
1- Thermal Comfort
2- Air Quality and Ventilation
2- Lighting Levels
8/6/2019 01 Bas & Green Gt2
20/46
BMS Role in DeliveringIEQ
1- Thermal ComfortThermal comfort for a person is the
combination of proper temperature andproper relative humidity levels
BMS Plays a major role in maintaining thethermal comfort conditions at acceptablelevels
Typically 22-24 C and 40-60% RHo
8/6/2019 01 Bas & Green Gt2
21/46
BMS Role in DeliveringIEQ
2- Air Quality and VentilationBMS plays an important role in ensuring
that minimum outdoor airflow rates areachieved in three areas:-
1- VAV System Control
2- Mixed-Mode Ventilation Systems
3- Dynamic Reset of Outdoor Air IntakeFlows
8/6/2019 01 Bas & Green Gt2
22/46
BMS Role in DeliveringIEQ
3- Lighting LevelsBMS can maintain desired light levels by
either adjusting electric light output orcontrolling the amount of daylight enteringthe building by the following:-
8/6/2019 01 Bas & Green Gt2
23/46
BMS Role in DeliveringIEQ
3- Lighting Levels - continued
a- Measuring Light levels inside the space bythe use of Photocells
b- Brighten or Dim the lights
c- Switch between multiple light levels
d- Raise or Lower window Blinds or adjust
louvers to keep daylighting at comfortablelevels and eliminate glare
8/6/2019 01 Bas & Green Gt2
24/46
BMS CommissioningProcess
BMS Commissioning Process
8/6/2019 01 Bas & Green Gt2
25/46
BMS CommissioningProcess
BMS commissioning process is defined as:
A quality focused process for enhancing the
delivery of a project. The process focusesupon verifying and documenting that thefacility and all of its systems andassemblies are planned, designed,
installed, tested, operated and maintainedto meet the owners project requirements
8/6/2019 01 Bas & Green Gt2
26/46
BMS CommissioningProcess
The design engineer should focus on thefollowing points to facilitate a successfulcommissioning program
1- Include the Commissioning provider in thedesign stage
2- Provide detailed control descriptions
3- Provide detailed control sequences
8/6/2019 01 Bas & Green Gt2
27/46
BMS Role in attainingLEED Certification
BMS Role in attaining LEEDCertification
8/6/2019 01 Bas & Green Gt2
28/46
BMS Role in attainingLEED Certification
The following slides will connect controlmethods with LEED-NC with regards to :
1-Water Efficiency (WE)2- Energy and Atmosphere (EA)
3- Indoor Environmental Quality (EQ)
8/6/2019 01 Bas & Green Gt2
29/46
BMS Role in attainingLEED Certification
1- Water Efficient Landscaping
Reduce by 50%: WE Credit 1.1
2- Fundamental Commissioning
EA Prerequisite 1 and Advanced Commissioning: EA Credit 3
3- Energy Performance
EA Prerequisite 2 (Minimum and Optimized: EA Credit 1
4- Measurement and Verification
EA Credits 5
8/6/2019 01 Bas & Green Gt2
30/46
BMS Role in attainingLEED Certification
5- Indoor Environmental Quality
Outdoor Air Delivery Monitoring: EQ Credit 1
6- Indoor Environmental Quality
Increased Ventilation: EQ Credit 2
7- Indoor Environmental Quality
Construction IAQ Management Plan: EQ Credit 3.2
8- Indoor Environmental Quality
Indoor Chemical and Pollutant Source Control: EQ Credit 5
8/6/2019 01 Bas & Green Gt2
31/46
BMS Role in attainingLEED Certification
9- Controllability of Systems
Lighting: EQ Credit 6.1
10- Controllability of Systems
Thermal Comfort: EQ Credit 6.2
11- Daylight and Views
Daylight 75% of Spaces: EQ Credit 8.1
8/6/2019 01 Bas & Green Gt2
32/46
BMS Case Study
BMS Case Studies
On
Energy EfficiencyWater Efficiency
Indoor Environmental Quality
8/6/2019 01 Bas & Green Gt2
33/46
BMS Case Study
Kempinski Dead Sea Hotel &
Resorts
8/6/2019 01 Bas & Green Gt2
34/46
8/6/2019 01 Bas & Green Gt2
35/46
8/6/2019 01 Bas & Green Gt2
36/46
8/6/2019 01 Bas & Green Gt2
37/46
8/6/2019 01 Bas & Green Gt2
38/46
8/6/2019 01 Bas & Green Gt2
39/46
8/6/2019 01 Bas & Green Gt2
40/46
8/6/2019 01 Bas & Green Gt2
41/46
8/6/2019 01 Bas & Green Gt2
42/46
8/6/2019 01 Bas & Green Gt2
43/46
8/6/2019 01 Bas & Green Gt2
44/46
8/6/2019 01 Bas & Green Gt2
45/46
8/6/2019 01 Bas & Green Gt2
46/46
Questions ?
Thank you!
For more information, please contact
Firas ObeidoSatch-Net Electronic Systems
Tel: + 962 6 4651525 Amman Jordan
Firas.obeido@satchnet.com