FAC review, 10/27 D. Schultz 1 e-Beams System Update Injector System Installation has started. Linac System Preparing for ’06 installation. Controls System.
Stefan Moeller XES [email protected] FAC Review – April 16, 2006 X-Ray Endstation Systems (XES) Status Stefan Moeller.
Javier A. Sevilla Interface & Configuration [email protected] FAC Review April 16, 2007 1 Interface and Configuration Management Outline CF.
Javier A. Sevilla MMF [email protected] FAC Review October 27, 2005 1 Magnetic Measuring Facility (MMF) Outline Summary of Facility Requirements.
LCLS-IISC Parameters Tor Raubenheimer. 2 Operating modes 1.0 - 18 keV (120 Hz) 1.0 - 5 keV (100 kHz) 0.2-1.2 keV (100kHz) 4 GeV SC Linac Two sources:
LCLS-IISC Parameters
Quadrupole Magnet Vibrations and RF Stability