STATO BARREL MU DT Roma 12/3/2007 F. Gasparini BARREL MU INSTALLATION IN YB0 UXC 7/3/2007.
JNE Consulting
SAP ETM – FI PERSPECTIVE.pptx
8 Technical Specs Electrical
Huawei DBS3900 LTE Network Commissioning v1.1
F900713008 Technical Specification_ Light Rev 2013-03-19
EnvisionProject Quick Start Guide
Oxford Group LHCb and CLEO-c Report Why flavour physics matters Status of LHC, LHCb and Oxford group RICH activities Physics activities (including CLEO-c)
ERLP Commissioning Naomi Wyles ASTeC STFC Daresbury Laboratory.
Jon S Kapustinsky 11/17/2010 Jon S Kapustinsky FVTX Commissioning Plan 1.71 Jon S Kapustinsky 1.
July 19, 2003 HEP03, Aachen P. Shanahan MINOS Collaboration 1 STATUS of the MINOS Experiment Argonne Athens Brookhaven Caltech Cambridge Campinas Dubna.
Science Committee Briefing to NAC Plenary July 10, 2008 Edward David (Chair) Jack Burns Owen Garriott Brad Jolliff Charles Kennel Mark Robinson Byron Tapley.