SAP ETM – FI PERSPECTIVE.pptx

33
SAP ETM –FI PERSPECTIVE MOORTHY ESAKKY Lead Consultant RP Techsoft

Transcript of SAP ETM – FI PERSPECTIVE.pptx

SAP ETM FI PERSPECTIVE

SAP ETM FI PERSPECTIVEMOORTHY ESAKKYLead ConsultantRP TechsoftSAP ETM Business Process Time Based Equipment Process Own EquipmentsPerformance Based Equipment ProcessTime Based Equipment Process Rental EquipmentsETM Non-Consumable Material ProcessETM Consumable Material ProcessETM Project Budget ReportEquipment that has been defined as time-based, for example a crane, is usually commissioned for a specific length of time on a specific usage site. This period of time is always settled in days for time-based equipment. The shipping document is used as basis for settlement for time-based equipment. The PBE document is not taken into account for time-based equipment. If it were, settlement would take place twice once using the shipping document and once using the PBE document. Time-based equipment can be an equipment item or multipart equipment.Time Based Equipment ProcessEquipment that has been defined as performance-based, for example an excavator, is usually settled in hours on the basis of the PBE document. The performance-based equipment document is used as basis for settlement for performance-based equipment. If no PBE document has been created for the complete commissioning period, the shipping document is used as a basis for settlement. PBE is usually expensive equipment and managed in stock as an equipment item. To keep the equipment costs as comprehensive as possible, it is usually a good idea to create a separate PM order administrator (cost collector) for each equipment item.Performance Based Equipment Process -PBEThis business process is used if standard material, called non-consumable material e.g. site facilities, ladders etc. has to be shipped from a warehouse to a recipient (debtor master with enhanced ETM view) together with equipment in one ETM shipping document or has to be taken out of a magazine In both ways, non-consumable material is given back to the magazine or the warehouse via ETM shipping document after it has been used. This saves time and costs for transports and administrative effort. Magazines are a kind of little project warehouses on big construction sites/projects.The process in ETM is called sales and repurchase of non consumable material to and from a recipient/project - to and from a warehouse. This means, construction sites buy non consumable material for a fixed price and after the non consumable material is given back to either the magazine or the warehouse a reduced value will be credited to the project (automated repurchase process).ETM Non-Consumable Material ProcessWhen the periodically settlement takes place, projects get debited for the received material and credited for the returned material. So the project pays a kind of provision fee for the usage of the material. Generally the settlement of non consumable material is based on quantity and not on the time period like time based equipment!The cost charging and automated repurchase of non-consumable material is fully automated handled via ETM!

ETM Non-Consumable Material ProcessThis business process is used for shipping standard material, called consumable material (e.g. concrete or nails) together with equipment in one ETM shipping document to reduce transport- and handling costs for projects in construction industry. The cost charging is done by SAP standard Sales and Distribution (SD) and Material Management (MM). ETM only overtakes - logistically seen - the delivery of consumable material.No settlement takes place in ETM for consumable materials!

ETM Consumable Material ProcessTime Based Equipment ProcessCreate ETM Requisition NoteCreate Acquisition Shipping Document and Requirement NoteAssign Equipment and Create Shipping DocumentReturn Equipment Back to the Construction Yard/Warehouse (Create Second Shipping Document)

CEM Sales Order Settlement (Create Sales Order)Log for CEM SD SettlementInternal Cost AllocationExternal Cost AllocationTime Based Equipment ProcessTime-Based Equipment Process Including Third-Party Rental EquipmentCreate ETM Requisition NoteCreate Purchasing Requisition for Rental EquipmentConvert Purchase Requisitions to Purchase OrderPosting Goods ReceiptInvoice VerificationCreate EquipmentCreate Equipment BOMPerformance Based Equipment ProcessETM equipment encompasses objects such as vehicles, equipment, machinery, scaffolding, shuttering and tools that have to be sent and managedOrganization Structure in ETM Controlling areaCompany CodePlantSales organizationDistribution channelDivisionPurchase organizationStorage LocEquipment Eg., Tower crane SK-C 200 Non-Consumable material Ex., Aluminum standing ladder Consumable Material Ex., Metal blade for saw Business RoleWarehouse ClerkProject Manager ECO (DIMP)Project Manager ECOECO Equipment Adminitrator (DIMP)

Time Based Equipment Process (Internal)Create Requisition Note(Availability check)\

Create ETM Requisition Note

Create Acquisition Shipping Document and Requirement Note

Assign Equipment and Create Shipping Document

This step is to assign the Equipment to the Requisition Note and create the shipping document to the graphical planning board.Logistics Equipment and Tools Management Transaction data Planning Requirements Overview Graphical Planning Board- ChangeT Code : /SAPCEM/PT01