Download - Proposed Ground Floor Plan FOR PLANNING 8830 / P

Transcript
Page 1: Proposed Ground Floor Plan FOR PLANNING 8830 / P

-

The Old LibraryAlbion Street, Lewes, East Sussex BN7 2ND

DRAWING NUMBER:

CA

D F

ILE

NA

ME

:

email. [email protected]. 01273 480608

STATUS:

CLIENT:

/Vol

umes

/Cur

rent

Pro

ject

s/C

urre

nt P

roje

cts

Mas

ter-J

ob F

iles/

8800

/883

0 M

erid

ian

Com

mun

ity P

rimar

y S

choo

l - E

xten

sion

/Dra

win

gs/A

rchi

cad

/883

0 M

erid

ain

Exi

stin

g M

k3.p

ln

LOCATION: Peacehaven

DRAWN BY:CHECKED BY:

SJD

REVISION:

RevID ChID Change Name Date

Revision History

PROJECT NAME:

NOTES

This drawing is Copyright and shall not be produced nor used for any other purposewithout the written permission of the Architects.

Do not scale this drawing.

The Contractor is responsible for checking all dimensions on site.Report any discrepancies, errors or omissions to the Architects immediately.

The Contractor shall ensure that all goods, materials and workmanship conform withcurrent British Agrément Certificates, British Standards and Building Regulations,and ensure that all works are executed in full compliance with all current Codes ofPractice and Regulations in respect of Health & Safety.

FOR PLANNING

FOR PLANNING

Meridian School

Emcor UK Ltd

8830 / P.115

SCALE: 1:100

DRAWING TITLE: Proposed Ground FloorPlan

SK

DRAWINGS:

Proposed Ground Floor Plan, ScaleBar

This office is licensed to reproduce Ordnance Survey maps onto drawings butanyone doing so must ensure that this use is acknowledged by displaying thefollowing on all copies of all paper maps:© Crown copyright. All rights reserved. Licence number AR 100006739

SHEET SIZE: A1

GFD - 28U 1

12 R

. @ 0

.163

11 T

. @ 0

.300

1

2

3

4

5

6

7

8

9

10

11

12

12 R

. @ 0

.163

11 T

. @ 0

.300

13

14

15

16

17

18

19

20

21

22

23

24

8 R. @ 0.1507 T. @ 0.300

12345678

2

2

2

2

2

2

2

2

2

2

2

2

2

2

2

2

2

2

2

2

2

2

2

2

2

2

2

2

2

2

2

2

2

2

2

2

2

2

2

2

2

2

2

2

2

2

2

2

2

2

2

2

2

2

A

A

B

B

C

C

E

E

F

F

H

H

I

I

1 1

2 2

3 3

4 4

6 6

D

D

G

G7 7

4a

4b

2.9023.6933.8113.9953.8933.8933.9953.811

1.34

57.

496

3.72

54.

367

3.07

40.

647

8.84

111

.813

4.36

70.

419

2.54

80.

758

2.02

4

3.50

6

7.602

2.860 S.O 0.490 2.998 S.O 1.441 2.860 S.O 0.590 2.998 S.O 1.441 2.998 S.O 0.490 2.860 S.O2.840 Opening

1.200 1.500 1.200 1.200 0.4001.219 C/L 1.519 C/L

2.978 Opening

1.200 1.500 1.200 1.200 0.4001.219 C/L 1.238 C/L 0.419 C/L 1.219 C/L 1.519 C/L 0.419 C/L1.238 C/L1.219 C/L

2.840 Opening 2.978 Opening

0.400 1.200 1.200 1.500 1.2000.419 C/L 1.238 C/L 1.219 C/L 1.219 C/L1.519 C/L

2.978 Opening 2.840 Opening

79°

+ 62.640approx

Gulleydrain

New Linear Drain +62.530 approx.+62.540 approx. At thresholds.

+62.540 approx. At thresholds.

Threshold +62.540 approx.

Threshold +62.540 approx.New Linear Drain +62.530 approx.

New Linear Drain+62.430 approx.

+ 61.280 approx

+ 62.440 approx

+ 62.320 approx

Gully + 62.310approx

+ 62.416 approx

Gully + 62.406approx

+ 62.465 approxS

lope

1:4

0

+ 62.416 approx

Gully + 62.406approxS

lope

1:4

0

Slope 1

:40

Threshold +62.540 approx.

+ 62

.540

app

rox

+ 62.368 approx

Gully + 62.358approx

Slope 1:60 + 62.450 approx

Existing + 62.040approx

8No. steps, 145mmRise, 300mm Going.

Existing Gully Raised+62.310 approx

Existing Gully Raised+62.310 approx

Slope 1:47 to suit falls

Slope 1:41 to suit falls

+ 62.640approx

Slope 1:52 to suit falls

Gully + 62.530approx

+ 63.750approx

+ 62.550 approx

Slo

pe 1

:31

to s

uit f

alls

Threshold+63.750 approx.

Threshold+63.750 approx.

+63.310 approx.

Slop

e 1:

19 to

sui

t

BLINDS BLINDSFire Exit Sign

RWP RWP

RWP RWP

RWP

RWP

AVBB

SFSSFS

D2

D2

AV

SFSSFS

2

2

BBAV

SFSSFS

2

2

BB

AV

SFSSFS

2

2

BBAV

SFSSFS

2

2

BBAV

SFSSFS

2

2

BB

D1 D1 D1

D1

D1

Lift

New soft landscaping

New soft la

ndscapingNew soft landscaping

New soft landscaping

New soft landscaping

Classroom01

A: 55.010 m2

H: 2,900 mmV: 161.60 m3

Classroom02

A: 55.016 m2

H: 2,900 mmV: 162.96 m3

Classroom03

A: 55.010 m2

H: 2,900 mmV: 161.61 m3

Classroom04

A: 55.010 m2

H: 2,900 mmV: 161.64 m3

Classroom05

A: 55.010 m2

H: 2,900 mmV: 161.65 m3

Classroom06

A: 55.010 m2

H: 2,900 mmV: 161.60 m3

Storage07

A: 1.500 m2

Storage08

A: 1.500 m2

Storage09

A: 1.500 m2

Storage10

A: 1.500 m2

Storage11

A: 1.500 m2

Storage12

A: 1.500 m2

Cloaks13

A: 2.486 m2

Cloaks14

A: 2.486 m2

Cloaks15

A: 2.486 m2

Cloaks16

A: 2.486 m2

Cloaks17

A: 2.486 m2

Cloaks18

A: 2.486 m2

Circulation19

A: 21.280 m2

H: 2,900 mm

Circulation20

A: 29.763 m2

H: 2,900 mm

Circulation21

A: 24.277 m2

H: 2,900 mm

Plant22

A: 13.238 m2

H: 3,442 mm

Circulation23

A: 12.223 m2

H: 3,558 mm

2 22 2 22 22 2

2 22 22 22 22

GFD - 04FD 60s

GFD - 05FD 60s

GFW - 01WHD 0.350x2.680

GFW - 07WHD 1.800x1.200

GFW - 02WHD 0.350x2.680

GFW - 08WHD 1.800x1.200

GFD - 06FD 60s

GFD - 07FD 60s

GFW - 03WHD 0.350x2.680

GFW - 09WHD 1.800x1.200

GFW - 04WHD 0.350x2.680

GFW - 10WHD 1.800x1.200

GFD - 08FD 60s

GFD - 09FD 60s

GFW - 05WHD 0.350x2.680

GFW - 12WHD 1.800x1.200

GFW - 06WHD 0.350x2.680

GFW - 11WHD 1.800x1.200

GFD

- 02

FD30

s

GFD

- 03

FD30

s

GFD - 22U 1

GFW - 13WHD 0.600x1.900GFD - 23

U 1

GFD

- 01

FD30

s

GFW

- 14

WH

D0.

600x

2.70

0

GFD - 10FD 30s

GFD - 11FD 30s

GFD - 13FD 30s

GFD - 15FD 30s

GFD - 14FD 30s

GFD - 12FD 30s

5.255

5 5

1:1000 5m 10m

GFW - 33WHD 1.570x1.800

GFW - 34WHD 1.800x2.700

GFD - 28U 1

GFW - 36WHD 1.800x0.800

GFD - 24U 1

GFW - 35WHD 1.800x0.600

GFD - 25U 1

GFD - 26FD 30s

GFD

- 27

FD60

s

8 R. @ 0.1507 T. @ 0.300

12345678

1

2

3

4

6

7

RWP

Circulation24

A: 17.851 m2

H: 2,358 mm

Circulation25

A: 26.443 m2

H: 2,800 mm

Storage26

A: 3.573 m2

GFD

- 01

FD30

s

5

1:100Proposed Ground Floor Plan

S-02

S-02

S-01 S-01

Site

Wes

tEl

evat

ion