WELCOME TO STOCKLEY PARK · Office floor to floor 3,950mm (Ground 4,850mm) Raised floor 150mm...
Embed Size (px)
Transcript of WELCOME TO STOCKLEY PARK · Office floor to floor 3,950mm (Ground 4,850mm) Raised floor 150mm...
-
2 3
-
W E L C O M E T O S T O C K L E Y P A R K T H E N E X T G E N E R T I O N
• 1 0 0 , 0 0 0 S Q F T G R A D E A H E A D Q U A R T E R S B U I L D I N G
• S T R I K I N G Q U A D R U P L E H E I G H T R E C E P T I O N
• 2 4 , 0 0 0 S Q F T F L O O R P L A T E S W I T H F E A T U R E T E R R A C E S
• 3 5 3 C A R P A R K I N G S P A C E S ( 1 : 2 8 0 S Q F T )
• D E D I C A T E D B I K E S T O R A G E , C H A N G I N G A N D S H O W E R F A C I L I T Y
4 5
-
WITH EXCEPTIONAL PROMINENCE AND AN UNRIVALLED
WELCOMING EXPERIENCE, 4 LONGWALK DELIVERS
THE NEW STANDARD FOR GRADE A OFFICE SPACE ON
STOCKLEY PARK.
T H E N T U R A L C H O I C E
6 7
-
8 9
-
V A I L A B I L I T Y 3 5 3 C A R S P A C E SC A R P A R K I N G R A T I O1 : 2 8 0 S Q F T
F I R S T F L O O R – U N D E R O F F E R2 4 , 2 1 0 S Q F T / 2 , 2 4 9 S Q M
G R O U N D F L O O R – L E T2 5 ,1 2 8 S Q F T / 2 , 3 3 4 S Q M R E C E P T I O N 2 , 2 4 2 S Q F T / 2 0 8 S Q M
B I C Y C L E R A C K S S H O W E R A N D C H A N G I N G F A C I L I T I E S
10 11
-
S E C O N D F L O O R 2 5 , 0 1 7 S Q F T / 2 , 3 2 4 S Q M
T H I R D F L O O R 2 4 , 6 2 8 S Q F T / 2 , 2 8 8 S Q MT E R R A C E S S P A C E 6 1 2 S Q F T / 5 6 S Q M
V A I L A B I L I T Y
T E R R A C E S
12 13
-
V A I L A B I L I T Y
Floor Areas (IPMS3) sq ft sq m
Third 24,628 2,288
Second 25,017 2,324.2
First UNDER OFFER
Ground Office LET
Ground Reception 2,242 208.3
Total 51,887 4,820.5
*Third Floor terraces provide an additional 612 sq ft (56.9 sq m)
353 car parking spaces with the entire building (1:280 sq ft)
S P A C E P L A N
1 B U S I N E S S L O U N G E
3 C O F F E E S T A T I O N S
1 3 O F F I C E S
1 C O M M S R O O M
6 S T O R E R O O M S
4 P R I N T H U B A R E A S
3 1 : 1 R O O M S
6 B O O T H S E A T I N G A R E A S
8 P H O N E B O O T H S
3 Q U I E T W O R K I N G A R E A S
5 H U D D L E A R E A S
6 I N F O R M A L M E E T I N G A R E A S
2 T R A I N I N G R O O M S
1 7 8 O P E N P L A N W O R K S T A T I O N S
4 M E E T I N G R O O M S
1 B R E A K O U T A R E A
1 P O S T R O O M
1 B O A R D R O O M
1 W A R R O O M
2 O U T D O O R T E R R A C E S
14 15
-
• BREEAM rating Excellent and energy performance certificate A rating
• 72 cycle bays and 3 motorcycle bays
• 10 car charging points included within the 353 car parking spaces with the entire building (1:280 sq ft)
• Dedicated shower and changing facilities with lockers and drying room
• Recycling stores
• Lighting design controls for optimum energy use
• Heating, ventilation and air conditioning controlled by Building Management System
• Integrated cladding and glazing facade system
• High-performance glazing admitting daylight while minimising solar gain
• Roof-mounted solar panels
S U S T I N A B I L I T Y
16 17
-
• 800 sq ft changing facility
• 9 showers
• 72 lockers
• 72 cycle racks
D E D I C A T E D S H O W E R A N D C H A N G I N G F A C I L I T I E S
18 19
-
20 21
-
1. Parking353 parking spaces with the entire building (1:280 sq ft) including 10 car charging points
72 cycle bays and 3 motorcycle bays
2. OccupancyMeans of escape 1 person/7 sq m
Internal climate 1 person/10 sq m
Lift provision 1 person/7 sq m
Sanitary provision 1 person/10 sq m (60% Male / 60% Female)
3. Air Conditioning Four pipe fan coil air conditioning
Winter 20°C ± 2°C, Summer 24°C ± 2°C
4. Planning Module1.5m
5. Structural Grid9m
6. Floor LoadingsOffice floors 5.0kN/sqm + 1kN/sqm for partitions
Capacity of supporting columns and foundations limited to equivalent total loading of 2.5kN/m2 + 0.8kN/m2 for partitions
Roof plant areas imposed load 5.0kN/sqm
7. Key Dimensions
Office floor to floor 3,950mm (Ground 4,850mm)
Raised floor 150mm overall (Ground 180mm)
Office floor to ceiling 2,800mm (Ground floor 3,600mm)
Ceiling lighting zone 100mm
Services zone 760mm between the beams
Structure 125mm
8. ReceptionQuadruple height reception
Floors: Large format stone tiles. Service void within floor screed to facilitate introduction of security ‘turnstiles’ by tenant
Ceilings: Emulsion paint on plasterboard with recessed downlighters
9. AtriumOpen atrium at ground floor with full height glazing on upper levels
Roof: Exposed aluminium structure supporting glazed panels with louvres integrated into the walls at high level
10. Lifts3 x 17 person passenger lifts in reception and 1 x 2,000kg goods and passenger lift provided to the rear core
11. Internal Finishes - Offices
Walls: Emulsion paint on plasterboard
Floors: 600 x 600mm modular fully accessible steel encapsulated raised floor
Ceilings: 600 x 600mm fully demountable perforated metal tile with plasterboard margins
Doors: Full-height metal framed glass doors to main core; walnut doors to secondary cores and lobbies; satin stainless steel ironmongery to all doors; service and duct doors painted
Balcony Balustrades: Frameless toughened laminated glass
Lighting: LED lighting
Blinds: Installation of recess for tenant to install blinds
12. WCs Wall and Skirting Finishes: Painted, plastered or plasterboard walls
Floor Finishes: Floor screed with ceramic tiled floor
Ceiling Finishes: Plasterboard ceilings with polyester powder-coated access panels in WC cubicles
Vanity Units: Solid surface trough basins with wall mounted water saving taps
Hand Dryers: Recessed stainless steel combination paper towel dispensers and hand dryers
Mirrors: Mirrors to ceiling from vanity unit level and full height mirrors
13. Showers and Cycle Changing Facilities
Shower Facilities: 4 Shower units to each changing area, with 1 fully accessible shower within the rear core at ground floor (9 showers in total)
Wall and Skirting Finishes: Walls to shower cubicles to be tiled with 200 x 200mm module. Painted, plastered or plasterboard walls. Square edged MDF painted skirtings
Floor Finishes: Floor screed with vinyl sheet flooring finish throughout
Ceiling Finishes: 600 x 600mm fully demountable perforated metal suspended ceiling system with plasterboard margins to the locker rooms. Plasterboard ceilings with polyester powder-coated access panels in the shower cubicles only
72 Lockers: Dedicated lockers and drying room within changing areas
14. External FinishesCurtain Walling: Unitised system of polyester powder-coated Aluminium framing with double glazed solar control glass with external shading to front elevations
Cladding: Polyester powder-coated aluminium cladding panels on metal framework to concrete or block walls, aluminium louvres and panels for plant room walls
Roof: Glazed atrium roof
Doors: Metal framed and glazed polyester powder-coated escape doors
G R A D E A , H I G H Q U L I T Y F I N I S H E S T H R O U G H O U T
S P E C I F I C T I O N
22 23
-
West Acton
Chiswick Park
HeathrowTerminals
1,2,3
HeathrowTerminal 4
RavenscourtPark
BaronsCourt
Earl’sCourt
West Kensington
SouthKensington
St James’sPark
Victoria Westminster
PiccadillyCircus
BondStreet
Green ParkHyde Park
CornerHigh StreetKensington
KnightsbridgeGloucester
Road
LancasterGate
TottenhamCourt Road Covent
GardenLeicesterSquare
CharingCross Temple
BlackfriarsMansionHouse
Cannon Street
Bank
Monument Tower Hill
Aldgate
LiverpoolStreet
Moorgate
St. Paul’s
Barbican
Farringdon
King’s CrossSt. Pancras
RussellSquare
ChanceryLane
Embankment
Hammersmith
Shepherd’sBush
GoldhawkRoad
Shepherd’sBush
HollandPark
Notting HillGate
LadbrokeGrove
WestbournePark
Bayswater
Regent’s Park
Paddington
OxfordCircus
WarrenStreet
BakerStreet
EdgwareRoad
EdgwareRoad
GreatPortland
Street
Marylebone
Euston Square
Euston
Marble Arch Holborn
White City
ActonTown
South Ealing
EalingCommon
WestEaling
Hanwell
Southall
SouthGreenford
Northolt
South Ruislip
15Minutes
RuislipGardens
Greenford
Castle BarPark
DraytonGreen
Hayes &Harlington
West DraytonSlough IverMaidenheadReading
Ealing BroadwayNorthActon
ActonMainline
EastActon
Royal Oak
LatimerRoadNorth Ealing
Park Royal
Alperton
Hanger Lane
SudburyTown
SudburyHill
South Harrow
Rayners Lane
Proposed Crossrail line - Due to be completed in 2019
Central Line
Eastcote
West Harrow
Harrow-on-the-Hill
Northwick Park
Preston Road
WembleyPark
Finchley Road
Ruislip Manor
Ruislip
IckenhamUxbridge
Hillingdon
from the North West
Liverpool Manchester Birmingham
from SwindonBath
BristolSouth Wales
Rugby Northampton Milton Keynes
from Glasgow Edinburgh Newcastle
Yorkshire Derby the East Midlands Peterborough
National Rail
Metropolitan Line
Piccadilly Line
District Line
Circle Line
Bakerloo Line
Victoria Line
Hammersmith and City Line
19Minutes
10Minutes
C O N N E C T I O N S
24 25
-
dna
rG
Cno
inU
lana
M2
5
HeathrowAirport
03A
Hayes &Harlington
Metropolitan and Piccadilly Lines
734
A
WestDrayton
Iver
52
M
HattonCross
0204A
21
3A
04M
A4 0
34
A7
Uxbridge
Hillingdon
J15 (M25)
J16 (M25)
J14 (M25)
J13 (M25)
J1 (M40)
J1a (M40)
J4 (M4)
J3 (M4)
HAYES
UXBRIDGE
WEST DRAYTON
80
4A
A4A4
113A
3
4MHGUOLS&GNIDAER
J4b (M4)
80
4A
StockleyPark
C E N T R A L L O N D O N
Piccad
illy Lin
e
Heathrow 6 minutesLondon 30 minutesReading 35 minutesOxford 55 minutesGatwick Airport 45 minutesBrighton 1hr 15 minutesCambridge 1hr 24 minutesBristol 1hr 36 minutesBirmingham 1hr 45 minutesManchester 3hrs 9 minutes
SAT NAV: UB11 1FE
Exceptional connectivity to Four Longwalk right in the heart of thriving Stockley Park.
DRIVE TOLONDON IN ONLY
30 MINUTES
L O C T I O NC O N N E C T I N G T O S T O C K L E Y P R K
L O N D O N C O N N E C T I O N S M A D E E A S Y
Uxbridge Tube Station Paddington Liverpool Street
Hayes & Harlington Rail Station
Hayes & Harlington Rail Station
Heathrow
Bond Street
Paddington
Hayes & Harlington Rail Station
West Drayton Rail Station
Reading
Hayes and Harlington Station
Uxbridge Station Reading Paris 1hr15Dublin 1hr15Amsterdam 1hr15Frankfurt 1hr40Madrid 2hrs15Dubai 7hrsNew York 7hrsSan Francisco 11hrsLos Angeles 11hrs20Hong Kong 11hrs30Cape Town 11hrs40
With connections to 185 destinations (covering 84 countries)
West Drayton Rail Station West Drayton Rail Station
Heathrow Airport Bus Station
Heathrow Terminal 5
Hayes & Harlington Rail Station
Hayes & Harlington Rail Station
Paddington
15 Minutes 15 Minutes 7 Minutes10 Minutes 15 Minutes 25 Minutes
9 Minutes 6 Minutes (Taxi)
6 Minutes (Taxi)
6 Minutes
3 Minutes
16 Minutes
6 Minutes (Taxi)
10 Minutes (Taxi)
29 Minutes
17 Minutes 19 Minutes 10 Minutes (Taxi)
10 Minutes 6 Minutes (Taxi)
20 Minutes
A10 U5350 First Western Heathrow Airport (2 miles)Heathrow Connect Crossrail/Elizabeth Line (Due to be completed in 2019)
26 27
-
Gilead Sciences
Canon Europe
Canon EuropeIBM Toshiba
Volga Dnepr
Mediterranean Shipping Co.
Samsonite
Grass Valley
Coats
Aspect Software
Stockley ParkGolf Course
Hayes and Harlington
West Drayton
Apple
Fiserv
Mitsubishi Heavy Industries
Regus
Hasbro
A408
Celgene Corporation
Lucozade Ribena Suntory
World Vision
Kuehne and Nagel
IMG Productions
Marks & SpencerGlaxo Smith Kline
J4
Long
wal
k Ro
ad
Roun
dwoo
d Ave
nue
M4Heathrow Airport
The Arena(Retail and Leisure)
M25
T H E A R E N A A T S T O C K L E Y P A R K
P R O V I D E S A N E X T E N S I V E C O L L E C T I O N
O F A M E N I T I E S , I N C L U D I N G
R E S T A U R A N T S , C O F F E E S H O P S A N D
B A R S . T H E R E I S A L S O A N U F F I E L D
H E A L T H C L U B A N D S T O C K L E Y P A R K
G O L F C L U B O N S I T E .
F N C Y A R E F R E S H I N G W L K ? Take a stroll around the extensively landscaped park and lakes
S T O C K L E Y P R K
2928
-
For further information contact
Richard [email protected]
James Shillabeer [email protected]
Misrepresentation Act 1967. Unfair Contract Terms Act 1977 The Property Misdescriptions Act 1991. These particulars are issued without any responsibility on the part of the agent and are not to be construed as containing any representation or fact upon which any person is entitled to rely. Neither the agent nor any person in their employ has any authority to make or give any representation or warranty whatsoever in relation to the property. Designed by 90degrees Design and Marketing 0161 833 1890. September 2018
Jonathan Gardiner [email protected]
Stuart Chambers [email protected]
C O N T C T
3130
-
UB11 1FE