WELCOME TO
ANNUAL GENERAL MEETING 2012
19 t h Apri l ,2012 @ Dusit Princess Srinakarin
Organized by PAE (Thailand) Public Co., Ltd.
Sharing Strength For Success
GLCC INSTALLATION DETAILED ENGINEERING FOR PMWI-KPWC & YAWD
STORAGE TANK ON BLQ HELICOPTER REFUELLING SKID MODIFICATION
GLCC INSTALLATION DETAILED ENGINEERING FOR PMWI-KPWC & YAWD
Hydrocarbon BU• Module Systems Fabrication • Pipeline, Piping and Steel Structures Fabrication
FabricationDepartment
(Rayong)
Oil & GasServices
Department(Songkhla)
Hydrocarbon BU• OFFSHORE AND ONSHORE OPERATION & MAINTENANCE
• FABRICATION AND MANPOWER SERVICES (ACCREDITED BY CHEVRON)• PROCUREMENT, EQUIPMENT RENTAL
• Provide Production Unit• Infrastructure Preparation• Pipe & Structural Fabrication and Erection
Hydrocarbon BU
TelecomBusiness Unit
Telecom BU
● Base Station & Network Equipment● Digital Trunked Mobile Radio● Information Technology System● IP Technology
Inspection& NDT
Services
PAE Technical Services
● Welder’s Training institute to attain accreditation
● Safety Training
PAE Technical Services
Top Related