Www.perspectives.cc · [email protected] © 2011 Perspectives GmbH Programme of Activities...

9
www.perspectives.cc · [email protected] © 2011 Perspectives GmbH Programme of Activities Lessons learnt & PoAs as a chance for CDM Host Countries UNFCCC Joint Coordination Workshop 12-13 March 2011, Bonn Perspectives GmbH, Hamburg Marc André Marr

Transcript of Www.perspectives.cc · [email protected] © 2011 Perspectives GmbH Programme of Activities...

Page 1: Www.perspectives.cc · marr@perspectives.cc © 2011 Perspectives GmbH Programme of Activities Lessons learnt & PoAs as a chance for CDM Host Countries UNFCCC.

www.perspectives.cc · [email protected] © 2011 Perspectives GmbH

Programme of ActivitiesLessons learnt &

PoAs as a chance for CDM Host Countries

UNFCCC Joint Coordination Workshop

12-13 March 2011, Bonn

Perspectives GmbH, Hamburg

Marc André Marr

Page 2: Www.perspectives.cc · marr@perspectives.cc © 2011 Perspectives GmbH Programme of Activities Lessons learnt & PoAs as a chance for CDM Host Countries UNFCCC.

www.perspectives.cc · [email protected] 2

PoA specific challenges

Implementation of PoAs

Suitability of CE and interdependencies

DNA related challenges

Very limited or no experience with PoAs

Methodology related challenges

PoA specific requirements and limited suitability (e.g. combination)

Reducing transaction costs?

PoA initially involves higher CDM transaction costs

DOE liability

Result: Contrary to initial idea of the PoA concept “Reduce transaction costs”

Stakeholder interaction and interrelations

Page 3: Www.perspectives.cc · marr@perspectives.cc © 2011 Perspectives GmbH Programme of Activities Lessons learnt & PoAs as a chance for CDM Host Countries UNFCCC.

www.perspectives.cc · [email protected] 3

PoA idea Two PoAs for newly built mini-

hydro power plants for rural electrification (replacing diesel generation)

PoA Case StudyMini hydro-power Africa

Current status Support for Coordinating Entity Business model finalized Project developers identified PoA Idea Notes finished Incentive scheme developed Terms of references Support in promotion material

Page 4: Www.perspectives.cc · marr@perspectives.cc © 2011 Perspectives GmbH Programme of Activities Lessons learnt & PoAs as a chance for CDM Host Countries UNFCCC.

www.perspectives.cc · [email protected] 4

Business Model of the PoA

Rural Electrification Agency will be Coordinating Entity

Supports CPA developers Administers the PoA Responsible for monitoring

CPA developers Construct and operate the projects Conduct on-site monitoring (metering)

Financial institutions Providing soft loans

PoA Case StudyMini hydro-power Africa

Page 5: Www.perspectives.cc · marr@perspectives.cc © 2011 Perspectives GmbH Programme of Activities Lessons learnt & PoAs as a chance for CDM Host Countries UNFCCC.

www.perspectives.cc · [email protected] 5

Key advantages of the PoAs

Enable projects that would otherwise never be realized

No access to finance Insufficient capabilities &

capacities

Support rural electrification in a sustainable way

Lowering the risks for investors and carbon buyers due to established framework

PoA Case StudyMini hydro-power Africa

Page 6: Www.perspectives.cc · marr@perspectives.cc © 2011 Perspectives GmbH Programme of Activities Lessons learnt & PoAs as a chance for CDM Host Countries UNFCCC.

www.perspectives.cc · [email protected] 6

Main challenges of the PoAs

Institutional framework with interrelations and dependencies

Setting up a business model which enables a high participation and being operable

High level of standardization required

PoA Case StudyMini hydro-power Africa

Page 7: Www.perspectives.cc · marr@perspectives.cc © 2011 Perspectives GmbH Programme of Activities Lessons learnt & PoAs as a chance for CDM Host Countries UNFCCC.

www.perspectives.cc · [email protected] 7

What PoAs can achieve

PoAs enable project activities that otherwise would not be realized

PoAs can significantly

Reduce transaction costs

Save time from initial idea to CER issuance

Lower the risks for investors and CER buyers

PoAs are able to set the basis for NAMA development

PoAs can be an attractive additional CDM option

Page 8: Www.perspectives.cc · marr@perspectives.cc © 2011 Perspectives GmbH Programme of Activities Lessons learnt & PoAs as a chance for CDM Host Countries UNFCCC.

www.perspectives.cc · [email protected] 8

What is required for enable a greater use of PoAs?

Increased stakeholder interaction => PoA Working Group

Solution oriented approach

Identify and develop methodological simplifications

Standardization; default factors

Combination of methodologies (pick and choose)

PoA specific methodologies

Clear guidance on Liability (currently playground for DOEs)

Opportunities for up-front financing

Support from UNFCCC (e.g. clear statement, guidelines, case studies)

Page 9: Www.perspectives.cc · marr@perspectives.cc © 2011 Perspectives GmbH Programme of Activities Lessons learnt & PoAs as a chance for CDM Host Countries UNFCCC.

www.perspectives.cc · [email protected] 9

Thank you!

Perspectives GmbH

Marc André MarrHead of Carbon Project Services

[email protected]