WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/25/2019 ITEM DESCRIPTION UNIT FY 17 FY 18 FY 19 108.3100.S Incentive/Disincentive for Interim Completion of Work CD $1.21 $4,154.55 $5,000.00 108.4300 RBC Progress Schedule EACH $1,000.00 $3,000.00 108.4400 CPM Progress Schedule EACH $1,781.54 $5,490.60 $3,016.67 201.0105 Clearing STA $262.16 $373.69 $357.25 201.0110 Clearing SY $3.52 $5.04 $2.94 201.0115 Clearing ACRE $1,983.58 $23,807.74 $5,420.83 201.0120 Clearing ID $15.39 $17.89 $15.39 201.0205 Grubbing STA $206.48 $220.39 $226.81 201.0210 Grubbing SY $3.96 $3.03 $2.23 201.0215 Grubbing ACRE $1,788.18 $6,255.94 $1,124.40 201.0220 Grubbing ID $10.20 $10.70 $8.55 202.0105 Roadside Clearing STA $698.55 $306.57 $621.00 202.0110 Roadside Clearing SY $2.89 $11.18 202.0115 Roadside Clearing ACRE 203.0100 Removing Small Pipe Culverts EACH $364.39 $403.39 $501.69 203.0200 Removing Old Structure (station) LS $35,477.10 $116,391.26 $101,104.27 203.0210.S Abatement of Asbestos Containing Material (structure) LS $4,776.29 $3,021.38 $4,714.56 203.0215.S Abatement of Asbestos Containing Material LS 203.0225.S Debris Containment (structure) LS $4,654.90 $3,748.03 $6,596.37 203.0500.S Removing Old Structure Over Waterway (station) LS $41,083.77 $33,870.55 $11,522.14 203.0600.S Removing Old Structure Over Waterway With Minimal Debris (station) LS $106,551.10 $51,820.62 $65,859.11 203.0700.S Removing Old Structure Over Waterway With Debris Capture System (s LS $107,822.22 $14,062.50 $259,750.00 204.0100 Removing Pavement SY $4.70 $2.92 $6.53 204.0105 Removing Pavement Butt Joints SY $11.03 $8.15 $8.96 204.0109.S Removing Concrete Surface Partial Depth SF $0.53 $0.45 $0.52 204.0110 Removing Asphaltic Surface SY $2.13 $3.43 $2.50 204.0115 Removing Asphaltic Surface Butt Joints SY $8.77 $10.61 $7.91 204.0120 Removing Asphaltic Surface Milling SY $1.26 $1.71 $1.55 204.0125 Removing Asphaltic Surface Milling TON $8.97 $13.29 $9.56 204.0130 Removing Curb LF $4.59 $11.43 $4.09 204.0140 Removing Gutter LF $5.78 204.0150 Removing Curb & Gutter LF $2.89 $3.49 $4.72 Page 1

Transcript of WISCONSIN DEPARTMENT OF TRANSPORTATION - AVERAGE … · wisconsin department of transportation ‐...

 

  

    

 

 

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/25/2019

ITEM DESCRIPTION UNIT FY 17 FY 18 FY 19 108.3100.S Incentive/Disincentive for Interim Completion of Work CD $1.21 $4,154.55 $5,000.00 108.4300 RBC Progress Schedule EACH $1,000.00 $3,000.00 108.4400 CPM Progress Schedule EACH $1,781.54 $5,490.60 $3,016.67 201.0105 Clearing STA $262.16 $373.69 $357.25 201.0110 Clearing SY $3.52 $5.04 $2.94 201.0115 Clearing ACRE $1,983.58 $23,807.74 $5,420.83 201.0120 Clearing ID $15.39 $17.89 $15.39 201.0205 Grubbing STA $206.48 $220.39 $226.81 201.0210 Grubbing SY $3.96 $3.03 $2.23 201.0215 Grubbing ACRE $1,788.18 $6,255.94 $1,124.40 201.0220 Grubbing ID $10.20 $10.70 $8.55 202.0105 Roadside Clearing STA $698.55 $306.57 $621.00 202.0110 Roadside Clearing SY $2.89 $11.18 202.0115 Roadside Clearing ACRE 203.0100 Removing Small Pipe Culverts EACH $364.39 $403.39 $501.69 203.0200 Removing Old Structure (station) LS $35,477.10 $116,391.26 $101,104.27 203.0210.S Abatement of Asbestos Containing Material (structure) LS $4,776.29 $3,021.38 $4,714.56 203.0215.S Abatement of Asbestos Containing Material LS 203.0225.S Debris Containment (structure) LS $4,654.90 $3,748.03 $6,596.37 203.0500.S Removing Old Structure Over Waterway (station) LS $41,083.77 $33,870.55 $11,522.14 203.0600.S Removing Old Structure Over Waterway With Minimal Debris (station) LS $106,551.10 $51,820.62 $65,859.11 203.0700.S Removing Old Structure Over Waterway With Debris Capture System (s LS $107,822.22 $14,062.50 $259,750.00 204.0100 Removing Pavement SY $4.70 $2.92 $6.53 204.0105 Removing Pavement Butt Joints SY $11.03 $8.15 $8.96 204.0109.S Removing Concrete Surface Partial Depth SF $0.53 $0.45 $0.52 204.0110 Removing Asphaltic Surface SY $2.13 $3.43 $2.50 204.0115 Removing Asphaltic Surface Butt Joints SY $8.77 $10.61 $7.91 204.0120 Removing Asphaltic Surface Milling SY $1.26 $1.71 $1.55 204.0125 Removing Asphaltic Surface Milling TON $8.97 $13.29 $9.56 204.0130 Removing Curb LF $4.59 $11.43 $4.09 204.0140 Removing Gutter LF $5.78 204.0150 Removing Curb & Gutter LF $2.89 $3.49 $4.72

Page 1

  

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/25/2019

ITEM DESCRIPTION UNIT FY 17 FY 18 FY 19 204.0155 Removing Concrete Sidewalk SY $4.24 $4.62 $6.12 204.0157 Removing Concrete Barrier LF $9.94 $11.19 $10.78 204.0160 Removing Lip Curb LF 204.0165 Removing Guardrail LF $1.64 $2.04 $2.78 204.0170 Removing Fence LF $1.22 $1.35 $1.88 204.0175 Removing Concrete Slope Paving SY $8.65 $6.29 $20.82 204.0180 Removing Delineators and Markers EACH $13.04 $15.70 $16.49 204.0185 Removing Masonry CY $105.84 $140.51 $104.02 204.0190 Removing Surface Drains EACH $260.34 $263.17 $260.54 204.0195 Removing Concrete Bases EACH $151.85 $231.91 $262.61 204.0200 Removing Railroad Track LF 204.0205 Removing Utility Poles EACH $129.56 $376.00 $170.60 204.0210 Removing Manholes EACH $404.28 $387.98 $439.32 204.0215 Removing Catch Basins EACH $350.64 $231.50 $391.06 204.0220 Removing Inlets EACH $249.17 $264.27 $305.04 204.0225 Removing Septic Tanks EACH $10.00 $4,157.26 $2,364.74 204.0230 Removing Building (station) LS $5,110.38 $5,000.00 204.0235 Removing Buildings (parcel) LS $21,165.05 $182,398.67 $9,481.52 204.0240 Site Clearance (parcel) LS $1,813.00 $9,392.02 $6,865.00 204.0245 Removing Storm Sewer (size) LF $12.45 $12.46 $16.94 204.0250 Abandoning Manholes EACH $825.52 $440.50 $696.33 204.0255 Abandoning Catch Basins EACH $400.00 $270.00 $800.00 204.0260 Abandoning Inlets EACH $690.05 $428.66 $455.26 204.0265 Abandoning Wells EACH $1,500.00 $1,625.00 $1,043.75 204.0270 Abandoning Culvert Pipes EACH $1,066.16 $904.86 $2,939.69 204.0275 Closing Culvert Pipes EACH $500.00 $313.25 $205.00 204.0280 Sealing Pipes EACH $378.14 $700.81 $694.91 204.0291.S Abandoning Sewer CY $165.29 $140.36 $140.40 204.9001.S Removing Advance Flasher Assemblies Type 1 EACH $250.00 204.9002.S Removing Advance Flasher Assemblies Type 2 EACH $388.33 204.9025.S Removing (item description) CF 204.9035.S Removing (item description) CY $9.00

Page 2

   

 

        

 

     

    

 

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/25/2019

ITEM DESCRIPTION UNIT FY 17 FY 18 FY 19 204.9060.S Removing (item description) EACH $101.93 $146.50 $407.15 204.9070.S Removing (item description) GAL 204.9090.S Removing (item description) LF $4.00 $2.14 $3.18 204.9105.S Removing (item description) LS $1,516.37 $2,282.63 $2,784.90 204.9125.S Removing (item description) MI 204.9165.S Removing (item description) SF $0.84 $20.00 $1.64 204.9170.S Removing (item description) STA 204.9180.S Removing (item description) SY $15.00 $1.73 $7.35 204.9195.S Removing (item description) TON 205.0100 Excavation Common CY $5.10 $6.24 $5.04 205.0200 Excavation Rock CY $9.08 $7.50 $9.11 205.0300 Excavation Stone Piles and Stone Fences CY $95.00 $16.67 205.0400 Excavation Marsh CY $2.89 $8.50 $10.07 205.0501.S Excavation, Hauling, and Disposal of Petroleum Contaminated Soil TON $34.32 $34.11 $33.80 205.1300 Presplitting Rock LF $65.00 205.2000.S Settlement Gauges EACH $1,031.25 205.3000.S Temporary Emergency Pullouts EACH $3,876.38 $2,223.83 205.9006.S Grading Shaping and Finishing for Barrier Terminals EACH 205.9010.S Grading and Shaping Intersection (location) LS $4,105.34 $3,368.79 205.9015.S Grading Shaping and Finishing Intersection (location) LS $2,430.42 $11,830.50 $6,730.00 206.1000 Excavation for Structures Bridges (structure) LS $52,867.33 $121,694.19 $84,757.22 206.1050.S Underwater Foundation Inspection (location) EACH $1,833.33 206.2000 Excavation for Structures Culverts (structure) LS $13,975.03 $31,644.06 $10,785.69 206.3000 Excavation for Structures Retaining Walls (structure) LS $57,146.40 $9,135.14 $96,292.31 206.4000 Excavation for Structures Structural Plate Pipe or Pipe Arches (station) LS 206.5000 Cofferdams (structure) LS $40,308.91 $89,449.03 $65,895.66 208.0100 Borrow CY $4.86 $4.97 $5.20 208.1100 Select Borrow CY $5.12 $4.08 $5.83 208.2100.S Fly Ash for Subgrade Stabilization Furnished TON $78.25 208.2110.S Fly Ash Subgrade Stabilization SY $3.20 $9.25 209.0200.S Backfill Controlled Low Strength CY $125.98 $108.56 $102.33 209.0300.S Backfill Coarse Aggregate (size) CY $25.43 $12.03 $38.15

Page 3

       

 

          

   

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/25/2019

ITEM DESCRIPTION UNIT FY 17 FY 18 FY 19 209.1100 Backfill Granular Grade 1 CY $19.24 $21.55 $27.52 209.1500 Backfill Granular Grade 1 TON $17.96 $4.10 $16.44 209.2100 Backfill Granular Grade 2 CY $11.76 $16.66 $25.22 209.2500 Backfill Granular Grade 2 TON $12.14 $4.00 $0.99 210.1100 Backfill Structure Type A CY $21.28 $33.11 $21.00 210.1500 Backfill Structure Type A TON $17.36 $18.92 $21.20 210.2100 Backfill Structure Type B CY $23.76 $30.45 210.2500 Backfill Structure Type B TON $15.42 $20.36 $16.56 211.0100 Prepare Foundation for Asphaltic Paving (project) LS $25,619.90 $16,080.97 $8,140.01 211.0200 Prepare Foundation for Concrete Pavement (project) LS $6,443.00 $10,071.43 $32,239.12 211.0300 Prepare Foundation for Concrete Base (project) LS $500.00 $0.67 $1,000.00 211.0400 Prepare Foundation for Asphaltic Shoulders STA $28.13 $31.58 $53.61 211.0500 Prepare Foundation for Base Aggregate STA $194.67 $140.15 $733.33 211.0600.S Prepare CIR Foundation for HMA Layer (project) EACH 211.0700.S Prepare Foundation for CIR Pavement (project) EACH 211.0800.S Base Repair for CIR Pavement CY 213.0100 Finishing Roadway (project) EACH $1,833.93 $2,128.52 $2,238.99 214.0100 Obliterating Old Road STA $347.31 $428.07 $446.38 305.0110 Base Aggregate Dense 3/4‐Inch TON $16.28 $13.02 $14.80 305.0115 Base Aggregate Dense 3/4‐Inch CY $28.00 $53.42 $34.53 305.0120 Base Aggregate Dense 1 1/4‐Inch TON $8.67 $9.13 $9.87 305.0125 Base Aggregate Dense 1 1/4‐Inch CY $28.04 $20.10 305.0130 Base Aggregate Dense 3‐Inch TON $11.30 $10.60 $12.36 305.0135 Base Aggregate Dense 3‐Inch CY 305.0410 Aggregate Detours TON $18.00 $29.31 $21.82 305.0415 Aggregate Detours CY $23.00 305.0500 Shaping Shoulders STA $18.05 $21.83 $22.75 305.0502.S Shaping Roadway STA $23.64 $250.00 $50.00 305.0504.S Hauling Excess Shoulder Material CY $9.00 $27.08 310.0110 Base Aggregate Open‐Graded TON $16.46 $14.40 $24.10 310.0115 Base Aggregate Open‐Graded CY $32.03 $36.47 $40.05 311.0110 Breaker Run TON $11.26 $12.23 $15.34

Page 4

 

 

 

 

 

 

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/25/2019

ITEM DESCRIPTION UNIT FY 17 FY 18 FY 19 311.0115 Breaker Run CY $21.50 $22.04 $34.00 312.0110 Select Crushed Material TON $8.25 $9.24 $8.60 312.0115 Select Crushed Material CY $15.61 $28.17 $34.87 313.0110 Pit Run TON $0.51 $9.19 313.0115 Pit Run CY $36.79 315.0100 Asphaltic Base TON $149.46 315.0200 Asphaltic Base Widening TON $84.50 $89.50 320.0105 Concrete Base 4‐Inch SY $34.00 $31.20 $44.41 320.0110 Concrete Base 4 1/2‐Inch SY 320.0115 Concrete Base 5‐Inch SY $42.00 320.0120 Concrete Base 5 1/2‐Inch SY 320.0125 Concrete Base 6‐Inch SY $40.54 $39.65 $39.28 320.0130 Concrete Base 6 1/2‐Inch SY $52.00 320.0135 Concrete Base 7‐Inch SY $39.91 $33.70 $85.00 320.0140 Concrete Base 7 1/2‐Inch SY 320.0145 Concrete Base 8‐Inch SY $41.13 $35.28 $58.05 320.0150 Concrete Base 8 1/2‐Inch SY 320.0155 Concrete Base 9‐Inch SY $39.72 $41.86 $49.81 320.0160 Concrete Base 9 1/2‐Inch SY 320.0165 Concrete Base 10‐Inch SY 320.0170 Concrete Base 10 1/2‐Inch SY 320.0305 Concrete Base HES 4‐Inch SY 320.0310 Concrete Base HES 4 1/2‐Inch SY 320.0315 Concrete Base HES 5‐Inch SY 320.0320 Concrete Base HES 5 1/2‐Inch SY 320.0325 Concrete Base HES 6‐Inch SY 320.0330 Concrete Base HES 6 1/2‐Inch SY 320.0335 Concrete Base HES 7‐Inch SY 320.0340 Concrete Base HES 7 1/2‐Inch SY 320.0345 Concrete Base HES 8‐Inch SY $68.00 320.0350 Concrete Base HES 8 1/2‐Inch SY 320.0355 Concrete Base HES 9‐Inch SY $70.62 $43.94 $125.00

Page 5

 

  

        

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/25/2019

ITEM DESCRIPTION UNIT FY 17 FY 18 FY 19 320.0360 Concrete Base HES 9 1/2‐Inch SY 320.0365 Concrete Base HES 10‐Inch SY $53.69 320.0370 Concrete Base HES 10 1/2‐Inch SY 325.0100 Pulverize and Relay SY $1.01 $1.25 $1.27 327.1000.S CIR Asphaltic Pavement SY 330.0100 Mill and Relay SY $2.75 $2.52 $0.60 335.0100 Rubblizing SY $9.60 340.0100 Cracking and Seating SY $0.50 350.0102 Subbase CY $22.50 $19.10 $26.40 350.0104 Subbase TON $15.26 350.0115 Subbase 6‐Inch SY 350.0120 Subbase 7‐Inch SY 350.0125 Subbase 8‐Inch SY $1.80 350.0130 Subbase 9‐Inch SY $6.00 350.0135 Subbase 10‐Inch SY 350.0140 Subbase 11‐Inch SY 350.0145 Subbase 12‐Inch SY $3.35 $2.25 371.1000.S QMP Base Aggregate Dense 1 1/4‐Inch Compaction TON $0.41 $0.20 $0.14 374.1010.S QMP Mill and Relay Compaction SY $0.10 $0.20 $0.15 374.1020.S QMP Pulverize and Relay Compaction SY $0.22 $0.20 $0.20 390.0103 Base Patching SY $75.50 390.0201 Base Patching Asphaltic TON $89.21 $264.80 $248.61 390.0203 Base Patching Asphaltic SY $29.20 $42.04 $92.40 390.0303 Base Patching Concrete SY $52.85 $76.08 $62.77 390.0403 Base Patching Concrete Shes SY $95.91 $139.71 $114.97 405.0100 Coloring Concrete WisDOT Red CY $58.20 $72.43 $74.65 405.0200 Coloring Concrete Custom CY $64.72 $79.50 $82.89 405.1000 Stamping Colored Concrete CY $98.06 $94.00 $107.55 415.0060 Concrete Pavement 6‐Inch SY $51.33 $70.98 $70.21 415.0065 Concrete Pavement 6 1/2‐Inch SY 415.0070 Concrete Pavement 7‐Inch SY $30.96 $41.96 $73.91 415.0075 Concrete Pavement 7 1/2‐Inch SY $30.45 $47.70

Page 6

                         

                

     

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/25/2019

ITEM DESCRIPTION UNIT FY 17 FY 18 FY 19 415.0080 Concrete Pavement 8‐Inch SY $30.07 $36.13 $38.65 415.0085 Concrete Pavement 8 1/2‐Inch SY $36.40 $32.45 $35.91 415.0090 Concrete Pavement 9‐Inch SY $36.69 $39.75 $48.81 415.0095 Concrete Pavement 9 1/2‐Inch SY $40.11 $38.64 $34.02 415.0100 Concrete Pavement 10‐Inch SY $36.49 $40.15 $60.47 415.0105 Concrete Pavement 10 1/2‐Inch SY $39.78 $42.32 $73.41 415.0110 Concrete Pavement 11‐Inch SY $44.71 $38.02 $49.75 415.0115 Concrete Pavement 11 1/2‐Inch SY $85.02 415.0120 Concrete Pavement 12‐Inch SY $37.46 $33.97 $49.51 415.0125 Concrete Pavement 12 1/2‐Inch SY $51.23 $34.99 $52.45 415.0130 Concrete Pavement 13‐Inch SY $31.46 $55.88 415.0135 Concrete Pavement 13 1/2‐Inch SY 415.0210 Concrete Pavement Gaps EACH $829.45 $868.47 $1,162.70 415.0310 Concrete Alley SY 415.0410 Concrete Pavement Approach Slab SY $142.02 $154.76 $171.50 415.1080 Concrete Pavement HES 8‐Inch SY $42.14 $42.53 $55.06 415.1085 Concrete Pavement HES 8 1/2‐Inch SY $38.94 $35.48 $47.40 415.1090 Concrete Pavement HES 9‐Inch SY $71.83 $50.16 $52.60 415.1095 Concrete Pavement HES 9 1/2‐Inch SY $50.00 $44.42 415.1100 Concrete Pavement HES 10‐Inch SY $48.21 $88.09 415.1105 Concrete Pavement HES 10 1/2‐Inch SY $76.69 415.1110 Concrete Pavement HES 11‐Inch SY $80.65 415.1115 Concrete Pavement HES 11 1/2‐Inch SY 415.1120 Concrete Pavement HES 12‐Inch SY $77.12 415.1125 Concrete Pavement HES 12 1/2‐Inch SY 415.1130 Concrete Pavement HES 13‐Inch SY 415.1135 Concrete Pavement HES 13 1/2‐Inch SY 415.1150.S Concrete Pavement Fast Track (inch) SY $89.55 $65.32 $73.60 415.1310 Concrete Alley HES SY 415.1410 Concrete Pavement Approach Slab HES SY $140.04 $172.34 $202.18 415.4100 Concrete Pavement Joint Filling SY $1.11 $1.47 415.5110.S Concrete Pavement Joint Layout LS $1,137.00 $2,579.97

Page 7

    

       

 

    

    

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/25/2019

ITEM DESCRIPTION UNIT FY 17 FY 18 FY 19 415.6000.S Rout and Seal LF $0.80 $1.04 $0.83 416.0160 Concrete Driveway 6‐Inch SY $43.85 $45.74 $50.19 416.0170 Concrete Driveway 7‐Inch SY $46.67 $46.39 $49.38 416.0180 Concrete Driveway 8‐Inch SY $44.99 $48.08 $57.55 416.0190 Concrete Driveway 9‐Inch SY $54.31 $59.84 $73.89 416.0260 Concrete Driveway HES 6‐Inch SY $47.87 $47.85 $52.86 416.0270 Concrete Driveway HES 7‐Inch SY $46.75 $55.05 $57.49 416.0280 Concrete Driveway HES 8‐Inch SY $55.98 $54.93 416.0290 Concrete Driveway HES 9‐Inch SY $55.22 $78.09 416.0512 Concrete Truck Apron 12‐Inch SY $56.58 $63.82 $68.84 416.0610 Drilled Tie Bars EACH $7.58 $7.59 $7.48 416.0620 Drilled Dowel Bars EACH $11.87 $11.77 $11.94 416.0623.S Pavement Dowel Bars Retrofit Warranted EACH 416.0750.S Concrete Pavement Partial Depth Repair Joint Repair LF $21.96 $20.00 416.0752.S Concrete Pavement Partial Depth Repair Crack Repair LF $28.40 $20.00 416.0754.S Concrete Pavement Partial Depth Repair Surface Repair SF $20.00 416.0756.S Concrete Pavement Partial Depth Repair Edge Repair LF $20.00 416.0758.S Concrete Pavement Partial Depth Repair Full Depth Adjustment SF $50.00 $20.00 416.1010 Concrete Surface Drains CY $494.88 $541.16 $680.12 416.1015 Concrete Surface Drains HES CY $614.14 $2,007.61 $741.30 416.1110 Concrete Shoulder Rumble Strips LF $0.32 $0.47 $0.55 416.1180 Concrete Intersection Rumble Strips SY $40.00 416.1710 Concrete Pavement Repair SY $75.64 $94.58 $34.51 416.1715 Concrete Pavement Repair SHES SY $115.03 $134.42 $33.81 416.1720 Concrete Pavement Replacement SY $71.54 $67.97 $0.01 416.1725 Concrete Pavement Replacement SHES SY $97.73 $110.48 $160.23 416.9100.S Filling Concrete Shoulder Rumble Strips (Size) EACH 416.9112.S Filling Concrete Shoulder Rumble Strips 12‐Inch LF 416.9116.S Filling Concrete Shoulder Rumble Strips 16‐Inch LF 416.9118.S Filling Concrete Shoulder Rumble Strips 18‐Inch LF 420.1000 Continuous Diamond Grinding Concrete Pavement SY $4.70 $5.41 $82.54 450.1100.S Asphaltic Mixture For Extreme Conditions TON $8.00 $2.98 $17.55

Page 8

 

     

 

                  

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/25/2019

ITEM DESCRIPTION UNIT FY 17 FY 18 FY 19 450.4000 HMA Cold Weather Paving TON $1.98 $2.32 $2.80 455.0500 Asphaltic Material Seal Coat TON $1,354.90 455.0505 Asphaltic Material Seal Coat GAL 455.0600 Tack Coat TON 455.0605 Tack Coat GAL $2.35 $2.58 $2.70 455.0770.S Asphalt Stabilizing Agent TON 460.0100.S HMA Pavement Test Strip EACH $52,476.13 $45,000.00 460.0105.S HMA Percent Within Limits (PWL) Test Strip Volumetrics EACH $6,299.32 460.0110.S HMA Percent Within Limits (PWL) Test Strip Density EACH $8,577.60 460.2000 Incentive Density HMA Pavement DOL $1.00 $1.00 $1.00 460.2005 Incentive Density PWL HMA Pavement DOL $1.00 $1.00 $1.00 460.2007 Incentive Density HMA Pavement Longitudinal Joints DOL $1.00 $1.00 460.2010 Incentive Air Voids HMA Pavement DOL $1.00 $1.00 $1.00 460.4110.S Reheating HMA Pavement Longitudinal Joints LF $0.18 $0.20 $0.17 460.5223 HMA Pavement 3 LT 58‐28 S TON $51.30 $57.04 $62.99 460.5224 HMA Pavement 4 LT 58‐28 S TON $51.06 $59.16 $65.33 460.5225 HMA Pavement 5 LT 58‐28 S TON $59.20 $62.38 $70.76 460.5243 HMA Pavement 3 LT 58‐34 S TON $172.00 $82.40 460.5244 HMA Pavement 4 LT 58‐34 S TON $55.82 $67.08 $68.80 460.5245 HMA Pavement 5 LT 58‐34 S TON $69.72 460.5424 HMA Pavement 4 LT 58‐28 H TON $74.29 $61.90 $74.80 460.5444 HMA Pavement 4 LT 58‐34 H TON 460.6222 HMA Pavement 2 MT 58‐28 S TON $51.62 460.6223 HMA Pavement 3 MT 58‐28 S TON $53.10 $54.93 $65.05 460.6224 HMA Pavement 4 MT 58‐28 S TON $55.72 $57.65 $61.73 460.6225 HMA Pavement 5 MT 58‐28 S TON $60.00 $70.53 460.6242 HMA Pavement 2 MT 58‐34 S TON 460.6243 HMA Pavement 3 MT 58‐34 S TON $65.46 $70.71 460.6244 HMA Pavement 4 MT 58‐34 S TON $53.16 $69.07 $71.90 460.6245 HMA Pavement 5 MT 58‐34 S TON $79.33 460.6424 HMA Pavement 4 MT 58‐28 H TON $65.39 $62.11 $78.78 460.6425 HMA Pavement 5 MT 58‐28 H TON $99.06 $70.41

Page 9

                                

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/25/2019

ITEM DESCRIPTION UNIT FY 17 FY 18 FY 19 460.6443 HMA Pavement 3 MT 58‐34 H TON $85.59 $85.05 460.6444 HMA Pavement 4 MT 58‐34 H TON $62.60 $64.91 $78.04 460.6445 HMA Pavement 5 MT 58‐34 H TON $74.62 $76.20 $142.72 460.6644 HMA Pavement 4 MT 58‐34 V TON $76.27 460.6645 HMA Pavement 5 MT 58‐34 V TON 460.7222 HMA Pavement 2 HT 58‐28 S TON $50.86 $54.07 $70.84 460.7223 HMA Pavement 3 HT 58‐28 S TON $50.18 $59.23 $58.11 460.7224 HMA Pavement 4 HT 58‐28 S TON $54.83 $61.00 $65.22 460.7225 HMA Pavement 5 HT 58‐28 S TON 460.7242 HMA Pavement 2 HT 58‐34 S TON 460.7243 HMA Pavement 3 HT 58‐34 S TON 460.7244 HMA Pavement 4 HT 58‐34 S TON 460.7245 HMA Pavement 5 HT 58‐34 S TON 460.7422 HMA Pavement 2 HT 58‐28 H TON 460.7423 HMA Pavement 3 HT 58‐28 H TON $83.35 $56.54 $84.38 460.7424 HMA Pavement 4 HT 58‐28 H TON $58.72 $62.69 $69.38 460.7425 HMA Pavement 5 HT 58‐28 H TON $90.30 $101.02 460.7442 HMA Pavement 2 HT 58‐34 H TON 460.7443 HMA Pavement 3 HT 58‐34 H TON $87.25 $95.59 460.7444 HMA Pavement 4 HT 58‐34 H TON $91.25 $77.64 $88.80 460.7445 HMA Pavement 5 HT 58‐34 H TON $95.22 $106.25 460.7624 HMA Pavement 4 HT 58‐28 V TON $80.30 $67.40 $91.77 460.7625 HMA Pavement 5 HT 58‐28 V TON 460.7644 HMA Pavement 4 HT 58‐34 V TON $96.44 $74.17 460.7645 HMA Pavement 5 HT 58‐34 V TON $99.94 460.8424 HMA Pavement 4 SMA 58‐28 H TON $57.30 $77.08 $89.83 460.8425 HMA Pavement 5 SMA 58‐28 H TON 460.8444 HMA Pavement 4 SMA 58‐34 H TON $78.49 $78.43 460.8445 HMA Pavement 5 SMA 58‐34 H TON 460.8624 HMA Pavement 4 SMA 58‐28 V TON $85.00 $68.50 $86.19 460.8625 HMA Pavement 5 SMA 58‐28 V TON $78.00 $365.00 460.8644 HMA Pavement 4 SMA 58‐34 V TON $84.08

Page 10

 

 

 

 

 

 

 

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/25/2019

ITEM DESCRIPTION UNIT FY 17 FY 18 FY 19 460.8645 HMA Pavement 5 SMA 58‐34 V TON $91.05 465.0105 Asphaltic Surface TON $80.39 $78.88 $83.12 465.0110 Asphaltic Surface Patching TON $100.51 $92.49 $117.50 465.0115 Asphaltic Surface Detours TON $66.91 $173.00 $78.56 465.0120 Asphaltic Surface Driveways and Field Entrances TON $109.35 $119.98 $139.08 465.0125 Asphaltic Surface Temporary TON $61.94 $69.74 $74.55 465.0305 Asphaltic Surface Safety Islands TON $188.03 $208.56 $110.26 465.0310 Asphaltic Curb LF $7.50 $8.52 $7.89 465.0315 Asphaltic Flumes SY $50.74 $52.46 $61.96 465.0400 Asphaltic Shoulder Rumble Strips LF $0.18 $0.19 $0.17 465.0425 Asphaltic Shoulder Rumble Strips 2‐Lane Rural LF $0.18 $0.15 $0.25 465.0450 Asphaltic Intersection Rumble Strips SY $60.20 $56.07 $121.88 465.0475 Asphalt Centerline Rumble Strips 2‐Lane Rural LF $0.26 $0.26 $0.28 475.0100 Seal Coat CY 475.0105 Seal Coat TON 492.2010.S Sealing Cracks and Joints with Hot‐Applied Sealant GAL $700.00 $165.71 495.1000.S Cold patch TON $312.00 $189.71 $71.52 501.1000.S Ice Hot Weather Concreting LB $0.17 $0.06 $0.25 502.0100 Concrete Masonry Bridges CY $562.72 $542.52 $550.61 502.0110.S Concrete Masonry Soldier Pile Footings CY $250.00 502.0120.S Non‐Shrink Grout CF 502.0200 Concrete Masonry Bridges HES CY 502.0717.S Crack Sealing Epoxy LF $10.28 $15.78 $2.51 502.1100 Concrete Masonry Seal CY $264.75 $434.99 $253.83 502.2000 Compression Joint Sealer Preformed Elastomeric (width) LF $38.98 $44.79 $62.86 502.3100 Expansion Device (structure) LS $18,686.03 $25,650.88 $36,285.71 502.3101 Expansion Device (structure) LF 502.3110.S Expansion Device Modular (structure) LS $238,000.00 $185,000.00 $315,200.00 502.3111.S Expansion Device Modular (structure) LF 502.3200 Protective Surface Treatment SY $2.39 $2.63 $2.94 502.3210 Pigmented Surface Sealer SY $4.96 $5.16 $8.67 502.3215.S Protective Surface Treatment Reseal SY $1.37 $1.26 $1.34

Page 11

          

 

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/25/2019

ITEM DESCRIPTION UNIT FY 17 FY 18 FY 19 502.4104 Adhesive Anchors 1/2‐inch EACH $25.07 502.4105 Adhesive Anchors 5/8‐inch EACH $25.00 $18.00 502.4106 Adhesive Anchors 3/4‐inch EACH $24.85 $22.23 502.4107 Adhesive Anchors 7/8‐inch EACH 502.4108 Adhesive Anchors 1‐inch EACH $115.00 502.4109 Adhesive Anchors 1 1/8‐inch EACH 502.4110 Adhesive Anchors 1 1/4‐inch EACH $125.00 502.4111 Adhesive Anchors 1 3/8‐inch EACH 502.4112 Adhesive Anchors 1 1/2‐inch EACH 502.4200.S Ruptured Void Repair SY 502.4204 Adhesive Anchors No. 4 Bar EACH $33.47 $12.30 $22.96 502.4205 Adhesive Anchors No. 5 Bar EACH $15.53 $24.40 $25.50 502.4206 Adhesive Anchors No. 6 Bar EACH $23.99 $17.25 $35.15 502.4207 Adhesive Anchors No. 7 Bar EACH $28.95 $33.48 $37.00 502.4208 Adhesive Anchors No. 8 Bar EACH $26.22 $41.94 $37.00 502.4209 Adhesive Anchors No. 9 Bar EACH $30.63 $47.00 502.4210 Adhesive Anchors No. 10 Bar EACH $62.00 $61.00 502.6500 Protective Coating Clear GAL $475.00 $250.00 502.9000.S Underwater Substructure Inspection (Structure) EACH 503.0128 Prestressed Girder Type I 28‐Inch LF $138.53 $162.76 $160.75 503.0136 Prestressed Girder Type I 36‐Inch LF $158.24 $177.96 $212.77 503.0137 Prestressed Girder Type I 36W‐Inch LF $197.35 $156.72 $183.16 503.0145 Prestressed Girder Type I 45‐Inch LF $174.30 $390.00 503.0146 Prestressed Girder Type I 45W‐Inch LF $155.49 $165.89 $181.29 503.0154 Prestressed Girder Type I 54‐Inch LF 503.0155 Prestressed Girder Type I 54W‐Inch LF $161.81 $181.85 $192.00 503.0170 Prestressed Girder Type I 70‐Inch LF 503.0172 Prestressed Girder Type I 72W‐Inch LF $165.00 $156.57 $201.70 503.0182 Prestressed Girder Type I 82W‐Inch LF 503.0400.S Precast Prestressed Concrete Deck Panels (structure) SF 503.1005.S Removing and Resetting Prestressed Girders (structure) LS 504.0100 Concrete Masonry Culverts CY $634.31 $559.60 $621.78

Page 12

                                                            

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/25/2019

ITEM DESCRIPTION UNIT FY 17 FY 18 FY 19 504.0200 Concrete Masonry Culverts HES CY 504.0500 Concrete Masonry Retaining Walls CY $444.01 $526.44 $687.38 504.0600 Concrete Masonry Retaining Walls HES CY 504.0900 Concrete Masonry Endwalls CY $934.29 $1,117.03 $1,429.45 504.1000.S Precast Concrete Wingwalls (structure) LS $24,500.00 $13,759.61 $11,367.50 504.2000.S Precast Concrete Box Culvert (ft X ft) LF $1,617.66 $711.90 $1,124.95 505.0100 Bar Steel Reinforcement Structures LB $0.84 505.0400 Bar Steel Reinforcement HS Structures LB $0.88 $0.94 $1.07 505.0600 Bar Steel Reinforcement HS Coated Structures LB $0.93 $0.99 $1.09 505.0800.S Bar Steel Reinforcement HS Stainless Structures LB $3.21 $3.46 $3.32 505.0904 Bar Couplers No. 4 EACH $34.39 $20.68 $33.36 505.0905 Bar Couplers No. 5 EACH $21.41 $19.69 $28.93 505.0906 Bar Couplers No. 6 EACH $37.83 $37.62 $34.67 505.0907 Bar Couplers No. 7 EACH $32.94 $89.64 $41.29 505.0908 Bar Couplers No. 8 EACH $59.33 $74.06 $52.42 505.0909 Bar Couplers No. 9 EACH $76.39 $30.00 505.0910 Bar Couplers No. 10 EACH $77.00 $119.78 505.0911 Bar Couplers No. 11 EACH $105.00 505.0984.S Bar Couplers Stainless No. 4 EACH 505.0985.S Bar Couplers Stainless No. 5 EACH 505.0986.S Bar Couplers Stainless No. 6 EACH 505.0987.S Bar Couplers Stainless No. 7 EACH 505.0988.S Bar Couplers Stainless No. 8 EACH 505.0989.S Bar Couplers Stainless No. 9 EACH 505.0990.S Bar Couplers Stainless No. 10 EACH 505.0991.S Bar Couplers Stainless No. 11 EACH 505.1000.S Grouted Bar Couplers EACH 506.0105 Structural Steel Carbon LB $3.01 $4.83 $8.63 506.0605 Structural Steel HS LB $1.19 $2.61 $1.45 506.1005 Castings Steel LB 506.1010 Castings Bronze LB 506.1105 Forgings Steel Carbon LB

Page 13

                   

 

  

 

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/25/2019

ITEM DESCRIPTION UNIT FY 17 FY 18 FY 19 506.1405 Lubricated Plates Bronze LB 506.1505 Sheet Copper LB 506.1510 Sheet Zinc LB 506.2605 Bearing Pads Elastomeric Non‐Laminated EACH $91.10 $110.71 $85.46 506.2610 Bearing Pads Elastomeric Laminated EACH $869.44 $968.99 $1,073.85 506.3003 Welded Stud Shear Connectors 5/8x4‐Inch EACH 506.3004 Welded Stud Shear Connectors 3/4x4‐Inch EACH $4.20 506.3005 Welded Stud Shear Connectors 7/8x4‐Inch EACH $5.64 506.3008 Welded Stud Shear Connectors 5/8x5‐Inch EACH $6.33 506.3009 Welded Stud Shear Connectors 3/4x5‐Inch EACH $7.50 506.3010 Welded Stud Shear Connectors 7/8x5‐Inch EACH $11.00 506.3013 Welded Stud Shear Connectors 5/8x6‐Inch EACH 506.3014 Welded Stud Shear Connectors 3/4x6‐Inch EACH $7.94 506.3015 Welded Stud Shear Connectors 7/8x6‐Inch EACH $4.08 $6.60 $5.33 506.3018 Welded Stud Shear Connectors 5/8x7‐Inch EACH 506.3019 Welded Stud Shear Connectors 3/4x7‐Inch EACH 506.3020 Welded Stud Shear Connectors 7/8x7‐Inch EACH $3.75 $6.84 506.3023 Welded Stud Shear Connectors 5/8x8‐Inch EACH 506.3024 Welded Stud Shear Connectors 3/4x8‐Inch EACH 506.3025 Welded Stud Shear Connectors 7/8x8‐Inch EACH $3.80 $5.66 506.3030 Welded Stud Shear Connectors 7/8x9‐Inch EACH 506.3035 Welded Stud Shear Connectors 7/8x10‐Inch EACH 506.4000 Steel Diaphragms (structure) EACH $834.33 $859.57 $743.99 506.5000 Bearing Assemblies Fixed (structure) EACH $1,150.74 $1,480.29 $1,000.00 506.6000 Bearing Assemblies Expansion (structure) EACH $1,300.55 $1,615.37 $2,428.57 506.7000.S Bearing Replacement (structure) EACH 506.7050.S Removing Bearings (structure) EACH $1,146.99 $1,177.57 $1,770.31 506.7060.S Bridge Jacking (structure) LS $85,000.00 $40,000.00 506.7070.S Hinge Replacement EACH $7,500.00 506.8005.S Prefabricated Steel Truss Pedestrian Bridge LRFD (structure) LS $300,000.00 507.0200 Treated Lumber and Timber MBM $3,507.50 509.0200 Preparation Approaches SY $0.90

Page 14

   

   

 

 

   

  

   

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/25/2019

ITEM DESCRIPTION UNIT FY 17 FY 18 FY 19 509.0250 Preparation Approaches SY 509.0301 Preparation Decks Type 1 SY $123.41 $140.02 $167.44 509.0302 Preparation Decks Type 2 SY $130.56 $136.49 $228.01 509.0310.S Sawing Pavement Deck Preparation Areas LF $4.11 $2.15 509.0351 Preparation Decks Type 1 SY $275.00 509.0352 Preparation Decks Type 2 SY $575.00 509.0400.S Cleaning Concrete Surfaces SY $18.90 509.0500 Cleaning Decks SY $11.38 $18.42 $24.99 509.0505.S Cleaning Decks to Reapply Concrete Masonry Overlay SY $7.30 509.0600 Cleaning Approaches SY $25.00 $24.30 509.1000 Joint Repair SY $930.09 $1,086.63 $1,274.31 509.1050 Joint Repair SY $1,700.00 509.1200 Curb Repair LF $69.07 $64.85 $67.74 509.1250 Curb Repair LF $300.00 509.1500 Concrete Surface Repair SF $105.32 $154.21 $133.58 509.2000 Full‐Depth Deck Repair SY $233.84 $346.32 $477.51 509.2050 Full‐Depth Deck Repair SY $1,000.00 509.2100.S Concrete Masonry Deck Repair CY $530.93 $738.45 509.2500 Concrete Masonry Overlay Decks CY $595.01 $870.04 $891.10 509.2550 Concrete Masonry Overlay Decks SY $56.00 509.2600 Concrete Masonry Overlay Approaches CY $638.00 $1,330.75 509.2650 Concrete Masonry Overlay Approaches SY 509.3500.S HMA Overlay Polymer‐Modified TON $978.46 $828.93 $542.00 509.5100.S Polymer Overlay SY $28.17 $28.99 $29.66 509.9005.S Removing Concrete Masonry Deck Overlay (structure) SY $15.17 $18.85 $15.80 509.9010.S Removing Asphaltic Concrete Deck Overlay (structure) SY $6.74 $10.35 $13.72 509.9015.S Removing Polymer Overlay (structure) SY $15.43 509.9020.S Epoxy Crack Sealing LF $27.15 $75.56 $165.00 509.9025.S Epoxy Injection Crack Repair LF $78.05 $83.86 $82.69 509.9026.S Cored Holes 2‐Inch Diameter EACH $365.71 $216.67 $491.43 509.9050.S Cleaning Parapets LF $6.68 $10.68 $6.08 511.1100 Temporary Shoring SF $21.44 $25.70 $16.34

Page 15

 

     

  

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/25/2019

ITEM DESCRIPTION UNIT FY 17 FY 18 FY 19 511.1200 Temporary Shoring (structure) SF $30.58 $16.25 $21.35 511.1300 Temporary Shoring (location) SF $0.01 $2.35 $0.01 511.2200 Temporary Shoring Left in Place (structure) SF $50.00 $11.57 $0.01 511.2300 Temp Shoring Left in Place (location) SF $35.25 $13.65 $0.01 512.0500 Piling Steel Sheet Permanent Delivered SF $19.88 $30.49 $41.52 512.0600 Piling Steel Sheet Permanent Driven SF $2.97 $6.16 $5.52 512.1000 Piling Steel Sheet Temporary SF $20.00 $22.50 $15.00 513.2001 Railing Pipe LF $121.25 $120.31 $213.15 513.4051 Railing Tubular Type F LF 513.4056 Railing Tubular Type H LF $260.00 $210.00 513.4061 Railing Tubular Type M LF $203.16 $233.21 $245.03 513.4066 Railing Tubular Type PF LF 513.4091 Railing Tubular Screening LF $137.12 $143.95 $165.05 513.7006 Railing Steel Type C1 LF $180.00 $175.00 513.7011 Railing Steel Type C2 LF $119.62 $141.01 $250.00 513.7016 Railing Steel Type C3 LF $162.04 $132.72 $165.54 513.7021 Railing Steel Type C4 LF $143.98 513.7026 Railing Steel Type C5 LF $150.00 513.7031 Railing Steel Type C6 LF $170.00 513.7051 Railing Steel Type W LF 513.7083 Railing Steel Type NY3 LF $330.00 $226.39 $340.00 513.7084 Railing Steel Type NY4 LF $183.59 $190.00 $280.03 513.7093 Railing Steel Type 3T LF $190.00 513.8006 Railing Steel Pedestrian Type C1 LF $127.27 513.8011 Railing Steel Pedestrian Type C2 LF $214.07 $186.58 $205.18 513.8016 Railing Steel Pedestrian Type C3 LF $171.81 $130.00 $160.00 513.8021 Railing Steel Pedestrian Type C4 LF $178.46 513.8026 Railing Steel Pedestrian Type C5 LF $175.00 513.8031 Railing Steel Pedestrian Type C6 LF $185.00 513.9005.S Removing and Resetting Tubular Railing (structure) LS $5,000.00 $12,000.00 $5,000.00 514.0445 Floor Drains Type GC EACH $1,270.91 $2,270.59 $2,071.43 514.0450 Floor Drains Type WF EACH $1,752.00 $2,326.32

Page 16

 

 

    

    

  

   

    

      

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/25/2019

ITEM DESCRIPTION UNIT FY 17 FY 18 FY 19 514.0460 Floor Drains Type H EACH 514.0900 Adjusting Floor Drains EACH $750.00 $950.00 514.1000 Railroad Deck Drains System (railroad structure) LS 514.2608 Downspout 8‐Inch LF $192.74 $154.12 514.2625 Downspout 6‐Inch LF $163.78 $206.71 $147.41 515.4000 Steel Grid Floor Open (inch) SF 515.5000 Steel Grid Floor Concrete Filled (inch) SF 516.0100 Dampproofing SY $11.70 $20.00 $30.99 516.0500 Rubberized Membrane Waterproofing SY $31.53 $25.70 $37.27 516.0600.S Sheet Membrane Waterproofing SY $35.00 516.0610.S Sheet Membrane Waterproofing for Top Slab (structure) SY $54.00 $46.04 $36.22 517.0600 Painting Epoxy System (structure) LS $60,521.88 $13,788.18 $31,537.50 517.0650.S Painting Polysiloxane System (structure) LS 517.0700.S Painting Vinyl System (structure) LS 517.0900.S Preparation and Coating of Top Flanges (structure) LS $10,990.29 $10,955.29 $22,045.18 517.1000 Painting Epoxy System Steel Truss (structure) LS $16,000.00 517.1000.S Structure Repainting Organic Zinc Rich System (structure) LS 517.1010.S Concrete Staining (structure) SF $1.08 $1.05 $1.05 517.1015.S Concrete Staining Multi‐Color (structure) SF $2.59 $2.46 $7.33 517.1050.S Architectural Surface Treatment (structure) SF $2.98 $2.84 $2.39 517.1800.S Structure Repainting Recycled Abrasive (structure) LS $221,864.56 $315,993.33 $142,717.78 517.2000.S Painting Warranted (structure) LS $300.00 517.3000.S Structure Overcoating Cleaning and Priming (structure) LS $34,356.15 $30,523.64 $8,613.14 517.4000.S Containment and Collection of Waste Materials (structure) LS $6,025.00 $20,840.00 $3,351.14 517.4500.S Negative Pressure Containment and Collection of Waste Materials (stru LS $84,760.90 $120,897.59 $50,410.91 517.6001.S Portable Decontamination Facility EACH $1,540.54 $2,129.63 $1,651.95 520.1012 Apron Endwalls for Culvert Pipe 12‐Inch EACH $512.17 $433.41 $582.35 520.1015 Apron Endwalls for Culvert Pipe 15‐Inch EACH $569.76 $265.46 $277.38 520.1018 Apron Endwalls for Culvert Pipe 18‐Inch EACH $281.53 $258.75 $310.82 520.1021 Apron Endwalls for Culvert Pipe 21‐Inch EACH 520.1024 Apron Endwalls for Culvert Pipe 24‐Inch EACH $539.88 $382.96 $293.16 520.1030 Apron Endwalls for Culvert Pipe 30‐Inch EACH $557.03 $607.89 $464.63

Page 17

       

             

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/25/2019

ITEM DESCRIPTION UNIT FY 17 FY 18 FY 19 520.1036 Apron Endwalls for Culvert Pipe 36‐Inch EACH $743.34 $670.23 $618.46 520.1042 Apron Endwalls for Culvert Pipe 42‐Inch EACH $838.50 $1,363.64 $1,007.50 520.1048 Apron Endwalls for Culvert Pipe 48‐Inch EACH $898.28 $1,642.88 $1,313.50 520.1054 Apron Endwalls for Culvert Pipe 54‐Inch EACH $1,076.00 $1,150.00 520.1060 Apron Endwalls for Culvert Pipe 60‐Inch EACH $1,600.00 $2,650.00 $1,550.00 520.1072 Apron Endwalls for Culvert Pipe 72‐Inch EACH 520.1084 Apron Endwalls for Culvert Pipe 84‐Inch EACH 520.2012 Culvert Pipe Temporary 12‐Inch LF $35.32 $36.51 $33.01 520.2015 Culvert Pipe Temporary 15‐Inch LF $31.29 $40.63 $40.00 520.2018 Culvert Pipe Temporary 18‐Inch LF $29.55 $36.68 $43.59 520.2021 Culvert Pipe Temporary 21‐Inch LF 520.2024 Culvert Pipe Temporary 24‐Inch LF $37.59 $55.02 $52.10 520.2030 Culvert Pipe Temporary 30‐Inch LF $51.00 $87.80 $495.00 520.2036 Culvert Pipe Temporary 36‐Inch LF $76.64 $118.42 $50.00 520.2042 Culvert Pipe Temporary 42‐Inch LF 520.2048 Culvert Pipe Temporary 48‐Inch LF $120.09 $4.64 520.2054 Culvert Pipe Temporary 54‐Inch LF 520.2060 Culvert Pipe Temporary 60‐Inch LF $120.00 520.2072 Culvert Pipe Temporary 72‐Inch LF 520.2084 Culvert Pipe Temporary 84‐Inch LF 520.3142 Culvert Pipe Class III 42‐Inch LF $83.75 $93.50 520.3148 Culvert Pipe Class III 48‐Inch LF $107.00 $119.08 $137.41 520.3154 Culvert Pipe Class III 54‐Inch LF $109.00 $110.00 520.3160 Culvert Pipe Class III 60‐Inch LF 520.3172 Culvert Pipe Class III 72‐Inch LF 520.3184 Culvert Pipe Class III 84‐Inch LF 520.3312 Culvert Pipe Class III‐A 12‐Inch LF $36.16 $38.31 $39.63 520.3315 Culvert Pipe Class III‐A 15‐Inch LF $50.45 $38.29 $38.74 520.3318 Culvert Pipe Class III‐A 18‐Inch LF $41.46 $37.30 $46.05 520.3321 Culvert Pipe Class III‐A 21‐Inch LF 520.3324 Culvert Pipe Class III‐A 24‐Inch LF $53.36 $52.33 $60.83 520.3327 Culvert Pipe Class III‐A 27‐Inch LF

Page 18

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/25/2019

ITEM DESCRIPTION UNIT FY 17 FY 18 FY 19 520.3330 Culvert Pipe Class III‐A 30‐Inch LF $61.35 $57.79 $91.37 520.3336 Culvert Pipe Class III‐A 36‐Inch LF $108.99 $79.84 $104.14 520.3412 Culvert Pipe Class III‐A Non‐metal 12‐Inch LF $25.00 $24.75 $102.26 520.3415 Culvert Pipe Class III‐A Non‐metal 15‐Inch LF $27.35 520.3418 Culvert Pipe Class III‐A Non‐metal 18‐Inch LF $28.00 $30.78 $44.63 520.3421 Culvert Pipe Class III‐A Non‐metal 21‐Inch LF 520.3424 Culvert Pipe Class III‐A Non‐metal 24‐Inch LF $118.64 $81.84 $69.00 520.3427 Culvert Pipe Class III‐A Non‐metal 27‐Inch LF 520.3430 Culvert Pipe Class III‐A Non‐metal 30‐Inch LF $104.39 $66.28 $120.00 520.3436 Culvert Pipe Class III‐A Non‐metal 36‐Inch LF $214.50 $96.00 520.3512 Culvert Pipe Class III‐B 12‐Inch LF $26.00 $49.00 520.3515 Culvert Pipe Class III‐B 15‐Inch LF $28.00 $54.00 520.3518 Culvert Pipe Class III‐B 18‐Inch LF $33.94 $20.00 520.3521 Culvert Pipe Class III‐B 21‐Inch LF 520.3524 Culvert Pipe Class III‐B 24‐Inch LF $38.13 $44.85 520.3527 Culvert Pipe Class III‐B 27‐Inch LF 520.3530 Culvert Pipe Class III‐B 30‐Inch LF $50.00 $61.26 520.3536 Culvert Pipe Class III‐B 36‐Inch LF $61.60 $97.58 520.3612 Culvert Pipe Class III‐B Non‐metal 12‐Inch LF 520.3615 Culvert Pipe Class III‐B Non‐metal 15‐Inch LF 520.3618 Culvert Pipe Class III‐B Non‐metal 18‐Inch LF 520.3621 Culvert Pipe Class III‐B Non‐metal 21‐Inch LF 520.3624 Culvert Pipe Class III‐B Non‐metal 24‐Inch LF 520.3627 Culvert Pipe Class III‐B Non‐metal 27‐Inch LF 520.3630 Culvert Pipe Class III‐B Non‐metal 30‐Inch LF 520.3636 Culvert Pipe Class III‐B Non‐metal 36‐Inch LF 520.4112 Culvert Pipe Class IV 12‐Inch LF $41.46 $32.27 520.4115 Culvert Pipe Class IV 15‐Inch LF $43.26 $43.92 $73.10 520.4118 Culvert Pipe Class IV 18‐Inch LF $47.72 $40.40 $71.40 520.4121 Culvert Pipe Class IV 21‐Inch LF 520.4124 Culvert Pipe Class IV 24‐Inch LF $58.10 $48.71 520.4130 Culvert Pipe Class IV 30‐Inch LF $71.40 $60.00 $66.79

Page 19

                     

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/25/2019

ITEM DESCRIPTION UNIT FY 17 FY 18 FY 19 520.4136 Culvert Pipe Class IV 36‐Inch LF $78.85 520.4142 Culvert Pipe Class IV 42‐Inch LF $163.00 520.4148 Culvert Pipe Class IV 48‐Inch LF $109.00 520.4154 Culvert Pipe Class IV 54‐Inch LF $124.50 520.4160 Culvert Pipe Class IV 60‐Inch LF $162.50 520.4172 Culvert Pipe Class IV 72‐Inch LF 520.4184 Culvert Pipe Class IV 84‐Inch LF 520.5112 Culvert Pipe Class V 12‐Inch LF 520.5115 Culvert Pipe Class V 15‐Inch LF $54.82 520.5118 Culvert Pipe Class V 18‐Inch LF 520.5121 Culvert Pipe Class V 21‐Inch LF 520.5124 Culvert Pipe Class V 24‐Inch LF $82.00 520.5130 Culvert Pipe Class V 30‐Inch LF 520.5136 Culvert Pipe Class V 36‐Inch LF 520.5142 Culvert Pipe Class V 42‐Inch LF 520.5148 Culvert Pipe Class V 48‐Inch LF 520.5154 Culvert Pipe Class V 54‐Inch LF 520.5160 Culvert Pipe Class V 60‐Inch LF 520.5172 Culvert Pipe Class V 72‐Inch LF 520.5184 Culvert Pipe Class V 84‐Inch LF 520.8000 Concrete Collars for Pipe EACH $488.00 $494.01 $556.28 520.8500 Pipe Cattle Pass LF $242.00 520.8700 Cleaning Culvert Pipes EACH $781.63 $920.31 $830.82 520.9700.S Culvert Pipe Liners (size) LF $140.81 $113.22 $197.43 520.9750.S Cleaning Culvert Pipes for Liner Verification EACH $655.13 $822.07 $655.00 521.0336 Apron Endwalls for Culvert Pipe Sloped Cross Drains Steel 36‐Inch 4 to 1 EACH $2,190.00 $2,510.00 $2,700.00 521.0342 Apron Endwalls for Culvert Pipe Sloped Cross Drains Steel 42‐Inch 4 to 1 EACH $3,607.00 $3,365.00 521.0348 Apron Endwalls for Culvert Pipe Sloped Cross Drains Steel 48‐Inch 4 to 1 EACH $4,132.73 $6,050.00 521.0354 Apron Endwalls for Culvert Pipe Sloped Cross Drains Steel 54‐Inch 4 to 1 EACH 521.0360 Apron Endwalls for Culvert Pipe Sloped Cross Drains Steel 60‐Inch 4 to 1 EACH $7,331.00 521.0436 Apron Endwalls for Culvert Pipe Sloped Cross Drains Steel 36‐Inch 6 to 1 EACH $3,522.96 521.0442 Apron Endwalls for Culvert Pipe Sloped Cross Drains Steel 42‐Inch 6 to 1 EACH

Page 20

                                                              

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/25/2019

ITEM DESCRIPTION UNIT FY 17 FY 18 FY 19 521.0448 Apron Endwalls for Culvert Pipe Sloped Cross Drains Steel 48‐Inch 6 to 1 EACH 521.0454 Apron Endwalls for Culvert Pipe Sloped Cross Drains Steel 54‐Inch 6 to 1 EACH 521.0460 Apron Endwalls for Culvert Pipe Sloped Cross Drains Steel 60‐Inch 6 to 1 EACH 521.0535 Apron Endwalls for Pipe Arch Sloped Cross Drains Steel 35x24‐Inch 4 to  EACH $1,560.00 521.0542 Apron Endwalls for Pipe Arch Sloped Cross Drains Steel 42x29‐Inch 4 to  EACH $2,532.63 $2,968.00 521.0549 Apron Endwalls for Pipe Arch Sloped Cross Drains Steel 49x33‐Inch 4 to  EACH 521.0557 Apron Endwalls for Pipe Arch Sloped Cross Drains Steel 57x38‐Inch 4 to  EACH $4,976.00 521.0564 Apron Endwalls for Pipe Arch Sloped Cross Drains Steel 64x43‐Inch 4 to  EACH $5,164.00 521.0571 Apron Endwalls for Pipe Arch Sloped Cross Drains Steel 71x47‐Inch 4 to  EACH $7,720.00 521.0635 Apron Endwalls for Pipe Arch Sloped Cross Drains Steel 35x24‐Inch 6 to  EACH 521.0642 Apron Endwalls for Pipe Arch Sloped Cross Drains Steel 42x29‐Inch 6 to  EACH 521.0649 Apron Endwalls for Pipe Arch Sloped Cross Drains Steel 49x33‐Inch 6 to  EACH 521.0657 Apron Endwalls for Pipe Arch Sloped Cross Drains Steel 57x38‐Inch 6 to  EACH $7,150.00 521.0664 Apron Endwalls for Pipe Arch Sloped Cross Drains Steel 64x43‐Inch 6 to  EACH 521.0671 Apron Endwalls for Pipe Arch Sloped Cross Drains Steel 71x47‐Inch 6 to  EACH 521.1012 Apron Endwalls for Culvert Pipe Steel 12‐Inch EACH $154.49 $203.98 $115.28 521.1015 Apron Endwalls for Culvert Pipe Steel 15‐Inch EACH $184.64 $256.99 $249.18 521.1018 Apron Endwalls for Culvert Pipe Steel 18‐Inch EACH $174.81 $330.56 $236.12 521.1021 Apron Endwalls for Culvert Pipe Steel 21‐Inch EACH $197.20 $275.00 521.1024 Apron Endwalls for Culvert Pipe Steel 24‐Inch EACH $262.78 $310.18 $525.02 521.1030 Apron Endwalls for Culvert Pipe Steel 30‐Inch EACH $449.28 $384.43 $420.75 521.1036 Apron Endwalls for Culvert Pipe Steel 36‐Inch EACH $586.91 $667.88 $794.73 521.1042 Apron Endwalls for Culvert Pipe Steel 42‐Inch EACH $982.86 $1,149.27 $1,447.00 521.1048 Apron Endwalls for Culvert Pipe Steel 48‐Inch EACH $1,043.56 $1,030.73 $1,086.73 521.1054 Apron Endwalls for Culvert Pipe Steel 54‐Inch EACH $1,150.00 $1,070.00 521.1060 Apron Endwalls for Culvert Pipe Steel 60‐Inch EACH $1,620.50 $1,658.00 $2,135.40 521.1072 Apron Endwalls for Culvert Pipe Steel 72‐Inch EACH $1,750.00 $1,870.00 $2,530.00 521.1084 Apron Endwalls for Culvert Pipe Steel 84‐Inch EACH 521.1217 Apron Endwalls for Pipe Arch Steel 17x13‐Inch EACH $253.00 $356.04 $288.00 521.1221 Apron Endwalls for Pipe Arch Steel 21x15‐Inch EACH $533.25 $175.00 $220.00 521.1224 Apron Endwalls for Pipe Arch Steel 24x18‐Inch EACH $236.00 521.1228 Apron Endwalls for Pipe Arch Steel 28x20‐Inch EACH $369.86 $263.03 $338.13

Page 21

                                      

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/25/2019

ITEM DESCRIPTION UNIT FY 17 FY 18 FY 19 521.1235 Apron Endwalls for Pipe Arch Steel 35x24‐Inch EACH $650.00 $850.00 $622.28 521.1242 Apron Endwalls for Pipe Arch Steel 42x29‐Inch EACH $355.84 $701.01 $530.25 521.1249 Apron Endwalls for Pipe Arch Steel 49x33‐Inch EACH $660.00 521.1257 Apron Endwalls for Pipe Arch Steel 57x38‐Inch EACH $735.37 $902.50 521.1264 Apron Endwalls for Pipe Arch Steel 64x43‐Inch EACH $1,135.00 521.1271 Apron Endwalls for Pipe Arch Steel 71x47‐Inch EACH $2,884.00 $2,200.00 521.1277 Apron Endwalls for Pipe Arch Steel 77x52‐Inch EACH $2,100.00 521.1283 Apron Endwalls for Pipe Arch Steel 83x57‐Inch EACH $2,309.98 $2,360.00 521.1502 Apron Endwalls for Culvert Pipe Sloped Side Drains Steel 15‐Inch 4 to 1 EACH $456.82 521.1503 Apron Endwalls for Culvert Pipe Sloped Side Drains Steel 18‐Inch 4 to 1 EACH $392.50 $830.34 521.1504 Apron Endwalls for Culvert Pipe Sloped Side Drains Steel 21‐Inch 4 to 1 EACH 521.1505 Apron Endwalls for Culvert Pipe Sloped Side Drains Steel 24‐Inch 4 to 1 EACH $662.82 $688.00 521.1506 Apron Endwalls for Culvert Pipe Sloped Side Drains Steel 30‐Inch 4 to 1 EACH 521.1507 Apron Endwalls for Culvert Pipe Sloped Side Drains Steel 36‐Inch 4 to 1 EACH 521.1508 Apron Endwalls for Culvert Pipe Sloped Side Drains Steel 42‐Inch 4 to 1 EACH 521.1509 Apron Endwalls for Culvert Pipe Sloped Side Drains Steel 48‐Inch 4 to 1 EACH 521.1510 Apron Endwalls for Culvert Pipe Sloped Side Drains Steel 54‐Inch 4 to 1 EACH 521.1511 Apron Endwalls for Culvert Pipe Sloped Side Drains Steel 60‐Inch 4 to 1 EACH 521.1515 Apron Endwalls for Culvert Pipe Sloped Side Drains Steel 15‐Inch 6 to 1 EACH $586.41 $500.92 $482.33 521.1518 Apron Endwalls for Culvert Pipe Sloped Side Drains Steel 18‐Inch 6 to 1 EACH $401.99 $539.04 $740.96 521.1521 Apron Endwalls for Culvert Pipe Sloped Side Drains Steel 21‐Inch 6 to 1 EACH $602.15 521.1524 Apron Endwalls for Culvert Pipe Sloped Side Drains Steel 24‐Inch 6 to 1 EACH $613.17 $703.40 $981.31 521.1530 Apron Endwalls for Culvert Pipe Sloped Side Drains Steel 30‐Inch 6 to 1 EACH $2,147.50 521.1536 Apron Endwalls for Culvert Pipe Sloped Side Drains Steel 36‐Inch 6 to 1 EACH $3,046.00 $4,136.50 521.1542 Apron Endwalls for Culvert Pipe Sloped Side Drains Steel 42‐Inch 6 to 1 EACH 521.1548 Apron Endwalls for Culvert Pipe Sloped Side Drains Steel 48‐Inch 6 to 1 EACH 521.1554 Apron Endwalls for Culvert Pipe Sloped Side Drains Steel 54‐Inch 6 to 1 EACH 521.1560 Apron Endwalls for Culvert Pipe Sloped Side Drains Steel 60‐Inch 6 to 1 EACH 521.1615 Apron Endwalls for Culvert Pipe Sloped Side Drains Steel 15‐Inch 10 to 1 EACH $939.67 $1,554.37 521.1618 Apron Endwalls for Culvert Pipe Sloped Side Drains Steel 18‐Inch 10 to 1 EACH $1,155.00 $1,047.22 $2,308.00 521.1621 Apron Endwalls for Culvert Pipe Sloped Side Drains Steel 21‐Inch 10 to 1 EACH 521.1624 Apron Endwalls for Culvert Pipe Sloped Side Drains Steel 24‐Inch 10 to 1 EACH $2,200.00 $1,198.81 $1,347.10

Page 22

                                                                                                                                        

     

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/25/2019

ITEM DESCRIPTION UNIT FY 17 FY 18 FY 19 521.1630 Apron Endwalls for Culvert Pipe Sloped Side Drains Steel 30‐Inch 10 to 1 EACH $2,790.66 521.1636 Apron Endwalls for Culvert Pipe Sloped Side Drains Steel 36‐Inch 10 to 1 EACH 521.1704 Apron Endwalls for Pipe Arch Sloped Side Drains Steel 17x13‐Inch 4 to 1 EACH 521.1705 Apron Endwalls for Pipe Arch Sloped Side Drains Steel 21x15‐Inch 4 to 1 EACH 521.1706 Apron Endwalls for Pipe Arch Sloped Side Drains Steel 24x18‐Inch 4 to 1 EACH 521.1707 Apron Endwalls for Pipe Arch Sloped Side Drains Steel 28x20‐Inch 4 to 1 EACH 521.1708 Apron Endwalls for Pipe Arch Sloped Side Drains Steel 35x24‐Inch 4 to 1 EACH $1,325.00 521.1709 Apron Endwalls for Pipe Arch Sloped Side Drains Steel 42x29‐Inch 4 to 1 EACH 521.1710 Apron Endwalls for Pipw Arch Sloped Side Drains Steel 49x33‐Inch 4 to  EACH 521.1711 Apron Endwalls for Pipe Arch Sloped Side Drains Steel 57x38‐Inch 4 to 1 EACH 521.1712 Apron Endwalls for Pipe Arch Sloped Side Drians Steel 64x43‐Inch 4 to 1 EACH 521.1717 Apron Endwalls for Pipe Arch Sloped Side Drains Steel 17x13‐Inch 6 to 1 EACH $617.41 $965.66 521.1721 Apron Endwalls for Pipe Arch Sloped Side Drains Steel 21x15‐Inch 6 to 1 EACH $769.46 $175.00 $1,006.04 521.1724 Apron Endwalls for Pipe Arch Sloped Side Drains Steel 24x18‐Inch 6 to 1 EACH 521.1728 Apron Endwalls for Pipe Arch Sloped Side Drains Steel 28x20‐Inch 6 to 1 EACH $666.50 $632.79 $1,227.86 521.1735 Apron Endwalls for Pipe Arch Sloped Side Drains Steel 35x24‐Inch 6 to 1 EACH $1,799.90 $1,834.12 521.1742 Apron Endwalls for Pipe Arch Sloped Side Drains Steel 42x29‐Inch 6 to 1 EACH $1,345.00 $2,970.47 521.1749 Apron Endwalls for Pipe Arch Sloped Side Drains Steel 49x33‐Inch 6 to 1 EACH $2,718.00 $5,700.00 521.1757 Apron Endwalls for Pipe Arch Sloped Side Drains Steel 57x38‐Inch 6 to 1 EACH 521.1764 Apron Endwalls for Pipe Arch Sloped Side Drains Steel 64x43‐Inch 6 to 1 EACH 521.1817 Apron Endwalls for Pipe Arch Sloped Side Drains Steel 17x13‐Inch 10 to EACH 521.1821 Apron Endwalls for Pipe Arch Sloped Side Drains Steel 21x15‐Inch 10 to EACH $1,600.00 521.1824 Apron Endwalls for Pipe Arch Sloped Side Drains Steel 24x18‐Inch 10 to EACH 521.1828 Apron Endwalls for Pipe Arch Sloped Side Drains Steel 28x20‐Inch 10 to EACH 521.1835 Apron Endwalls for Pipe Arch Sloped Side Drains Steel 35x24‐Inch 10 to EACH 521.1842 Apron Endwalls for Pipe Arch Sloped Side Drains Steel 42x29‐Inch 10 to EACH 521.1900 Pipe Cattle Pass Corrugated Steel LF $154.65 521.2005.S Surface Drain Pipe Corrugated Metal Slotted (inch) LF $88.89 $95.62 $105.58 521.3112 Culvert Pipe Corrugated Steel 12‐Inch LF $33.73 $45.88 $51.02 521.3115 Culvert Pipe Corrugated Steel 15‐Inch LF $30.53 $56.40 $54.92 521.3118 Culvert Pipe Corrugated Steel 18‐Inch LF $33.76 $46.16 $47.74 521.3121 Culvert Pipe Corrugated Steel 21‐Inch LF $38.36

Page 23

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/25/2019

ITEM DESCRIPTION UNIT FY 17 FY 18 FY 19 521.3124 Culvert Pipe Corrugated Steel 24‐Inch LF $48.41 $65.14 $67.23 521.3130 Culvert Pipe Corrugated Steel 30‐Inch LF $58.51 $65.98 $113.54 521.3136 Culvert Pipe Corrugated Steel 36‐Inch LF $84.80 $74.94 $85.63 521.3142 Culvert Pipe Corrugated Steel 42‐Inch LF $108.12 $126.00 521.3148 Culvert Pipe Corrugated Steel 48‐Inch LF $90.12 $187.70 $350.00 521.3154 Culvert Pipe Corrugated Steel 54‐Inch LF $160.00 521.3160 Culvert Pipe Corrugated Steel 60‐Inch LF $179.12 $440.61 $277.59 521.3172 Culvert Pipe Corrugated Steel 72‐Inch LF $900.00 521.3184 Culvert Pipe Corrugated Steel 84‐Inch LF 521.3196 Culvert Pipe Corrugated Steel 96‐Inch LF 521.3717 Pipe Arch Corrugated Steel 17x13‐Inch LF $43.00 $45.50 $73.69 521.3721 Pipe Arch Corrugated Steel 21x15‐Inch LF $50.86 $39.64 $67.87 521.3724 Pipe Arch Corrugated Steel 24x18‐Inch LF $147.00 521.3728 Pipe Arch Corrugated Steel 28x20‐Inch LF $53.30 $50.12 $55.88 521.3735 Pipe Arch Corrugated Steel 35x24‐Inch LF $90.00 $61.23 521.3742 Pipe Arch Corrugated Steel 42x29‐Inch LF $56.00 $105.95 $86.66 521.3749 Pipe Arch Corrugated Steel 49x33‐Inch LF $99.00 $215.15 521.3757 Pipe Arch Corrugated Steel 57x38‐Inch LF $87.51 $114.59 521.3764 Pipe Arch Corrugated Steel 64x43‐Inch LF $103.95 521.3771 Pipe Arch Corrugated Steel 71x47‐Inch LF $151.25 521.3777 Pipe Arch Corrugated Steel 77x52‐Inch LF 521.3783 Pipe Arch Corrugated Steel 83x57‐Inch LF $240.00 521.5112 Culvert Pipe Corrugated Steel Polymer Coated 12‐Inch LF $60.00 521.5115 Culvert Pipe Corrugated Steel Polymer Coated 15‐Inch LF 521.5118 Culvert Pipe Corrugated Steel Polymer Coated 18‐Inch LF $50.00 521.5121 Culvert Pipe Corrugated Steel Polymer Coated 21‐Inch LF 521.5124 Culvert Pipe Corrugated Steel Polymer Coated 24‐Inch LF $58.59 $50.00 521.5130 Culvert Pipe Corrugated Steel Polymer Coated 30‐Inch LF 521.5136 Culvert Pipe Corrugated Steel Polymer Coated 36‐Inch LF 521.5142 Culvert Pipe Corrugated Steel Polymer Coated 42‐Inch LF 521.5148 Culvert Pipe Corrugated Steel Polymer Coated 48‐Inch LF 521.5154 Culvert Pipe Corrugated Steel Polymer Coated 54‐Inch LF

Page 24

            

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/25/2019

ITEM DESCRIPTION UNIT FY 17 FY 18 FY 19 521.5160 Culvert Pipe Corrugated Steel Polymer Coated 60‐Inch LF $183.00 521.5172 Culvert Pipe Corrugated Steel Polymer Coated 72‐Inch LF 521.5184 Culvert Pipe Corrugated Steel Polymer Coated 84‐Inch LF 521.5196 Culvert Pipe Corrugated Steel Polymer Coated 96‐Inch LF $272.00 521.5717 Pipe Arch Polymer Coated Corrugated Steel 17x13‐Inch LF 521.5721 Pipe Arch Polymer Coated Corrugated Steel 21x15‐Inch LF 521.5724 Pipe Arch Polymer Coated Corrugated Steel 24x18‐Inch LF 521.5728 Pipe Arch Polymer Coated Corrugated Steel 28x20‐Inch LF 521.5735 Pipe Arch Polymer Coated Corrugated Steel 35x24‐Inch LF 521.5742 Pipe Arch Polymer Coated Corrugated Steel 42x29‐Inch LF 521.5749 Pipe Arch Polymer Coated Corrugated Steel 49x33‐Inch LF 521.5757 Pipe Arch Polymer Coated Corrugated Steel 57x38‐Inch LF 521.5764 Pipe Arch Polymer Coated Corrugated Steel 64x43‐Inch LF 521.5771 Pipe Arch Polymer Coated Corrugated Steel 71x47‐Inch LF $417.00 521.5777 Pipe Arch Polymer Coated Corrugated Steel 77x52‐Inch LF 521.5783 Pipe Arch Polymer Coated Corrugated Steel 83x57‐Inch LF $310.00 521.6112 Culvert Pipe Corrugated Steel Aluminum Coated 12‐Inch LF 521.6115 Culvert Pipe Corrugated Steel Aluminum Coated 15‐Inch LF 521.6118 Culvert Pipe Corrugated Steel Aluminum Coated 18‐Inch LF $75.00 $30.00 521.6121 Culvert Pipe Corrugated Steel Aluminum Coated 21‐Inch LF $45.00 521.6124 Culvert Pipe Corrugated Steel Aluminum Coated 24‐Inch LF $46.46 $47.18 521.6130 Culvert Pipe Corrugated Steel Aluminum Coated 30‐Inch LF $95.99 $85.30 521.6136 Culvert Pipe Corrugated Steel Aluminum Coated 36‐Inch LF 521.6142 Culvert Pipe Corrugated Steel Aluminum Coated 42‐Inch LF $160.00 521.6148 Culvert Pipe Corrugated Steel Aluminum Coated 48‐Inch LF $106.90 $89.09 521.6154 Culvert Pipe Corrugated Steel Aluminum Coated 54‐Inch LF 521.6160 Culvert Pipe Corrugated Steel Aluminum Coated 60‐Inch LF 521.6172 Culvert Pipe Corrugated Steel Aluminum Coated 72‐Inch LF 521.6184 Culvert Pipe Corrugated Steel Aluminum Coated 84‐Inch LF 521.6196 Culvert Pipe Corrugated Steel Aluminum Coated 96‐Inch LF 521.6717 Pipe Arch Corrugated Steel Aluminum Coated 17x13‐Inch LF 521.6721 Pipe Arch Corrugated Steel Aluminum Coated 21x15‐Inch LF

Page 25

                          

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/25/2019

ITEM DESCRIPTION UNIT FY 17 FY 18 FY 19 521.6724 Pipe Arch Corrugated Steel Aluminum Coated 24x18‐Inch LF 521.6728 Pipe Arch Corrugated Steel Aluminum Coated 28x20‐Inch LF $39.74 521.6735 Pipe Arch Corrugated Steel Aluminum Coated 35x24‐Inch LF $63.06 521.6742 Pipe Arch Corrugated Steel Aluminum Coated 42x29‐Inch LF $65.98 521.6749 Pipe Arch Corrugated Steel Aluminum Coated 49x33‐Inch LF $170.00 521.6757 Pipe Arch Corrugated Steel Aluminum Coated 57x38‐Inch LF $193.00 521.6764 Pipe Arch Corrugated Steel Aluminum Coated 64x43‐Inch LF $220.00 521.6771 Pipe Arch Corrugated Steel Aluminum Coated 71x47‐Inch LF 521.6777 Pipe Arch Corrugated Steel Aluminum Coated 77x52‐Inch LF $214.00 521.6783 Pipe Arch Corrugated Steel Aluminum Coated 83x57‐Inch LF $375.68 $239.00 522.0112 Culvert Pipe Reinforced Concrete Class III 12‐Inch LF $40.45 $45.39 $87.59 522.0115 Culvert Pipe Reinforced Concrete Class III 15‐Inch LF $50.72 $59.76 $99.25 522.0118 Culvert Pipe Reinforced Concrete Class III 18‐Inch LF $43.81 $51.65 $66.88 522.0121 Culvert Pipe Reinforced Concrete Class III 21‐Inch LF 522.0124 Culvert Pipe Reinforced Concrete Class III 24‐Inch LF $64.44 $65.43 $82.42 522.0127 Culvert Pipe Reinforced Concrete Class III 27‐Inch LF 522.0130 Culvert Pipe Reinforced Concrete Class III 30‐Inch LF $83.48 $84.74 $139.70 522.0136 Culvert Pipe Reinforced Concrete Class III 36‐Inch LF $100.49 $95.85 $122.86 522.0142 Culvert Pipe Reinforced Concrete Class III 42‐Inch LF $104.43 $120.39 $141.58 522.0148 Culvert Pipe Reinforced Concrete Class III 48‐Inch LF $160.47 $131.43 $178.21 522.0154 Culvert Pipe Reinforced Concrete Class III 54‐Inch LF $282.25 $158.68 $175.31 522.0160 Culvert Pipe Reinforced Concrete Class III 60‐Inch LF $252.28 $189.57 $271.55 522.0166 Culvert Pipe Reinforced Concrete Class III 66‐Inch LF 522.0172 Culvert Pipe Reinforced Concrete Class III 72‐Inch LF $312.56 $543.38 $264.73 522.0178 Culvert Pipe Reinforced Concrete Class III 78‐Inch LF $475.00 522.0184 Culvert Pipe Reinforced Concrete Class III 84‐Inch LF $340.00 $795.00 522.0190 Culvert Pipe Reinforced Concrete Class III 90‐Inch LF 522.0196 Culvert Pipe Reinforced Concrete Class III 96‐Inch LF 522.0202 Culvert Pipe Reinforced Concrete Class III 102‐Inch LF 522.0208 Culvert Pipe Reinforced Concrete Class III 108‐Inch LF 522.0412 Culvert Pipe Reinforced Concrete Class IV 12‐Inch LF $46.83 $51.50 $55.37 522.0415 Culvert Pipe Reinforced Concrete Class IV 15‐Inch LF $65.39 $48.10 $44.58

Page 26

                                                         

   

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/25/2019

ITEM DESCRIPTION UNIT FY 17 FY 18 FY 19 522.0418 Culvert Pipe Reinforced Concrete Class IV 18‐Inch LF $55.75 $46.32 $57.09 522.0421 Culvert Pipe Reinforced Concrete Class IV 21‐Inch LF 522.0424 Culvert Pipe Reinforced Concrete Class IV 24‐Inch LF $92.27 $67.30 $85.12 522.0427 Culvert Pipe Reinforced Concrete Class IV 27‐Inch LF 522.0430 Culvert Pipe Reinforced Concrete Class IV 30‐Inch LF $116.76 $81.43 $119.38 522.0436 Culvert Pipe Reinforced Concrete Class IV 36‐Inch LF $122.97 $126.53 $101.53 522.0442 Culvert Pipe Reinforced Concrete Class IV 42‐Inch LF $117.12 $130.06 522.0448 Culvert Pipe Reinforced Concrete Class IV 48‐Inch LF $199.04 $179.89 $138.75 522.0454 Culvert Pipe Reinforced Concrete Class IV 54‐Inch LF $208.11 $221.36 522.0460 Culvert Pipe Reinforced Concrete Class IV 60‐Inch LF $250.56 $259.00 522.0466 Culvert Pipe Reinforced Concrete Class IV 66‐Inch LF 522.0472 Culvert Pipe Reinforced Concrete Class IV 72‐Inch LF $349.54 $317.57 $290.00 522.0478 Culvert Pipe Reinforced Concrete Class IV 78‐Inch LF 522.0484 Culvert Pipe Reinforced Concrete Class IV 84‐Inch LF $541.25 522.0512 Culvert Pipe Reinforced Concrete Class V 12‐Inch LF $46.52 522.0515 Culvert Pipe Reinforced Concrete Class V 15‐Inch LF 522.0518 Culvert Pipe Reinforced Concrete Class V 18‐Inch LF $324.65 $48.00 $53.00 522.0521 Culvert Pipe Reinforced Concrete Class V 21‐Inch LF 522.0524 Culvert Pipe Reinforced Concrete Class V 24‐Inch LF $54.82 $73.18 $64.14 522.0527 Culvert Pipe Reinforced Concrete Class V 27‐Inch LF 522.0530 Culvert Pipe Reinforced Concrete Class V 30‐Inch LF $121.72 $108.08 $89.02 522.0536 Culvert Pipe Reinforced Concrete Class V 36‐Inch LF $77.42 $109.71 522.0542 Culvert Pipe Reinforced Concrete Class V 42‐Inch LF 522.0548 Culvert Pipe Reinforced Concrete Class V 48‐Inch LF $132.72 522.0554 Culvert Pipe Reinforced Concrete Class V 54‐Inch LF $171.60 $177.13 522.0560 Culvert Pipe Reinforced Concrete Class V 60‐Inch LF $226.39 $302.30 522.0566 Culvert Pipe Reinforced Concrete Class V 66‐Inch LF 522.0572 Culvert Pipe Reinforced Concrete Class V 72‐Inch LF 522.0584 Culvert Pipe Reinforced Concrete Class V 84‐Inch LF 522.1012 Apron Endwalls for Culvert Pipe Reinforced Concrete 12‐Inch EACH $628.08 $765.29 $760.12 522.1015 Apron Endwalls for Culvert Pipe Reinforced Concrete 15‐Inch EACH $694.16 $703.70 $793.54 522.1018 Apron Endwalls for Culvert Pipe Reinforced Concrete 18‐Inch EACH $737.65 $755.78 $838.84

Page 27

            

                                                   

      

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/25/2019

ITEM DESCRIPTION UNIT FY 17 FY 18 FY 19 522.1021 Apron Endwalls for Culvert Pipe Reinforced Concrete 21‐Inch EACH $648.75 $847.13 522.1024 Apron Endwalls for Culvert Pipe Reinforced Concrete 24‐Inch EACH $887.01 $895.66 $1,011.11 522.1027 Apron Endwalls for Culvert Pipe Reinforced Concrete 27‐Inch EACH $942.20 $993.37 $1,012.50 522.1030 Apron Endwalls for Culvert Pipe Reinforced Concrete 30‐Inch EACH $1,097.39 $989.50 $1,083.72 522.1036 Apron Endwalls for Culvert Pipe Reinforced Concrete 36‐Inch EACH $1,290.43 $1,245.60 $1,361.78 522.1042 Apron Endwalls for Culvert Pipe Reinforced Concrete 42‐Inch EACH $1,477.37 $1,614.88 $1,695.64 522.1048 Apron Endwalls for Culvert Pipe Reinforced Concrete 48‐Inch EACH $1,782.18 $1,595.75 $1,905.68 522.1054 Apron Endwalls for Culvert Pipe Reinforced Concrete 54‐Inch EACH $2,551.37 $2,601.13 $3,022.75 522.1060 Apron Endwalls for Culvert Pipe Reinforced Concrete 60‐Inch EACH $3,124.85 $3,213.10 $3,424.31 522.1066 Apron Endwalls for Culvert Pipe Reinforced Concrete 66‐Inch EACH 522.1072 Apron Endwalls for Culvert Pipe Reinforced Concrete 72‐Inch EACH $4,061.41 $4,089.42 $4,392.00 522.1084 Apron Endwalls for Culvert Pipe Reinforced Concrete 84‐Inch EACH $5,160.00 $5,500.00 522.1500 Pipe Cattle Pass Reinforced Concrete LF $310.00 $277.70 $390.39 522.2314 Culvert Pipe Reinforced Concrete Horizontal Elliptical Class HE‐III 14x23 LF $160.00 $164.65 522.2319 Culvert Pipe Reinforced Concrete Horizontal Elliptical Class HE‐III 19x30 LF $77.29 $88.17 $108.73 522.2324 Culvert Pipe Reinforced Concrete Horizontal Elliptical Class HE‐III 24x38 LF $84.93 $106.92 $121.14 522.2329 Culvert Pipe Reinforced Concrete Horizontal Elliptical Class HE‐III 29x45 LF $115.78 $124.08 $179.17 522.2334 Culvert Pipe Reinforced Concrete Horizontal Elliptical Class HE‐III 34x53 LF $130.00 $180.71 522.2338 Culvert Pipe Reinforced Concrete Horizontal Elliptical Class HE‐III 38x60 LF $171.07 $159.09 $256.85 522.2343 Culvert Pipe Reinforced Concrete Horizontal Elliptical Class HE‐III 43x68 LF $163.22 $166.00 522.2348 Culvert Pipe Reinforced Concrete Horizontal Elliptical Class HE‐III 48x76 LF $226.72 $249.45 $376.00 522.2353 Culvert Pipe Reinforced Concrete Horizontal Elliptical Class HE‐III 53x83 LF $336.35 $303.19 522.2358 Culvert Pipe Reinforced Concrete Horizontal Elliptical Class HE‐III 58x91 LF $374.27 $519.70 522.2363 Culvert Pipe Reinforced Concrete Horizontal Elliptical Class HE‐III 63x98 LF $525.00 522.2368 Culvert Pipe Reinforced Concrete Horizontal Elliptical Class HE‐III 68x10 LF $618.75 $724.00 522.2414 Culvert Pipe Reinforced Concrete Horizontal Elliptical Class HE‐IV 14x23 LF $91.66 $112.42 $84.22 522.2419 Culvert Pipe Reinforced Concrete Horizontal Elliptical Class HE‐IV 19x30 LF $96.59 $90.70 $114.83 522.2424 Culvert Pipe Reinforced Concrete Horizontal Elliptical Class HE‐IV 24x38 LF $106.47 $119.88 $116.50 522.2429 Culvert Pipe Reinforced Concrete Horizontal Elliptical Class HE‐IV 29x45 LF $126.52 $165.54 $151.91 522.2434 Culvert Pipe Reinforced Concrete Horizontal Elliptical Class HE‐IV 34x53 LF $323.01 $307.51 522.2614 Apron Endwalls for Culvert Pipe Reinforced Concrete Horizontal Elliptic EACH $964.52 $991.55 $979.60 522.2619 Apron Endwalls for Culvert Pipe Reinforced Concrete Horizontal Elliptic EACH $1,054.01 $1,103.95 $1,144.60

Page 28

                              

 

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/25/2019

ITEM DESCRIPTION UNIT FY 17 FY 18 FY 19 522.2624 Apron Endwalls for Culvert Pipe Reinforced Concrete Horizontal Elliptic EACH $1,261.28 $1,301.71 $1,230.72 522.2629 Apron Endwalls for Culvert Pipe Reinforced Concrete Horizontal Elliptic EACH $1,380.35 $1,343.54 $1,594.73 522.2634 Apron Endwalls for Culvert Pipe Reinforced Concrete Horizontal Elliptic EACH $2,130.00 $1,924.12 $2,104.42 522.2638 Apron Endwalls for Culvert Pipe Reinforced Concrete Horizontal Elliptic EACH $2,862.43 $2,517.22 $2,868.50 522.2643 Apron Endwalls for Culvert Pipe Reinforced Concrete Horizontal Elliptic EACH $2,871.78 $3,150.22 $4,291.00 522.2648 Apron Endwalls for Culvert Pipe Reinforced Concrete Horizontal Elliptic EACH $4,073.26 $3,993.02 $4,782.50 522.2653 Apron Endwalls for Culvert Pipe Reinforced Concrete Horizontal Elliptic EACH $3,980.08 $6,539.73 $6,393.00 522.2658 Apron Endwalls for Culvert Pipe Reinforced Concrete Horizontal Elliptic EACH $6,277.99 $6,033.33 522.2663 Apron Endwalls for Culvert Pipe Reinforced Concrete Horizontal Elliptic EACH $8,550.00 522.2668 Apron Endwalls for Culvert Pipe Reinforced Concrete Horizontal Elliptic EACH $6,450.00 $9,136.75 $9,500.00 524.0112 Culvert Pipe Salvaged 12‐Inch LF $12.00 524.0115 Culvert Pipe Salvaged 15‐Inch LF 524.0118 Culvert Pipe Salvaged 18‐Inch LF $100.90 $140.00 $19.47 524.0121 Culvert Pipe Salvaged 21‐Inch LF 524.0124 Culvert Pipe Salvaged 24‐Inch LF $99.68 $250.00 $36.94 524.0127 Culvert Pipe Salvaged 27‐Inch LF 524.0130 Culvert Pipe Salvaged 30‐Inch LF $141.93 $80.50 524.0133 Culvert Pipe Salvaged 33‐Inch LF 524.0136 Culvert Pipe Salvaged 36‐Inch LF $221.07 $64.75 $22.00 524.0142 Culvert Pipe Salvaged 42‐Inch LF $105.00 $149.00 524.0148 Culvert Pipe Salvaged 48‐Inch LF $235.00 $67.00 524.0154 Culvert Pipe Salvaged 54‐Inch LF 524.0160 Culvert Pipe Salvaged 60‐Inch LF $12.50 524.0166 Culvert Pipe Salvaged 66‐Inch LF 524.0172 Culvert Pipe Salvaged 72‐Inch LF 524.0178 Culvert Pipe Salvaged 78‐Inch LF 524.0184 Culvert Pipe Salvaged 84‐Inch LF 524.0190 Culvert Pipe Salvaged 90‐Inch LF 524.0196 Culvert Pipe Salvaged 96‐Inch LF 524.0202 Culvert Pipe Salvaged 102‐Inch LF 524.0208 Culvert Pipe Salvaged 108‐Inch LF 524.0612 Apron Endwalls for Culvert Pipe Salvaged 12‐Inch EACH $428.48 $174.44 $365.50

Page 29

                

 

 

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/25/2019

ITEM DESCRIPTION UNIT FY 17 FY 18 FY 19 524.0615 Apron Endwalls for Culvert Pipe Salvaged 15‐Inch EACH $231.00 524.0618 Apron Endwalls for Culvert Pipe Salvaged 18‐Inch EACH $527.84 $310.09 $399.30 524.0621 Apron Endwalls for Culvert Pipe Salvaged 21‐Inch EACH 524.0624 Apron Endwalls for Culvert Pipe Salvaged 24‐Inch EACH $744.95 $515.95 $400.11 524.0627 Apron Endwalls for Culvert Pipe Salvaged 27‐Inch EACH 524.0630 Apron Endwalls for Culvert Pipe Salvaged 30‐Inch EACH $920.36 $620.89 $712.36 524.0633 Apron Endwalls for Culvert Pipe Salvaged 33‐Inch EACH 524.0636 Apron Endwalls for Culvert Pipe Salvaged 36‐Inch EACH $902.78 $530.25 $355.00 524.0642 Apron Endwalls for Culvert Pipe Salvaged 42‐Inch EACH $1,524.07 $892.00 $463.00 524.0648 Apron Endwalls for Culvert Pipe Salvaged 48‐Inch EACH $806.67 $963.00 524.0654 Apron Endwalls for Culvert Pipe Salvaged 54‐Inch EACH $2,890.00 524.0660 Apron Endwalls for Culvert Pipe Salvaged 60‐Inch EACH $2,131.44 524.0666 Apron Endwalls for Culvert Pipe Salvaged 66‐Inch EACH 524.0672 Apron Endwalls for Culvert Pipe Salvaged 72‐Inch EACH 524.0678 Apron Endwalls for Culvert Pipe Salvaged 78‐Inch EACH 524.0684 Apron Endwalls for Culvert Pipe Salvaged 84‐Inch EACH 524.0800 Pipe Cattle Pass Salvaged LF 524.0900 Pipe Arch Salvaged Corrugated Steel (rise x span) LF 525.0112 Culvert Pipe Corrugated Aluminum 12‐Inch LF 525.0115 Culvert Pipe Corrugated Aluminum 15‐Inch LF 525.0118 Culvert Pipe Corrugated Aluminum 18‐Inch LF $30.48 525.0121 Culvert Pipe Corrugated Aluminum 21‐Inch LF 525.0124 Culvert Pipe Corrugated Aluminum 24‐Inch LF $75.18 $50.00 525.0130 Culvert Pipe Corrugated Aluminum 30‐Inch LF $95.00 525.0136 Culvert Pipe Corrugated Aluminum 36‐Inch LF $125.00 525.0142 Culvert Pipe Corrugated Aluminum 42‐Inch LF 525.0148 Culvert Pipe Corrugated Aluminum 48‐Inch LF 525.0154 Culvert Pipe Corrugated Aluminum 54‐Inch LF 525.0160 Culvert Pipe Corrugated Aluminum 60‐Inch LF 525.0172 Culvert Pipe Corrugated Aluminum 72‐Inch LF $295.00 $350.00 525.0184 Culvert Pipe Corrugated Aluminum 84‐Inch LF 525.0312 Apron Endwalls for Culvert Pipe Aluminum 12‐Inch EACH

Page 30

            

 

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/25/2019

ITEM DESCRIPTION UNIT FY 17 FY 18 FY 19 525.0315 Apron Endwalls for Culvert Pipe Aluminum 15‐Inch EACH 525.0318 Apron Endwalls for Culvert Pipe Aluminum 18‐Inch EACH $340.00 525.0321 Apron Endwalls for Culvert Pipe Aluminum 21‐Inch EACH 525.0324 Apron Endwalls for Culvert Pipe Aluminum 24‐Inch EACH $744.14 $300.00 525.0330 Apron Endwalls for Culvert Pipe Aluminum 30‐Inch EACH $1,000.00 $425.00 525.0336 Apron Endwalls for Culvert Pipe Aluminum 36‐Inch EACH $1,320.69 $625.00 525.0342 Apron Endwalls for Culvert Pipe Aluminum 42‐Inch EACH 525.0348 Apron Endwalls for Culvert Pipe Aluminum 48‐Inch EACH $2,950.00 525.0354 Apron Endwalls for Culvert Pipe Aluminum 54‐Inch EACH 525.0360 Apron Endwalls for Culvert Pipe Aluminum 60‐Inch EACH 525.0372 Apron Endwalls for Culvert Pipe Aluminum 72‐Inch EACH $4,450.00 $5,150.00 525.0384 Apron Endwalls for Culvert Pipe Aluminum 84‐Inch EACH 525.0484 Steel Apron Endwalls for Aluminum Culvert Pipe 84‐Inch EACH 526.0100 Temporary Structure (station) LS $258,750.00 $116,236.30 $487,257.50 526.0200.S Temporary Pedestrian Structure (station) LS 527.0160 Pipe Structural Plate 60‐Inch LF 527.0172 Pipe Structural Plate 72‐Inch LF $430.00 $800.00 527.0184 Pipe Structural Plate 84‐Inch LF 527.0196 Pipe Structural Plate 96‐Inch LF 527.0208 Pipe Structural Plate 108‐Inch LF 527.0220 Pipe Structural Plate 120‐Inch LF 527.0232 Pipe Structural Plate 132‐Inch LF 527.0244 Pipe Structural Plate 144‐Inch LF 527.0256 Pipe Structural Plate 156‐Inch LF 527.0268 Pipe Structural Plate 168‐Inch LF 527.0280 Pipe Structural Plate 180‐Inch LF 527.0305 Pipe Arch Structural Plate 6‐FT Span LF 527.0310 Pipe Arch Structural Plate 7‐FT Span LF 527.0315 Pipe Arch Structural Plate 8‐FT Span LF 527.0320 Pipe Arch Structural Plate 9‐FT Span LF 527.0325 Pipe Arch Structural Plate 10‐FT Span LF 527.0330 Pipe Arch Structural Plate 11‐FT Span LF

Page 31

     

       

   

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/25/2019

ITEM DESCRIPTION UNIT FY 17 FY 18 FY 19 527.0335 Pipe Arch Structural Plate 12‐FT Span LF 527.0340 Pipe Arch Structural Plate 13‐FT Span LF 527.0345 Pipe Arch Structural Plate 14‐FT Span LF 527.0350 Pipe Arch Structural Plate 15‐FT Span LF 527.0355 Pipe Arch Structural Plate 16‐FT Span LF 527.0360 Pipe Arch Structural Plate 16.5‐FT Span LF 530.0112 Culvert Pipe Corrugated Polyethylene 12‐Inch LF $55.00 $51.39 $95.00 530.0115 Culvert Pipe Corrugated Polyethylene 15‐Inch LF $29.44 530.0118 Culvert Pipe Corrugated Polyethylene 18‐Inch LF $34.72 $70.79 $49.96 530.0124 Culvert Pipe Corrugated Polyethylene 24‐Inch LF $57.38 $73.00 530.0130 Culvert Pipe Corrugated Polyethylene 30‐Inch LF $78.10 $79.00 530.0136 Culvert Pipe Corrugated Polyethylene 36‐Inch LF $53.86 $61.00 $76.19 530.1112 Culvert Pipe Corrugated Polypropylene 12‐Inch LF 530.1115 Culvert Pipe Corrugated Polypropylene 15‐Inch LF 530.1118 Culvert Pipe Corrugated Polypropylene 18‐Inch LF 530.1121 Culvert Pipe Corrugated Polypropylene 21‐Inch LF 530.1124 Culvert Pipe Corrugated Polypropylene 24‐Inch LF 530.1127 Culvert Pipe Corrugated Polypropylene 27‐Inch LF 530.1130 Culvert Pipe Corrugated Polypropylene 30‐Inch LF 530.1136 Culvert Pipe Corrugated Polypropylene 36‐Inch LF 531.0200.S Noise Barriers Single‐Sided Sound Absorptive (structure) SF $27.03 $30.32 531.0300.S Noise Barriers Double‐Sided Sound Absorptive (structure) SF $32.08 $25.12 $30.17 531.0400.S Noise Barriers Non‐Absorptive (structure) SF 532.0201.S Wall Modular Block Gravity LRFD SF $45.00 532.0225.S Wall Modular Block Gravity Landscape SF 532.0301.S Wall Modular Block Mechanically Stabilized Earth LRFD SF 532.0501.S Wall Concrete Panel Mechanically Stabilized Earth LRFD SF 532.0601.S Wall CIP Facing Mechanically Stabilized Earth LRFD SF 532.0701.S Wall Wire Faced Mechanically Stabilized Earth LRFD SF 532.0751.S Temporary Wall Wire Faced Mechanically Stabilized Earth LRFD SF 532.0801.S Wall Gabion LRFD CY 532.0901.S Wall Modular Bin or Crib LRFD SF

Page 32

   

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/25/2019

ITEM DESCRIPTION UNIT FY 17 FY 18 FY 19 532.1000.S Precast Panels for Soldier Pile Walls SF 550.0010 Pre‐Boring Unconsolidated Materials LF $91.43 $97.26 $111.02 550.0020 Pre‐Boring Rock or Consolidated Materials LF $106.16 $105.10 $168.09 550.0500 Pile Points EACH $144.75 $126.27 $129.40 550.0600 Pile Redriving EACH $250.00 $300.00 $339.44 550.1100 Piling Steel HP 10‐Inch X 42 Lb LF $33.73 $34.64 $39.01 550.1120 Piling Steel HP 12‐Inch X 53 Lb LF $35.91 $37.30 $48.67 550.1125 Piling Steel HP 12‐Inch X 74 Lb LF $60.00 550.1140 Piling Steel HP 14‐Inch X 73 Lb LF $38.48 $68.00 $60.00 550.2102 Piling CIP Concrete 10 3/4 X 0.219‐Inch LF $35.00 $36.00 $40.00 550.2104 Piling CIP Concrete 10 3/4 X 0.25‐Inch LF $34.12 $33.44 $37.54 550.2106 Piling CIP Concrete 10 3/4 X 0.365‐Inch LF $40.36 $39.08 $47.75 550.2108 Piling CIP Concrete 10 3/4 X 0.50‐Inch LF $55.79 $42.09 $56.82 550.2122 Piling CIP Concrete 12 3/4 X 0.219‐Inch LF 550.2124 Piling CIP Concrete 12 3/4 X 0.25‐Inch LF $39.12 $41.81 550.2126 Piling CIP Concrete 12 3/4 X 0.375‐Inch LF $41.30 $45.87 $57.52 550.2128 Piling CIP Concrete 12 3/4 X 0.50‐Inch LF $63.51 $58.78 $62.66 550.2142 Piling CIP Concrete 14 X 0.219‐Inch LF 550.2144 Piling CIP Concrete 14 X 0.25‐Inch LF 550.2146 Piling CIP Concrete 14 X 0.375‐Inch LF $46.00 $68.00 550.2148 Piling CIP Concrete 14 X 0.50‐Inch LF $70.00 $75.00 550.2162 Piling CIP Concrete 16 X 0.219‐Inch LF 550.2164 Piling CIP Concrete 16 X 0.25‐Inch LF 550.2166 Piling CIP Concrete 16 X 0.375‐Inch LF $60.00 550.2168 Piling CIP Concrete 16 X 0.50‐Inch LF $66.00 550.3010.S Piling Precast Concrete Testing LF 550.3100 Piling Precast Concrete 10‐Inch LF 550.3120 Piling Precast Concrete 12‐Inch LF 550.3140 Piling Precast Concrete 14‐Inch LF 550.3160 Piling Precast Concrete 16‐Inch LF 550.3810 Pile Splices Precast Concrete 10‐Inch EACH 550.3812 Pile Splices Precast Concrete 12‐Inch EACH

Page 33

      

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/25/2019

ITEM DESCRIPTION UNIT FY 17 FY 18 FY 19 550.3814 Pile Splices Precast Concrete 14‐Inch EACH 550.3816 Pile Splices Precast Concrete 16‐Inch EACH 550.5100.S Piling Wave Analysis Steel HP 10‐Inch X 42 Lb LF 550.5120.S Piling Wave Analysis Steel HP 12‐Inch X 53 Lb LF 550.5125.S Piling Wave Analysis Steel HP 12‐Inch X 74 Lb LF 550.5140.S Piling Wave Analysis Steel HP 14‐Inch X 73 Lb LF 550.6102.S Piling Wave Analysis CIP Concrete 10 3/4 X 0.219‐Inch LF 550.6104.S Piling Wave Analysis CIP Concrete 10 3/4 X 0.25‐Inch LF 550.6106.S Piling Wave Analysis CIP Concrete 10 3/4 X 0.365‐Inch LF 550.6108.S Piling Wave Analysis CIP Concrete 10 3/4 X 0.50‐Inch LF 550.6122.S Piling Wave Analysis CIP Concrete 12 3/4 X 0.219‐Inch LF 550.6124.S Piling Wave Analysis CIP Concrete 12 3/4 X 0.25‐Inch LF 550.6126.S Piling Wave Analysis CIP Concrete 12 3/4 X 0.375‐Inch LF 550.6128.S Piling Wave Analysis CIP Concrete 12 3/4 X 0.50‐Inch LF 550.6142.S Piling Wave Analysis CIP Concrete 14 X 0.219‐Inch LF 550.6144.S Piling Wave Analysis CIP Concrete 14 X 0.25‐Inch LF 550.6146.S Piling Wave Analysis CIP Concrete 14 X 0.375‐Inch LF 550.6148.S Piling Wave Analysis CIP Concrete 14 X 0.50‐Inch LF 550.6162.S Piling Wave Analysis CIP Concrete 16 X 0.219‐Inch LF 550.6164.S Piling Wave Analysis CIP Concrete 16 X 0.25‐Inch LF 550.6166.S Piling Wave Analysis CIP Concrete 16 X 0.375‐Inch LF 550.6168.S Piling Wave Analysis CIP Concrete 16 X 0.50‐Inch LF 550.7100.S Piling Wave Analysis Precast Concrete 10‐Inch LF 550.7120.S Piling Wave Analysis Precast Concrete 12‐Inch LF 550.7140.S Piling Wave Analysis Precast Concrete 14‐Inch LF 550.7160.S Piling Wave Analysis Precast Concrete 16‐Inch LF 601.0105 Concrete Curb Type A LF $25.44 $43.17 $33.11 601.0110 Concrete Curb Type D LF $36.10 $25.23 $21.12 601.0115 Concrete Curb Type G LF $39.73 $45.00 601.0120 Concrete Curb Type J LF $27.40 $36.89 $45.00 601.0150 Concrete Curb Integral Type D LF $11.43 $14.41 $16.71 601.0155 Concrete Curb Integral Type J LF

Page 34

 

                                                          

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/25/2019

ITEM DESCRIPTION UNIT FY 17 FY 18 FY 19 601.0199.S Concrete Curb Precast EACH $161.75 601.0205 Concrete Gutter 24‐Inch LF $13.70 $15.66 601.0319 Concrete Curb & Gutter 19‐Inch LF $23.84 $16.08 601.0322 Concrete Curb & Gutter 22‐Inch LF $29.62 $32.23 601.0331 Concrete Curb & Gutter 31‐Inch LF $13.75 $15.38 $20.00 601.0342 Concrete Curb & Gutter Integral 18‐Inch LF $10.12 601.0344 Concrete Curb & Gutter Integral 36‐Inch LF 601.0405 Concrete Curb & Gutter 18‐Inch Type A LF $13.24 $14.38 $18.23 601.0407 Concrete Curb & Gutter 18‐Inch Type D LF $16.22 $13.04 $16.55 601.0409 Concrete Curb & Gutter 30‐Inch Type A LF $16.49 $16.27 $16.60 601.0411 Concrete Curb & Gutter 30‐Inch Type D LF $13.34 $15.66 $18.04 601.0413 Concrete Curb & Gutter 6‐Inch Sloped 30‐Inch Type G LF $10.03 $19.86 $15.74 601.0415 Concrete Curb & Gutter 6‐Inch Sloped 30‐Inch Type J LF $13.15 $15.51 $13.63 601.0417 Concrete Curb & Gutter 30‐Inch Type K LF $25.00 $24.11 601.0419 Concrete Curb & Gutter 30‐Inch Type L LF $13.18 $12.58 $15.57 601.0452 Concrete Curb & Gutter Integral 30‐Inch Type D LF $9.69 $11.69 $16.44 601.0454 Concrete Curb & Gutter Integral 30‐Inch Type J LF 601.0456 Concrete Curb & Gutter Integral 30‐Inch Type L LF 601.0501 Concrete Curb & Gutter Integral 4‐Inch Sloped 36‐Inch LF $15.88 $34.00 601.0511 Concrete Curb & Gutter Integral 6‐Inch Sloped 36‐Inch LF $13.00 $90.00 601.0551 Concrete Curb & Gutter 4‐Inch Sloped 36‐Inch Type A LF $17.66 $17.17 $23.29 601.0553 Concrete Curb & Gutter 4‐Inch Sloped 36‐Inch Type D LF $17.85 $16.47 $16.74 601.0555 Concrete Curb & Gutter 6‐Inch Sloped 36‐Inch Type A LF $16.12 $17.86 $18.18 601.0557 Concrete Curb & Gutter 6‐Inch Sloped 36‐Inch Type D LF $14.41 $17.64 $24.26 601.0574 Concrete Curb & Gutter 4‐Inch Sloped 30‐Inch Type G LF $13.91 $24.00 $17.39 601.0576 Concrete Curb & Gutter 4‐Inch Sloped 30‐Inch Type J LF $14.50 $13.53 $24.46 601.0580 Concrete Curb & Gutter 4‐Inch Sloped 36‐Inch Type R LF $18.45 $20.98 $25.32 601.0582 Concrete Curb & Gutter 4‐Inch Sloped 36‐Inch Type T LF $14.72 $25.12 $20.96 601.0584 Concrete Curb & Gutter 4‐Inch Sloped 30‐Inch Type TBT LF $28.73 $24.90 601.0586 Concrete Curb & Gutter 4‐Inch Sloped 30‐Inch Type TBTT LF $31.65 $44.76 $27.42 601.0588 Concrete Curb & Gutter 4‐Inch Sloped 36‐Inch Type TBT LF $36.00 $18.41 $39.69 601.0590 Concrete Curb & Gutter 4‐Inch Sloped 36‐Inch Type TBTT LF $35.89 $25.99 $25.79

Page 35

 

 

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/25/2019

ITEM DESCRIPTION UNIT FY 17 FY 18 FY 19 601.0600 Concrete Curb Pedestrian LF $24.31 $24.25 $35.67 602.0405 Concrete Sidewalk 4‐Inch SF $3.85 $4.19 $4.78 602.0410 Concrete Sidewalk 5‐Inch SF $3.84 $4.59 $5.20 602.0415 Concrete Sidewalk 6‐Inch SF $4.47 $5.01 $6.99 602.0420 Concrete Sidewalk 7‐Inch SF $5.09 $5.95 $6.51 602.0505 Curb Ramp Detectable Warning Field Yellow SF $35.03 $36.66 $39.97 602.0510 Curb Ramp Detectable Warning Field White SF 602.0515 Curb Ramp Detectable Warning Field Natural Patina SF $38.17 $33.85 $39.24 602.0605 Curb Ramp Detectable Warning Field Radial Yellow SF $53.93 $57.93 602.0610 Curb Ramp Detectable Warning Field Radial White SF 602.0615 Curb Ramp Detectable Warning Field Radial Natural Patina SF $50.57 $62.69 602.1000 Concrete Loading Zone SF $9.85 $7.31 $9.24 602.1500 Concrete Steps SF $63.76 $58.08 $76.66 602.2400 Concrete Safety Islands SF $6.21 $6.35 $6.00 603.0105 Concrete Barrier Single‐Faced 32‐Inch LF $40.68 $141.48 603.0205 Concrete Barrier Double‐Faced 32‐Inch LF $300.00 $609.00 603.0405 Concrete Barrier Transition Section 32‐Inch LF $220.63 $150.00 603.1132 Concrete Barrier Type S32 LF $70.71 $46.91 $455.00 603.1136 Concrete Barrier Type S36 LF $52.91 $200.98 603.1142 Concrete Barrier Type S42 LF $50.59 $43.13 $41.86 603.1156 Concrete Barrier Type S56 LF $54.41 $55.83 $131.58 603.1232 Concrete Barrier Type S32A LF $259.51 603.1236 Concrete Barrier Type S36A LF $165.00 603.1242 Concrete Barrier Type S42A LF $44.97 $98.50 $74.37 603.1256 Concrete Barrier Type S56A LF $80.56 $163.64 603.1332 Concrete Barrier Type S32B LF 603.1336 Concrete Barrier Type S36B LF 603.1342 Concrete Barrier Type S42B LF $350.85 603.1356 Concrete Barrier Type S56B LF $228.00 $225.00 603.1432 Concrete Barrier Type S32C LF 603.1436 Concrete Barrier Type S36C LF $90.00 603.1442 Concrete Barrier Type S42C LF $169.75 $112.82 $140.13

Page 36

        

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/25/2019

ITEM DESCRIPTION UNIT FY 17 FY 18 FY 19 603.1456 Concrete Barrier Type S56C LF $137.90 $155.69 $142.00 603.2132 Concrete Barrier Fixed Object Protection Type S32 LF $202.00 603.2136 Concrete Barrier Fixed Object Protection Type S36 LF 603.2142 Concrete Barrier Fixed Object Protection Type S42 LF $277.12 603.2156 Concrete Barrier Fixed Object Protection Type S56 LF $228.63 $232.07 603.3111 Concrete Barrier Transition Type NJ32SF to S32 EACH $3,500.00 603.3113 Concrete Barrier Transition Type NJ32SF to S36 EACH $3,850.00 $3,754.95 603.3155 Concrete Barrier Transition Type NJ42SF to S42 EACH 603.3175 Concrete Barrier Transition Type NJ51SF to S42 EACH 603.3211 Concrete Barrier Transition Type F32SF to S32 EACH 603.3213 Concrete Barrier Transition Type F32SF to S36 EACH 603.3255 Concrete Barrier Transition Type F42SF to S42 EACH $28,111.84 603.3275 Concrete Barrier Transition Type F51SF to S42 EACH 603.3279 Concrete Barrier Transition Type F51SF to S56 EACH 603.3311 Concrete Barrier Transition Type NJ32DF to S32 EACH 603.3313 Concrete Barrier Transition Type NJ32DF to S36 EACH $4,620.03 603.3355 Concrete Barrier Transition Type NJ42DF to S42 EACH 603.3375 Concrete Barrier Transition Type NJ51DF to S42 EACH 603.3411 Concrete Barrier Transition Type F32DF to S32 EACH 603.3413 Concrete Barrier Transition Type F32DF to S36 EACH 603.3455 Concrete Barrier Transition Type F42DF to S42 EACH 603.3475 Concrete Barrier Transition Type F51DF to S42 EACH 603.3513 Concrete Barrier Transition Type S32 to S36 EACH $3,860.00 $3,233.70 $5,566.67 603.3535 Concrete Barrier Transition Type S36 to S42 EACH $4,406.21 $3,372.70 $3,750.00 603.3559 Concrete Barrier Transition Type S42 to S56 EACH $5,250.13 $3,981.44 $3,506.94 603.3611 Concrete Barrier Transition Type V32 to S32 EACH $3,000.00 603.3613 Concrete Barrier Transition Type V32 to S36 EACH 603.3655 Concrete Barrier Transition Type V42 to S42 EACH 603.3675 Concrete Barrier Transition Type V51 to S42 EACH 603.3699 Concrete Barrier Transition Type V56 to S56 EACH $3,748.27 603.8000 Concrete Barrier Temporary Precast Delivered LF $9.07 $8.80 $7.47 603.8125 Concrete Barrier Temporary Precast Installed LF $3.28 $2.71 $3.14

Page 37

      

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/25/2019

ITEM DESCRIPTION UNIT FY 17 FY 18 FY 19 603.8505 Anchoring Concrete Barrier on Bridge Decks LF $10.24 $14.13 604.0400 Slope Paving Concrete SY $60.06 $67.58 $79.16 604.0500 Slope Paving Crushed Aggregate SY $22.46 $22.83 $24.41 604.0600 Slope Paving Select Crushed Material SY $21.02 $37.12 $19.59 604.9010.S Slope Paving Repair Crushed Aggregate CY $50.44 $110.88 $111.04 604.9015.S Reseal Crushed Aggregate Slope Paving SY $11.80 $12.54 $8.65 606.0050 Riprap Extra‐Light CY 606.0100 Riprap Light CY $43.78 $82.78 $65.90 606.0200 Riprap Medium CY $54.96 $56.85 $64.34 606.0300 Riprap Heavy CY $56.08 $51.25 $59.00 606.0400 Riprap Extra‐Heavy CY $75.00 $55.00 $50.90 606.0500 Grouted Riprap Light CY $200.00 $190.29 606.0600 Grouted Riprap Medium CY $200.00 $217.86 606.0700 Grouted Riprap Heavy CY $125.00 $92.96 $98.60 606.0800 Grouted Riprap Extra‐Heavy CY 606.1100.S Transition Mat SY 606.9105.S Underwater Substructure Backfill or Riprap Inspection (Structure) LF 608.0005 Storm Sewer Rock Excavation CY $7.13 $30.07 $107.97 608.0106 Relaid Storm Sewer 6‐Inch LF 608.0108 Relaid Storm Sewer 8‐Inch LF 608.0110 Relaid Storm Sewer 10‐Inch LF $85.00 608.0112 Relaid Storm Sewer 12‐Inch LF $64.22 $31.63 $105.85 608.0115 Relaid Storm Sewer 15‐Inch LF 608.0118 Relaid Storm Sewer 18‐Inch LF $64.58 $29.00 $44.00 608.0121 Relaid Storm Sewer 21‐Inch LF 608.0124 Relaid Storm Sewer 24‐Inch LF $70.21 $354.61 608.0127 Relaid Storm Sewer 27‐Inch LF 608.0130 Relaid Storm Sewer 30‐Inch LF $141.00 608.0136 Relaid Storm Sewer 36‐Inch LF $195.00 608.0142 Relaid Storm Sewer 42‐Inch LF $172.28 608.0148 Relaid Storm Sewer 48‐Inch LF $212.00 608.0154 Relaid Storm Sewer 54‐Inch LF

Page 38

                         

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/25/2019

ITEM DESCRIPTION UNIT FY 17 FY 18 FY 19 608.0160 Relaid Storm Sewer 60‐Inch LF 608.0166 Relaid Storm Sewer 66‐Inch LF 608.0172 Relaid Storm Sewer 72‐Inch LF 608.0178 Relaid Storm Sewer 78‐Inch LF 608.0184 Relaid Storm Sewer 84‐Inch LF 608.0190 Relaid Storm Sewer 90‐Inch LF 608.0196 Relaid Storm Sewer 96‐Inch LF 608.0212 Storm Sewer Pipe Reinforced Concrete Class II 12‐Inch LF $80.36 $54.95 $44.81 608.0215 Storm Sewer Pipe Reinforced Concrete Class II 15‐Inch LF $49.50 608.0218 Storm Sewer Pipe Reinforced Concrete Class II 18‐Inch LF $51.62 608.0221 Storm Sewer Pipe Reinforced Concrete Class II 21‐Inch LF 608.0224 Storm Sewer Pipe Reinforced Concrete Class II 24‐Inch LF 608.0227 Storm Sewer Pipe Reinforced Concrete Class II 27‐Inch LF 608.0230 Storm Sewer Pipe Reinforced Concrete Class II 30‐Inch LF 608.0236 Storm Sewer Pipe Reinforced Concrete Class II 36‐Inch LF 608.0242 Storm Sewer Pipe Reinforced Concrete Class II 42‐Inch LF 608.0248 Storm Sewer Pipe Reinforced Concrete Class II 48‐Inch LF 608.0254 Storm Sewer Pipe Reinforced Concrete Class II 54‐Inch LF 608.0260 Storm Sewer Pipe Reinforced Concrete Class II 60‐Inch LF $256.45 608.0266 Storm Sewer Pipe Reinforced Concrete Class II 66‐Inch LF 608.0272 Storm Sewer Pipe Reinforced Concrete Class II 72‐Inch LF 608.0278 Storm Sewer Pipe Reinforced Concrete Class II 78‐Inch LF 608.0284 Storm Sewer Pipe Reinforced Concrete Class II 84‐Inch LF 608.0290 Storm Sewer Pipe Reinforced Concrete Class II 90‐Inch LF 608.0296 Storm Sewer Pipe Reinforced Concrete Class II 96‐Inch LF 608.0297 Storm Sewer Pipe Reinforced Concrete Class II 102‐Inch LF 608.0298 Storm Sewer Pipe Reinforced Concrete Class II 108‐Inch LF 608.0312 Storm Sewer Pipe Reinforced Concrete Class III 12‐Inch LF $46.86 $54.48 $59.30 608.0315 Storm Sewer Pipe Reinforced Concrete Class III 15‐Inch LF $42.04 $53.43 $56.46 608.0318 Storm Sewer Pipe Reinforced Concrete Class III 18‐Inch LF $43.95 $56.71 $67.81 608.0321 Storm Sewer Pipe Reinforced Concrete Class III 21‐Inch LF $42.08 $86.40 $76.96 608.0324 Storm Sewer Pipe Reinforced Concrete Class III 24‐Inch LF $57.78 $65.64 $73.52

Page 39

                                

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/25/2019

ITEM DESCRIPTION UNIT FY 17 FY 18 FY 19 608.0327 Storm Sewer Pipe Reinforced Concrete Class III 27‐Inch LF $74.48 $61.65 $87.23 608.0330 Storm Sewer Pipe Reinforced Concrete Class III 30‐Inch LF $72.89 $82.14 $92.11 608.0336 Storm Sewer Pipe Reinforced Concrete Class III 36‐Inch LF $86.24 $106.64 $117.92 608.0342 Storm Sewer Pipe Reinforced Concrete Class III 42‐Inch LF $102.22 $122.38 $125.76 608.0348 Storm Sewer Pipe Reinforced Concrete Class III 48‐Inch LF $131.77 $150.08 $142.03 608.0354 Storm Sewer Pipe Reinforced Concrete Class III 54‐Inch LF $157.55 $205.25 $202.27 608.0360 Storm Sewer Pipe Reinforced Concrete Class III 60‐Inch LF $186.94 $247.59 $256.44 608.0366 Storm Sewer Pipe Reinforced Concrete Class III 66‐Inch LF $290.00 $342.79 608.0372 Storm Sewer Pipe Reinforced Concrete Class III 72‐Inch LF $365.00 $357.63 608.0378 Storm Sewer Pipe Reinforced Concrete Class III 78‐Inch LF 608.0384 Storm Sewer Pipe Reinforced Concrete Class III 84‐Inch LF 608.0390 Storm Sewer Pipe Reinforced Concrete Class III 90‐Inch LF 608.0396 Storm Sewer Pipe Reinforced Concrete Class III 96‐Inch LF 608.0397 Storm Sewer Pipe Reinforced Concrete Class III 102‐Inch LF 608.0398 Storm Sewer Pipe Reinforced Concrete Class III 108‐Inch LF 608.0412 Storm Sewer Pipe Reinforced Concrete Class IV 12‐Inch LF $44.08 $48.12 $63.69 608.0415 Storm Sewer Pipe Reinforced Concrete Class IV 15‐Inch LF $45.92 $51.20 $56.09 608.0418 Storm Sewer Pipe Reinforced Concrete Class IV 18‐Inch LF $51.17 $45.57 $64.96 608.0421 Storm Sewer Pipe Reinforced Concrete Class IV 21‐Inch LF $55.14 $62.25 $64.84 608.0424 Storm Sewer Pipe Reinforced Concrete Class IV 24‐Inch LF $57.54 $64.32 $64.64 608.0427 Storm Sewer Pipe Reinforced Concrete Class IV 27‐Inch LF $58.46 $62.16 $95.44 608.0430 Storm Sewer Pipe Reinforced Concrete Class IV 30‐Inch LF $70.03 $82.67 $86.16 608.0436 Storm Sewer Pipe Reinforced Concrete Class IV 36‐Inch LF $95.06 $99.21 $103.84 608.0442 Storm Sewer Pipe Reinforced Concrete Class IV 42‐Inch LF $123.38 $111.62 $120.59 608.0448 Storm Sewer Pipe Reinforced Concrete Class IV 48‐Inch LF $146.50 $134.01 $168.64 608.0454 Storm Sewer Pipe Reinforced Concrete Class IV 54‐Inch LF $188.01 $234.00 608.0460 Storm Sewer Pipe Reinforced Concrete Class IV 60‐Inch LF $212.52 $217.31 608.0466 Storm Sewer Pipe Reinforced Concrete Class IV 66‐Inch LF $560.00 608.0472 Storm Sewer Pipe Reinforced Concrete Class IV 72‐Inch LF $260.00 608.0478 Storm Sewer Pipe Reinforced Concrete Class IV 78‐Inch LF $318.61 608.0484 Storm Sewer Pipe Reinforced Concrete Class IV 84‐Inch LF $456.67 608.0512 Storm Sewer Pipe Reinforced Concrete Class V 12‐Inch LF $53.69 $45.56 $98.08

Page 40

             

                  

                     

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/25/2019

ITEM DESCRIPTION UNIT FY 17 FY 18 FY 19 608.0515 Storm Sewer Pipe Reinforced Concrete Class V 15‐Inch LF $78.09 $64.28 $64.77 608.0518 Storm Sewer Pipe Reinforced Concrete Class V 18‐Inch LF $75.11 $72.37 $62.77 608.0521 Storm Sewer Pipe Reinforced Concrete Class V 21‐Inch LF 608.0524 Storm Sewer Pipe Reinforced Concrete Class V 24‐Inch LF $64.34 $61.74 $85.16 608.0527 Storm Sewer Pipe Reinforced Concrete Class V 27‐Inch LF 608.0530 Storm Sewer Pipe Reinforced Concrete Class V 30‐Inch LF $79.49 $77.07 $140.35 608.0536 Storm Sewer Pipe Reinforced Concrete Class V 36‐Inch LF $106.42 $95.56 $98.58 608.0542 Storm Sewer Pipe Reinforced Concrete Class V 42‐Inch LF $117.55 $165.00 608.0548 Storm Sewer Pipe Reinforced Concrete Class V 48‐Inch LF $294.62 $112.02 $144.30 608.0554 Storm Sewer Pipe Reinforced Concrete Class V 54‐Inch LF $237.36 608.0560 Storm Sewer Pipe Reinforced Concrete Class V 60‐Inch LF 608.0566 Storm Sewer Pipe Reinforced Concrete Class V 66‐Inch LF 608.0572 Storm Sewer Pipe Reinforced Concrete Class V 72‐Inch LF 608.2314 Storm Sewer Pipe Reinforced Concrete Horizontal Elliptical Class HE‐III LF $73.69 $89.07 608.2319 Storm Sewer Pipe Reinforced Concrete Horizontal Elliptical Class HE‐III LF $80.45 $85.40 $96.23 608.2324 Storm Sewer Pipe Reinforced Concrete Horizontal Elliptical Class HE‐III LF $104.41 $106.44 $114.77 608.2329 Storm Sewer Pipe Reinforced Concrete Horizontal Elliptical Class HE‐III LF $133.66 $112.81 $143.58 608.2334 Storm Sewer Pipe Reinforced Concrete Horizontal Elliptical Class HE‐III LF $150.00 $137.31 $146.22 608.2338 Storm Sewer Pipe Reinforced Concrete Horizontal Elliptical Class HE‐III LF $156.25 $174.50 608.2343 Storm Sewer Pipe Reinforced Concrete Horizontal Elliptical Class HE‐III  LF $57.06 $255.00 608.2348 Storm Sewer Pipe Reinforced Concrete Horizontal Elliptical Class HE‐III LF $262.48 608.2353 Storm Sewer Pipe Reinforced Concrete Horizontal Elliptical Class HE‐III LF 608.2358 Storm Sewer Pipe Reinforced Concrete Horizontal Elliptical Class HE‐III LF $487.00 $425.78 608.2363 Storm Sewer Pipe Reinforced Concrete Horizontal Elliptical Class HE‐III LF 608.2368 Storm Sewer Pipe Reinforced Concrete Horizontal Elliptical Class HE‐III LF $804.00 608.2414 Storm Sewer Pipe Reinforced Concrete Horizontal Elliptical Class HE‐IV  LF $65.81 $79.29 $125.12 608.2419 Storm Sewer Pipe Reinforced Concrete Horizontal Elliptical Class HE‐IV  LF $88.57 $86.70 $97.11 608.2424 Storm Sewer Pipe Reinforced Concrete Horizontal Elliptical Class HE‐IV  LF $98.75 $108.84 $113.03 608.2429 Storm Sewer Pipe Reinforced Concrete Horizontal Elliptical Class HE‐IV  LF $136.37 $144.47 $145.03 608.2434 Storm Sewer Pipe Reinforced Concrete Horizontal Elliptical Class HE‐IV  LF $152.88 $150.00 $171.08 608.3012 Storm Sewer Pipe Class III‐A 12‐Inch LF $49.93 $70.91 $75.27 608.3015 Storm Sewer Pipe Class III‐A 15‐Inch LF $50.09 $56.29 $79.15

Page 41

        

  

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/25/2019

ITEM DESCRIPTION UNIT FY 17 FY 18 FY 19 608.3018 Storm Sewer Pipe Class III‐A 18‐Inch LF $59.86 $55.00 $42.99 608.3021 Storm Sewer Pipe Class III‐A  21‐Inch LF $65.00 608.3024 Storm Sewer Pipe Class III‐A  24‐Inch LF $52.31 $58.63 $91.50 608.3027 Storm Sewer Pipe Class III‐A  27‐Inch LF 608.3030 Storm Sewer Pipe Class III‐A  30‐Inch LF $71.50 608.3036 Storm Sewer Pipe Class III‐A  36‐Inch LF $68.77 608.3612 Storm Sewer Pipe Class III‐B 12‐Inch LF $46.48 $101.55 $33.55 608.3615 Storm Sewer Pipe Class III‐B 15‐Inch LF $43.91 $56.15 608.3618 Storm Sewer Pipe Class III‐B 18‐Inch LF $51.32 $54.00 $38.36 608.3621 Storm Sewer Pipe Class III‐B 21‐Inch LF $65.66 608.3624 Storm Sewer Pipe Class III‐B 24‐Inch LF $63.83 $86.42 $41.16 608.3627 Storm Sewer Pipe Class III‐B 27‐Inch LF 608.3630 Storm Sewer Pipe Class III‐B 30‐Inch LF $107.21 $82.93 608.3636 Storm Sewer Pipe Class III‐B 36‐Inch LF $92.93 608.6006 Storm Sewer Pipe Composite 6‐Inch LF $22.51 $34.92 608.6008 Storm Sewer Pipe Composite 8‐Inch LF $43.32 $35.43 $89.84 608.6010 Storm Sewer Pipe Composite 10‐Inch LF $37.69 $72.71 $99.00 608.6012 Storm Sewer Pipe Composite 12‐Inch LF $59.17 $79.36 608.6015 Storm Sewer Pipe Composite 15‐Inch LF $71.65 611.0410 Reconstructing Catch Basins EACH $876.92 $2,000.00 $1,557.14 611.0420 Reconstructing Manholes EACH $843.63 $1,298.79 $1,811.26 611.0430 Reconstructing Inlets EACH $863.97 $1,082.50 $1,384.22 611.0530 Manhole Covers Type J EACH $433.34 $470.68 $543.64 611.0535 Manhole Covers Type J‐Special EACH $442.17 $445.08 $445.45 611.0540 Manhole Covers Type K EACH $662.53 611.0545 Manhole Covers Type L EACH $378.71 $473.88 $465.86 611.0550 Manhole Covers Type M EACH $550.00 $778.16 611.0552 Manhole Covers Type M‐Communications EACH 611.0555 Manhole Covers Type Q EACH $675.15 $641.00 $568.00 611.0557 Manhole Covers Type Q‐Communications EACH 611.0600 Inlet Covers Type A EACH $519.15 $619.26 $757.05 611.0603 Inlet Covers Type A‐S EACH $450.00 $566.39 $648.33

Page 42

                           

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/25/2019

ITEM DESCRIPTION UNIT FY 17 FY 18 FY 19 611.0606 Inlet Covers Type B EACH $583.18 $565.48 $715.47 611.0609 Inlet Covers Type B‐A EACH $900.00 $562.96 $734.30 611.0610 Inlet Covers Type BW EACH $688.08 $585.46 $589.74 611.0612 Inlet Covers Type C EACH $464.38 $398.99 $462.11 611.0615 Inlet Covers Type F EACH $1,017.76 $986.39 $1,369.00 611.0624 Inlet Covers Type H EACH $535.99 $574.37 $639.54 611.0627 Inlet Covers Type HM EACH $601.91 $621.12 $616.65 611.0630 Inlet Covers Type HM‐GJ EACH $532.57 $562.00 $578.62 611.0633 Inlet Covers Type HM‐GJ‐S EACH $525.00 $567.00 $588.16 611.0636 Inlet Covers Type HM‐S EACH $676.00 $535.28 $794.01 611.0639 Inlet Covers Type H‐S EACH $534.40 $561.42 $632.50 611.0642 Inlet Covers Type MS EACH $393.39 $420.67 $469.44 611.0645 Inlet Covers Type MS‐A EACH $513.67 $441.54 $619.94 611.0648 Inlet Covers Type R EACH $960.00 $1,500.00 611.0651 Inlet Covers Type S EACH $565.30 $596.05 $900.42 611.0652 Inlet Covers Type T EACH $710.97 $684.75 $790.84 611.0654 Inlet Covers Type V EACH $550.80 $556.39 $617.65 611.0657 Inlet Covers Type W EACH $976.11 $1,007.00 611.0660 Inlet Covers Type WM EACH $1,084.21 $1,100.00 $964.24 611.0663 Inlet Covers Type X EACH $669.00 611.0666 Inlet Covers Type Z EACH $521.49 $538.00 $613.21 611.1003 Catch Basins 3‐FT Diameter EACH $1,307.04 $1,328.27 $1,829.24 611.1004 Catch Basins 4‐FT Diameter EACH $1,549.46 $1,825.96 $2,298.87 611.1005 Catch Basins 5‐FT Diameter EACH $2,654.89 $2,895.70 $3,094.15 611.1006 Catch Basins 6‐FT Diameter EACH $3,707.03 $3,601.23 $4,514.26 611.1230 Catch Basins 2x3‐FT EACH $1,267.16 $1,465.69 $1,776.58 611.1253 Catch Basins 2.5x3‐FT EACH $2,250.00 $850.00 611.2003 Manholes 3‐FT Diameter EACH $1,385.78 $1,463.43 $1,528.06 611.2004 Manholes 4‐FT Diameter EACH $1,741.41 $1,897.91 $2,014.30 611.2005 Manholes 5‐FT Diameter EACH $2,510.35 $2,441.61 $2,770.66 611.2006 Manholes 6‐FT Diameter EACH $3,383.82 $3,879.70 $3,745.88 611.2007 Manholes 7‐FT Diameter EACH $4,864.33 $5,831.86 $6,138.12

Page 43

  

                  

 

 

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/25/2019

ITEM DESCRIPTION UNIT FY 17 FY 18 FY 19 611.2008 Manholes 8‐FT Diameter EACH $7,201.96 $7,527.06 $7,934.02 611.2033 Manholes 3x3‐FT EACH $2,400.00 $2,339.00 611.2044 Manholes 4x4‐FT EACH $2,470.05 $2,279.37 $3,419.50 611.2055 Manholes 5x5‐FT EACH $4,486.78 $4,745.91 611.2066 Manholes 6x6‐FT EACH $4,518.47 $6,043.27 $5,563.72 611.2104 Manholes Communication 4‐FT Diameter EACH 611.2504 Manholes Variable Tee 4‐FT Diameter EACH $5,394.00 $3,256.50 $5,740.00 611.2604 Manholes Variable Special 4‐FT Diameter EACH $8,369.73 $4,225.00 611.3003 Inlets 3‐FT Diameter EACH $1,466.87 $1,075.38 $1,974.39 611.3004 Inlets 4‐FT Diameter EACH $1,452.22 $1,489.75 $1,523.65 611.3220 Inlets 2x2‐FT EACH $1,108.98 $1,104.32 $1,239.04 611.3225 Inlets 2x2.5‐FT EACH $1,171.10 $1,140.40 $1,244.79 611.3230 Inlets 2x3‐FT EACH $1,059.58 $1,263.14 $1,344.51 611.3253 Inlets 2.5x3‐FT EACH $1,230.00 $1,535.63 $1,399.68 611.3901 Inlets Median 1 Grate EACH $1,690.43 $1,584.81 $1,962.24 611.3902 Inlets Median 2 Grate EACH $2,325.48 $2,744.98 $2,613.06 611.3903 Inlets Median 3 Grate EACH $2,755.00 $3,202.00 $3,404.58 611.3904 Inlets Median 4 Grate EACH $1,775.00 $3,833.33 $2,761.86 611.8105 Adjusting Catch Basin Covers EACH $335.71 $277.00 $705.00 611.8110 Adjusting Manhole Covers EACH $350.83 $427.19 $530.37 611.8115 Adjusting Inlet Covers EACH $359.67 $383.35 $732.78 611.8120.S Cover Plates Temporary EACH $174.04 $171.82 $345.23 611.9705 Salvaged Manhole Covers EACH $309.52 $1,200.00 611.9710 Salvaged Inlet Covers EACH $441.43 $255.22 $503.53 611.9800.S Pipe Grates EACH $891.00 $980.94 $1,399.97 611.9900.S Drain Slotted Vane EACH $1,121.43 $1,903.62 $1,783.94 612.0104 Pipe Underdrain 4‐Inch LF $16.03 $10.15 $12.29 612.0106 Pipe Underdrain 6‐Inch LF $6.45 $6.90 $8.39 612.0108 Pipe Underdrain 8‐Inch LF $18.12 $6.83 $30.00 612.0110 Pipe Underdrain 10‐Inch LF $8.00 612.0112 Pipe Underdrain 12‐Inch LF $12.00 $10.24 612.0115 Pipe Underdrain 15‐Inch LF

Page 44

  

     

  

    

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/25/2019

ITEM DESCRIPTION UNIT FY 17 FY 18 FY 19 612.0118 Pipe Underdrain 18‐Inch LF 612.0121 Pipe Underdrain 21‐Inch LF 612.0204 Pipe Underdrain Unperforated 4‐Inch LF $6.65 $10.04 $22.36 612.0206 Pipe Underdrain Unperforated 6‐Inch LF $15.75 $12.66 $17.23 612.0208 Pipe Underdrain Unperforated 8‐Inch LF $17.13 $16.37 $26.61 612.0210 Pipe Underdrain Unperforated 10‐Inch LF $10.00 $32.20 612.0212 Pipe Underdrain Unperforated 12‐Inch LF $30.89 $31.69 $38.55 612.0215 Pipe Underdrain Unperforated 15‐Inch LF $48.00 $15.00 612.0218 Pipe Underdrain Unperforated 18‐Inch LF $40.46 $80.13 612.0221 Pipe Underdrain Unperforated 21‐Inch LF 612.0404 Pipe Underdrain Wrapped 4‐Inch LF $6.66 $8.43 $11.45 612.0406 Pipe Underdrain Wrapped 6‐Inch LF $7.06 $5.82 $8.57 612.0408 Pipe Underdrain Wrapped 8‐Inch LF $10.00 612.0410 Pipe Underdrain Wrapped 10‐Inch LF 612.0412 Pipe Underdrain Wrapped 12‐Inch LF 612.0415 Pipe Underdrain Wrapped 15‐Inch LF 612.0504 Pipe Underdrain Wrapped and Plowed 4‐Inch LF 612.0506 Pipe Underdrain Wrapped and Plowed 6‐Inch LF 612.0600 Underdrain Trench LF $2.74 $23.73 612.0700 Drain Tile Exploration LF $4.83 $2.87 $5.20 612.0804 Apron Endwalls for Underdrain Reinforced Concrete 4‐Inch EACH $219.39 $223.33 $259.19 612.0806 Apron Endwalls for Underdrain Reinforced Concrete 6‐Inch EACH $198.51 $325.72 $259.28 612.0902.S Insulation Board Polystyrene (inch) SY $16.41 $17.09 $11.69 613.1100.S Cable Barrier Type 1 LF $16.83 $16.53 $18.23 613.1200.S Cable Barrier End Terminal Type 1 EACH $3,561.91 $3,820.79 $4,228.41 614.0010 Barrier System Grading Shaping Finishing EACH $1,883.52 $2,561.15 $2,185.68 614.0115 Anchorages for Steel Plate Beam Guard Type 2 EACH $753.08 $829.55 $900.00 614.0150 Anchor Assemblies for Steel Plate Beam Guard EACH $192.22 $190.86 $150.22 614.0200 Steel Thrie Beam Structure Approach LF $54.73 $61.96 $67.47 614.0212 Steel Thrie Beam Structure Approach Retrofit Cantilever Blunt End EACH 614.0213 Steel Thrie Beam Structure Approach Retrofit Cantilever Sloped End EACH $1,500.00 614.0215 Steel Thrie Beam Structure Approach Retrofit Span EACH $2,426.47

Page 45

     

        

   

 

   

 

 

    

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/25/2019

ITEM DESCRIPTION UNIT FY 17 FY 18 FY 19 614.0216 Steel Thrie Beam Structure Approach Retrofit Post EACH 614.0220 Steel Thrie Beam Bullnose Terminal EACH $5,535.51 $6,255.81 $7,022.73 614.0230 Steel Thrie Beam LF $25.63 $27.76 $26.57 614.0250 Steel Thrie Beam Structure Approach Temporary LF $50.04 $50.00 614.0305 Steel Plate Beam Guard Class A LF $15.63 $17.36 $18.17 614.0340 Steel Plate Beam Guard Over Low‐Fill Culverts Class A LF $24.73 $26.50 $29.00 614.0345 Steel Plate Beam Guard Short Radius LF $24.52 $24.56 $26.54 614.0360 Steel Plate Beam Guard Temporary LF $12.00 $12.00 $10.53 614.0370 Steel Plate Beam Guard Energy Absorbing Terminal EACH $2,502.99 $2,619.02 $2,926.35 614.0380 Steel Plate Beam Guard Energy Absorbing Terminal Temporary EACH $2,150.00 $2,125.00 614.0390 Steel Plate Beam Guard Short Radius Terminal EACH $1,445.83 $1,399.14 $1,587.50 614.0395 Guardrail Mow Strip Concrete SY $54.20 $70.00 614.0396 Guardrail Mow Strip Asphalt SY $23.26 $42.90 $39.06 614.0397 Guardrail Mow Strip Emulsified Asphalt SY $10.08 $8.80 $12.59 614.0400 Adjusting Steel Plate Beam Guard LF $8.27 $9.28 $10.98 614.0510 Guardrail Stiffened NW LF 614.0515 Guardrail Stifened LHW LF $24.18 $26.01 $25.53 614.0700 Sand Barrels Arrays EACH $2,127.27 $3,000.00 614.0800 Crash Cushions Permanent EACH $14,023.53 $15,743.02 $14,000.00 614.0805 Crash Cushions Permanent Low Maintenance EACH $25,642.86 $27,272.73 $35,995.25 614.0905 Crash Cushions Temporary EACH $5,778.52 $5,136.73 $4,634.94 614.0920 Salvaged Rail LF $1.81 $2.31 $2.00 614.0925 Salvaged Guardrail End Treatments EACH $200.42 $214.72 $173.46 614.0930 Salvaged Crash Cushions EACH $200.00 $154.17 614.0935 Salvaged Sand Barrels EACH $100.00 614.0950 Replacing Guardrail Posts and Blocks EACH $61.27 $109.21 $121.29 614.0951 Replacing Guardrail Rail and Hardware LF $8.57 $13.45 $15.22 614.0952 Replacing Guardrail Reflectors EACH 614.1000 MGS Guardrail Temporary LF $16.19 $10.29 614.1100 MGS Guardrail Temporary Thrie Beam Transition LF $61.07 $67.01 $70.00 614.1200 MGS Guardrail Temporary Terminal EAT EACH $2,200.00 $2,520.00 614.2300 MGS Guardrail 3 LF $16.06 $16.87 $18.73

Page 46

     

   

  

  

    

       

  

     

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/25/2019

ITEM DESCRIPTION UNIT FY 17 FY 18 FY 19 614.2310 MGS Guardrail 3 HS LF $25.73 $25.27 $27.68 614.2320 MGS Guardrail 3 QS LF $37.91 $40.00 614.2330 MGS Guardrail 3 K LF $24.11 $26.48 $26.56 614.2340 MGS Guardrail 3 L LF $19.73 $25.63 $23.64 614.2350 MGS Guardrail Short Radius LF $26.47 $28.61 614.2500 MGS Thrie Beam Transition LF $60.56 $64.49 $71.65 614.2610 MGS Guardrail Terminal EAT EACH $2,386.61 $2,610.79 $3,009.30 614.2620 MGS Guardrail Terminal Type 2 EACH $870.11 $912.57 $1,027.91 614.2630 MGS Guardrail Short Radius Terminal EACH $1,393.67 $1,704.29 614.8010 Anchor Post Assembly Top Mount EACH $252.38 $511.11 $440.00 615.0100 Guard Fence Timber Rail LF 615.0200 Curbs Treated Timber EACH $85.00 615.0300 Guard Posts Timber EACH 615.0400 Marker Posts Rustic EACH 615.1000 Wisconsin Historical Marker EACH 616.0100 Fence Woven Wire (height) LF $4.39 $5.01 $4.76 616.0120.S Fencing Small Animal LF 616.0204 Fence Chain Link 4‐FT LF $30.50 $43.51 $29.58 616.0205 Fence Chain Link 5‐FT LF $21.38 $10.09 $104.99 616.0206 Fence Chain Link 6‐FT LF $14.27 $13.90 $17.07 616.0207 Fence Chain Link 7‐FT LF 616.0208 Fence Chain Link 8‐FT LF $16.25 616.0210 Fence Chain Link 10‐FT LF 616.0329 Gates Chain Link (width) EACH $1,606.00 $1,445.18 $980.71 616.0350.S Gates Wood Single Leaf (length) EACH 616.0352.S Gates Wood Double Leaf (length) EACH 616.0360.S Gates Pipe Single Leaf (length) EACH $7,650.00 $7,387.78 616.0404 Fence Chain Link Salvaged 4‐FT LF $188.15 616.0405 Fence Chain Link Salvaged 5‐FT LF $100.00 $5.33 616.0406 Fence Chain Link Salvaged 6‐FT LF $14.13 616.0407 Fence Chain Link Salvaged 7‐FT LF $75.00 616.0408 Fence Chain Link Salvaged 8‐FT LF

Page 47

       

 

        

  

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/25/2019

ITEM DESCRIPTION UNIT FY 17 FY 18 FY 19 616.0410 Fence Chain Link Salvaged 10‐FT LF 616.0600.S Fence Temporary LF $5.00 $14.05 $3.84 616.0700.S Fence Safety LF $2.57 $2.89 $3.60 616.0800.S Fence Track Clearance LF $4.00 617.0100 Hauling (material) CYMI 618.0100 Maintenance And Repair of Haul Roads (project) EACH $397.50 $523.52 $779.70 619.1000 Mobilization EACH $157,870.95 $279,736.62 $298,561.08 620.0100 Concrete Corrugated Median SF $8.27 $9.24 $9.59 620.0200 Concrete Median Blunt Nose SF $9.90 $8.98 $9.89 620.0300 Concrete Median Sloped Nose SF $7.99 $9.51 $10.14 621.0100 Landmark Reference Monuments EACH $215.97 $244.57 $166.68 621.1100 Landmark Reference Monuments and Cast Iron Covers EACH $1,042.86 $1,294.74 621.1200 Landmark Reference Monuments and Aluminum Covers EACH $1,500.00 623.0200 Dust Control Surface Treatment SY $0.06 $0.03 $0.04 624.0100 Water MGAL $14.28 $12.63 $14.88 625.0100 Topsoil SY $1.85 $1.58 $3.42 625.0105 Topsoil CY $23.91 $18.66 $10.06 625.0500 Salvaged Topsoil SY $0.62 $0.66 $0.85 626.0200 Peat Humus SY 627.0200 Mulching SY $0.15 $0.17 $0.20 627.0205 Mulching TON 628.1104 Erosion Bales EACH $8.61 $10.21 $12.02 628.1504 Silt Fence LF $1.70 $1.93 $2.12 628.1520 Silt Fence Maintenance LF $0.04 $0.08 $0.07 628.1550 Silt Screen LF $28.48 $50.00 628.1905 Mobilizations Erosion Control EACH $191.54 $201.42 $244.11 628.1910 Mobilizations Emergency Erosion Control EACH $138.07 $176.63 $266.88 628.1920 Cleaning Sediment Basins CY $11.59 $23.76 $50.00 628.2002 Erosion Mat Class I Type A SY $0.90 $1.02 $1.04 628.2004 Erosion Mat Class I Type B SY $0.92 $0.98 $1.16 628.2006 Erosion Mat Urban Class I Type A SY $1.46 $1.65 $1.82 628.2008 Erosion Mat Urban Class I Type B SY $1.52 $1.67 $1.97

Page 48

      

 

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/25/2019

ITEM DESCRIPTION UNIT FY 17 FY 18 FY 19 628.2021 Erosion Mat Class II Type A SY $3.80 $5.95 628.2023 Erosion Mat Class II Type B SY $1.51 $1.40 $1.77 628.2027 Erosion Mat Class II Type C SY $4.25 $4.17 $3.88 628.2031 Erosion Mat Class III Type A SY $3.73 $10.00 $10.81 628.2033 Erosion Mat Class III Type B SY $8.00 628.2037 Erosion Mat Class III Type C SY $15.00 $8.20 $7.85 628.2039 Erosion Mat Class III Type D SY $9.04 $10.87 $9.96 628.5505 Polyethylene Sheeting SY $1.26 $3.53 $4.31 628.6005 Turbidity Barriers SY $28.87 $31.26 $34.53 628.6505 Soil Stabilizer Type A ACRE $1,976.25 $2,211.22 $4,361.77 628.6510 Soil Stabilizer Type B ACRE $645.03 $688.70 $696.87 628.7005 Inlet Protection Type A EACH $92.52 $91.37 $90.21 628.7010 Inlet Protection Type B EACH $52.33 $48.78 $57.37 628.7015 Inlet Protection Type C EACH $49.45 $52.30 $58.83 628.7020 Inlet Protection Type D EACH $97.34 $112.43 $118.56 628.7504 Temporary Ditch Checks LF $7.30 $7.43 $7.84 628.7515.S Stone or Rock Ditch Checks CY $38.81 $52.88 $79.87 628.7555 Culvert Pipe Checks EACH $15.72 $19.89 $19.31 628.7560 Tracking Pads EACH $802.56 $689.34 $787.62 628.7570 Rock Bags EACH $7.40 $10.26 $12.30 629.0205 Fertilizer Type A CWT $49.20 $54.51 $74.98 629.0210 Fertilizer Type B CWT $52.30 $59.53 $58.73 629.1100 Agricultural Limestone Treatment TON 630.0110 Seeding Mixture No. 10 LB $5.46 $5.24 $8.15 630.0120 Seeding Mixture No. 20 LB $5.11 $5.15 $6.56 630.0130 Seeding Mixture No. 30 LB $5.03 $5.38 $6.89 630.0140 Seeding Mixture No. 40 LB $9.56 $10.00 $9.07 630.0160 Seeding Mixture No. 60 LB $16.33 $21.34 $18.59 630.0170 Seeding Mixture No. 70 LB $125.41 $150.00 $158.37 630.0171 Seeding Mixture No. 70A LB $120.11 $186.54 $347.65 630.0175 Seeding Mixture No. 75 LB $25.00 $26.81 $68.00 630.0180 Seeding Mixture No. 80 LB $22.00 $46.13

Page 49

  

 

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/25/2019

ITEM DESCRIPTION UNIT FY 17 FY 18 FY 19 630.0200 Seeding Temporary LB $2.20 $2.40 $2.36 630.0300 Seeding Borrow Pit LB $3.57 $5.06 $5.86 630.0400 Seeding Nurse Crop LB $2.44 $5.59 $4.56 630.0500 Seed Water MGAL 631.0300 Sod Water MGAL $17.22 $24.34 $38.20 631.1000 Sod Lawn SY $4.12 $4.74 $5.42 631.1100 Sod Erosion Control SY $3.93 $7.33 $10.95 631.1200 Sod Erosion Control Sandy Soil SY $20.00 $10.00 632.0101 Trees (species) (size) (root) EACH $461.13 $434.13 $500.41 632.0201 Shrubs (species) (size) (root) EACH $58.64 $65.97 $97.97 632.0301 Vines (species) (size) (root) EACH $22.34 $60.00 632.9101 Landscape Planting Surveillance and Care Cycles EACH $750.47 $920.31 $3,417.89 633.0100 Delineator Posts Steel EACH $21.98 $22.04 $26.13 633.0200 Delineators Flexible EACH $39.50 $34.48 $43.72 633.0500 Delineator Reflectors EACH $4.39 $4.42 $5.46 633.1000 Delineators Barrier Wall EACH $39.97 $39.49 $43.60 633.1100 Delineators Temporary EACH $19.91 $18.79 $21.98 633.5100 Markers Row EACH $46.32 $23.92 $46.90 633.5200 Markers Culvert End EACH $42.15 $44.31 $46.54 633.5300 Markers Crossover EACH 633.5400 Markers Median EACH 633.9010 Salvaged Delineator Steel EACH 634.0410 Posts Wood 4x4‐Inch X 10‐FT EACH $51.67 $50.00 $60.00 634.0412 Posts Wood 4x4‐Inch X 12‐FT EACH $40.00 $50.00 $55.00 634.0414 Posts Wood 4x4‐Inch X 14‐FT EACH $54.82 $49.99 $38.31 634.0416 Posts Wood 4x4‐Inch X 16‐FT EACH $59.59 $72.00 $51.52 634.0418 Posts Wood 4x4‐Inch X 18‐FT EACH $75.00 $75.00 634.0612 Posts Wood 4x6‐Inch X 12‐FT EACH $52.35 $57.86 $60.94 634.0614 Posts Wood 4x6‐Inch X 14‐FT EACH $50.76 $53.91 $63.17 634.0616 Posts Wood 4x6‐Inch X 16‐FT EACH $53.43 $59.32 $65.08 634.0618 Posts Wood 4x6‐Inch X 18‐FT EACH $60.88 $76.17 $78.12 634.0620 Posts Wood 4x6‐Inch X 20‐FT EACH $83.49 $87.40 $82.46

Page 50

                                    

 

 

   

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/25/2019

ITEM DESCRIPTION UNIT FY 17 FY 18 FY 19 634.0622 Posts Wood 4x6‐Inch X 22‐FT EACH $81.70 $96.51 $111.60 634.0624 Posts Wood 4x6‐Inch X 24‐FT EACH $125.00 $103.94 $123.07 634.0801 Posts Tubular Steel 2x2‐Inch X 1.5‐FT EACH 634.0803 Posts Tubular Steel 2x2‐Inch X 3‐FT EACH 634.0805 Posts Tubular Steel 2x2‐Inch X 5‐FT EACH $103.75 $105.00 634.0808 Posts Tubular Steel 2x2‐Inch X 8‐FT EACH $119.46 $128.33 $156.50 634.0809 Posts Tubular Steel 2x2‐Inch X 9.5‐FT EACH $145.57 $165.00 634.0810 Posts Tubular Steel 2x2‐Inch X 10‐FT EACH $127.58 $129.86 $153.46 634.0811 Posts Tubular Steel 2x2‐Inch X 11‐FT EACH $116.58 $136.70 $144.75 634.0812 Posts Tubular Steel 2x2‐Inch X 12‐FT EACH $128.74 $115.57 $156.67 634.0814 Posts Tubular Steel 2x2‐Inch X 14‐FT EACH $133.78 $127.01 $151.10 634.0816 Posts Tubular Steel 2x2‐Inch X 16‐FT EACH $130.79 $156.04 $136.16 634.0818 Posts Tubular Steel 2x2‐Inch X 18‐FT EACH $176.67 $167.69 $177.33 634.0885 Posts Tubular Steel 2x2‐Inch X 8.5‐FT EACH $129.19 $255.10 635.0200 Sign Supports Structural Steel HS LB $2.76 $3.50 $4.04 635.0300 Sign Supports Replacing Base Connection Bolts EACH $147.16 $160.27 $161.92 635.9010.S Sign Supports Shorten Structural Steel EACH $825.00 $350.00 636.0050.S Foundation Drilling (diameter) LF $63.37 $250.24 636.0100 Sign Supports Concrete Masonry CY $842.03 $880.38 $864.99 636.0500 Sign Supports Steel Reinforcement LB $2.84 $3.28 $3.57 636.1000 Sign Supports Steel Reinforcement HS LB $3.14 $2.48 $2.67 636.1500 Sign Supports Steel Coated Reinforcement HS LB $2.89 $3.15 $1.51 637.0620 Sign Flags Permanent Type II EACH $121.44 $155.89 $147.73 637.1210 Signs Type I Reflective H SF $21.74 $22.80 637.1220 Signs Type I Reflective SH SF $20.37 $22.30 $23.61 637.1230 Signs Type I Reflective F SF $20.74 $23.01 $23.56 637.2110 Signs Type II Non Reflective SF 637.2115 Signs Type II Non Reflective Folding SF 637.2210 Signs Type II Reflective H SF $15.05 $16.89 $17.74 637.2215 Signs Type II Reflective H Folding SF $22.62 $22.63 $23.46 637.2220 Signs Type II Reflective SH SF $18.19 $40.34 $16.76 637.2225 Signs Type II Reflective SH Folding SF

Page 51

 

         

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/25/2019

ITEM DESCRIPTION UNIT FY 17 FY 18 FY 19 637.2230 Signs Type II Reflective F SF $16.89 $18.04 $19.81 637.2235 Signs Type II Reflective F Folding SF $23.09 637.5453 Barricades Permanent Type III EACH $445.38 $574.60 $327.13 638.2101 Moving Signs Type I EACH $647.86 $645.11 $600.24 638.2102 Moving Signs Type II EACH $69.15 $79.65 $107.07 638.2601 Removing Signs Type I EACH $289.05 $233.34 $242.18 638.2602 Removing Signs Type II EACH $15.86 $18.40 $20.00 638.3000 Removing Small Sign Supports EACH $15.53 $18.64 $21.69 638.3100 Removing Structural Steel Sign Supports EACH $223.49 $351.50 $348.73 638.3150 Removing Overhead Sign Supports Cantilever (structure) EACH $3,127.50 $4,800.00 638.3155 Removing Overhead Sign Supports Full Span (structure) EACH $6,125.00 638.3210 Revising Signs Type I Demountable EACH $1,190.67 $504.55 $550.00 638.3215 Revising Signs Type I Non‐Removeable EACH 638.3610 Erecting State Owned Signs Type I EACH $2,166.67 $1,000.00 638.3620 Erecting State Owned Signs Type II EACH $100.00 638.4000 Moving Small Sign Supports EACH $56.85 $76.40 $69.27 638.4100 Moving Structural Steel Sign Supports EACH $471.43 $437.50 $880.00 639.0106 Drill Hole in Earth 6‐Inch LF 639.0108 Drill Hole in Earth 8‐Inch LF 639.0110 Drill Hole in Earth 10‐Inch LF 639.0112 Drill Hole in Earth 12‐Inch LF 639.0504 Drill Hole in Rock 4‐Inch LF 639.0506 Drill Hole in Rock 6‐Inch LF 639.0508 Drill Hole in Rock 8‐Inch LF 639.0510 Drill Hole in Rock 10‐Inch LF 639.0512 Drill Hole in Rock 12‐Inch LF 639.1004 Well Casing Pipe 4‐Inch LF 639.1006 Well Casing Pipe 6‐Inch LF 639.1008 Well Casing Pipe 8‐Inch LF 639.1010 Well Casing Pipe 10‐Inch LF 639.1012 Well Casing Pipe 12‐Inch LF 639.1700 Well Screen LF

Page 52

  

 

  

          

  

    

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/25/2019

ITEM DESCRIPTION UNIT FY 17 FY 18 FY 19 639.2100 Grout for Sealing Well Casing CF 639.2500 Pump and Well Platform EACH 639.3000 Wayside Well Shelter EACH 639.4000 Test Pumping EACH 640.0200.S Placing Industrial (byproduct) CY 640.0250.S Hauling Industrial (byproduct) TON 640.0270.S Maintenance of Cells (byproduct) HRS 640.0400.S Basin Lysimeter EACH 640.0500.S Head Monitoring Well EACH 640.1303.S Pond Liner Clay CY $18.00 $9.55 $6.96 640.1305.S Clay Cover CY 641.0100 Sign Bridge Single Pole Sign Support One Sign (structure) LS $16,765.00 $22,250.00 $18,452.38 641.0600 Sign Bridge Single Pole Sign Support Two Signs (structure) LS $22,297.50 $21,647.11 $22,321.43 641.1200 Sign Bridge Cantilevered (structure) LS $26,312.25 $29,930.78 $29,860.87 641.5100 Sign Bridge Structure Mounted (structure) LS $53,825.00 641.6600 Sign Bridge (structure) LS $54,948.93 $69,883.91 $63,221.84 641.8100 Overhead Sign Support (structure) LS $17,864.33 $22,677.64 $26,043.95 642.5001 Field Office Type B EACH $4,761.99 $4,395.58 $5,056.29 642.5201 Field Office Type C EACH $8,697.04 $7,972.03 $9,938.76 642.5401 Field Office Type D EACH $13,660.99 $22,660.18 $23,702.88 642.6001 Field Laboratory EACH $6,666.67 643.0300 Traffic Control Drums DAY $0.37 $0.21 $0.19 643.0310.S Temporary Portable Rumble Strips LS $10,945.08 $11,284.93 $9,097.11 643.0405 Traffic Control Barricades Type I DAY 643.0410 Traffic Control Barricades Type II DAY $0.49 $0.35 $0.37 643.0420 Traffic Control Barricades Type III DAY $0.68 $0.52 $0.49 643.0500 Traffic Control Flexible Tubular Marker Posts EACH $27.29 $26.68 $22.81 643.060.S Traffic Channelizing Curb System LF 643.0600 Traffic Control Flexible Tubular Marker Bases EACH $2.25 $3.10 $3.08 643.0705 Traffic Control Warning Lights Type A DAY $0.20 $0.12 $0.11 643.0710 Traffic Control Warning Lights Type B DAY $0.20 643.0715 Traffic Control Warning Lights Type C DAY $0.21 $0.11 $0.11

Page 53

 

 

  

       

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/25/2019

ITEM DESCRIPTION UNIT FY 17 FY 18 FY 19 643.0800 Traffic Control Arrow Boards DAY $17.23 $11.29 $10.61 643.0900 Traffic Control Signs DAY $0.73 $0.42 $0.38 643.0910 Traffic Control Covering Signs Type I EACH $364.34 $232.31 $234.03 643.0920 Traffic Control Covering Signs Type II EACH $35.50 $29.34 $50.20 643.0930.S Digital Speed Limit Sign Assembly DAY 643.1000 Traffic Control Signs Fixed Message SF $24.12 $22.62 $19.17 643.1050 Traffic Control Signs PCMS DAY $48.68 $24.26 $30.14 643.1051 Traffic Control Signs PCMS with Cellular Communications DAY $59.92 $40.45 $41.91 643.1055.S Truck or Trailer Mounted Attenuator DAY $352.45 $287.28 $265.50 643.1070 Traffic Control Cones 42‐Inch DAY $0.36 $0.15 643.1100.S Dynamic Late Merge System DAY $190.27 643.1200.S Portable Automated Real‐Time Traffic Queue Warning System DAY 643.4100.S Traffic Control Interim Lane Closure EACH $1,031.00 $344.47 643.5000 Traffic Control EACH $22,648.28 $18,221.17 $32,018.06 644.1410 Temporary Pedestrian Surface Asphalt SF 644.1410.S Temporary Pedestrian Surface Asphalt SF $2.75 $3.64 $2.64 644.1420 Temporary Pedestrian Surface Plywood SF 644.1420.S Temporary Pedestrian Surface Plywood SF $4.55 $3.33 $2.73 644.1430 Temporary Pedestrian Surface Plate SF 644.1430.S Temporary Pedestrian Surface Plate SF $2.52 $4.00 $2.78 644.1601 Temporary Curb Ramp DAY 644.1601.S Temporary Curb Ramp EACH $388.89 $385.86 $376.86 644.1616.S Temporary Pedestrian Safety Fence LF $5.00 $5.09 $5.94 644.1810 Temporary Pedestrian Barricade LF 644.1810.S Temporary Pedestrian Barricade LF $6.00 $10.96 645.0105 Geotextile Type C SY $2.87 $2.23 $2.16 645.0111 Geotextile Type DF Schedule A SY $2.18 $2.15 $1.46 645.0112 Geotextile Type DF Schedule B SY $3.09 $2.03 $2.93 645.0113 Geotextile Type DF Schedule C SY 645.0115 Geotextile Type ES SY $14.45 645.0120 Geotextile Type HR SY $3.11 $3.23 $3.12 645.0125 Geotextile Type MS SY

Page 54

   

 

 

 

 

        

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/25/2019

ITEM DESCRIPTION UNIT FY 17 FY 18 FY 19 645.0130 Geotextile Type R SY $2.30 $3.55 $2.38 645.0135 Geotextile Type SR SY $2.20 $0.94 $2.48 645.0140 Geotextile Type SAS SY $2.18 $1.32 $2.76 645.0220 Geogrid Type SR SY $1.56 $1.23 $1.25 645.0240 Geogrid Type MR SY 645.0260 Geogrid Type SSR SY $3.10 646.0101.S Pavement Marking Paint High Build 4‐Inch LF 646.0121.S Pavement Marking Paint High Build 8‐Inch LF 646.0871.S Pavement Marking Wet Reflective Tape 4‐Inch LF 646.0873.S Pavement Marking Wet Reflective Tape 8‐Inch LF 646.1005 Marking Line Paint 4‐Inch LF $0.11 $0.13 $0.15 646.1020 Marking Line Epoxy 4‐Inch LF $0.29 $0.34 $0.45 646.1040 Marking Line Grooved Wet Ref Epoxy 4‐Inch LF $1.00 $1.22 $1.46 646.1041.S Marking Replace Wet Reflective Epoxy 4‐Inch LF 646.1050 Marking Line Grooved Permanent Tape 4‐Inch LF $4.60 $5.85 646.1545 Marking Line Grooved Wet Ref Contrast Epoxy 4‐Inch LF $1.81 $2.87 $2.99 646.1546.S Marking Replace Line Contrast Wet Reflective Epoxy 4‐Inch LF 646.1555 Marking Line Grooved Contrast Permanent Tape 4‐Inch LF $7.25 $7.54 646.3005 Marking Line Paint 8‐Inch LF $0.17 $0.39 $0.47 646.3020 Marking Line Epoxy 8‐Inch LF $0.65 $0.81 $1.22 646.3040 Marking Line Grooved Wet Ref Epoxy 8‐Inch LF $2.26 $2.50 $3.33 646.3041.S Marking Replace Wet Reflective Epoxy 8‐Inch LF 646.3050 Marking Line Grooved Permanent Tape 8‐Inch LF $9.54 $8.41 646.3545 Marking Line Grooved Wet Ref Contrast Epoxy 8‐Inch LF $3.90 $4.40 $5.65 646.3546.S Marking Replace Line Contrast Wet Reflective Epoxy 8‐Inch LF 646.3555 Marking Line Grooved Contrast Permanent Tape 8‐Inch LF $10.00 $11.53 646.4505 Marking Line Same Day Paint 4‐Inch LF $3.65 $1.20 646.4520 Marking Line Same Day Epoxy 4‐Inch LF $0.71 $0.85 $1.28 646.4605 Marking Line Same Day Paint 8‐Inch LF $2.20 646.4620 Marking Line Same Day Epoxy 8‐Inch LF 646.5005 Marking Arrow Paint EACH $196.43 646.5020 Marking Arrow Epoxy EACH $168.14 $210.03 $251.34

Page 55

 

     

    

 

 

 

    

   

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/25/2019

ITEM DESCRIPTION UNIT FY 17 FY 18 FY 19 646.5105 Marking Word Paint EACH $275.00 646.5120 Marking Word Epoxy EACH $191.79 $234.96 $276.49 646.5205 Marking Symbol Paint EACH $198.00 646.5220 Marking Symbol Epoxy EACH $127.23 $162.99 $200.94 646.5305 Marking Railroad Crossing Paint EACH $750.00 $675.00 646.5320 Marking Railroad Crossings Epoxy EACH $882.25 $955.32 $1,090.97 646.5420 Marking Aerial Enforcement Bar Epoxy EACH $32.85 $42.70 $106.57 646.5520 Marking Outfall Epoxy EACH $20.25 $43.28 $64.38 646.6005 Marking Stop Line Paint 12‐Inch LF 646.6020 Marking Stop Line Epoxy 12‐Inch LF $8.32 $9.30 $17.42 646.6105 Marking Stop Line Paint 18‐Inch LF $4.67 $11.63 $8.65 646.6120 Marking Stop Line Epoxy 18‐Inch LF $8.66 $11.51 $12.82 646.6205 Marking Yield Line Paint 18‐Inch EACH 646.6220 Marking Yield Line Epoxy 18‐Inch EACH $44.40 $48.27 $64.10 646.6305 Marking Dotted Extension Paint 18‐Inch LF $9.50 646.6320 Marking Dotted Extension Epoxy 18‐Inch LF $16.11 $14.22 646.6464 Cold Weather Marking Epoxy 4‐Inch LF $0.84 646.6468 Cold Weather Marking Epoxy 8‐Inch LF $1.73 646.7005 Marking Diagonal Paint 6‐Inch LF 646.7020 Marking Diagonal Epoxy 6‐Inch LF $5.80 $3.70 $8.63 646.7105 Marking Diagonal Paint 12‐Inch LF 646.7120 Marking Diagonal Epoxy 12‐Inch LF $6.66 $6.72 $10.11 646.7205 Marking Chevron Paint 24‐Inch LF 646.7220 Marking Chevron Epoxy 24‐Inch LF $10.73 $12.18 646.7405 Marking Crosswalk Paint Transverse Line 6‐Inch LF $5.02 $5.36 $4.89 646.7420 Marking Crosswalk Epoxy Transverse Line 6‐Inch LF $7.67 $7.84 $9.96 646.7505 Marking Crosswalk Paint Ladder Pattern 24‐Inch LF 646.7520 Marking Crosswalk Epoxy Ladder Pattern 24‐Inch LF $9.32 $13.21 $28.00 646.8005 Marking Corrugated Median Paint SF 646.8020 Marking Corrugated Median Epoxy SF $4.35 $3.89 $6.24 646.8105 Marking Curb Paint LF 646.8120 Marking Curb Epoxy LF $6.48 $5.65 $8.04

Page 56

    

 

 

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/25/2019

ITEM DESCRIPTION UNIT FY 17 FY 18 FY 19 646.8205 Marking Island Nose Paint EACH 646.8220 Marking Island Nose Epoxy EACH $112.43 $127.55 $184.62 646.8305 Marking Parking Stall Paint LF $4.83 $1.40 $4.33 646.8320 Marking Parking Stall Epoxy LF $2.43 $3.32 $4.96 646.9000 Marking Removal Line 4‐Inch LF $0.30 $0.29 $0.43 646.9010 Marking Removal Line Water Blasting 4‐Inch LF $0.80 $0.23 $0.24 646.9100 Marking Removal Line 8‐Inch LF $0.70 $0.72 646.9110 Marking Removal Line Water Blasting 8‐Inch LF $0.72 $0.65 646.9200 Marking Removal Line Wide LF $2.38 $4.40 646.9210 Marking Removal Line Water Blasting Wide LF $1.22 $1.66 646.9300 Marking Removal Special Marking EACH $143.69 $136.39 646.9310 Marking Removal Special Marking Water Blasting EACH $90.00 $202.86 $133.74 646.9400 Marking Removal Plowable Raised Pavement Markers EACH $15.55 $28.65 $45.07 648.0100 Locating No‐Passing Zones MI $331.43 $289.62 $412.83 649.0105 Temporary Marking Line Paint 4‐Inch LF $0.30 $0.30 $0.40 649.0120 Temporary Marking Line Epoxy 4‐Inch LF $0.57 $0.51 $0.81 649.0150 Temporary Marking Line Removable Tape 4‐Inch LF $0.83 $0.82 $0.85 649.0155 Temporary Marking Line Removable Contrast Tape 4‐Inch LF $1.61 $3.50 $2.79 649.0205 Temporary Marking Line Paint 8‐Inch LF $0.32 $0.41 $0.73 649.0220 Temporary Marking Line Epoxy 8‐Inch LF $0.72 $1.01 $1.17 649.0250 Temporary Marking Line Removable Tape 8‐Inch LF $1.84 $1.63 $1.76 649.0255 Temporary Marking Line Removable Contrast Tape 8‐Inch LF $4.50 649.0505 Temporary Marking Arrow Paint EACH $45.87 $46.53 $51.25 649.0520 Temporary Marking Arrow Epoxy EACH $175.00 $169.22 $139.20 649.0550 Temporary Marking Arrow Removable Tape EACH $160.00 $160.71 $104.90 649.0605 Temporary Marking Word Paint EACH $50.00 $36.72 $54.74 649.0620 Temporary Marking Word Epoxy EACH $192.17 $75.00 649.0650 Temporary Marking Word Removable Tape EACH $181.52 $151.51 $98.62 649.0760 Temporary Marking Raised Pavement Marker Type I EACH $5.73 $5.60 $4.85 649.0770 Temporary Marking Raised Pavement Marker Type II EACH $1.00 $6.25 $4.37 649.0805 Temporary Marking Stop Line Paint 18‐Inch LF $2.85 $2.98 $2.69 649.0820 Temporary Marking Stop Line Epoxy 18‐Inch LF $8.12 $2.09

Page 57

 

 

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/25/2019

ITEM DESCRIPTION UNIT FY 17 FY 18 FY 19 649.0850 Temporary Marking Stop Line Removable Tape 18‐Inch LF $4.72 $5.09 $5.30 649.0905 Temporary Marking Diagonal Paint 12‐Inch LF $1.61 649.0920 Temporary Marking Diagonal Epoxy 12‐Inch LF $18.00 649.0950 Temporary Marking Diagonal Removable Tape 12‐Inch LF $4.05 $3.98 649.0960 Temporary Marking Removable Mask Out Tape 6‐Inch LF $1.69 $2.08 $2.06 649.0970 Temporary Marking Removable Mask Out Tape 10‐Inch LF $2.49 $4.69 $3.90 650.4000 Construction Staking Storm Sewer EACH $63.20 $83.94 $78.52 650.4500 Construction Staking Subgrade LF $0.12 $0.12 $0.13 650.5000 Construction Staking Base LF $0.48 $0.50 $0.37 650.5500 Construction Staking Curb Gutter and Curb & Gutter LF $0.78 $0.73 $0.95 650.6000 Construction Staking Pipe Culverts EACH $125.82 $108.13 $134.62 650.6500 Construction Staking Structure Layout (structure) LS $1,865.95 $2,146.48 $2,653.61 650.7000 Construction Staking Concrete Pavement LF $1.45 $1.61 $1.07 650.7500 Construction Staking Concrete Barrier LF $1.34 $2.50 $10.00 650.8000 Construction Staking Resurfacing Reference LF $0.08 $0.09 $0.09 650.8500 Construction Staking Electrical Installations (project) LS $2,110.93 $2,836.43 $2,667.81 650.9000 Construction Staking Curb Ramps EACH $130.85 $120.54 650.9910 Construction Staking Supplemental Control (project) LS $1,584.33 $1,424.28 $1,093.95 650.9920 Construction Staking Slope Stakes LF $0.67 $0.64 $0.53 651.1000.S Signal Controller Training LS 652.0105 Conduit Rigid Metallic 3/4‐Inch LF $18.00 $5.00 652.0110 Conduit Rigid Metallic 1‐Inch LF $30.00 $20.98 652.0115 Conduit Rigid Metallic 1 1/4‐Inch LF $3.00 652.0120 Conduit Rigid Metallic 1 1/2‐Inch LF 652.0125 Conduit Rigid Metallic 2‐Inch LF $26.32 $28.89 $36.85 652.0130 Conduit Rigid Metallic 2 1/2‐Inch LF 652.0135 Conduit Rigid Metallic 3‐Inch LF $30.58 $14.84 $95.00 652.0140 Conduit Rigid Metallic 3 1/2‐Inch LF 652.0145 Conduit Rigid Metallic 4‐Inch LF 652.0205 Conduit Rigid Nonmetallic Schedule 40 3/4‐Inch LF $4.76 $3.00 652.0210 Conduit Rigid Nonmetallic Schedule 40 1‐Inch LF $5.08 $4.81 $4.71 652.0215 Conduit Rigid Nonmetallic Schedule 40 1 1/4‐Inch LF $4.25 $4.22

Page 58

 

 

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/25/2019

ITEM DESCRIPTION UNIT FY 17 FY 18 FY 19 652.0220 Conduit Rigid Nonmetallic Schedule 40 1 1/2‐Inch LF $8.20 $5.60 $4.71 652.0225 Conduit Rigid Nonmetallic Schedule 40 2‐Inch LF $4.64 $4.72 $5.60 652.0230 Conduit Rigid Nonmetallic Schedule 40 2 1/2‐Inch LF $5.04 $5.16 $6.17 652.0235 Conduit Rigid Nonmetallic Schedule 40 3‐Inch LF $6.63 $5.92 $7.01 652.0240 Conduit Rigid Nonmetallic Schedule 40 4‐Inch LF $8.31 $6.89 $6.60 652.0305 Conduit Rigid Nonmetallic Schedule 80 3/4‐Inch LF $3.10 652.0310 Conduit Rigid Nonmetallic Schedule 80 1‐Inch LF $4.34 652.0315 Conduit Rigid Nonmetallic Schedule 80 1 1/4‐Inch LF 652.0320 Conduit Rigid Nonmetallic Schedule 80 1 1/2‐Inch LF 652.0325 Conduit Rigid Nonmetallic Schedule 80 2‐Inch LF $5.47 $5.24 $6.09 652.0330 Conduit Rigid Nonmetallic Schedule 80 2 1/2‐Inch LF $5.10 $6.01 $6.96 652.0335 Conduit Rigid Nonmetallic Schedule 80 3‐Inch LF $6.55 $6.73 $8.44 652.0340 Conduit Rigid Nonmetallic Schedule 80 4‐Inch LF 652.0405 Conduit Reinforced Thermosetting Resin 2‐Inch LF $33.05 652.0410 Conduit Reinforced Thermosetting Resin 3‐Inch LF 652.0415 Conduit Reinforced Thermosetting Resin 4‐Inch LF 652.0605 Conduit Special 2‐Inch LF $19.21 $18.66 $54.54 652.0610 Conduit Special 2 1/2‐Inch LF $18.51 $22.80 $15.41 652.0615 Conduit Special 3‐Inch LF $22.60 $18.50 $21.38 652.0620 Conduit Special 3 1/2‐Inch LF 652.0625 Conduit Special 4‐Inch LF $19.55 652.0690 Conduit Special (inch) LF $15.00 652.0700.S Install Conduit into Existing Item EACH $208.35 $224.76 $235.07 652.0800 Conduit Loop Detector LF $4.15 $4.23 $4.88 652.0900 Loop Detector Slots LF $27.53 $18.94 $36.55 653.0105 Pull Boxes Steel 12x24‐Inch EACH $486.24 $396.23 $730.00 653.0110 Pull Boxes Steel 12x30‐Inch EACH 653.0115 Pull Boxes Steel 12x36‐Inch EACH $450.00 $530.00 653.0120 Pull Boxes Steel 18x24‐Inch EACH $600.00 653.0125 Pull Boxes Steel 18x30‐Inch EACH 653.0130 Pull Boxes Steel 18x36‐Inch EACH $500.00 $625.00 653.0135 Pull Boxes Steel 24x36‐Inch EACH $700.23 $681.53 $705.38

Page 59

    

 

 

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/25/2019

ITEM DESCRIPTION UNIT FY 17 FY 18 FY 19 653.0140 Pull Boxes Steel 24x42‐Inch EACH $785.13 $728.82 $732.19 653.0145 Pull Boxes Steel 24x48‐Inch EACH $1,014.35 $774.29 653.0154 Pull Boxes Non‐Conductive 24x36‐Inch EACH $1,147.59 $1,256.19 653.0164 Pull Boxes Non‐Conductive 24x42‐Inch EACH $1,199.25 $1,340.63 653.0180 Pull Boxes Steel Communications (inch) EACH $663.89 653.0208 Junction Boxes 8x8x8‐Inch EACH $1,579.73 $988.00 653.0210 Junction Boxes 10x10x6‐Inch EACH $1,000.00 653.0220 Junction Boxes 18x6x6‐Inch EACH $1,179.31 $1,098.26 $1,200.73 653.0222 Junction Boxes 18x12x6‐Inch EACH $1,171.53 $1,135.63 $1,219.69 653.0900 Adjusting Pull Boxes EACH $241.16 $215.34 $268.66 653.0905 Removing Pull Boxes EACH $93.07 $94.79 $100.77 654.0101 Concrete Bases Type 1 EACH $588.20 $592.40 $646.00 654.0102 Concrete Bases Type 2 EACH $783.92 $473.60 $885.46 654.0105 Concrete Bases Type 5 EACH $644.48 $662.82 $694.75 654.0106 Concrete Bases Type 6 EACH $659.86 $720.65 $735.57 654.0107 Concrete Bases Type 7 EACH $770.32 $831.13 $839.95 654.0108 Concrete Bases Type 8 EACH $1,095.40 $975.61 $1,220.00 654.0110 Concrete Bases Type 10 EACH $4,069.86 $3,733.34 $4,060.05 654.0111 Concrete Bases Type 11 EACH $500.00 $625.00 $513.37 654.0113 Concrete Bases Type 13 EACH $6,479.86 $6,694.64 $7,661.93 654.0200 Concrete Control Cabinet Bases Type 6 EACH $1,200.00 654.0205 Concrete Control Cabinet Bases Type 7 EACH $1,100.00 $1,200.00 654.0210 Concrete Control Cabinet Bases Type 8 EACH 654.0215 Concrete Control Cabinet Bases Type 9 EACH $1,208.11 $1,200.00 654.0217 Concrete Control Cabinet Bases Type 9 Special EACH $1,532.14 $1,360.99 $1,390.32 654.0220 Concrete Control Cabinet Bases Type 10 EACH $660.92 $834.38 $1,069.50 654.0224 Concrete Control Cabinet Bases Type L24 EACH $1,105.92 $1,156.98 $1,255.96 654.0230 Concrete Control Cabinet Bases Type L30 EACH $1,069.51 $1,126.48 $1,258.25 654.1130 Concrete Bases Camera Pole 30‐FT EACH $810.08 654.1150 Concrete Bases Camera Pole 50‐FT EACH $2,498.33 $2,590.11 $3,050.00 654.1180 Concrete Bases Camera Pole 80‐FT EACH $4,219.00 $7,000.00 654.1239 Concrete Control Cabinet Bases ITS EACH $955.00 $1,433.00 $1,800.00

Page 60

                                                                                      

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/25/2019

ITEM DESCRIPTION UNIT FY 17 FY 18 FY 19 655.0102 Cable In Duct 2‐2 AWG LF 655.0104 Cable In Duct 2‐4 AWG LF $12.00 655.0106 Cable In Duct 2‐6 AWG LF 655.0108 Cable In Duct 2‐8 AWG LF 655.0110 Cable In Duct 2‐10 AWG LF 655.0122 Cable In Duct 3‐2 AWG LF $8.61 $8.36 655.0124 Cable In Duct 3‐4 AWG LF $7.13 $7.13 655.0126 Cable In Duct 3‐6 AWG LF $6.33 655.0128 Cable In Duct 3‐8 AWG LF $5.51 655.0130 Cable In Duct 3‐10 AWG LF $5.15 655.0144 Cable In Duct 4‐4 AWG LF 655.0146 Cable In Duct 4‐6 AWG LF 655.0148 Cable In Duct 4‐8 AWG LF $5.80 655.0150 Cable In Duct 4‐10 AWG LF 655.0205 Cable Traffic Signal 3‐12 AWG LF $2.20 655.0210 Cable Traffic Signal 3‐14 AWG LF $1.02 $0.70 $0.95 655.0215 Cable Traffic Signal 4‐12 AWG LF 655.0220 Cable Traffic Signal 4‐14 AWG LF $1.20 $1.10 655.0223 Cable Traffic Signal 5‐10 AWG LF 655.0225 Cable Traffic Signal 5‐12 AWG LF 655.0230 Cable Traffic Signal 5‐14 AWG LF $1.06 $1.06 $1.25 655.0233 Cable Traffic Signal 7‐10 AWG LF 655.0235 Cable Traffic Signal 7‐12 AWG LF $2.10 655.0240 Cable Traffic Signal 7‐14 AWG LF $1.23 $1.28 $1.51 655.0243 Cable Traffic Signal 9‐10 AWG LF 655.0245 Cable Traffic Signal 9‐12 AWG LF 655.0250 Cable Traffic Signal 9‐14 AWG LF $1.32 $1.38 $1.91 655.0253 Cable Traffic Signal 12‐10 AWG LF 655.0255 Cable Traffic Signal 12‐12 AWG LF $2.10 655.0260 Cable Traffic Signal 12‐14 AWG LF $2.01 $1.78 $1.82 655.0263 Cable Traffic Signal 15‐10 AWG LF 655.0265 Cable Traffic Signal 15‐12 AWG LF

Page 61

                 

                     

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/25/2019

ITEM DESCRIPTION UNIT FY 17 FY 18 FY 19 655.0270 Cable Traffic Signal 15‐14 AWG LF $2.20 $2.41 $2.37 655.0273 Cable Traffic Signal 19‐10 AWG LF 655.0275 Cable Traffic Signal 19‐12 AWG LF 655.0280 Cable Traffic Signal 19‐14 AWG LF $2.40 $2.34 $3.05 655.0285 Cable Traffic Signal 21‐12 AWG LF 655.0290 Cable Traffic Signal 21‐14 AWG LF $2.00 $2.61 $3.15 655.0305 Cable Type UF 2‐12 AWG Grounded LF $0.99 $1.22 $1.08 655.0320 Cable Type UF 2‐10 AWG Grounded LF $1.23 $1.28 $1.20 655.0325 Cable Type UF 2‐8 AWG Grounded LF 655.0400 Communication Cable Plowed LF 655.0405 Communication Cable Trenched LF 655.0410 Communication Cable Installed in Conduit LF $0.50 $2.00 655.0505 Electrical Wire Traffic Signals 14 AWG LF 655.0510 Electrical Wire Traffic Signals 12 AWG LF $0.73 $0.59 $0.49 655.0515 Electrical Wire Traffic Signals 10 AWG LF $0.67 $0.78 $0.79 655.0520 Electrical Wire Traffic Signals 8 AWG LF $0.85 655.0525 Electrical Wire Traffic Signals 6 AWG LF $1.01 $1.13 $1.22 655.0530 Electrical Wire Traffic Signals 4 AWG LF $1.11 655.0535 Electrical Wire Traffic Signals 2 AWG LF $2.00 $2.38 $1.85 655.0610 Electrical Wire Lighting 12 AWG LF $0.58 $0.58 $0.63 655.0615 Electrical Wire Lighting 10 AWG LF $0.66 $0.62 $0.78 655.0620 Electrical Wire Lighting 8 AWG LF $0.81 $0.84 $0.98 655.0625 Electrical Wire Lighting 6 AWG LF $0.99 $1.08 $1.21 655.0630 Electrical Wire Lighting 4 AWG LF $1.39 $1.36 $1.38 655.0635 Electrical Wire Lighting 2 AWG LF $1.45 $2.05 $1.74 655.0640 Electrical Wire Lighting 1 AWG LF $1.71 $2.46 $3.89 655.0645 Electrical Wire Lighting 1/0 AWG LF $2.32 $3.63 655.0700 Loop Detector Lead In Cable LF $1.13 $1.07 $1.33 655.0800 Loop Detector Wire LF $0.71 $0.65 $0.74 655.0900 Traffic Signal EVP Detector Cable LF $1.03 $0.97 $1.35 656.0100 Electrical Service Meter Socket (location) LS $1,200.00 $1,200.00 $1,000.88 656.0200 Electrical Service Meter Breaker Pedestal (location) LS $1,150.20 $1,091.64 $1,306.95

Page 62

  

   

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/25/2019

ITEM DESCRIPTION UNIT FY 17 FY 18 FY 19 656.0300 Electrical Service Unmetered (location) LS 656.0400 Electrical Service Main Lugs Only Meter Pedestal (location) LS $1,104.41 $767.31 $816.19 656.0500 Electrical Service Breaker Disconnect Box (location) LS $814.41 $588.56 $740.08 657.0100 Pedestal Bases EACH $202.53 $197.81 $193.41 657.0205 Transformer Bases Breakaway 13‐15 Inch Bolt Circle EACH $310.44 $399.88 657.0210 Transformer Bases Breakaway 15‐17 Inch Bolt Circle EACH $371.62 $406.91 $405.48 657.0255 Transformer Bases Breakaway 11 1/2‐Inch Bolt Circle EACH $322.09 $330.35 $335.15 657.0305 Poles Type 2 EACH $1,129.34 $1,261.70 $1,634.33 657.0310 Poles Type 3 EACH $2,339.13 $2,121.43 $2,483.09 657.0315 Poles Type 4 EACH $1,347.50 $1,086.08 $1,443.84 657.0321 Poles Type 5‐Steel EACH $1,137.13 $1,183.33 657.0322 Poles Type 5‐Aluminum EACH $1,030.44 $1,079.31 $1,136.24 657.0326 Poles Type 6‐Steel EACH $1,250.00 $1,500.00 $1,600.00 657.0327 Poles Type 6‐Aluminum EACH $1,223.40 $1,248.58 $1,717.03 657.0330 Poles Type 7 EACH $1,440.00 $1,473.75 $1,617.06 657.0336 Poles Type 17‐Steel EACH 657.0337 Poles Type 17‐Aluminum EACH $1,060.84 $1,260.00 $1,260.00 657.0345 Poles Type 9 EACH $4,908.91 657.0346 Poles Type 9‐Over Height EACH 657.0350 Poles Type 10 EACH $6,226.93 657.0351 Poles Type 10‐Over Height EACH 657.0355 Poles Type 12 EACH $9,407.39 657.0356 Poles Type 12‐Over Height EACH $15,450.00 657.0360 Poles Type 13 EACH $12,707.79 657.0361 Poles Type 13‐Over Height EACH 657.0375 Poles Type A EACH $1,882.00 $2,557.79 $2,283.00 657.0380 Poles Type E EACH $2,658.50 $2,935.14 $3,120.00 657.0405 Traffic Signal Standards Aluminum 3.5‐FT EACH $209.33 $195.80 $336.91 657.0410 Traffic Signal Standards Aluminum 9‐FT EACH $324.40 $357.91 $398.75 657.0415 Traffic Signal Standards Aluminum 11‐FT EACH $400.00 657.0420 Traffic Signal Standards Aluminum 13‐FT EACH $393.22 $417.97 $468.33 657.0425 Traffic Signal Standards Aluminum 15‐FT EACH $442.67 $451.36 $541.73

Page 63

    

    

        

    

    

    

         

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/25/2019

ITEM DESCRIPTION UNIT FY 17 FY 18 FY 19 657.0430 Traffic Signal Standards Aluminum 10‐FT EACH $369.66 $407.76 $456.98 657.0515 Monotube Arms 15‐FT EACH $2,700.00 657.0520 Monotube Arms 20‐FT EACH $3,229.00 657.0525 Monotube Arms 25‐FT EACH $3,167.96 657.0530 Monotube Arms 30‐FT EACH $4,504.76 657.0535 Monotube Arms 35‐FT EACH $6,073.23 657.0540 Monotube Arms 40‐FT EACH $7,316.83 657.0545 Monotube Arms 45‐FT EACH $9,322.92 657.0550 Monotube Arms 50‐FT EACH $11,029.25 657.0555 Monotube Arms 55‐FT EACH $12,672.01 657.0585 Trombone Arms 15‐FT EACH $1,171.00 $976.11 $1,272.56 657.0590 Trombone Arms 20‐FT EACH $1,030.67 $1,143.46 $1,337.93 657.0595 Trombone Arms 25‐FT EACH $1,412.09 $1,411.98 $1,748.72 657.0605 Luminaire Arms Single Member 4 1/2‐Inch Clamp 4‐FT EACH $157.58 $201.18 657.0609 Luminaire Arms Single Member 4‐Inch Clamp 6‐FT EACH $201.41 $185.25 $198.22 657.0610 Luminaire Arms Single Member 4 1/2‐Inch Clamp 6‐FT EACH $169.45 $163.03 $185.92 657.0614 Luminaire Arms Single Member 4‐Inch Clamp 8‐FT EACH $188.14 $155.82 $297.77 657.0615 Luminaire Arms Single Member 4 1/2‐Inch Clamp 8‐FT EACH $188.77 $177.31 $176.77 657.0620 Luminaire Arms Single Member 6‐Inch Clamp 4‐FT EACH $206.67 $165.68 $150.00 657.0625 Luminaire Arms Single Member 6‐Inch Clamp 6‐FT EACH $164.47 657.0630 Luminaire Arms Single Member 6‐Inch Clamp 8‐FT EACH $165.57 $170.03 $153.00 657.0635 Luminaire Arms Single Member 6‐Inch Clamp 10‐FT EACH $260.19 $189.00 657.0640 Luminaire Arms Single Member 6‐Inch Clamp 15‐FT EACH $335.41 $280.00 657.0704 Luminaire Arms Truss Type 4‐Inch Clamp 10‐FT EACH $419.00 657.0705 Luminaire Arms Truss Type 4 1/2‐Inch Clamp 10‐FT EACH $350.14 $186.82 657.0709 Luminaire Arms Truss Type 4‐Inch Clamp 12‐FT EACH $418.76 $306.84 $380.00 657.0710 Luminaire Arms Truss Type 4 1/2‐Inch Clamp 12‐FT EACH $401.65 $307.85 $453.88 657.0714 Luminaire Arms Truss Type 4‐Inch Clamp 15‐FT EACH $310.00 $396.26 $420.00 657.0715 Luminaire Arms Truss Type 4 1/2‐Inch Clamp 15‐FT EACH $380.67 $375.13 $355.00 657.0720 Luminaire Arms Truss Type 6‐Inch Clamp 20‐FT EACH $581.39 $875.00 657.0725 Luminaire Arms Truss Type 6‐Inch Clamp 15‐FT EACH 657.0730 Luminaire Arms Truss Type 6‐Inch Clamp 12‐FT EACH $290.39 $315.00 $425.00

Page 64

   

 

   

 

  

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/25/2019

ITEM DESCRIPTION UNIT FY 17 FY 18 FY 19 657.0735 Luminaire Arms Truss Type 6‐Inch Clamp 10‐FT EACH 657.0806 Luminaire Arms Steel 6‐FT EACH $696.75 657.0808 Luminaire Arms Steel 8‐FT EACH $672.97 657.0810 Luminaire Arms Steel 10‐FT EACH 657.0812 Luminaire Arms Steel 12‐FT EACH $578.50 657.0815 Luminaire Arms Steel 15‐FT EACH $742.86 657.6005 Anchor Assemblies Light Poles on Structures EACH $614.49 $838.13 658.0170 Traffic Signal Face 1S 8‐Inch EACH $500.00 658.0171 Traffic Signal Face 1S 12‐Inch EACH $181.54 $285.00 $350.00 658.0172 Traffic Signal Face 2S 12‐Inch EACH $438.00 658.0173 Traffic Signal Face 3S 12‐Inch EACH $339.07 $418.11 $533.00 658.0174 Traffic Signal Face 4S 12‐Inch EACH $409.24 $506.42 $638.84 658.0175 Traffic Signal Face 5S 12‐Inch EACH $440.82 $669.86 $715.12 658.0412 Pedestrian Signal Face 12‐Inch EACH $407.31 $410.58 658.0416 Pedestrian Signal Face 16‐Inch EACH $220.39 $302.02 $396.69 658.0500 Pedestrian Push Buttons EACH $257.09 $277.80 $276.49 658.1133 Programmable Traffic Signal Face 3S 12‐Inch EACH $3,037.00 $627.50 658.1134 Programmable Traffic Signal Face 4S 12‐Inch EACH $797.50 658.1135 Programmable Traffic Signal Face 5S 12‐Inch EACH $931.50 658.5069 Signal Mounting Hardware (location) LS $2,476.29 $2,981.80 $3,622.12 659.0400 Luminaires High Mast Lighting LED EACH $2,455.00 $1,519.95 $1,566.36 659.0600 Underdeck Lighting (location) LS $3,412.00 $5,351.60 $5,009.54 659.0700 Lighting Units Walkway EACH $1,336.67 $1,821.43 659.1115 Luminaires Utility LED A EACH $387.17 $318.81 $306.30 659.1120 Luminaires Utility LED B EACH $454.80 $357.61 $248.63 659.1125 Luminaires Utility LED C EACH $519.81 $367.24 $311.59 659.1130 Luminaires Utility LED D EACH $513.06 $452.88 $380.79 659.1205 Luminaires Underdeck LED A EACH $475.00 $372.25 $375.00 659.1210 Luminaires Underdeck LED B EACH $475.00 $536.15 $517.06 659.1215 Luminaires Underdeck LED C EACH $556.00 $727.05 $596.00 659.2124 Lighting Control Cabinets 120/240 24‐Inch EACH $5,812.83 $5,886.24 $5,166.71 659.2130 Lighting Control Cabinets 120/240 30‐Inch EACH $5,820.80 $6,060.32 $6,534.09

Page 65

  

 

 

 

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/25/2019

ITEM DESCRIPTION UNIT FY 17 FY 18 FY 19 659.2230 Lighting Control Cabinets 240/480 30‐Inch EACH $6,894.27 $7,635.17 $7,047.51 660.0100 High Mast Foundation (location) LS $18,550.00 $37,341.42 660.0200 High Mast Lighting Tower (location) LS $41,680.00 $59,545.22 661.0100 Temporary Traffic Signals for Bridges (structure) LS $11,370.00 $9,940.33 $8,220.24 661.0200 Temporary Traffic Signals for Intersections (location) LS $38,529.43 $30,232.06 $37,914.62 661.0300 Generators DAY $510.30 $225.02 $260.26 661.0700 Temporary Ramp Meter (location) LS 662.1024.S Ramp Closure Gates 24‐FT EACH $10,600.00 $11,000.00 662.1026.S Ramp Closure Gates 26‐FT EACH $12,255.00 $12,460.00 662.1028.S Ramp Closure Gates 28‐FT EACH $11,500.00 $14,400.00 662.1030.S Ramp Closure Gates 30‐FT EACH $11,842.50 $14,500.00 662.1032.S Ramp Closure Gates 32‐FT EACH $14,600.00 662.1037.S Ramp Closure Gates 37‐FT EACH $12,573.75 $12,200.00 662.1040.S Ramp Closure Gates 40‐FT EACH $12,408.25 $12,665.00 662.4000.S Ramp Closure Gate Flashers Stockpile EACH $859.71 $900.00 662.6020.S Ramp Closure Barricade Rack 2‐Unit EACH $1,500.00 $600.00 662.6030.S Ramp Closure Barricade Rack 3‐Unit EACH $500.00 $150.00 670.0100 Field System Integrator LS $4,853.11 $3,280.29 $4,415.45 670.0200 ITS Documentation LS $2,683.77 $1,962.00 $2,597.95 671.0100 Conduit HDPE 4‐Duct 1 1/4‐Inch LF 671.0112 Conduit HDPE 1‐Duct 2‐Inch LF $5.44 $4.25 $5.48 671.0122 Conduit HDPE 2‐Duct 2‐Inch LF $12.00 $7.07 $6.58 671.0132 Conduit HDPE 3‐Duct 2‐Inch LF $7.74 $8.78 $7.68 671.0142 Conduit HDPE 4‐Duct 2‐Inch LF $12.00 $12.00 671.0200 Conduit HDPE Directional Bore 4‐Duct 1 1/4‐Inch LF 671.0212 Conduit HDPE Directional Bore 1‐Duct 2‐Inch LF $19.08 $20.00 671.0222 Conduit HDPE Directional Bore 2‐Duct 2‐Inch LF $28.22 $24.00 $20.60 671.0232 Conduit HDPE Directional Bore 3‐Duct 2‐Inch LF $21.96 $24.57 $27.30 671.0242 Conduit HDPE Directional Bore 4‐Duct 2‐Inch LF $30.00 $34.00 671.0244 Conduit HDPE Directional Bore 4‐Duct 4‐Inch LF 671.0300 Fiber Optic Cable Marker EACH $80.01 $91.33 $85.91 673.0105 Communication Vault Type 1 EACH $1,615.13 $1,836.10 $1,806.34

Page 66

 

    

 

    

 

      

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/25/2019

ITEM DESCRIPTION UNIT FY 17 FY 18 FY 19 673.0110 Communication Vault Type Round EACH $2,160.85 $2,347.54 673.0200 Tracer Wire Marker Posts EACH $81.82 $176.72 673.0200.S Install ITS Field Cabinet EACH $966.50 $1,332.23 $3,500.00 673.0225.S Install Pole Mounted Cabinet EACH $1,436.45 $1,216.33 $1,419.57 674.0106 Cable ITS Communication 6 Pair LF 674.0112 Cable ITS Communication 12 Pair LF 674.0125 Cable ITS Communication 25 Pair LF 674.0200 Cable Microwave Detector LF $2.83 $2.68 $3.38 674.0300 Remove Cable LF $0.78 $0.67 $0.64 674.0400 Reinstall Cable LF $0.64 $0.80 $3.52 675.0100 Install Controller Ramp Meter Processor Assembly EACH $850.00 675.0200 Install Controller Detector Processor Assembly EACH $1,630.00 675.0300 Install Mounted Controller Microwave Detector Assembly EACH $1,875.13 $1,695.72 $2,094.08 677.0130 Install Camera Pole 30‐FT EACH $1,825.53 677.0150 Install Camera Pole 50‐FT EACH $2,430.00 $2,315.09 $2,891.91 677.0180 Install Camera Pole 80‐FT EACH $3,756.00 $6,500.00 677.0200 Install Camera Assembly EACH $2,298.00 $2,601.51 $2,269.40 677.0300.S Install Video Encoder EACH $530.67 677.0400.S Install Video Image Detector Card EACH 677.0500.S Install Video Detection Camera EACH $4,116.00 677.0600.S Install Video Detection Processor EACH 677.9050.S Salvage 50‐FT Camera Pole with Lowering System EACH $1,176.85 $500.00 677.9051.S Removing 50‐FT Camera Pole EACH $820.00 $724.50 $1,853.33 677.9080.S Salvage 80‐Foot Camera Pole with Lowering System EACH 677.9081.S Removing 80‐Foot Camera Pole EACH 677.9200.S Removing CCTV Camera EACH $1,186.00 $697.92 $658.33 678.0006 Install Fiber Optic Cable Outdoor Plant 6‐CT LF $1.33 $1.05 $1.24 678.0012 Install Fiber Optic Cable Outdoor Plant 12‐CT LF $1.43 $2.00 $2.98 678.0024 Install Fiber Optic Cable Outdoor Plant 24‐CT LF $1.15 $1.17 $1.24 678.0036 Install Fiber Optic Cable Outdoor Plant 36‐CT LF $1.31 $2.41 $2.55 678.0048 Install Fiber Optic Cable Outdoor Plant 48‐CT LF 678.0072 Install Fiber Optic Cable Outdoor Plant 72‐CT LF $1.60 $1.45 $1.88

Page 67

  

    

 

  

WISCONSIN DEPARTMENT OF TRANSPORTATION ‐ AVERAGE UNIT PRICE LIST 7/25/2019

ITEM DESCRIPTION UNIT FY 17 FY 18 FY 19 678.0096 Install Fiber Optic Cable Outdoor Plant 96‐CT LF 678.0100.S Install Overhead Freeway DMS Full Matrix EACH $6,101.75 $6,527.71 678.0144 Install Fiber Optic Cable Outdoor Plant 144‐CT LF 678.0200 Fiber Optic Splice Enclosure EACH $1,671.11 $1,470.07 $1,155.19 678.0300 Fiber Optic Splice EACH $48.28 $54.29 $70.58 678.0400 Fiber Optic Termination EACH $80.36 $67.08 $95.46 678.0500 Communication System Testing LS $3,867.11 $2,139.29 $2,675.07 678.0600 Install Ethernet Switches EACH $709.03 $651.23 678.0700 Install Wireless Antennas EACH $1,365.01 $1,815.47 678.0800 Install Cellular Modems EACH $619.91 $671.33 690.0150 Sawing Asphalt LF $1.20 $1.23 $1.31 690.0250 Sawing Concrete LF $2.08 $2.20 $2.04 999.1000.S Seismograph LS $5,437.50 $8,662.75 $6,191.07 999.1500.S Crack and Damage Survey LS $12,136.33 $5,816.28 $7,493.22 999.1800.S Picnic Tables Single Pedestal EACH 999.1950.S Bicycle Rack Asphalt or Concrete‐Mounted EACH