Wisconsin Tribal Transportation Improvement Programs ......Wisconsin Tribal Transportation...

37
Wisconsin Tribal Transportation Improvement Programs Federal Lands Highway Program, 23 USC 204 Tribal Contacts: Honorable Michael Wiggins, Jr. Chair, Bad River Band of Lake Superior Chippewa PO Box 39 Odanah, WI 54861 Honorable Ned Daniels, Jr. Chair, Forest County Potawatomi Community PO Box 340 Crandon, WI 54520 Honorable Marlon WhiteEagle President, Ho-Chunk Nation PO Box 667 Black River Falls, WI 54615 Honorable Louis Taylor Chair, Lac Courte Oreilles Band of Lake Superior Chippewa Tribal Governing Board 13394 West Trepenia Road Hayward, WI 54843 Honorable Joseph Wildcat Sr. President, Lac du Flambeau Band of Lake Superior Chippewa PO Box 67 Lac du Flambeau, WI 54538 Honorable Doug Cox Chairperson, Menominee Nation Tribal Legislature PO Box 910 Keshena, WI 54135-0910 Honorable Shannon Holsey President, Stockbridge-Munsee Band of Mohican Indians PO Box 70 Bowler, WI 54416 Honorable Tehassi Hill Chair, Oneida Nation of Wisconsin PO Box 365 Oneida, WI 54155-0365 Honorable Richard Peterson Chair, Red Cliff Band of Lake Superior Chippewa 88385 Pike Rd, Hwy 13 Bayfield, WI 54814 Honorable Susan Lowe Chair, St. Croix Chippewa Community 24663 Angeline Avenue Webster, WI 54893 Honorable Garland McGeshick Tribal Chair, Sokaogon Chippewa Community (Mole Lake Band of Lake Superior Chippewa Indians) 3051 Sand Lake Road Crandon, WI 54520 2020 – 2023 Statewide Transportation Improvement Program 8 – 1

Transcript of Wisconsin Tribal Transportation Improvement Programs ......Wisconsin Tribal Transportation...

Page 1: Wisconsin Tribal Transportation Improvement Programs ......Wisconsin Tribal Transportation Improvement Programs Federal Lands Highway Program, 23 USC 204 Tribal Contacts: Honorable

Wisconsin Tribal Transportation Improvement Programs Federal Lands Highway Program, 23 USC 204

Tribal Contacts:

Honorable Michael Wiggins, Jr. Chair, Bad River Band of Lake Superior Chippewa PO Box 39 Odanah, WI 54861

Honorable Ned Daniels, Jr. Chair, Forest County Potawatomi Community PO Box 340 Crandon, WI 54520

Honorable Marlon WhiteEagle President, Ho-Chunk Nation PO Box 667 Black River Falls, WI 54615

Honorable Louis Taylor Chair, Lac Courte Oreilles Band of Lake Superior Chippewa Tribal Governing Board 13394 West Trepenia Road Hayward, WI 54843

Honorable Joseph Wildcat Sr. President, Lac du Flambeau Band of Lake Superior Chippewa PO Box 67 Lac du Flambeau, WI 54538

Honorable Doug Cox Chairperson, Menominee Nation Tribal Legislature PO Box 910 Keshena, WI 54135-0910

Honorable Shannon Holsey President, Stockbridge-Munsee Band of Mohican Indians PO Box 70 Bowler, WI 54416

Honorable Tehassi Hill Chair, Oneida Nation of Wisconsin PO Box 365 Oneida, WI 54155-0365

Honorable Richard Peterson Chair, Red Cliff Band of Lake Superior Chippewa 88385 Pike Rd, Hwy 13 Bayfield, WI 54814

Honorable Susan Lowe Chair, St. Croix Chippewa Community 24663 Angeline Avenue Webster, WI 54893

Honorable Garland McGeshick Tribal Chair, Sokaogon Chippewa Community (Mole Lake Band of Lake Superior Chippewa Indians) 3051 Sand Lake Road Crandon, WI 54520

2020 – 2023 Statewide Transportation Improvement Program 8 – 1

Page 2: Wisconsin Tribal Transportation Improvement Programs ......Wisconsin Tribal Transportation Improvement Programs Federal Lands Highway Program, 23 USC 204 Tribal Contacts: Honorable

Indian Reservation Roads Programs Federal Lands Highway

REPORT FILTERS:

Location = F-**-***

Any level TIP/EIP Report program_class_code = 6K1

Reporting each CSTIP that meets the filter. CSTIP Type = TIP

Entity Name F55430 - BAD RIVER BAND FIRST PAGE FOR CSTIPProgram Class Code 6K1

CSTIP Type TIP FHWA Approved Date 08-JAN-19

Fiscal Year Funding Amount

2019 617,877

State 55 - Wisconsin Projects on the CSTIP withn this state are listed and subtotaled in this section Location F55430 - Bad River Covers that part of the reservation within the current state.

PCAS F5535600 Phase FY 2019 ($) FY 2023 ($) Total Class R PE 0 0 0Name PINE FLATS ROAD CONS 1,000 0 0 0 0 1,000County 003 - Ashland CE 1,000 0 0 0 0 1,000Project Type RECONS Z 0 0 0 0 0 0Work Type 3 Total 2,000 0 0 0 0 2,000PCAS F5543001 Phase FY 2019 ($) FY 2023 ($) Total Class O PE 1,000 0 4,000Name BAD RIVER SAFETY PROJECT CONS 5,000 5,000 5,000 5,000 0 20,000County 003 - Ashland CE 1,000 1,000 1,000 1,000 0 4,000Project Type SAFETY Z 0 0 0 0 0 0Work Type P2 Total 7,000 7,000 7,000 7,000 0 28,000PCAS F5543010 Phase FY 2019 ($) FY 2023 ($) Total Class R PE 5,000 0 25,000Name OLD ODANAH ROAD CONS 0 1,000 300,000 10,000 0 311,000County 003 - Ashland CE 0 0 15,000 15,000 0 30,000Project Type REHAB Z 0 0 0 0 0 0Work Type 7 Total 5,000 6,000 330,000 25,000 0 366,000PCAS F5543011 Phase FY 2019 ($) FY 2023 ($) Total Class R PE 0 0 1,000Name CEMETERY ROAD CONS 1,000 0 0 0 0 1,000County 003 - Ashland CE 7,000 3,000 1,000 0 0 11,000Project Type REHAB Z 0 0 0 0 0 0Work Type 3 Total 8,000 4,000 1,000 0 0 13,000PCAS F5543012 Phase FY 2019 ($) FY 2023 ($) Total Class R PE 0 0 25,000Name BAD RIVER WALKING TRAIL CONS 0 1,000 1,000 300,000 0 302,000County 003 - Ashland CE 0 0 1,000 15,000 0 16,000Project Type WALKWY Z 0 0 0 0 0 0Work Type 7 Total 0 6,000 12,000 325,000 0 343,000PCAS F5543013 Phase FY 2019 ($) FY 2023 ($) Total Class R PE 0 0 20,000Name WEST FIRE LANE CONS 0 0 0 1,000 0 1,000County 003 - Ashland CE 0 0 0 1,000 0 1,000Project Type RECONS Z 0 0 0 0 0 0 Work Type 3 Total 0 0 0 22,000 0 22,000

0 00FY 2020 ($) FY 2021 ($) FY 2022 ($)

1,000 1,0001,000FY 2020 ($) FY 2021 ($) FY 2022 ($)

15,000 05,000FY 2020 ($) FY 2021 ($) FY 2022 ($)

0 01,000FY 2020 ($) FY 2021 ($) FY 2022 ($)

10,000 10,0005,000FY 2020 ($) FY 2021 ($) FY 2022 ($)

0 20,0000FY 2020 ($) FY 2021 ($) FY 2022 ($)

16-OCT-2019 07:26 AM Page 22 of 100

Page 3: Wisconsin Tribal Transportation Improvement Programs ......Wisconsin Tribal Transportation Improvement Programs Federal Lands Highway Program, 23 USC 204 Tribal Contacts: Honorable

Indian Reservation Roads Programs Federal Lands Highway

REPORT FILTERS:

Location = F-**-***

Any level TIP/EIP Report program_class_code = 6K1

Reporting each CSTIP that meets the filter. CSTIP Type = TIP

6K1Program Class Code CSTIP Type Fiscal YearTIP 2019

Funding Amount 617,877

F55430 - BAD RIVER BANDEntity Name

08-JAN-19

State 55 - Wisconsin Projects on the CSTIP withn this state are listed and subtotaled in this section Location F55430 - Bad River Covers that part of the reservation within the current state.

PCAS F5543014 Phase FY 2019 ($) FY 2023 ($) Total Class R PE 0 0 5,000Name CNW TRAIL CONS 0 0 0 1,000 0 1,000County 003 - Ashland CE 0 0 0 1,000 0 1,000Project Type WALKWY Z 0 0 0 0 0 0Work Type 3 Total 0 0 0 7,000 0 7,000PCAS F5543015 Phase FY 2019 ($) FY 2023 ($) Total Class R PE 50,000 0 100,000Name BAD RIVER ERFO CONS 1,000 1,000 0 0 0 2,000County 003 - Ashland CE 50,000 2,000 0 0 0 52,000Project Type ERFO Z 0 0 0 0 0 0Work Type C3 Total 101,000 53,000 0 0 0 154,000PCAS F5543016 Phase FY 2019 ($) FY 2023 ($) Total Class R PE 0 0 2,000Name HISTORICAL PRESERVATION PROJECT CONS 0 0 1,000 1,000 0 2,000County 003 - Ashland CE 0 0 0 1,000 0 1,000Project Type NEWCON Z 0 0 0 0 0 0Work Type 7 Total 0 0 2,000 3,000 0 5,000PCAS F5543017 Phase FY 2019 ($) FY 2023 ($) Total Class R PE 0 0 7,000Name NEW HOUSING DEVELOPMENT CONS 0 1,000 1,000 20,000 0 22,000County 003 - Ashland CE 0 0 1,000 5,000 0 6,000Project Type NEWCON Z 0 0 0 0 0 0Work Type 7 Total 0 4,000 3,000 28,000 0 35,000PCAS F5543018 Phase FY 2019 ($) FY 2023 ($) Total Class R PE 25,000 0 26,000Name Headstart Access Road CONS 207,877 10,000 0 0 0 217,877County 003 - Ashland CE 5,000 20,000 2,000 0 0 27,000Project Type NEWCON Z 0 0 0 0 0 0Work Type 7 Total 237,877 31,000 2,000 0 0 270,877PCAS F5543019 Phase FY 2019 ($) FY 2023 ($) Total Class R PE 7,000 0 27,000Name Maple Street Rehabilitation CONS 0 250,000 10,000 0 0 260,000County 003 - Ashland CE 0 5,000 15,000 0 0 20,000Project Type RECONS Z 0 0 0 0 0 0 Work Type D1 Total 7,000 275,000 25,000 0 0 307,000

0 5,0000FY 2020 ($) FY 2021 ($) FY 2022 ($)

0 050,000FY 2020 ($) FY 2021 ($) FY 2022 ($)

1,000 1,0000FY 2020 ($) FY 2021 ($) FY 2022 ($)

1,000 3,0003,000FY 2020 ($) FY 2021 ($) FY 2022 ($)

0 01,000FY 2020 ($) FY 2021 ($) FY 2022 ($)

0 020,000FY 2020 ($) FY 2021 ($) FY 2022 ($)

16-OCT-2019 07:26 AM Page 23 of 100

Page 4: Wisconsin Tribal Transportation Improvement Programs ......Wisconsin Tribal Transportation Improvement Programs Federal Lands Highway Program, 23 USC 204 Tribal Contacts: Honorable

Indian Reservation Roads Programs Federal Lands Highway

REPORT FILTERS:

Location = F-**-***

Any level TIP/EIP Report program_class_code = 6K1

Reporting each CSTIP that meets the filter. CSTIP Type = TIP

6K1Program Class Code CSTIP Type Fiscal YearTIP 2019

Funding Amount 617,877

F55430 - BAD RIVER BANDEntity Name

08-JAN-19

State 55 - Wisconsin Projects on the CSTIP withn this state are listed and subtotaled in this section Location F55430 - Bad River Covers that part of the reservation within the current state.

PCAS F5543020 Phase FY 2019 ($) FY 2023 ($) Total Class R PE 1,000 0 3,000Name 2018 ERFO CONS 1,000 1,000 1,000 0 0 3,000County 003 - Ashland CE 1,000 1,000 1,000 0 0 3,000Project Type ERFO Z 0 0 0 0 0 0Work Type D1 Total 3,000 3,000 3,000 0 0 9,000PCAS F55430RI Phase FY 2019 ($) FY 2023 ($) Total Class O PE 1,000 0 4,000Name TTP ROAD INVENTORY PROJECT CONS 0 0 0 0 0 0County 003 - Ashland CE 0 0 0 0 0 0Project Type PLANING Z 0 0 0 0 0 0Work Type P8 Total 1,000 1,000 1,000 1,000 0 4,000PCAS F55430RM Phase FY 2019 ($) FY 2023 ($) Total Class O PE 0 0 0Name TTP ROAD MAINTENANCE PROJECT CONS 0 0 0 0 0 0County 003 - Ashland CE 0 0 0 0 0 0Project Type PLANING Z 200,000 200,000 200,000 200,000 0 800,000Work Type P10 Total 200,000 200,000 200,000 200,000 0 800,000PCAS F55430TP Phase FY 2019 ($) FY 2023 ($) Total Class O PE 45,000 0 165,000Name TTP TRANSPORTATION PLANNING PRO CONS 0 0 0 0 0 0County 003 - Ashland CE 0 0 0 0 0 0Project Type PLANING Z 0 0 0 0 0 0Work Type P9 Total 45,000 40,000 40,000 40,000 0 165,000PCAS F55430TR Phase FY 2019 ($) FY 2023 ($) Total Class O PE 0 0 0Name BAD RIVER TRANSIT CONS 0 0 0 0 0 0County 003 - Ashland CE 1,000 1,000 1,000 1,000 0 4,000Project Type TRANSIT Z 0 0 0 0 0 0 Work Type T2 Total 1,000 1,000 1,000 1,000 0 4,000

1,000 01,000FY 2020 ($) FY 2021 ($) FY 2022 ($)

1,000 1,0001,000FY 2020 ($) FY 2021 ($) FY 2022 ($)

0 00FY 2020 ($) FY 2021 ($) FY 2022 ($)

40,000 40,00040,000FY 2020 ($) FY 2021 ($) FY 2022 ($)

0 00FY 2020 ($) FY 2021 ($) FY 2022 ($)

617,877 631,000 627,000 659,000 0 2,534,877 2,534,877

617,877 631,000 627,000 659,000 0 2,534,877

617,877 631,000 627,000 659,000

Location Subtotal

State Subtotal CSTIP Subtotal

0

16-OCT-2019 07:26 AM Page 24 of 100

Page 5: Wisconsin Tribal Transportation Improvement Programs ......Wisconsin Tribal Transportation Improvement Programs Federal Lands Highway Program, 23 USC 204 Tribal Contacts: Honorable

Indian Reservation Roads Programs Federal Lands Highway

REPORT FILTERS:

Location = F-**-***

Any level TIP/EIP Report program_class_code = 6K1

Reporting each CSTIP that meets the filter. CSTIP Type = TIP

Entity Name F55431 - LAC COURTE OREILLES BAND FIRST PAGE FOR CSTIPProgram Class Code 6K1

CSTIP Type TIP FHWA Approved Date 21-FEB-19

Fiscal Year Funding Amount

2019 474,254

State 55 - Wisconsin Projects on the CSTIP withn this state are listed and subtotaled in this section Location F55431 - Lac Courte Oreilles Covers that part of the reservation within the current state.

PCAS F5543111 Phase FY 2019 ($) FY 2023 ($) Total Class R PE 0 0 0Name WATER TOWER CONNECTOR CONS 0 0 0 0 0 0County 113 - Sawyer CE 1,000 0 0 0 0 1,000Project Type NEWCON Z 0 0 0 0 0 0Work Type 7 Total 1,000 0 0 0 0 1,000PCAS F5543115 Phase FY 2019 ($) FY 2023 ($) Total Class R PE 0 0 0Name LCO TRAIL CONS 0 0 0 0 0 0County 113 - Sawyer CE 3,000 0 0 0 0 3,000Project Type WALKWY Z 0 0 0 0 0 0Work Type 7 Total 3,000 0 0 0 0 3,000PCAS F5543116 Phase FY 2019 ($) FY 2023 ($) Total Class R PE 0 0 0Name POPPLE TOWN ROAD CONS 0 0 0 0 0 0County 113 - Sawyer CE 1,000 0 0 0 0 1,000Project Type NEWCON Z 0 0 0 0 0 0Work Type 7 Total 1,000 0 0 0 0 1,000PCAS F5543117 Phase FY 2019 ($) FY 2023 ($) Total Class R PE 0 0 0Name VETERAN'S MEMORIAL PARKING CONS 1,000 0 0 0 0 1,000County 113 - Sawyer CE 4,000 0 0 0 0 4,000Project Type RECONS Z 0 0 0 0 0 0Work Type 7 Total 5,000 0 0 0 0 5,000PCAS F5543118 Phase FY 2019 ($) FY 2023 ($) Total Class R PE 0 0 0Name TREPANIA ROAD CONS 10,000 0 0 0 0 10,000County 113 - Sawyer CE 6,000 0 0 0 0 6,000Project Type RECONS Z 0 0 0 0 0 0Work Type 7 Total 16,000 0 0 0 0 16,000PCAS F5543119 Phase FY 2019 ($) FY 2023 ($) Total Class R PE 8,000 0 10,000Name CASINO RV PARK ROAD CONS 133,254 10,000 0 0 0 143,254County 113 - Sawyer CE 0 5,000 0 0 0 5,000Project Type NEWCON Z 0 0 0 0 0 0 Work Type 3 Total 141,254 17,000 0 0 0 158,254

0 00FY 2020 ($) FY 2021 ($) FY 2022 ($)

0 00FY 2020 ($) FY 2021 ($) FY 2022 ($)

0 00FY 2020 ($) FY 2021 ($) FY 2022 ($)

0 00FY 2020 ($) FY 2021 ($) FY 2022 ($)

0 00FY 2020 ($) FY 2021 ($) FY 2022 ($)

0 02,000FY 2020 ($) FY 2021 ($) FY 2022 ($)

16-OCT-2019 07:26 AM Page 25 of 100

Page 6: Wisconsin Tribal Transportation Improvement Programs ......Wisconsin Tribal Transportation Improvement Programs Federal Lands Highway Program, 23 USC 204 Tribal Contacts: Honorable

Indian Reservation Roads Programs Federal Lands Highway

REPORT FILTERS:

Location = F-**-***

Any level TIP/EIP Report program_class_code = 6K1

Reporting each CSTIP that meets the filter. CSTIP Type = TIP

6K1Program Class Code CSTIP Type Fiscal YearTIP 2019

Funding Amount 474,254

F55431 - LAC COURTE OREILLES BANDEntity Name

21-FEB-19

State 55 - Wisconsin Projects on the CSTIP withn this state are listed and subtotaled in this section Location F55431 - Lac Courte Oreilles Covers that part of the reservation within the current state.

PCAS F5543120 Phase FY 2019 ($) FY 2023 ($) Total Class R PE 5,000 0 7,000Name ADMINISTRATION ROAD CONS 110,000 10,000 0 0 0 120,000County 113 - Sawyer CE 0 5,000 0 0 0 5,000Project Type RECONS Z 0 0 0 0 0 0Work Type 7 Total 115,000 17,000 0 0 0 132,000PCAS F5543121 Phase FY 2019 ($) FY 2023 ($) Total Class R PE 12,000 0 24,000Name C-STORE PARKING LOT CONS 0 75,000 75,000 5,000 0 155,000County 113 - Sawyer CE 0 10,000 10,000 5,000 0 25,000Project Type RECONS Z 0 0 0 0 0 0Work Type 7 Total 12,000 97,000 85,000 10,000 0 204,000PCAS F5543123 Phase FY 2019 ($) FY 2023 ($) Total Class R PE 0 0 15,000Name GRINDSTONE SPRINGS ROAD CONS 0 0 60,000 260,000 0 320,000County 113 - Sawyer CE 0 0 0 15,000 0 15,000Project Type RECONS Z 0 0 0 0 0 0Work Type 7 Total 0 0 75,000 275,000 0 350,000PCAS F55431RI Phase FY 2019 ($) FY 2023 ($) Total Class O PE 5,000 0 8,000Name TTP ROAD INVENTORY PROJECT CONS 0 0 0 0 0 0County 113 - Sawyer CE 0 0 0 0 0 0Project Type PLANING Z 0 0 0 0 0 0Work Type P8 Total 5,000 1,000 1,000 1,000 0 8,000PCAS F55431RM Phase FY 2019 ($) FY 2023 ($) Total Class O PE 0 0 0Name TTP ROAD MAINTENANCE PROJECT CONS 0 0 0 0 0 0County 113 - Sawyer CE 0 0 0 0 0 0Project Type PLANING Z 140,000 100,000 100,000 100,000 0 440,000Work Type P10 Total 140,000 100,000 100,000 100,000 0 440,000PCAS F55431TP Phase FY 2019 ($) FY 2023 ($) Total Class O PE 35,000 0 140,000Name TTP TRANSPORTATION PLANNING PRO CONS 0 0 0 0 0 0County 113 - Sawyer CE 0 0 0 0 0 0Project Type PLANING Z 0 0 0 0 0 0 Work Type P9 Total 35,000 35,000 35,000 35,000 0 140,000

0 02,000FY 2020 ($) FY 2021 ($) FY 2022 ($)

0 012,000FY 2020 ($) FY 2021 ($) FY 2022 ($)

15,000 00FY 2020 ($) FY 2021 ($) FY 2022 ($)

1,000 1,0001,000FY 2020 ($) FY 2021 ($) FY 2022 ($)

0 00FY 2020 ($) FY 2021 ($) FY 2022 ($)

35,000 35,00035,000FY 2020 ($) FY 2021 ($) FY 2022 ($)

16-OCT-2019 07:26 AM Page 26 of 100

Page 7: Wisconsin Tribal Transportation Improvement Programs ......Wisconsin Tribal Transportation Improvement Programs Federal Lands Highway Program, 23 USC 204 Tribal Contacts: Honorable

Indian Reservation Roads Programs Federal Lands Highway

REPORT FILTERS:

Location = F-**-***

Any level TIP/EIP Report program_class_code = 6K1

Reporting each CSTIP that meets the filter. CSTIP Type = TIP

6K1Program Class Code CSTIP Type Fiscal YearTIP 2019

Funding Amount 474,254

F55431 - LAC COURTE OREILLES BANDEntity Name

21-FEB-19

State 55 - Wisconsin Projects on the CSTIP withn this state are listed and subtotaled in this section Location F55431 - Lac Courte Oreilles Covers that part of the reservation within the current state.

PCAS F55431TR Phase FY 2019 ($) FY 2023 ($) Total Class O PE 0 0 0Name LCO TRANSIT PROJECT CONS 0 0 0 0 0 0County 113 - Sawyer CE 0 40,000 40,000 40,000 0 120,000Project Type TRANSIT Z 0 0 0 0 0 0Work Type T2 Total 0 40,000 40,000 40,000 0 120,000PCAS F5560604 Phase FY 2019 ($) FY 2023 ($) Total Class R PE 0 0 8,000Name LARSON ROAD NORTH CONS 0 165,000 135,000 5,000 0 305,000County 113 - Sawyer CE 0 0 6,000 5,000 0 11,000Project Type RECONS Z 0 0 0 0 0 0 Work Type 7 Total 0 172,000 142,000 10,000 0 324,000

0 00FY 2020 ($) FY 2021 ($) FY 2022 ($)

1,000 07,000FY 2020 ($) FY 2021 ($) FY 2022 ($)

474,254 479,000 478,000 471,000 0 1,902,254 1,902,254

474,254 479,000 478,000 471,000 0 1,902,254

474,254 479,000 478,000 471,000

Location Subtotal

State Subtotal CSTIP Subtotal

0

16-OCT-2019 07:26 AM Page 27 of 100

Page 8: Wisconsin Tribal Transportation Improvement Programs ......Wisconsin Tribal Transportation Improvement Programs Federal Lands Highway Program, 23 USC 204 Tribal Contacts: Honorable

Indian Reservation Roads Programs Federal Lands Highway

REPORT FILTERS:

Location = F-**-***

Any level TIP/EIP Report program_class_code = 6K1

Reporting each CSTIP that meets the filter. CSTIP Type = TIP

Entity Name F55432 - LAC DU FLAMBEAU BAND FIRST PAGE FOR CSTIPProgram Class Code 6K1

CSTIP Type TIP FHWA Approved Date 06-FEB-19

Fiscal Year Funding Amount

2019 983,479

State 55 - Wisconsin Projects on the CSTIP withn this state are listed and subtotaled in this section Location F55432 - Lac Du Flambeau Covers that part of the reservation within the current state.

PCAS F5543214 Phase FY 2019 ($) FY 2023 ($) Total Class R PE 0 0 0Name OBERLAND HEIGHTS (ASAAWEE) CONS 1,000 0 0 0 0 1,000County 125 - Vilas CE 1,000 0 0 0 0 1,000Project Type NEWCON Z 0 0 0 0 0 0Work Type 7 Total 2,000 0 0 0 0 2,000PCAS F5543218 Phase FY 2019 ($) FY 2023 ($) Total Class R PE 0 0 10,000Name AJIDAMOO TRAIL/ROAD CONS 0 0 1,000 75,000 0 76,000County 125 - Vilas CE 0 0 0 7,000 0 7,000Project Type NEWCON Z 0 0 0 0 0 0Work Type 7 Total 0 0 11,000 82,000 0 93,000PCAS F5543223 Phase FY 2019 ($) FY 2023 ($) Total Class R PE 0 0 9,000Name LEACH LANE CONS 0 0 1,000 90,000 0 91,000County 125 - Vilas CE 0 0 0 5,000 0 5,000Project Type RECONS Z 0 0 0 0 0 0Work Type 3 Total 0 0 8,000 97,000 0 105,000PCAS F5543226 Phase FY 2019 ($) FY 2023 ($) Total Class R PE 0 0 5,000Name THOROFARE REINFORCEMENT CONS 0 50,000 175,000 5,000 0 230,000County 125 - Vilas CE 0 3,000 10,000 10,000 0 23,000Project Type RECONS Z 0 0 0 0 0 0Work Type 7 Total 0 58,000 185,000 15,000 0 258,000PCAS F5543228 Phase FY 2019 ($) FY 2023 ($) Total Class R PE 0 0 1,000Name SHOOTING RANGE ROAD CONS 0 0 0 1,000 0 1,000County 125 - Vilas CE 0 0 0 1,000 0 1,000Project Type RECONS Z 0 0 0 0 0 0Work Type 3 Total 0 0 0 3,000 0 3,000PCAS F5543233 Phase FY 2019 ($) FY 2023 ($) Total Class R PE 0 0 0Name NORTH SCHILLEMAN ROAD CONS 0 0 75,000 5,000 0 80,000County 125 - Vilas CE 0 0 5,000 5,000 0 10,000Project Type RECONS Z 0 0 0 0 0 0 Work Type 7 Total 0 0 80,000 10,000 0 90,000

0 00FY 2020 ($) FY 2021 ($) FY 2022 ($)

10,000 00FY 2020 ($) FY 2021 ($) FY 2022 ($)

7,000 2,0000FY 2020 ($) FY 2021 ($) FY 2022 ($)

0 05,000FY 2020 ($) FY 2021 ($) FY 2022 ($)

0 1,0000FY 2020 ($) FY 2021 ($) FY 2022 ($)

0 00FY 2020 ($) FY 2021 ($) FY 2022 ($)

16-OCT-2019 07:26 AM Page 28 of 100

Page 9: Wisconsin Tribal Transportation Improvement Programs ......Wisconsin Tribal Transportation Improvement Programs Federal Lands Highway Program, 23 USC 204 Tribal Contacts: Honorable

Indian Reservation Roads Programs Federal Lands Highway

REPORT FILTERS:

Location = F-**-***

Any level TIP/EIP Report program_class_code = 6K1

Reporting each CSTIP that meets the filter. CSTIP Type = TIP

6K1Program Class Code CSTIP Type Fiscal YearTIP 2019

Funding Amount 983,479

F55432 - LAC DU FLAMBEAU BANDEntity Name

06-FEB-19

State 55 - Wisconsin Projects on the CSTIP withn this state are listed and subtotaled in this section Location F55432 - Lac Du Flambeau Covers that part of the reservation within the current state.

PCAS F5543234 Phase FY 2019 ($) FY 2023 ($) Total Class R PE 0 0 0Name YOUTH CENTER LANE CONS 1,000 0 0 0 0 1,000County 125 - Vilas CE 1,000 0 0 0 0 1,000Project Type RECONS Z 0 0 0 0 0 0Work Type 7 Total 2,000 0 0 0 0 2,000PCAS F5543235 Phase FY 2019 ($) FY 2023 ($) Total Class B PE 20,000 0 21,000Name TROUT RIVER BRIDGE CONS 10,000 1,000 0 0 0 11,000County 125 - Vilas CE 0 0 0 0 0 0Project Type BRIDGE Z 0 0 0 0 0 0Work Type B16 Total 30,000 2,000 0 0 0 32,000PCAS F5543237 Phase FY 2019 ($) FY 2023 ($) Total Class R PE 0 0 10,000Name TRUMAN LANE CONS 0 0 1,000 85,000 0 86,000County 125 - Vilas CE 0 0 0 5,000 0 5,000Project Type RECONS Z 0 0 0 0 0 0Work Type 3 Total 0 0 11,000 90,000 0 101,000PCAS F5543239 Phase FY 2019 ($) FY 2023 ($) Total Class R PE 1,000 0 1,000Name LONG'S POINT LANE CONS 5,000 0 0 0 0 5,000County 125 - Vilas CE 5,000 0 0 0 0 5,000Project Type RECONS Z 0 0 0 0 0 0Work Type D1 Total 11,000 0 0 0 0 11,000PCAS F5543240 Phase FY 2019 ($) FY 2023 ($) Total Class R PE 9,000 0 9,000Name WEST RIVER TRAIL CONS 77,479 50,000 50,000 0 0 177,479County 051 - Iron CE 3,000 3,000 3,000 0 0 9,000Project Type RECONS Z 0 0 0 0 0 0Work Type 3 Total 89,479 53,000 53,000 0 0 195,479PCAS F5543242 Phase FY 2019 ($) FY 2023 ($) Total Class R PE 0 0 7,000Name TREE HAVEN CONS 0 0 1,000 65,000 0 66,000County 125 - Vilas CE 0 0 0 5,000 0 5,000Project Type NEWCON Z 0 0 0 0 0 0 Work Type 7 Total 0 0 8,000 70,000 0 78,000

0 00FY 2020 ($) FY 2021 ($) FY 2022 ($)

0 01,000FY 2020 ($) FY 2021 ($) FY 2022 ($)

10,000 00FY 2020 ($) FY 2021 ($) FY 2022 ($)

0 00FY 2020 ($) FY 2021 ($) FY 2022 ($)

0 00FY 2020 ($) FY 2021 ($) FY 2022 ($)

7,000 00FY 2020 ($) FY 2021 ($) FY 2022 ($)

16-OCT-2019 07:26 AM Page 29 of 100

Page 10: Wisconsin Tribal Transportation Improvement Programs ......Wisconsin Tribal Transportation Improvement Programs Federal Lands Highway Program, 23 USC 204 Tribal Contacts: Honorable

Indian Reservation Roads Programs Federal Lands Highway

REPORT FILTERS:

Location = F-**-***

Any level TIP/EIP Report program_class_code = 6K1

Reporting each CSTIP that meets the filter. CSTIP Type = TIP

6K1Program Class Code CSTIP Type Fiscal YearTIP 2019

Funding Amount 983,479

F55432 - LAC DU FLAMBEAU BANDEntity Name

06-FEB-19

State 55 - Wisconsin Projects on the CSTIP withn this state are listed and subtotaled in this section Location F55432 - Lac Du Flambeau Covers that part of the reservation within the current state.

PCAS F5543243 Phase FY 2019 ($) FY 2023 ($) Total Class O PE 5,000 0 5,000Name LDF PUBLIC DOCKS CONS 50,000 50,000 1,000 0 0 101,000County 125 - Vilas CE 5,000 5,000 3,000 0 0 13,000Project Type NEWCON Z 0 0 0 0 0 0Work Type F1 Total 60,000 55,000 4,000 0 0 119,000PCAS F5543244 Phase FY 2019 ($) FY 2023 ($) Total Class R PE 4,000 0 9,000Name THOROFARE BUSINESS PARKWAY CONS 50,000 150,000 5,000 0 0 205,000County 125 - Vilas CE 4,000 8,000 3,000 0 0 15,000Project Type RECONS Z 0 0 0 0 0 0Work Type 7 Total 58,000 163,000 8,000 0 0 229,000PCAS F5543245 Phase FY 2019 ($) FY 2023 ($) Total Class O PE 1,000 0 4,000Name LDF SAFETY PROJECT (LIGHTING) CONS 3,000 3,000 3,000 3,000 0 12,000County 125 - Vilas CE 0 0 0 0 0 0Project Type SAFETY Z 0 0 0 0 0 0Work Type P6 Total 4,000 4,000 4,000 4,000 0 16,000PCAS F5543247 Phase FY 2019 ($) FY 2023 ($) Total Class R PE 10,000 0 25,000Name WEST BIG CROOKED LAKE ROAD CONS 0 0 0 0 0 0County 125 - Vilas CE 0 0 0 0 0 0Project Type RECONS Z 0 0 0 0 0 0Work Type 7 Total 10,000 5,000 5,000 5,000 0 25,000PCAS F5543248 Phase FY 2019 ($) FY 2023 ($) Total Class R PE 4,000 0 9,000Name OLD INDIAN VILLAGE STREET CONS 0 1,000 0 0 0 1,000County 125 - Vilas CE 0 1,000 0 0 0 1,000Project Type RECONS Z 0 0 0 0 0 0Work Type E Total 4,000 7,000 0 0 0 11,000PCAS F5543249 Phase FY 2019 ($) FY 2023 ($) Total Class R PE 0 0 2,000Name TRIBAL CAMPGROUND ROAD CONS 0 0 0 0 0 0County 125 - Vilas CE 0 0 0 0 0 0Project Type RECONS Z 0 0 0 0 0 0 Work Type 3 Total 0 0 1,000 1,000 0 2,000

0 00FY 2020 ($) FY 2021 ($) FY 2022 ($)

0 05,000FY 2020 ($) FY 2021 ($) FY 2022 ($)

1,000 1,0001,000FY 2020 ($) FY 2021 ($) FY 2022 ($)

5,000 5,0005,000FY 2020 ($) FY 2021 ($) FY 2022 ($)

0 05,000FY 2020 ($) FY 2021 ($) FY 2022 ($)

1,000 1,0000FY 2020 ($) FY 2021 ($) FY 2022 ($)

16-OCT-2019 07:26 AM Page 30 of 100

Page 11: Wisconsin Tribal Transportation Improvement Programs ......Wisconsin Tribal Transportation Improvement Programs Federal Lands Highway Program, 23 USC 204 Tribal Contacts: Honorable

Indian Reservation Roads Programs Federal Lands Highway

REPORT FILTERS:

Location = F-**-***

Any level TIP/EIP Report program_class_code = 6K1

Reporting each CSTIP that meets the filter. CSTIP Type = TIP

6K1Program Class Code CSTIP Type Fiscal YearTIP 2019

Funding Amount 983,479

F55432 - LAC DU FLAMBEAU BANDEntity Name

06-FEB-19

State 55 - Wisconsin Projects on the CSTIP withn this state are listed and subtotaled in this section Location F55432 - Lac Du Flambeau Covers that part of the reservation within the current state.

PCAS F5543250 Phase FY 2019 ($) FY 2023 ($) Total Class R PE 0 0 2,000Name POTTS BAY LANE CONS 0 0 1,000 1,000 0 2,000County 125 - Vilas CE 0 0 1,000 1,000 0 2,000Project Type RECONS Z 0 0 0 0 0 0Work Type 7 Total 0 0 3,000 3,000 0 6,000PCAS F55432RI Phase FY 2019 ($) FY 2023 ($) Total Class O PE 1,000 0 4,000Name TTP ROAD INVENTORY PROJECT CONS 0 0 0 0 0 0County 125 - Vilas CE 0 0 0 0 0 0Project Type PLANING Z 0 0 0 0 0 0Work Type P8 Total 1,000 1,000 1,000 1,000 0 4,000PCAS F55432RM Phase FY 2019 ($) FY 2023 ($) Total Class O PE 0 0 0Name TTP ROAD MAINTENANCE PROJECT CONS 0 0 0 0 0 0County 125 - Vilas CE 0 0 0 0 0 0Project Type PLANING Z 350,000 350,000 350,000 350,000 0 1,400,000Work Type P10 Total 350,000 350,000 350,000 350,000 0 1,400,000PCAS F55432TP Phase FY 2019 ($) FY 2023 ($) Total Class O PE 50,000 0 200,000Name TTP TRANSPORTATION PLANNING PRO CONS 0 0 0 0 0 0County 125 - Vilas CE 0 0 0 0 0 0Project Type PLANING Z 0 0 0 0 0 0Work Type P9 Total 50,000 50,000 50,000 50,000 0 200,000PCAS F55432TR Phase FY 2019 ($) FY 2023 ($) Total Class O PE 0 0 0Name TTP TRIBAL TRANSIT PROJECT CONS 0 0 0 0 0 0County 125 - Vilas CE 200,000 200,000 200,000 200,000 0 800,000Project Type TRANSIT Z 0 0 0 0 0 0Work Type T2 Total 200,000 200,000 200,000 200,000 0 800,000PCAS F5572206 Phase FY 2019 ($) FY 2023 ($) Total Class O PE 7,000 0 10,000Name LDF PUBLIC PARKING AREAS CONS 100,000 30,000 1,000 0 0 131,000County 125 - Vilas CE 5,000 5,000 2,000 0 0 12,000Project Type REHAB Z 0 0 0 0 0 0 Work Type 7 Total 112,000 38,000 3,000 0 0 153,000

1,000 1,0000FY 2020 ($) FY 2021 ($) FY 2022 ($)

1,000 1,0001,000FY 2020 ($) FY 2021 ($) FY 2022 ($)

0 00FY 2020 ($) FY 2021 ($) FY 2022 ($)

50,000 50,00050,000FY 2020 ($) FY 2021 ($) FY 2022 ($)

0 00FY 2020 ($) FY 2021 ($) FY 2022 ($)

0 03,000FY 2020 ($) FY 2021 ($) FY 2022 ($)

983,479 986,000 985,000 981,000 0 3,935,479 3,935,479

983,479 986,000 985,000 981,000 0 3,935,479

983,479 986,000 985,000 981,000

Location Subtotal

State Subtotal CSTIP Subtotal

0

16-OCT-2019 07:26 AM Page 31 of 100

Page 12: Wisconsin Tribal Transportation Improvement Programs ......Wisconsin Tribal Transportation Improvement Programs Federal Lands Highway Program, 23 USC 204 Tribal Contacts: Honorable

Indian Reservation Roads Programs Federal Lands Highway

REPORT FILTERS:

Location = F-**-***

Any level TIP/EIP Report program_class_code = 6K1

Reporting each CSTIP that meets the filter. CSTIP Type = TIP

Entity Name F55433 - ONEIDA TRIBE OF INDIANS (WI) FIRST PAGE FOR CSTIPProgram Class Code 6K1

CSTIP Type TIP FHWA Approved Date 30-JAN-19

Fiscal Year Funding Amount

2019 1,060,883

State 55 - Wisconsin Projects on the CSTIP withn this state are listed and subtotaled in this section Location F55433 - Oneida Nation - Wisconsin Covers that part of the reservation within the current state.

PCAS F5543316 Phase FY 2019 ($) FY 2023 ($) Total Class R PE 10,000 0 10,000Name Poplar Lane CONS 130,000 0 0 0 0 130,000County 087 - Outagamie CE 5,000 0 0 0 0 5,000Project Type REHAB Z 0 0 0 0 0 0Work Type 7 Total 145,000 0 0 0 0 145,000PCAS F5543318 Phase FY 2019 ($) FY 2023 ($) Total Class R PE 10,000 0 130,000Name Manders Court (Metoxen Lane / Uskah V CONS 140,000 810,000 200,000 0 0 1,150,000County 087 - Outagamie CE 5,000 25,000 11,300 0 0 41,300Project Type REHAB Z 0 0 0 0 0 0Work Type 7 Total 155,000 935,000 231,300 0 0 1,321,300PCAS F5543326 Phase FY 2019 ($) FY 2023 ($) Total Class R PE 0 0 30,000Name Minoka Hill Drive CONS 0 0 150,000 0 0 150,000County 087 - Outagamie CE 0 0 10,000 0 0 10,000Project Type RECONS Z 0 0 0 0 0 0Work Type 7 Total 0 0 190,000 0 0 190,000PCAS F5543328 Phase FY 2019 ($) FY 2023 ($) Total Class R PE 0 0 70,000Name Seminary Road CONS 0 0 200,000 605,000 0 805,000County 087 - Outagamie CE 0 0 13,700 50,000 0 63,700Project Type NEWCON Z 0 0 0 0 0 0Work Type 7 Total 0 0 233,700 705,000 0 938,700PCAS F5543329 Phase FY 2019 ($) FY 2023 ($) Total Class R PE 10,000 0 10,000Name Johnson Road CONS 100,000 0 0 0 0 100,000County 087 - Outagamie CE 5,000 0 0 0 0 5,000Project Type RECONS Z 0 0 0 0 0 0Work Type 7 Total 115,000 0 0 0 0 115,000PCAS F5543330 Phase FY 2019 ($) FY 2023 ($) Total Class R PE 0 0 15,000Name Sand Hill Court CONS 0 0 150,000 0 0 150,000County 087 - Outagamie CE 0 0 15,000 0 0 15,000Project Type RECONS Z 0 0 0 0 0 0 Work Type 7 Total 0 0 180,000 0 0 180,000

0 00FY 2020 ($) FY 2021 ($) FY 2022 ($)

20,000 0100,000FY 2020 ($) FY 2021 ($) FY 2022 ($)

30,000 00FY 2020 ($) FY 2021 ($) FY 2022 ($)

20,000 50,0000FY 2020 ($) FY 2021 ($) FY 2022 ($)

0 00FY 2020 ($) FY 2021 ($) FY 2022 ($)

15,000 00FY 2020 ($) FY 2021 ($) FY 2022 ($)

16-OCT-2019 07:26 AM Page 32 of 100

Page 13: Wisconsin Tribal Transportation Improvement Programs ......Wisconsin Tribal Transportation Improvement Programs Federal Lands Highway Program, 23 USC 204 Tribal Contacts: Honorable

Indian Reservation Roads Programs Federal Lands Highway

REPORT FILTERS:

Location = F-**-***

Any level TIP/EIP Report program_class_code = 6K1

Reporting each CSTIP that meets the filter. CSTIP Type = TIP

6K1Program Class Code CSTIP Type Fiscal YearTIP 2019

Funding Amount 1,060,883

F55433 - ONEIDA TRIBE OF INDIANS (WI)Entity Name

30-JAN-19

State 55 - Wisconsin Projects on the CSTIP withn this state are listed and subtotaled in this section Location F55433 - Oneida Nation - Wisconsin Covers that part of the reservation within the current state.

PCAS F5543331 Phase FY 2019 ($) FY 2023 ($) Total Class R PE 24,000 0 24,000Name O-NA-STE Trail (Maple Leaf West) CONS 400,000 0 0 0 0 400,000County 009 - Brown CE 0 0 0 0 0 0Project Type REHAB Z 0 0 0 0 0 0Work Type 7 Total 424,000 0 0 0 0 424,000PCAS F55433RM Phase FY 2019 ($) FY 2023 ($) Total Class O PE 0 0 0Name TPP Road Maintenance Project CONS 0 0 0 0 0 0County 087 - Outagamie CE 0 0 0 0 0 0Project Type PLANING Z 71,000 75,000 75,000 75,000 0 296,000Work Type P10 Total 71,000 75,000 75,000 75,000 0 296,000PCAS F55433T1 Phase FY 2019 ($) FY 2023 ($) Total Class O PE 0 0 0Name Oneida - Pedestrian Infrastructure Projec CONS 100,000 0 0 130,000 0 230,000County 085 - Oneida CE 0 0 0 0 0 0Project Type WALKWY Z 0 0 0 0 0 0Work Type F1 Total 100,000 0 0 130,000 0 230,000PCAS F55433TP Phase FY 2019 ($) FY 2023 ($) Total Class O PE 0 0 0Name TPP Safety, Planning & Inventory Project CONS 0 0 0 0 0 0County 087 - Outagamie CE 0 0 0 0 0 0Project Type PLANING Z 50,883 50,883 150,883 150,883 0 403,532 Work Type P9 Total 50,883 50,883 150,883 150,883 0 403,532

0 00FY 2020 ($) FY 2021 ($) FY 2022 ($)

0 00FY 2020 ($) FY 2021 ($) FY 2022 ($)

0 00FY 2020 ($) FY 2021 ($) FY 2022 ($)

0 00FY 2020 ($) FY 2021 ($) FY 2022 ($)

1,060,883 1,060,883 1,060,883 1,060,883 0 4,243,532 4,243,532

1,060,883 1,060,883 1,060,883 1,060,883 0 4,243,532

1,060,883 1,060,883 1,060,883 1,060,883

Location Subtotal

State Subtotal CSTIP Subtotal

0

16-OCT-2019 07:26 AM Page 33 of 100

Page 14: Wisconsin Tribal Transportation Improvement Programs ......Wisconsin Tribal Transportation Improvement Programs Federal Lands Highway Program, 23 USC 204 Tribal Contacts: Honorable

Indian Reservation Roads Programs Federal Lands Highway

REPORT FILTERS:

Location = F-**-***

Any level TIP/EIP Report program_class_code = 6K1

Reporting each CSTIP that meets the filter. CSTIP Type = TIP

Entity Name F55434 - FOREST COUNTY POTAWATOMI COMMUNITY FIRST PAGE FOR CSTIPProgram Class Code 6K1

CSTIP Type TIP FHWA Approved Date 08-JAN-19

Fiscal Year Funding Amount

2019 258,825

State 55 - Wisconsin Projects on the CSTIP withn this state are listed and subtotaled in this section Location F55434 - Forest County Potawatomi Covers that part of the reservation within the current state.

PCAS F5543417 Phase FY 2019 ($) FY 2023 ($) Total Class R PE 2,000 0 32,000Name FCPC HOUSING ROADS CONS 241,825 235,000 230,000 230,000 0 936,825County 041 - Forest CE 5,000 10,000 12,000 12,000 0 39,000Project Type RECONS Z 0 0 0 0 0 0Work Type 7 Total 248,825 251,000 254,000 254,000 0 1,007,825PCAS F5543423 Phase FY 2019 ($) FY 2023 ($) Total Class R PE 1,000 0 2,000Name EVERYBODY'S ROAD (MISH KO SWEN CONS 1,000 1,000 0 0 0 2,000County 041 - Forest CE 1,000 1,000 0 0 0 2,000Project Type WALKWY Z 0 0 0 0 0 0Work Type F1 Total 3,000 3,000 0 0 0 6,000PCAS F55434RI Phase FY 2019 ($) FY 2023 ($) Total Class O PE 1,000 0 4,000Name TTP ROAD INVENTORY PROJECT CONS 0 0 0 0 0 0County 041 - Forest CE 0 0 0 0 0 0Project Type PLANING Z 0 0 0 0 0 0Work Type P8 Total 1,000 1,000 1,000 1,000 0 4,000PCAS F55434RM Phase FY 2019 ($) FY 2023 ($) Total Class O PE 0 0 0Name TTP ROAD MAINTENANCE PROJECT CONS 0 0 0 0 0 0County 041 - Forest CE 0 0 0 0 0 0Project Type PLANING Z 1,000 1,000 1,000 1,000 0 4,000Work Type P10 Total 1,000 1,000 1,000 1,000 0 4,000PCAS F55434TP Phase FY 2019 ($) FY 2023 ($) Total Class O PE 5,000 0 20,000Name TTP TRANSPORTATION PLANNING PRO CONS 0 0 0 0 0 0County 041 - Forest CE 0 0 0 0 0 0Project Type PLANING Z 0 0 0 0 0 0 Work Type P9 Total 5,000 5,000 5,000 5,000 0 20,000

12,000 12,0006,000FY 2020 ($) FY 2021 ($) FY 2022 ($)

0 01,000FY 2020 ($) FY 2021 ($) FY 2022 ($)

1,000 1,0001,000FY 2020 ($) FY 2021 ($) FY 2022 ($)

0 00FY 2020 ($) FY 2021 ($) FY 2022 ($)

5,000 5,0005,000FY 2020 ($) FY 2021 ($) FY 2022 ($)

258,825 261,000 261,000 261,000 0 1,041,825 1,041,825

258,825 261,000 261,000 261,000 0 1,041,825

258,825 261,000 261,000 261,000

Location Subtotal

State Subtotal CSTIP Subtotal

0

16-OCT-2019 07:26 AM Page 34 of 100

Page 15: Wisconsin Tribal Transportation Improvement Programs ......Wisconsin Tribal Transportation Improvement Programs Federal Lands Highway Program, 23 USC 204 Tribal Contacts: Honorable

Indian Reservation Roads Programs Federal Lands Highway

REPORT FILTERS:

Location = F-**-***

Any level TIP/EIP Report program_class_code = 6K1

Reporting each CSTIP that meets the filter. CSTIP Type = TIP

Entity Name F55435 - RED CLIFF BAND FIRST PAGE FOR CSTIPProgram Class Code 6K1

CSTIP Type TIP FHWA Approved Date 04-MAR-19

Fiscal Year Funding Amount

2019 460,966

State 55 - Wisconsin Projects on the CSTIP withn this state are listed and subtotaled in this section Location F55435 - Red Cliff Covers that part of the reservation within the current state.

PCAS F5543506 Phase FY 2019 ($) FY 2023 ($) Total Class R PE 0 0 0Name COMMUNITY DRIVE CONS 35,000 1,000 0 0 0 36,000County 007 - Bayfield CE 14,000 2,000 0 0 0 16,000Project Type REHAB Z 0 0 0 0 0 0Work Type 7 Total 49,000 3,000 0 0 0 52,000PCAS F5543508 Phase FY 2019 ($) FY 2023 ($) Total Class R PE 1,000 0 1,000Name ROWLEY ROAD CONS 1,000 0 0 0 0 1,000County 007 - Bayfield CE 1,000 0 0 0 0 1,000Project Type RECONS Z 0 0 0 0 0 0Work Type 7 Total 3,000 0 0 0 0 3,000PCAS F5543510 Phase FY 2019 ($) FY 2023 ($) Total Class R PE 0 0 0Name PIKE ROAD CONS 35,000 1,000 0 0 0 36,000County 007 - Bayfield CE 14,000 2,000 0 0 0 16,000Project Type REHAB Z 0 0 0 0 0 0Work Type 7 Total 49,000 3,000 0 0 0 52,000PCAS F5543512 Phase FY 2019 ($) FY 2023 ($) Total Class R PE 7,000 0 17,000Name BRADUM DEVELOPMENT CONS 0 50,000 40,000 40,000 0 130,000County 007 - Bayfield CE 0 1,000 1,000 10,000 0 12,000Project Type NEWCON Z 0 0 0 0 0 0Work Type 7 Total 7,000 56,000 45,000 51,000 0 159,000PCAS F5543518 Phase FY 2019 ($) FY 2023 ($) Total Class R PE 0 0 0Name WATER TOWER ROAD CONS 1,000 1,000 0 0 0 2,000County 007 - Bayfield CE 5,000 1,000 0 0 0 6,000Project Type RECONS Z 0 0 0 0 0 0Work Type 7 Total 6,000 2,000 0 0 0 8,000PCAS F5543520 Phase FY 2019 ($) FY 2023 ($) Total Class R PE 0 0 0Name JD DRIVE CONS 1,000 1,000 0 0 0 2,000County 007 - Bayfield CE 3,000 1,000 0 0 0 4,000Project Type RECONS Z 0 0 0 0 0 0 Work Type 7 Total 4,000 2,000 0 0 0 6,000

0 00FY 2020 ($) FY 2021 ($) FY 2022 ($)

0 00FY 2020 ($) FY 2021 ($) FY 2022 ($)

0 00FY 2020 ($) FY 2021 ($) FY 2022 ($)

4,000 1,0005,000FY 2020 ($) FY 2021 ($) FY 2022 ($)

0 00FY 2020 ($) FY 2021 ($) FY 2022 ($)

0 00FY 2020 ($) FY 2021 ($) FY 2022 ($)

16-OCT-2019 07:26 AM Page 35 of 100

Page 16: Wisconsin Tribal Transportation Improvement Programs ......Wisconsin Tribal Transportation Improvement Programs Federal Lands Highway Program, 23 USC 204 Tribal Contacts: Honorable

Indian Reservation Roads Programs Federal Lands Highway

REPORT FILTERS:

Location = F-**-***

Any level TIP/EIP Report program_class_code = 6K1

Reporting each CSTIP that meets the filter. CSTIP Type = TIP

6K1Program Class Code CSTIP Type Fiscal YearTIP 2019

Funding Amount 460,966

F55435 - RED CLIFF BANDEntity Name

04-MAR-19

State 55 - Wisconsin Projects on the CSTIP withn this state are listed and subtotaled in this section Location F55435 - Red Cliff Covers that part of the reservation within the current state.

PCAS F5543523 Phase FY 2019 ($) FY 2023 ($) Total Class R PE 0 0 13,000Name BISHOP LANE LOOP CONS 0 1,000 1,000 10,000 0 12,000County 007 - Bayfield CE 0 0 0 3,000 0 3,000Project Type RECONS Z 0 0 0 0 0 0Work Type 7 Total 0 6,000 6,000 16,000 0 28,000PCAS F5543524 Phase FY 2019 ($) FY 2023 ($) Total Class R PE 0 0 0Name SUPPORTIVE HOUSING PROJECT CONS 0 0 1,000 1,000 0 2,000County 007 - Bayfield CE 0 0 2,000 2,000 0 4,000Project Type NEWCON Z 0 0 0 0 0 0Work Type 7 Total 0 0 3,000 3,000 0 6,000PCAS F5543525 Phase FY 2019 ($) FY 2023 ($) Total Class R PE 1,000 0 1,000Name LITTLE SAND BAY ROAD CONS 0 0 1,000 1,000 0 2,000County 007 - Bayfield CE 0 0 2,000 2,000 0 4,000Project Type RECONS Z 0 0 0 0 0 0Work Type 7 Total 1,000 0 3,000 3,000 0 7,000PCAS F55435ER Phase FY 2019 ($) FY 2023 ($) Total Class O PE 0 0 0Name RED CLIFF ERFO PROJECT CONS 1,000 1,000 0 0 0 2,000County 007 - Bayfield CE 5,000 2,000 0 0 0 7,000Project Type ERFO Z 0 0 0 0 0 0Work Type D1 Total 6,000 3,000 0 0 0 9,000PCAS F55435RI Phase FY 2019 ($) FY 2023 ($) Total Class O PE 1,000 0 4,000Name TTP INVENTORY PROJECT CONS 0 0 0 0 0 0County 007 - Bayfield CE 0 0 0 0 0 0Project Type PLANING Z 0 0 0 0 0 0Work Type P8 Total 1,000 1,000 1,000 1,000 0 4,000PCAS F55435RM Phase FY 2019 ($) FY 2023 ($) Total Class O PE 0 0 0Name TTP ROAD MAINTENANCE PROJECT CONS 0 0 0 0 0 0County 007 - Bayfield CE 0 0 0 0 0 0Project Type PLANING Z 219,966 300,000 300,000 300,000 0 1,119,966 Work Type P9 Total 219,966 300,000 300,000 300,000 0 1,119,966

5,000 3,0005,000FY 2020 ($) FY 2021 ($) FY 2022 ($)

0 00FY 2020 ($) FY 2021 ($) FY 2022 ($)

0 00FY 2020 ($) FY 2021 ($) FY 2022 ($)

0 00FY 2020 ($) FY 2021 ($) FY 2022 ($)

1,000 1,0001,000FY 2020 ($) FY 2021 ($) FY 2022 ($)

0 00FY 2020 ($) FY 2021 ($) FY 2022 ($)

16-OCT-2019 07:26 AM Page 36 of 100

Page 17: Wisconsin Tribal Transportation Improvement Programs ......Wisconsin Tribal Transportation Improvement Programs Federal Lands Highway Program, 23 USC 204 Tribal Contacts: Honorable

Indian Reservation Roads Programs Federal Lands Highway

REPORT FILTERS:

Location = F-**-***

Any level TIP/EIP Report program_class_code = 6K1

Reporting each CSTIP that meets the filter. CSTIP Type = TIP

6K1Program Class Code CSTIP Type Fiscal YearTIP 2019

Funding Amount 460,966

F55435 - RED CLIFF BANDEntity Name

04-MAR-19

State 55 - Wisconsin Projects on the CSTIP withn this state are listed and subtotaled in this section Location F55435 - Red Cliff Covers that part of the reservation within the current state.

PCAS F55435TP Phase FY 2019 ($) FY 2023 ($) Total Class O PE 35,000 0 140,000Name TTP TRANSPORTATION PLANNING PRO CONS 0 0 0 0 0 0County 007 - Bayfield CE 0 0 0 0 0 0Project Type PLANING Z 0 0 0 0 0 0Work Type P9 Total 35,000 35,000 35,000 35,000 0 140,000PCAS F55435TR Phase FY 2019 ($) FY 2023 ($) Total Class O PE 0 0 0Name RED CLIFF TRANSIT CONS 0 0 0 0 0 0County 007 - Bayfield CE 80,000 80,000 80,000 80,000 0 320,000Project Type TRANSIT Z 0 0 0 0 0 0 Work Type T2 Total 80,000 80,000 80,000 80,000 0 320,000

35,000 35,00035,000FY 2020 ($) FY 2021 ($) FY 2022 ($)

0 00FY 2020 ($) FY 2021 ($) FY 2022 ($)

460,966 491,000 473,000 489,000 0 1,913,966 1,913,966

460,966 491,000 473,000 489,000 0 1,913,966

460,966 491,000 473,000 489,000

Location Subtotal

State Subtotal CSTIP Subtotal

0

16-OCT-2019 07:26 AM Page 37 of 100

Page 18: Wisconsin Tribal Transportation Improvement Programs ......Wisconsin Tribal Transportation Improvement Programs Federal Lands Highway Program, 23 USC 204 Tribal Contacts: Honorable

Indian Reservation Roads Programs Federal Lands Highway

REPORT FILTERS:

Location = F-**-***

Any level TIP/EIP Report program_class_code = 6K1

Reporting each CSTIP that meets the filter. CSTIP Type = TIP

Entity Name F55436 - ST. CROIX CHIPPEWA INDIANS FIRST PAGE FOR CSTIPProgram Class Code 6K1

CSTIP Type TIP FHWA Approved Date 04-MAR-19

Fiscal Year Funding Amount

2019 279,799

State 55 - Wisconsin Projects on the CSTIP withn this state are listed and subtotaled in this section Location F55436 - St. Croix Covers that part of the reservation within the current state.

PCAS F5543605 Phase FY 2019 ($) FY 2023 ($) Total Class R PE 0 0 5,000Name 2-1/8 STREET CONS 0 0 25,000 60,000 0 85,000County 095 - Polk CE 0 0 1,000 5,000 0 6,000Project Type REHAB Z 0 0 0 0 0 0Work Type 7 Total 0 0 31,000 65,000 0 96,000PCAS F5543606 Phase FY 2019 ($) FY 2023 ($) Total Class R PE 0 0 5,000Name 2-5/8 STREET CONS 0 0 25,000 60,000 0 85,000County 095 - Polk CE 0 0 1,000 5,000 0 6,000Project Type REHAB Z 0 0 0 0 0 0Work Type 7 Total 0 0 31,000 65,000 0 96,000PCAS F5543609 Phase FY 2019 ($) FY 2023 ($) Total Class R PE 7,000 0 7,000Name SHORT ROAD CONS 120,000 0 0 0 0 120,000County 095 - Polk CE 6,000 2,000 0 0 0 8,000Project Type REHAB Z 0 0 0 0 0 0Work Type 7 Total 133,000 2,000 0 0 0 135,000PCAS F5543613 Phase FY 2019 ($) FY 2023 ($) Total Class R PE 6,799 0 11,799Name 2-1/2 STREET CONS 0 140,000 100,000 0 0 240,000County 095 - Polk CE 0 10,000 2,000 0 0 12,000Project Type RECONS Z 0 0 0 0 0 0Work Type 7 Total 6,799 155,000 102,000 0 0 263,799PCAS F5543617 Phase FY 2019 ($) FY 2023 ($) Total Class R PE 0 0 5,000Name CLIFFORD LANDING CONS 0 0 0 25,000 0 25,000County 095 - Polk CE 0 0 0 0 0 0Project Type RECONS Z 0 0 0 0 0 0Work Type 7 Total 0 0 0 30,000 0 30,000PCAS F5543618 Phase FY 2019 ($) FY 2023 ($) Total Class R PE 0 0 0Name HERTEL FRONTAGE ROAD CONS 20,000 0 0 0 0 20,000County 013 - Burnett CE 13,000 2,000 0 0 0 15,000Project Type NEWCON Z 0 0 0 0 0 0 Work Type 7 Total 33,000 2,000 0 0 0 35,000

5,000 00FY 2020 ($) FY 2021 ($) FY 2022 ($)

5,000 00FY 2020 ($) FY 2021 ($) FY 2022 ($)

0 00FY 2020 ($) FY 2021 ($) FY 2022 ($)

0 05,000FY 2020 ($) FY 2021 ($) FY 2022 ($)

0 5,0000FY 2020 ($) FY 2021 ($) FY 2022 ($)

0 00FY 2020 ($) FY 2021 ($) FY 2022 ($)

16-OCT-2019 07:26 AM Page 38 of 100

Page 19: Wisconsin Tribal Transportation Improvement Programs ......Wisconsin Tribal Transportation Improvement Programs Federal Lands Highway Program, 23 USC 204 Tribal Contacts: Honorable

Indian Reservation Roads Programs Federal Lands Highway

REPORT FILTERS:

Location = F-**-***

Any level TIP/EIP Report program_class_code = 6K1

Reporting each CSTIP that meets the filter. CSTIP Type = TIP

6K1Program Class Code CSTIP Type Fiscal YearTIP 2019

Funding Amount 279,799

F55436 - ST. CROIX CHIPPEWA INDIANSEntity Name

04-MAR-19

State 55 - Wisconsin Projects on the CSTIP withn this state are listed and subtotaled in this section Location F55436 - St. Croix Covers that part of the reservation within the current state.

PCAS F55436RM Phase FY 2019 ($) FY 2023 ($) Total Class O PE 0 0 0Name TTP ROAD MAINTENANCE PROJECT CONS 0 0 0 0 0 0County 013 - Burnett CE 0 0 0 0 0 0Project Type PLANING Z 75,000 80,000 80,000 80,000 0 315,000Work Type P10 Total 75,000 80,000 80,000 80,000 0 315,000PCAS F55436SA Phase FY 2019 ($) FY 2023 ($) Total Class O PE 2,000 0 4,000Name DANBURY PEDESTRIAN TRAIL CONS 0 0 0 0 0 0County 013 - Burnett CE 0 0 0 0 0 0Project Type SAFETY Z 0 0 0 0 0 0Work Type F1 Total 2,000 2,000 0 0 0 4,000PCAS F55436TP Phase FY 2019 ($) FY 2023 ($) Total Class O PE 30,000 0 120,000Name TTP TRANSPORTATION PLANNING PRO CONS 0 0 0 0 0 0County 013 - Burnett CE 0 0 0 0 0 0Project Type PLANING Z 0 0 0 0 0 0 Work Type P9 Total 30,000 30,000 30,000 30,000 0 120,000

0 00FY 2020 ($) FY 2021 ($) FY 2022 ($)

0 02,000FY 2020 ($) FY 2021 ($) FY 2022 ($)

30,000 30,00030,000FY 2020 ($) FY 2021 ($) FY 2022 ($)

279,799 271,000 274,000 270,000 0 1,094,799 1,094,799

279,799 271,000 274,000 270,000 0 1,094,799

279,799 271,000 274,000 270,000

Location Subtotal

State Subtotal CSTIP Subtotal

0

16-OCT-2019 07:26 AM Page 39 of 100

Page 20: Wisconsin Tribal Transportation Improvement Programs ......Wisconsin Tribal Transportation Improvement Programs Federal Lands Highway Program, 23 USC 204 Tribal Contacts: Honorable

Indian Reservation Roads Programs Federal Lands Highway

REPORT FILTERS:

Location = F-**-***

Any level TIP/EIP Report program_class_code = 6K1

Reporting each CSTIP that meets the filter. CSTIP Type = TIP

Entity Name F55437 - SOKAOGON CHIPPEWA COMMUNITY FIRST PAGE FOR CSTIPProgram Class Code 6K1

CSTIP Type TIP FHWA Approved Date 06-FEB-19

Fiscal Year Funding Amount

2019 192,990

State 55 - Wisconsin Projects on the CSTIP withn this state are listed and subtotaled in this section Location F55437 - Sokaogon Chippewa Community Covers that part of the reservation within the current state.

PCAS F5543702 Phase FY 2019 ($) FY 2023 ($) Total Class R PE 1,000 0 3,000Name POW WOW GROUNDS ROAD CONS 0 0 0 0 0 0County 041 - Forest CE 0 0 0 0 0 0Project Type RECONS Z 0 0 0 0 0 0Work Type 7 Total 1,000 1,000 1,000 0 0 3,000PCAS F5543704 Phase FY 2019 ($) FY 2023 ($) Total Class R PE 0 0 0Name COMMUNITY DRIVE CONS 9,990 135,000 130,000 15,000 0 289,990County 041 - Forest CE 1,000 6,000 5,000 3,000 0 15,000Project Type OVRLAY Z 0 0 0 0 0 0Work Type 7 Total 10,990 141,000 135,000 18,000 0 304,990PCAS F5543708 Phase FY 2019 ($) FY 2023 ($) Total Class R PE 0 0 13,000Name ACKLEY CIRCLE CONS 0 0 0 105,000 0 105,000County 041 - Forest CE 0 0 0 6,000 0 6,000Project Type REHAB Z 0 0 0 0 0 0Work Type 7 Total 0 0 3,000 121,000 0 124,000PCAS F5543710 Phase FY 2019 ($) FY 2023 ($) Total Class R PE 0 0 2,000Name VANZILE ROAD CONS 0 0 0 0 0 0County 041 - Forest CE 0 0 0 0 0 0Project Type RECONS Z 0 0 0 0 0 0Work Type 7 Total 0 0 1,000 1,000 0 2,000PCAS F5543711 Phase FY 2019 ($) FY 2023 ($) Total Class R PE 0 0 2,000Name MCGESHICK ROAD CONS 0 0 0 0 0 0County 041 - Forest CE 0 0 0 0 0 0Project Type RECONS Z 0 0 0 0 0 0Work Type 7 Total 0 0 1,000 1,000 0 2,000PCAS F5543712 Phase FY 2019 ($) FY 2023 ($) Total Class R PE 0 0 0Name CONNECTOR ROAD (BLACK LANE) CONS 0 0 0 0 0 0County 041 - Forest CE 1,000 0 0 0 0 1,000Project Type RECONS Z 0 0 0 0 0 0 Work Type 7 Total 1,000 0 0 0 0 1,000

1,000 01,000FY 2020 ($) FY 2021 ($) FY 2022 ($)

0 00FY 2020 ($) FY 2021 ($) FY 2022 ($)

3,000 10,0000FY 2020 ($) FY 2021 ($) FY 2022 ($)

1,000 1,0000FY 2020 ($) FY 2021 ($) FY 2022 ($)

1,000 1,0000FY 2020 ($) FY 2021 ($) FY 2022 ($)

0 00FY 2020 ($) FY 2021 ($) FY 2022 ($)

16-OCT-2019 07:26 AM Page 40 of 100

Page 21: Wisconsin Tribal Transportation Improvement Programs ......Wisconsin Tribal Transportation Improvement Programs Federal Lands Highway Program, 23 USC 204 Tribal Contacts: Honorable

Indian Reservation Roads Programs Federal Lands Highway

REPORT FILTERS:

Location = F-**-***

Any level TIP/EIP Report program_class_code = 6K1

Reporting each CSTIP that meets the filter. CSTIP Type = TIP

6K1Program Class Code CSTIP Type Fiscal YearTIP 2019

Funding Amount 192,990

F55437 - SOKAOGON CHIPPEWA COMMUNITYEntity Name

06-FEB-19

State 55 - Wisconsin Projects on the CSTIP withn this state are listed and subtotaled in this section Location F55437 - Sokaogon Chippewa Community Covers that part of the reservation within the current state.

PCAS F55437RI Phase FY 2019 ($) FY 2023 ($) Total Class O PE 1,000 0 4,000Name TTP ROAD INVENTORY PROJECT CONS 0 0 0 0 0 0County 041 - Forest CE 0 0 0 0 0 0Project Type RECONS Z 0 0 0 0 0 0Work Type P8 Total 1,000 1,000 1,000 1,000 0 4,000PCAS F55437RM Phase FY 2019 ($) FY 2023 ($) Total Class O PE 0 0 0Name TTP ROAD MAINTENANCE PROJECT CONS 0 0 0 0 0 0County 041 - Forest CE 0 0 0 0 0 0Project Type PLANING Z 175,000 50,000 50,000 50,000 0 325,000Work Type P10 Total 175,000 50,000 50,000 50,000 0 325,000PCAS F55437TP Phase FY 2019 ($) FY 2023 ($) Total Class O PE 3,000 0 12,000Name TTP TRANSPORTATION PLANNING PRO CONS 0 0 0 0 0 0County 041 - Forest CE 0 0 0 0 0 0Project Type PLANING Z 0 0 0 0 0 0Work Type P9 Total 3,000 3,000 3,000 3,000 0 12,000PCAS F55437TR Phase FY 2019 ($) FY 2023 ($) Total Class O PE 0 0 0Name TTP TRIBAL TRANSIT CONS 0 0 0 0 0 0County 041 - Forest CE 1,000 1,000 1,000 1,000 0 4,000Project Type TRANSIT Z 0 0 0 0 0 0 Work Type T4 Total 1,000 1,000 1,000 1,000 0 4,000

1,000 1,0001,000FY 2020 ($) FY 2021 ($) FY 2022 ($)

0 00FY 2020 ($) FY 2021 ($) FY 2022 ($)

3,000 3,0003,000FY 2020 ($) FY 2021 ($) FY 2022 ($)

0 00FY 2020 ($) FY 2021 ($) FY 2022 ($)

192,990 197,000 196,000 196,000 0 781,990 781,990

192,990 197,000 196,000 196,000 0 781,990

192,990 197,000 196,000 196,000

Location Subtotal

State Subtotal CSTIP Subtotal

0

16-OCT-2019 07:26 AM Page 41 of 100

Page 22: Wisconsin Tribal Transportation Improvement Programs ......Wisconsin Tribal Transportation Improvement Programs Federal Lands Highway Program, 23 USC 204 Tribal Contacts: Honorable

Indian Reservation Roads Programs Federal Lands Highway

REPORT FILTERS:

Location = F-**-***

Any level TIP/EIP Report program_class_code = 6K1

Reporting each CSTIP that meets the filter. CSTIP Type = TIP

Entity Name F55438 - STOCKBRIDGE MUNSEE COMMUNITY FIRST PAGE FOR CSTIPProgram Class Code 6K1

CSTIP Type TIP FHWA Approved Date 30-JAN-19

Fiscal Year Funding Amount

2019 584,793

State 55 - Wisconsin Projects on the CSTIP withn this state are listed and subtotaled in this section Location F55438 - Stockbridge Munsee Community Covers that part of the reservation within the current state.

PCAS F5543809 Phase FY 2019 ($) FY 2023 ($) Total Class R PE 1,000 0 4,000Name School House Road CONS 25,000 25,000 25,000 25,000 0 100,000County 115 - Shawano CE 0 0 0 0 0 0Project Type RECONS Z 0 0 0 0 0 0Work Type 7 Total 26,000 26,000 26,000 26,000 0 104,000PCAS F5543813 Phase FY 2019 ($) FY 2023 ($) Total Class R PE 1,000 0 4,000Name Hillside Drive CONS 25,000 25,000 25,000 25,000 0 100,000County 115 - Shawano CE 0 0 0 0 0 0Project Type REHAB Z 0 0 0 0 0 0Work Type 7 Total 26,000 26,000 26,000 26,000 0 104,000PCAS F5543815 Phase FY 2019 ($) FY 2023 ($) Total Class R PE 1,000 0 4,000Name Maple Road CONS 10,000 10,000 10,000 10,000 0 40,000County 115 - Shawano CE 0 0 0 0 0 0Project Type REHAB Z 0 0 0 0 0 0Work Type 7 Total 11,000 11,000 11,000 11,000 0 44,000PCAS F5543816 Phase FY 2019 ($) FY 2023 ($) Total Class R PE 50,000 0 200,000Name CTH J CONS 129,793 129,793 129,793 129,793 0 519,172County 115 - Shawano CE 5,000 5,000 5,000 5,000 0 20,000Project Type RECONS Z 0 0 0 0 0 0Work Type 7 Total 184,793 184,793 184,793 184,793 0 739,172PCAS F5543820 Phase FY 2019 ($) FY 2023 ($) Total Class R PE 15,000 0 60,000Name North Branch Road CONS 50,000 50,000 50,000 50,000 0 200,000County 115 - Shawano CE 0 0 0 0 0 0Project Type REHAB Z 0 0 0 0 0 0Work Type 7 Total 65,000 65,000 65,000 65,000 0 260,000PCAS F5543821 Phase FY 2019 ($) FY 2023 ($) Total Class R PE 20,000 0 80,000Name Moh He Con Nuck Road and Circle Subd CONS 50,000 50,000 50,000 50,000 0 200,000County 115 - Shawano CE 0 0 0 0 0 0Project Type RECONS Z 0 0 0 0 0 0 Work Type 7 Total 70,000 70,000 70,000 70,000 0 280,000

1,000 1,0001,000FY 2020 ($) FY 2021 ($) FY 2022 ($)

1,000 1,0001,000FY 2020 ($) FY 2021 ($) FY 2022 ($)

1,000 1,0001,000FY 2020 ($) FY 2021 ($) FY 2022 ($)

50,000 50,00050,000FY 2020 ($) FY 2021 ($) FY 2022 ($)

15,000 15,00015,000FY 2020 ($) FY 2021 ($) FY 2022 ($)

20,000 20,00020,000FY 2020 ($) FY 2021 ($) FY 2022 ($)

16-OCT-2019 07:26 AM Page 42 of 100

Page 23: Wisconsin Tribal Transportation Improvement Programs ......Wisconsin Tribal Transportation Improvement Programs Federal Lands Highway Program, 23 USC 204 Tribal Contacts: Honorable

Indian Reservation Roads Programs Federal Lands Highway

REPORT FILTERS:

Location = F-**-***

Any level TIP/EIP Report program_class_code = 6K1

Reporting each CSTIP that meets the filter. CSTIP Type = TIP

6K1Program Class Code CSTIP Type Fiscal YearTIP 2019

Funding Amount 584,793

F55438 - STOCKBRIDGE MUNSEE COMMUNITYEntity Name

30-JAN-19

State 55 - Wisconsin Projects on the CSTIP withn this state are listed and subtotaled in this section Location F55438 - Stockbridge Munsee Community Covers that part of the reservation within the current state.

PCAS F5543822 Phase FY 2019 ($) FY 2023 ($) Total Class R PE 10,000 0 40,000Name Little Road CONS 50,000 50,000 50,000 50,000 0 200,000County 115 - Shawano CE 0 0 0 0 0 0Project Type RECONS Z 0 0 0 0 0 0Work Type 7 Total 60,000 60,000 60,000 60,000 0 240,000PCAS F5543823 Phase FY 2019 ($) FY 2023 ($) Total Class R PE 10,000 0 40,000Name River Road/West Town Hall Road CONS 50,000 50,000 50,000 50,000 0 200,000County 115 - Shawano CE 0 0 0 0 0 0Project Type RECONS Z 0 0 0 0 0 0Work Type 7 Total 60,000 60,000 60,000 60,000 0 240,000PCAS F5543824 Phase FY 2019 ($) FY 2023 ($) Total Class R PE 30,000 0 120,000Name Town Hall Road CONS 40,000 40,000 40,000 40,000 0 160,000County 115 - Shawano CE 0 0 0 0 0 0Project Type RECONS Z 0 0 0 0 0 0Work Type 7 Total 70,000 70,000 70,000 70,000 0 280,000PCAS F55438RI Phase FY 2019 ($) FY 2023 ($) Total Class O PE 0 0 0Name TTP Inventory CONS 0 0 0 0 0 0County 115 - Shawano CE 0 0 0 0 0 0Project Type PLANING Z 10,000 10,000 10,000 10,000 0 40,000Work Type P9 Total 10,000 10,000 10,000 10,000 0 40,000PCAS F55438RM Phase FY 2019 ($) FY 2023 ($) Total Class O PE 0 0 0Name TTP Road Maintenance CONS 0 0 0 0 0 0County 115 - Shawano CE 0 0 0 0 0 0Project Type PLANING Z 1,000 1,000 1,000 1,000 0 4,000Work Type P10 Total 1,000 1,000 1,000 1,000 0 4,000PCAS F55438TP Phase FY 2019 ($) FY 2023 ($) Total Class O PE 0 0 0Name TTP Transportation Planning CONS 0 0 0 0 0 0County 115 - Shawano CE 0 0 0 0 0 0Project Type PLANING Z 1,000 1,000 1,000 1,000 0 4,000 Work Type P9 Total 1,000 1,000 1,000 1,000 0 4,000

10,000 10,00010,000FY 2020 ($) FY 2021 ($) FY 2022 ($)

10,000 10,00010,000FY 2020 ($) FY 2021 ($) FY 2022 ($)

30,000 30,00030,000FY 2020 ($) FY 2021 ($) FY 2022 ($)

0 00FY 2020 ($) FY 2021 ($) FY 2022 ($)

0 00FY 2020 ($) FY 2021 ($) FY 2022 ($)

0 00FY 2020 ($) FY 2021 ($) FY 2022 ($)

584,793 584,793 584,793 584,793 0 2,339,172 2,339,172

584,793 584,793 584,793 584,793 0 2,339,172

584,793 584,793 584,793 584,793

Location Subtotal

State Subtotal CSTIP Subtotal

0

16-OCT-2019 07:26 AM Page 43 of 100

Page 24: Wisconsin Tribal Transportation Improvement Programs ......Wisconsin Tribal Transportation Improvement Programs Federal Lands Highway Program, 23 USC 204 Tribal Contacts: Honorable

Indian Reservation Roads Programs Federal Lands Highway

REPORT FILTERS:

Location = F-**-***

Any level TIP/EIP Report program_class_code = 6K1

Reporting each CSTIP that meets the filter. CSTIP Type = TIP

Entity Name F55439 - Ho-Chunk Nation FIRST PAGE FOR CSTIPProgram Class Code 6K1

CSTIP Type TIP FHWA Approved Date 08-JAN-19

Fiscal Year Funding Amount

2019 5,957,346

State 55 - Wisconsin Projects on the CSTIP withn this state are listed and subtotaled in this section Location F55439 - Ho-Chunk Nation Covers that part of the reservation within the current state.

PCAS F5543903 Phase FY 2019 ($) FY 2023 ($) Total Class R PE 10,000 0 15,000Name Winneshiek Property CONS 0 600,000 5,000 0 0 605,000County 053 - Jackson CE 0 20,000 10,000 0 0 30,000Project Type NEWCON Z 0 0 0 0 0 0Work Type 7 Total 10,000 625,000 15,000 0 0 650,000PCAS F5543950 Phase FY 2019 ($) FY 2023 ($) Total Class R PE 1,000 0 1,000Name Wazee North and South CONS 1,000 5,000 0 0 0 6,000County 053 - Jackson CE 5,000 5,000 0 0 0 10,000Project Type NEWCON Z 0 0 0 0 0 0Work Type 7 Total 7,000 10,000 0 0 0 17,000PCAS F5543952 Phase FY 2019 ($) FY 2023 ($) Total Class R PE 1,000 0 1,000Name Little Blackhawk CONS 1,000 1,000 0 0 0 2,000County 053 - Jackson CE 1,000 1,000 0 0 0 2,000Project Type NEWCON Z 0 0 0 0 0 0Work Type 7 Total 3,000 2,000 0 0 0 5,000PCAS F5543966 Phase FY 2019 ($) FY 2023 ($) Total Class R PE 0 0 5,000Name Wittenberg Youth Center Road CONS 0 0 95,000 1,000 0 96,000County 115 - Shawano CE 0 0 10,000 5,000 0 15,000Project Type NEWCON Z 0 0 0 0 0 0Work Type 7 Total 0 0 110,000 6,000 0 116,000PCAS F5543983 Phase FY 2019 ($) FY 2023 ($) Total Class R PE 0 0 11,000Name Ho Chunk Village - Parcels 11 & 12 CONS 0 1,000 400,000 1,000 0 402,000County 111 - Sauk CE 0 10,000 25,000 15,000 0 50,000Project Type REHAB Z 0 0 0 0 0 0Work Type 7 Total 0 21,000 426,000 16,000 0 463,000PCAS F5543985 Phase FY 2019 ($) FY 2023 ($) Total Class R PE 10,000 0 35,000Name East Colley Road CONS 0 900,000 10,000 0 0 910,000County 105 - Rock CE 0 20,000 25,000 0 0 45,000Project Type RECONS Z 0 0 0 0 0 0 Work Type 7 Total 10,000 945,000 35,000 0 0 990,000

0 05,000FY 2020 ($) FY 2021 ($) FY 2022 ($)

0 00FY 2020 ($) FY 2021 ($) FY 2022 ($)

0 00FY 2020 ($) FY 2021 ($) FY 2022 ($)

5,000 00FY 2020 ($) FY 2021 ($) FY 2022 ($)

1,000 010,000FY 2020 ($) FY 2021 ($) FY 2022 ($)

0 025,000FY 2020 ($) FY 2021 ($) FY 2022 ($)

16-OCT-2019 07:26 AM Page 44 of 100

Page 25: Wisconsin Tribal Transportation Improvement Programs ......Wisconsin Tribal Transportation Improvement Programs Federal Lands Highway Program, 23 USC 204 Tribal Contacts: Honorable

Indian Reservation Roads Programs Federal Lands Highway

REPORT FILTERS:

Location = F-**-***

Any level TIP/EIP Report program_class_code = 6K1

Reporting each CSTIP that meets the filter. CSTIP Type = TIP

6K1Program Class Code CSTIP Type Fiscal YearTIP 2019

Funding Amount 5,957,346

F55439 - Ho-Chunk NationEntity Name

08-JAN-19

State 55 - Wisconsin Projects on the CSTIP withn this state are listed and subtotaled in this section Location F55439 - Ho-Chunk Nation Covers that part of the reservation within the current state.

PCAS F5543986 Phase FY 2019 ($) FY 2023 ($) Total Class R PE 0 0 18,000Name Well #5 Mortensen CONS 0 0 150,000 0 0 150,000County 111 - Sauk CE 0 0 5,000 0 0 5,000Project Type RECONS Z 0 0 0 0 0 0Work Type 7 Total 0 3,000 170,000 0 0 173,000PCAS F5543987 Phase FY 2019 ($) FY 2023 ($) Total Class R PE 0 0 1,000Name HCDC Mauston CONS 0 0 1,000 1,000 0 2,000County 057 - Juneau CE 0 0 1,000 1,000 0 2,000Project Type NEWCON Z 0 0 0 0 0 0Work Type 7 Total 0 0 3,000 2,000 0 5,000PCAS F5543994 Phase FY 2019 ($) FY 2023 ($) Total Class R PE 0 0 16,000Name Eddy Road CONS 0 0 150,000 5,000 0 155,000County 053 - Jackson CE 0 0 5,000 10,000 0 15,000Project Type RECONS Z 0 0 0 0 0 0Work Type 7 Total 0 1,000 170,000 15,000 0 186,000PCAS F5543995 Phase FY 2019 ($) FY 2023 ($) Total Class R PE 0 0 1,000Name Christensen Property CONS 0 0 1,000 1,000 0 2,000County 053 - Jackson CE 0 0 1,000 1,000 0 2,000Project Type NEWCON Z 0 0 0 0 0 0Work Type 7 Total 0 0 3,000 2,000 0 5,000PCAS F5543996 Phase FY 2019 ($) FY 2023 ($) Total Class R PE 7,000 0 7,000Name Lowe Avenue CONS 100,000 5,000 0 0 0 105,000County 053 - Jackson CE 5,000 10,000 0 0 0 15,000Project Type RECONS Z 0 0 0 0 0 0Work Type 7 Total 112,000 15,000 0 0 0 127,000PCAS F5543997 Phase FY 2019 ($) FY 2023 ($) Total Class R PE 0 0 55,000Name Mortensen Property CONS 0 0 0 900,000 0 900,000County 141 - Wood CE 0 0 0 20,000 0 20,000Project Type NEWCON Z 0 0 0 0 0 0 Work Type 7 Total 0 0 25,000 950,000 0 975,000

15,000 03,000FY 2020 ($) FY 2021 ($) FY 2022 ($)

1,000 00FY 2020 ($) FY 2021 ($) FY 2022 ($)

15,000 01,000FY 2020 ($) FY 2021 ($) FY 2022 ($)

1,000 00FY 2020 ($) FY 2021 ($) FY 2022 ($)

0 00FY 2020 ($) FY 2021 ($) FY 2022 ($)

25,000 30,0000FY 2020 ($) FY 2021 ($) FY 2022 ($)

16-OCT-2019 07:26 AM Page 45 of 100

Page 26: Wisconsin Tribal Transportation Improvement Programs ......Wisconsin Tribal Transportation Improvement Programs Federal Lands Highway Program, 23 USC 204 Tribal Contacts: Honorable

Indian Reservation Roads Programs Federal Lands Highway

REPORT FILTERS:

Location = F-**-***

Any level TIP/EIP Report program_class_code = 6K1

Reporting each CSTIP that meets the filter. CSTIP Type = TIP

6K1Program Class Code CSTIP Type Fiscal YearTIP 2019

Funding Amount 5,957,346

F55439 - Ho-Chunk NationEntity Name

08-JAN-19

State 55 - Wisconsin Projects on the CSTIP withn this state are listed and subtotaled in this section Location F55439 - Ho-Chunk Nation Covers that part of the reservation within the current state.

PCAS F5543999 Phase FY 2019 ($) FY 2023 ($) Total Class R PE 0 0 0Name CTH II - Marathon County CONS 1,000 0 0 0 0 1,000County 073 - Marathon CE 1,000 0 0 0 0 1,000Project Type REHAB Z 0 0 0 0 0 0Work Type 7 Total 2,000 0 0 0 0 2,000PCAS F55439D4 Phase FY 2019 ($) FY 2023 ($) Total Class R PE 0 0 25,000Name Mo Ra Je Ga Road CONS 0 0 1,000 100,000 0 101,000County 115 - Shawano CE 0 0 1,000 10,000 0 11,000Project Type RECONS Z 0 0 0 0 0 0Work Type 7 Total 0 0 12,000 125,000 0 137,000PCAS F55439D7 Phase FY 2019 ($) FY 2023 ($) Total Class R PE 0 0 3,000Name District 1 Walking Trail CONS 0 1,000 1,000 1,000 0 3,000County 053 - Jackson CE 0 1,000 1,000 1,000 0 3,000Project Type WALKWY Z 0 0 0 0 0 0Work Type F1 Total 0 3,000 3,000 3,000 0 9,000PCAS F55439E8 Phase FY 2019 ($) FY 2023 ($) Total Class R PE 0 0 10,000Name Willowbrook Road CONS 0 1,000 1,000 1,000 0 3,000County 105 - Rock CE 0 1,000 1,000 1,000 0 3,000Project Type REHAB Z 0 0 0 0 0 0Work Type 7 Total 0 7,000 7,000 2,000 0 16,000PCAS F55439E9 Phase FY 2019 ($) FY 2023 ($) Total Class R PE 1,000 0 3,000Name Chahk Hah Chee CONS 0 1,000 1,000 0 0 2,000County 141 - Wood CE 0 1,000 1,000 0 0 2,000Project Type RECONS Z 0 0 0 0 0 0Work Type 7 Total 1,000 3,000 3,000 0 0 7,000PCAS F55439F3 Phase FY 2019 ($) FY 2023 ($) Total Class R PE 0 0 2,000Name Clay Schoool Road CONS 0 0 1,000 1,000 0 2,000County 053 - Jackson CE 0 0 1,000 1,000 0 2,000Project Type REHAB Z 0 0 0 0 0 0 Work Type 7 Total 0 0 3,000 3,000 0 6,000

0 00FY 2020 ($) FY 2021 ($) FY 2022 ($)

10,000 15,0000FY 2020 ($) FY 2021 ($) FY 2022 ($)

1,000 1,0001,000FY 2020 ($) FY 2021 ($) FY 2022 ($)

5,000 05,000FY 2020 ($) FY 2021 ($) FY 2022 ($)

1,000 01,000FY 2020 ($) FY 2021 ($) FY 2022 ($)

1,000 1,0000FY 2020 ($) FY 2021 ($) FY 2022 ($)

16-OCT-2019 07:26 AM Page 46 of 100

Page 27: Wisconsin Tribal Transportation Improvement Programs ......Wisconsin Tribal Transportation Improvement Programs Federal Lands Highway Program, 23 USC 204 Tribal Contacts: Honorable

Indian Reservation Roads Programs Federal Lands Highway

REPORT FILTERS:

Location = F-**-***

Any level TIP/EIP Report program_class_code = 6K1

Reporting each CSTIP that meets the filter. CSTIP Type = TIP

6K1Program Class Code CSTIP Type Fiscal YearTIP 2019

Funding Amount 5,957,346

F55439 - Ho-Chunk NationEntity Name

08-JAN-19

State 55 - Wisconsin Projects on the CSTIP withn this state are listed and subtotaled in this section Location F55439 - Ho-Chunk Nation Covers that part of the reservation within the current state.

PCAS F55439F7 Phase FY 2019 ($) FY 2023 ($) Total Class R PE 35,000 0 35,000Name STH 21 Turn Lanes CONS 520,000 10,000 0 0 0 530,000County 081 - Monroe CE 15,000 20,000 2,000 0 0 37,000Project Type RECONS Z 0 0 0 0 0 0Work Type 7 Total 570,000 30,000 2,000 0 0 602,000PCAS F55439F8 Phase FY 2019 ($) FY 2023 ($) Total Class R PE 1,000 0 1,000Name Potch Cha Chee CONS 1,000 1,000 0 0 0 2,000County 115 - Shawano CE 8,000 1,000 0 0 0 9,000Project Type RECONS Z 0 0 0 0 0 0Work Type 7 Total 10,000 2,000 0 0 0 12,000PCAS F55439G1 Phase FY 2019 ($) FY 2023 ($) Total Class B PE 0 0 1,000Name CTH M Bridge Replacement - Monroe Co CONS 0 0 1,000 1,000 0 2,000County 081 - Monroe CE 0 0 1,000 1,000 0 2,000Project Type BRIDGE Z 0 0 0 0 0 0Work Type B16 Total 0 0 3,000 2,000 0 5,000PCAS F55439G2 Phase FY 2019 ($) FY 2023 ($) Total Class O PE 0 0 2,000Name Ho Chunk Village Walking Trail - Sauk Co CONS 0 1,000 1,000 1,000 0 3,000County 111 - Sauk CE 0 0 1,000 1,000 0 2,000Project Type WALKWY Z 0 0 0 0 0 0Work Type F1 Total 0 2,000 3,000 2,000 0 7,000PCAS F55439G3 Phase FY 2019 ($) FY 2023 ($) Total Class R PE 25,000 0 25,000Name Mission Road CONS 425,000 10,000 0 0 0 435,000County 053 - Jackson CE 10,000 25,000 0 0 0 35,000Project Type REHAB Z 0 0 0 0 0 0Work Type 7 Total 460,000 35,000 0 0 0 495,000PCAS F55439G4 Phase FY 2019 ($) FY 2023 ($) Total Class O PE 0 0 15,000Name Sand Pillow Trail CONS 0 0 330,000 10,000 0 340,000County 053 - Jackson CE 0 0 10,000 15,000 0 25,000Project Type WALKWY Z 0 0 0 0 0 0 Work Type F1 Total 0 0 355,000 25,000 0 380,000

0 00FY 2020 ($) FY 2021 ($) FY 2022 ($)

0 00FY 2020 ($) FY 2021 ($) FY 2022 ($)

1,000 00FY 2020 ($) FY 2021 ($) FY 2022 ($)

1,000 01,000FY 2020 ($) FY 2021 ($) FY 2022 ($)

0 00FY 2020 ($) FY 2021 ($) FY 2022 ($)

15,000 00FY 2020 ($) FY 2021 ($) FY 2022 ($)

16-OCT-2019 07:26 AM Page 47 of 100

Page 28: Wisconsin Tribal Transportation Improvement Programs ......Wisconsin Tribal Transportation Improvement Programs Federal Lands Highway Program, 23 USC 204 Tribal Contacts: Honorable

Indian Reservation Roads Programs Federal Lands Highway

REPORT FILTERS:

Location = F-**-***

Any level TIP/EIP Report program_class_code = 6K1

Reporting each CSTIP that meets the filter. CSTIP Type = TIP

6K1Program Class Code CSTIP Type Fiscal YearTIP 2019

Funding Amount 5,957,346

F55439 - Ho-Chunk NationEntity Name

08-JAN-19

State 55 - Wisconsin Projects on the CSTIP withn this state are listed and subtotaled in this section Location F55439 - Ho-Chunk Nation Covers that part of the reservation within the current state.

PCAS F55439G5 Phase FY 2019 ($) FY 2023 ($) Total Class R PE 0 0 0Name Timber Run CONS 1,000 1,000 0 0 0 2,000County 057 - Juneau CE 8,000 1,000 0 0 0 9,000Project Type REHAB Z 0 0 0 0 0 0Work Type 7 Total 9,000 2,000 0 0 0 11,000PCAS F55439G6 Phase FY 2019 ($) FY 2023 ($) Total Class R PE 12,000 0 40,000Name Mission Road Community Overlays CONS 0 750,000 10,000 1,000 0 761,000County 053 - Jackson CE 0 20,000 10,000 1,000 0 31,000Project Type REHAB Z 0 0 0 0 0 0Work Type 7 Total 12,000 795,000 23,000 2,000 0 832,000PCAS F55439G7 Phase FY 2019 ($) FY 2023 ($) Total Class R PE 0 0 0Name CTH HH - Juneau County CONS 0 0 400,000 10,000 0 410,000County 057 - Juneau CE 0 0 10,000 10,000 0 20,000Project Type RECONS Z 0 0 0 0 0 0Work Type 7 Total 0 0 410,000 20,000 0 430,000PCAS F55439G8 Phase FY 2019 ($) FY 2023 ($) Total Class R PE 0 0 30,000Name STH 54 Turn Lanes CONS 1,000 0 470,000 10,000 0 481,000County 053 - Jackson CE 3,000 0 10,000 20,000 0 33,000Project Type RECONS Z 0 0 0 0 0 0Work Type I1 Total 4,000 25,000 485,000 30,000 0 544,000PCAS F55439G9 Phase FY 2019 ($) FY 2023 ($) Total Class R PE 0 0 1,000Name Boss Thunder CONS 0 0 1,000 1,000 0 2,000County 001 - Adams CE 0 0 1,000 1,000 0 2,000Project Type NEWCON Z 0 0 0 0 0 0Work Type 7 Total 0 0 3,000 2,000 0 5,000PCAS F55439H1 Phase FY 2019 ($) FY 2023 ($) Total Class O PE 15,000 0 15,000Name Blue Wing Village CONS 400,000 10,000 0 0 0 410,000County 081 - Monroe CE 10,000 10,000 0 0 0 20,000Project Type WALKWY Z 0 0 0 0 0 0 Work Type F1 Total 425,000 20,000 0 0 0 445,000

0 00FY 2020 ($) FY 2021 ($) FY 2022 ($)

3,000 025,000FY 2020 ($) FY 2021 ($) FY 2022 ($)

0 00FY 2020 ($) FY 2021 ($) FY 2022 ($)

5,000 025,000FY 2020 ($) FY 2021 ($) FY 2022 ($)

1,000 00FY 2020 ($) FY 2021 ($) FY 2022 ($)

0 00FY 2020 ($) FY 2021 ($) FY 2022 ($)

16-OCT-2019 07:26 AM Page 48 of 100

Page 29: Wisconsin Tribal Transportation Improvement Programs ......Wisconsin Tribal Transportation Improvement Programs Federal Lands Highway Program, 23 USC 204 Tribal Contacts: Honorable

Indian Reservation Roads Programs Federal Lands Highway

REPORT FILTERS:

Location = F-**-***

Any level TIP/EIP Report program_class_code = 6K1

Reporting each CSTIP that meets the filter. CSTIP Type = TIP

6K1Program Class Code CSTIP Type Fiscal YearTIP 2019

Funding Amount 5,957,346

F55439 - Ho-Chunk NationEntity Name

08-JAN-19

State 55 - Wisconsin Projects on the CSTIP withn this state are listed and subtotaled in this section Location F55439 - Ho-Chunk Nation Covers that part of the reservation within the current state.

PCAS F55439H2 Phase FY 2019 ($) FY 2023 ($) Total Class R PE 0 0 2,000Name Sandpillow West CONS 0 0 1,000 1,000 0 2,000County 053 - Jackson CE 0 0 1,000 1,000 0 2,000Project Type NEWCON Z 0 0 0 0 0 0Work Type 7 Total 0 1,000 3,000 2,000 0 6,000PCAS F55439H3 Phase FY 2019 ($) FY 2023 ($) Total Class R PE 0 0 0Name CTH GG Wood County CONS 1,000 0 0 0 0 1,000County 141 - Wood CE 1,000 0 0 0 0 1,000Project Type REHAB Z 0 0 0 0 0 0Work Type 7 Total 2,000 0 0 0 0 2,000PCAS F55439H4 Phase FY 2019 ($) FY 2023 ($) Total Class R PE 0 0 0Name CTH Y Richland County CONS 1,000 0 0 0 0 1,000County 103 - Richland CE 1,000 0 0 0 0 1,000Project Type RECONS Z 0 0 0 0 0 0Work Type 7 Total 2,000 0 0 0 0 2,000PCAS F55439H5 Phase FY 2019 ($) FY 2023 ($) Total Class R PE 0 0 0Name Koranda Road CONS 1,000 0 0 0 0 1,000County 053 - Jackson CE 2,000 0 0 0 0 2,000Project Type REHAB Z 0 0 0 0 0 0Work Type 7 Total 3,000 0 0 0 0 3,000PCAS F55439H6 Phase FY 2019 ($) FY 2023 ($) Total Class R PE 0 0 0Name CTH A Jackson County CONS 0 1,000 1,000 0 0 2,000County 053 - Jackson CE 0 1,000 1,000 0 0 2,000Project Type REHAB Z 0 0 0 0 0 0Work Type 7 Total 0 2,000 2,000 0 0 4,000PCAS F55439H7 Phase FY 2019 ($) FY 2023 ($) Total Class R PE 0 0 0Name CTH Q Shawano County CONS 1,000 1,000 0 0 0 2,000County 115 - Shawano CE 1,000 1,000 0 0 0 2,000Project Type REHAB Z 0 0 0 0 0 0 Work Type 7 Total 2,000 2,000 0 0 0 4,000

1,000 01,000FY 2020 ($) FY 2021 ($) FY 2022 ($)

0 00FY 2020 ($) FY 2021 ($) FY 2022 ($)

0 00FY 2020 ($) FY 2021 ($) FY 2022 ($)

0 00FY 2020 ($) FY 2021 ($) FY 2022 ($)

0 00FY 2020 ($) FY 2021 ($) FY 2022 ($)

0 00FY 2020 ($) FY 2021 ($) FY 2022 ($)

16-OCT-2019 07:26 AM Page 49 of 100

Page 30: Wisconsin Tribal Transportation Improvement Programs ......Wisconsin Tribal Transportation Improvement Programs Federal Lands Highway Program, 23 USC 204 Tribal Contacts: Honorable

Indian Reservation Roads Programs Federal Lands Highway

REPORT FILTERS:

Location = F-**-***

Any level TIP/EIP Report program_class_code = 6K1

Reporting each CSTIP that meets the filter. CSTIP Type = TIP

6K1Program Class Code CSTIP Type Fiscal YearTIP 2019

Funding Amount 5,957,346

F55439 - Ho-Chunk NationEntity Name

08-JAN-19

State 55 - Wisconsin Projects on the CSTIP withn this state are listed and subtotaled in this section Location F55439 - Ho-Chunk Nation Covers that part of the reservation within the current state.

PCAS F55439H8 Phase FY 2019 ($) FY 2023 ($) Total Class R PE 0 0 0Name Lynn Hill Road CONS 0 0 0 600,000 0 600,000County 141 - Wood CE 0 0 0 25,000 0 25,000Project Type RECONS Z 0 0 0 0 0 0Work Type 7 Total 0 0 0 625,000 0 625,000PCAS F55439H9 Phase FY 2019 ($) FY 2023 ($) Total Class R PE 1,000 0 1,000Name Ho Chunk Road CONS 1,000 0 0 0 0 1,000County 115 - Shawano CE 5,000 0 0 0 0 5,000Project Type REHAB Z 0 0 0 0 0 0Work Type 7 Total 7,000 0 0 0 0 7,000PCAS F55439I2 Phase FY 2019 ($) FY 2023 ($) Total Class R PE 3,000 0 13,000Name Winneshiek Road Nekoosa CONS 0 100,000 0 0 0 100,000County 141 - Wood CE 0 5,000 5,000 0 0 10,000Project Type REHAB Z 0 0 0 0 0 0Work Type 7 Total 3,000 115,000 5,000 0 0 123,000PCAS F55439I3 Phase FY 2019 ($) FY 2023 ($) Total Class R PE 0 0 0Name CTH D Wood County CONS 525,000 10,000 0 0 0 535,000County 141 - Wood CE 5,000 10,000 0 0 0 15,000Project Type REHAB Z 0 0 0 0 0 0Work Type 7 Total 530,000 20,000 0 0 0 550,000PCAS F55439I4 Phase FY 2019 ($) FY 2023 ($) Total Class R PE 15,000 0 16,000Name Hwy 12 Access to Badger Ammunition CONS 550,000 10,000 1,000 0 0 561,000County 111 - Sauk CE 10,000 20,000 10,000 0 0 40,000Project Type RECONS Z 0 0 0 0 0 0Work Type 7 Total 575,000 31,000 11,000 0 0 617,000PCAS F55439I5 Phase FY 2019 ($) FY 2023 ($) Total Class R PE 0 0 1,000Name HCG Parking Access CONS 0 1,000 1,000 1,000 0 3,000County 025 - Dane CE 0 1,000 1,000 1,000 0 3,000Project Type RECONS Z 0 0 0 0 0 0 Work Type 7 Total 0 3,000 2,000 2,000 0 7,000

0 00FY 2020 ($) FY 2021 ($) FY 2022 ($)

0 00FY 2020 ($) FY 2021 ($) FY 2022 ($)

0 010,000FY 2020 ($) FY 2021 ($) FY 2022 ($)

0 00FY 2020 ($) FY 2021 ($) FY 2022 ($)

0 01,000FY 2020 ($) FY 2021 ($) FY 2022 ($)

0 01,000FY 2020 ($) FY 2021 ($) FY 2022 ($)

16-OCT-2019 07:26 AM Page 50 of 100

Page 31: Wisconsin Tribal Transportation Improvement Programs ......Wisconsin Tribal Transportation Improvement Programs Federal Lands Highway Program, 23 USC 204 Tribal Contacts: Honorable

Indian Reservation Roads Programs Federal Lands Highway

REPORT FILTERS:

Location = F-**-***

Any level TIP/EIP Report program_class_code = 6K1

Reporting each CSTIP that meets the filter. CSTIP Type = TIP

6K1Program Class Code CSTIP Type Fiscal YearTIP 2019

Funding Amount 5,957,346

F55439 - Ho-Chunk NationEntity Name

08-JAN-19

State 55 - Wisconsin Projects on the CSTIP withn this state are listed and subtotaled in this section Location F55439 - Ho-Chunk Nation Covers that part of the reservation within the current state.

PCAS F55439I6 Phase FY 2019 ($) FY 2023 ($) Total Class R PE 0 0 20,000Name Old 54 CONS 0 0 400,000 10,000 0 410,000County 053 - Jackson CE 0 0 20,000 10,000 0 30,000Project Type REHAB Z 0 0 0 0 0 0Work Type 7 Total 0 0 440,000 20,000 0 460,000PCAS F55439I7 Phase FY 2019 ($) FY 2023 ($) Total Class R PE 0 0 20,000Name Bartos Road CONS 0 0 400,000 10,000 0 410,000County 053 - Jackson CE 0 0 20,000 5,000 0 25,000Project Type REHAB Z 0 0 0 0 0 0Work Type 7 Total 0 0 440,000 15,000 0 455,000PCAS F55439I8 Phase FY 2019 ($) FY 2023 ($) Total Class R PE 0 0 15,000Name River Drive CONS 0 0 300,000 10,000 0 310,000County 053 - Jackson CE 0 0 15,000 5,000 0 20,000Project Type REHAB Z 0 0 0 0 0 0Work Type 7 Total 0 0 330,000 15,000 0 345,000PCAS F55439I9 Phase FY 2019 ($) FY 2023 ($) Total Class R PE 40,000 0 40,000Name CTH J Lacrosse County CONS 866,346 10,000 0 0 0 876,346County 053 - Jackson CE 20,000 25,000 0 0 0 45,000Project Type REHAB Z 0 0 0 0 0 0Work Type 7 Total 926,346 35,000 0 0 0 961,346PCAS F55439J1 Phase FY 2019 ($) FY 2023 ($) Total Class R PE 0 0 15,000Name Hemlock Road CONS 0 0 240,000 5,000 0 245,000County 141 - Wood CE 0 0 15,000 5,000 0 20,000Project Type REHAB Z 0 0 0 0 0 0Work Type 7 Total 0 0 270,000 10,000 0 280,000PCAS F55439J2 Phase FY 2019 ($) FY 2023 ($) Total Class O PE 10,000 0 10,000Name Tribal Courts Walking Trail CONS 250,000 10,000 0 0 0 260,000County 053 - Jackson CE 5,000 15,000 1,000 0 0 21,000Project Type WALKWY Z 0 0 0 0 0 0 Work Type F1 Total 265,000 25,000 1,000 0 0 291,000

20,000 00FY 2020 ($) FY 2021 ($) FY 2022 ($)

20,000 00FY 2020 ($) FY 2021 ($) FY 2022 ($)

15,000 00FY 2020 ($) FY 2021 ($) FY 2022 ($)

0 00FY 2020 ($) FY 2021 ($) FY 2022 ($)

15,000 00FY 2020 ($) FY 2021 ($) FY 2022 ($)

0 00FY 2020 ($) FY 2021 ($) FY 2022 ($)

16-OCT-2019 07:26 AM Page 51 of 100

Page 32: Wisconsin Tribal Transportation Improvement Programs ......Wisconsin Tribal Transportation Improvement Programs Federal Lands Highway Program, 23 USC 204 Tribal Contacts: Honorable

Indian Reservation Roads Programs Federal Lands Highway

REPORT FILTERS:

Location = F-**-***

Any level TIP/EIP Report program_class_code = 6K1

Reporting each CSTIP that meets the filter. CSTIP Type = TIP

6K1Program Class Code CSTIP Type Fiscal YearTIP 2019

Funding Amount 5,957,346

F55439 - Ho-Chunk NationEntity Name

08-JAN-19

State 55 - Wisconsin Projects on the CSTIP withn this state are listed and subtotaled in this section Location F55439 - Ho-Chunk Nation Covers that part of the reservation within the current state.

PCAS F55439J3 Phase FY 2019 ($) FY 2023 ($) Total Class R PE 5,000 0 17,000Name Elder Circle CONS 0 340,000 10,000 0 0 350,000County 053 - Jackson CE 0 5,000 10,000 0 0 15,000Project Type RECONS Z 0 0 0 0 0 0Work Type 7 Total 5,000 357,000 20,000 0 0 382,000PCAS F55439J4 Phase FY 2019 ($) FY 2023 ($) Total Class R PE 0 0 5,000Name Ho Chunk Madison Gaming CONS 0 750,000 120,000 0 0 870,000County 025 - Dane CE 0 25,000 20,000 0 0 45,000Project Type RECONS Z 0 0 0 0 0 0Work Type 7 Total 0 780,000 140,000 0 0 920,000PCAS F55439J5 Phase FY 2019 ($) FY 2023 ($) Total Class R PE 0 0 12,000Name White Eagle Road CONS 0 0 300,000 10,000 0 310,000County 111 - Sauk CE 0 0 5,000 10,000 0 15,000Project Type REHAB Z 0 0 0 0 0 0Work Type 7 Total 0 0 317,000 20,000 0 337,000PCAS F55439J6 Phase FY 2019 ($) FY 2023 ($) Total Class R PE 0 0 20,000Name Wazee Road Phase III CONS 0 0 0 1,670,000 0 1,670,000County 053 - Jackson CE 0 0 0 40,000 0 40,000Project Type RECONS Z 0 0 0 0 0 0Work Type 7 Total 0 0 0 1,730,000 0 1,730,000PCAS F55439J7 Phase FY 2019 ($) FY 2023 ($) Total Class R PE 0 0 5,000Name White Hawk Road CONS 0 0 0 200,000 0 200,000County 053 - Jackson CE 0 0 0 5,000 0 5,000Project Type REHAB Z 0 0 0 0 0 0Work Type 7 Total 0 0 0 210,000 0 210,000PCAS F55439PA Phase FY 2019 ($) FY 2023 ($) Total Class O PE 1,050,000 0 4,290,000Name TTP Administration - Ho-Chunk CONS 0 0 0 0 0 0County 053 - Jackson CE 0 0 0 0 0 0Project Type PLANING Z 0 0 0 0 0 0 Work Type P9 Total 1,050,000 1,070,000 1,080,000 1,090,000 0 4,290,000

0 012,000FY 2020 ($) FY 2021 ($) FY 2022 ($)

0 05,000FY 2020 ($) FY 2021 ($) FY 2022 ($)

12,000 00FY 2020 ($) FY 2021 ($) FY 2022 ($)

0 20,0000FY 2020 ($) FY 2021 ($) FY 2022 ($)

0 5,0000FY 2020 ($) FY 2021 ($) FY 2022 ($)

1,080,000 1,090,0001,070,000FY 2020 ($) FY 2021 ($) FY 2022 ($)

16-OCT-2019 07:26 AM Page 52 of 100

Page 33: Wisconsin Tribal Transportation Improvement Programs ......Wisconsin Tribal Transportation Improvement Programs Federal Lands Highway Program, 23 USC 204 Tribal Contacts: Honorable

Indian Reservation Roads Programs Federal Lands Highway

REPORT FILTERS:

Location = F-**-***

Any level TIP/EIP Report program_class_code = 6K1

Reporting each CSTIP that meets the filter. CSTIP Type = TIP

6K1Program Class Code CSTIP Type Fiscal YearTIP 2019

Funding Amount 5,957,346

F55439 - Ho-Chunk NationEntity Name

08-JAN-19

State 55 - Wisconsin Projects on the CSTIP withn this state are listed and subtotaled in this section Location F55439 - Ho-Chunk Nation Covers that part of the reservation within the current state.

PCAS F55439RI Phase FY 2019 ($) FY 2023 ($) Total Class O PE 2,000 0 8,000Name TTP Road Inventory Project - Ho Chunk CONS 0 0 0 0 0 0County 081 - Monroe CE 0 0 0 0 0 0Project Type PLANING Z 0 0 0 0 0 0Work Type P8 Total 2,000 2,000 2,000 2,000 0 8,000PCAS F55439RM Phase FY 2019 ($) FY 2023 ($) Total Class O PE 0 0 0Name TTP Road Maintenance - Ho Chunk CONS 0 0 0 0 0 0County 081 - Monroe CE 0 0 0 0 0 0Project Type SAFETY Z 662,000 662,000 662,000 672,000 0 2,658,000Work Type 3 Total 662,000 662,000 662,000 672,000 0 2,658,000PCAS F55439RW Phase FY 2019 ($) FY 2023 ($) Total Class O PE 0 0 2,000Name TTP ROW Acquisition - Ho Chunk CONS 0 0 0 0 0 0County 081 - Monroe CE 0 0 0 0 0 0Project Type PLANING Z 0 0 0 0 0 0Work Type P9 Total 0 0 1,000 1,000 0 2,000PCAS F55439TP Phase FY 2019 ($) FY 2023 ($) Total Class O PE 288,000 0 1,152,000Name TTP Transportation Planning - Ho Chunk CONS 0 0 0 0 0 0County 081 - Monroe CE 0 0 0 0 0 0Project Type PLANING Z 0 0 0 0 0 0Work Type P9 Total 288,000 288,000 288,000 288,000 0 1,152,000PCAS F55439TR Phase FY 2019 ($) FY 2023 ($) Total Class O PE 0 0 0Name TTP Transit - Ho Chunk CONS 0 0 0 0 0 0County 081 - Monroe CE 0 0 1,000 0 0 1,000Project Type TRANSIT Z 0 0 0 0 0 0 Work Type T1 Total 0 0 1,000 0 0 1,000

2,000 2,0002,000FY 2020 ($) FY 2021 ($) FY 2022 ($)

0 00FY 2020 ($) FY 2021 ($) FY 2022 ($)

1,000 1,0000FY 2020 ($) FY 2021 ($) FY 2022 ($)

288,000 288,000288,000FY 2020 ($) FY 2021 ($) FY 2022 ($)

0 00FY 2020 ($) FY 2021 ($) FY 2022 ($)

5,957,346 5,939,000 6,284,000 5,909,000 0 24,089,346 24,089,346

5,957,346 5,939,000 6,284,000 5,909,000 0 24,089,346

5,957,346 5,939,000 6,284,000 5,909,000

Location Subtotal

State Subtotal CSTIP Subtotal

0

16-OCT-2019 07:26 AM Page 53 of 100

Page 34: Wisconsin Tribal Transportation Improvement Programs ......Wisconsin Tribal Transportation Improvement Programs Federal Lands Highway Program, 23 USC 204 Tribal Contacts: Honorable

Indian Reservation Roads Programs Federal Lands Highway

REPORT FILTERS:

Location = F-**-***

Any level TIP/EIP Report program_class_code = 6K1

Reporting each CSTIP that meets the filter. CSTIP Type = TIP

Entity Name F58440 - MENOMINEE INDIAN TRIBE FIRST PAGE FOR CSTIPProgram Class Code 6K1

CSTIP Type TIP FHWA Approved Date 30-JAN-19

Fiscal Year Funding Amount

2019 1,274,597

State 55 - Wisconsin Projects on the CSTIP withn this state are listed and subtotaled in this section Location F58440 - Menominee Covers that part of the reservation within the current state.

PCAS F5844002 Phase FY 2019 ($) FY 2023 ($) Total Class R PE 20,000 0 30,000Name Standing Pines Drive CONS 100,000 10,000 10,000 0 0 120,000County 078 - Menominee CE 10,000 5,000 5,000 0 0 20,000Project Type NEWCON Z 0 0 0 0 0 0Work Type 7 Total 130,000 20,000 20,000 0 0 170,000PCAS F5844003 Phase FY 2019 ($) FY 2023 ($) Total Class R PE 25,000 0 35,000Name Tower Road CONS 85,705 10,000 10,000 0 0 105,705County 078 - Menominee CE 10,000 5,000 5,000 0 0 20,000Project Type NEWCON Z 0 0 0 0 0 0Work Type 7 Total 120,705 20,000 20,000 0 0 160,705PCAS F5844006 Phase FY 2019 ($) FY 2023 ($) Total Class R PE 0 0 10,000Name Ponfil Road CONS 0 0 0 100,000 0 100,000County 078 - Menominee CE 0 0 0 10,000 0 10,000Project Type REHAB Z 0 0 0 0 0 0Work Type 7 Total 0 0 0 120,000 0 120,000PCAS F5844009 Phase FY 2019 ($) FY 2023 ($) Total Class O PE 0 0 0Name New Street Lighting Iniative and Repair CONS 14,000 15,000 15,000 15,000 0 59,000County 078 - Menominee CE 0 0 0 0 0 0Project Type SAFETY Z 0 0 0 0 0 0Work Type P6 Total 14,000 15,000 15,000 15,000 0 59,000PCAS F5844010 Phase FY 2019 ($) FY 2023 ($) Total Class O PE 40,000 0 121,000Name Sidewalk/Parking Lot Initiative and Repai CONS 164,447 380,447 380,447 300,447 0 1,225,788County 078 - Menominee CE 19,000 12,000 12,000 12,000 0 55,000Project Type WALKWY Z 0 0 0 0 0 0Work Type F1 Total 223,447 419,447 419,447 339,447 0 1,401,788PCAS F5844028 Phase FY 2019 ($) FY 2023 ($) Total Class R PE 25,000 0 100,000Name STH 47/55 CONS 147,048 165,000 165,000 165,000 0 642,048County 078 - Menominee CE 10,000 10,000 10,000 10,000 0 40,000Project Type RECONS Z 0 0 0 0 0 0 Work Type 7 Total 182,048 200,000 200,000 200,000 0 782,048

5,000 05,000FY 2020 ($) FY 2021 ($) FY 2022 ($)

5,000 05,000FY 2020 ($) FY 2021 ($) FY 2022 ($)

0 10,0000FY 2020 ($) FY 2021 ($) FY 2022 ($)

0 00FY 2020 ($) FY 2021 ($) FY 2022 ($)

27,000 27,00027,000FY 2020 ($) FY 2021 ($) FY 2022 ($)

25,000 25,00025,000FY 2020 ($) FY 2021 ($) FY 2022 ($)

16-OCT-2019 07:26 AM Page 61 of 100

Page 35: Wisconsin Tribal Transportation Improvement Programs ......Wisconsin Tribal Transportation Improvement Programs Federal Lands Highway Program, 23 USC 204 Tribal Contacts: Honorable

Indian Reservation Roads Programs Federal Lands Highway

REPORT FILTERS:

Location = F-**-***

Any level TIP/EIP Report program_class_code = 6K1

Reporting each CSTIP that meets the filter. CSTIP Type = TIP

6K1Program Class Code CSTIP Type Fiscal YearTIP 2019

Funding Amount 1,274,597

F58440 - MENOMINEE INDIAN TRIBEEntity Name

30-JAN-19

State 55 - Wisconsin Projects on the CSTIP withn this state are listed and subtotaled in this section Location F58440 - Menominee Covers that part of the reservation within the current state.

PCAS F58440RM Phase FY 2019 ($) FY 2023 ($) Total Class O PE 0 0 0Name TTP Road Maintenance Project CONS 0 0 0 0 0 0County 078 - Menominee CE 0 0 0 0 0 0Project Type PLANING Z 500,000 500,000 500,000 500,000 0 2,000,000Work Type P10 Total 500,000 500,000 500,000 500,000 0 2,000,000PCAS F58440RW Phase FY 2019 ($) FY 2023 ($) Total Class O PE 1,000 0 1,000Name TTP Survey & ROW Perfection Initiative CONS 0 0 0 0 0 0County 078 - Menominee CE 0 0 0 0 0 0Project Type PLANING Z 0 0 0 0 0 0Work Type P10 Total 1,000 0 0 0 0 1,000PCAS F58440TP Phase FY 2019 ($) FY 2023 ($) Total Class O PE 64,247 0 247,247Name TTP Planning & Inventory Project CONS 0 0 0 0 0 0County 078 - Menominee CE 0 0 0 0 0 0Project Type PLANING Z 0 0 0 0 0 0Work Type P9 Total 64,247 61,000 61,000 61,000 0 247,247PCAS F58440TR Phase FY 2019 ($) FY 2023 ($) Total Class O PE 0 0 0Name TTP Transit Project CONS 0 0 0 0 0 0County 078 - Menominee CE 39,150 39,150 39,150 39,150 0 156,600Project Type TRANSIT Z 0 0 0 0 0 0 Work Type T2 Total 39,150 39,150 39,150 39,150 0 156,600

0 00FY 2020 ($) FY 2021 ($) FY 2022 ($)

0 00FY 2020 ($) FY 2021 ($) FY 2022 ($)

61,000 61,00061,000FY 2020 ($) FY 2021 ($) FY 2022 ($)

0 00FY 2020 ($) FY 2021 ($) FY 2022 ($)

1,274,597 1,274,597 1,274,597 1,274,597 0 5,098,388 5,098,388

1,274,597 1,274,597 1,274,597 1,274,597 0 5,098,388

1,274,597 1,274,597 1,274,597 1,274,597

Location Subtotal

State Subtotal CSTIP Subtotal

0

16-OCT-2019 07:26 AM Page 62 of 100

Page 36: Wisconsin Tribal Transportation Improvement Programs ......Wisconsin Tribal Transportation Improvement Programs Federal Lands Highway Program, 23 USC 204 Tribal Contacts: Honorable

        

       

   

  

        

    

   

  

   

             

     

                     

          

 

                      

                      

    

               

                            

    

 

         

              

         

               

                     

          

       

              

            

 

                

                  

    

       

   

                         

    

                         

          

                

         

         

             

         

               

     

         

               

     

                         

        

          

       

              

                          

                              

                   

FY2020‐FY2023 Transportation Improvement Program Last Printed: 11/18/2019

Federal Highway Administration Eastern Federal Lands Highway Division

PROJECT PROGRAM FISCAL YEAR

STATE COUNTY PARK, REFUGE, FOREST OR OTHER PARTNER/AGENCY

DESCRIPTION TYPE OF WORK

PRIMARY FUND SOURCE

TOTAL FUNDS PROGRAMMED FROM

AMOUNT TITLE

DELIVERED BY

STATUS CONGRESSIONAL

DISTRICT FLMA

Wisconsin

FS_Pvmt_Preservation_FY17(1) 2019 WI Multiple Region Wide Pavement Preservation in Various Forest Units

MISC FLTP $180,000.00 Title 23 USFS In Design _VARIOUS USFS

FW_IRRI_10(1) 2019 WI Bayfield Iron River National Fish Hatchery Rehabilitate Entrance Road (Route 10) and Public Parking Area (Route 900).

3RH FLTP $1,840,000.00 Title 23 EFLHD Under

Construction WI‐07 NPS

WI FLAP CWFD CTHN(1) 2019 WI Crawford USFWS, Upper Mississippi River National Wildlife and Fish Refuge

Reconstruct CTH N between STH 35 and STH 27 in Crawford County, WI.

3RL FLAP $2,983,280.00 Title 23 STATE Under

Construction WI‐01 FWS

WI FLAP DOT 35(1) 2019 WI Vernon USFWS Genoa National Fish History

Install guardrail, bypass lane, and 4 end treatments at the high crash area along WI Route 35.

MISC FLAP $234,000.00 Title 23 STATE Under

Construction WI‐03 FWS

WI_ERFO_FS_2016‐1(2) 2019 WI Ashland, Bayfield Chequamegon Nicolet National Forest

Emergency repairs on FS‐199 and FS‐198. 3RH ERFO $4,118,913.00 Title 23 EFLHD In

Acquisitions WI‐07 USFS

WI_ERFO_FS_2016‐1(3) 2019 WI Ashland, Bayfield Chequamegon Nicolet National Forest

Emergency repairs on FS‐199 and FS‐198. BRRC ERFO $1,738,476.00 Title 23 EFLHD In Design WI‐07 USFS

WI_ERFO_FS_2016‐1(5) 2019 WI Bayfield, Sawyer Chequamegon Nicolet National Forest

Emergency repairs on various roads in Bayfield and Sawyer Counties.

3RH ERFO $4,564,534.00 Title 23 EFLHD In Design WI‐07 USFS

WI_FLAP_FIFIELD_143(1) 2019 WI Price US Forest Service, Chequamegon‐ Replacement of the existing culvert over Nicolet National Forest Squaw Creek Crossing along FR 143.

3RL FLAP $440,800.00 Title 23 STATE Under

Construction WI‐07 USFS

WI_FLAP_LACRS_GIP(1) 2019 WI La Crosse U.S. Army Corps of Engineers, Goose Island Park

Goose Island Park CTH GI road, shoreline, canoe/kayak boat landing improvements.

3RL FLAP $2,835,157.00 Title 23 LOCAL Under

Construction WI‐03 USACE

WI_FLAP_POPL_2404(1) 2019 WI Forest Bridge Replacement or open bottom box

US Forest Service, Chequamegon‐culvert with concrete footings off old State

Nicolet National Forest Highway 139.

BRRP FLAP $275,600.00 Title 23 STATE Under

Construction WI‐07 USFS

WI ERFO FS 2016‐1(7) 2019 WI Ashland Chequamegon Nicolet National Forest

Trail 25 Decommissioning. Design & NEPA only. Construction by Forest Service.

3RH ERFO $300,000.00 Title 23 EFLHD Planned WI‐07 USFS

WI FLAP BFLD CTHM(2) 2020 WI Bayfield Forest Service / Chequamegon‐Nicolet National Forest

Rehabilitation of CTHM 3RL FLAP $1,020,000.00 Title 23 STATE In Design WI‐07 USFS

WI_ERFO_FS_2016‐1(6) 2020 WI Bayfield, Sawyer Chequamegon Nicolet National Forest

FR 383 Snake Road Decommissioning. 3RH ERFO $961,754.34 Title 23 EFLHD In Design WI‐07 USFS

WI_FLAP_RUSL_LSBR(1) 2020 WI Bayfield NPS, Apostle Islands National Lakeshore

Roadway rehab, widening, shoulder construction, drainage improvements, and miscellaneous work.

3RH_3RL FLAP $526,388.00 Title 23 STATE In Design WI‐07 NPS

WI_FLAP_RUSL_OCHK(1) 2020 WI Bayfield NPS, Apostle Islands National Lakeshore

Roadway rehab, widening, shoulder construction, drainage improvements, and miscellaneous work

3RH_3RL FLAP $1,892,040.00 Title 23 STATE In Design WI‐07 NPS

WI_FLAP_TRIPP_FRVW(1) 2020 WI Bayfield Iron River National Fish Hatchery Reconstruction of 1 mile of Fairview Road in Tripp Township, WI.

3RH FLAP $300,184.00 Title 23 STATE In Design WI‐07 FWS

FW‐UPLA 100(1) 2021 WI La Crosse LaCrosse District, Upper Miss. NWFR

Rail Crossing Work 3RH FLTP $3,240,000.00 Title 23 FWS Planned WI‐03 FWS

WI FLAP ASH FH32(1) 2021 WI Ashland Forest Service/ Chequamegon‐Nicolet National Forest

Milling and resurfacing 9.2 miles of Forest Highway 32 through Chequamegon‐Nicolet NF.

3RL FLAP $1,020,000.00 Title 23 STATE In Design WI‐07 USFS

Page 47 of 51 Approval signature is shown on first page packet only. The listing reflects all newly identified and programmed and/or modified projects as of September 30, 2019.

Page 37: Wisconsin Tribal Transportation Improvement Programs ......Wisconsin Tribal Transportation Improvement Programs Federal Lands Highway Program, 23 USC 204 Tribal Contacts: Honorable

        

       

   

  

        

    

   

  

   

              

                            

       

                 

     

                

                

   

                 

      

                              

                   

FY2020‐FY2023 Transportation Improvement Program Last Printed: 11/18/2019

Federal Highway Administration Eastern Federal Lands Highway Division

PROJECT PROGRAM FISCAL YEAR

STATE COUNTY PARK, REFUGE, FOREST OR OTHER PARTNER/AGENCY

DESCRIPTION TYPE OF WORK

PRIMARY FUND SOURCE

TOTAL PROGRAMMED

AMOUNT

FUNDS FROM TITLE

DELIVERED BY

STATUS CONGRESSIONAL

DISTRICT FLMA

WI FLAP WASH 2178(1) 2021 WI Vilas Forest Service, Chequamegon‐Nicolet National Forest

Resurfacing, widening, increased shoulder width & improve safety on Military Road (RT 2178)

3RL FLAP $677,000.00 Title 23 STATE In Design WI‐07 USFS

WI_FLAP_FENC_2183(1) 2021 WI Florence US Forest Service, Chequamegon‐ Rock Creek Bridge Replacement P‐19‐0902, Nicolet National Forest south of Popple River.

BRRP FLAP $291,840.00 Title 23 STATE In Design WI‐07 USFS

Replacement of a 63‐year old, seven‐span, Stockfarm Birdge Replacement 2022 WI Ashland Chequemegon‐Nicolet NF single lane, timber bridge with new, three‐ BRRP FLTP $1,400,000.00 Title 23 USFS Planned WI‐07 USFS

span, 2‐lane timber bridge.

FW_TREM_10(1) 2022 WI Buffalo Trempealeau National Wildlife Refuge

Safety improvements for Entrance Road (Route 10)

3RL FLTP $2,100,000.00 Title 23 EFLHD In Design WI‐03 FWS

Approval signature is shown on first page packet only. The listing reflects all newly Page 48 of 51 identified and programmed and/or modified projects as of September 30, 2019.