Wisconsin Department of Transportation Version 06-2014 Solving tomorrow’s transportation challenges Division of Transportation Systems Development Bureau of Project Development 4802 Sheboygan Avenue, Rm 601 P O Box 7916 Madison, WI 53707-7916 Telephone: (608) 266-1631 Facsimile (FAX): (608) 266-8459 March 3, 2017 NOTICE TO ALL CONTRACTORS: Proposal #03: 1650-06-73, WISC 2017 093 Lancaster – Boscobel City Limits St to Fennimore CL USH 61 Grant County Letting of March 14, 2017 This is Addendum No. 01, which provides for the following: Special Provisions: Revised Special Provisions Article No. Description 6 Utilities Schedule of Items: Added Bid Item Quantities Bid Item Item Description Unit Old Quantity Revised Quantity Proposal Total 520.1018 Apron Endwalls for Culvert Pipe 18-Inch EACH 0 76 76 520.1024 Apron Endwalls for Culvert Pipe 24-Inch EACH 0 10 10 520.3318 Culvert Pipe III-A 18-Inch LF 0 1,898 1,898 520.3324 Culvert Pipe III-A 24-Inch LF 0 334 334 Deleted Bid Item Quantities Bid Item Item Description Unit Old Quantity Revised Quantity Proposal Total 521.0118 Culvert Pipe Corrugated Steel 18-Inch LF 1,898 -1,898 0 521.0124 Culvert Pipe Corrugated Steel 24-Inch LF 334 -334 0 521.1018 Apron Endwalls for Culvert Pipe Steel 18-Inch EACH 76 -76 0 521.1024 Apron Endwalls for Culvert Pipe Steel 24-Inch EACH 10 -10 0

Transcript of Wisconsin Department of Transportation · 14.03.2017  · 5 pt: 2125+84.76 pc: 2149+25.87 matchline...

Page 1: Wisconsin Department of Transportation · 14.03.2017  · 5 pt: 2125+84.76 pc: 2149+25.87 matchline 2124+20.00 matchline 2154+60.00 t t. t. t t. t. t t. t. t t t t t e e e oh oh oh

Wisconsin Department of Transportation

Version 06-2014 Solving tomorrow’s transportation challenges

Division of Transportation Systems Development Bureau of Project Development 4802 Sheboygan Avenue, Rm 601 P O Box 7916 Madison, WI 53707-7916 Telephone: (608) 266-1631 Facsimile (FAX): (608) 266-8459

March 3, 2017

NOTICE TO ALL CONTRACTORS: Proposal #03: 1650-06-73, WISC 2017 093

Lancaster – Boscobel City Limits St to Fennimore CL USH 61 Grant County

Letting of March 14, 2017 This is Addendum No. 01, which provides for the following: Special Provisions:

Revised Special Provisions Article

No. Description

6 Utilities Schedule of Items:

Added Bid Item Quantities

Bid Item Item Description Unit Old

Quantity Revised Quantity

Proposal Total

520.1018 Apron Endwalls for Culvert Pipe 18-Inch EACH 0 76 76 520.1024 Apron Endwalls for Culvert Pipe 24-Inch EACH 0 10 10 520.3318 Culvert Pipe III-A 18-Inch LF 0 1,898 1,898 520.3324 Culvert Pipe III-A 24-Inch LF 0 334 334

Deleted Bid Item Quantities

Bid Item Item Description Unit Old

Quantity Revised Quantity

Proposal Total

521.0118 Culvert Pipe Corrugated Steel 18-Inch LF 1,898 -1,898 0 521.0124 Culvert Pipe Corrugated Steel 24-Inch LF 334 -334 0 521.1018 Apron Endwalls for Culvert Pipe Steel 18-Inch EACH 76 -76 0 521.1024 Apron Endwalls for Culvert Pipe Steel 24-Inch EACH 10 -10 0

Page 2: Wisconsin Department of Transportation · 14.03.2017  · 5 pt: 2125+84.76 pc: 2149+25.87 matchline 2124+20.00 matchline 2154+60.00 t t. t. t t. t. t t. t. t t t t t e e e oh oh oh

Plan Sheets:

Revised Plan Sheets 02 General Notes (added abbreviation to table) 19 Intersection Detail (revised pipe note) 20 Intersection Detail (revised pipe notes) 22 Intersection Detail (revised pipe notes) 23 Intersection Detail (revised pipe notes) 24 Intersection Detail (revised pipe notes) 60 Miscellaneous Quantities (revised pipe item schedule) 94 Plan Sheet (revised pipe notes) 95 Plan Sheet (revised pipe notes) 96 Plan Sheet (revised pipe notes) 97 Plan Sheet (revised pipe notes) 98 Plan Sheet (revised pipe notes) 99 Plan Sheet (revised pipe notes) 100 Plan Sheet (revised pipe notes) 101 Plan Sheet (revised pipe notes) 102 Plan Sheet (revised pipe note) 104 Plan/Profile Sheet (revised pipe note)

The responsibility for notifying potential subcontractors and suppliers of these changes remains with the prime contractor.

Sincerely,

Mike Coleman Proposal Development Specialist Proposal Management Section

Page 3: Wisconsin Department of Transportation · 14.03.2017  · 5 pt: 2125+84.76 pc: 2149+25.87 matchline 2124+20.00 matchline 2154+60.00 t t. t. t t. t. t t. t. t t t t t e e e oh oh oh

ADDENDUM NO. 01

1650-06-73

March 3, 2017

Special Provisions 6. Utilities. Replace entire section titled Wisconsin Power & Light / Alliant Energy (Electric) with the following:

Wisconsin Power & Light / Alliant Energy (Electric) Alliant Energy has both overhead electric lines and underground electric cable that begin at the project beginning on the west side of the roadway near the existing right-of-way and parallel USH 61. The facilities cross the roadway at various locations to provide local service. The following relocations will occur prior to construction:

Between Station 45+00‘CM’ and 46+88’CM’, a new utility pole will be placed at Station

2104+50, 50’ LT, new underground electric facilities will continue north approximately 6’ inside the east right-of-way of Commercial Drive, the underground facilities will cross Commercial Drive at approximately Station 46+85’CM’.

Station 2103+00, 50’ LT, a new pole will be set; Station 2112+13, 42’ LT, a new pole and anchor will be set; Station 2224+80, 62’ RT, a new pole will be set; Between Stations 2263+35, LT and 2275+00, LT the overhead facilities will be removed and

replaced outside the slope intercepts; Station 2275+87 an overhead crossing will be placed; Between Station 2276+00, RT to 2296+00, RT the overhead facilities will continue north

approximately 10-feet inside the east right-of-way; Station 2296+40 an overhead crossing will be placed; Between Stations 2296+60, LT and 2314+40, LT the overhead facilities will be removed and

replaced along the west right-of-way; Between Stations 2336+00, RT and 2341+25, RT the overhead facilities will be removed and

replaced outside the proposed slope intercepts; Station 2429+00, LT the pole will be removed and replace north of the existing location outside

the slope intercept; Station 2450+00, RT a pole will be added to maintain vertical clearance over USH 61; Between Stations 2452+70, LT and 2457+25, LT the overhead facilities will be removed and

replaced outside the slope intercepts, along the west right-of-way; Between Stations 2468+20, LT and 2470+40, LT the overhead facilities will be removed and

replaced outside the slope intercepts, along the west right-of-way. Anchors will be place on several poles;

Between Stations 2514+75, LT and 2555+50, LT, three poles at Stations 2526+20, 2528+60, 2533+25 will remain in their existing locations. Remaining poles in this section of the overhead facilities will be removed and replaced outside the slope intercepts, along the west right-of-way;

Between Stations 2514+75, LT and 2555+50, LT the overhead facilities will be removed and replaced outside the slope intercepts, along the west right-of-way;

Between Stations 2563+25, RT and 2566+65, RT, new overhead facilities will be placed along the east right-of-way crossing McGhan Rd.

Page 4: Wisconsin Department of Transportation · 14.03.2017  · 5 pt: 2125+84.76 pc: 2149+25.87 matchline 2124+20.00 matchline 2154+60.00 t t. t. t t. t. t t. t. t t t t t e e e oh oh oh

Wisconsin Power and Light will begin relocation work prior to construction and has an anticipated completion date of June 1, 2017. The field contact for Wisconsin Power & Light (WP&L) - Electricity is Dennis Stephenson, 761 Enterprise Dr, Platteville, WI 53818, telephone (608) 326-9485, email [email protected].

Replace entire section titled Charter Communications (Communications Line) with the following:

Charter Communications has underground cables that begin at the project beginning on the west side of the roadway near the existing right-of-way and parallel to USH 61 to Station 2300+00 LT, including a crossing under USH 61 at Station 2296+00. The facilities from Station 2263+00 LT to Station 2266+00 LT will be relocated to within 4 feet of the new right-of-way prior to construction. The field contact for Charter Communications (Communication Line) is Brent Schneider, telephone (608) 209-6011, email [email protected].

Schedule of Items Attached, dated March 3, 2017, are the revised Schedule of Items Pages 1 – 14. Plan Sheets The following 8½ x 11-inch sheets are attached and made part of the plans for this proposal: Revised (1007-10-86): 2, 19, 20, 22 - 24, 60, 94 - 102, and 104.

END OF ADDENDUM

Page 5: Wisconsin Department of Transportation · 14.03.2017  · 5 pt: 2125+84.76 pc: 2149+25.87 matchline 2124+20.00 matchline 2154+60.00 t t. t. t t. t. t t. t. t t t t t e e e oh oh oh

E

22

dstodola
Text Box
2
dotmpc
Text Box
Addendum No. 01 ID 1650-06-73 Revised Sheet 2 March 3, 2017
Page 6: Wisconsin Department of Transportation · 14.03.2017  · 5 pt: 2125+84.76 pc: 2149+25.87 matchline 2124+20.00 matchline 2154+60.00 t t. t. t t. t. t t. t. t t t t t e e e oh oh oh

T

EE

E

GG

GG

G

G

G

G

G

G

G

G

G

G

2071+00

2072+00

2073+00

2074+00

2075+00

2076+00

PC: 2071+71.35

25+00'K'

26+00'K'

27

XXXX

XXXX

XXXX

XXXX

XXXX

XXXX

XXXX

XXXX

XXXX

G G

2077+00

2078+00

2079+00

E

22

dstodola
Text Box
19
dotmpc
Text Box
Addendum No. 01 ID 1650-06-73 Revised Sheet 19 March 3, 2017
Page 7: Wisconsin Department of Transportation · 14.03.2017  · 5 pt: 2125+84.76 pc: 2149+25.87 matchline 2124+20.00 matchline 2154+60.00 t t. t. t t. t. t t. t. t t t t t e e e oh oh oh

TT

TT

T

TT

T

TT

TT

TT

TT

TTT

TT

TT

T

TT

TT

TT

TT

TT

TT

TT

TT

TT

T

GG

GG

GG

GG

GG

GG

G

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

SAN

OH

G

G

G

57+00'BM'

2102+00

2103+00

2104+00

2105+00

2106+00

2107+00

2108+00

45+00'CM'

46+00'CM'

47+00'CM'

XXXX

XXXX

XXXX

XXXX

XXXX

XXXX

XXXX

MATCHLINE 2107+00.00

E

22

dstodola
Text Box
20
dotmpc
Text Box
Addendum No. 01 ID 1650-06-73 Revised Sheet 20 March 3, 2017
Page 8: Wisconsin Department of Transportation · 14.03.2017  · 5 pt: 2125+84.76 pc: 2149+25.87 matchline 2124+20.00 matchline 2154+60.00 t t. t. t t. t. t t. t. t t t t t e e e oh oh oh

TT

TT

TT

T

TT

TT

TT

T

T

T

EE

EE

EE

OH

OH

OH

OH

OH

OH

OH

OHOHOHOH

+00

2181+00

2182+00

2183+00

95+00'CS' 96+00'CS' 97+00'CS'

T

T

TT

TT

TT

TT

OH

OH

OH

OH

OH

OH

8+00

2239+00

2240+00

2241

115+00'LRS'

116+00'LRS'

117+00'LRS

'

PC: 116+37.34'LRS'

PT: 117+08.77'LRS'

XXXX

E

22

dstodola
Text Box
22
dotmpc
Text Box
Addendum No. 01 ID 1650-06-73 Revised Sheet 22 March 3, 2017
Page 9: Wisconsin Department of Transportation · 14.03.2017  · 5 pt: 2125+84.76 pc: 2149+25.87 matchline 2124+20.00 matchline 2154+60.00 t t. t. t t. t. t t. t. t t t t t e e e oh oh oh

T

T

T

T

T

T

T

T

TT

TT

T

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

2250+00

2251+00

2252+00

2253+00

2254+00

2255+00

PC: 2249+5

7.05

125+00'L

RE'

126+00'LRE'

127+00'LRE'

128+00

PC: 125+33.36'LRE'

PT: 126+79.42'LRE'

PC: 127+51.45'LRE'

137+00'LRW'

138+00'LRW'

PT: 136+79.05'LRW'

XXXX

XXXX

E

22

dstodola
Text Box
23
dotmpc
Text Box
Addendum No. 01 ID 1650-06-73 Revised Sheet 23 March 3, 2017
Page 10: Wisconsin Department of Transportation · 14.03.2017  · 5 pt: 2125+84.76 pc: 2149+25.87 matchline 2124+20.00 matchline 2154+60.00 t t. t. t t. t. t t. t. t t t t t e e e oh oh oh

T

T

TT

TT

OH

OH

OHOH

OH

OH

OH

2345+00

2346+00

2347+00

2348

175+00'GL'

176+00'GL'

177+00'GL'

178+00'GL

PC: 175+45.25'GL'

PT: 176+6

1.59'GL'

TT

TT

TT

OH

OH

OH

OH

1+00

2352+00

2353+00

2354

XXXX 186+00'RG'

187+00'RG'

E

22

dstodola
Text Box
24
dotmpc
Text Box
Addendum No. 01 ID 1650-06-73 Revised Sheet 24 March 3, 2017
Page 11: Wisconsin Department of Transportation · 14.03.2017  · 5 pt: 2125+84.76 pc: 2149+25.87 matchline 2124+20.00 matchline 2154+60.00 t t. t. t t. t. t t. t. t t t t t e e e oh oh oh

E

33

dstodola
Text Box
60
dotmpc
Text Box
Addendum No. 01 ID 1650-06-73 Revised Sheet 60 March 3, 2017
Page 12: Wisconsin Department of Transportation · 14.03.2017  · 5 pt: 2125+84.76 pc: 2149+25.87 matchline 2124+20.00 matchline 2154+60.00 t t. t. t t. t. t t. t. t t t t t e e e oh oh oh

T

T

T

T

T

T

T

T

E

E

E

G

GG

G

G

G

G

G

H

OH

OH

OHOH

OH

OH

OH

OH

OH

OH

OH

OHOH

OH

W

W

G

G

2063

2065

2070

2075

2080

2085

2090

2095

25'K'

27'K'

35'EN'

38'EN'

PC: 2071+71.35

PT: 2084+85.66

MATCH

LINE 209

3+80.00

T

T

T

TT

T

T

T

T

T

T

TT

T

T T

T

TT

T

T

T

T

E

E

GG

GG

G

G

GG

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

SAN

W

2095

2100

2105

2110

2115

2120

21

45'CM'

47'CM'

55'BM'

57'BM'

65'IN'

67'IN'

XXXX

PC: 2118+71.49

P

MATCHLINE 2093+80.00

MATCHLINE 2124+20.00

E

55

dstodola
Text Box
94
dotmpc
Text Box
Addendum No. 01 ID 1650-06-73 Revised Sheet 94 March 3, 2017
Page 13: Wisconsin Department of Transportation · 14.03.2017  · 5 pt: 2125+84.76 pc: 2149+25.87 matchline 2124+20.00 matchline 2154+60.00 t t. t. t t. t. t t. t. t t t t t e e e oh oh oh

TT

TT

TT

TT

TT

TT

TT

TT

TT

TT

TT

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

2125

2130

2135

2140

2145

2150

2155

PT: 2125+84.76

PC: 2149+25.87

MATCHLINE 2124+20.0

0

MATCHLINE 2154+60.00

TT

T

TT

TT

TT

TT

T

TT

T

TT

EE

E

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

TT

TT

TT

2155

2160

2165

2170

2175

2180

2185

95'CS'97'CS'

PT: 2166+55.41

MATCHLINE 215

4+60.00

MATCHLINE 2185+00.00

55

E

dstodola
Text Box
95
dotmpc
Text Box
Addendum No. 01 ID 1650-06-73 Revised Sheet 95 March 3, 2017
Page 14: Wisconsin Department of Transportation · 14.03.2017  · 5 pt: 2125+84.76 pc: 2149+25.87 matchline 2124+20.00 matchline 2154+60.00 t t. t. t t. t. t t. t. t t t t t e e e oh oh oh

T

T

T

T

TT

TT

TT

TT

T

T

T

TT

TT

TT

T

T

T

EE

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

2185

2190

2195

2200

2205

2210

2215

105'HY'

108'HY'

PC: 2194+70.45

PT: 2210+29.05

MATCHLINE 2185+00.00

MATCHLINE 2215+40.00

TT

TT

TT

TT

TT

TT

T

TT

TT

TT

TT

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

2215

2220

2225

2230

2235

2240

2245

115'LRS'

117'LRS'

MATCHLINE 2215+40.00

MATCHLINE 2245+80.00

55

E

dstodola
Text Box
96
dotmpc
Text Box
Addendum No. 01 ID 1650-06-73 Revised Sheet 96 March 3, 2017
Page 15: Wisconsin Department of Transportation · 14.03.2017  · 5 pt: 2125+84.76 pc: 2149+25.87 matchline 2124+20.00 matchline 2154+60.00 t t. t. t t. t. t t. t. t t t t t e e e oh oh oh

T

T

T

T

T

TT

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

2245

2250

2255

2260

2265

2270

2275

135'LRW'

138'LRW'125'LRE'

129'LRE'

PC: 22

49+57.05

PT: 2274+19.74

MATCHL

INE 2245+8

0.00

MATCH

LINE 2276+20.00

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

2280

2285

2290

2295

2300

2305

155'CN'

157'CN'

165'E'

169'E'

MATCHLINE 2276+20.00

MATCHLINE 2306+60.00

55

E

dstodola
Text Box
97
dotmpc
Text Box
Addendum No. 01 ID 1650-06-73 Revised Sheet 97 March 3, 2017
Page 16: Wisconsin Department of Transportation · 14.03.2017  · 5 pt: 2125+84.76 pc: 2149+25.87 matchline 2124+20.00 matchline 2154+60.00 t t. t. t t. t. t t. t. t t t t t e e e oh oh oh

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

2310

2315

2320

2325

2330

2335

MATCHLINE 2306+60.00

MATCHLINE 2337+00.00

T

T

TT

TT

T

T

T

T

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

2340

2345

2350

2355

2360

2365

175'GL'

178'GL'

185'RG'187'RG'

PC: 2342+26.84

MATCHLINE 2337+00.00

MATCHL

INE 2367+40

.00

55

E

GREGORY BR.

GREGORY BR.

dstodola
Text Box
98
dotmpc
Text Box
Addendum No. 01 ID 1650-06-73 Revised Sheet 98 March 3, 2017
Page 17: Wisconsin Department of Transportation · 14.03.2017  · 5 pt: 2125+84.76 pc: 2149+25.87 matchline 2124+20.00 matchline 2154+60.00 t t. t. t t. t. t t. t. t t t t t e e e oh oh oh

T

T

T

TT

TT

TT

TT

TT

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

O2370

2375

2380

2385

2390

2395

PT: 2378+18.89

MATCHLINE 2367+40.00

MATCHLINE 2397+80.00

TT

TT

TT

TT

TT

TT

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

2400

2405

2410

2415

2420

2425

195'PG'

MATCHLINE 2397+80.00

MATCHLINE 2428+20.00

55

E

GREGORY BR.

GREGORY BR.

dstodola
Text Box
99
dotmpc
Text Box
Addendum No. 01 ID 1650-06-73 Revised Sheet 99 March 3, 2017
Page 18: Wisconsin Department of Transportation · 14.03.2017  · 5 pt: 2125+84.76 pc: 2149+25.87 matchline 2124+20.00 matchline 2154+60.00 t t. t. t t. t. t t. t. t t t t t e e e oh oh oh

TT

TT

T

T

T

TT

TT

TT

TT

TT

T

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

2430

2435

2440

2445

2450

2455

195'PG'

197'PG'

MATCHLINE 2428+20.00

MATCHLINE 2458+60.00

TT

T

T

T

T

TT

T

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

2460

2465

2470

2475

2480

2485

2

205'WL'

207'WL'

PC: 2461+6

6.92

MATCHLINE

2458+60

.00

MATCHLINE 2489+00.00

55

E

GREGORY BR.

GREGORY BR.

dstodola
Text Box
100
dotmpc
Text Box
Addendum No. 01 ID 1650-06-73 Revised Sheet 100 March 3, 2017
Page 19: Wisconsin Department of Transportation · 14.03.2017  · 5 pt: 2125+84.76 pc: 2149+25.87 matchline 2124+20.00 matchline 2154+60.00 t t. t. t t. t. t t. t. t t t t t e e e oh oh oh

T

TT

TT

T

T

T

T

T

TT

TT

TT

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

2490

2495

2500

2505

2510

2515

252

PT: 2496+01.04

PC: 2508+61.29

MATCHLINE 2489

+00.00

MATCHLINE 2519+40.00

T

T

T

TT

T

T

TT

TT

T

T

T

T

T

T

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH

2520

2525

2530

2535

2540

2545

2550

PT: 2538+79.45

MATCHLINE 2

519+40.00

MATCHLINE 2549+80.00

55

E

GREGORY BR.

GREGORY BR.

dstodola
Text Box
101
dotmpc
Text Box
Addendum No. 01 ID 1650-06-73 Revised Sheet 101 March 3, 2017
Page 20: Wisconsin Department of Transportation · 14.03.2017  · 5 pt: 2125+84.76 pc: 2149+25.87 matchline 2124+20.00 matchline 2154+60.00 t t. t. t t. t. t t. t. t t t t t e e e oh oh oh

T

T

T

TT

T

T

T

TT

E

E

E

OH

OH

OH

OH

OH

OH

OH

OH

OH

OH2550

2555

2560

2565

2570

2575

2580

215'MG'

217'MG'

PC: 2552+92.97

PT: 2565+68.05

PC: 2568+42.91

MATCHLINE 2549

+80.00

MATCHL

INE 258

0+20.00

TT

T

TT

T

T

T

EE

EE

E

G

2575

2580

2585

2590

2595

2600

PT: 2584+32.09

MATCHLINE 2580+20.00

55

E

dstodola
Text Box
102
dotmpc
Text Box
Addendum No. 01 ID 1650-06-73 Revised Sheet 102 March 3, 2017
Page 21: Wisconsin Department of Transportation · 14.03.2017  · 5 pt: 2125+84.76 pc: 2149+25.87 matchline 2124+20.00 matchline 2154+60.00 t t. t. t t. t. t t. t. t t t t t e e e oh oh oh

E

55

dstodola
Text Box
104
dotmpc
Text Box
Addendum No. 01 ID 1650-06-73 Revised Sheet 104 March 3, 2017
Page 22: Wisconsin Department of Transportation · 14.03.2017  · 5 pt: 2125+84.76 pc: 2149+25.87 matchline 2124+20.00 matchline 2154+60.00 t t. t. t t. t. t t. t. t t t t t e e e oh oh oh

Wisconsin Department of Transportation 03/03/2017 08:51:30

Proposal ID: 20170314003 Project(s): 1650-06-73

Federal ID(s): WISC 2017093

0001 Contract ItemsSECTION:

Alt Set ID: Alt Mbr ID:

Bid AmountUnit PriceApproximateQuantity and

UnitsDescription

Item IDProposal

LineNumber

0010 201.0105

Clearing STA

49.000

_________._____ _________._____

0020 201.0205

Grubbing STA

49.000

_________._____ _________._____

0030 203.0100

Removing Small Pipe Culverts EACH

46.000

_________._____ _________._____

0040 203.0200

Removing Old Structure (station) 01.2081+65.57

LUMP SUM _________._____LS

0050 203.0200

Removing Old Structure (station) 02.2084+32.45

LUMP SUM _________._____LS

0060 203.0200

Removing Old Structure (station) 03.2231+14.61

LUMP SUM _________._____LS

0070 203.0200

Removing Old Structure (station) 04.2305+83.40

LUMP SUM _________._____LS

0080 203.0200

Removing Old Structure (station) 05.2332+95.43

LUMP SUM _________._____LS

0090 203.0200

Removing Old Structure (station) 06.2412+77.73

LUMP SUM _________._____LS

0100 203.0200

Removing Old Structure (station) 07.2432+77.58

LUMP SUM _________._____LS

0110 203.0200

Removing Old Structure (station) 08.2447+32.38

LUMP SUM _________._____LS

0120 203.0200

Removing Old Structure (station) 09.2469+76.22

LUMP SUM _________._____LS

0130 203.0200

Removing Old Structure (station) 10.2497+16.23

LUMP SUM _________._____LS

0140 203.0200

Removing Old Structure (station) 11.2530+46.06

LUMP SUM _________._____LS

Proposal Schedule of Items Page 1 of 14

Page 23: Wisconsin Department of Transportation · 14.03.2017  · 5 pt: 2125+84.76 pc: 2149+25.87 matchline 2124+20.00 matchline 2154+60.00 t t. t. t t. t. t t. t. t t t t t e e e oh oh oh

Wisconsin Department of Transportation 03/03/2017 08:51:30

Proposal ID: 20170314003 Project(s): 1650-06-73

Federal ID(s): WISC 2017093

0001 Contract ItemsSECTION:

Alt Set ID: Alt Mbr ID:

Bid AmountUnit PriceApproximateQuantity and

UnitsDescription

Item IDProposal

LineNumber

0150 203.0200

Removing Old Structure (station) 12.2481+16.32

LUMP SUM _________._____LS

0160 203.0200

Removing Old Structure (station) 13.2539+55.14

LUMP SUM _________._____LS

0170 203.0200

Removing Old Structure (station) 14.2552+61.29

LUMP SUM _________._____LS

0180 203.0200

Removing Old Structure (station) 15.2567+68.96

LUMP SUM _________._____LS

0190 203.0200

Removing Old Structure (station) 16.2531+78.54

LUMP SUM _________._____LS

0200 204.0150

Removing Curb & Gutter LF

959.000

_________._____ _________._____

0210 204.0165

Removing Guardrail LF

5,631.000

_________._____ _________._____

0220 204.0170

Removing Fence LF

20,182.000

_________._____ _________._____

0230 204.0185

Removing Masonry CY

21.000

_________._____ _________._____

0240 204.0195

Removing Concrete Bases EACH

1.000

_________._____ _________._____

0250 205.0100

Excavation Common CY

82,977.000

_________._____ _________._____

0260 205.0200

Excavation Rock CY

13,705.000

_________._____ _________._____

0270 206.2000

Excavation for Structures Culverts(structure) 01. C-22-1759

LUMP SUM _________._____LS

0280 206.2000

Excavation for Structures Culverts(structure) 02. C-22-1760

LUMP SUM _________._____LS

0290 206.2000

Excavation for Structures Culverts(structure) 03. C-22-1762

LUMP SUM _________._____LS

Proposal Schedule of Items Page 2 of 14

Page 24: Wisconsin Department of Transportation · 14.03.2017  · 5 pt: 2125+84.76 pc: 2149+25.87 matchline 2124+20.00 matchline 2154+60.00 t t. t. t t. t. t t. t. t t t t t e e e oh oh oh

Wisconsin Department of Transportation 03/03/2017 08:51:30

Proposal ID: 20170314003 Project(s): 1650-06-73

Federal ID(s): WISC 2017093

0001 Contract ItemsSECTION:

Alt Set ID: Alt Mbr ID:

Bid AmountUnit PriceApproximateQuantity and

UnitsDescription

Item IDProposal

LineNumber

0300 206.2000

Excavation for Structures Culverts(structure) 04. C-22-1763

LUMP SUM _________._____LS

0310 206.2000

Excavation for Structures Culverts(structure) 05. C-22-1764

LUMP SUM _________._____LS

0320 206.2000

Excavation for Structures Culverts(structure) 06. C-22-1765

LUMP SUM _________._____LS

0330 206.2000

Excavation for Structures Culverts(structure) 07. C-22-1766

LUMP SUM _________._____LS

0340 206.2000

Excavation for Structures Culverts(structure) 08. C-22-1767

LUMP SUM _________._____LS

0350 206.2000

Excavation for Structures Culverts(structure) 09. C-22-1768

LUMP SUM _________._____LS

0360 206.2000

Excavation for Structures Culverts(structure) 10. C-22-1769

LUMP SUM _________._____LS

0370 206.2000

Excavation for Structures Culverts(structure) 11. C-22-1770

LUMP SUM _________._____LS

0380 206.2000

Excavation for Structures Culverts(structure) 12. C-22-1771

LUMP SUM _________._____LS

0390 206.2000

Excavation for Structures Culverts(structure) 13. C-22-1772

LUMP SUM _________._____LS

0400 206.2000

Excavation for Structures Culverts(structure) 14. C-22-1773

LUMP SUM _________._____LS

0410 206.2000

Excavation for Structures Culverts(structure) 15. C-22-1774

LUMP SUM _________._____LS

0420 208.0100

Borrow CY

103,777.000

_________._____ _________._____

Proposal Schedule of Items Page 3 of 14

Page 25: Wisconsin Department of Transportation · 14.03.2017  · 5 pt: 2125+84.76 pc: 2149+25.87 matchline 2124+20.00 matchline 2154+60.00 t t. t. t t. t. t t. t. t t t t t e e e oh oh oh

Wisconsin Department of Transportation 03/03/2017 08:51:30

Proposal ID: 20170314003 Project(s): 1650-06-73

Federal ID(s): WISC 2017093

0001 Contract ItemsSECTION:

Alt Set ID: Alt Mbr ID:

Bid AmountUnit PriceApproximateQuantity and

UnitsDescription

Item IDProposal

LineNumber

0430 210.2500

Backfill Structure Type B TON

6,668.000

_________._____ _________._____

0440 213.0100

Finishing Roadway (project) 01. 1650-06-73

EACH

1.000

_________._____ _________._____

0450 305.0110

Base Aggregate Dense 3/4-Inch TON

8,762.000

_________._____ _________._____

0460 305.0120

Base Aggregate Dense 1 1/4-Inch TON

65,185.000

_________._____ _________._____

0470 311.0115

Breaker Run CY

347.000

_________._____ _________._____

0480 312.0110

Select Crushed Material TON

35,959.000

_________._____ _________._____

0490 325.0100

Pulverize and Relay SY

216,316.000

_________._____ _________._____

0500 371.1000.S

QMP Base Aggregate Dense 1 1/4-InchCompaction

TON

65,185.000

_________._____ _________._____

0510 374.1020.S

QMP Pulverize and Relay Compaction SY

216,316.000

_________._____ _________._____

0520 416.0160

Concrete Driveway 6-Inch SY

70.000

_________._____ _________._____

0530 416.1010

Concrete Surface Drains CY

22.000

_________._____ _________._____

1.00000

0540 440.4410

Incentive IRI Ride DOL

19,156.000

19,156.00

0550 455.0605

Tack Coat GAL

12,831.000

_________._____ _________._____

1.00000

0560 460.2000

Incentive Density HMA Pavement DOL

47,370.000

47,370.00

1.00000

0570 460.2010

Incentive Air Voids HMA Pavement DOL

47,370.000

47,370.00

0580 460.4110.S

Reheating HMA Pavement LongitudinalJoints

LF

29,479.000

_________._____ _________._____

Proposal Schedule of Items Page 4 of 14

Page 26: Wisconsin Department of Transportation · 14.03.2017  · 5 pt: 2125+84.76 pc: 2149+25.87 matchline 2124+20.00 matchline 2154+60.00 t t. t. t t. t. t t. t. t t t t t e e e oh oh oh

Wisconsin Department of Transportation 03/03/2017 08:51:30

Proposal ID: 20170314003 Project(s): 1650-06-73

Federal ID(s): WISC 2017093

0001 Contract ItemsSECTION:

Alt Set ID: Alt Mbr ID:

Bid AmountUnit PriceApproximateQuantity and

UnitsDescription

Item IDProposal

LineNumber

0590 460.6223

HMA Pavement 3 MT 58-28 S TON

41,383.000

_________._____ _________._____

0600 460.6224

HMA Pavement 4 MT 58-28 S TON

29,316.000

_________._____ _________._____

0610 465.0120

Asphaltic Surface Driveways and FieldEntrances

TON

248.000

_________._____ _________._____

0620 465.0425

Asphaltic Shoulder Rumble Strips 2-LaneRural

LF

85,414.000

_________._____ _________._____

0630 465.0475

Asphalt Center Line Rumble Strips 2-Lane Rural

LF

33,031.000

_________._____ _________._____

0640 502.4205

Adhesive Anchors No. 5 Bar EACH

524.000

_________._____ _________._____

0650 504.0100

Concrete Masonry Culverts CY

439.000

_________._____ _________._____

0660 505.0400

Bar Steel Reinforcement HS Structures LB

36,750.000

_________._____ _________._____

0670 505.0600

Bar Steel Reinforcement HS CoatedStructures

LB

16,330.000

_________._____ _________._____

0680 516.0500

Rubberized Membrane Waterproofing SY

298.000

_________._____ _________._____

0690 520.8000

Concrete Collars for Pipe EACH

58.000

_________._____ _________._____

0700 520.9700.S

Culvert Pipe Liners (size) 01. 24-Inch LF

166.000

_________._____ _________._____

0710 520.9700.S

Culvert Pipe Liners (size) 02. 36-Inch LF

376.000

_________._____ _________._____

0720 520.9700.S

Culvert Pipe Liners (size) 03. 60-Inch LF

123.000

_________._____ _________._____

0730 520.9750.S

Cleaning Culvert Pipes for LinerVerification

EACH

3.000

_________._____ _________._____

Proposal Schedule of Items Page 5 of 14

Page 27: Wisconsin Department of Transportation · 14.03.2017  · 5 pt: 2125+84.76 pc: 2149+25.87 matchline 2124+20.00 matchline 2154+60.00 t t. t. t t. t. t t. t. t t t t t e e e oh oh oh

Wisconsin Department of Transportation 03/03/2017 08:51:30

Proposal ID: 20170314003 Project(s): 1650-06-73

Federal ID(s): WISC 2017093

0001 Contract ItemsSECTION:

Alt Set ID: Alt Mbr ID:

Bid AmountUnit PriceApproximateQuantity and

UnitsDescription

Item IDProposal

LineNumber

0760 521.0130

Culvert Pipe Corrugated Steel 30-Inch LF

4.000

_________._____ _________._____

0770 521.0136

Culvert Pipe Corrugated Steel 36-Inch LF

70.000

_________._____ _________._____

0780 521.0160

Culvert Pipe Corrugated Steel 60-Inch LF

66.000

_________._____ _________._____

0810 521.1030

Apron Endwalls for Culvert Pipe Steel30-Inch

EACH

2.000

_________._____ _________._____

0820 521.1036

Apron Endwalls for Culvert Pipe Steel36-Inch

EACH

2.000

_________._____ _________._____

0830 521.1060

Apron Endwalls for Culvert Pipe Steel60-Inch

EACH

6.000

_________._____ _________._____

0840 522.0124

Culvert Pipe Reinforced Concrete ClassIII 24-Inch

LF

374.000

_________._____ _________._____

0850 522.0130

Culvert Pipe Reinforced Concrete ClassIII 30-Inch

LF

38.000

_________._____ _________._____

0860 522.0136

Culvert Pipe Reinforced Concrete ClassIII 36-Inch

LF

86.000

_________._____ _________._____

0870 522.0142

Culvert Pipe Reinforced Concrete ClassIII 42-Inch

LF

48.000

_________._____ _________._____

0880 522.0148

Culvert Pipe Reinforced Concrete ClassIII 48-Inch

LF

56.000

_________._____ _________._____

0890 522.1018

Apron Endwalls for Culvert PipeReinforced Concrete 18-Inch

EACH

1.000

_________._____ _________._____

0900 522.1024

Apron Endwalls for Culvert PipeReinforced Concrete 24-Inch

EACH

34.000

_________._____ _________._____

0910 522.1030

Apron Endwalls for Culvert PipeReinforced Concrete 30-Inch

EACH

8.000

_________._____ _________._____

Proposal Schedule of Items Page 6 of 14

Page 28: Wisconsin Department of Transportation · 14.03.2017  · 5 pt: 2125+84.76 pc: 2149+25.87 matchline 2124+20.00 matchline 2154+60.00 t t. t. t t. t. t t. t. t t t t t e e e oh oh oh

Wisconsin Department of Transportation 03/03/2017 08:51:30

Proposal ID: 20170314003 Project(s): 1650-06-73

Federal ID(s): WISC 2017093

0001 Contract ItemsSECTION:

Alt Set ID: Alt Mbr ID:

Bid AmountUnit PriceApproximateQuantity and

UnitsDescription

Item IDProposal

LineNumber

0920 522.1036

Apron Endwalls for Culvert PipeReinforced Concrete 36-Inch

EACH

9.000

_________._____ _________._____

0930 522.1042

Apron Endwalls for Culvert PipeReinforced Concrete 42-Inch

EACH

6.000

_________._____ _________._____

0940 522.1048

Apron Endwalls for Culvert PipeReinforced Concrete 48-Inch

EACH

4.000

_________._____ _________._____

0950 524.0124

Culvert Pipe Salvaged 24-Inch LF

120.000

_________._____ _________._____

0960 524.0130

Culvert Pipe Salvaged 30-Inch LF

48.000

_________._____ _________._____

0970 524.0136

Culvert Pipe Salvaged 36-Inch LF

24.000

_________._____ _________._____

0980 524.0142

Culvert Pipe Salvaged 42-Inch LF

24.000

_________._____ _________._____

0990 524.0148

Culvert Pipe Salvaged 48-Inch LF

24.000

_________._____ _________._____

1000 524.0624

Apron Endwalls for Culvert PipeSalvaged 24-Inch

EACH

1.000

_________._____ _________._____

1010 601.0411

Concrete Curb & Gutter 30-Inch Type D LF

57.000

_________._____ _________._____

1020 601.0415

Concrete Curb & Gutter 6-Inch Sloped30-Inch Type J

LF

62.000

_________._____ _________._____

1030 601.0553

Concrete Curb & Gutter 4-Inch Sloped36-Inch Type D

LF

565.000

_________._____ _________._____

1040 601.0557

Concrete Curb & Gutter 6-Inch Sloped36-Inch Type D

LF

2,404.000

_________._____ _________._____

1050 606.0200

Riprap Medium CY

150.000

_________._____ _________._____

1060 606.0300

Riprap Heavy CY

87.000

_________._____ _________._____

Proposal Schedule of Items Page 7 of 14

Page 29: Wisconsin Department of Transportation · 14.03.2017  · 5 pt: 2125+84.76 pc: 2149+25.87 matchline 2124+20.00 matchline 2154+60.00 t t. t. t t. t. t t. t. t t t t t e e e oh oh oh

Wisconsin Department of Transportation 03/03/2017 08:51:30

Proposal ID: 20170314003 Project(s): 1650-06-73

Federal ID(s): WISC 2017093

0001 Contract ItemsSECTION:

Alt Set ID: Alt Mbr ID:

Bid AmountUnit PriceApproximateQuantity and

UnitsDescription

Item IDProposal

LineNumber

1070 608.0418

Storm Sewer Pipe Reinforced ConcreteClass IV 18-Inch

LF

136.000

_________._____ _________._____

1080 608.0424

Storm Sewer Pipe Reinforced ConcreteClass IV 24-Inch

LF

126.000

_________._____ _________._____

1090 611.0615

Inlet Covers Type F EACH

1.000

_________._____ _________._____

1100 611.0630

Inlet Covers Type HM-GJ EACH

2.000

_________._____ _________._____

1110 611.0642

Inlet Covers Type MS EACH

3.000

_________._____ _________._____

1120 611.3004

Inlets 4-FT Diameter EACH

3.000

_________._____ _________._____

1130 611.3903

Inlets Median 3 Grate EACH

1.000

_________._____ _________._____

1140 611.8110

Adjusting Manhole Covers EACH

2.000

_________._____ _________._____

1150 614.2300

MGS Guardrail 3 LF

67.000

_________._____ _________._____

1160 614.2500

MGS Thrie Beam Transition LF

160.000

_________._____ _________._____

1170 614.2610

MGS Guardrail Terminal EAT EACH

4.000

_________._____ _________._____

1180 616.0700.S

Fence Safety LF

118.000

_________._____ _________._____

1190 618.0100

Maintenance And Repair of Haul Roads(project) 01. 1650-06-73

EACH

1.000

_________._____ _________._____

1200 619.1000

Mobilization EACH

1.000

_________._____ _________._____

1210 620.0300

Concrete Median Sloped Nose SF

64.000

_________._____ _________._____

1220 624.0100

Water MGAL

2,160.000

_________._____ _________._____

Proposal Schedule of Items Page 8 of 14

Page 30: Wisconsin Department of Transportation · 14.03.2017  · 5 pt: 2125+84.76 pc: 2149+25.87 matchline 2124+20.00 matchline 2154+60.00 t t. t. t t. t. t t. t. t t t t t e e e oh oh oh

Wisconsin Department of Transportation 03/03/2017 08:51:30

Proposal ID: 20170314003 Project(s): 1650-06-73

Federal ID(s): WISC 2017093

0001 Contract ItemsSECTION:

Alt Set ID: Alt Mbr ID:

Bid AmountUnit PriceApproximateQuantity and

UnitsDescription

Item IDProposal

LineNumber

1230 625.0500

Salvaged Topsoil SY

295,226.000

_________._____ _________._____

1240 627.0200

Mulching SY

273,616.000

_________._____ _________._____

1250 628.1504

Silt Fence LF

51,300.000

_________._____ _________._____

1260 628.1520

Silt Fence Maintenance LF

51,300.000

_________._____ _________._____

1270 628.1905

Mobilizations Erosion Control EACH

8.000

_________._____ _________._____

1280 628.1910

Mobilizations Emergency Erosion Control EACH

4.000

_________._____ _________._____

1290 628.2002

Erosion Mat Class I Type A SY

63,000.000

_________._____ _________._____

1300 628.2004

Erosion Mat Class I Type B SY

3,800.000

_________._____ _________._____

1310 628.7005

Inlet Protection Type A EACH

5.000

_________._____ _________._____

1320 628.7020

Inlet Protection Type D EACH

5.000

_________._____ _________._____

1330 628.7504

Temporary Ditch Checks LF

1,600.000

_________._____ _________._____

1340 628.7555

Culvert Pipe Checks EACH

490.000

_________._____ _________._____

1350 628.7560

Tracking Pads EACH

10.000

_________._____ _________._____

1360 629.0205

Fertilizer Type A CWT

273.000

_________._____ _________._____

1370 630.0110

Seeding Mixture No. 10 LB

3,116.000

_________._____ _________._____

1380 630.0130

Seeding Mixture No. 30 LB

3,644.000

_________._____ _________._____

1390 630.0200

Seeding Temporary LB

11,698.000

_________._____ _________._____

Proposal Schedule of Items Page 9 of 14

Page 31: Wisconsin Department of Transportation · 14.03.2017  · 5 pt: 2125+84.76 pc: 2149+25.87 matchline 2124+20.00 matchline 2154+60.00 t t. t. t t. t. t t. t. t t t t t e e e oh oh oh

Wisconsin Department of Transportation 03/03/2017 08:51:30

Proposal ID: 20170314003 Project(s): 1650-06-73

Federal ID(s): WISC 2017093

0001 Contract ItemsSECTION:

Alt Set ID: Alt Mbr ID:

Bid AmountUnit PriceApproximateQuantity and

UnitsDescription

Item IDProposal

LineNumber

1400 633.5200

Markers Culvert End EACH

80.000

_________._____ _________._____

1410 634.0614

Posts Wood 4x6-Inch X 14-FT EACH

81.000

_________._____ _________._____

1420 634.0616

Posts Wood 4x6-Inch X 16-FT EACH

69.000

_________._____ _________._____

1430 634.0618

Posts Wood 4x6-Inch X 18-FT EACH

22.000

_________._____ _________._____

1440 634.0808

Posts Tubular Steel 2x2-Inch X 8-FT EACH

1.000

_________._____ _________._____

1450 637.2210

Signs Type II Reflective H SF

818.110

_________._____ _________._____

1460 637.2230

Signs Type II Reflective F SF

321.500

_________._____ _________._____

1470 638.2102

Moving Signs Type II EACH

1.000

_________._____ _________._____

1480 638.2602

Removing Signs Type II EACH

149.000

_________._____ _________._____

1490 638.3000

Removing Small Sign Supports EACH

145.000

_________._____ _________._____

1500 642.5001

Field Office Type B EACH

1.000

_________._____ _________._____

1510 643.0100

Traffic Control (project) 01. 1650-06-73 EACH

1.000

_________._____ _________._____

1520 643.0300

Traffic Control Drums DAY

39,689.000

_________._____ _________._____

1530 643.0420

Traffic Control Barricades Type III DAY

5,610.000

_________._____ _________._____

1540 643.0705

Traffic Control Warning Lights Type A DAY

640.000

_________._____ _________._____

1550 643.0715

Traffic Control Warning Lights Type C DAY

170.000

_________._____ _________._____

1560 643.0900

Traffic Control Signs DAY

4,300.000

_________._____ _________._____

Proposal Schedule of Items Page 10 of 14

Page 32: Wisconsin Department of Transportation · 14.03.2017  · 5 pt: 2125+84.76 pc: 2149+25.87 matchline 2124+20.00 matchline 2154+60.00 t t. t. t t. t. t t. t. t t t t t e e e oh oh oh

Wisconsin Department of Transportation 03/03/2017 08:51:30

Proposal ID: 20170314003 Project(s): 1650-06-73

Federal ID(s): WISC 2017093

0001 Contract ItemsSECTION:

Alt Set ID: Alt Mbr ID:

Bid AmountUnit PriceApproximateQuantity and

UnitsDescription

Item IDProposal

LineNumber

1570 643.1050

Traffic Control Signs PCMS DAY

14.000

_________._____ _________._____

1580 645.0105

Geotextile Type C SY

1,230.000

_________._____ _________._____

1590 645.0120

Geotextile Type HR SY

203.000

_________._____ _________._____

1600 645.0130

Geotextile Type R SY

590.000

_________._____ _________._____

1610 646.0106

Pavement Marking Epoxy 4-Inch LF

111,046.000

_________._____ _________._____

1620 646.0126

Pavement Marking Epoxy 8-Inch LF

3,363.000

_________._____ _________._____

1630 646.0406

Pavement Marking Same Day Epoxy 4-Inch

LF

62,339.000

_________._____ _________._____

1640 647.0566

Pavement Marking Stop Line Epoxy 18-Inch

LF

218.000

_________._____ _________._____

1650 648.0100

Locating No-Passing Zones MI

9.578

_________._____ _________._____

1660 649.0403

Temporary Pavement Marking Epoxy 4-Inch

LF

62,339.000

_________._____ _________._____

1670 650.4000

Construction Staking Storm Sewer EACH

7.000

_________._____ _________._____

1680 650.4500

Construction Staking Subgrade LF

53,049.000

_________._____ _________._____

1690 650.5000

Construction Staking Base LF

53,049.000

_________._____ _________._____

1700 650.5500

Construction Staking Curb Gutter andCurb & Gutter

LF

3,095.000

_________._____ _________._____

1710 650.6000

Construction Staking Pipe Culverts EACH

77.000

_________._____ _________._____

Proposal Schedule of Items Page 11 of 14

Page 33: Wisconsin Department of Transportation · 14.03.2017  · 5 pt: 2125+84.76 pc: 2149+25.87 matchline 2124+20.00 matchline 2154+60.00 t t. t. t t. t. t t. t. t t t t t e e e oh oh oh

Wisconsin Department of Transportation 03/03/2017 08:51:30

Proposal ID: 20170314003 Project(s): 1650-06-73

Federal ID(s): WISC 2017093

0001 Contract ItemsSECTION:

Alt Set ID: Alt Mbr ID:

Bid AmountUnit PriceApproximateQuantity and

UnitsDescription

Item IDProposal

LineNumber

1720 650.6500

Construction Staking Structure Layout(structure) 01. C-22-1759

LUMP SUM _________._____LS

1730 650.6500

Construction Staking Structure Layout(structure) 02. C-22-1760

LUMP SUM _________._____LS

1740 650.6500

Construction Staking Structure Layout(structure) 03. C-22-1762

LUMP SUM _________._____LS

1750 650.6500

Construction Staking Structure Layout(structure) 04. C-22-1763

LUMP SUM _________._____LS

1760 650.6500

Construction Staking Structure Layout(structure) 05. C-22-1764

LUMP SUM _________._____LS

1770 650.6500

Construction Staking Structure Layout(structure) 06. C-22-1765

LUMP SUM _________._____LS

1780 650.6500

Construction Staking Structure Layout(structure) 07. C-22-1766

LUMP SUM _________._____LS

1790 650.6500

Construction Staking Structure Layout(structure) 08. C-22-1767

LUMP SUM _________._____LS

1800 650.6500

Construction Staking Structure Layout(structure) 09. C-22-1768

LUMP SUM _________._____LS

1810 650.6500

Construction Staking Structure Layout(structure) 10. C-22-1769

LUMP SUM _________._____LS

1820 650.6500

Construction Staking Structure Layout(structure) 11. C-22-1770

LUMP SUM _________._____LS

1830 650.6500

Construction Staking Structure Layout(structure) 12. C-22-1771

LUMP SUM _________._____LS

1840 650.6500

Construction Staking Structure Layout(structure) 13. C-22-1772

LUMP SUM _________._____LS

Proposal Schedule of Items Page 12 of 14

Page 34: Wisconsin Department of Transportation · 14.03.2017  · 5 pt: 2125+84.76 pc: 2149+25.87 matchline 2124+20.00 matchline 2154+60.00 t t. t. t t. t. t t. t. t t t t t e e e oh oh oh

Wisconsin Department of Transportation 03/03/2017 08:51:30

Proposal ID: 20170314003 Project(s): 1650-06-73

Federal ID(s): WISC 2017093

0001 Contract ItemsSECTION:

Alt Set ID: Alt Mbr ID:

Bid AmountUnit PriceApproximateQuantity and

UnitsDescription

Item IDProposal

LineNumber

1850 650.6500

Construction Staking Structure Layout(structure) 14. C-22-1773

LUMP SUM _________._____LS

1860 650.6500

Construction Staking Structure Layout(structure) 15. C-22-1774

LUMP SUM _________._____LS

1870 650.8000

Construction Staking ResurfacingReference

LF

51,797.000

_________._____ _________._____

1880 650.9910

Construction Staking SupplementalControl (project) 01. 1650-06-73

LUMP SUM _________._____LS

1890 650.9920

Construction Staking Slope Stakes LF

53,049.000

_________._____ _________._____

1900 690.0150

Sawing Asphalt LF

28,347.000

_________._____ _________._____

1910 690.0250

Sawing Concrete LF

65.000

_________._____ _________._____

1.00000

1920 715.0502

Incentive Strength Concrete Structures DOL

2,634.000

2,634.00

5.00000

1930 ASP.1T0A

On-the-Job Training Apprentice at$5.00/HR

HRS

2,500.000

12,500.00

5.00000

1940 ASP.1T0G

On-the-Job Training Graduate at$5.00/HR

HRS

3,520.000

17,600.00

1950 SPV.0035

Special 01. Excess Pulverized Material CY

346.000

_________._____ _________._____

1960 SPV.0060

Special 01. Hot Mix Asphalt PercentWithin Limit (PWL) Test Strip

EACH

1.000

_________._____ _________._____

1970 520.1018

Apron Endwalls for Culvert Pipe 18-Inch EACH

76.000

_________._____ _________._____

1980 520.1024

Apron Endwalls for Culvert Pipe 24-Inch EACH

10.000

_________._____ _________._____

1990 520.3318

Culvert Pipe Class III-A 18-Inch LF

1,898.000

_________._____ _________._____

Proposal Schedule of Items Page 13 of 14

Page 35: Wisconsin Department of Transportation · 14.03.2017  · 5 pt: 2125+84.76 pc: 2149+25.87 matchline 2124+20.00 matchline 2154+60.00 t t. t. t t. t. t t. t. t t t t t e e e oh oh oh

Wisconsin Department of Transportation 03/03/2017 08:51:30

Proposal ID: 20170314003 Project(s): 1650-06-73

Federal ID(s): WISC 2017093

0001 Contract ItemsSECTION:

Alt Set ID: Alt Mbr ID:

Bid AmountUnit PriceApproximateQuantity and

UnitsDescription

Item IDProposal

LineNumber

2000 520.3324

Culvert Pipe Class III-A 24-Inch LF

334.000

_________._____ _________._____

Section: 0001 _________._____Total:

Total Bid: _________._____

Proposal Schedule of Items Page 14 of 14

Page 36: Wisconsin Department of Transportation · 14.03.2017  · 5 pt: 2125+84.76 pc: 2149+25.87 matchline 2124+20.00 matchline 2154+60.00 t t. t. t t. t. t t. t. t t t t t e e e oh oh oh