Delivering Hospitalityto the Workplace
Renovations DeliveringSummer 2018
1615 L Street NW – Construction Timeline
Lobby Construction Begins Q1 2018
Lobby Construction Updates (Ongoing)Q1, Q2 & Q3 2018
Lobby Construction ConcludesQ3 2018
SECURITYCARR BISTRO NEW STAIRCASE TECH LOUNGE GATEWAY LOUNGE RECEPTION
1615 L Street NW – First Floor Renovations
1615 L Street NW
Reception
1615 L Street NW
Gateway Lounge
1615 L Street NW
Gateway Lounge
1615 L Street NW
Tech Lounge
1615 L Street NW
Carr Bistro
1615 L Street NW
Grand Staircase
1615 L Street NW
3rd Floor Library Lounge
1615 L Street NW
4th Floor Terrace
1615 L Street NW
5th Floor Work Pods
1615 L Street NW
6th Floor Gallery
TV
TV
TV
I-2.01
C1
I-2.02 C1C2
I-2.02
B1
I-2.02
A3
I-2.03
B1
D1 D2
A2I-2.03
I-2.03 A1
C1I-2.02
A1/I-2.04
I-2.03
D3
C1/I
-2.0
2
A2/I
-2.0
3
T-113AT-113B
(5) LT-111
QT-110
(4) LT-110
ST-111
ST-111
ST-111
ST-111
T-112
T-112
CP-111
I-5.02D4
I-5.02D4
Scale: 1/4" = 1' - 0"
FIRST FLOOR - CARR BAR/TECH LOUNGE/GATEWAY LOUNGE - FINISH PLAN1
A1I-2.04
B1/I-2.03B1
I-2.03
I-2.03 B4B4SIM.
I-2.02
B1
A2 A1
CP-110
CONFERENCE CENTER - SEEARCHITECT'S DWGS.
(3) LT-115
MAT
CHLI
NE
A/I-
1.01
STAIR 1
I-5.07D1
I-5.07D1
LT-116
ST-111 ST-111
LT-115
I-5.08D1
I-5.04C1
T-115
(7) LT-113AWALL
(10) LT-113BCEILING
RESTAURANT -NOT IN SCOPE
MAT
CHLI
NE
B/I-
1.02
LT-112
T-116T-117 BASE
T-110M
T-111 BASET-110A
NEW ADA LIFT -SEE ARCHT'S
DWGS.
TECH LOUNGE
ELEVATOR LOBBY 1
GATEWAYLOUNGE 2
GATEWAYLOUNGE 1
I-5.02B1
ST-
111
STAIR 4
CARR BAR/ LOUNGE
T-11
2T-
110M
/A
T-11
2T-
110M
/A
T-11
6
TR-110
TR-110
TR-110
DU3
DU3
DU3
DU3 DU3
DU3
DU1 DU1 DU1
DU1DU2 DU2
DU4
DU3
DU4
DU4
DU4
DU3
DU3 DU3
DU3
HW-111
STAIR 3
STAIR 2A STAIR 2B
(2) LT-117
ST-111STAIR 6
MT-118
ELEVATOR LOBBY 1 NOTE:1. SECURITY TURNSTILES TO BEPER OWNER'S SPECIFICATIONS.
STAIR 6 NOTE:1. STAIR 6 WALLFINISHES TO BESIMILAR TO FITNESSCORRIDOR.
6 TOTAL
5 TOTAL
4 TOTAL
H
H
HH
TILE FLOORING TO EXTENDUNDER BANQUETTE MILLWORK
T-111 BASE
T-111 BASE
QT-111 BASE
T-11
0Q
T-11
0
QT-110T-110
TV
I2.01
A1
A2A2
B1
I2.01
B2
A2 A2
SIM
MAT
CHLI
NE
B/I-
1.01
I-5.01D1
I-5.02D1
I-5.03D3
SIM
I-5.03D3
EXISTING FLOOR GRILLE
SF-110
I-5.08D1
T-110M
T-111 BASET-110A
DU2 DU2
ELEV.LOBBY 2
RECEPTION
Temporary Relocatable Partition (Typ.)
Temp Secretarial/ Reception Desk
Construction Area Access (Typ.)
Construction Area Access (Typ.)
Temporary Hard Partition (Typ.)
HHH H
Material Lift
1615 L STREETWASHINGTON D.C.
CONSTRUCTION PHASING & ACCESS PLAN
K E Y
Temporary Relocatable Partition (Typ.)
Construction Area Access
Temporary Hard Partition (Typ.)
Hepa Fan (Typ.)
Material Lift
Temporary Secretarial / Reception Desk
Construction Area
H