    Sl.No. Item of work Unit Qty. Rate Amount

    1 Earth work in excavation by mechanical

    means upto depth of 6 M for footing

    foundation, Pile Cap, Tie Beam extra asper drawing and technical specification

    including settting out, Construction of

    soring and bracing removal of slumps and

    other deterious matter braking of side and

    bottom and back filling as per standard

    data book of IRC.SL. NO.12.1(11) Page 3

    to 4

    A- Labour

    Mate Day 0.32 210.00 67.20

    Mazdoor Day 8.00 200.00 1600.00

    Total 1667.20

    B- Machinery

    Hydraulic excavator 1.00 Cum bucket

    (Market value)

    Hour 6.00 1200.00 7200.00

    C- For the [email protected]% (A+B) 8867.20 665.04

    D.- Over head establishment & mobilization

    @20% on (A+B+C) 9532.24 1906.44

    E- Contractor profit @ 10%(A+B+C+D) 1143.86

    11438.68

    Total 12582.54

    Hence Rate for one Cum

    12582.54/210

    59.91

    Say 60.00

    J.E. S.D.O. E.E.

    Analysis of Rate

    Take Qty=210 Cum.

  • 7/30/2019 Well Foundation by Vivek Shukla New

    2/19

    Sl.No. Item of work Unit Qty. Rate Amount

    2 Fabricating and laying cutting edge made

    out of M.S. Angle & plates, including

    cutting, moulding in the required shape,welding as per approved drawing and

    specification, including cost of all

    materials, labour, tools tackels, plants &

    equipments etc. Complete as required for

    successful completion of the work

    Standard data book of IRC Sl No. 12.10

    page no. 350

    A) Material

    Structure MT 1.05 52000.00 54600.00

    Nuts & Bolts KG 20.00 70.00 1400.00

    B) Labour

    Mate Day 1.32 210.00 277.20

    Fitter Day 5.50 250.00 1375.00

    Blacksmith Day 5.50 290.00 1595.00

    Welder 5.50 250.00 1375.00

    Mazdoor 16.50 200.00 3300.00

    Total 63922.20

    Consumables 10% 0.10 6392.22

    Total (A+B) 70314.42

    A) Over Heads, establishment &

    mobilzation etc. @ 20% on (A+B)

    14062.88

    Total (A+B+C) 84377.30

    All Taxes Risk and contractor Profit etc.

    @10%

    8437.73

    Total 92815.03

    Say Rs. 92815.00

    .

    J.E. S.D.O. E.E.

    Analysis of Rate

  • 7/30/2019 Well Foundation by Vivek Shukla New

    3/19

  • 7/30/2019 Well Foundation by Vivek Shukla New

    4/19

    Sl.No. Item of work Unit Qty. Rate Amount

    4 Providing and laying RCC with cement

    approved coarse sand (FM-1.8 to 2.5) and

    graded approved hard stone ballast with M

    20 grade concrete in well staining of well

    foundation complete as per drawing and

    technical specifications excluding supplyof reinforcement and its bending but

    including its fixing and binding the same

    with 24 BWG G.I. binding wire and

    including necessary centering & shuttering

    including supply of all materials labour and

    T&P etc. required for proper completion of

    work. Standard data book of IRC SL No. )

    12.11 Page 351

    A) Material

    Cement

    M.T.

    5.16 6000.00 30960.00

    Coarse sand Cum 6.75 1600.00 10800.00

    20 mm Aggregate Cum 10.80 1440.00 15552.00

    10 mm Aggregate Cum 2.70 1350.00 3645.00

    B) Mate Day 0.86 210.00 180.60

    Mason Day 1.50 290.00 435.00

    Mazddor for concreting Day 20.00 200.00 4000.00

    C) Machinery

    Conrete Mixer (Capacity 0.40/0.28 Cum.) Hour 6.00 160.00 960.00

    Generator (Capacity 33 KVA) Hour 6.00 240.00 1440.00

    Total (A+B+C) 67972.60

    Add. 25% escalation on machinery on

    960.00+1440.00=2400

    600.00

    Total (A+B+C+D) 68572.60

    E) Form Work 20% (L.S.) 13714.40

    Total (A+B+C+D+E) 82287.00Over Heads. Establishment & mobilization

    etc. @ 20% on

    Rs. 82287.00

    16457.40

    Total 98744.40

    All taxes & Contractor Profit Taxes etc. @

    10%

    98744.44

    Total 108618.84

    Rate Per Cum. 7241.25

    Say 7241.00

    J.E. S.D.O. E.E.

    Analysis of Rate

    Take Qty=15 Cum.

  • 7/30/2019 Well Foundation by Vivek Shukla New

    5/19

  • 7/30/2019 Well Foundation by Vivek Shukla New

    6/19

    Sl.No. Item of work Unit Qty. Rate Amount

    6 Sinking of 6 m. external diameter well

    through sandy soil complete as per

    drawing and technical specifications

    including supply of all materials, labour &

    T&P etc. required for proper completion of

    work. Depth of sinking is reckoned from

    bed level Standred data book of IRC SLNo. 12.12 page 372

    Sandy Soil

    (i) Depth below bed level upto 3.00 m.

    Rate of sinking=0.50 m. per hour

    A) Labour

    Head Sinker Day 0.12 900.00 108.00

    Sinker Day 1.00 450.00 450.00

    Sinker helper Day 2.00 300.00 600.00

    Total (A) 1158.00

    B) MachineryCrane for will sinking TATA P&H 325 or

    equivalent with 0.75 cum. Hour grab with

    average diesel consumption 18 ltr per

    hour, Mobil 1 ltrs for 5 hours.

    Hour 2.00 3000.00 6000.00

    Hire and running charges of 10 KVA

    Generator with fuel & Operator

    Hour 2.00 240.00 480.00

    Total (B) 6480.00

    Total (A+B) 7638.00

    C) Over Heads, establishment & moblization

    etc. @ 20% on (A+B) 20% of

    (1158.00+6480.00) i.e. 7638.00

    Total "C" 1527.60

    Total (A+B+C) 9165.60

    D) All Taxes Risk and contractor Profit etc. @

    10% of total of (A+B+C) 10%

    (1158+6480+1527.60)x10%

    Total (D) 916.56

    Grand Total 10082.16

    Say Rs. 10082.00

    J.E. S.D.O. E.E.

    Analysis of Rate

    Taking output =1 Mt.

  • 7/30/2019 Well Foundation by Vivek Shukla New

    7/19

    Sl.No. Item of work Unit Qty. Rate Amount

    (ii) Beyond 3 m upto 6m. Depth

    Rate of sinking =0.33m. Per hour

    A) Labour

    Head Sinker Day 0.15 900.00 135.00

    Sinker Day 1.25 450.00 562.50

    Sinker helper Day 2.50 300.00 750.00

    Total (A) 1447.50

    B) MachinaryCrane for well sinking TATA P&H 325 or

    equivalent with 0.75 cum. Hour grab with

    average diesel consumption 18 ltr. Per

    hour, Mobil 1 litrs for 5 hours.

    Hour 3.00 3000.00 9000.00

    Hire and running charges of 10 KVA

    Generator with fuel & operator

    Hour 3.00 240.00 720.00

    Total (B) 9720.00

    Total (A+B) 11167.50

    C) Over Heads, establishment & mobilzation

    etc. @ 20% on (A+B)

    2233.50

    Total (A+B+C) 13401.00

    D) All Taxes Risk and contractor Profit etc. @

    10%

    1340.10

    Total 14741.10

    Say 14741.00

    (iii) Beyond 6 m up to 10m depth

    Rate of sinking=0.25m per hour

    (A) Labour

    Head SinkerDay

    0.30 900.00 270.00

    Siner Day 2.50 450.00 1125.00

    Sinker helperDay

    5.00 300.00 1500.00

    Total (A) 2895

    J.E. S.D.O. E.E.

    Analysis of Rate

  • 7/30/2019 Well Foundation by Vivek Shukla New

    8/19

    Sl.No. Item of work Unit Qty. Rate Amount

    B) Machinary

    Crane for well sinking TATA P&H 325 or

    equivalent with 0.75 cum. Hour grab with

    average diesel consumption 18 ltr. Per

    hour, Mobil 1 litrs for 5 hours.

    Hour 4.00 3000.00 12000.00

    Hire and running charges of 10 KVA

    Generator with fuel & operator

    Hour 4.00 240.00 960.00

    Total (B) 12960.00

    Total (A+B) 15855.00

    C) Over Heads, establishment & mobilzation

    etc. @ 20% on (A+B)

    3171.00

    Total (A+B+C) 19026.00All Taxes Risk and contractor Profit etc. @

    10%

    1902.60

    Grand Total 20928.60

    Say Rs. 20928.00

    (iv) Beyond 10m. Upto 15m. Depth

    1 10m upto 11m. Depth Add 5% over the

    rate of previous Mt.

    21974.00

    2 11m upto 12m. Depth Add 5% over the

    rate of previous Mt.

    23073.00

    3 12m upto 13m. Depth Add 5% over the

    rate of previous Mt.

    24227.00

    4 13m upto 14m. Depth Add 5% over the

    rate of previous Mt.

    25438.00

    5

    14m upto 15m. Depth Add 5% over the

    rate of previous Mt. 26710.00

    TOTAL 121422/5 24284.00(v) Beyond 15m. Upto 20m. Depth

    6

    15m upto 16m. Depth Add 5% over the

    rate of previous Mt. 28046.00

    7

    16m upto 17m. Depth Add 5% over the

    rate of previous Mt. 29448.00

    8

    17m upto 18m. Depth Add 5% over the

    rate of previous Mt. 30920.00

    9

    18m upto 19m. Depth Add 5% over the

    rate of previous Mt. 32466.00

    10

    19m upto 20m. Depth Add 5% over the

    rate of previous Mt. 34089.00

    TOTAL 154969/5 30994.00

    J.E. S.D.O. E.E.

    Analysis of Rate

  • 7/30/2019 Well Foundation by Vivek Shukla New

    9/19

  • 7/30/2019 Well Foundation by Vivek Shukla New

    10/19

  • 7/30/2019 Well Foundation by Vivek Shukla New

    11/19

    Sl.No. Item of work Unit Qty. Rate Amount

    9 Same as item no. 5 above but in M-20

    grade concrete in Top Plug of well

    foundation with coarse sand (F.M. 1.8 to

    2.5) and approved graded hard stone

    ballast complete. Standard data book of

    IRC SL. No. 12.11 (E) page-362

    A) Material

    Cement M.T. 5.16 6000.00 30960.00

    Coarse sand Cum 6.75 1600.00 10800.00

    40 mm. aggregate Cum 5.40 1350.00 7290.00

    20 mm. aggregate Cum 5.40 1440.00 7776.00

    10 mm. aggregate Cum 2.70 1350.00 3645.000

    Total (A) 60471.00

    B) Labour

    Mate Day 0.86 210.00 180.60

    Mason Day 1.50 290.00 435.00

    Madzoor for concreting Day 20.00 200.00 4000.00

    Total (B) 4615.60

    C) Machinary

    Concrete Mixer (0.40/0.28 Cum. (market

    Rate)

    Hour 6.00 160.00 960.00

    Generator (Capacity 33 KVA) (Market

    Rate)

    Hour 6.00 240.00 1440.00

    Total "C" 2400.00

    Total (A+B+C) 67486.00

    D) Over Heads Establishment &

    mobilization etc. @ 20% on (A+B+C) i.e.

    Rs. 67486.00

    13497.20

    Total (A+B+C+D) 80983.20

    E) All taxes & Contractor Profit Taxes etc.

    @ 10% on Rs. 80983.20

    8098.32

    Grand Total 89681.52

    Rate per Cum. Rs. 5938.77

    Say Rs. 5939.00

    J.E. S.D.O. E.E.

    Analysis of Rate

    Qt. 15.00 Cum.

  • 7/30/2019 Well Foundation by Vivek Shukla New

    12/19

    Sl.No. Item of work Unit Qty. Rate Amount

    10 RCC work with cement approved Coarse

    sand (FM 1.8 to 2.5) and 2 CM gauge

    graded hard stone ballast) in M-20 grade

    concrete in RCC Beam Chimney, Well cap

    , excluding supply of reinforcement and its

    binding but including its fixing and binding

    the same with 24 BWG G.I. binding wireand including necessary centering &

    shuttering including supply of all materials

    ) labour and T&P etc. required for proper

    completion of work M-20 grade Concrete

    (1:11/2:3) Nominal mix. (Min. cement

    content shall be 400 Kg. per Cum.)

    A) Rate as per schedule item no. 5.25 on

    6933/1.10

    6302.72

    B)- Over Heads. Establishment &

    mobilization etc. 20% on Rs. 6409.00

    1260.54

    Total (A+B) 7563.26

    C)-Contractor Profit Taxes etc. @ 10% onRs. 7563.26

    756.32

    Grand Total 8319.59

    Say Rs. 8319.00

    J.E. S.D.O. E.E.

    Analysis of Rate

  • 7/30/2019 Well Foundation by Vivek Shukla New

    13/19

    Sl.No. Item of work Unit Qty. Rate Amount

    11 Providing and constructing temporary

    island 4.5 m. average height for

    construction with wooden with wooden

    ballies, sand bages, compacted earth etc.

    including supply of all materials labor and

    T&P etc. required for proper completion of

    work. Standard data book of IRC SL No.12.9 (A) page-348

    QTY=200.00 Sqm.

    A) Material

    Earth Cum 904.32 60.00 54259.20

    Sand Bags No. 6000.00 1.50 9000.00

    Wooden ballies 200mm dia and 9m long No. 95.00 1200.00 114000.00

    Wooden ballies 50mm dia RM 190.00 30.00 5700.000

    Total (A) 182959.20

    B) Labour

    Mate Day 5.60 250.00 1400.00

    Mazdoor for piling 8" dia ballis Day 18.00 200.00 3600.00

    Mazdoor for piling 2" dia ballis Day 12.00 200.00 2400.00

    Mazdoor for filling sand bags, stitching &

    Placing

    Day 110.00 200.00 22000.00

    Total (B) 29400.00

    C) Machinery

    Crane (Light Crane) Hour 50.00 2000.00 100000.00

    Total "C" 100000.00

    Total (A+B+C) 312359.20

    D) Consumables @ 2.5% of (A+B+C) Total (D) 7808.98

    Total (A+B+C+D) 320168.18

    E) Over Heads. Establishment & mobilization

    etc.@20% on (A+B+C)

    Total (E) 64033.63

    Total (A+B+C+D+E) 384201.81

    All taxes & Contractor Profit Taxes etc. @

    10% on Rs.384201.81

    38420.18

    Grand Total 422621.99

    Rate Rs. Per Sqm. 2113.11

    Say Rs. 2113.00

    J.E. S.D.O. E.E.

    Analysis of Rate

  • 7/30/2019 Well Foundation by Vivek Shukla New

    14/19

    Sl.No. Item of work Unit Qty. Rate Amount

    12 Providing and constructing 5.0 m. wide

    service road tyo reach island locations

    with sand bags and compacted earth

    including supply of all materials labour and

    T&P etc. required for proper completion of

    work. Standard data book of IRC SL. No.

    12.9 (A) page -349. In case of change of width of road the same will be paid on the

    pre-rata basis.

    Span 60.00 M

    A) Material

    Earth Cum 450.00 60.00 27000.00

    Sang Bags No. 300.00 1.50 450.00

    Total (A) 27450.00

    B) Labour

    Mate Day 0.24 250.00 60.00

    Mazdoor for piling "8" dia ballies Day 6.00 200.00 1200.00

    Total (B) 1260.00

    C) Machinery

    Front end loader (Market Rate) Hour 27.00 750.00 20250.00

    Tipper 5.5 cum capacity (Market Rate) Hour 28.00 300.00 8400.00

    Total "C" 28650.00

    Total (A+B+C) 57360.00D) Over Heads, Establishment & mobilization

    etc. @ 20% on (A+B+C) 11472.00

    Total (A+B+C+D) 68832.00

    E) All taxes & Contractor Profit etc. @ 10%

    on Rs. 68832.00

    6883.20

    Grand Total 75715.20

    Rate per RM. 1261.92

    Say Rs. 1262.00

    J.E. S.D.O. E.E.

    Analysis of Rate

  • 7/30/2019 Well Foundation by Vivek Shukla New

    15/19

  • 7/30/2019 Well Foundation by Vivek Shukla New

    16/19

    l.No Item of work Unit Qty. Rate Amount

    1 Earth work in excavation by mechanical

    means upto depth of 6 M for footing

    foundation, Pile Cap, Tie Beam extra as per

    drawing and technical specification includingsettting out, Construction of soring and

    bracing removal of slumps and other

    deterious matter braking of side and bottom

    and back filling as per standard data book of

    IRC.SL. NO.12.1(11) Page 324

    CUM. 300.00 60.00

    (Rupees Sixty

    only)

    18000.00

    2 Fabricating and laying cutting edge made out

    of M.S. Angle & plates, including cutting,

    moulding in the required shape, welding as

    per approved drawing and specification,

    including cost of all materials, labour, tools

    tackels, plants & equipments etc. Complete

    as required for successful completion of thework Standard data book of IRC Sl No. 12.10

    page no. 350

    MT 9.25 94340.00

    (Rupees Ninty

    four thousand

    three hundred

    forty only)

    872645.00

    3 RCC work in well kerb with concrete mix M-25

    grade with coarse sand (F.M. 1.8 to 2.5) and

    graded hard stone ballast including shuttering

    and placing and fixing of reinforcement bars

    with 24 BWG bindingwire in proper position as

    per approved drawing, including placing of

    concrete and compacting the same with

    vibrators with cost of materials, labour and

    T&P complete. (Standard data book of I.R.C.

    S/No. 12.11 page 351 ) (cement content shallbe 550 kg/cum.)

    CUM. 69.00 9110.00

    (Rupees Nine

    thousand One

    Hundred ten

    only)

    628590.00

    4 Providing and laying RCC with cement

    approved coarse sand (FM-1.8 to 2.5) and

    graded approved hard stone ballast with M-20

    grade concrete in well staining of well

    foundation complete as per drawing and

    technical specifications excluding supply of

    reinforcement and its bending but including its

    fixing and binding the same with 24 BWG G.I.

    binding wire and including necessary

    centering & shuttering including supply of allmaterials labour and T&P etc. required for

    proper completion of work. Standard data

    book of IRC SL No. ) 12.11 Page 351

    (cement content shall be 400 kg/cum)

    CUM. 576.00 7773.00

    (Rupees Seven

    thousand seven

    Hundred

    seventy three

    only)

    4477248.00

    BILL OF QUANTITY FOR CONSTRUCTION OF THREE NO. WELL FOUNDATION FOR

    CROSSING OF 220KV ROZA-BADAUN (D/C) TRANSMISSION LINE OVER GARRA RIVER

    (SHAHJAHANPUR)

    J.E. S.D.O. E.E.

  • 7/30/2019 Well Foundation by Vivek Shukla New

    17/19

    l.No Item of work Unit Qty. Rate Amount

    BILL OF QUANTITY FOR CONSTRUCTION OF THREE NO. WELL FOUNDATION FOR

    CROSSING OF 220KV ROZA-BADAUN (D/C) TRANSMISSION LINE OVER GARRA RIVER

    (SHAHJAHANPUR)

    5 Providing and laying PCC with cement

    approved coarse sand (FM 1.8 to 2.5) and

    graded approved hard stone ballast with M-20

    grade concrete in Botton Plug of wellfoundation with 10% extra cement for under

    water concreting complete as per drawing and

    technical specifications including supply of all

    materials labour and T& P etc. required for

    proper completion of work. Standard data

    book of IRC SL No) 12.11 (C) Page 354

    (cement content shall be 400 kg/ cum)

    CUM. 282.00 8293.00

    (Rupees Eight

    thousand two

    hundred ninetythree only)

    2338626.00

    6 Sinking of 6 m. external diameter well through

    sandy soil complete as per drawing and

    technical specifications including supply of all

    materials, labour & T&P etc. required for proper completion of work. Depth of sinking is

    reckoned from bed level Standred data book

    of IRC SL No. 12.12 page 372

    RM

    A- Depth 0.00 to 3.00 Mt, below bed level RM 9.00 10082.00

    (Rupees Ten

    thousand eighty

    two only)

    90738.00

    B- Depth beyond 3.00 Mt, upto 6.00 M. RM 9.00 14741.00

    (Rupees forteen

    thousand seven

    hundred fortyone only)

    132669.00

    C- Depth beyond 6.00 Mt, upto 10.00 M. RM 12.00 20928.00

    (Rupees twenty

    thousand nine

    hundred twenty

    ei ht onl

    251136.00

    D- Depth beyond 10.00 Mt, upto 15.00 M. RM 15.00 24284.00

    (Rupees twenty

    four thousand

    two hundred

    eighty four only)

    364260.00

    E- Depth beyond 15.00 Mt, upto 20.00 M. RM 12.00 30994.00(Rupees thirty

    thousand nine

    hundred ninty

    four only)

    371928.00

    J.E. S.D.O. E.E.

  • 7/30/2019 Well Foundation by Vivek Shukla New

    18/19

    l.No Item of work Unit Qty. Rate Amount

    BILL OF QUANTITY FOR CONSTRUCTION OF THREE NO. WELL FOUNDATION FOR

    CROSSING OF 220KV ROZA-BADAUN (D/C) TRANSMISSION LINE OVER GARRA RIVER

    (SHAHJAHANPUR)

    7 Supply cutting bending to the shape, welding

    fixing placing uncoated HYSD/TMT bar Fe-

    415 of approved make ISI marked

    reinforcement in Pile cap, well, Beam andChimney etc. above ground level complete as

    per drawing and technical specification IRC

    13-70 page 460

    MT 34.00 70493.00

    (Rupees

    seventy

    thousand fourhundred ninety

    three only)

    2396762.00

    8 Sand filling in well foundaiton available from

    site including watering , dressing etc. Rate to

    include of all materials, labour & T&P etc.

    required for proper completion of work.

    Standared data book of I.R.C. Sl. No. 12.21

    page 422

    CUM. 630.00 82.00

    (Rupees Eighty

    Two only)

    51660.00

    9 Same as item no. 5 above but in M-20 grade

    concrete in Top Plug of well foundation with

    coarse sand (F.M. 1.8 to 2.5) and approved

    graded hard stone ballast complete. Standard

    data book of IRC SL. No. 12.11 (E) page-362(

    cement content shall be 400 kg/cum)

    CUM. 24.00 6382.00

    (Rupees Six

    thousand three

    hundred eighty

    two only)

    153168.00

    10 RCC work with cement ( cement content shall

    be 400 Kg. per Cum.) approved Coarse sand

    (FM 1.8 to 2.5) and 2 CM gauge graded hard

    stone ballast) in M-20 grade concrete in RCC

    Beam Chimney, Well cap excluding supply ofreinforcement and its binding but including its

    fixing and binding the same with 24 BWG G.I.

    binding wire and including necessary

    centering & shuttering including supply of all

    materials ) labour and T&P etc. required for

    proper completion of work M-20 grade

    CUM. 153.00 8319.00

    (Rupees eight

    thousand three

    hundred

    nineteen only)

    1272807.00

    11 Providing and constructing temporary island

    4.5 m. average height for construction with

    wooden with wooden ballies, sand bages,

    compacted earth etc. including supply of all

    materials labor and T&P etc. required for proper completion of work. Standard data

    book of IRC SL No. 12.9 (A) page-348

    Sqm. 300.00 2113.00

    (Rupees two

    thousand one

    hundred thirteen

    only

    633900.00

    J.E. S.D.O. E.E.

  • 7/30/2019 Well Foundation by Vivek Shukla New

    19/19

    l.No Item of work Unit Qty. Rate Amount

    BILL OF QUANTITY FOR CONSTRUCTION OF THREE NO. WELL FOUNDATION FOR

    CROSSING OF 220KV ROZA-BADAUN (D/C) TRANSMISSION LINE OVER GARRA RIVER

    (SHAHJAHANPUR)

    12 Providing and constructing 5.0 m. wide

    service road tyo reach island locations with

    sand bags and compacted earth including

    supply of all materials labour and T&P etc.

    required for proper completion of work.

    Standard data book of IRC SL. No. 12.9 (A)

    page -349. In case of change of width of road

    the same will be paid on the pre-rata basis.

    RM 250.00 1262.00

    (Rupeese one

    thousand two

    hundred sixtytwo only)

    315500.00

    13 Fixing of templete for slub for tower in correct

    position, level and alignment including setting

    of slub supplied by the department free of

    cost. Templete shall also be provided by the

    department free of cost.

    Job 3.00 15000.00

    (Rupees fifteen

    thousand only)

    45000.00

    Total 14414637.00

    J.E. S.D.O. E.E.

    SIGNATURE OF TENDERER

    (SEAL)

    my/ our rates as .......%(in figure)

    ...(in words)

    Below/ Above the estimated rates mentioned in the bill of quantities.

    (Rupees One crore forty four lacs forteen thousand six hundred thirty seven only)

    TO BE FILLED BY THE TENDERER

    I/Weresident

    of ..submit

    J.E. S.D.O. E.E.