Plant Maintenance & Shutdown Planning
Under the current business environment, cost competitivenessand effective maintenance management is key of corporate strategy
The failures of equipments have led to high maintenance and
operation costs.
Shutdown Planning is a mega activity in the continuous running plantsso that all activities can be completed within a specified span of time.
Why So Important ?
It is very difficult to afford unplanned down time
-
8/3/2019 S K Shukla
2/21
2
Plant Maintenance & Shutdown Planning
By maintaining Equipment Data Bank with all important details
Keeping History cards ready for reference
Shutdown Planning in a most effective manner
How ICT can Help ?
Maintaining Logbooks and Equipment Schedules
Business Intelligence (BI) for Management Analysis and Decision making
Plant Maintenance Management System
Designed to automate the activities of all Sections of
Maintenance Department of all IFFCO Units.
Includes Equipment Data Bank, Equipment Scheduling,
Log Book, Equipment History, MWR, Shutdown, Inspection,
Calibration & Testing, Routine Test, Analytical Reports etc.
Integration with other running applications like HRMS,
Material Management System, Financial Accounting System
Data Flows from one Module to another Seamlessly,
Just on a Mouse Click.
Hierarchical Structure of Equipments has been provided at
different levels, Plant, Section, Area, Equipment Category,
Sub-Category, Train / Loops etc.
-
8/3/2019 S K Shukla
3/21
3
Plant Maintenance Management System
The Static Information like Plant, Section, Area, Equipment Category
(e.g. Turbine, Pump, Compressor, Heat Exchanger, Motor etc. ,
Technical Specifications, Trouble Shooting Parameters are
codified in PMMS Masters.
PMMS Masters linked to all Modules of the System to
facilitate Quick and Accurate Performance Analysis of the
Equipments along with Optimisation of Data Storage.
Access Control and Different kind of Privileges,Rights on each Module,
Form and Report is Monitored by One Separate Data Security Module.
PLANT
MAINTENANCEMANAGEMENT
SYSTEM
(PMMS)
MASTERS
EQUIPMENT
DATA BANKSCHEDULING MWR LOG BOOK
INTEGRATION
WITH
FAS & HRMS
ANALYTICAL
REPORTS
INSPECTION,
CALIBRATION
& TESTING
ROUTINE
TEST
EQUIPMENT
HISTORY
SHUTDOWNPMMS
ADMN
-
8/3/2019 S K Shukla
4/21
4
All Static Information like Unit,Plant, Section, Area, Equipment Category,Technical Specifications, Trouble Shooting Parameters are codified in Masters.
Common Masters
Common Masters are being referred by each module of PMMS & will be
uniform in all units of IFFCO.
Ammonia-1
Ammonia-2
Urea-1
Urea-2
Mechanical
Electrical
Instrument
Inspection
Plant
Category
Area
Section
Compressor House,
HP Section, LP Section etc
Turbine, Pump,
Compressor,Controller,
Motor etc
Centrifugal, Reciprocating
in case of pump etc.
K-1Train for
Complete turbine-compressor-
gear box etc
Hierarchical Structure of Equipments
-
8/3/2019 S K Shukla
5/21
5
Plant Maintenance
Management System
Equipment Data Bank Inspection
Equipment Scheduling Calibration & Testing
MWR Routine Test
Log Book Analytical Reports
Equipment History Integration With Materials
Shutdown Integration With FAS & HRMS
EquipmentEquipmentData BankData Bank
PM
Schedule
Modifications
Lub
Schedule
Specifications
Drawings
General
Details
Documents
AMC Common
Spares
Spare Parts
Back
-
8/3/2019 S K Shukla
6/21
6
-
8/3/2019 S K Shukla
7/21
7
EquipmentEquipment
SchedulingScheduling
Lubrication
ScheduleCalibration
Schedule
Preventive
Maintenance
Schedule
Flushing
Top-Up
Greasing
Sampling
Visual Inspection
OverhaulingTube Thickness Checking
Tray Thickness Checking Etc.
Calibrator Calibration
Multi Meter Caliberation
Equipment Calibration
Switch Calibration Etc.Back
-
8/3/2019 S K Shukla
8/21
-
8/3/2019 S K Shukla
9/21
9
-
8/3/2019 S K Shukla
10/21
10
Log BookLog Book
RecordingRecording
External
Agencies
Job Details
Man Power
Details
Work Order No.
Job Description
SIV No
Item Code
Personal No, Name, Shift
Employee Status
Job Employee Details
Job Non-Employee
Details
Job Executed
By
MaterialConsumption
MWR NO.
Plant Name
Eqpt Cat.,Name,Tag
Maint. Type
Job Status
Description
Vendor Detail
Loadable Value
Item Descp.
Qty. & Value
Back
-
8/3/2019 S K Shukla
11/21
11
-
8/3/2019 S K Shukla
12/21
12
EquipmentHistory
Spares
Job Details
Man Power
External Agencies
Jobs at a Glance
Attachments
Insurance Claims
Fault
Unit,Plant,Tag No.,Category, Eqpt id, Job details
& Constraints etc.
Item Code ,Description ,Type, Qty, Value etc.
Man Power Type, Man Hrs. Over Time Details.
Maintenance Type ,Work Order No.,Description,
Vendor details, Loadable Value
Summary of Jobs done at a Glance
Attached documents detail
Observations &Loss Details.
Symptoms, Defects& Remedy etc.
Back
-
8/3/2019 S K Shukla
13/21
13
It is built to keep Date wise record of all Important Jobs carried
out on a Particular Equipment.
Integration with Log Book module facilitates to move
consolidated data of Job done, Spares consumed,
External Agency details, OT etc.directly from multiple
Log Books to History, to avoid duplicacy of Job.
History card of an equipment consists Detail of Job Done,
Engaged Man Power, Spares Consumed, External Agency,Important Data i.e. Protocol Reading etc.
Symptom-Cause-Remedy entry is also provided for better
analysis of the problem.
Equipment History
-
8/3/2019 S K Shukla
14/21
14
This Module of PMMS is built to meet all requirements
related to Shutdown/Annual turn around..
This Module covers all Shutdown activities
1. Job List Preparation
2. Manpower and Material Planning
3. Other Requirements like Electrical, Crane/Mobile Equipment,
Blinds, Scaffolding etc.4. Marking of Major/Critical Jobs.
5. Monitoring Plant wise daily Shutdown Activities.
6. Maintaining Job History of Equipment
7. Generating Shutdown Report.
Provision of job list preparation from any MWR and MWR
preparation from shutdown job list is given.
Shutdown
Back
-
8/3/2019 S K Shukla
15/21
15
-
8/3/2019 S K Shukla
16/21
16
-
8/3/2019 S K Shukla
17/21
17
Inspection Tests Dye Penetrant Test Hardness Test Magnetic Particle Test Gauss Measurement Test Radiographic Test Thickness Measurement Test Ultrasonic Examination Vibration Readings
Dynamic Balancing Readings Primary Reformer Monitoring - (a) Tube Master
(b) Creep Measurement
(c) Delta P Measurement
(d) Metallography Measurement(e) Temperature Measurement(f) Visual Inspection
Rubber Line Thickness Measurement Equipment Skin Temperature Measurement Vendor Site Inspection EOT / Mobile Crane Overload TestBack
-
8/3/2019 S K Shukla
18/21
18
Electrical - Routine Tests & Check Chart Measuring Equipment Calibration
Motor Checking - (a) LT Motor Overhauling
(b) HT Motor Monitoring
Transformer Checking
Cathodic Protection
Earthing / Earthing pit Checking
Battery & Charger Panel checking
Lift Checking
Plant Communication
Telephone Line Checking
Back
Instrumentation - Calibration
Master
Calibration Unit Master Plant Calibrator Master
Plant Multi Meter Master
Form and Reports
Calibrator Calibration Multi Meter Calibration Equipment Calibration
Switch Calibration
-
8/3/2019 S K Shukla
19/21
19
Analytical Report
Equipment Having recurring jobs
Plant wise Equipment vs Defect
Equipment wise Failure Analysis
Cause wise Failure Analysis
( common defect in many Equipment )
Failure vs Frequency Graph
Equipment Expenditure Analysis
Section wise Equipment Analysis
Equipment Wise MWRs
Mean Time to Repair (MTTR)
MWR wise Expenditure
-
8/3/2019 S K Shukla
20/21
20
-
8/3/2019 S K Shukla
21/21
Plant Maintenance & Shutdown Planning
Proper record keeping and documentation
Easy handling of Inter departmental jobs
Proper Analysis and monitoring of equipment failures and job done
Expenditure check on different activities
Fast decision making
No dependency on single person
Best execution planning and optimized utilization of resources
Transparency & Knowledge sharing
Easy identification of bottlenecks
Benefits from ICT