BILL OF QUANTITY FOR ANNUAL MAINTENANCE AND REPAIR WORKS AT
132. KV SUB-STATION ---------------------------
S.No. Item of Work Unit Qty. Rate Amount
1 Excavation in foundation in ordinary soil (clay or
sand) including lift upto 1.5 meter (loam, (5 ft.)
and lead upto 30 meter (100 ft) and including
filling, watering and ramming of excavated earthinto the trenches or into the space between the
building and sides of the foundation trenches or
into the plinth and removal and disposal of
surplus earth as directed by the E/I upto a
distance of 30 meters (100 ft.) from the
foundation trenches.
(CSI No. 4.01)
Cum 2.00 104.00
(Rs. One Hundred
four only)
208.00
2 Clearing jungle including uprooting of rank
vegetations, grass, bush, trees and saplings of
girth upto 30cm measured at a height of 1.0
meter above ground level including removal of
rubbish upto a distance of 50 meters outside the
periphery of area cleared.
(CSI No. 4.09)
Sqm. 100.00 4.50
(Rs. Four & Paisa
fifty only)
450.00
3 Concrete with 4 cm gauge I class brick ballast
(class 150) with coarse sand (F.M. 1.8 to 2.5)
and cement in proportion of 12:6:1 in foundation
and under floors including supply of all
materials, labours and tools and plants etc.
required for proper completion of the work.
(CSI No. 5.01)
Cum 0.50 3072.00
(Rs. ThreeThousand
seventy two only)
1536.00
4 Precast cement concrete door, sills, chaukhats
boundary posts, shelves and similar small work
with cement approved coarse sand (F.M. 1.8 to
2.5) and 2 cm gauge graded approved hard
stone ballast in the proportion 1:2:4, excluding
supply of reinforcement and its bending butincluding its fixing and binding the same with 24
BWG. G.I. binding wire and including the cost of
binding wire, moulds, all other materials, labour
and T&P etc. required for proper completion of
the work.
(CSI No. 5.09)
Cum 0.10 6148.00
(Rs. Six Thousand
one hundred forty
eight only)
614.80
5 First class brick (class-150) work in 1:6 cement
and coarse sand (F.M. 1.8 to 2.5) mortar in
foundation and plinth including supply of all
materials, labour & T&P etc. required for proper
completion of work.
(CSI No. 6.01)
Cum 0.50 3498.00
(Rs. Three
Thousand four
Hundred ninety eight
only)
1749.00
6 First class brick work in foundation and plinthold dismantled bricks (supplied by department
free of cost) and coarse sand of F.M. 1.8 to 2.5
mortar in 1:6 including supply of all material,
labour and T&P etc. required for proper
completion of the work.
(CSI No. 6.20)
Cum 1.00 1538.00(Rs. One Thousand
Five Hundred Thirty
Eight only)
1538.00
J.E. S.D.O. COMPUTER / J.E. E.E.
-
7/30/2019 Vivek Shukla Sir
2/14
Page 2
BILL OF QUANTITY FOR ANNUAL MAINTENANCE AND REPAIR WORKS AT
132. KV SUB-STATION ---------------------------
S.No. Item of Work Unit Qty. Rate Amount
7 Indian salwood wrought framed and fixed
including simple moulding straight work as in
chaukhts including supply of all material, labour
and T&P etc. required for proper completion ofthe work. (CSI No. 8.02)
Cum 0.02 59275.00
Rs. Fifty Nine
Thousand Two
Hundred Seventyfive only)
1185.50
8 Supply and fixing of galvanized mosquito proof
heavy quality iron wire gauge or expanded metal
heavy quality (24 x 16 gauge) over door/window
old shisham wood beading and supply and fixing
necessary screws, nails and all materials labour
and T&P etc. required for proper completion of
the work. (CSI No. 8.49)
Sqm. 1.50 739.00
(Rs. Siven Hundred
thirty Nine only)
1108.50
9 Providing and fixing of shisham wood beading of
tappered section of (35x10x5) mm with screws,
nails etc. including supply of all materials, labour
and T&P etc. required for proper completion of
work. (CSI No. 8.66)(b)
RM 4.00 34.00
(Rs. Thirty four only)
136.00
10 Renewing panes of glass including supply of
glass panes 4 mm thick with putty and brads
including supply of all materials, labour and T&P
etc. required for proper completion of the work.
[CSI No. 20.04 (b)]
Sqm. 1.00 388.00
(Rs. Three Hundred
Eighty Eight only)
388.00
11 Supply and fixing ISI marked approved quality
following oxidised iron fitting in old doors and
windows, shutters with screws, nuts, bolts, etc.
including cartage of material, labour and T&P
etc. required for proper completion of the work.
(a) Tower bolts 10 mm dia x 200 mm log.
( C.S.I No. 22.88 (b)
No. 1.00 44.00
(Rs. Forty four only)
44.00
(b) Tower bolts 10 mm dia x 150 mm log.
( C.S.I No. 22.88
No. 1.00 38.00
(Rs.Thirty Eight only)
38.00
(c) M.S. Hinges 100 mm size.
( C.S.I No. 22.88 (d)
No. 2.00 31.00
(Rs. Thirty One only)
62.00
(d) Handles, 100 to 150 mm size long.
( C.S.I No. 22.88 (f)
No. 1.00 33.00
(Rs Thirty Three
only)
33.00
(e) L-drop 16 mm dia x 250 mm long. (
C.S.I No. 22.88 (g)
No. 1.00 75.00
(Rs. Seventy five
only)
75.00
12(a) Easing door and windows (CSI No. 20.05) Each 1.00 36.50
(Rs. Thirty Six &
Paisa Fifty only)
36.50
(b) Labour for fixing door bolts or hinges or tower
bolts or hasp and staples or handles etc. to door
and windows. (CSI No. 20.10)
Each 4.00 13.30
(Rs. Thirteen &
Paisa Thirty only)
53.20
J.E. S.D.O. COMPUTER / J.E. E.E.
-
7/30/2019 Vivek Shukla Sir
3/14
Page 3
BILL OF QUANTITY FOR ANNUAL MAINTENANCE AND REPAIR WORKS AT
132. KV SUB-STATION ---------------------------
S.No. Item of Work Unit Qty. Rate Amount
13 Mild Steel or Iron in plain work such as
reinforced concrete or reinforced brick work
(when not included in an over all rates) wrought
to required shape as necessary includingbending for proper completion of the work and
including supply of steel its wastage, bend,
hooks and authorised overlapping shall be
measured. (steel shall be arranged by the
contractor). (CSI No. 9.05)
MT 0.01 69500.00
(Rs. Sixty Nine
Thousand Five
Hundred only)
695.00
14(a) Providing barbed iron wire fencing including
fixing in to post after straightening it including
labour and T&P etc. required for proper
completion of the work but excluding supply of
posts and wire. (labour rates only)
(CSI NO. 9.12)
RM 50.00 2.20
(Rs. Two & Paisa
Twenty only)
110.00
(b) Same as item No. 15(a) above but alsoincluding stretching, fixing into the post including
all labour, materials and T&P required for proper
completion of work the weight of hot dipped GI
barbed wire having 12 SWG- 2 ply wires and 4
point ordinary barbs @ 150 mm (approx) C/C
should be 100 gm per Meter. (CSI No. 9.13)
Kg 2.00 95.40(Rs. Ninty Five and
Paisa Fourty only)
190.80
15 Supply and fixing welded wire mesh size 75mm
x 25mm and rectangular made out of 10 SWG
over M.S. angle frame with M.S. flat with nut and
bolts welded as required including cost of drilling
holes, bolts, nuts, washer wilding etc. as
required including cost of all labour, materials,
T&P require for proper completion of the workexcept cost of angle iron and flat. (CSI No. 933).
Sqm. 1.00 575.00
(Rs. Five Hundred
Seventy Five only)
575.00
16 Supply & fixing hold fasts 300x40x6 mm flat iron
with 10 mm dia bolts with nut including grouting
in CC 1:2:4 size of block 230x115x75 mm (CC
shall be measured separately) (CSI No. 9.28)
Each 1.00 66.10
(Rs.Sixty six & Paisa
Ten only)
66.10
17 Spreading over leaky roofs with bitumen paints
at 10 Lbs. per 100 sq.ft. or 1 LB (0.45 Kg.) per
sq.m. including sweeping, cleaning the roof with
brushes, heating of the paints up to the required
temperature, pouring it on the surface,
spreading of necessary quantity of approvedcoarse sand 1 cft. per 100 sft. and including
supply of all materials, labour and T&P etc.
required for proper completion of the work. (CSI
No. 10.08)
Sqm. 1.00 42.90
(Rs. Forty Two &
Paisa Ninety only)
42.90
18 12 mm thick plaster in 1:6 with cement and
coarse sand mortar. (CSI No. 11.10)
Sqm. 5.00 125.00
(Rs. One hundred
Twenty Five only)
625.00
J.E. S.D.O. COMPUTER / J.E. E.E.
-
7/30/2019 Vivek Shukla Sir
4/14
Page 4
BILL OF QUANTITY FOR ANNUAL MAINTENANCE AND REPAIR WORKS AT
132. KV SUB-STATION ---------------------------
S.No. Item of Work Unit Qty. Rate Amount
19 Same as Item No. 18 above but in patches (CSI
No. 11.10+20.02)
Sqm. 10.00 156.25
(Rs. One Hundred
fifty six & Paisa
Twanety five only)
1562.50
20 Supply and mixing approved water proofing
compound in cement mortar in plaster or
concrete work in the proposition as
recommended by the manufacturer. (CSI No.
11.18)
Kg 1.00 54.70
(Rs. Fifty Four &
Paisa Seventy only)
54.70
21 2.5 cm thick 1:2:4 plain cement concrete floor
with cement approved coarse sand, and 2 cm
(3/4") graded approved stone ballast laid in
panels finished with 3 mm (1/8") floating coat of
neat cement or cement and marble dust in ratio
of 5:1 as specified without base concrete
including supply of all materials, labour and T&P
etc. required for proper completion of the work.
(CSI No. 12.02)
Sqm. 3.00 202.00
(Rs. Two Hundred
Two only)
606.00
22 Repair to 2.5 cm thick 1:2:4 plain CC floor in
patches/panels with cement, approved coarse
sand and 2 cm gauge approved stone ballast in
panels f inished with 3 mm floating coat of neat
cement including dismantling and removal of old
damaged floor and also including supply of all
material, labour and T&P etc. (CSI No.
12.02+20.03)
Sqm. 5.00 252.50
(Rs. Two Hundred
Fifty Two & Paisa
Fifty only)
1262.50
23 First class brick on edge floor laid dry, joints
sand filled, including preparation of base to
proper slope and its ramming including supply of
all material labour & T&P etc. required for proper
completion of the work. (CSI No. 12.08)
Sqm. 1.00 338.00
(Rs. Three Hundred
Thirty Eight only)
338.00
24 Same as Item No. 23 above but bricks laid flat
(CSI No. 12.11)
Sqm. 1.00 297.00
(Rs. Two Hundred
ninety seven only)
297.00
25 1st class brick on edge floor laid dry joints sand
filled but resoling work with existing bricks,
including preparation base to proper slope and
its ramming including supply of labour T&P etc.
(labour only) (CSI No. 20.24)
Sqm. 5.00 113.00
(Rs.One hundred
Thirteen only)
565.00
26 Providing and fixing glass strips of 3.15 mm
thickness in joints of floor and skirting at the
time of laying, floors flush with floor level
including labour, Tools and plants etc. complete.(CSI No. 12.18)
(a) of 25 mm depth.
RM 8.00 18.80
(Rs. Eighteen &
Paisa Eighty only)
150.40
27 Painting or varnishing one coat synthetic enamel
paint (Berger/Luxol) or varnish on previously
painted surface on wood work or iron work
including its sand papering, rubbing and
cleaning as required, for proper completion of
work. (CSI No. 13.03)
Sqm. 20.00 36.60
(Rs. Sixty six &
Paisa sixty only)
732.00
J.E. S.D.O. COMPUTER / J.E. E.E.
-
7/30/2019 Vivek Shukla Sir
5/14
Page 5
BILL OF QUANTITY FOR ANNUAL MAINTENANCE AND REPAIR WORKS AT
132. KV SUB-STATION ---------------------------
S.No. Item of Work Unit Qty. Rate Amount
28 Same as item No. (27) above but for every coat
after first coat.
(CSI No. 13.02)
Sqm. 20.00 26.80
(Rs. Twenty six &
Paisa Eighty only)
536.00
29 Finishing walls with one coat of water proof cement paint of approved quality like "Super
Snowcem" or equivalent on previously old
treated surface with this paint to give an even
shade including supply of all materials, labour
and Tools & plants etc. required for proper
completion of work. (CSI No. 13.09)
Sqm. 50.00 25.50(Rs. Twenty five &
Paisa fifty only)
1275.00
30 Same as item No. (29) above but for each coat
of water proof cement paint after the first coat.
(CSI No. 13.08)
Sqm. 50.00 16.70
(Rs. Sixteen & Paisa
seventy only)
835.00
31 White washing two coats including cost of all
materials, labour and T&P etc. required for
proper completion of the work. (CSI No. 14.02)
Sqm. 160.00 6.60
(Rs. Six & Paisa
sixty only)
1056.00
32 Colour washing two coats, using approved
colouring materials, of buff, blue gray or brown
shade including supply of all materials, labour
and T&P etc. for proper completion of the work.
(CSI No. 14.05)
Sqm. 80.00 11.80
(Rs. Eleven & Paisa
Eighty only)
944.00
33 One coat of dry distemper on previously treated
old surface including supply of all materials,
labour and T&P etc. for proper completion of the
work. (CSI No. 14.08)
Sqm. 80.00 13.50
(Rs. Thirteen &
Paisa fifty only)
1080.00
34 Scrapping old white or colour wash or distemper
including disposal refuse as directed by the
Engineer-Incharge within a distance of 60 M.
(CSI No. 15.10)
Sqm. 100.00 7.80
(Rs. Seven & Paisa
Eitghty only)
780.00
35 Dismantling of existing plaster including disposal
of refuse as directed by the Engineer-Incharge
within a distance of 60 M. (CSI No. 15.09)
Sqm. 10.00 25.30
(Rs.Twenty five &
Paisa Thirty only)
253.00
36 Providing and fixing stop/bib cock (brass) 15
mm dia 200 gm weight of approved superior
quality. (CSI No. 26.52)
Each 5.00 303.00
(Rs. Three Hundred
Three only)
1515.00
37 Providing and fixing 15 mm dia C.P. pillar cock
of approved make including cost of all materials,
cartage, labour, T&P etc. required for proper
completion of work. (CSI No. 26.66)
Each 2.00 624.00
(Rs. Six Hundred
Twenty four only)
1248.00
38 Supply and fixing C.P. Brass stop cock heavyquality 15 mm dia ISI mark including cutting and
threading the pipe if required including supply of
all materials, labour, T&P etc. required for
proper completion of work. (CSI No. 26.59)
Each 2.00 519.00(Rs. Five Hundred
Nineteen only)
1038.00
J.E. S.D.O. COMPUTER / J.E. E.E.
-
7/30/2019 Vivek Shukla Sir
6/14
Page 6
BILL OF QUANTITY FOR ANNUAL MAINTENANCE AND REPAIR WORKS AT
132. KV SUB-STATION ---------------------------
S.No. Item of Work Unit Qty. Rate Amount
39(a) Providing and fixing 15 mm dia B-class Jindal,
JTC, ISI marked G.I. pipes complete with
special such as bend, tee, socket, cross, clamp
etc. earth work including filling the trenches etc.required for proper completion of the work, the
rate also includes concealed GI f itting where
required, cutting and making good the walls etc
and all materials, labour and T&P complete.
(CSI No. 26.01)
RM 8.00 167.00
(Rs. One Hundred
sixty seven only)
1336.00
(b) Same as Item No. 39(a) above but for 20 mm
dia. (CSI No. 26.02)
RM 20.00 203.00
(Rs. Two Hundred
Three only)
406.00
(c) Same as Item No. 39(a) above but for 25 mm
dia. (CSI No. 26.03)
RM 3.00 279.00
(Rs. Two Hundred
Seventy Nine only)
837.00
(d) Same as Item No. 39(a) above but for 32 mm
dia. (CSI No. 26.04)
RM 1.00 344.00
(Rs. Three Hundred
Forty four only)
344.00
40 S/F P.V.C. float for float valve 15 mm with brass
rod and union. (CSI No. 26.28)
Each 1.00 223.00
(Rs. Two Hundred
Twanety Three only)
223.00
41 Supply and fixing P.V.C./C.I. Bibcock 15 mm dia
of approved quality (old cock shall be the
property of contractor).[CSI No. 26.52(d)]
Each 10.00 42.90
(Rs. Forty two &
Paisa Ninety only)
429.00
42 Providing and replacing of the following
galvanized iron fittings in existing pipe line
including cutting, threading in pipe if required.
(Chapter 24.00)
(a) GI Elbows 15 mm dia
((CSI No. 26.78)(a)
No. 10.00 35.20
(Rs. Thirty five &Paisa Twenty only)
352.00
(b) GI Socket 15 mm dia
(CSI No. 26.75)(a)
No. 10.00 30.80
(Rs. Thirty & Paisa
Eighty only)
308.00
(c) GI Elbow 20 mm dia
(CSI No. 26.78)(B)
No. 5.00 49.50
(Rs. Forty Nine &
Paisa fifty only)
247.50
(d) GI Socket 20 mm dia.
(CSI No. 26.75)(B)
No. 5.00 46.20
(Rs. Forty six &
Paisa Twenty only)
231.00
(e) G.I. Tee 15 mm dia
(CSI No. 26.76) (a)
No. 3.00 73.70
(Rs. Seventy Three
& Paisa seventy
only)
221.10
(f) G.I. Tee 20 mm dia
(CSI No. 26.76)(B)
No. 3.00 95.70
(Rs. Ninety five &
Paisa seventy only)
287.10
(g) G.I. Union 15 mm dia
(CSI No. 26.79)(A)
No. 2.00 81.40
(Rs. Eighty One &
Paisa forty only)
162.80
(h) G.I. Union 20 mm dia
(CSI No. 26.79)(B)
No. 2.00 129.00
(Rs. One Hundred
Twenty Nine only)
258.00
J.E. S.D.O. COMPUTER / J.E. E.E.
-
7/30/2019 Vivek Shukla Sir
7/14
Page 7
BILL OF QUANTITY FOR ANNUAL MAINTENANCE AND REPAIR WORKS AT
132. KV SUB-STATION ---------------------------
S.No. Item of Work Unit Qty. Rate Amount
43 Repair of sluice valve 80mm size including
repair of valve seat & spindle etc. NSI.
Job 1.00 359.80
(Rs. Three Hundred
Fifty Nine & Paisa
Eighty only)
359.80
44 Dismantling reinforced cement concrete or
reinforced brick work. Including stacking of
dismantled materials as directed by the
Engineer I/C within a distance of 60 meters.
(CSI No. 15.03).
Cum 0.50 667.00
(Rs. Six Hundred
sixty seven only)
333.50
45 One Coat of ready mixed primer of 'Burger' or
equivalent brand on new iron/wood surface
including supply of all material, labour & T&P
etc. required for proper completion of the work.
(CSI No. 13.01-13.02)
Sqm. 10.00 26.70
(Rs. Twenty six &
Paisa seventy only)
267.00
46 Cleaning of existing water pipe line having dia
upto 50 mm including digging trenches openingand cleaning of pipes, cutting threading if
required and refilling of earth and including
making good the road and wall etc.as directed
by the Engineer-I/C. [CSI No. 20.45(b)]
RM 50.00 52.20
(Rs. Fifty two &Paisa twenty only)
2610.00
47 Providing and fixing first quality Indian type white
glazed earthen wire ISI mark W.C. Pan size 580
mm (Hindustan, Cera make) including supply of
all materials, labour and T&P etc. required for
proper completion of the work.
(CSI No. 27.03)
Each 1.00 790.00
(Rs. Seven Hundred
Ninety only)
790.00
48 Providing and fixing a pair of white glazed foots
rests of standard pattern for Indian Type W.C.pan including supply of all materials, labour and
T&P etc. reqruied for proper completion of the
work. (CSI No. 27.14)
Pair 1.00 158.00
(Rs. One HundredFifty Eight only)
158.00
49 Supply and fixing white glazed earthen-ware
W.C. "Orissa" Pan Hindustan make of size
(58x44 cm) including supply of all materials
labour and T&P etc. complete. [CSI No. 27.02
(b)]
Each 1.00 1457.00
(Rs. One Thousand
Four Hundred fifty
Seven only)
1457.00
50 supply and fixing wash hand basin (56x41) cm
of white glazed earthen ware of hindware /perry
or eqyivalent make excluding fittings. (C.S.I.
No.27.09)(b)
Each 1.00 1257.00 Rs. One
Thousand two
hundred fifty seven
only)
1257.00
J.E. S.D.O. COMPUTER / J.E. E.E.
-
7/30/2019 Vivek Shukla Sir
8/14
Page 8
BILL OF QUANTITY FOR ANNUAL MAINTENANCE AND REPAIR WORKS AT
132. KV SUB-STATION ---------------------------
S.No. Item of Work Unit Qty. Rate Amount
51 Providing and fixing 600 mm x 450 mm plain,
edge mirror of Atul, Kiran make glass with Indian
polish 6.50 mm thick complete with back of 600
mm x 450 mm x 6 mm hard board sheet fixed towooden cleats with C.P. brass screws and
washers including supply of all materials, labour
and T&P etc. required for proper completion of
the work.
[CSI No.27.23 (a)]
Each 1.00 616.00
Rs.(Six hundred
eighteen only)
616.00
52 Supply and replacing of 40 mm dia P.V.C. waste
pipe for wash basin/ sink including cost of all
labour, materials, and T&P etc. required for
proper completion of the work. (CSI No. 20.14)
Each 5.00 66.00
(Rs. Sixty six only)
330.00
53 Providing and replacing P.V.C. connection pipe
15 mm with two no. brass union.
(CSI No. 26.40)
Each 4.00 57.00
(Rs. Fifty seven only)
228.00
54 Supply and fixing P.V.C. cistern Hindustan or
equivalent make 10 litres. Capacity complete
with all accessories (Low level) including all
materials, labour and T&P etc. complete.
[CSI No. 27.16(b)]
Each 1.00 1093.00
(Rs. One thousand
Ninety three only)
1093.00
55 Providing and fixing fully way G.M. gate valve 25
mm dia with wheel, ISI mark heavy quality
including supply of all materials, labour and T&P
required for proper completion of work.
(CSI No. 26.24)
Each 1.00 1012.00
(Rs. One thousand
Twelve only)
1012.00
56 Disposal of rubbish / Debris out side the UPPCL
area as per direction of Engineer -in-charge
including cartage, labour and materials, T&P
etc. required for proper completion of the work.
No deduction for voids shall be made. (CSI No.
20.19)
Cum 10.00 107.00
(Rs.One hundred
seven only)
1017.00
57(A) Cleaning of septic tank including disposal of
waste out side the UPPCL area as per direction
of the Engineer-in-charge including cost of all
labour, T&P etc. required for proper completion
of the work. (CSI No. 20.15)
Job 2.00 1295.00
(Rs. One thousand
two hundred Ninety
five only)
2590.00
(B) Same as Item No. 59(a) above but for
inspection chamber. (CSI No. 20.16)
No. 5.00 92.80
(Rs. Ninety two &
Paisa eighty only)
464.00
58 Cleaning of R.C.C. over head tank upto capacity
of one lac litres and chlorinating with bleachingpowder mixed to water as per direction of
Engineer-in-charge complete.
(CSI No. 20.48)
Job 1.00 1301.00
(Rs. One Thousandthree hundred one
only)
1301.00
59 Cutting out cracks of roof terrace to V-selection
cleaning out, wetting, grouting with cement and
sand slurry 1:3 (1 cement and 3 sand) including
cost of all materials, labours, T&P etc. required
for proper completion of the work. (Cement
consumption .004 Bags/RM) (CSI No. 22.55)
RM 5.00 38.60
(Rs. Thirty eight &
Paisa Sixty only)
193.00
J.E. S.D.O. COMPUTER / J.E. E.E.
-
7/30/2019 Vivek Shukla Sir
9/14
Page 9
BILL OF QUANTITY FOR ANNUAL MAINTENANCE AND REPAIR WORKS AT
132. KV SUB-STATION ---------------------------
S.No. Item of Work Unit Qty. Rate Amount
60 Opening, cleaning, overhauling, oiling and
greasing of defective roll ing shutter and also
resetting of its springs for its smooth functioning
including cost of all materials, labour and T&Petc. (CSI No. 20.27)
Job 1.00 285.00
(Rs. Two Hundred
eighty five only)
285.00
61 Painting and printing house No. or residence in
circle of size 8" including preparation of base
with enameled paint complete as directed by the
engineer-in-charge.
(CSI No. 20.81)
Job 10.00 31.90
(Rs. Thirty one &
Paisa Ninety only)
319.00
62 Attending maintenance petty problems with in
the reach of one suitable and experienced
beldar/mali along with required T&P & sundries.
(Chapter 2 Item 9+10%)
Per Day 5.00 220.00
(Rs. Two Hundred
twenty only)
1100.00
63 Attending to petty maintenance service like
plumbing service , welder sevice ,and carpenter
service required as below. (C.S.I. No.22.71)
A Job attending by one no. plumber / welder /
mason/ carpenter with one no. helper per hour
or part of an hour ,
hour 10.00 67.40 (Rs.
Sixty seven & paisa
forty only)
674.00
B Job attending by one no. plumber / welder /
mason/ carpenter with two no. helper per hour
or part of an hour ,
hour 10.00 95 .00
(Rs. Ninety five only)
950.00
65(a) Cleaning of main drain width less than 300 mm
including disposal of waste refuses sludge out
side the board's area including washing and
cleaning by clean water completely (Rate for
cleaning the drain per R.M. per month for
cleaning the drains once a week). (CSI No.
20.17)
RM 800.00 14.10
(Rs. Forteen &
Paisa ten only)
11280.00
(b) Same as above in item No. 65(a) but for drain of
width less than 300 mm. (CSI No. 20.18)
RM 300.00 7.30
(Rs. Seven & Paisa
thirty only)
2190.00
66 Cement washing two coat with slack lime in ratio
1:2 (Cement : lime) including supply of all
materials, labour and T&P etc. required for
proper completion of the work. (CSI No. 14.09)
Sqm. 100.00 7.20
(Rs.Seven & Paisa
twenty only)
720.00
67 Same as in Item No. 66 but for subsequent coat.
(CSI No. 14.10)
Sqm. 100.00 6.20
(Rs. Six & Paisa
twenty only)
620.00
68 Supply and fixing of Syntex or equivalent make
water storage tank including all materials,labours, T&P etc required for proper completion
of work. (CSI No. 26.50)
Litre 200.00 9.20
(Rs. Nine & PaisaTwenty only)
1840.00
69 Oil bound distemper (Berger or equivalent) on
old previously distempered surface including
supply of material, labour and T&P etc. required
for proper completion of work. (CSI No. 13.13)
Sqm. 50.00 22.30
(Rs. Twenty two &
Paisa thirty only)
1115.00
J.E. S.D.O. COMPUTER / J.E. E.E.
-
7/30/2019 Vivek Shukla Sir
10/14
Page 10
BILL OF QUANTITY FOR ANNUAL MAINTENANCE AND REPAIR WORKS AT
132. KV SUB-STATION ---------------------------
S.No. Item of Work Unit Qty. Rate Amount
70 Same as Item No. 70 above but for each coat
after first coat or subsequent coat. (CSI No.
13.14)
Sqm. 50.00 19.40
(Rs. Nineteen &
Paisa forty only)
970.00
71 Supply and planting Ashoka, Pendula, Mango,Neem or other Shadow trees including digging
hole of proper size, manure anti termite with
proper chemical etc., including cost of all
materials, labour and T&P etc. complete in all
respects. (CSI No.23.13)
Nos. 50.00 44.00(Rs. Forty four only) 2200.00
72 (a) Supply and fixing of double action floor spring
including cutting in floors and RCC slabs and
grouting the same with C.C. & finishing the
surface properly as and where required under
Al. doors as per direction of Engineer-in-
charge. The rate includes all labour material and
T&P required for completion of work. (CSI No.
8.70)
No. 1.00 2471.00
(Rs. Two Thousand
four hundred
seventy one only)
2471.00
73 P/F Neosprine Gasket for fixing glass panes ofdoor and window shutters including cost of all
materials, labour and T&P etc. required for
proper completion of the work. (CSI No. 22.52)
RM 1.00 84.70(Rs. Eighty four
&paisa Seventy
only)
84.70
74 Cleaning of grass and removal of rubbish up to
a distrance of 50 M outside the UPPCL area
cleared. (CSI No. 4.10)
Sqm. 1000.00 1.70
(Rs. One & Paisa
seventy only)
1700.00
75(a) Cement concrete with 2 cm gauge approved
hard stone ballast, coarse sand (F.M. 1.8 to 2.5)
and cement in proportion of 4:2:1 including
supply of all materials, labour, side shuttering if
required and T&P etc. required for proper
completion of work. (CSI No. 5.06)
Cum 0.30 5257.00
(Rs. Five Thousand
Two Hundred Fifty
Seven only)
1577.10
(b) RCC work with cement approved coarse sand
(F.M. 1.8 to 2.5) and 2 cm gauge graded
approved hard stone ballast in proportion 1:2:4
in slabs excluding supply of reinforcement and
its bending but including its f ixing and binding
the same with 24 B.W.G. binding wire and
including necessary centering and shuttering
etc. and also including cost of all materials,
binding wire, labour and T&P etc. required for
proper completion of the work (binding wire to
be supplied by the contractor free of cost. (CSI
No. 5.11)
Cum 0.10 6613.00
(Rs. Six Thousand
Six Hundred
Thriteen only)
661.30
76 Same as above in item No. 75(b) but for R.C.C.
raft foundation (CSI No. 5.15)
Cum 0.10 5539.00
(Rs. Five Thousand
five Hundred thirty
nine only)
553.90
J.E. S.D.O. COMPUTER / J.E. E.E.
-
7/30/2019 Vivek Shukla Sir
11/14
Page 11
BILL OF QUANTITY FOR ANNUAL MAINTENANCE AND REPAIR WORKS AT
132. KV SUB-STATION ---------------------------
S.No. Item of Work Unit Qty. Rate Amount
77 Concrete work with 40 mm gauge brick ballast
obtained from breaking brick bats (brick bats
supplied by the department free of cost) in
proportion of 12:6:1 as in item 5.01 aboveincluding cost of al l labour, material, T&P etc.
required for proper completion of work. (CSI
No. 5.22)
Cum 0.20 2356.00
(Rs.Two Thousand
three Hundred fifty
six only)
471.20
78 Mild Steel or Iron work of small size and
sections such as holding down bolts, Holdfast
tie rods, gratings etc. (when not included in an
over all rates) wrought etc. and their fixing,
required for proper completion of the work
including cost of steel which shall be arranged
by the contractor. (CSI No. 9.01)
MT 0.020 68757.00
(Rs. Sixty Eight
Thousand seven
Hundred Fifty seven
only)
1375.14
79 Fixing panes of glass with and including putty
brads and including supply of all materials,
labour and T&P etc. required for proper
completion of the work but excluding cost of glass. (CSI No. 20.07)
Sqm. 2.00 124.00
(Rs. One Hundred
Twenty four only)
248.00
80 As in Item No. 79 above but with wooden
beading. (CSI No. 20.08)
Sqm. 2.00 223.00
(Rs. Two Hundred
Twenty three only)
446.00
81 First class brick work in 1:6 with old dismantled
bricks with cement coarse sand mortar in 9"
(230 mm) thick wall in super structure including
all materials, labour T&P etc. except brick which
will be issued free of cost. (CSI No.6.20)
Cum 0.50 1538.00
(Rs. One Thousand
Five Hundred thirty
eight only)
769.00
82 Supply and sprinkling of lime in all drains of
colony and water logged area including cost of
all labour, materials and T&P etc. as required for
proper completion of the work. (CSI No. 22.72)
Kg. 10.00 11.00
(Rs. Eleven only)
110.00
83 RCC work with cement approved coarse sand
(F.M. 1.8 to 2.5) and 2 cm gauge graded
approved hard stone ballast in proportion 1:2:4
in T-beam-slab and RCC Columns excluding
supply of reinforcement and its fixing and
binding the same with 24 B.W.G. G.I. binding
wire and including necessary centering and
shuttering etc. and also including cost of all
materials, binding wire, labour and T&P etc.
required for proper completion of the work. (CSI
No. 5.16)
Cum 0.10 6380.00
(Rs. Six Thousand
three Hundred
eighty only)
638.00
84 Providing and fixing 15 mm dia PVC ball float
valve with brass rod and union complete ISI
mark including supply of all materials, labour
and T&P etc. required for proper completion of
work. CSI No. 26.28
No. 3.00 223.00
(Rs. Two Hundred
twenty three only)
669.00
J.E. S.D.O. COMPUTER / J.E. E.E.
-
7/30/2019 Vivek Shukla Sir
12/14
Page 12
BILL OF QUANTITY FOR ANNUAL MAINTENANCE AND REPAIR WORKS AT
132. KV SUB-STATION ---------------------------
S.No. Item of Work Unit Qty. Rate Amount
85 Providing and fixing of PVC pipe 6 Kg/Sq.cm for
water supply mains and rain water pipe of
Tirupati or equivalent make with special such as
Tee, bend, socket, elbow etc. including cuttingof pipe where necessary and including
excavation of trenches for laying the pipe line of
approved size (600 x 900 mm) and including its
back filling after testing the pipe line, watering,
ramming etc. complete including disposal of
surplus earth from the sides upto 100 Meter as
per direction of Engineer Incharge as required
for ro er com letion of work.(a) 110 mm dia PVC Pipe (CSI No. 26.64 a) RM 5.00 224.00
(Rs. Two Hundred
twenty Four only)
1120.00
(b) 75 mm dia PVC Pipe (CSI No. 26.64 c) RM 5.00 116.00
(Rs. One Hundred
sixteen only)
580.00
(c) 50 mm dia PVC Pipe (CSI No. 26.64 e) RM 5.00 73.00
(Rs. Seventy three
only)
365.00
(d) 25 mm dia PVC Pipe (CSI No. 26.64 h) RM 5.00 30.80
(Rs. Thity & paisa
eighty only)
154.00
86 Fixing and grouting of 25 mm dia Anchor bolts
in proper alignment level and setout with the
help of a template including supply of all labour
T&P etc. required for proper completion of the
work. (CSI No. 9.21)
No. 4.00 58.20
(Rs. Fifty eight &
Paisa Twenty only)
232.80
87 Providing and fixing full way G.M. gate valve 15
mm dia with wheel, ISI mark heavy qualityincluding supply of all materials, labour and T&P
required for proper completion of work. (CSI No.
26.22)
No. 1.00 509.00
(Rs. Five HundredNine only)
509.00
88 Same as Item No. 87 above but for 20 mm dia
(CSI No. 26.23)
No. 1.00 675.00
(Rs. Six Hundred
seventy five only)
675.00
89 3 mm thick floating coat of neat cement finish
including supply of all materials, labour and T&P
etc. required for proper completion of the work.
(including cost of cement), cement consumption
0.044 bag/Sq.m. (CSI No. 20.23)
Sqm. 5.00 21.80
(Rs. Twenty one &
Paisa eighty only)
109.00
90 Filling of 20 mm wide 80/100/115 mm deep joint
with coarse sand and saw dust mixed with hot
bitumen etc. complete (CSI No. 18.20)
RM. 10.00 37.40
(Rs. Thirty seven &
paisa forty only)
374.00
91 Providing Gola 75 x 75 mm in C.C. 1:2:4 with
coarse sand and 10 mm down grit including
finishing with cement mortar 1:3 as per standard
design. (CSI No. 10.17)
RM 20.00 53.40
(Rs. Fifty three &
Paisa forty only)
1068.00
J.E. S.D.O. COMPUTER / J.E. E.E.
-
7/30/2019 Vivek Shukla Sir
13/14
Page 13
BILL OF QUANTITY FOR ANNUAL MAINTENANCE AND REPAIR WORKS AT
132. KV SUB-STATION ---------------------------
S.No. Item of Work Unit Qty. Rate Amount
92 S/F 6 mm white glazed tiles of size 200x300 mm
in skirting, wall or dado laid with 1:3 cement and
approved coarse sand mortar finished with white
cement slurry, jointing and polishing complete,including supply of all materials, labour and
Tools and Plants etc. required for proper
completition of the work. (CSI No. 12.17a)
Sqm. 0.50 1000.00
(Rs.One thousand
Only)
500.00
93 S/F 6 mm white glazed tiles of size 300x300 mm
in flooring laid with 1:3 cement and approved
coarse sand mortar finished with white cement
slurry, jointing and polishing complete, including
supply of all materials, labour and Tools and
Plants etc. required for proper completion of the
work. (CSI No. 12.17b)
Sqm. 0.50 981.00
(Rs. Nine Hundred
eighty one only)
490.50
94 Dismantling doors or windows including
chaukhats with hold fasts and including stackingof materials as directed by the Engineer-I/C
within a distance of 60 metres. (CSI No. 15.07)
Sqm. 10.00 44.30
(Rs. Forty Four &Paisa Thirtty only)
443.00
95 Providing and mixing "Acrocrete" or any other
approved polymer modified water proofing
coating system in cement mortar for filling
cracks in plaster or concrete work in proportion
as recommended by the manufacturer including
supply of all materials, labour and T&P etc. as
required for proper completion of the work. (CSI
No. 22.78)
Kg 3.00 332.00
(Rs. Three Hundred
Thirty Two only)
996.00
96 Extraction of defective chocked hand pump
machines with variable length of pipe andstrainer and reinsertion of complete assembly
afters its repairing such as welding of pipe
handle jhoola and replacing strainer bolts, nuts,
washers Rubber seats etc. if also cleaning
borehole by boring etc. if necxessay.(old SOR,
CSI NO. 20.41)
1.00 Each 450.00
(Rs Four HundredFifty Only)
450.00
97 Replacing of plastic mesh with new strainer
(fitter) including dismantl ing of old damaged
plastic mesh cleaning of the holes etc.
complete. (Old SOR, CSI NO, 20.39)
1.00 Each 72.00 (Rs.
Seventy Two Ony)
72.00
98 Development of hand pumps by operating
continuously for clean water with testing and
commissioning etc. (Old SOR, CSI NO. 20.43)
1.00 Job 325.00 (Rs.
Three Hundred
Twenty Five Only)
325.00
99 Boring with 4" dia (100 mm) casing pipe upto 6
meter depth (Old SOR, CSI NO. 20.37)
1.00 Rm 133.00
(Rs. One Hundred
Thirty Three Only)
133.00
100 Boring with 4" dia (100 mm) casing pipe
beyound 6 meter to 50 meter depth (Old SOR,
CSI NO. 20.38)
1.00 Rm 169.00
(Rs One Hundred
Sixty Nine Only)
169.00
TOTAL 94209.84
Rs. Eighty Sixe Thousand Eight Hundred Twenety Two and Paisa Seventy Three Only
TOTAL 94209.84
J.E. S.D.O. COMPUTER / J.E. E.E.
-
7/30/2019 Vivek Shukla Sir
14/14
Page 14
BILL OF QUANTITY FOR ANNUAL MAINTENANCE AND REPAIR WORKS AT
132. KV SUB-STATION ---------------------------
S.No. Item of Work Unit Qty. Rate Amount
Rs. Eighty Sixe Thousand Eight Hundred Twenety Two and Paisa Seventy Three Only
J.E. S.D.O. COMPUTER / J.E. E.E.