Water pollution prevention in the Sava River Basin€¦ · Prevention of Water Pollution caused by...

13
Samo Grošelj Deputy Secretary of ISRBC Budapest (HU), November 4-5, 2019 Water pollution prevention in the Sava River Basin

Transcript of Water pollution prevention in the Sava River Basin€¦ · Prevention of Water Pollution caused by...

Page 1: Water pollution prevention in the Sava River Basin€¦ · Prevention of Water Pollution caused by Navigation • Scope – To effectively prevent, control and reduce pollution from

Samo GrošeljDeputy Secretary of ISRBC

Budapest (HU), November 4-5, 2019

Water pollution prevention in the Sava River Basin

Page 2: Water pollution prevention in the Sava River Basin€¦ · Prevention of Water Pollution caused by Navigation • Scope – To effectively prevent, control and reduce pollution from

FASRB• Framework Agreement on the Sava River Basin (FASRB)

• Objectives – to establish:– Sustainable water management– Sustainable hazard management

(floods, droughts, accidents, etc.)

– International regime of navigation

• International Sava River Basin Commission(4 member countries + Montenegro)

Contingency planning workshop, November 4-5, 2019

Page 3: Water pollution prevention in the Sava River Basin€¦ · Prevention of Water Pollution caused by Navigation • Scope – To effectively prevent, control and reduce pollution from

Contingency planning workshop, November 4-5, 2019

FASRB

Article 2Objective of the Agreement

1) The Parties shall cooperate in order to achieve the following goals:

c) Undertaking of measures to prevent or limit hazards, and reduce and eliminate adverse consequences, including those from floods, ice hazards, droughts and incidents involving substances hazardous to water.

Page 4: Water pollution prevention in the Sava River Basin€¦ · Prevention of Water Pollution caused by Navigation • Scope – To effectively prevent, control and reduce pollution from

Contingency planning workshop, November 4-5, 2019

FASRB

1) The Parties shall establish a coordinated or joint system of measures, activities, warnings and alarms in the Sava River Basin forextraordinary impacts on the water regime, such as sudden and accidental pollution, discharge of artificial accumulations and retentions caused by collapsing or inappropriate handling, flood, ice, drought, water shortage, and obstruction of navigation.

2) In realization of the obligation in paragraph 1 of this Article, the Parties shall act in accordance with activities undertaken in the framework of The Convention for Protection and Sustainable Use of Danube River and in the scope of the procedures agreed within the ICPDR.

Article 13Extraordinary Impacts on the Water

Regime

Page 5: Water pollution prevention in the Sava River Basin€¦ · Prevention of Water Pollution caused by Navigation • Scope – To effectively prevent, control and reduce pollution from

Contingency planning workshop, November 4-5, 2019

FASRBArticle 30Protocols

1) In implementing this Agreement, the Parties shall, in addition to the protocols referred to in other provisions of this Agreement, conclude other protocols for regulating:

g) Emergency situations.

Page 6: Water pollution prevention in the Sava River Basin€¦ · Prevention of Water Pollution caused by Navigation • Scope – To effectively prevent, control and reduce pollution from

Protocols to FASRB

Issue Signed Ratified by In force since

Navigation Regime Kranjska Gora, 3 Dec. 2002 All Parties 29 Dec. 2004

Prevention of Water Pollution caused by Navigation Belgrade, 1 June 2009 All Parties 8 October 2017

Flood Protection Gradiška, 1 June 2010 All Parties 27 Nov. 2015

Sediment Management Brčko, 6 July 2015 All Parties 8 October 2017

Emergency Situations Final harmonization expected

Transboundary Impact Draft under reconsideration

Contingency planning workshop, November 4-5, 2019

Page 7: Water pollution prevention in the Sava River Basin€¦ · Prevention of Water Pollution caused by Navigation • Scope – To effectively prevent, control and reduce pollution from

Protocols to FASRB• Navigation Regime

– To regulate the navigation and to ensure the proper maintenance of the fairway

• Flood Protection– To regulate the issues of sustainable flood protection

caused by:• natural phenomena such as high flows of rivers, as well

as ice jamming, and • artificial impacts like water discharge from reservoirs and

retentions induced by dam collapsing or inadequate handling, changes in river basin, riverbeds and floodplains, etc.

• Sediment Management– To regulate the procedures related to sustainable

sediment managementContingency planning workshop, November 4-5, 2019

Page 8: Water pollution prevention in the Sava River Basin€¦ · Prevention of Water Pollution caused by Navigation • Scope – To effectively prevent, control and reduce pollution from

Prevention of Water Pollution caused by Navigation

• Scope– To effectively prevent, control and reduce pollution from vessels

• Activities– The Parties shall take all necessary measures to effectively prevent,

control and reduce pollution from vessels in navigation and shall execute necessary measures for adequate pollution response, using the polluter pays principle whenever possible.

– The Parties shall establish a sufficiently dense network of reception facilities on the waterway

– The Parties shall take all necessary steps to equip the ports open for international traffic with required reception facilities within five years as of entry into force of this Protocol

Contingency planning workshop, November 4-5, 2019

Page 9: Water pollution prevention in the Sava River Basin€¦ · Prevention of Water Pollution caused by Navigation • Scope – To effectively prevent, control and reduce pollution from

• Scope– prevention of, preparedness for and response to industrial accidents and

navigation-related accidents causing a transboundary impact, and any other event resulting from an uncontrolled development involving hazardous substances causing or threatening to cause transboundary impact;

– cooperation among the Parties concerning the mutual assistance, exchange of information, exchange of technology and research

• Activities– establish coordinated or joint system in case of emergency situations– identify hazardous activities and other potential risks of transboundary impact,– take appropriate measures for the prevention of accidents, – ensure the preparation and implementation of on-site and off-site contingency

plans,– provide for the establishment and operation of compatible and efficient alarm and

warning systems (AEWS), – assess the nature and extent of the transboundary impact – applying AEWS manual,– ensure in the event of an emergency situation adequate response measures, – a Party may request assistance from other Parties

Emergency Situations

Contingency planning workshop, November 4-5, 2019

Page 10: Water pollution prevention in the Sava River Basin€¦ · Prevention of Water Pollution caused by Navigation • Scope – To effectively prevent, control and reduce pollution from

Protocol on Emergency SituationsPart I: General Provisions

Part II: Prevention, Preparedness, Response and Mutual assistance

Part III: Institutional arrangements and cooperation

Part IV: Final provisions

Annexes:

DefinitionsGeneral Provisions

Coordinated systemIdentification, consultation and advice PreventionEmergency planning and preparednessAlarm and warning systemsAssessment of extraordinary impacts Emergency responseMutual Assistance

Dispute settlementOther agreementsDuration and entering into forceReservationsAmendments, withdraw and dispute settlementsInternational Borders Depositary

Designated authorities and focal pointsExchange of informationExchange of technologyCommon research and developmentMeeting of the PartiesInternational Sava River Basin CommissionSecretariatMonitoring implementation of the Protocol

Status: Adopted by the Sava Commission and sent to the Parties for consideration

Annex I: Hazardous substances for the purposes of defining hazardous activities Annex II: Purposes of related articles,Annex III: Contingency plans

Contingency planning workshop, November 4-5, 2019

Page 11: Water pollution prevention in the Sava River Basin€¦ · Prevention of Water Pollution caused by Navigation • Scope – To effectively prevent, control and reduce pollution from

Water Contingency Management in the Sava River Basin – WACOM(submitted to 3rd DTP call for proposals)

• Main objective– To develop operational framework for activation of Protocols on Emergency

situations, Prevention of Pollution Caused by Navigation, Flood Protection• Expected results

– reduced risks induced by the accidental pollution and floods of transnational dimension by strengthening the transnational and trans-sectorial cooperation among institutions, especially governmental institutions(responsible for water and flood management and the civil protection) managing the flood and accidental pollution preparedness and response stage

• LP: University of Ljubljana (SI)• PP: Institutions for water management,

navigation and civil protection from SRB

Contingency planning workshop, November 4-5, 2019

Page 12: Water pollution prevention in the Sava River Basin€¦ · Prevention of Water Pollution caused by Navigation • Scope – To effectively prevent, control and reduce pollution from

Data and information exchange• Sava GIS (www.savagis.org) and Sava HIS - www.savahis.org

– RBM, FRM and HMI related data available– Integration of module for navigation- ongoing– Integration of module for APC- planned

• Sava Flood Forecasting & Warning System (operational since 2018)

Contingency planning workshop, November 4-5, 2019

Page 13: Water pollution prevention in the Sava River Basin€¦ · Prevention of Water Pollution caused by Navigation • Scope – To effectively prevent, control and reduce pollution from

Contact information

International Sava River Basin CommissionKneza Branimira 2910000 ZagrebCroatia

www.savacommission.org