10
B. L."Pete" Ivey Southern Nuclear Vice President Operating Company, Inc. Nuclear Development Support 42 Inverness Center Parkway Post Office Box 1295 Birmingham, Alabama 35242 Tel 205.992.7619 Fax 205.992.5217 SOUTHERN r• COMPANY AUG 232010 Docket Nos.: 52-025 ND-10-1608 52-026 U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001 Southern Nuclear Operating Company Vogtle Electric Generating Plant Units 3 and 4 Combined License Application Summary Identification of Reference Combined License Application Standard Content Submittals Ladies and Gentlemen: By letter dated March 28, 2008, Southern Nuclear Operating Company (SNC) submitted an application for combined licenses (COLs) for proposed Vogtle Electric Generating Plant (VEGP) Units 3 and 4 to the U.S. Nuclear Regulatory Commission (NRC) for two Westinghouse AP1000 reactor plants. That application was patterned after the initial APIO00 Reference COL application (Bellefonte Units 3 and 4). The NRC wrote a safety evaluation report (SER) with open items (Ols) for the Bellefonte COL application. Subsequently, VEGP Units 3 and 4 became the APIO00 Reference COL applicant. The enclosure to this letter provides a listing of submittals, in table format, for the Reference Combined License Application (R-COLA) that addresses SER Ols and other concerns, some of which include standard content for the AP1 000 Subsequent COLAs (S- COLAs). The attached table, which is sorted by the associated NRC RAI/OI number, identifies the response as either standard or plant-specific. A column for an AP1000 S- COLA indication of endorsement is provided as a placeholder in the table to facilitate the transmittal of subsequent applicants' evaluations. The table supplements the SNC R-COLA submittals identified in the previous such listing (SNC Letter ND-09-1867, dated November 20, 2009) through July 15, 2010. Similar summary information will be submitted periodically to include future responses (and supplements) to formal R-COLA submittals. If you have any questions regarding this letter, please contact Mr. Wes Sparkman at (205) 992-5061 or Ms. Amy Aughtman at (205) 992-5805. ?~Oc 1--

Transcript of Vogtle, Units 3 and 4, Combined License Application, Summary ... · Vogtle Electric Generating...

Page 1: Vogtle, Units 3 and 4, Combined License Application, Summary ... · Vogtle Electric Generating Plant Units 3 and 4 Combined License Application Summary Identification of Reference

B. L. "Pete" Ivey Southern NuclearVice President Operating Company, Inc.Nuclear Development Support 42 Inverness Center Parkway

Post Office Box 1295Birmingham, Alabama 35242

Tel 205.992.7619Fax 205.992.5217

SOUTHERN r•COMPANY

AUG 232010

Docket Nos.: 52-025 ND-10-160852-026

U.S. Nuclear Regulatory CommissionDocument Control DeskWashington, DC 20555-0001

Southern Nuclear Operating CompanyVogtle Electric Generating Plant Units 3 and 4 Combined License Application

Summary Identification of Reference Combined License ApplicationStandard Content Submittals

Ladies and Gentlemen:

By letter dated March 28, 2008, Southern Nuclear Operating Company (SNC) submittedan application for combined licenses (COLs) for proposed Vogtle Electric Generating Plant(VEGP) Units 3 and 4 to the U.S. Nuclear Regulatory Commission (NRC) for twoWestinghouse AP1000 reactor plants. That application was patterned after the initialAPIO00 Reference COL application (Bellefonte Units 3 and 4). The NRC wrote a safetyevaluation report (SER) with open items (Ols) for the Bellefonte COL application.Subsequently, VEGP Units 3 and 4 became the APIO00 Reference COL applicant.

The enclosure to this letter provides a listing of submittals, in table format, for theReference Combined License Application (R-COLA) that addresses SER Ols and otherconcerns, some of which include standard content for the AP1 000 Subsequent COLAs (S-COLAs). The attached table, which is sorted by the associated NRC RAI/OI number,identifies the response as either standard or plant-specific. A column for an AP1000 S-COLA indication of endorsement is provided as a placeholder in the table to facilitate thetransmittal of subsequent applicants' evaluations.

The table supplements the SNC R-COLA submittals identified in the previous such listing(SNC Letter ND-09-1867, dated November 20, 2009) through July 15, 2010. Similarsummary information will be submitted periodically to include future responses (andsupplements) to formal R-COLA submittals.

If you have any questions regarding this letter, please contact Mr. Wes Sparkman at(205) 992-5061 or Ms. Amy Aughtman at (205) 992-5805.

?~Oc 1--

Page 2: Vogtle, Units 3 and 4, Combined License Application, Summary ... · Vogtle Electric Generating Plant Units 3 and 4 Combined License Application Summary Identification of Reference

U.S. Nuclear Regulatory CommissionND-10-1608Page 2 of 4

Mr. B. L. Ivey states he is a Vice President of Southern Nuclear Operating Company, isauthorized to execute this oath on behalf of Southern Nuclear Operating Company and tothe best of his knowledge and belief, the facts set forth in this letter are true.

Respectfully submitted,

SOUTHERN NUCLEAR OPERATING COMPANY

B. L. Ivey

Sworn to and subscribed before me this day of (2 Ier , 2010

Notary Public:___ _ _ __ __

My commission expires: &AreA 1- .r2-0 /4/-

BLI/BJS

Enclosure: Supplemental Listing of R-COLA Submittals through July 15, 2010

Page 3: Vogtle, Units 3 and 4, Combined License Application, Summary ... · Vogtle Electric Generating Plant Units 3 and 4 Combined License Application Summary Identification of Reference

U.S. Nuclear Regulatory CommissionND-10-1608Page 3 of 4

cc: Southern Nuclear Operating CompanyMr. J. H. Miller, Ill, President and CEO (w/o enclosure)Mr. J. A. Miller, Executive Vice President, Nuclear Development (w/o enclosure)Mr. J. T. Gasser, Executive Vice President, Nuclear Operations (w/o enclosure)Mr. D. H. Jones, Site Vice President, Vogtle 3 & 4 (w/o enclosure)Mr. T. E. Tynan, Vice President - Vogtle (w/o enclosure)Mr. M. K. Smith, Technical Support Director (w/o enclosure)Mr. D. M. Lloyd, Vogtle 3 & 4 Project Support Director (w/o enclosure)Mr. C. R. Pierce, AP1000 Licensing ManagerMr. M. J. Ajluni, Nuclear Licensing ManagerMr. T. C. Moorer, Manager, Environmental Affairs, Chemistry and Rad. ServicesMr. J. D. Williams, Vogtle 3 & 4 Site Support ManagerMr. J. T. Davis, Vogtle 3& 4 Site Licensing SupervisorMr. W. A. Sparkman, COL Project EngineerMs. A. G. Aughtman, Lead AP1 000 Licensing EngineerDocument Services RTYPE: AR01.1053File AR.01.02.06

Nuclear Regulatory CommissionMr. L. A. Reyes, Region II AdministratorMr. F. M. Akstulewicz, Deputy Director Div. of Safety Systems & Risk Assess. (w/o encl.)Mr. R. G. Joshi, Lead Project Manager of New ReactorsMs. T. E. Simms, Project Manager of New ReactorsMr. B. C. Anderson, Project Manager of New ReactorsMr. M. M. Comar, Project Manager of New ReactorsMs. S. Goetz, Project Manager of New ReactorsMr. J. M. Sebrosky, Project Manager of New ReactorsMr. D. C. Habib, Project Manager of New ReactorsMs. D. L. McGovern, Project Manager of New ReactorsMs. T. L. Spicher, Project Manager of New ReactorsMs. M. A. Sutton, Environmental Project ManagerMr. M. D. Notich, Environmental Project ManagerMr. L. M. Cain, Senior Resident Inspector of VEGP 1 & 2Mr. J. D. Fuller, Senior Resident Inspector of VEGP 3 & 4

Georgqia Power CompanyMr. T. W. Yelverton, Nuclear Development DirectorMs. A. N. Faulk, Nuclear Regulatory Affairs Manager

Oglethorpe Power CorporationMr. M. W. Price, Executive Vice President and Chief Operating OfficerMr. K. T. Haynes, Director of Contracts and Regulatory Oversight

Municipal Electric Authority of GeorgiaMr. J. E. Fuller, Senior Vice President, Chief Financial OfficerMr. S. M. Jackson, Vice President, Power Supply

Dalton UtilitiesMr. D. Cope, President and Chief Executive Officer

Page 4: Vogtle, Units 3 and 4, Combined License Application, Summary ... · Vogtle Electric Generating Plant Units 3 and 4 Combined License Application Summary Identification of Reference

U.S. Nuclear Regulatory CommissionND-10-1608Page 4 of 4

Bechtel Power CorporationMr. J. S. Prebula, Project Engineer (w/o enclosure)Mr. R. W. Prunty, Licensing Engineer

Tetra Tech NUS, Inc.Ms. K. K. Patterson, Project Manager

Shaw Stone & Webster, Inc.Mr. C. A. Fonseca, Vogtle Project Manager (w/o enclosure)Mr. J. M. Oddo, Licensing ManagerMr. D. C. Shutt, Licensing Engineer

Westinghouse Electric Company, LLCMr. S. D. Rupprecht, Vice President of Regulatory Affairs & Strategy (w/o enclosure)Mr. R. Buechel, Consortium Project Director Vogtle Units 3 & 4 (w/o enclosure)Mr. S. A. Bradley, Vogtle Project Licensing ManagerMr. M. A. Melton, Manager, Regulatory InterfacesMr. R. B. Sisk, Manager, AP1000 Licensing and Customer InterfaceMr. D. A. Lindgren, Principal Engineer, AP1 000 Licensing and Customer Interface

NuStart EnergyMr. R. J. GrumbirMr. E. R. GrantMr. P. S. HastingsMr. B. HirmanpourMr. N. HaggertyMs. K. N. Slays

Other NuStart Energy AssociatesMs. M. C. Kray, NuStartMr. S. P. Frantz, Morgan LewisMr. J. A. Bailey, TVAMs. A. L. Sterdis, TVAMr. M. Vidard, EDFMr. W. Maher, FP&LMr. K. Hughey, EntergyMr. N. T. Simms, Duke EnergyMr. G. A. Zinke, NuStart & EntergyMr. R. H. Kitchen, PGNMs. A. M. Monroe, SCE&GMr. T. Miller, DOE/PM

Page 5: Vogtle, Units 3 and 4, Combined License Application, Summary ... · Vogtle Electric Generating Plant Units 3 and 4 Combined License Application Summary Identification of Reference

Southern Nuclear Operating Company

ND-10-1608.

Enclosure

Supplemental Listing of R-COLA Submittals

through July 15, 2010

NOTE: The enclosed document is a five (5) page standalone table.

Page 6: Vogtle, Units 3 and 4, Combined License Application, Summary ... · Vogtle Electric Generating Plant Units 3 and 4 Combined License Application Summary Identification of Reference

ND- 10-1608 Enclosure8/23/2010 AP1000 R-COLA (VEGP) SUPPLEMENTAL EVALUATION of SUBMITTALS for STANDARD APPLICABILITY Page Iof 5

:.rnl a nrl.r...,, 1COAl I/•II I;t A I II'll Tnnlr II;,,klat't fl.#O C.,k..,l**t4 glflfl I* at I itin.-. en,.lfl.. l¢'•Iil a r DaIInia

3602 ~i~.3381' A MWiin'r iDifenrtial SettelirnfBitietin theNl and Other St dIttir&3/2/2010t41_ 045.i4 l>-i• -'Soten 32:05.04-S-'-4132 4645 CIBI- Squib valve surveillances 5/27/2010 056 I Standard 03.09.06-01•36•.Q-l "330•:'; Max(imn~ni*Differ'irtia~t~ e~t66fiWBbilclir-&1* 04-Cý ••:

3 4642 EMBl- Surge line monitoring test abstract 7/2/2010 057 Standard 403.12-02

49 4281 Control Room Habitability System - ALOHA and TOXDISP Methodologies 3/5/2010 048 Southern 06.04-3

,Req~ir~ni~s~f10 CfR s0.6switlCspt tornintenci f siteir do ffsit'e p r .",

ý15967-S1•system components 0 -," 4 S1-•'--'- - n th 08.02-02;VRi-, ,•,

I

4_13SL'/ý3992!'

4093

1596

Section 8.2.1.4 of the FSAR discusses maintenance, testing, and calibration practices that

SCTnfollows 4/28/2010 025 S1_4067

Southern

Suthndrd

_Staindard1525 1 5/6/

)8.02-07 VR

)8.02-14

)9.3.03l'3905.02-31211

4057

[4214I . 4034#s

5, **411;s Waste waterretention bvbl request to u

Offsite communication, - verbal reus toudthe SREPF4/15/2010ý 00 $2

1211 3/15/2010 005 S Southern

1 -748 -, Cori•tru t inh rkerd1748 lConstruction worker dose

P-11/29/201011/20/2009

17S11i fR Coristeictidn'WerkeI I 1/29/2010._ i

4147

3710

371

4043

40451

1751

3384

3682

3682

... .. 4140 . .....

Construction worker dose

Vehicle Search Process

Describe Cyber Security Team QualiIcations

Describe hoie.Critical Di~ltlAse'rnitfed - .

Describe how all cyber security cowntrols in R 5.71. Appendices 8 & C are addressed and

applied

IDo/.ljt~iiei /ohhntttiffi dufcei~ocumen~tation available for reviewipo<, jl,inspection ,;-AI ~ : ~ ~ '

Describe how Cyber Security Program will be maintained

PESB Diesel and Associated Secondary Power Supply Equipment RoomsLevel I -f D~III f•'psp fi

Security measures for ground level doorsrii., Ie• ht b f"ffstait •' iII rit If~l-ilal' i • d •dukie

Incorporation of 1994 VBS for Units 3 & 4 Protected Area

lihc&sofAtiii'bf 1994 V85f nt 54PBS ~ ~ ac c ,; > V

11/20/2009

-4/a28/20160V-5/21/2010

•3• S / 2 i72010 ';',•'•11/20/2009

i11/20/2009A5

11/2012009,

11/20/2009

3/5/2010

3/5/2010

3/5/2010

021 S1 Southern

021 $51 Southern029 s2•~•• ~'~r~~~~ h' I I

041152 Southern

041043 Standard

043 Standard

043 Standard

047 Southern

047 Southern

Southern

047 Southern

047 -Sothend04 tadr

12.03-12.04-1 VR1.2:03:12.64-2 RYlS12.03-12.04-2 VR13:10M3W- VR, :•

13.06-06 S1 VR

1306-21

13.06-23 21

13 .06-25

13 .06-2 7

13 .06-29

12:03'-104K1.VRa ?

>5,:"- ~

I~I~A.

HS l/41441111{ I

40... ,1- . . . .... "Z - . ....

i,•-5404 6 •

0404-713.06:30

33.06-314140,4 1401 IzolLulu ý!4414 FUse of Delay Fence 3/5/2010

4054

4157

421 4 , r d riiC t aI6 t- -6irply " ...t....06..- [.214 1 FFD During Construction Program - site-specific information

5 2010,13.06-343/5/2010

'FFD Program for Codstrijictidn'- Cciiforminc b 1'ie FA-1 4201 4 it 1lrs'121 ~~C io & -0iI

FF0 Program for Construction - Conformance between FSAR T13.4-201 and LIcensei4161 Conditions

-3/s/20i0z

6/22/2010

44664416_'2I

Deciibe h6wM6e irýiýWhtj 6f 10 CFR(73:58, SaeyS&Ority linterfa clill br ief'ii tDefensive Model - Location of CDAsDiflinsie Mbdlel -'ii ~a~iiiuitosbt nLe.vel 24id Ie~ l~-~lImplementation of security controls - use of "commensurate"CWb•iSeiklrij6tb 4i-jtc

55.i/14/2010Ai~049 SI Standard 13 35 1 . o

0519 St ...... ... 5anda rd 1306.06-051

051 .: •.T S~tandarcd __ 13 -3

051 S Standard , 113.06.06-0

051 Standard 13.0606-04

4/16/2010

44664/16/2010 1

'136/14/2010 '44081

3 '4086~

i 4153

l 40834- -

4085'l'4086

4153

4154'

4:089

4466 Defensive model criteria 1 4/16/2010

44166 Clarification ("address" vs. "apply_ _ _

/ <"- '4461'v"4"~Pro r~ijiii lil .'4'-4 5 t J1 Ž''3 ' f4466 Definition of CDA

4466 'Cyber Security Plan - Licensing Basis use for Scoping

4466 Support systemsy o _,0 __I____I

• ';•2{?{i4466 '•~ Cyher Sei~urity:PlianUse 'of Licensing Ba'sis for systems "associated with".SSEP functions>•

4466 Hardening ____________

4466 Cyber Security Plan - "Mitigation"

4716 CQVP - 1&3 plant only testing [C

"4/16/20106

4/16/2010

4/16/2010

4/16/2010

4/16/2010Q

6/14/2010

6/18/2010'

3/5/2010

051 $1 Standard

051 Standard051-" I Standard

051 S Standard

0ltandard05 S1 Standard

0512 -~ ~ '/4 ~ - ~StndarcP051 Standard

05151 '\ ~ -Standard_

051 Standard0S11l'l1s 445. . "4 .. Standard

051 Si1 Standard6.5.1Standard -

058 Standardo- '.iýs Rtaniddard.--'

047 Standard

13.06.06-06

13.06.06:07 '

13.06.06-0813,06.61

13.06.06-1215 .06 .06-13''13.06 .061-1

13 06 0614''s

14.02-01

14.03.12-01

.1.545 -

'4"

'4• 4ý1411

iiCQVPi7SUT Llten Cond diti6os •l4'4 -'4

EPhysical Security ITAAC - Cross-reference with SRP 14.3.12 Ap p. A and APl1000 OCD

Page 7: Vogtle, Units 3 and 4, Combined License Application, Summary ... · Vogtle Electric Generating Plant Units 3 and 4 Combined License Application Summary Identification of Reference

ND- 10-1608 Enclosure8/23/2010 AP10O0 R-COLA (VEGP) SUPPLEMENTAL EVALUATION of SUBMITTALS for STANDARD APPUCABILITY Page 2of5

•n AI I•* •----Z. IC,.L:--• T tZ~L* -}

IERAI/U| # I.AI/4 I pnc/Su ectnw e I IwI/ Ltr # U O c aFIC 4AI/-" # S flO OdW U

3765

3766_ý3767/ýf

4002

3769-

L 414_1...

J. 34_09 ......

3409

340934t! >-

31409

Phissical Security ITAAC"'Conf6r-mance'W~ith SRP,14.3.12 Draf Revisi bni',/., i/k~/11/201, J 1'7S2 45 /tPhysical Security ITAAC - Cross-reference between SRP 14.3.12 App. A and DCD 3/5/2010 047

Phi~iicil Sc6irit ITA. ~s~f tae/R1..2ad DCD`ITAAC ~ 2-4 3/5/2010,~1,4'General - Site drawing/map showing areas referenced in response 10/29/2009 042

D'••>rfsfi;a~te<Ad at~iSeisri~i/M4~i•'n M ••" 4 2 ;:.•.','•, '4510/36/2069'4 4 0

General - Descriptions of staging areas and equipment locations in procedures 10/29/2009 042

Genltoe !untions 10/29/2009 042 $2

General - Cooling tower basin functions 12/23/2009 1042SGe era isetifv7Alteenate Witer Sources -~j-sn~- 10/29/20095 ,4 ~1, 2.

4 2Standard 14.03.12-01'S2Tl2

,Sitandard 14.03.12-02

*,/ 3jtainiard.s 14ý03.12-03

Southern•' ' '• ;

19-010

Standard 19-011

19-0 12'•nHfhPrn ]1•-n1•~~4-n24~ outer 119-012 ~.t~t-Q•#-

•t

General - Capability of FPS to Meet Competing 1 10/29/2009 042

General -Enaluation of stiratgies -idJroce~dures in relation to safety and secuntv. LA5/2

Standard 19-014

7--,. .4- ,-di 1-1

042 S24003ýk771-5-

40)26772

3409

i40-55-3409q'

General - Evaluation of strateeies and Drocedures in relation to safety and security 12/23/2009 Standard 19-015Shiitdo M~de C~iceiiiýý ,Shutdown Mode Considerations

151,11/13/2009s~~~~s0~~I042 S15ý1'f51// 5441s5~1 4Staindard,4'_ 1s-19-016u~Z-ns2/5/2010 04253 Standard 119-016 VR

St-Sandard2 119 -017 'I-. -

4004

_u37 IF

3774

3777

37793

4006l

4007

3793

3794-

1240097-

3409 ILabeling/Tagging LOLA Equipment 12/23/2009 042$2 S Standard 19-017

- ~3409•> Discussion of SimpleS i•Modific~a~t ionsto• I~l5 rnt /Failifatn tCOLA" St/a t ins 1 4 .~ 11/13/2009"_4Ij 042 511 51#1.Staindaid2 5252 19 018-hA

3409 COLA Markup to Depict Design Features of Mitigation Strategies 11/13/2009 042 11 Standard 19-019

niCom tmenttoiWalkThrough Procedures and Train Responsible lndivdualsA,5, 14,12 •''10/29/2009251 04- -Stancda•id -4, 19-020 LA3409 Assurance that Critical SSCs will Survive LOLA Event _ 10/29/2009 042 Standard 19-021

30 -Asuran ce thiatCritii46 SSCs Will Si-; T LLDi 12/23/2009; '15 ý141~10 Standard,-.512 9- 2473409 Differentiate Between "Commitments" and "Strategies" in the MST 10/29/2009 0421- Standard 19-022

'J4O ý251yr Protati~tn hRing Hna1r.F'dii 4~444~i4221-. f Li 1_- -. - . S1 15 -1- 224~<Standard411-4 190253409 Communication Enhancements for Robust Buildings 10/29/2009 042 Standard 19-024

- .- 30952. Spir'atid15afF i/e5Wait eP41~s151541511! •41'155144114155454412212 :12i11/13/2009 - 04 i -2'--2' ~ t~ad2 19-025"•-1

3409 Separation of Fire Water Pumps 12/23/2009 19-0211130/74. __ VnsaEtra i 454 4 22214 11/13/2009 2g 2 oS

3409 Clarify if FPS Isolation Valves are External PIVs 12/23/2009 04212 Standard 19-026•;4•34097!.?'15 Pumnp redundancy clarifications re:b cotcn osadpy ahoust/P '3'•1 '215; t--!111100•, .... - -I--!., .. ..... , 55 >....... , ... a .. • -, -.9:27

3409 yire Water Storage Tank Refill Capabilities 11/13/2009 042 51 _____._____ Standard 19-029

3409 Fire Protection System Management 10/29/20094042 .

3409 SFP Makeup from Cusk Washdown Pit 11/13/2009 I042 I1

3409 5FP Makeup Through the PCCS 11/13/2009 ,042 51 Stndard 19-033

3409 SFP Makeup from Fire Ring Header or Yard Hydrants 11/13/2009 0421 $ Standard 19-034

30 PWR Design Considerations for Site Response Strategies 10/29/2009 l042 __...Sadr 19-037

3409 CLficti1R" ega..ingPha,3.Mitigtietrategie--. tandard

3409 Clarifications Regarding Phase 3 Mitigative Strategies 12/23/2009 042 12 Standard- --- 49- Portable Spray Clarificatio5ns L.•;; !!*, !:.-•:'2- ;- x:. 12725 4-/422- -22,2/I-'n7-/ 4! 1542 1113209 045 .' 11. Sta4alcid4224;" 25 19-03914/11

3409 Portable Spray Clarifications 12/23/2009 042 Standard 19-0391492 Additicinal Ditails i 'RSMkeU2 s22212- /442','47,41Standard 5-C3/320912' , 1.-- -2--.2- 4tudrd11' 90042.

3409 Additional Details Re: Safety Injection 131/13/2009 042,51 ." Standard 19-041

•3409 -,z AcditioialbDkail15 R'i11/O3/a20He0t Reno1val'2-. --IStandard 19'042 -

3409 Additional Details Re: Containment Cooling 11/13/2009 0421 Standard 19-043

ti3409 - l FAdditona Detais Re: Contasnmenst l onlat.&i4

I4 1 / /li- -tin , 111/0 44,5042S1,3409 Additional Details Re: Containment Isolation 2/1/2010 042S$3 • Standard 19-044 VR

MSPae;Ite 12yire Fihtn R/p ye-t't~IFireBrigadeý Ta/get anid Staginig7124 -14' ' ., " 15 ,s.

______ .' 74 --- ~ - 42K45~41f 114411,2- Southern- 1519-04514.

- 25-154'.': 15------.--.--

7241

'-2-15~

- 4141~I- 15.1

2.4124215:4/':

-7-15255155-2'25

471 1441I- 2421254

24254-

................ •F ............. ..... - -.....

2- -~

Sly ~.4:'A454-

- 25- s'~~ "'in-~ ,22154-'---5-154----'257-5-, - ,----.'.,;'.-s -.15-'- - - - - . -.. . -. 5,-5~.5----..5-2---4-15--515-2'z

MT, Phase 1, Item 1 Fire Fighting Response Strategy Fire Brigade Target and Staging

4012 3409 Areas 12/23/2009l15ins~v4-5451 .~ - 45 15 4'22 5 ,-5au-5 .45 ~

254.4515 n5-45555 --- u' .5-5 -'4 s--'444--55-4~-~-3801~.5~- 25. 2~934Q910 ins.5 MST, -5'-'~5-~ Brinade Reoort Locntidr 415115 2~7210/29/20O9-'-

042S254126t2~ 2417722-21225.

Southern 19-045

-5122So1,t he;r-4119:-046 'sy-l2-7412'2/ s 54

4013

__401.4.

30 IT, Phase 1, Item 1- Fire Fighting Response Strategy- Fire Brigade Report LocationsMSTlePhase 1, tel 2 g p St1 g P edural R ýq ul "m-12es f ., Fi r

MST, Phase 1, Item 2- Fire Fighting Response Strategy - Procedural Requirements for Fire

3409 Brigade Dispersal

12/23/2009

,2'10/29/2009i-3-042S

Southern

t•32.5•So ut h er n152-5l1

19-046

-5- "4<s 41 5~25242,2

+ -.- -- + - - -- +

12/23/2009 j042 S2 Southern 19-047

Page 8: Vogtle, Units 3 and 4, Combined License Application, Summary ... · Vogtle Electric Generating Plant Units 3 and 4 Combined License Application Summary Identification of Reference

ND-10-1608 Enclosure8/23/2010 AP1000 R-COLA (VEGP) SUPPLEMENTAL EVALUATION of SUBMITTALS for STANDARD APPUCABILTY Page 3 of 5

RAI/Ol DID ERAI/Ol 8 RAI/Ol Topic/Subject Date Submitted RAI/Ol Ltr 1 Utility Specific Offlclal NRC RAI/OI # S-COLA Endorsement

MST, Phase 1, Item 4 - Fire Fighting Response Strategy - Technical Direction to Offsite

3804 3409 Responders 10/29/2009 042 -Sothern • 19-049

MSTi, Phase 1, Item 5S-yire Fighti4i Repos Statg - Ageeen fo use of:~~- ~ ~5-411 gan Iizations with Sp'ecifi'cknowledg'e -or Abilities Ifor LOLA Re Osp ~~ -'~12 o-102/20y7s ,l 2 l~~ e12i~ QSahr-~•/ l:S ~

MST, Phase 1, Item 6 - Fire Fighting Response Strategy - Identification and Acquisition of

3806 3409 Equipment Needed to Fight Large Fires 10/29/2009 042 Southern 19-051

~~ MS~~T, Phase 1, Item,7i -ir Fir'ghting -sponseirategy-!A-pmpropate L6ct, nfr~e~ Ifs'' ITZ~-~-'~'- 15 ~~o~~

--~~38o7; ~ ~ 1Staging On-Site Fr iltriquento ~ i t -• 5;o 02/09i~7 2 ~ ~ 4~ 1 ~ ~ ~~t~'l-5 {~~~MST, Phase 1, Item 8 - Fire Fighting Response Strategy - Coordination with Local Fire

3909 3409 Departments and Other Regional Fire Fighting Aid 10/29/2009 042 Southern 19-053MTPhase 1, Item 9 - Fi~lFightingRýri I I I~- I- r D<r

MST, Phase 1, Item 10- Fire Fighting Response Strategy - Communication Enhancements

3810 3409 Related to Radios 10/29/2009 042 Southern 19-55

4,1 a ae- f T Iusparse Strat1i10/29/2009 01-

MST, Phase 1, Item 11 - Fire Fighting Response Strategy - Triage Areas for Treatment of4015 3409 Mass Casualties ___________ _________________ 12/23/2009 042 S2 Southern 19-056___________

~41~y812 ~~-~2 340A~n- MST, P~hase 1;Itemi 12 5Fir Fghtiimg Response Strategy-7 Pant ersonne _______Areasus•uz-!~,z-*~',~~o, 907~;',-:_________

4016 3409 MST, Phase 1, item 12 - Fire Fighting Response Strategy - Plant Personnel Assemly Areas 12/23/2009 04232 Southern 19-057.•.3813•£2•,.3:409•'•A - MsT,Pse1 its~~tem 13 •Fir•Fighti• Re iiS~t••• Fi~e9Bgig•d•Triningi21 :• i ls1029/00• 042i=• • '-• • ; ..... • •: f 1Sotherri - 9•S8 •%ti5 , -................. .... .

3914 j 3409 Protocols and Procedures to Mobilize Additional Organizations-10/29/2009 042 Southern 19-059_

3816 3409 Anti-Radiation Shields/Blankets for Fire Fighters,'10/29/2009 042 Southern 19-061

T A•ctonsýfo•in, Ni Relui it, P1 1 iteim 3o,, Fat it• n 1PRA•sed 1 •n 1 /I

M a , Itd perations to Mitigate Fuel Damage - Pm-Defined Positioning

3918 3409 and Dispersal of Personnel ,_ 10/29/2009 042 Southern 19-063

• 4P,• --,349017 0 •'i/2/209 042.2. -S2- / 4 ,•7it!outh~erni- 4/' 19-063 -• i' !•

4 MST, Phase 1, Item 2 - Plant Operations to Mitigate Fuel Damage - Communications

3819 3409 Capahilities 10/29/_2009 Southern _. 19-64 .. ....... ... .. . ...........

4~ 11 9~~

3820

i 4 O 2 8 •

3409

MSTPhase 1,ltemi 2PanpeaintMtgt FlDarag

MST, Phase 1, Item 8 - Plant Operations to Mitigate Fuel Damage - Plant Area

Compartmentalization

MýT, Phase 1; item 8 Pln Oeai- i to Mitge Fue I Da ,II FI ,,>'L ;t'f,.Compartmentahization i tI- 2:"u:•::, .t -

MST, Phase 1, Item 6 - Plant Operations to Mitigate Fuel Damage - Equipment

tequirements Related to LOLA Compensatory Functions

MST Phase 1 Item 7 Plant Operations to Mitigate Fuel Damoage iMitigation EquipmentRlenqurem~ents Reluteil to loss of Roth AC andl DCPwe.--. , ;;:-•:•,5.

K-12/23/2009~rtj~ __042_s2_,________H,

38221 _ 3409

~Ž~1-Southern'4~2' 19-064.

11/•13/2009 [0_42 51 Standa

S 11/13/2009 0 42S 51tadsi •-. 0-1 -

[• 11/13/2009 •042 51 :t Standa

•rd

rd

•rd

19-06S

19-068

ReclUir6rhents Related tu'Ld's'sýori BoihAC art Po.er

3823 3409

i3382o _________09

4029

3823826

4030

3830,r. 4019 li

3831

4020

2.,•3833ro

3409

3409

-3409" -

3409

3409

3409

• ;3409-•

MST, Phase 1, Item 9 - Plant Operations to Mitigate Fuel Damage - Equipment Sur

in Plant Areas Affected by Fire or Explosion

MST, Phase 1, Item 13 Pla•nto•eraitin MigateF l D' I, 5FF- I Loss of ln

and Spaent-Fuel Loading Patterns #&MST, Phase 1, Item 13 - Plant Operations to Mitigate Fuel Damage -SFP Loss of In•

and Spent Fuel Loading Patterns

MST, Phase 1, Item 14 - Plant Operations to Mitigate Fuel Da1, j& Tr~li~fEResponse Orgamzuation (ERO) Personnel and Potential lesfode

MST, Phase 2, Item 4- Onsite Resources to Reduce or Stop SFP Leakage

SFP Fuel Rack Dsii•m-ronp ernents4- ' 0 2I il-,yts

SFP Fuel Rack Design Improvements

Plans fo'ip6iktLOLA' Resfoarati6ri of c o•ilnUicati

Command and Control Structure if Control Staffis Substantially Affected

mmand o Control Struct6 i el ConI Stais d i t IIAffg1td, 2Offsite Notifications and ERO Callout if Control Room is Lost

Fnitial DI mage Assessmentl ha EeO 4 -_ii -(X 'Initial Damage Assessment byERO

MVST,' Phase 3, Item 1 -8cunrid jC6ffditicins 1`6 D1 616si~iii1F&EDMQs -

MST, Phase 3, Item 8 - Use of Portable Sprays to Provide Additional Capahilities to

Fission Product Release and Charge the FPS Fire Header

2/5/2010 042 SO

10/29/2009 _______

10/29/2009 042Stanar

Stanar

19-069 VRI

1I9-071

-- --- -' -- ~i - -- -

i4- 10/29/2009fi04S.1 ,-19-7 •" I >. ...... •, ... ......... • ........

19-072 Vr-I -'----

I. , 7I d -s

10/29/20(9 '12

1.0/29/2009 042-12/23/2009 i042 S2

1 1/13/2009 14 2s1

Standard110-111lStandard i4~2~

StandardIIll11lStandardŽ 11114

Standard

19-078

19-077

19-079

............. .I

3834 1 3409 Standard

Page 9: Vogtle, Units 3 and 4, Combined License Application, Summary ... · Vogtle Electric Generating Plant Units 3 and 4 Combined License Application Summary Identification of Reference

ND- 10-1608 Enclosure8/23/2010 AP1000 RCOLA (VEGP) SUPPLEMENTAL EVALUATION of SUBMITTALS for STANDARD APPUCABILITY Page 4 of S

RAI/OI ERAIl AI/O Topc/Subject Date Submitted RAI/Ol Ltr Utlity Specific Official NRC RAI/Ol # S-COLA Endorsement

'.'i4021v - _,[r.n"3409 •.y i si Release and Curge he ire. eader ,.,-•.VJk .2 3209-045

19-81: Clearly define Phase 2 pathways for Internal makeup, external makeup, and

4062 4459 external spray strategies _ 5/5/2010 052 Standard 19-081.larify4the respone t9 RAI 19.91re. Defining the . ..as. .2p.or.. "I I . '

Ii11 4 External Makeup, and External Spray strategies2 24 _ __ 1 - '021 2 >W. -91 l1-Sunar 4 :ý 1 -08144 19 82 Assure that power supplies for equipment needed for Phase 2 are "diverse" 5/5/2010 - 52 Standard 19-082

41 s' 119 83: Describe personnell'actions needed to makeup to o p/ Qh p~ent Fuel Pool. ~ ~-4 9~~3' yŽ1i 4~

406+- -'5- 4459 19-84: Provide Phase 2 injection and spray flow path flow rates 5/5/2010 0 52 1 Standard __ 19-084 __________

4 74459 19 4- e p t h e t r i . 5 22 Standard_

4067 4459 19 -86: State the applicant will have a means to secure flexible hoses5/200 52Sadr 1986_______________i-7~~9, ~ ~~ ~ s59 19-87, Addrelss "" ' 4v-. -, >'-K-

~9:4068: ~419 ara fte pla ntm9 ~ ~ 1.Sadr~________

4069

4 (14 - 1'j~

4459 19-88: List additional site-specific Spent Fuel Pool strategies•19}89'Address how~ensginee'ring basI forF10 CfR SO 54(hh)(2) is to edocumented andbf.I

119-90: Confirm that plant will have adequate length and diameter hose to perform certain

5/5/2010 1052N44-44>51S201994- 05•-4-N -'-4;

Standard 19-088'444 I4~

4'~'4~- -C- -~ -4~ 94v" "1->4iŽ94South&i..19~0892A-4x~/U

- 4071

4144

4074

4077

4105

4109

4149

"4112

4459 strategies

~Clarifications in: Updated Mitigative Strategies Table to differentiate between

441 omitments and strategies .. . .

S1•9-92: idanc o• • h chood Whichof the Phase 2 external strategis to

4459 119-93: Spatial separation of Spent Fuel Pool headers

,I '4S~- Clirific'dtiotse ' Spati~l S'ejpirki&Wof SpentF el Pool SPaI Headers.s5 9'$4 ,4459 I19-96: Describe the normal makeup flow path to the Spent Fuel Pool

41 14543 +imlrlmenitatlon if programs related 1010 CfiRrSOCp 4(hhj(2) and 1O CFR:52.80(d).'

4543 Provide a draft commitment to follow NEI 99-04, Rev. 0.

1' ý I3 r i5'iescuss mai-nitieraie p~rojranm a'nd controls fo~~5i uiýnt'credited under (hh)()Supplement 1 to RAI 19-40 - Address spatial separation of CVS and CMTs inside or outside

44 11 ontainment used to provide RCS makeup

++'7-7 e .4SupplementJi toRAlIl19-41 - Address commonequipment'and spatial separation Issues fOr.

-J i,-4543 > safety i Iksety vfunct'on'.. -

4.3 4 ... Ientify iispatial separation criteria for key safet functons •

Sipp!errent 2 to RAI 19-44- ClarifictiOf 5de6te sljatlal Sif ti '1 of dc power 1 f"":•:;•453" • •.;cntainment•+ "i •solation' % ''! ••= •• - •+ +" + . +••• • ••, •,

454- - -- "--'ue u o e the-core.Supplement 1 to RAI 19-67 - Develo rcdrst tr DG without dc powe Ian

454 - discuss capabilityvof use of a IumoerIIIckto ifiectoth core.

5/5/2010 352 +_ LStandard1"44ffty++• :- :994594.9t19'9 19-090 _______

9i3~<'4441-4.1 :19 091

F ___________________

419.091 51 VR-~ ,1'• --44~.~4i9i.4.-A'

tq-rt92 4.4"::"02 S1

•4 4 '~ ':9

5/5/2010 052 Standard 919-093

I ý /2 2''1,100 2 14 ',35 %5/5/2010 052

5/24/2010

5/24/2010

6/4/2010

054

54

354

54 S

5S/24/2010

c 5/24/2010

Standard -19- 94

-95 0... . .. ......

1 190954:'">4/9

Standard 19-902

I Sothr BLN 060-0

Standard 19L- 095N-09 I R2

Sta 1 0 /a

Standard 110

- ~44-9394;-51~' 9~~9445

154--- + ..... __ • , 4.

4097t,-, 413654

40O9679'4035f4

409492944023

4213

">-' i iSpplement 1ito RAI 19-2 2oModify comtmn -xinclde an enlnering evlato or'X 4543• - emonstration that hoses and-electrical equipment can bedhooked u as I I

4337 CB1 -Coatings ____ _ I6/_I,_I172010

68. ..CQVP. .....AP... ....... ... . .. ..... ... .. .. 4/2aT /2 ~010 --">349- R 13 C6EcetdnCnltii• > - 49 +, 914 9 9'-i7"14 4-1821049

35494949495>4 >4 495

7{;

9-: 947~94<'

44-4 -

r-+-- - .sEGP-VOL-Ch06 re BLN-170

/EOP- L-Ch06 re BLN-169LEqPVL- CLýhl7 9.VEGP-VOL-Chl7COL-SER-lR0-Ch0 Ci

994091,49

3950

39521

3ý955

1ýummarlze Nlkclarification IoLor3crr lnepcain rmJnay1,Zla meeting. ..... . ........... 1/22/2010 111

5- -256> 9 arrts'30/40l7 149974~- 'k5 99494 c -'99 3 /9/2 01099 ' r CCl 0L ý.ClR09h01S 49:l945569 Pipe rupture analyses 3/18/2010 COL-SER-01-Ch03 S4

4/mi. 5699 3194. /'IPi 4 <4/23/2010'1949-' COL-SER9Oi'CO3 56-

110 Valve testing 3/1/2010 COL-SER-0I-ChO3 S3

110 I Valve testing 3/1/2010 . COL-SER-0O-Ch03 S3

tI 4/94-'ni4ii4hi -4 - /14/2010,44/ COL 7SER5OI

2C1,03 S7, '

110 Valve testing - 12/14/2009 COL-SER-0!-ChO3

S110' ...... l testing .9-9- 11/12010 1 C(OL-SER-0O-Ch03 St

11 Vlive testing _____ 1//21 COL-SER-0l-ChO3 S1'94519I 11- I ~ilat-eclTechb Sbc'14'..15 -7444 4-9'$45"'979v. 945 .9,,1/14/20(95I COL-SER-'01-Ch(03 49 415, ii9

653 "ieismiic a nd dynamic qlualification 2/5/2010 COL-SER-0l-ChO3 S2

Standard

rd 0103.06-01-944Ii5'Sa'nard->'"9-jol03.06-01/V'Wi-"r'l1-

tandard

91494rtndard 9Southern

Standard

, 12l2 _300 VR,.594

01I 03.09-03VF

'01 03.09-04

101 03.09:4 R9' :99

01 03.09-05_____

DlO 03.10-01

1949417155-9919944':

Page 10: Vogtle, Units 3 and 4, Combined License Application, Summary ... · Vogtle Electric Generating Plant Units 3 and 4 Combined License Application Summary Identification of Reference

ND-10-1608 Enclosure812312010 AP1000 R-COLA (VEGP) SUPPLEMENTAL EVALUATION of SUBMIrTALS for STANDARD APPUCABIUTY Page 5 of 5

RAI/Ol lOll EtRAI/Ol # RAI/Ol Topic/Subject Date Submitted RAI/Ol Ltr If Utlity Specific Official NRC RAI/Ol If S-COLA Endorsement409 63 `iA't SeismIl and'dyndrnic ~iifici toil.j ~ i~A 4/2/N010~~S COLýSER-ý0iti03 IS-0R i.~Z~~~ standard Cl~i 01 ý01- - .v..

39-92-9 t i 12/30/2009 COL-SER-OI-Ch09 Standard 01 09.01-01394O276 i8-329~ Metari ini,,itoring progra~m 4 L /321~1CLIR0-C0SA ~ ~ i~1 tandad 10.0-1j $..; t1

3977 290 LLHS inspection implementation 12/30/2009 COL-SER-OI-ChO9 Standard 0109.01-02~ii~97 ~ .-~21~~ J: 0LHSWfr` im~plement~t&,~>~ .1. lI- I 12/3/200 C0 t-0l-,Ch099 1>i 01~~Sard ~ O 09.01-O0 s~~$1

3979-- 291 0LHS inipection- implementation .. . .. _--...... . .... .._12/30/2009 tC.OL-SER-0-ChO9 IStndard 01 09.01-04

3961 3951 Calorimetric uncertainty COL item 1/22/2010 COL-SER-Oi-Ch15 Standard 1 15,00-01

40ý Caýi epjd.~"-f~/121~ COL-SER Ol'Ch15 5EL ~ standirid~-L 01 is.00-01i33 - 3952 GL8S-OS 1/22/2010 COL-SER-8I-Ch5S Standard 01 15.04-01

403920 ' # 1450 v, I setpomint m30ethodology and Proram17 CO0LSER:01-Chi6 SJ_ • $ Standardn : 0I 16A01-01k "• "4092 ! 1450 TI- setpoint methodology and program 5/21/2010 COL-SER-0l-Ch16 12 Standard 01 16.01-01 _____________

392 1vl 14,S s~3922- 066 17.1-05

•! 0066 i7.5-06- -;

3926 I 013717.5-14

416 . ..4940

41O2. I41637

4101 4. 43

RA- NEf 06-14 - Regulation citation

QN N El 06:f-1421RC peirANSl N18.7s2-aA- NEl 06-14 - ID licensee

iAi Nti6-14 -CGcalibra-OA- NEI 06-14 - CG dedication

Wvaterproofing

Service Lenel II Coatings

Ser-Ii lale If CaIri' L_SPCV - Setpoint calculation

SPCV.Systysii Reqired for Safe S

SPCV - Systems Required for Safe Ihutdomn

I BRof EP -47Revise Table 13.04-201 to identifymilestone for CSP as Prior to receipt of fuel onsite

(Protected Area)"

Cybgir.Secaurity PlanrIenision torG SI7mih itis ..

BR of PSP

Correct frequency for cyber security assessments from bi-annual to at least every 24

months

EdiI r iatio Tabexistine fronp

:1231,20094,I COL2-ItR-0Fh17! 1 A 22iI Standaird} I0 -171-1 s1 -12/31/2009

12/31/2009

12/31/2009

7/1/2010

7/1/2010

COL-SER-OI-Ch17 51:CoE-SER•0:C ZH17 $i

COL-SER-OI-Ch17 S1

COL-SIR-0O-Ch17 51

VEGP-VOL-Ch02 re waterproofing

VEGP-VOL-ChO6 CoatingsvEcP-vI-oChO6 Cnr tiit si

Standard4A TStancldard -

Standard

Standard

Standard

Standard-

01 17.05-01

01 17.05-0301 17.05-04• ••i!

01 17.05-05 ____

VEGP 02.01 VRVEGP 033 VR

VEGP 06.01 VR

242<.-........ -, - -, .... • .......5/24/2010

I , I III VEOP 06.01 VR2- -

61/4/010" SIEGP-VOL-Ch07 Standard VEiP 07.01 VR___ ___ __ ___ - - - - - . -.-

"-.: 41009>4160

4219

,74139

,; 64/2010 ]I

4466

7/6/2010

4/16/2010

•:•' •!2/19/2010 <41

VEGP-VOL-CliO7

VEGP-VOL-Ch07 51

VEGP-VOLC-hh133 _

0510

V/EGP-VOL-Chl3

VEGP-VOL-Ch 18TIC -:•:• •• ::

•,<•; :Standard4 VEGP 07.01 VRKi.9.° <41 lr s •, •.Standard VEGP 07.05 VR

1 ' VEGP 13.03.f ýE

Standard

Standard<k ySo~jtlir 9 4 -

VEGP 13.04VEGPR13061VR5,VEiOP 13.06 VIRV1EGP 198 PR~42

- 7-. -

4219 4466

4221 4466

-4222- ls 453L1~

4/16/2010 051 standard IVEGP CiPi j

--- I.

Revise Proposed License Condition S to include the Cyber Security Plan

Clarify thnmsmum thickness of concrete between spent fuel pool and outside mall .,s .•, 34

Clarify which spray headers are supplied by the independently-powered portable pump

Revise MIT Section 7.0 to clarify the sus wtin bis Ie, dapagei asociated with soaiepn

Revise MI T Setion 7.89to clarify the desig bais reil caaiyoIh fir maeI trg

4/16/2010

7•I< 5/24/2010 IL

051 ~ sun n5~~ 3tvs31~. Standard VEP LC#5

1~~ 41-

9-~ ..~42'I2 .22-1*. 1

S4223 4543

IL 4543 42-'

5/24/2010 054 Standard VEP LOLA2

Ill.. I taks ________________ /4210 054 Standard VEOP 1OA

4-217 iLWA SUppotn ER Inf 3/121 IP-OL-Ptil, Sot r P

Notes j.- 3 ' _240612 Thi 1epne~naie bot Ttnd? adlatjcic'itent. T he 1ed to , 1 1 deiitem 9.8 i~the site imntrf2stbei TNA04.222 2 412Zs2 T <: .-- un -- -IL -9 i'4 -

3625/ 3529 Corcto to20 -1-0lsig The * Nte atace to RA/ 1 362 ma acual aP Note fo r RAI/Ol I1D# 352.Temoimshulhaerd365ndS29. -____________________ _____________