[Transportation] 11.12. enkh, shatar (ulaanbaatar)
-
Upload
shrdcinfo -
Category
Government & Nonprofit
-
view
122 -
download
2
description
Transcript of [Transportation] 11.12. enkh, shatar (ulaanbaatar)
Urban Transportation Policy Program
INCEPTION REPORT
Transport Department of the Capital city
Senior specialist Mr. E.BAYARTSpecialist Mrs. SH.OYUMAA
2014.04.16
Ulaanbaatar city
Current situation of public transport 1
2
Urban transport projects
3
Main problems of public transport
4
CONTENTS
Long term plan of UB City Public Transport
Outline of Ulaanbaatar City Established in : 1639
Population : 1.2 million
Density : 229 persons/km2
Area : 4,704.4 km2
Current situation and problems of public transport in Ulaanbaatar city
Urban public transport service provider
organizations integrate and improve the
capacity of firms by enlarging and fewer small
bus strategy.
Current situation of public transportation in Ulaanbaatar city
Ulaanbaatar city public transportation service starts at 06:30 AM to 22:30 PM along through approved routes and schedules.
2009 2010 2011 2012 20130
10
20
30
40
50
60
70
80
52 5460
66 6667
53
44 4650
1319 19 20 18
The number of public transport routes
Main routes Assisting routes /microbus/
Suburban routes
The number of public transport routes
2009 2010 2011 2012 20130
500
1000
1500
2000
2500
3000
3500
947 893 943 1020 1048
51 47 47 58 66
17091235 970 968 885
511
566658 734 649
Number of vehicles in public transport
Taxi
Microbus
Trolleybus
Bus
Urban public transport service provider organizations integrate and improve the capacity of
firms by enlarging and fewer small bus strategy.
Current situation of public transportation in Ulaanbaatar city
Vehicle types in Ulaanbaatar
Trolley Medium capacity buses Small capacity buses TaxiHigh capacity buses
2004 2005 2006 2007 2008 2009 2010 2011 2012 2013
0
50
100
150
200
250
300
152.3 153.2 154.4156.2 193 199
220.7 234.7 236 262.8
Passenger of public transport (million people)
Passengers
БҮРТГЭЛ ХЯНАЛТЫН СТАНЦУУДЫН БАЙРШИЛ
CONTROL SYSTEM OF PUBLIC TRANSPORT BUSES
Commissioned in 2002, the accounting control system consists of the following sections.
• MT -150 (mini transmitter) – in the all bus
• Registration stations - 51
• High power transmission station-2
• Central system and servers , software…
Controlling systemRunning smoothly is very low
Data of public transportation№ Data Value
2 Number of motor vehicles /Ulaanbaatar city/ 375 000
3Number of motor vehicles /Public transport/
Bus 1048Trolleybus 66Microbus 885Taxi 649total 2648
4 Roads length /asphalts/ 427 km
5 Public transportation routes length 4414 km
6 Average route length 31.08 km
7 No. of bus station 596
8
Public transport fare
Bus 1 passenger – 500 ₮= 0.28 $
9 Trolleybus 1 passenger – 300 ₮= 0.17 $
10 Microbus 1 passenger – 500 ₮= 0.28 $
11 Taxi 1 km – 700 ₮= 0.4 $
12 Passengers262,8 million.persons
/2013 year/
13 Passengers in a day 720.000
14Highway, subway
None
Average Daily Passenger Volume of Peace Avenue (SL-4) West-East
-1,0002,0003,0004,0005,0006,0007,0008,0009,000
10,000
6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 1 2 3 4 5
Hour
Pas
seng
er
Cars Micro bus Small Bus Large Bus Small Rigid Truck
Average Daily Traffic Volume of Peace Avenue (West-East)
-
200
400
600
800
1,000
1,200
1,400
1,600
1,800
2,000
6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 1 2 3 4 5
Hour
Uni
t
Cars Micro bus Small Bus Large Bus Light Truck
Тээврийн хэрэгслийн нягтрал Public transport Private car
Number of vehicles 2 % 98%
Passengers 60% 35%
Current situation of public transportation in Ulaanbaatar city
Source of ADB
Main problems of public transport in Ulaanbaatar city
Main problems of public transport in Ulaanbaatar city
• Mechanical growth of the population, Traffic congestion;• Usage of private vehicle is at rise; accessibility and availability of car park is reduced • The public transportation policies didn’t have strong linkage to Urban planning;• Public transport is facing lack of proper Information and technology and banking/
financial systems;• Low ticket price and insufficient compensation of Government for elderly and disabled,
including students and elementary school pupils• Level of Road safety conditions are worsening;• Re-novation of the vehicle fleet, machinery and equipment not done in recent years;• Traffic management capacity is weak;• High rate of traffic accident
– Low enforcement of traffic regulation by the pedestrians and vehicles – High rate of traffic accident – Regular road maintenance, especially in winter time
• And the transport infrastructure and facilities are not developed well etc.
• Implementation Phasing (2015, 2025, 2030, 2045)
Source of ADB
Long term plan of Ulaanbaatar City Public Transport
Planning for the special route buses relating with Master Plan of Development of Ulaanbaatar city until 2030.
Long term plan of Ulaanbaatar City Public Transport
• In short term:Introduction of Bus Information System/BIS, Bus Management System/BMS and E-ticketing systems, to re-organize and plan the public transport service routes,to build up the public transport fleet with more of newer units, to reduce the emission caused by transport vehicles, to formulate and implement the capital city’s public transport development program;
• Mid term: To introduce the Bus Rapid Transport /BRT/, to create the legal basis to introduce the Metro service, to modernize the payment collection system of public transport, to construct public transport service terminals, to develop logistics system for cargo and passenger transports, to install CCTV control devices on public transport terminals for the non-stop surveillance for safety, to prepare professional staff;
• Long term: To introduce the Metro service in Ulaanbaatar city and to convert all of the public transport fleet engines that would be consuming natural gas.
Public transport in the near and medium-and long-term scheduled tasks ...
THE CURRENT PUBLIC TRANSPORT NETWORK
16
PUBLIC TRANSPORT NETWORK RE-PLANNING
2
1
1. Urban Transport Development Project in Mongolia
o Bus Rapid Transit Project /BRT/
o Intelligent Transportation Systems (ITS) project
2. “Ulaanbaatar, the subway construction
Feasibility”
o Metro Feasibility Study on /Soosung
engineering & Seoul metro /
o Research, public transport projects in
Ulaanbaatar / JICA /
Urban transport projects
Bus Rapid Transit Project /BRT/
Санхүүжилтын эх үүсвэр Phase 1 Phase 1 Phase 1 Total
ADB 59.9 78.0 78.0 215.9
Government of Mongolian 17.0 20.0 20.0 57.0
НИЙТ 76.9 98.0 98.0 272.9
Investment plan of Bus Rapid Transit Project /BRT/
Intelligent Transportation Systems (ITS) projects
Public transport services in Ulaanbaatar register control / BMS, BIS / or electronic payment / e-ticketing / systems for feasibility studies and advanced research and development of tender documents in project 3.
Intelligent Transportation Systems (ITS) projects
Solve integration problems
• Install new line (BRT) • Improvement fare and control system • Human resource development• Service quality• Bus station problems
Thank you for attention !
?Q/A