GE Global Operations, Environmental, Health & Safety
• 159 Plastics Avenue Pittsfield, MA 01201 USA
Transmitted via Overnight Courier
February 8, 2016
Mr. Dean Tagliaferro Mr. Michael Gorski U.S. Environmental Protection Agency Regional Director Region I - New England Western Regional Office clo Avatar Environmental Department of Environmental Protection l 0 Lyman Street, Suite 2 436 Dwight Street Pittsfield, MA 0120 I Springfield, MA 01103
(Hard copy and CD-ROM of report) (Hard copy of cover letter and CD-ROM of report)
Re: GE-Pittsfield/Housatonic River Site Monthly Status Report Pursuant to Consent Decree-January 2016 (GECD900)
Dear Mr. Tagliaferro and Mr. Gorski:
Enclosed are copies of General Electric's (GE's) monthly progress report for January 2016 activities conducted by GE at the GE-Pittsfield/Housatonic River Site. This monthly report is submitted pursuant to Paragraph 67 of the Consent Decree (CD) for this Site, which was entered by the U.S. District Court on October 27, 2000.
This monthly report includes not only activities conducted by GE under the CD, but also certain other activities conducted by GE at the GE-Pittsfield/Housatonic River Site (as defined in the CD). It is formatted to apply to the various areas of the Site as defined in the CD; and it includes, where applicable, tables summarizing sampling and testing results, recovery inforrnation for non-aqueous-phase liquid, and other data received by GE during the subject month. The activities conducted specifically pursuant to or in connection with the CD are marked in the text with an asterisk. As described in GE's cover letters for its monthly reports for March and April 2015, the enclosed monthly report does not include certain inforrnation that the U.S. Environmental Protection Agency (EPA) and the Massachusetts Department of Environmental Protection (MDEP) have agreed need not be reported.
Please call me ifyou have any questions about this monthly report.
Mr. Dean Tagliaferro and Mr. Michael Gorski February 8, 2016
Page 2 of2
Sincerely,
4~f'i,1,/ --(4/
Richard W. Gates Senior Project Manager Global Operations - Environment, Health and Safety
Enclosure
cc: Richard Fisher, EPA Robert Cianciarulo, EPA (cover letter only) Tim Conway, EPA (cover letter only) Dave Dickerson, EPA (cover letter and Items 7 and 20) Chris Ferry, ASRC Primus (cover letter and CD-ROM ofreport) Scott Campbell, Avatar Environmental (hard copy and CD-ROM of report) Robert Leitch, USACE (CD-ROM of report) John Ziegler, MDEP (cover letter and CD-ROM ofreport) Eva Tor, MDEP (cover letter via email) Karen Pelto, MDEP (CD-ROM of report) Nancy E. Harper, MA AG (cover letter only) Susan Peterson, CT DEEP (hard copy and CD-ROM of report) Field Supervisor, US FWS, DOI Kenneth Finkelstein, Ph.D., NOAA (cover letter and Items 13, 14, and 15) Nate Joyner, City of Pittsfield (cover letter and CD-ROM ofreport) Corydon L. Thurston, Director, Pittsfield Economic Development Authority Jack Yablonsky, Berkshire Gas (CD-ROM of report) Richard Nasman, P.E., Berkshire Gas (cover letter only) Andrew Silfer, GE (cover letter only) Rod McLaren, GE (C cover letter only) James Nuss, ARCADIS James Bieke, Sidley Austin Greg Hencir, AECOM (email ofreport) Kevin Russell, Anchor QEA (narrative only) Public Information Repositories (I hard copy, 3 copies of CD-ROM) GE Internal Repository (I hard copy)
(wlo separate CD-ROM, except where noted)
JANUARY 2016
MONTHLY STATUS REPORT
PURSUANT TO CONSENT DECREE FOR
GE-PITTSFIELD/HOUSATONIC RIVER SITE
GENERAL ELECTRIC COMPANY
PITTSFIELD, MASSACHUSETTS
Background
The General Electric Company (GE), the United States Environmental Protection Agency (EPA), the Massachusetts Department of Environmental Protection (MDEP), and other governmental entities have entered into a Consent Decree (CD) for the GE-Pittsfield/Housatonic River Site, which was entered by the U.S. Court on October 27, 2000. In accordance with Paragraph 67 of the CD, GE is submitting the monthly report, prepared on GE's behalf by ARCADIS (formerly Blasland, Bouck & Lee, Inc.), which summarizes the status of activities conducted by GE at the GE-Pittsfield/Housatonic River Site ("Site (as defined in the CD).
This report covers activities in the areas listed below (as defined in the CD and/or the accompanying Statement of Work for Removal Actions Outside the River [SOW]). Only those areas that have had work activities for the month subject to reporting are included. These items are highlighted below in bold type. The specific activities conducted pursuant to or in connection with the CD are noted with an asterisk.
General Actiyjtjes £GECD9QQ)
GE Plant Area (non-groundwater) 1. 20s, 30s, 40s Complexes (GECD120) 2. East Street Area 2- South (GECDJ 50) 3. East Street Area 2-North (GECD140) 4. East Street Area 1 - North (GECD130) 5. Hill 78 and Building 71 Consolidation Areas (GECD210/220) 6. Hill 78 Area- Remainder(GECD160) 7. Unkamet Brook Area (GECD170)
Former Oxbow Areas {non-groupdwaterl 8. Former Oxbow Areas A & C (GECD410) 9. Lyman Street Area (GECD430) I0. Newell Street Area I (GECD440) 11. Newell Street Area 11 (GECD450) 12. Former Oxbow AreasJ & K (GECD420)
Housatonjc Rjyer 13. Upper Yi-Mile Reach (GECD800) 14. lYz-Mile Reach (only for activities, if any, conducted by GE) (GECD820) 15. Rest of the River (GECD850)
Housatonjc Rjyer Floodn!ajn 16. Current Residential Properties Adjacent to I Yz-Mile Reach (Actual/Potential
Lawns) (GECD710) 17. Non-Residential Properties Adjacent to I Yz-Mile Reach (excluding banks)
(GECD720) 18. Current Residential Properties Downstream of Confluence (Actual/Potential
Lawns) (GECD730)
Other Areas 19. Allendale School Property (GECD500) 20. Silver Lake Area (GECD600)
Groundwater Manai:ement Areas CGMAs) 21. Plant Site 1 (GECD310) 22. Fonner Oxbows J & K (GECD320) 23. Plant Site 2 (GECD330) 24. Plant Site 3 (GECD340) 24A. On-Plant Consolidation Areas, Post-Closure Program 25. Fonner Oxbows A&C (GECD350)
GENERAL ACTIVITIES GE-PITTSFIELD/HOUSATONIC RIVER SITE
(GECD900) JANUARY 2016
a. Activities Undertaken/Completed
Continued GE-EPA electronic data exchanges for the Housatonic River Watershed.
Continued discussions with EPA regarding the frequency and timing of future post-remediation inspections at various areas at the Site.*
Received EPA's cost bill for Fiscal Year (FY) 2015 (January 20, 2016).*
b. Sampling/Test Results Received
Received sample results for routine sampling conducted pursuant to GE's NPDES Permit for the GE facility. A summary of those results is provided in Attachment A to this report.
c. Work Plans/Reports/Documents Submitted
Submitted NPDES Discharge Monitoring Reports (DMRs) for the period of December I through December 31, 2015 to EPA and MDEP using NetDMR, a web-based application that allows for the electronic submission ofDMR data. The upload was performed on January 28, 2016 and a confirmation email was received on the same day.
d. Upcoming Scheduled and Anticipated Activities (next six weeks)
Continue NPDES Permit-related sampling and monitoring activities.
Review EPA's cost bill for FY 2016, discuss it with EPA, and prepare GE's response (due March 20, 2016).*
Prepare a Site-wide proposal to EPA regarding the frequency and timing of future remediation inspections at various areas at the Site.*
post
e. General Progress/Unresolved Issues/Potential Schedule Impacts
No issues
f. Proposed/Approved Work Plan Modifications
None
ITEMl PLANT AREA
20s, 30s, 40s COMPLEXES (GECD120)
JANUARY 2016
a. Activities Undertaken/Completed
None
b. Sampling/Test Results Received
None
c. Work Plans/Reportsffiocuments Submitted
None
d. Upcoming Scheduled and Anticipated Activities (next six weeks)
None
e. General Progress/Unresolved Issues/Potential Schedule Impacts
Comments submitted in June 2015 by GE and the Pittsfield Economic Development Authority (PEDA) on the draft NPDES Permit issued by EPA and MDEP to PEDA for discharge from its water quality basin in the former 30s Complex to Silver Lake are under review by EPA and MDEP.
f. Proposed/Approved Work Plan Modifications
None
ITEMS PLANT AREA
HILL 78 & BUILDING 71 CONSOLIDATION AREAS
(GECD210/220) JANUARY 2016
* All activities described below for this item were conducted pursuant to the Consent Decree.
a. Activities Undertaken/Completed
Transferred 6,000 gallons of leachate from the Building 7 I On-Plant Consolidation Area (OPCA) to the Building 64G Groundwater Treatment Facility (GWTF) for treatment during January 2016 (see attached Table 5-1 ).
Conducted communications with a representative of the natural resource trustees (Trustees) regarding GE's November 18, 2015 summary report on the 2015 inspections of the invasive species Cypress spurge at the Building 71 OPCA and the biological controls for Cypress spurge.
b. Sampling/Test Results Received
None
c. Work Plans/Reports/Documents Submitted
None
d. Upcoming Scheduled and Anticipated Activities (next six week~)
Receive comments from the Trustees on GE's November 18, 2015 summary report on the 2015 inspections of the Cypress spurge and biological controls, and submit a revised version of that report.
e. General Progress/Unresolved Issues/Potential Schedule Impacts
No issues.
f. Proposed/ Approved Work Plan Modifications
None
TABLE 5-1 BUILDING 71 CONSOLIDATION AREA LEACHATE TRANSFER SUMMARY
PLANT AREA- HILL 78 & BUILDING 71 CONSOLIDATION AREAS
CONSENT DECREE MONTHLY STATUS REPORT
GENERAL ELECTRIC COMPANY - PITTSFIELD, MASSACHUSETTS
JANUARY 2016
Month/Year
January 2015
February 2015
March 2015
April 2015
May 2015
June 2015
July 2015
August 2015
September 2015
October 2015
November 2015
December 2015
January 2016
Total Volume of Leachate Transferred
{Gallons)
0
0
6,000
0
6,000
0
0
0
6,000
0
0
6,000
6,000
Note:
1. Leachate is transferred from the Building 71 On-Plant
Consolidation Area to Building 64TG for Treatment.
ITEM7 PLANT AREA
UNKAMET BROOK AREA (GECD170)
JANUARY 2016
a. Activities Undertaken/Completed
Continued excavation and removal of material regulated under the Toxic Substances Control Act (TSCA) and placement of excavated material in the appropriate areas.*
Loaded approximately 48 loads ofTSCA-regulated material for transportation to and disposal at appropriate off-site disposal facilities.*
Transferred 16,500 gallons of water to Building 640 Groundwater Treatment Facility (GWTF) for treatment.*
Performed ambient air monitoring for particulate matter at vanous locations, with no exceedances of the notification level.*
Performed ambient air monitoring for PCBs at UB-7, UB-8, UB-SCO (collocated), UB-31, and background (BK-3) monitoring locations on January 19-20, 2016. *
Continued to prepare the former brook channel to accept the relocated sanitary sewer line and install helical piles.*
Completed excavation activities in Excavation Cells 3 and 4.
Completed cleaning sediment from existing 30-inch CMP and installed the 26-inch HOPE slip line pipe east of YD12A-4 and within the horizontal limits of Excavation Cells 3 and 4 and completed all connections between the new and slip-lined pipe.*
Installed new yard drain in the Building 120s area.*
Completed restoration of the southern half of the asphalt covered engineered barrier and reopened the area for parking.
Transmitted a revised draft of the Notice of Environmental Restriction (Notice ERE) for the Berkshire Community College (BCC) property, Parcel Ll2-2-I, to EPA and the State, and received comments on that draft from counsel for the Massachusetts Community College System and from EPA.*
ITEM7 (cont'd)
PLANT AREA UNKAMETBROOKAREA
(GECD170) JANUARY 2016
a. Activities Undertaken/Completed (cont'd)
Received comments from EPA on the draft Grant of Environmental Restriction and Easement (ERE) for GE-owned Parcel K 12-9-1. *
b. Sampling/Test Results Received
Received the ambient air monitoring results for PCBs from the January 19-20, 2016 sampling event.* These results are presented in Table 7-1. (Note: The ambient air monitoring data for particulate matter during December showed no exceedances of the applicable notification level and thus are not presented.)
c. Work Plans/Reportsillocuments Submitted
None
d. Upcoming Scheduled and Anticipated Activities (next six weeks)
Continue ambient air monitoring for PCBs (monthly) and particulate matter (daily on working days).*
Continue turbidity monitoring within Unkamet Brook prior to the start of sediment removal activities as needed.*
Perform weekly surface water sampling during active remediation of brook channel as needed.*
Conduct pre-construction survey activities south of Merrill Road, and begin site preparation activities.*
Reconfigure bypass piping so that portions of the brook channel in the vicinity of the inlets to Culvert #2 and the outlets for Outfall 009 can undergo excavation activities.*
Continue driving helical piles and pour concrete footing to support sanitary sewer.
ITEM7 (cont'd)
PLANT AREA UNKAMETBROOKAREA
(GECD170) JANUARY 2016
d. Upcoming Scheduled and Anticipated Activities (next six weeks) (cont'd)
Complete sediment removal activities at the inlets of Culvert #2 and the outlets for Outfall 009.*
Continue dewatering/bypass/isolation activities.*
Complete final site restoration and submit waste disposal documentation and an amended postwork notification form to MDEP for an emergency excavation (conducted in February 2015) in the roadway just north of Building OP-I to find and repair a fire protection water main break.
Make further revisions to the Notice ERE for the BCC property, Parcel Ll2-2-l, and transmit it to EPA and the State for review.*
Make further revisions to the ERE for Parcel Kl2-9-l and transmit il to EPA and the State for review.*
Continue efforts lo obtain subordination agreements for the ERE for Parcel Kl2-9-l.*
e. General Progress/Unresolved Issues/Potential Schedule Impacts
GE and EPA are discussing the timing for submission of Plan/Restoration Project Monitoring and Maintenance Plan.*
a Post-Removal Site Control
A draft of the Conservation Easement and Restriction for the wetlands east of the former interior landfill is under review by EPA and the State.*
f. Proposed/Approved Work Plan Modifications
None
TABLE 7-1 AMBIENT AIR PCB DATA RECEIVED DURING JANUARY 2016
PCB AMBIENT AIR CONCENTRATIONS UNKAMET BROOK AREA
GENERAL ELECTRIC COMPANY· PITISFIELD, MASSACHUSETIS
Date Analytical Results UB·BCO Background
UB-7 UB-31UB·BReceived by Berkshire Field Blank (colocated)Sampling Event Period BK-3
Environmental (µg/PUF) (µg/m3) (µg/m3
) (µg/m3}
(µg/m3) (µg/m3
}Consultants, Inc.
01/19/16. 01/20/16 01/25/16 ND (<0.10) 0.0117 0.0005 0.0005 0.0005 0.0006
Notification Level 0.05 0.05 0.05 0.05 0.05
Note: ND - Non-Detect
C:\Users\50029937 4\AppData\Loca!\Microsoft\ Windows\ Temporary ln1emet Files\Content. Outlook\485BP 840\Table 7 • 1.x!sx 7·1 Page1of1 2/4/2016
ITEM13 HOUSATONIC RIVER AREA
UPPER 1/2 MILE REACH (GECDSOO)
JANUARY 2016
a. Activities Undertaken/Completed
None
b. Sampling/Test Results Received
None
c. Work Plans/Reportsffiocuments Submitted
None
d. Upcoming Scheduled and Anticipated Activities (next six weeks)
Complete and submit 2015 Annual Monitoring Report (postponed with EPA concurrence until after receipt of final surface water sampling data from laboratory).*
e. General Progress/Unresolved Issues/Potential Schedule Impacts
GE submitted a report evaluating the total organic carbon (TOC) content and effectiveness of the isolation layeron the river sediments on March 14, 2007. The Final Completion Report for the Upper V2-Mile Reach Removal Action will be submitted following EPA review and approval of that report.*
f. Proposed/Approved Work Plan Modifications
None
ITEM 14 HOUSATONIC RIVER AREA
1Y:z MILE REACH (GECD820)
JANUARY 2016
a. Activities Undertaken/Completed
Performed one round of water column monitoring at nine locations along the Housatonic River between Coitsville and Great Barrington on January 21and22, 2016. Two of the locations monitored are situated in the l\12 Mile Reach: Lyman Street Bridge (Location 4), monitored on January 22, 2016, and Pomeroy Avenue Bridge (Location 6A), monitored on January 21, 2016. A composite grab sample was collected at each location and submitted for analysis of PCBs (total) and total suspended solids (TSS). (The other seven locations are discussed under Items 15 and 20 below.)
b. Sampling/Test Results Received
None (Note: Results from the water column monitoring events performed on December 16 and 17, 2015 have not yet been received and will be presented in next month's report.)
c. Work Plans/Reports/Documents Submitted
None
d. Upcoming Scheduled and Anticipated Activities (next six weeks)
Continue Housatonic River water column monitoring.
Complete and submit 2015 Annual Monitoring Report (postponed with EPA concurrence until after receipt of final surface water sampling data from laboratory).*
e. General Progress/Unresolved Issues/Potential Schedule Impacts
No issues.
f. Proposed/ Approved Work Plan Modifications
None
ITEM15 HOUSATONIC RIVER AREA
REST OF THE RIVER (GECDSSO)
JANUARY 2016
a. Activities Undertaken/Completed
Performed one round of water column monitoring at nine locations along the Housatonic River between Coitsville and Great Barrington, MA on January 21 and 22, 2016. Two locations sampled are situated in the I Vi Mile Reach of the Housatonic River and were discussed in Item 14. One location is at the outlet of Silver Lake and is discussed in Item 20 below. Of the remaining six locations, two are located upstream of the I Vi Mile Reach and were monitored on January 22, 2016: Hubbard Avenue Bridge (Location I) and Newell Street Bridge (Location 2). The four remaining locations are situated in the Rest of the River and were monitored on January 21, 2016: Holmes Road Bridge (Location 7); New Lenox Road Bridge (Location 9); Schweitzer Bridge (Location 12); and Division Street Bridge (Location 13). An additional location (Woods Pond Headwaters [Location 1 OJ) that is normally part of the monthly monitoring program was not sampled during this monitoring event as the location was inaccessible due to ice. Composite grab samples were collected at each sampled location and submitted for analysis of PCBs (total) and TSS.
Received results from the Academy of Natural Sciences of Drexel University on the 2014 sampling of fish and benthic insects in the Connecticut portion of the river (see Table 15-1 ).
b. Sampling/Test Results
See attached table presenting the results from the 2014 sampling of fish and benthic insects in the Connecticut portion of the river. (Note: Results from the water column monitoring events performed on December 16 and 17, 2015 have not yet been received and will be presented in next month's report.)
c. Work Plans/Reportsillocuments Submitted
Submitted Statement of Position to EPA in GE's dispute of EPA's intended final remedy decision (January 19, 2016).*
d. Upcoming Scheduled and Anticipated Activities (next six weeks)
Continue Housatonic River monthly water column monitoring.
Continue negotiations, including confidential mediation, on GE's dispute of EPA's intended final remedy decision.*
ITEM 15 (cont'd)
HOUSATONIC RIVER AREA REST OF THE RIVER
(GECDSSO) JANUARY 2016
d. Upcoming Scheduled and Anticipated Activities (next six weeks) (cont'd)
Receive EPA's Statement of Position in GE's dispute of EPA's intended final remedy decision (due February 29, 2016), and prepare and submit a Reply to that Statement (due March 15, 2016).*
Receive and submit report by the Academy of Natural Sciences of Drexel University on the 2014 sampling of fish and benthic insects in the Connecticut portion of the river. (Note: The timing of GE's receipt of that report from the Academy is uncertain.)
e. General Progress/Unresolved Issues/Potential Schedule Impacts
No Issues
f. Proposed/Approved Work Plan Modifications
None
DRAFT
TABLE 15-1 SAMPLE DATA RECEIVED DURING JANUARY 2016
2014 ACADEMY OF NATURAL SCIENCES OF DREXEL UNIVERSITY SAMPLING PCB CONCENTRATIONS IN FISHES AND BENTHIC INSECTS FROM THE CONNECTICUT PORTION OF THE HOUSATONIC RIVER
HOUSATONIC RIVER - REST OF RIVER GENERAL ELECTRIC COMPANY - PITTSFIELD, MASSACHUSETTS
•· Date River Age Length Weight Preparation Percent Aroclor-1254 Aroclor-1260
Sample 10 Location Collected Species Individuals fvearl Sex (mm) In\ Method Lipids{%) lnnb) lnnb)
Lake Ulinonah, CT SMB F-7248 Lake Ulinonah, CT 10/7/2014 SMB 1 4 M 349 515.32 SF 1.21 119.17 748.10 lake Ulinonah, CT SMB F-7249 lake Ulinonah, CT 10/7/2014 SMB 1 4 M 328 321.03 SF 0.48 50.94 1077.47 Lake UHnonah, CT SMB F-7250 lake Ul!nonah, CT 10/7/2014 SMB 1 3 M 312 330.39 SF 0.83 80.56 443.79 Wes! Cornwall, CT BNT F-7251 West Cornwall, CT 10/6/2014 BNT 1 0.44 M 314 318.42 SSF 1.58 532.80 1944.36 West Cornwall, CT BNT F-7252 West Cornwall, CT 10/6/2014 BNT 1 0.44 F 296 267.3 SSF 1.18 466.93 2076.18 West Cornwall, CT BNT F-7253 West Cornwall, CT 1016/2014 BNT 1 0.39 F 286 240.52 SSF 3.08 413.46 2060.72 West Cornwall, CT BNT F-7254 West Cornwall, CT 1016/2014 BNT 1 0.44 F 335 430.56 SSF 8.06 276.72 1255.22 West Cornwall, CT BNT F-7255 West Cornwall, CT 10/612014 BNT 1 0.39 M 256 183.47 SSF 1.99 420.69 2191.40 West Cornwall, CT BNT F-7256 West Cornwall, CT 10/6/2014 BNT 1 1.03 F 347 465.75 SSF 5.36 655.59 3009.47 Wes! Cornwall, CT BNT F-7257 West Cornwall, CT 10/612014 BNT 1 0.39 F 275 216.26 SSF 2.53 402.72 1993.96
Burlinaton Hatcherv, CT BNT F-7258 Burlinqton Hatcherv, CT 10/3/2014 BNT 1 0 F 348 518.42 SSF 7.62 4.81 0.68 Burlington Hatchery, CT BNT F-7259 Burlington Hatchery, CT 10/3/2014 BNT 1 0 F 302 298.06 SSF 9.46 2.26 3.00
10/3/2014 BNT 1 0 F 302 298.06 SSF [9.03] [1.78] I I 10/3/2014 BNT 1 0 F 302 298.06 SSF ra.111 fl.891 [1.421
West Cornwall, CT BNT F-7260 West Cornwall, CT 10/612014 BNT 1 3.6 M 313 307.8 SSF 5.05 479.36 2208.82 West Cornwall, CT BNT F-7261 West Cornwall, CT 9/5/2014 BNT 1 0.95 M 339 433.21 SSF 2.13 358.76 1794.65
Lake Zoar, CT BNT F-7262 lake Zoar, CT 10/7/2014 BNT 1 3 M 273 250.62 SSF 1.00 108.20 476.70 West Cornwall, CT BNT F-7263 West Cornwall, CT 10/612014 BNT 1 2.03 F 430 767.47 SSF 2.76 968.74 6030.28
Lake Zoar, CT SMB F-7264 lake Zoar, CT 1017/2014 SMB 1 9 F 460 1389.4 SF 2.10 422.80 4133.13 West Cornwall, CT BNT F-7265 West Cornwall, CT 9/5/2014 BNT 1 1.95 F 436 938.18 SSF 4.72 842,69 4891.29 Wes! Cornwall, CT BNT F-7266 West Cornwall, CT 9/5/2014 BNT 1 0.95 F 377 645.38 SSF 2.38 769.29 4784.30 West Cornwall, CT BNT F-7267 Wes! Cornwall, CT 9/5/2014 BNT 1 2.35 F 426 879.68 SSF 4.25 998.05 6873. 12 West Cornwall, CT BNT F-7268 West Cornwall, CT 9/512014 BNT 1 1.95 M 420 823.83 SSF 2.86 670.32 3621.74 West Cornwall, CT BNT F-7269 West Cornwall, CT 9/5/2014 BNT 1 1.35 F 465 1190.31 SSF 4.76 756.82 4883.28 West Cornwall, CT SMB F-7270 West Cornwall, CT 8/27/2014 SMB 1 4 F 335 569.01 SF 3.54 297.37 1872.68 West Cornwall, CT SMB F-7271 West Cornwall, CT 8127/2014 SMB 1 9 M 379 841.42 SF 1.15 318.10 2721.50 West Cornwall, CT BNT F-7272 West Cornwall, CT B/26/2014 BNT 1 0.33 M 305 257.83 SSF 2.27 225.96 843.42
8126/2014 BNT 1 0.33 M 305 257.83 SSF [1.501 1226.601 [818.161 I/Jest Cornwall, CT BNT F-7273 West Cornwall, CT 812812014 BNT 1 0.29 M 284 229.31 SSF 3.49 298.43 1313.81 West Cornwall, CT BNT F·7274 West Cornwall. CT 8127/2014 BNT 1 0.29 F 260 202.4 SSF 1.67 267.48 1154.42 West Cornwall, CT BNT F-7275 West Cornwall. CT 8127/2014 BNT 1 0.28 M 232 134.81 SSF 2.08 536.19 2861,59 West Cornwall, CT BNT F-7276 West Cornwall, CT 8/27/2014 BNT 1 0.28 M 233 136,68 SSF 2.12 367.19 1949.70
8/27/2014 BNT 1 0.28 M 233 136.68 SSF 11.901 f411.561 (2112.551 West Cornwall, CT BNT F-7277 West Cornwall, CT 8126/2014 BNT 1 0.28 F 225 127.62 SSF 1.36 316.54 1665. 13 West Cornwall, CT BNT F-7278 West Cornwall, CT 8/27/2014 BNT 1 0.33 F 296 307.8 SSF 3.95 501.24 2133,25 West Cornwall, CT BNT F-7279 West Cornwall, CT 8128/2014 BNT 1 0.33 F 290 284.23 SSF 3.72 343.92 1582.38 West Cornwall, CT BNT F·7280 West Cornwall, CT B/27/2014 BNT 1 0.33 F 284 304.34 SSF 3.12 373.24 1548.38
Arcolor-1254 & Total PCB Aroclor-1260 lnnb) Conaenefs lnnb)
867.27 729.23 1128.41 849.81 524.36 449.70
2477. 15 2169.20 2543.11 2229.93 2474.18 2139.49 1531.94 1306.12 2612.08 2279.78 3665,06 3230.40 2396.68 2105.88
5.50 5.83 5.26 3.28
[1.78] [1.68] 13.321 12.371
2688.18 2339.20 2153.41 1821.65 584.90 526.82
6999.02 5830.99 4555.93 3575.65 5733.98 4820.38 5553.58 4702.93 7871.18 6669.92 4292.05 3649.97 5640.10 4776.19 2170.05 1818.13 3039.60 2646.32 1069.38 933.89
f1044.761 f909.161 1612.25 1398.19 1421.90 1243.22 3397.77 2965.31 2316.89 1955.67
12524.121 !2125.501 1981.67 1698.47 2634.48 2348.22 1926.30 1675.69 1921.62 1713.61
C:\Users\500299374\AppData\LocanMicmsoM\Wmtlows\Temporary Internet Files\eontent.Out!ook\485BPS40\Table 15·1~2014 CT Fishes and Benthlc Insects Oata.xrsx Fishes and Benthic Page 1 o! 3 21512016
DRAFT
TABLE 15-1 SAMPLE DATA RECEIVED DURING JANUARY 2016
2014 ACADEMY OF NATURAL SCIENCES OF DREXEL UNIVERSITY SAMPLING PCB CONCENTRATIONS IN FISHES AND BENTHIC INSECTS FROM THE CONNECTICUT PORTION OF THE HOUSATONIC RIVER
HOUSATONIC RIVER - REST OF RIVER GENERAL ELECTRIC COMPANY - PITTSFIELD, MASSACHUSETTS
Sample ID Location Date
Collected Soecies Individuals River Age
Cvearl Sex Length (mml
Weight In\
Preparation Method
Percent Lioids {%)
Aroclor-1254 lnnb)
Aroclor-1260 lnnbl
Arcolor-1254 & Aroclor-1260 lnnb)
Total PCB ConnAners lnnb)
West Cornwall, CT BNT F·7281 West Cornwall, CT 8/27/2014 8/27/2014
BNT BNT
1 1
0.33 0.33
F F
283 283
281.8 281.8
SSF SSF
2.96 13.101
344.18 1364.511
1608.00 [1708.111
1952.18 12072.621
1736.81 11846.051
West Cornwall, CT BNT F-7282 West Cornwall. CT 8/26/2014 BNT 1 0.28 M 219 124.02 SSF 2.81 298.58 1582.63 1881.20 1628.48 West Cornwall, CT BNT F-7283 West Cornwall, CT 8/28/2014 BNT 1 0.29 F 225 131.9 SSF 3.27 405.88 2009.57 2415.45 2095.46 West Cornwall, CT BNT F-7284 West Cornwall, CT 8127/2014 BNT 1 0.28 M 259 195.41 SSF 1.30 210.07 885.25 1095.31 942.56 West Cornwall. GT BNT F-7285 West Cornwall. CT 8/27/2014 BNT 1 0.28 M 251 165.51 SSF 2.31 258.84 1411.46 1670.30 1418.57 West Cornwall, CT BNT F-7286 West Cornwall, CT 8/26/2014
8/26/2014 BNT BNT
1 1
0.28 0.28
F F
215 215
117.53 117.53
SSF SSF
1.92 12.431
421.50 1379.981
2249.20 12021.031
2670.71 12401.011
2295.77 12066.841
West Cornwall, CT SMB F-7287 West Cornwall, CT 8/27/2014 SMB 1 4 F 326 477.33 SF 1.62 236.55 1593.85 1830.40 1539. 14 West Cornwall, CT SMB F-7288 West Cornwall, CT 8/26/2014 SMB 1 7 F 358 647.45 SF 1.64 313.69 2313.73 2627.42 2167.13 West Cornwall, CT SMB F· 7289 West CornwaU, CT 8127/2014 SMB 1 9 M 412 868.54 SF 0.75 247.63 1787.31 2034.94 1749.00 Lake U!inonah, CT SMB F-7290 lake Ulinonah, CT 8/612014 SMB 1 6 M 380 739.5 SF 1.38 298.40 1869.53 2167.92 1841.42 West Cornwall. CT SMB F-7291 West Cornwall, CT 8/26/2014 SMB 1 4 M 295 336.91 SF 1.23 280.87 2198.56 2479.43 2206.43 West Cornwall, CT SMB F-7292 West Cornwall, GT 8/27/2014
8/27/2014 8/27/2014
SMB SMB SMB
1 1 1
4 4 4
F F F
295 295 295
354.36 354.36 354.36
SF SF SF
1.05 [1.121 f0.761
103.82 [115.131 r100.681
714.52 [758.631 1655.991
818.35 [873.761 [756.671
696.17 [733.74] 1637.781
West Cornwall, CT SMB F-7293 West Cornwall, CT 8/27/2014 SMB 1 4 M 300 376.85 SF 0.44 168.09 1136.78 1304.87 1112.21 Wes! Cornwall, CT SMB F·7294 West Cornwall, CT 8/26/2014 SMB 1 4 M 285 269.97 SF 0,31 188.53 1353.18 1541.71 1296.43 West Cornwall, CT SMB F-7295 West Cornwall, CT 8/26/2014 SMB 1 3 M 269 293.28 SF 2.10 322.33 1810.51 2132.85 1842.87 Lake Ulinonah, CT SMB F·7296 lake Ulinonah, CT 81812014
8/6/2014 SMB SMB
1 1
3 3
M M
269 269
248.25 248.25
SF SF
0.56 J0.831
46.27 150.101
243.96 1259.441
290.24 1309.541
247.35 1263.161
lake lilinonah, CT SMB F·7297 Lake lilinonah, CT 8/6/2014 SMB 1 3 F 284 274.61 SF 0.91 49.58 307.20 356.78 302.19 Lake Ulinonah, CT SMB F-7298 Lake li!inonah, CT 81612014 SMB 1 4 F 302 327.8 SF 1.34 60.47 399.38 459.85 382.32 Lake lilinonah, CT SMB F·7299 Lake Li!inonah, CT 816/2014 SMB 1 4 M 365 606.62 SF 1.19 141.04 711.24 852.29 728.84 Lake UUnonah. CT SMB F·7300 Lake li!inonah, CT 8/6/2014 SMB 1 9 F 469 1605.28 SF 3.41 745.45 4253.73 4999. 19 4180.92 Lake Lilinonah, CT SMB F-7301 Lake li!inonah, CT 8/6/2014 SMB 1 14 F 549 1838.19 SF 3.60 898.63 6169.63 7068.25 5721.70 Bulls Bridge, CT SMB F-7302 Bulls Bridge, CT 8/4/2014
8/4/2014 SMB SMB
1 1
15 15
F F
450 450
1306.99 1306.99
SF SF
1.01 10.921
42.96 [57.551
370.08 1486.391
413.03 1543.941
319.39 1426.881
Bulls Bridoe, CT SMB F-7303 Bulls Bridoe, CT 8/4/2014 SMB 1 8 F 414 910.62 SF 0.64 41.09 335.30 376.39 283.84 Bulls Bridoe, CT SMB F·7304 Bulls Bridae, CT SMB F-7305
Bulls Bri e, CT Bulls Bridae, CT
8/4/2014 8/4/2014
SMB SMB
1 1
7 7
M F
369 354
757.38 648.85
SF SF
0.74 0.57
284.28 64.45
3015.97 435.69
3300.24 500.13
2646.30 397.25
Bulls Bri e, CT SMB F-7306 Bulls Bridoe, CT SMB F·7307
Bulls Bri e, CT Bulls Bridne, CT
8/4/2014 8/4/2014
SMB SMB
1 1
4 3
F M
286 260
327.18 263.29
SF SF
0.80 1.05
311.35 232.05
581.57 1505.28
892.91 1737.33
739.85 1462.48
Bulls Bridne, CT SMB F-7308 Bulls Bridne, CT 8/4/2014 SMB 1 9 F 400 851.43 SF 1.42 83,74 602.16 685.90 556.63 Bu!ls Bridqe, CT SMB F-7309 Bulls Bridqe, CT 8/4/2014 SMB 1 10 M 384 819.23 SF 0.76 230.36 2478.89 2709.24 2200.23 Bulls Bridge, CT SMB F-7310 Bulls Bridge, CT 8/4/2014
814/2014 SMB SMB
1 1
4 4
F F
332 332
506.29 506.29
SF SF
1.49 11.781
323.27 1307.341
2264.72 12134.741
2587.99 12442.081
2158.69 12053.271
Bulls Bridqe, CT SMB F-7311 Buns Bridoe, CT 8/4/2014 SMB 1 4 M 310 404.56 SF 1.25 236.25 1836.51 2072.76 1714.52 Lake Zoar, CT SMB F-7312 Lake Zoar, CT 8/512014 SMB 1 9 M 489 1305.83 SF 1.39 523.56 3310.50 3834.06 3202.38 Lake Zoar, CT SMB F-7313 Lake Zoar, CT 8/5/2014 SMB 1 10 M 402 928.2 SF 2.36 366.10 1710.30 2076.40 1760.73 Lake Zoar, CT SMB F-7314 Lake Zoar. CT 8/5/2014 SMB 1 13 F 441 875.95 SF 0.47 358.93 2616.03 2974.96 2366.58 lake Zoar, CT SMB F-7315 Lake Zoar, CT 8/512014 SMB 1 5 M 430 971.51 SF 1.29 204.79 900.66 1105.45 932.21 Lake Zoar, CT SMB F-7316 Lake Zoar, CT 8/512014 SMB 1 8 F 385 790.87 SF 0.99 115.65 553.16 668.81 566.12 Lake Zoar, CT SMB F-7317 Lake Zoar, CT 815/2014 SMB 1 9 M 355 553.99 SF 0.61 47.31 247.36 294.67 252.26
C:IUsetsl.500299374\AppOata\Locaf\Microso!!\Windows\Temporary !nlemet Files\Content.Out!ook\4858PS40\Table 15-1 ~2014 CT Fishes and Benlhic Insects Oata.xfsx Fishes and Benthic Page 2 ol 3 2/512016
DRAFT
TABLE 15·1 SAMPLE DATA RECEIVED DURING JANUARY 2016
2014 ACADEMY OF NATURAL SCIENCES OF DREXEL UNIVERSITY SAMPLING PCB CONCENTRATIONS IN FISHES ANO BENTHIC INSECTS FROM THE CONNECTICUT PORTION OF THE HOUSATONIC RIVER
HOUSATONIC RIVER - REST OF RIVER GENERAL ELECTRIC COMPANY· PITTSFIELD, MASSACHUSETTS
Date River Age Length Weight Preparation Percent Aroclor-1254 Aroclor-1260 Sample ID Location Collected Soecies Individuals (vearl Sex tmml lo\ Method Lioids (%) lnob\ '""bl
lake Zoar, CT SMB F-7318 lake Zoar, CT 8/5/2014 SMB 1 8 F 302 345.72 SF 0.93 168.11 1147.23 8/5/2014 SMB 1 8 F 302 345.72 SF f0,971 f163.921 [1178.701
lake Zoar, CT SMB F-7319 Lake Zoar, CT 8/5/2014 SMB 1 4 F 261 212.19 SF 0.49 41.60 248.44 HYPS-01-0111 06/14 West Cornwall, CT 6/23/2014 CF Composite - - - WBC 2.10 159.50 876.41
6/23/2014 CF Comoosite - - - - WBC [2.001 [212.671 f1181.13J PERL-01-01 12 06/14 West Cornwall, CT 6/23/2014 SFN Comoosite - - - - WBC 2.44 116.29 888.80 COAY-01-01 13 06/14 West Cornwall, CT 6/23/2014 HL Composite - - - - WBC 2.44 153.01 1438.82
6/23/2014 HL Comoosite - - - - WBC 12.521 1149.001 '1435.611 HYPS-01·02 14 06/14 West Cornwall, CT 6/23/2014 CF Comooslte - WBC 2.75 214.80 1229.64 COAY-01-0215 06/14 West Cornwall, CT 6/23/2014 HL Comoosite - - - - WBC 2.88 221.81 2099.53 PERL-01-02 16 06/14 West Cornwall, CT 6/23/2014 SFN Composite - - - - WBC 3.61 161.77 1071.69
6/23/2014 SFN Comnosite - - - - WBC 13.081 1159.681 11098.451
Arcolor-1254 & Total PCB Aroclor-1260 lnnb) Conqeners fnnb}
1315.34 1088.43 11342.621 f1108.871
290.04 245.41 1035.90 891.12
f1393.80l 11206.611 1005.09 905.46 1591.83 1267.22
11584.611 11242.861 1444.44 1239.94 2321.35 1869.80 1233.47 1117.89
{1258.131 f1145.501
Notes: 1. Samples were collected by The Academy of Natural Sciences of Drexel University. 2. BNT =Brown trout 3. CF = Caddisfly 4. HL = Hellgrammite larvae 5. mm= mll!imeter 6. ppb "' parts per billion 7. SF= Fillet wilh scales off and skin on 8. SFN = Stonet!y nymph 9. SMB = Smal!mouth bass 10. SSF =Fillet with scales and skin on 11. WBC =Whole body composite 12. - =not available/not applicable 13. Field duplicate sample results are presented In brackets.
C:\Usern\500299374\AppData\Loca!\Microso!t\Windows\Temporary Internet Files\Con!ent.Ou1look\4B5BPS4D\Tab!e 15·1_2014 CT Fishes and Benthic Insects Da!a.x!sx Flshes and Benthic Page 3 ol 3 2/512016
ITEM 18 HOUSATONIC RIVER FLOODPLAIN
CURRENT RESIDENTIAL PROPERTIES DOWNSTREAM OF CONFLUENCE
(ACTUAL/POTENTIAL LAWNS) (GECD730)
JANUARY 2016
*All activities described below for this item were conducted pursuant to the Consent Decree.
a. Activities Undertaken/Completed
None.
b. Sampling/Test Results Received
None
c. Work Plans/Reports/Documents Submitted
None
d. Upcoming Scheduled and Anticipated Activities (next six weeks)
Anticipate receipt of EPA' s review of GE's Pre-Design Investigation Report (submitted in November 2015).
e. General Progress/Unresolved Issues/Potential Schedule Impacts
No issues.
f. Proposed/Approved Work Plan Modifications
None
ITEM20 OTHER AREAS
SILVER LAKE AREA (GECD600)
JANUARY 2016
a. Activities Undertaken/Completed
Performed one round of water column monitoring at the Silver Lake Outfall (Location 4A) on January 21, 2016. A composite grab sample was collected and submitted for analysis of PCBs (total and dissolved) and TSS. Select field measurements made during the January 21, 2016 water column monitoring event are summarized in Table 20-1.
Obtained a gauge reading at the Silver Lake Outfall on January 21, 2016 as part of the Housatonic River monitoring program. The lake level and flow information for the Silver Lake Outfall are presented in Table 20-2.
b. Sampling/Test Results Received
See attached tables. (Note: Results from the water column monitoring event performed on December 16, 2015 have not yet been received and will be presented in next month's report.)
c. Work Plans/Reports/Documents Submitted
None
d. Upcoming Scheduled and Anticipated Activities (next six weeks)
Continue communications with Trustees' representative regarding GE's summer 20 l 5 inspection report on natural resource restoration/enhancement (NRRE) plantings and other NRRE measures.*
If requested by the Trustees, submit a revised version of GE's summer 2015 NRRE inspection report or a set of errata to that report.*
Prepare and submit 2015 Annual Monitoring Report (postponed with EPA concurrence until after receipt of final surface water sampling data from laboratory).*
e. General Progress/Unresolved Issues/Potential Schedule Impacts
No issues.
ITEM20 (cont'd)
OTHER AREAS SILVER LAKE AREA
(GECD600) JANUARY 2016
f. Proposed/Approved Work Plan Modifications
None
TABLE 20·1 SILVER LAKE FIELD MEASUREMENTS COLLECTED DURING JANUARY 2016
CONSENT DECREE MONTHLY STATUS REPORT GENERAL ELECTRIC COMPANY· PITTSFIELD, MASSACHUSETTS
Turbidity Water Depth Water Temperature
Date (Nephelometrlc (Degrees Celsius) {feet)
Turbldltv Unltsl 1/21/2016 NA 3.6 0.90
Note: 1. Measurements collected by Arcadis (NA= Not Available).
Page 1 of l
C:\Uoors\5002!19374\AppDala\locahMicrooolt\Wiodcw~\Tnmpcmry !n!mn<lt Filos\Coll!ofl! OU!ioo!(\4BSBPS40\ Tahlo 2!M .>faX ~ 21412016
--
TABLE 20-2 SILVER LAKE OUTLET DISCHARGE
SILVER LAKE AREA
CONSENT DECREE MONTHLY STATUS REPORT GENERAL ELECTRIC COMPANY· PITTSFIELD, MASSACHUSETTS
JANUARY 2016
Gauge· Measured Flow Date Calculated Flow (els)lcfsl ·Measurement 1111
1/21/2016 3.27 1.19
Notes: 1. Measured flows collected by ARCADIS by recording channel width, water depth,
and velocities at Silver Lake Outlet. 2. Calculated flows developed using rating curve (rating curve revised July 2015). 3. Gauge located at top of grate at end ol Silver Lake outlet channel. 4. ·-~indicates measurement not taken.
Page 1 of 1
C:\Uwn;\500m374\AppD1ta\loc1rJAJcrmoll\Wil'ldowsl T timf!Of~'Y fnlil<'Mt Fi~\Con1611t0otlook\.f858PS40\
Table 20·2,.'<IEU 2/4/Z016
ITEM21 GROUNDWATER MANAGEMENT AREAS
PLANT SITE 1 (GMA 1) (GECD310)
JANUARY 2016
* All activities described below for this item were conducted pursuant to the Consent Decree.
a. Activities Undertaken/Completed
General:
Conducted routine groundwater elevation monitoring and non-aqueous-phase liquid (NAPL) monitoring/recovery activities. The thicknesses of LNAPL and DNAPL measured during these activities are shown in Table 21-1.
Continued routine manual LNAPL and DNAPL removal activities at various wells within GMA 1, as indicated in Tables 21-2 (for LNAPL) and 21-3 (for DNAPL).
Note: The following entries identify additional activities conducted within specific Removal Action Areas within GMA 1.
East Street Area 1-North and South:
Continued automated recovery operations for groundwater and LNAPL (if recoverable) at the Northside and Southside Caissons (see Table 21-4). No LNAPL was recovered from either caisson in January.
East Street Area 2-South:
Continued automated recovery operations for groundwater and/or LNAPL (if recoverable) from pumping systems 17W, 64R, 64S, 64V, 64X, RW-2(X), RW-l(S), RW-l(X), RW-4, and E2SC03D (see Table 21-5).
Did not conduct automated recovery of DNAPL from pumping system RW-3(X), since this system was shut down for maintenance and due to plugging with sand throughout January (see Table 21-5).
Continued treatment/discharge of water through the Building 64G Groundwater Treatment Facility (GWTF) (see Table 21-6).
ITEM21 (cont'd)
GROUNDWATER MANAGEMENT AREAS PLANT SITE 1 (GMA 1)
(GECD310) JANUARY 2016
a. Activities Undertaken/Completed (cont'd)
Lyman Street Area
Continued automated recovery operations for groundwater from pumping systems RW-1 R and RW-3 (see Table 21-7). LNAPL recovery (if any) from these pumping systems would be performed manually, but there was no such recovery in January (see Table 21-2).
Newell Street Area II:
Conducted automated recovery operations for DNAPL at System 2 (which is composed of wells N2SC-Oll(R), N2SC-031(R), and N2SC-14), but there was no DNAPL recovery in January (see Table 21-8)
Completed optimization efforts (pump cycle adjustment) at automated DNAPL recovery system 2.
Silver Lake Area:
Conducted routine monitoring of the lake level and discharges at the outfall Housatonic river water column monitoring program. (See Item 20.a above.)
as part of the
b. Samplingffcst Results Received
See attached tables.
c. Work Plans/Reports/Documents Submitted
None
ITEM21 (cont'd)
GROUNDWATER MANAGEMENT AREAS PLANT SITE 1(GMA1)
(GECD310) JANUARY 2016
d. Upcoming Scheduled and Anticipated Activities (next six weeks)
Continue routine groundwater and NAPL monitoring/recovery activities.
Complete and submit Long-Term Monitoring Event Evaluation Report for Fall 2015 (due by February 29, 2016).*
Conduct well maintenance and/or survey activities (if any) identified during the fall 2015 monitoring event.
e. General Progress/Unresolved Issues/Potential Schedule Impacts
No issues.
f. Proposed/Approved Work Plan Modifications
None
TABLE21-1 ROUTINE WELL MONITORING
GROUNDWATER MANAGEMENT AREA 1
CONSENT DECREE MONTHLY STATUS REPORT GENERAL ELECTRIC COMPANY· PITTSFIELD, MASSACHUSETTS
January 2016
LNAPL DNAPL
Thickness ThicknessDateWell (feet\lfeetlName 0.001/7/2016 0.0064R
0.00 0.0064R 1/14/2016
0.00 0.0064R 1/21/2016
0.00 0.0064R 1/28/2016
0.001/7/2016 0.0064S
0.00 0.0064S 1/14/2016
0.00 0.0064S 1/21/2016
0.00 0.0064S 1/28/2016
0.0064S-CAISSON 1/7/2016 0.02
0.03 0.0064S-CAISSON 1/14/2016
0.03 0.0064S-CAISSON 1/21/2016
64S-CAISSON 1/28/2016 0.03 0.00
<0.0164V 1/7/2016 0.72
<0.010.6164V 1/14/2016
<0.010.6464V 1/21/2016
<0.0164V 0.391/28/2016
0.0064X(N) 1/7/2016 0.02
64X(N) 0.02 0.001/14/2016
64X(N) 0.02 0.001/21/2016
64X(N) 1/28/2016 0.02 0.00
0.0064X(S) 117/2016 0.03
64X(S) 0.03 0.001/14/2016
64X(S) 0.03 0.001/21/2016
64X(S) 0.03 0.001/28/2016
64X(W) 1/7/2016 0.00 0.00
64X(W) <0.01 0.001/14/2016
64X(W) 0.00 0.001/21/2016
64X(W) 0.02 0.001/28/2016
E2SC-03D 0.00 0.40117/2016
E2SC-03D 0.00 1.201/14/2016
E2SC-03D 1/21/2016 0.00 0.60
Page 1 of4
C-\Users\50029937 4\Doettmenls\ Copy of GMA-1 Data January 2016,xlsxMonitoring
215/2016
TABLE 21-1 ROUTINE WELL MONITORING
GROUNDWATER MANAGEMENT AREA 1
CONSENT DECREE MONTHLY STATUS REPORT GENERAL ELECTRIC COMPANY - PITTSFIELD, MASSACHUSETTS
January 2016
LNAPL DNAPL
Well Date Thickness Thickness Name lfeetl lfeetl
E2SC-03D 1/28/2016 0.00 0.80
GMA1-17W 1/7/2016 0.09 0.00
GMA1-17W 1/14/2016 0.33 0.00
GMA1-17W 1/21/2016 0.16 0.00
GMA1-17W 1/28/2016 0.00 0.00
N2SC-011 R 1/7/2016 NA 0.60
N2SC-011 R 1/14/2016 NA 0.80
N2SC-011 R 1/21/2016 NA 0.80
N2SC-011 R 1/28/2016 NA 0.70
N2SC-031 R 1/7/2016 NA 0.40
N2SC-031 R 1/14/2016 NA 0.70
N2SC-031 R 1/21/2016 NA 0.80
N2SC-031 R 1/28/2016 NA 0.85
N2SC-14 1/7/2016 NA 0.50
N2SC-14 1/14/2016 NA 0.60
N2SC-14 1/21/2016 NA 0.65
N2SC-14 1/28/2016 NA 0.60
NORTH CAISSON 1/7/2016 0.01 0.00
NORTH CAISSON 1/14/2016 0.01 0.00
NORTH CAISSON 1/21/2016 0.01 0.00
NORTH CAISSON 1/28/2016 0.02 0.00
RW-1(R) 1/7/2016 <0.01 <0.01
RW-1(R) 1/14/2016 <0.01 <0.01
RW-1(R) 1/21/2016 <0.01 <0.01
RW-1(R) 1/28/2016 <0.01 <0.01
RW-1(S) 1/7/2016 0.38 0.00
RW-1(S) 1/14/2016 0.67 0.00
RW-1(S) 1/21/2016 0.32 0.00
RW-1(S) 1/28/2016 0.02 0.00
RW-1(X) 1/7/2016 0.25 0.00
RW-1(X) 1/14/2016 0.25 0.00
RW-1(X) 1/21/2016 0.25 0.00
Page 2 of4
C \Users\500299374\Documents\ Copy of GMA-1 Data January 2016.x!sxMonitoring
2/5/2016
TABLE 21-1 ROUTINE WELL MONITORING
GROUNDWATER MANAGEMENT AREA 1
CONSENT DECREE MONTHLY STATUS REPORT GENERAL ELECTRIC COMPANY - PITTSFIELD, MASSACHUSETTS
January 2016
LNAPL DNAPL
Well Date Thickness Thickness Name (feet) (feet}
RW-1(X) 1/28/2016 0.25 0.00
RW-2 1/7/2016 0.00 0.00
RW-2 1/14/2016 0.00 0.00
RW-2 1/21/2016 0.00 0.00
RW-2 1/28/2016 0.00 0.00
RW-2(X) 1/7/2016 0.00 0.00
RW-2(X) 1/14/2016 0.00 0.00
RW-2(X) 1/21/2016 0.00 0.00
RW-2(X) 1/28/2016 0.00 0.00
RW-3 1/7/2016 0.10 0.00
RW-3 1/14/2016 0.10 0.00
RW-3 1/21/2016 0.10 0.00
RW-3 1/28/2016 0.20 0.00
RW-3(X) 117/2016 0.00 0.90
RW-3(X) 1/14/2016 0.00 0.90
RW-3(X) 1/21/2016 0.00 0.90
RW-3(X) 1/28/2016 0.00 0.90
RW-4 1/7/2016 0.03 0.00
RW-4 1/14/2016 0.02 0.00
RW-4 1/21/2016 0.10 0.00
RW-4 1/28/2016 0.02 0.00
SOUTH CAISSON 1/7/2016 0.02 0.00
SOUTH CAISSON 1/14/2016 0.04 0.00
SOUTH CAISSON 1/21/2016 0.02 0.00
SOUTH CAISSON 1/28/2016 0.02 0.00
140 1/12/2016 0.00 0.00
19R 1/12/2016 0.00 0.00
49R 1/12/2016 0.00 0.00
49RR 1/12/2016 0.00 0.00
GMA1-20R 1/12/2016 0.00 0.00
GMA1-21 1/12/2016 0.00 0.00
50 1/12/2016 0.16 0.00
Page 3 of4
C:\Users\500299374\0ocuments\ Copy of GMA-1 Data January 2016.xlsxMonitoring
2/5/2016
TABLE 21-1 ROUTINE WELL MONITORING
GROUNDWATER MANAGEMENT AREA 1
CONSENT DECREE MONTHLY STATUS REPORT GENERAL ELECTRIC COMPANY· PITTSFIELD, MASSACHUSETTS
January 2016
LNAPL DNAPL
Well Date Thickness Thickness Name (feet) (feet)
E2SC-031 1/12/2016 NM 6.13
E2SC-23 1/12/2016 0.00 0.00
E2SC-24 1/12/2016 0.00 0.00
ES1-08R 1/12/2016 0.00 0.00
ESA1S-31R 1/12/2016 0.00 0.00
ESA1S-34 1/12/2016 0.00 0.00
ESA1S-72 1/12/2016 0.01 0.00
ESA1S-72R 1/12/2016 0.00 0.00
ESA1S-75 1/12/2016 0.00 0.00
ESA2S-PZ3 1/12/2016 0.00 0.00
ESA2S-PZ4 1/12/2016 0.00 0.00
ESA2S-PZ5 1/12/2016 0.00 0.00
ESA2S-PZ6 1/12/2016 0.61 0.00
GMA1-24R 1/12/2016 0.00 0.00
GMA1-30 1/12/2016 0.00 0.00
LS-12 1/12/2016 0.00 0.00
LS-24 1/12/2016 0.00 0.00
LS-30 1/12/2016 0.00 0.70
LS-31 1/12/2016 0.00 0.40
LS-38 1/12/2016 0.00 0.00
LS-38S 1/12/2016 0.00 0.00
LSSC-07 1/12/2016 0.00 0.93
LSSC-081 1/12/2016 0.00 0.00
LSSC-161 1/12/2016 0.00 0.00
LSSC-18 1/12/2016 0.00 0.00
N2SC-07 1/12/2016 0.00 0.09
Notes:
1. NM indicates no measurement was taken.
2. NA indicates measurement is not available.
Page4 of 4
C:\Users\500299374\Documents\ 21512016 Copy of GMA·1 Data January 2016.xlsxMonitonng
TABLE 21-2
WELL MONITORING AND RECOVERY OF LNAPL
GROUNDWATER MANAGEMENT AREA 1
CONSENT DECREE MONTHLY STATUS REPORT
GENERAL ELECTRIC COMPANY - PITTSFIELD, MASSACHUSETTS
January 2016
LNAPL LNAPL LNAPL Well Date Thickness Removed Removed
Name (feet) laallons) (liters)
E8A28-PZ6 1/12/2016 0.61 0.30 1.14
RW-1(8) 1/7/2016 0.38 5.00 18.93
RW-1(8) 1/14/2016 0.67 14.00 52.99
RW-1(8) 1/21/2016 0.32 9.00 34.07
RW-1(8) 1/28/2016 0.02 10.00 37.85
Total LNAPL Removal for January 2016:l.._3_s_.3_g_a_11_o_n_s__ _1_4_s._o_n_te_rs _,
Page 1 of 1
C ·\Users\50029937 4\AppData\local\Microsofl\Windows\T emporary lntemet Files\Content. OuUook\4BSBPS4D\ GMA·1 Data January 2016,xlsxLNAPL
2/4/2016
TABLE 21-3
WELL MONITORING AND RECOVERY OF DNAPL
GROUNDWATER MANAGEMENT AREA 1
CONSENT DECREE MONTHLY STATUS REPORT
GENERAL ELECTRIC COMPANY - PITTSFIELD, MASSACHUSETTS
January 2016
Well Name
Date DNAPL
Thickness (feet)
DNAPL Removed (gallons)
DNAPL Removed
(liters)
LS-30 1/12/2016 0.70 0.50 1.89
LSSC-07 1/12/2016 0.93 0.75 2.84
E2SC-031 1/12/2016 6.13 1.00 3.79
Total DNAPL Removal for January 2016:,_l_2_.a_g_a_n_o_n_s_.__a_._s_1_1te_rs __,_
Page 1 of 1
C-\Users\50029937 4\AppOata\local\Microsoft\Windows\T emporary Internet FHes\Content Outlook\4B5BPS4D\ GMA¥1 Data January 2016,xls:< ~ DNAPL
214/2016
TABLE 21-4 AUTOMATED LNAPL & GROUNDWATER RECOVERY SYSTEMS MONTHLY SUMMARY
EAST STREET AREA 1 ·NORTH & SOUTH GROUNDWATER MANAGEMENT AREA 1
CONSENT DECREE MONTHLY STATUS REPORT GENERAL ELECTRIC COMPANY ·PITTSFIELD, MASSACHUSETTS
JANUARY 2016
Caisson Month
Vol. LNAPL Collected (gallon)
Vol. Water Recovered
laallon) Percent
Downtime
Northside January 2015 0.0 29,300
February 2015 0.0 15,690
March 2015 0.0 16,400
April 2015 0.0 35,770
May 2015 0.0 19,620
June 2015 0.0 16,020
July 2015 0.0 32,840
August 2015 0.0 15,370
September 2015 0.0 12,670
October 2015 0.0 15,250 0.04 3
November 2015 0.0 12,050
December 2015 0.0 16,130
January 2016 0.0 19,010
Southside January 2015 0.0 93,083
February 2015 0.0 51,921
March 2015 0.0 47,961
April2015 0.0 93,840
May 2015 0.0 72,392
June 2015 0.0 76,530
July 2015 0.0 120,859
August 2015 0.0 72,634
September 2015 0.0 65,576
October 2015 0.0 84,983 0.04 3
November 2015 0.0 73,898
December 2015 0.0 101,021
January 2016 0.0 89,684
Notes: 1. South Caisson recovery system shutdown on 5126/14. 2. Northside Caisson depression pump shutdown 11/19/14 through 11120/14 for maintenance. 3. Pumps shut down for maintenance at Building 64G.
Page 1 of 1
C:\U~\500299374\Docl.lmonts\MSR Tables\ MSR T11blc 214.xlsx21-4
213/2016
TABLE 21-5 AUTOMATEO LNAPUDNAPL & GROUNDWATER RECOVERY SYSTEMS
EAST STREET AREA 2 - SOUTH GROUNDWATER MANAGEMENT AREA 1
CONSENT DECREE MONTHLY STATUS REPORT GENERAL ELECTRIC COMPANY - PITTSFIELD, MASSACHUSETTS
JANUARY 2016
Recovery System Location Month
011 Collected (gallon)
Water Recovered
(gallon) Percent
Downtime 17W January 2015 1.7
February 2015 1.0 March 2015 1.0 April 2015 0.0 May 2015 0.0 June 2015 0.1 July 2015 0.3
August 2015 0.2 Note6 September 2015 1.4
October 2015 0.3 November 2015 0.4 December 2015 0.2
Januarv 2016 1.2 64R January 2015 37.5 733,096
February 2015 25.0 148,554 March 2015 0.0 11,802 April2015 75.0 784,408 May 2015 June 2015
75.0 25.1
620,209 530,587
July 2015 August 2015
0.0 100.0
925,782 504,348
September 2015 October 2015
November 2015
62.5 0.0 0.0
104,679 9,285
151 0.04 6
December 2015 18.8 232 Januarv 2016 0.0 10.195
64S System January 2015 200.1 913,637 February 2015 81.3 528,533
March 2015 37.5 437,848 April 2015 293.8 1,058,225 May 2015 112.6 714,223 June 2015 81.3 639,291 July 2015 222.0 1,232,886
August2015 264.9 675,416 September 2015 97.3 433,530
October 2015 November 2015
108.8 77.5
354,301 285,451
0.04 6
December 2015 Januarv 2016
0.0 0.0
272,423 364,513
64V January 2015 294.7 939,500 February 2015 66.5 799,200
March 2015 149.4 721,700 April 2015 444.1 1,120,400 May 2015 236.6 796,800 June 2015 249.0 786,900 July 2015
August2015 564.5 273.9
1,107,400 780,600
September 2015 323.7 670,800 October 2015 307.1 799,800 Q.04 B
November 2015 290.5 667,000 December 2015 January 2016
331.7 253.3
791,800 677,600
Page 1 of 3
C'\Ummi\50020037 4\0orumentl\MSFl. T1UlleG\ MSRT4t>lt:!Hi"'"'21.5
21312016
TABLE 21·5 AUTOMATED LNAPUDNAPL & GROUNDWATER RECOVERY SYSTEMS
EAST STREET AREA 2 ·SOUTH GROUNDWATER MANAGEMENT AREA 1
CONSENT DECREE MONTHLY STATUS REPORT GENERAL ELECTRIC COMPANY· PITTSFIELD, MASSACHUSETTS
JANUARY 2016
Recovery System Location Month
Oil Collected
(aallon)
Water Recovered
(aallonl Percent
Downtime 64X January 2015 18.9 1,308,006 11.43 4
February 2015 0.0 1,107,572 March 2015 0.0 907,686 April 2015 47.4 1,516,557 May 2015 0.0 1,155,379 June 2015 0.0 1, 182,697 July 2015 22.0 1,487,839
August 2015 3.3 1,160,229 September 2015 28.6 953,093
October 2015 61.1 940,155 0.04 6
November 2015 19.8 891,113 December 2015 22.1 1,047,384
Januarv 2016 0.0 980,341 RW-2(X) January 2015 0.0 71,420
February 2015 0.0 39,246 11.43 4
March 2015 0.0 33,633 April 2015 0.0 100,312 May 2015 0.0 36,000 June 2015 0.0 38,448 July 2015 0.0 72,567
August2015 0.0 21,499 September 2015 0.0 36,228
October 2015 0.0 44,029 0.04 6
November 0.0 40,852 December 2015 0.0 46,333
Januarv 2016 0.0 41,173 RW-1(S) January 2015 See Note 5 670,094
February 2015 See Nole 5 499,004 March 2015 See Note 5 359,911 April 2015 See Note 5 741,087 May 2015 See Note 5 554,006 June 2015 See Note 5 557,992 July 2015 See Note 5 822,675
August 2015 See Note 5 590,439 September 2015 See Note 5 384,135
October 2015 See Note 5 510,809 0.04 6
November 2015 See Note 5 365,433 December 2015 See Note 5 467,476 Januarv 2016 See Note 5 432,696
RW-1(X) January 2015 0.0 265,324 11.43 4
February 2015 0.0 222,435 March 2015 0.0 204,971 April2015 0.0 272,907 May 2015 0.0 202,559 June 2015 0.0 244,794 July 2015 0.0 264,216
August 2015 0.0 210,215 September 2015 0.0 188,903
October 2015 0.0 240,736 0,04 6
November 2015 0.0 162,830 December 2015 0.0 186,048
Januarv 2016 0.0 213,112
Page2of3
C ~'5002993741Documllrrts\MS1'1 Tabim<\ MSfl Tlltl!ft 21-!lm.21·5
21312016
TABLE21-5 AUTOMATED LNAPL/DNAPL & GROUNDWATER RECOVERY SYSTEMS
EAST STREET AREA 2 ·SOUTH GROUNDWATER MANAGEMENT AREA 1
CONSENT DECREE MONTHLY STATUS REPORT GENERAL ELECTRIC COMPANY • PITTSFIELD, MASSACHUSETTS
JANUARY 2016
Recovery Oil Water System Collected Recovered Percent
Location (nallon)Month (nallonl Downtime RW-4 January 2015 16.7 621,319
February 2015 0.0 514,670 March 2015 0.0 569,222 April 2015 0.0 727.436 May 2015 0.0 501,406 June 2015 14.5 493,541 July 2015 727,65710.4
August 2015 16.6 550,231 September 2015 487,2612.1
October 2015 516,50710.4 0.04 6
November 2015 16.7 503,689 December 2015 10.4 630,838
12.4 497,754Janaurv 2016 RW-3(X) Janual)l 2015 0.0
Februal)l 2015 0.0 March 2015 0.0 April 2015 0.0 May 2015 0.0 June 2015 0.0 100 6
July 2015 0.0 100 6
August 2015 0.0 1QQ G
September 2015 0.0 1QQ G
October 2015 0.0 100 6
November 2015 0.0 100 6
December 2015 0.0 100 6
January 2016 0.0 100 6
E2SC-030 November 2015 15.6 December2015 78.4
Janaurv 2016 58.4
Summan of Total Automated Removal Water: 3217384.0 Gallons
LNAPL: 266.9 Gallons DNAPL: 58.4 Gallons
1. 64X- July 2014 tolal LNAPL removal is corrected to 48 gallons from 30 as reported in July 2014 CD Monthly Slatus Report.
2. RW~1(X) Drepression pump down 8/112014 through 8/412014 due to control float failure, (-48 hrs: 3. RW-4 Depression pump down from - 8:30 PM, 819 through-8:00 AM, B/11. Pump controller
fault. (-35.5 hrs)
4, January 2015-64X Transfer Pump control system failure caused well shutdowns at 64X(W), RW-1(X) and RW-1(X). Wells were shutdown 1/16 through 1120.
5. Effective November 2014, LNAPL recovery from RW~1(S) is reported as manual recovery and Included In the LNAPL Monitoring and Manual Recovery table of the monthly report.
6, System shutdown for maintenance.
Page 3 of 3
C \Uwra\5002GIB741D<lwm<M'l!a'MSR Totbles\
MSR Ttth21·5 ide><21.S
21312016
TABLE 21-6 64G TREATMENT PLANT DISCHARGE DATA
GROUNDWATER MANAGEMENT AREA 1
CONSENT DECREE MONTHLY STATUS REPORT GENERAL ELECTRIC COMPANY - PITTSFIELD, MASSACHUSETTS
JANUARY 2016
Housatonic River Recharge Pond Total Date Discharge Discharge Discharge
(gallons) (gallons) (gallons)
January 2015 4,583,810 122,915 4,706,725
February 2015 3,415,820 129,568 3,646,388
March 2015 3,444,380 102,651 3,547,031
April 2015 5,520,390 121,777 5,642, 167
May 2015 4,788,360 255,416 5,043,776
June 2015 4,583,160 182,662 4,765,822
July 2015 5,919,270 189,726 6,108,996
August 2015 4,676,770 221,821 4,898,591
September 2015 3,256,360 223,773 3,480,133
October 2015 2,239,470 185,839 2,425,309
November 2015 2,254,030 191,964 2,445,994
December 2015 2,339,320 172,629 2,511,949
January 2016 2,625,290 138,587 2,763,877
Note: After treatment, the majority of the water processed at GE's Building 64G groundwater treatment facility is discharged to the Housatonic River through NPDES permitted Outfall 005. However, as part of GE's overall efforts to contain NAPL within the site and to optimize NAPL recovery operations, a portion of the treated water discharged from the 64G facillty is routed to GE's on~site recharge pond located in East Street Area 2-South.
Page 1 of 1
C~\5002993T~\Oooum¢111S\MSR Tattles\ MSR Tllbie 21-6.xt.oal-6
21312016
TABLE 21-7 ACTIVE RECOVERY SYSTEMS MONTHLY SUMMARY
LYMAN STREET AREA GROUNDWATER MANAGEMENT AREA 1
CONSENT DECREE MONTHLY STATUS REPORT GENERAL ELECTRIC COMPANY - PITTSFIELD, MASSACHUSETTS
JANUARY 2016
Month/Year
Volume Water Pumped lnallonl1
RW-1R LNAPL Recovered
(gallon)
RW-3 LNAPL Recovered
(gallon) January 2014 141,436 - -February 2014 92,501 - 3.5
March 2014 100,221 - -April 2014 166,614 - 7
May 2014 186,814 - -June 2014 123,699 - 5
July 2014 183,004 - 8.5
August 2014 128,909 - 3'
September 2014 84,258 - - 4
October 2014 101,477 - -November 2014 89,755 - See Note 5
December 2014 121,890 - See Note 5
January 2015 151,799 - See Note 5
February 2015 125,905 - See Note 5
March 2015 94,437 - See Note 5
April 2015 205,706 - See Note 5
May 2015 116,987 - See Note 5
June 2015 117,200 - See Note 5
July 2015 175,482 - See Note 5
August 2015 89,870 - See Note 5
September 2015 80,994 - See Nate 5
October 2015 97,377 - See Nate 5
November 2015 86, 128 - See Note 5
December 2015 109,704 - See Note 5
January 2016 101,022 - See Note 5
Notes: 1. Volume of water pumped is total from Wells RW-1 R, RW-2, and RW-3. 2. - indicates NAPL was not recovered by the system. 3. Far the week ending August 28, 2014, depression pump system float switch failure at Well RW-3.
Issues exist with the manufacturer's replacement switches which caused intermittent periods where the system was not functioning. Estimated total downtime for this period is 96 hours (14.29% downtime).
4. For the week ending September 4, 2014, depression pump system float switch failure at Well RW-3. Issues exist with the manufacturer's replacement switches which caused intermittent periods where the system was not functioning. Estimated total downtime for this period is 160 + 167 hours (48.66% downtime).
5. Effective November 2014, LNAPL recovery (if any) from RW-3 is reported as manual recovery and included in the LNAPL Monitoring and Manual Recovery table of the monthly report.
Page 1 of 1
C:\Users\500299374\DocumentslMSR Tables\ MSR Tab1e 21·7..x.lsx21-7
215/2016
TABLE 21-8 ACTIVE DNAPL RECOVERY SYSTEMS MONTHLY SUMMARY
NEWELL STREET AREA II GROUNDWATER MANAGEMENT AREA 1
CONSENT DECREE MONTHLY STATUS REPORT GENERAL ELECTRIC COMPANY ·PITTSFIELD, MASSACHUSETTS
JANUARY 2016
Recovery
System Date
Total Gallons
Recovered
System 2'" January 2015 o'
February 2015 o'
March 2015 o'
April 2015 o'
May 2015 o'
June 2015 o'
July 2015 6<5
August 2015 1<5
September 2015 0<1
October 2015 3<0
November 2015 o<o
December 2015 1.8
January 2016 o<o
JANUARY 2016 o<o
Note: 1. System 2 wells are N2SC-011(R), N2SC-031(R), and N2SC-14< 2< Recovery system shutdown for maintenance on October 16, 2014 (504 hours/63<64% dow 3< Recovery system shutdown for maintenance (672 hours/93<33% downtime)< 4< Recovery system shutdown for maintenance (100% downtime)<
Page 1 of 1
C:\Usen\500299374\DocumantslMSR Tcble$\ MSR Tatile 21.fJ.Jdsli:21-8
213/2016
ITEM23 GROUNDWATER MANAGEMENT AREAS
PLANT SITE 2 (GMA 3) (GECD330)
JANUARY 2016
* All activities described below for this item were conducted pursuant to the Consent Decree.
a. Activities Undertaken/Completed
Conducted routine groundwater elevation monitoring and NAPL monitoring/recovery activities. The thicknesses of LNAPL and DNAPL measured during these activities (if any) are shown in Table 23-1.
Continued automated recovery operations for LNAPL by automatic skimmers located in wells 51-21 and GMA3-l 7 (see Table 23-2).
Conducted manual LNAPL removal activities from the wells in this area (see Table 23-3).
Continued installation of the sub-slab depressurization system (SSDS) in Building 59 to address potential vapor intrusion (including completion of pipe installation), subject to delivery of certain remaining components.
b. Samplingffest Results Received
See attached tables.
c. Work Plans/Reportsffiocuments Submitted
None
d. Upcoming Scheduled and Anticipated Activities (next six weeks)
Continue routine groundwater and NAPL monitoring/recovery activities.
Receive and install the remaining components of the SSDS in Building 59, conduct start-up activities, and begin operation of the SSDS.
Complete and submit Groundwater Quality and NAPL Monitoring Report for Fall 2015 (due by February 29, 2016).
Conduct well maintenance and/or survey activities (if any) identified during the fall 2015 monitoring event.
ITEM23 (cont'd)
GROUNDWATER MANAGEMENT AREAS PLANT SITE 2 (GMA 3)
(GECD330) JANUARY 2016
e. General Progress/Unresolved Issues/Potential Schedule Impacts
GE will discuss with EPA the scheduling of the next indoor air sampling event in Building 59 after the SSDS is in operation.
f. Proposed/Approved Work Plan Modifications
None
TABLE 23-1 ROUTINE WELL MONITORING - LNAPL AND DNAPL THICKNESSES
GROUNDWATER MANAGEMENT AREA 3
CONSENT DECREE MONTHLY STATUS REPORT GENERAL ELECTRIC COMPANY - PITISFIELD, MASSACHUSETIS
January 2016
Well Name
Date LNAPL
Thickness (f&etl
DNAPL Thickness
lfeetl
51-08 11712016 1-42 0.00
51-08 1/12/2016 0.70 Q_QQ
51-08 1/20/2016 0.90 0.00
51-08 1/26/2016 0.95 0.00
51-21 1/7/2016 0.02 0.00
51-21 1/12/2016 0.10 0.00
51-21 1/20/2016 0.21 0.00
51-21 1/26/2016 0.25 0.00
GMA3-10 1f7/2016 0.02 0.00
GMA3-10 1/12/2016 0.02 0.00
GMA3-10 1/20/2016 0.02 0.00
GMA3-10 1/2612016 0.02 0.00
GMA3-12 1/7/2016 0.10 0.00
GMA3-12 1/12/2016 0-20 0.00
GMA3-12 1/20/2016 0.20 0.00
GMA3-12 1/26/2016 0,80 0.00
GMA3-13 117/2016 0 00 0.00
GMA3-13 1/12/2016 0.00 0.00
GMA3-13 1/20/2016 0.00 0.00
GMA3-13 1/26/2016 0.00 0.00
GMA3-17 117/2016 0.00 0.00
GMA3-17 1/1212016 0.00 0.00
GMA3-17 1/20/2016 0.00 0.00
GMA3-17 1/26/2016 0.00 0.00
51-0SR 1/1312016 0-13 0.00
51-06 1/1312016 0.00 0.00
51-07 111312016 0.00 0.00
51-09 1113/2016 0.00 0.00
51-11 1/13/2016 0.00 0.00
51-12 1113/2016 0.00 0.00
51-13 1/13/2016 0.00 0.00
51-14 1/13/2016 0.00 0.00
51-15 1/13/2016 0.12 0.00
51-16R 1/13/2016 0.03 0.00
51-17 1/1312016 1.14 0.00
51-18 1/13/2016 0.00 0.00
51-19 1/13/2016 0.64 0.00
59-01 1113/2016 0.18 0.00
59-03R 1/13/2016 0.60 0.00
59-07 1/13/2016 0.71 0.00
GMA3-11 1/1312016 0.00 0.00
GMA3-14 1/13/2016 0.00 0.00
UB-MW-10R 1/1312016 0.00 0.00
UB-PZ-3 111312016 0.17 0.00
Page 1of1
c.w_..~7~~~Wotdowo\T~"-T1<!!F....\C=ttit:t0ulb>!MS~P~O\ GMA-30....J-=ory:?ITTl!M>M~
2/412016
TABLE 23-2 AUTOMATED LNAPL RECOVERY SYSTEMS MONTHLY SUMMARY
GROUNDWATER MANAGEMENT AREA 3
CONSENT DECREE MONTHLY STATUS REPORT GENERAL ELECTRIC COMPANY - PITISFIELD, MASSACHUSETIS
JANUARY 2016
Vol.LNAPL Recovery Collected
Well Month (gallons)
51-21 January 2015 0.3
February 2015 4.5
March 2015 12.3
April 2015 0.9
May 2015 1.1
June 2015 6.3
July 2015 0.0
August2015 6.6
September 2015 13.3
October 2015 11.6
November 2015 20.2
December 2015 21.4
January 2016 10.4
GMA 3-17 January 2015 0.2
February 2015 0.3
March 2015 0.0
April 2015 0.0
May2015 0.1
June 2015 0.2
July 2015 0.1
August 2015 0.0
September 2015 0.1
October 2015 0.9
November 2015 0.8
December 2015 0.9
January 2016 0.8
Notes:
1. As of August 4, 2014, Well 51-21 system down. Skimmer motor not functioning and awaiting manufacturer replacement Estimated downtime for this period is approximately 576 hours (85.71%)
2. On September 3, 2014, Well 51-21 motor replaced and system operating. Estimated downtime for this period is approximately 144 hours (21.43%)
Page 1 of 1
C:\Users\500299374\Dectimen'.s\MSR T&bles\ MSR Table 23-2 GMA 1 and 3 GW anti NAPL Recovery.x!sx23-2
213/2016
TABLE 23-3 LNAPL MONITORING AND MANUAL RECOVERY
GROUNDWATER MANAGEMENT AREA 3
CONSENT DECREE MONTHLY STATUS REPORT GENERAL ELECTRIC COMPANY - PITISFIELD, MASSACHUSETIS
January 2016
Well Name
Date LNAPL
Thickness (feet\
LNAPL Removed loallons\
LNAPL Removal !liters\
51-17 1/13/2016 1.14 0.75 2.84
51-19 1/13/2016 0.64 0.50 1.89
59-03R 1/13/2016 0.60 0.50 1.89
59-07 1/13/2016 0.71 0.50 1.89
UB-PZ-3 1/13/2016 0.17 0.20 0.76
51-08 117/2016 1.42 0.23 0.85
51-08 1/12/2016 0.70 0.11 0.42
51-08 1/20/2016 0.90 0.14 0.54
Total LNAPL Removed for January 201 s:l..._2_.9...-g_a1_1o_n_s_.__11_._1_11_te_rs_ _.
Page 1 of 1 2/412016 C:\Usersl.50029937 4\AppOata\local\Microsoft\Windows\T emporary Internet flles\Content. Out!ook\4B5BPS40\GMA~3 Data January 2015,JdsxLNAPL
ITEM24 GROUNDWATER MANAGEMENT AREAS
PLANT SITE 3 (GMA 4) (GECD340)
JANUARY 2016
Note: This Item 24 describes activities conducted at GMA 4 other than those associated with the OPCAs. Activities relating to the OPCA post-closure groundwater monitoring program are described in Item 24A below.
* All activities described below for this item were conducted pursuant to the Consent Decree.
a. Activities Undertaken/Completed
None
b. Sampling /Test Results Received
None
c. Work Plans/Reportsillocuments Submitted
None
d. Upcoming Scheduled and Anticipated Activities (next six weeks)
Submit the Long-Term Trend Evaluation Report for Fall 2015 (due by February 4, 2016).
Conduct well maintenance and/or survey activities (if any) identified during the fall 2015 monitoring event.
e. General Progress/Unresolved Issues/Potential Schedule Impacts
No issues.
f. Proposed/Approved Work Plan Modifications
None
ITEM24A GROUNDWATER MANAGEMENT AREAS
ON-PLANT CONSOLIDATION AREAS POST-CLOSURE PROGRAM
JANUARY 2016
Note: In accordance with GE's Revised Post-Removal Site Control Plan for the On-Plant Consolidation Area, approved by EPA on September 26, 2011, a separate post-closure groundwater monitoring program is being implemented for the OPCA monitoring wells. The activities in that program arc described in this item.
* All activities described below for this item were conducted pursuant to the Consent Decree.
a. Activities Undertaken/Completed
None
b. Sampling/Test Results Received
None
c. Work Plans/Reports/Documents Submitted
Submitted the Monitoring Event Evaluation Report for Fall 2015 (January 20, 2016).
d. Upcoming Scheduled and Anticipated Activities (next six weeks)
Conduct well maintenance and/or survey activities (if any) identified during the fall 2015 monitoring event.
e. General Progress/Unresolved Issues/Potential Schedule Impacts
No issues.
f. Proposed/Approved Work Plan Modifications
None
TABLE A-1 DATA RECEIVED DURING JANUARY 2016
NPDES PERMIT MONITORING SAMPLING GENERAL ELECTRIC COMPANY - PITTSFIELD, MASSACHUSETTS
(Results are presented ln parts per million, ppm)
Sample ID: 00~101M-1X-CP 00~1Q1M-1X-CT 00~101M-1X·GO 00~101M·2X-CP 005-101M-2X-CT 005·101M-2X-GO Parameter Date Collected: 01104/16 Volatile Organics 1, 1-Dich!oroelhane NA 1,4-Dichlorobenzene NA Chtoroethane NA Methylene Chloride NA To!al Target Volatiles (TIV) NA PCBs-Unfiltered Aroclor-1248 0.0000067 J Aroclor-1254 0.0000065J
Aroclor-1260 0.0000047 J
Total PCBs 0.0000179J
Semivolatile Organics None Detected I NA lnorganics-Unfittered Aluminum NA Cadmium NA Copper NA Lead NA Nickel NA Zinc NA Conventional Alkallnilv NA Ammonia Nitrogen NA Oil & Grease NA Total Dissolved Solids NA Total Organic Carbon NA Total Solids NA Total Suspended Solids NA
01/04116 01/04116 01/11/16 01/11/16 01/11/16
NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA
NA NA 0.000015 J NA NA NA NA 0.000031 NA NA NA NA 0.000051 NA NA NA NA 0.000097 NA NA
NA NA I NA I NA I NA
NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA
NA NA NA NA NA NA NA NA NA NA NA N0(4.1) NA NA NDl4.1) NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA
NDl1.00) NA NA 2.90 NA
005-4Q3M-1X-CT 005-403M-1X-GO 005-403M·2X·CT 12/07/15 12107/15 12114115
NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA
NA NA NA NA NA NA NA NA NA NA NA NA
I NA NA I NA
NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA
NA NA NA NA NA NA NA NDl4.1) NA NA NA NA NA NA NA NA NA NA
ND(1.00) NA ND(1.00)
10 \U,.,>'bt~>< ...1<""""'-"""'"""'""'''""''l""'""'"1,_..,,...,,~,,,_,,,__._,BC!'>'f'""}, Paget cf9 2/4/2016, .... Al>fu. Al
TABLE A-1 DATA RECEIVED DURING JANUARY 2016
NPDES PERMIT MONITORING SAMPLING GENERAL ELECTRIC COMPANY - PITISFIELD, MASSACHUSETTS
(Results are presented in parts per million, ppm)
Sample ID: 005403M·2X-OO Parameter Date Collected: 12/14/15 Volatile Organics 1, 1 ·Dichloroethane NA 1,4-Dichlorobenzene NA Chloroethane NA Methylene Chloride NA Total Target Volatiles (TTV) NA PCBs·Unfiltered Aroclor-1248 NA Aroclor-1254 NA Aroclor-1260 NA Total PCBs NA Semivolatile Organics None Delected I NA lnorganics-Unfiltered Aluminum NA Cadmium NA Copper NA Lead NA Nickel NA Zinc NA Conventional Alkalinilv NA Ammonia Nitronen NA Oil & Grease ND(4.1) Total Dissolved Solids NA Total Organic Carbon NA Total Solids NA Total Suspended Solids NA
I
05AW-10-1X-CP 05AW-10·1X·CT 05AW·10·1X-OO 05AW·10·2X·CP 05AW-4Q·2X·CT 01/10/16 01/10/16 01/10/16 01/16116 10125/15
NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA
0.00016 NA NA 0.000044 NA 0.00054 NA NA 0.00015 NA 0.0011 NA NA 0.00032 NA 0.0018 NA NA 0.000514 NA
NA I NA I NA I NA I NA
NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA
NA NA NA NA NA NA NA NA NA NA NA NA ND(«1) NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 104 NA NA 6.50
05BW·10·1X-CP 05BW-1Q-1X-CT 05BW·10·1X·GO 01/10/16 01/10/16 01110/16
NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA
0.00017 NA NA 0.00061 NA NA 0.0013 NA NA 0.00208 NA NA
I NA I NA I NA
NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA
NA NA NA NA NA NA NA NA N0(4,1) NA NA NA NA NA NA NA NA NA NA 99.0 NA
~"-'""""""'""''*"11<""''"'""''"-WIM>•n'1""<"'"'"""""' .."'""""" ""'""·~eM'.f'$<rl lato.A1"" ~! Page2of9 21412015
TABLE A-1 DATA RECEIVED DURING JANUARY 2016
NPDES PERMIT MONITORING SAMPLING GENERAL ELECTRIC COMPANY - PITTSFIELD, MASSACHUSETTS
(Results are presented in parts per million, ppm}
Sample ID: 005W·10·1X-CP Parameter Date Colleeted: 01/16/16 Volatile Organics 1, 1 ·Dichforoelhane NA 1,4·0!chforobenzene NA Chloroethane NA Methvlene Chloride NA Total Target Volatiles (TTV) NA PCBs·Unfiltered Aroclor-1248 0.000011 J'
Aroclor-1254 0.000017
Aroclor-1260 0.000014 J' Total PCBs 0.000042 Semivolatile Organics None Detected I NA lnorganics·Unfiltered Aluminum NA Cadmium NA Copper NA Lead NA Nickel NA Zinc NA Conventional Alkalinity NA Ammonia Nitroaen NA Oil & Grease NA Total Dissolved Solids NA Total Organic Carbon NA Total Solids NA Total Suspended Solids NA
005W-10·1X-GO D1/10h6
NA NA NA NA NA
NA NA NA NA
NA I
NA NA NA NA NA NA
NA NA
ND(4.2) NA NA NA NA
OOSW-40..JX-CT 06AW-10-1X-CP 06AW·10·1X-CT 06AW-1a-1x-00 0060-1Q1M-1X-CP 006D·101M-1X-CT 0060·101M·1X-OO 10/25/15 01/10/16 01/10/16 01/10/16 01/05/16 01/05/16 01/05/16
NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA
NA 0.000071 NA NA 0.000013 J NA NA NA 0.00032 NA NA 0.000033 NA NA NA 0.00038 NA NA 0.000027 NA NA NA 0.000771 NA NA 0.000073 NA NA
NA NA I NA I NA I NA I NA I NA
NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA
NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 5.0 NA NA N0(4.1) NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA
ND{1.00) NA 236 NA NA 19.9 NA
C''.1$«'"""""""'n"'*''"""•"'"""'"""""'''""""""''""'""'""'~"'0""""'~wsP~>· Page3ot9 21412016t-A1'fil• '-'
TABLE A·1 DATA RECEIVED DURING JANUARY 2016
NPDES PERMIT MONITORING SAMPLING GENERAL ELECTRIC COMPANY - PITTSFIELD, MASSACHUSETTS
(Results are presented in parts per million, ppm)
Sample ID: 006Q..1Q1M-2X-CP Parameter Date Collected: 01115/16 Volatile Organics 1, 1-Dich!oroelhane NA 1,4-0ichfombenzene NA Chlomethane NA Methylene Chloride NA Total large! Volatiles (TTV) NA PCBs-UnfiHered
Arodor-1248 0.000031 Arodor-1254 0.000082 Aroclor-1260 0.000095 Total PCBs 0.000208 Semivolatile Organics None Detected I NA lnorganics-Unfiltered Aluminum NA Cadmium NA Copper NA Lead NA Nickel NA Zinc NA Conventional Alkalinity NA Ammonia Nl!mgen NA Oil & Grease NA Total Dissolved Solids NA Total Organic Carbon NA Total Solids NA Tota! Suspended Solids NA
I
006D-4Q2M·2X-OS 006D-4Q2M-2X-OV 0060-4Q3M-2X-CT 0060403M·2X-GO 11118/15 11HB/15 12117/15 12117115
NA ND{0.0010) NA NA NA 0.00042 J NA NA NA N0(0.0010) NA NA NA ND(D.0010) NA NA NA N0{0.0010) NA NA
NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA
NA I NA I NA
NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA
NA NA NA NA NA NA NA NA NA NA NA N0(4,1) NA NA NA NA NA NA NA NA NA NA NA NA NA NA 19.2 NA
006W-10-1X-CP 006W·10-1X-CT 006W·10·1X-OO 01/10/16 01110/16 01/10116
NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA
0.000075 NA NA 0.00031 NA NA 0.00049 NA NA 0.000875 NA NA
I NA I NA I NA
NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA
NA NA NA NA NA NA NA NA ND(4,1) NA NA NA NA NA NA NA NA NA NA 225 NA
c·;,...,~-m><1h•h<<»0&1U<,_,,,,,"'".,..,..,""'"'"''""'""''"""'"'""'""'',,,_,..•11,.~=1-. T«hA1'<n A 1 Page 4 DI 9 21412016
TABLE A·1 DATA RECEIVED DURING JANUARY 2016
NPOES PERMIT MONITORING SAMPLING GENERAL ELECTRIC COMPANY - PITTSFIELD, MASSACHUSETTS
(Results are presented in parts per million, ppm}
Sample ID: Parameter Dale Collected:
006W-10·2X..CP 01/16116
006W-40-3X-CT 098-10·1X·CT 10/25115 01/10/16
09B-1Q-1X-OO 01/10/16
09840..JX..CT 12102/15
09BW-1Q-1X..CP 01/11/16
009W·10·1X·CP 01/10/16
009W-1Q-1X-CT 01/10/16
009W-1Q-1X-GO 01/10/16
Volatile Organics 1, 1-Dichloroethane NA NA NA NA NA NA NA NA NA 1,4-Dich!orobenzene NA NA NA NA NA NA NA NA NA Ch!oroethane NA NA NA NA NA NA NA NA NA Methytene Chloride NA NA NA NA NA NA NA NA NA Tola! Target Volaliles (TTV) NA NA NA NA NA NA NA NA NA PCBs·Unfiltered
Aroclor-1248 0.000028
Aroclor-1254 0.000076
Aroclor-1260 0.000082
Total PCBs 0.000186 Semivolatile Organics None Detected NA lnorganics-Unfiltered Aluminum NA Cadmium NA Copper NA Lead NA Nickel NA Zinc NA Conventional Alkallnitv NA Ammonia Nitrogen NA Oil & Grease NA Total Dissolved Solids NA Total Organic Carbon NA Total Solids NA Tota! Suspended Solids NA
I
NA NA NA NA 0.0000090 J
NA NA NA NA 0.000025
NA NA NA NA 0.000052
NA NA NA NA 0.000086
NA I NA I NA I NA NA
NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA
NA NA NA NA NA NA NA NA NA NA NA NA ND(4.1) NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA 19.2 11.7 NA ND(l.00) NA
0.000031 NA NA 0.000024 NA NA 0.000049 NA NA 0.000104 NA NA
I NA NA NA
NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA
NA NA NA NA NA NA NA NA ND(4.1) NA NA NA NA NA NA NA NA NA NA 11.9 NA
C'"'""'"""'*"'"·'<ti""''"''-"""'"""'W'"""""'t~"'"l'°""""''"""'°"'-.,'"''""'''.."'""'"°'ff Page 5 DI 9 21412016l"""~'- ~·
TABLE A-1 DATA RECEIVED DURING JANUARY 2016
NPDES PERMIT MONITORING SAMPLING GENERAL ELECTRIC COMPANY - PITISFIELO, MASSACHUSETIS
(Results are presented in parts per million, ppm)
Sample ID: 009W-10·2X-CP Parameter Date Collected: 01/16/16 Volatile Organics 1,1 ·Dichloroethane NA 1 A·Dichlorobenzene NA Chloroethane NA Methylene Chloride NA Total Target Vo!a!Hes (TIV) NA PCBs-Unfiltered
Aroclor-1248 ND(0.000015)
Aroc!or-1254 0.000013 J Aroclor-1260 0.000016 Total PCBs 0.000029 Semivolatile Organics None Detected I NA lnorganics-Unfiltered Aluminum NA Cadmium NA Copper NA Lead NA Nickel NA Zinc NA Conventional Alkalinity NA Ammonia Nitrooen NA Oil & Grease NA Total Dissolved Solids NA Total Organic Carbon NA Total Solids NA Tofal Suspended Solids NA
009W"40-3X-CT 10125/15
NA NA NA NA NA
NA NA NA NA
NA I
NA NA NA NA NA NA
NA NA NA NA NA NA L40
64G-101M-1X..CP 64G-1Q1M·1X..CT 64G-1Q1M-1X-GO 64G-1Q1M-1X-GS 64G-101M-1X-GV 01/04/16 01/04/16 01/04/16 01/04/16 01/04/16
NA NA NA NA 0.00057 J NA NA NA NA ND(0.0010) NA NA NA NA 0.00041 J NA NA NA NA ND(0.0010) NA NA NA NA ND(0.0010)
ND(0.000016) NA NA NA NA ND(0.000016) NA NA NA NA ND(0.000016) NA NA NA NA N0(0.000016) NA NA NA NA
NA I NA NA I - NA
NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA
NA NA NA NA NA NA NA NA NA NA NA NA ND(4.1) NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA ND(1.00) NA NA NA
64G-1Q1M·2X-CP 64G-1Q1M-2X-CT 01/11116 01/11/16
NA NA NA NA NA NA NA NA NA NA
ND(0.000016) NA ND(0.000016) NA ND(0.000016) NA N0(0.000016) NA
NA I NA
NA NA NA NA NA NA NA NA NA NA NA NA
NA NA NA NA NA NA NA NA NA NA NA NA NA ND(1.00)
(,;'"-'""'"-'~~"'"3l"'r<'""''"'°'"''°'""'"'""'""' '""""""V-f">"·'""'""'-"°''•1"l!JPS;lf1...... , ...... , Paga 6 of 9 2!4!2016
TABLE A-1 DATA RECEIVED DURING JANUARY 2016
NPDES PERMIT MONITORING SAMPLING GENERAL ELECTRIC COMPANY - PITTSFIELD, MASSACHUSETTS
(Results are presented in parts per mllllon, ppm)
Sample ID: 64G·101M-2X-GO Parameter Date Collected: 01/11/16 Volatile Organics 1, 1 ·Dich!oroefhane NA 1,4-Dichlorobenzene NA Chloroethane NA Methylene Chloride NA Total Target Volatiles (TTV) NA PCBs·Unfiltered Aroclor-1248 NA Aroclor-1254 NA Aroc!or-1260 NA Total PCBs NA Semivolatile Organics None Detected NA lnorganics·Unfiltered Aluminum NA Cadmium NA Copper NA Lead NA Nickel NA Zinc NA Conventional Alkalinity NA Ammonia Nitrogen NA Oil & Grease N0(4.2) Total Dissolved Solids NA Total Organic Carbon NA Total Solids NA Total Suspended Solids NA
64G-40-1X..CX 12114/15
NA NA NA NA NA
NA NA NA NA
I NA
ND(0.100) ND(0.00100)
0.00170 ND{0.00100)
0.00270 ND(0.00500)
392 ND(0.0500)
NA 662 3.2 692 NA
64G-4Q2M·2X-GS 64G-402M-2X-GV 64G-40-2X-CX 64G-403M-1X..CT 11/1)9/15 11/09/15 12/16/15 12/07/15
NA 0.00086 J NA NA NA ND(0.0010) NA NA NA 0.00043 J NA NA NA ND(0.0010) NA NA NA 0.0013 NA NA
NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA
- I NA I NA I NA
NA NA N0(0.100) NA NA NA N0(0.00100) NA NA NA 0.00200 NA NA NA ND(0.00100) NA NA NA 0.00250 NA NA NA ND(0.00500) NA
NA NA 382 NA NA NA ND(0.0500) NA NA NA NA NA NA NA 699 NA NA NA 3.8 NA NA NA 732 NA NA NA NA ND(1.00)
64G-403M·1X-GO 64G-4Q3M·1X-GS 64G-4Q3M-1X-GV 12/07/15 12/07/15 12/07/15
NA NA 0.00067 J NA NA NDI0.0010) NA NA 0.00039 J NA NA ND(0.0010) NA NA 0.0011
NA NA NA NA NA NA NA NA NA NA NA NA
NA I - I NA
NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA
NA NA NA NA NA NA
N0{4.1} NA NA NA NA NA NA NA NA NA NA NA NA NA NA
'°"'"''·'==''"'4''°""""'"'""'""""-""'"·'°"'''"''-f""'""""'"'""'-'"'4fhBl>s.<D Page 7 of 9 2/412016'"""-"'""' A 1
TABLE A-1 DATA RECEIVED DURING JANUARY 2016
NPDES PERMIT MONITORING SAMPLING GENERAL ELECTRIC COMPANY - PITTSFIELD, MASSACHUSETTS
(Results are presented in parts per million, ppm)
Sample ID: 64G-403M·2X-CT Parameter Date Collected: 12114/15 Volatile Organics 1, 1-Dichloroethane NA 1.4-Dich!orobenzene NA Ch!oroe!hane NA Me!hylene Chloride NA Total Target Volatiles (TIV) NA PCBs·Unfiltered
Amclor-1248 NA Aroclor-1254 NA Aroclor-1260 NA Total PCBs NA Semivolatile Organics None Detected I NA lnorganics-Unfiltered Aluminum NA Cadmium NA Copper NA Lead NA Nickel NA Zinc NA Conventional Alkalinity NA Ammonia Ni!roqen NA Oil & Grease NA Total Dissolved Solids NA Total Oroanic Carbon NA Total Solids NA Total Suspended Solids N0{1.00)
64G-403M-2X-GO 64G-403M·2X-GS 64G-403M-2X-GV 64G-40-3X..CX 12114/15 12114/15 12114115 12118/15
NA NA 0.00071 J NA NA NA N0{0.0010) NA NA NA 0.00044 J NA NA NA 0.00021 J NA NA NA 0.0014 NA
NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA
NA I .. I NA I NA I
NA NA NA N0(0.100) NA NA NA ND(0.00100) NA NA NA 0.00160 NA NA NA ND{0.00100} NA NA NA 0.00240 NA NA NA N0{0.00500)
NA NA NA 398 NA NA NA ND{0.0500)
ND{4.1) NA NA NA NA NA NA 625 NA NA NA 3.6 NA NA NA 714 NA NA NA NA
64TD-101M·1X-CP 64TD-101M-1X-CT 64TD-101M-1X-GO 01/05/16 01/05116 01/05/16
NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA
0.000034 NA NA 0.000041 NA NA 0.000043 NA NA 0.000118 NA NA
NA NA I NA
NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA
NA NA NA NA NA NA NA NA ND{4.1) NA NA NA NA NA NA NA NA NA NA 1.30 NA
C'l-h'>002%)'74Aj.t0;<•(=>f'""->=<'<W"""""'""<"""''""'*'"''""'"'_,Q""""4<~6'N~~ Page8o!9 2!412016
i.1... ~·-·~·
TABLE A-1 DATA RECEIVED DURING JANUARY 2016
NPDES PERMIT MONITORING SAMPLING GENERAL ELECTRIC COMPANY - PITTSFIELD, MASSACHUSETIS
(Results are presented in parts per million, ppm)
Sample 10: 64T0-101M-2X-CP 64TD4Q3M-2X..CT 64TD403M-2X-GO HR4Q-1X-GX Parameter Date Collected: 01/15/16 12117/15 12117/15 12114/15 Volatile Organics 1, 1-Dichtoroethane NA NA NA NA 1,4-Dichlorobenzene NA NA NA NA Chloroethane NA NA NA NA Methylene Chloride NA NA NA NA Total Target Volatiles (TTV) NA NA NA NA PCBs-Unfiltered
Aroc!or-1248 0.000024 NA NA NA Aroc!or-1254 0.000032 NA NA NA Aroctor-1260 0.000036 NA NA NA Tota! PCBs 0.000092 NA NA NA Semivolatile Organics None Detected NA I NA I NA I NA lnorganics-Unfiltered Aluminum NA NA NA ND{0.100) Cadmium NA NA NA ND(0.00100) Copper NA NA NA 0.000400 J Lead NA NA NA ND(0.00100) Nickel NA NA NA 0.000700 J Zinc NA NA NA N0(0.00500) Conventional Alkalinity NA NA NA 73.3 Ammonia Nitrogen NA NA NA ND(0.0500) Oil & Grease NA NA ND{4.1) NA Total Dissolved Solids NA NA NA 109 Tota! Organic Carbon NA NA NA 3.3 Total Sollds NA NA NA 108 Tolal Suspended Solids NA 1.50 NA NA
HR40·2X-GX HR-4Q-3X-GX 12/16115 12115/15
NA NA NA NA NA NA NA NA NA NA
NA NA NA NA NA NA NA NA
I NA I NA
0.0300 BJ ND{0.100) ND(0.00100) ND(0.00100) 0.000500 J 0.000600J
ND(0.00100) ND(0.00100} 0.000800 BJ 0.000800 BJ
0.00170 J 0.00210 J
56.0 54.0 ND(0.0500) ND(0.0500)
NA NA 85.0 75.0 4.3 4.3
95.0 92.0 NA NA
Notes:
t. Samples were collected by General Electric Company, and were submitted lo ALS Environmental and SGS Environmental Services, Inc. for analysis of volaltles, PCBs, semivolaliles, metals, alkalinity, ammonia, total organic carbon, oil & grease, total dissolved solids, !olal solids and to!al suspended solids.
2. NA· Not Analyzed. 3. ND • Analyte was not detected. The number in parentheses is the associated reporting limit. 4. With the exception of conventional parameters and metals, only those consti!uents detecled in one or more samples are summarized. 5. -· Indicates that alt constituents for the parameter group were not detected.
Data Qualifiers:
Oraanjcs lvola!!les PCBs semivolati!esl J · Indicates an estimated value between the method detection limit (MDL) and method reporting llmit {MAL) • ALS. J 1 - Indicates an estimated value less than the practical quantitation timit (POL} - SGS Environmental Services, Inc.
lnomanics J ·Indicates an estimated value between the method deleclion !imil {MDL) and method reporting limit (MAL).
C'""'*<•='''«'°"""'"'"'"''""°"W""""'1""1"'">"-f•o.<-.<ht••:NLI"'°""V. \'..mR!- A1 Page 9 of 9 2/412016