    Pathloss 4 0 TrainingPresented byOri Widianto @ 2009

  • 5/23/2018 Training Pathloss 4

    2/33

    Step b y step Instal lat ion of Pathlos s 4.0 :

    1. Extract BDE setup and install BDE setup.

    2. Run VolumeSerial, choose your drive that will be destination for Pathloss

    installation (e.g C:\)

    3. Fill on new serial number field by : DC7915D5

    4. Push button Change Serial Number

    5. Restart your PC

    6. Run setup wizard on Pathloss Setup Folder.

    7. Copy file on folder Key Initialization (PASSIVE.BINfile) to folder that

    Pathloss already installed (e.g C:\PLW40).

    8. Restart your PC.

    9. Run fileplw40_mu.exe(last update for Pathloss) and extract to Pathloss

    installation folder.

    10.Your Pathloss ready for used

  • 5/23/2018 Training Pathloss 4

    3/33

    How To Operate Pathloss

    PATHLOSS program is full Microwave Network designsoftware.

    For our work we shall use PATHLOSS for the following:

    a) Make Path Profile to find antenna height in each station

    b) Make Network Configuration

    c) Calculate Link Budget to find Antenna diameters , RX level & Link

    Availability

  • 5/23/2018 Training Pathloss 4

    4/33

    Necessary Data for Microwave Network Design &

    how to place it in your PATHLOSS Program

    The followings data must be placed in PATHLOSS program folder to be

    able to use the program as a full Microwave system Planner.

    1. RAIN file

    This folder contents Rain data for each area of the world according

    to 4 standards (Canada, Crane, Crane_96 & ITU). Usually we work

    according to ITU standard (ITU-R-P.530-7/8)

    THIS DATA WILL AUTOMATICALLY PLACED IN PATHLOSS FOLDER AFTER PROGRAM SET

    UP

  • 5/23/2018 Training Pathloss 4

    5/33

    2. Equipment File

    This folder contents 4 folders but for our Microwave design we just

    use 2 folders as the followings:a. MAS which contents Microwave Antenna Data for different Antenna

    Manufacturer (Andrew , RFS , ERICSSON , ..)

    b. MRS which contents Microwave Radio Data for different

    Manufacturers.

    3. Contour map database

  • 5/23/2018 Training Pathloss 4

    6/33

    How To Set Contour Map Database

    In Pathloss, we can use some contour map database to generate path

    Profile.

    Please note, this contour map database just only for reference, we

    have to verification the actual condition by doing pathsurvey.

    The common contour map database are SRTM (Shuttle Radar

    Topography Mission) and GTopo30, but in this case we will use

    SRTM Database due to it has high accuracy than GTopo30.

    The contour map database SRTM is free and could be download from :

    ftp://e0srp01u.ecs.nasa.gov/srtm

    ftp://e0srp01u.ecs.nasa.gov/srtmftp://e0srp01u.ecs.nasa.gov/srtm
  • 5/23/2018 Training Pathloss 4

    7/33

    To set the contour map database, please follow the following steps :

    1. Create a folder in your hard drive, name it with SRTM or another

    name.2. Copy the SRTM file (file name.hgt)

    3. Run Pathloss, click Configure and the select Terrain Database

    Fig. 1

  • 5/23/2018 Training Pathloss 4

    8/33

    4. On Configure Terrain Database window, choose Primary menu and

    select SRTM.

    Fig. 2

    5. Select Setup Primary, then select File -> BIL-HDR-BLW

    6. Choose the folder of SRTM data, select the SRTM data and thenclick Open.

    7. The contour map database already set to your Pathloss

  • 5/23/2018 Training Pathloss 4

    9/33

    Fig. 3

  • 5/23/2018 Training Pathloss 4

    10/33

    Make Path ProfileTo make Path Profile for one hop, please follow the following steps :

    1. Run Pathloss

    2. Enter site name and site coordinate on each column

    Fig. 4

  • 5/23/2018 Training Pathloss 4

    11/33

    3. Click Module and then select Terrain Data

    4. Then, click Operations and select Generate Profile

    (note: we have to set up the contour database before do this

    step)5. The result will shown as figure below

    Fig 5

  • 5/23/2018 Training Pathloss 4

    12/33

    6. To set obstacle (building or tree), click on structure column, andchoose the menu Single Structure or Range of Structures

    5. Choose the type of obstacle (building or tree) and set the height ofobstacle (in meter). It shown below.

    Fig 6

  • 5/23/2018 Training Pathloss 4

    13/33

    Set Antenna Height

    After we make the path profile, the next step we have to set the

    antenna height to check the LOS condition.

    1. Click on Module menu and choose Antenna Heights.

    2. We can set the antenna height manually or optimize it automatically.

    3. If we set the heights manually, we have to click the antenna

    heights menu on the left/right top side and input the parameter.

    4. To optimize the antenna heights automatically, just click the Optimizeicon on the top side. See Fig. 7

    5. Click on Module and select Print Profile to see the result.

    We can see the antenna heights are LOS or not. See Fig. 8

  • 5/23/2018 Training Pathloss 4

    14/33

    Fig 7

    To set Antenna

    Height

    To optimizeAntenna Height

  • 5/23/2018 Training Pathloss 4

    15/33

    Fig. 8

  • 5/23/2018 Training Pathloss 4

    16/33

    Link Budget Calculation

    After we already decided antenna heights for each link we should

    calculate link budget for each link to find antenna diameter, link RX &

    Availability as the following steps :

    1. Go to Worksheets from Modules menu or by pressing ctrl W.

    You get work sheet page as shown in Fig. 9

    Fig.9

  • 5/23/2018 Training Pathloss 4

    17/33

    2. Enter Point frequency & polarization at each site by pressing on Ch.

    Then click OK As shown in Fig. 10

    Fig.10

  • 5/23/2018 Training Pathloss 4

    18/33

    3. Select Radio Equipment type by clicking on TR you will get RadioEquipment page as shown in Fig. 11

    Fig. 11

  • 5/23/2018 Training Pathloss 4

    19/33

    4. Click on Code Index then New Index. Go to your pathloss folder

    EquipmentMRSNEC (where you placed NEC equipment folder)

    as shown in Fig. 12

    Fig. 12

  • 5/23/2018 Training Pathloss 4

    20/33

    5. Select your radio according to Type (3000S , Pasolink , Pasolink+)

    Frequency band (7G , 8G , 11G, .) Modulation (16 QAM , 32

    QAM , 128QAM,.) Capacity (PDH x E1 , STM-0 , STM-1) then

    click Both to set same Radio for both stations then Press OK asshown in Fig. 13

    Fig. 13

  • 5/23/2018 Training Pathloss 4

    21/33

    6. Set Branching Circuit or Hybrid Loss by clicking on its Symbol

    (above TR) then press OK as shown in Fig. 14

    Fig. 16

  • 5/23/2018 Training Pathloss 4

    22/33

    7. Enter Feeder Data & connection losses by pressing on Wave Guide

    symbol then press OK as shown in Fig. 15

    Fig. 15

  • 5/23/2018 Training Pathloss 4

    23/33

    8. Select antenna type for each station by clicking on antenna symbol

    then press as shown in Fig. 16

    Fig. 16

  • 5/23/2018 Training Pathloss 4

    24/33

    9. Press on Code Index then New Index then brows for pathloss folder

    (where you placed it)EquipmentMASAntenna manufacturer

    (Andrew, RFS, ..) Frequency Range (102-132 , 122132 , 142

    153 , .) then press OK as shown in Fig. 17

    Fig. 17

  • 5/23/2018 Training Pathloss 4

    25/33

    10. Select antenna for site 1 & press on Site 1, select antenna for site 2

    & press Site 2 or in case of both sites have same antenna press on

    Both. The press CloseOK as shown in Fig. 18

    Fig. 18

  • 5/23/2018 Training Pathloss 4

    26/33

    11. Set Reliability Method

    In worksheet page go to Operation MenuReliability Methods

    Set Reliability criteria as per shown in Fig. 19 for SDH or as Project& Customer requirement & press OK

  • 5/23/2018 Training Pathloss 4

    27/33

    12. Set of Rain factor

    Press on Rain symbolselect ITU-R-P-530. 7/8press Load Rain

    FileSelect Rain area according to ITU-530 Map Fig. 21 (Rain

    Files are placed in Pathloss folderRain)Press Close as per

    shown in Fig. 20

    Fig. 20

  • 5/23/2018 Training Pathloss 4

    28/33

    Fig. 21

    For Indonesia

    Area, we use

    Rain area P

  • 5/23/2018 Training Pathloss 4

    29/33

    13. Set Geoclimatic Factor

    Press on the Ground Symbol (as shown in Fig. 22)Set

    Geoclimatic Factor according to ITU-R-P-453 as Shown in Fig. 23)

    Fig. 22

    Ground

    Symbol

  • 5/23/2018 Training Pathloss 4

    30/33

    Fig. 23

  • 5/23/2018 Training Pathloss 4

    31/33

    14. Make sure of either our Path Calculation is correct or we need to

    revise again.

    To do that please check the followings

    - Make sure that your worksheet page has Green Correct sign in

    right bottom of screen. If it is wrong sign that's mean there are some

    data mistake

    - Have a look to RX Signal, Fade Margin & (Annual Availability with

    rain) Percentage as per shown in Fig. 24

    - If any of (RX, Margin, Availability) is less than the required to meet

    the spec. & recommendations. You have to increase antenna

    diameter or add Space Diversity Radio to reach to the required

    specification.

  • 5/23/2018 Training Pathloss 4

    32/33

    Green

    Correct

    Sign

    Fig. 24

  • 5/23/2018 Training Pathloss 4

    33/33

    15. After finish of path calculations go to Report Menu in Worksheet

    page , select Full Report. You will get full path calculation report as

    Fig. 25. You can copy it to Word or Excel sheet & save it for

    reference & submitting with your survey report

    W aihaong DCS AY.Patty Ex Halong

    Elevation (m) 7.07 11.35Latitude 03 41 55.20 S 03 41 44.01 S

    Longitude 128 10 32.30 E 128 10 45.99 ETrue azimuth () 50.87 230.87Vertical angle () 0.45 -0.45

    Antenna model VHLP2-220 VHLP2-220Antenna height (m) 40.00 40.00Antenna gain (dBi) 40.10 40.10

    TX loss (dB) 0.00 0.00RX loss (dB) 0.00 0.00

    Frequency (MHz) 22799.00Polarization VerticalPath length (km) 0.54

    Free space loss (dB) 114.35Atmospheric absorption loss (dB) 0.11

    Net path loss (dB) 34.25 34.25

    Radio model PASOLINK 23G 8MB (V3) PASOLINK 23G 8MB (V3)TX power (watts) 0.20 0.20TX power (dBm) 23.00 23.00

    EIRP (dBm) 63.10 63.10TX Channels 22799.0000V 22799.0000V

    RX threshold criteria BER 10-6 BER 10-6RX threshold level (dBm) -85.00 -85.00

    RX signal (dBm) -11.25 -11.25Thermal fade margin (dB) 73.75 73.75

    Geoclimatic factor 5.59E-06Path inclination (mr) 7.85

    Average annual temperature (C) 30.00

    Worst month - multipath (%) 100.00000 100.00000(sec) 6.23e-10 6.23e-10

    Annual - multipath (%) 100.00000 100.00000(sec) 2.81e-09 2.81e-09

    (% - sec) 100.00000 - 0.00

    Rain region ITU Region P0.01% rain rate (mm/hr) 145.00

    Flat fade margin - rain (dB) 73.75Rain rate (mm/hr) 2467.42

    Rain attenuation (dB) 73.75Annual rain (%-sec) 100.00000 - 0.00

    Annual multipath + rain (%-sec) 100.00000 - 0.00

    Thu, Apr 16 2009

    Reliability Method - ITU-R P.530-7/8Rain - ITU-R P530-7

    Fig 25