TOWN OF RICHMOND HILL...Maple Grove Avenue - Yonge to Parker 2 TOWN OF RICHMOND HILL 2017 Draft...
Transcript of TOWN OF RICHMOND HILL...Maple Grove Avenue - Yonge to Parker 2 TOWN OF RICHMOND HILL 2017 Draft...
TOWN OF RICHMOND HILL2017 Draft Capital BudgetEnvironment Infrastructure Services
C A P I T A L S U M M A R Y
Project Reserves and Cash Cost Reserve Fund To Capital Other
2017 RequestDesign & Construction
Construction 23,322,700$ 22,820,500$ 410,900$ 91,300$ Design 2,423,100 2,036,500 291,000 95,600
Asset ManagementProperties 6,279,000 3,979,000 - 2,300,000
Environment Services 1,555,500 1,400,500 - 155,000
2017 Department Total 33,580,300$ 30,236,500$ 701,900$ 2,641,900$
2016 ApprovedDesign & Construction
Construction 27,794,900$ 25,474,000$ 1,733,700$ 587,200$ Design 2,869,600 2,869,600 - -
Asset ManagementProperties 21,626,400 19,033,200 115,000 2,478,200
Environment Services 12,485,900 485,900 - 12,000,000
2016 Department Total 64,776,800$ 47,862,700$ 1,848,700$ 15,065,400$
Funding Source
1
TOWN OF RICHMOND HILL 2017 Draft Capital BudgetEnvironment Infrastructure Services - Design
Funding SourceReserves or
Project Reserves or Cash Local Reserve FundCost Res. Fund To Capital Improve. Description
Roads Reconstruction Projects
Road 253,700 114,200 114,200 25,300 Transportation Network ($79,900); Water Quality Protection RF ($34,300)
Watermain / Sanitary 81,200 81,200 - - Watermain RFStreetlight 13,500 13,500 - - Transportation Network
348,400 208,900 114,200 25,300
Road 309,900 139,500 139,400 31,000 Transportation Network ($97,700); Water Quality Protection RF ($41,800)
Watermain / Sanitary 99,500 99,500 - - Watermain RFStreetlight 16,600 16,600 - - Transportation Network
426,000 255,600 139,400 31,000
Road 83,100 37,400 37,400 8,300 Transportation Network ($26,200); Water Quality Protection RF ($11,200)
Watermain / Sanitary 25,500 25,500 - - Watermain RFStreetlight 4,200 4,200 - - Transportation Network
112,800 67,100 37,400 8,300
Watermain ProjectsCedar Avenue - South Limit to 167m North of Palmer 61,200 61,200 - - Watermain RFPalmer Avenue - Lennox to CNR 40,800 40,800 - - Watermain RF
Sidewalk & Trails Leslie Street - Elgin Mills Road E to 19th Avenue 46,000 46,000 - - Area Specific ($36,800) & Transportation
Network ($9,200)19th Avenue - Bayview to Leslie 92,500 92,500 - - Area Specific ($69,400) & Transportation
Network ($23,100)Elgin East Channel Lands (PCMP) - CNR to Rosebranch Drive
68,900 68,900 - - Federal Gas Tax
Red Maple Avenue - South side 95m S/O 16th to 16th
Avenue4,400 4,400 - - Transportation Network
Other Sidewalks - (Cameo Drive, Hillhurst Drive, Kevi Crescent, Regent Street, Carrington Drive, Oldhill Street)
7,000 7,000 - - Transportation Network
Illumination & Other ProjectsLeslie Street - Elgin Mills Rd E to 19th Avenue 40,100 40,100 - - Area Specific ($32,100) & Transportation
Network ($8,000)Rosebranch Drive Culvert - Rosebranch Drive 50m South of Cougar Court
92,100 92,100 - - Water Quality Protection RF
19th Avenue - Bayview to Leslie 80,500 80,500 - - Area Specific ($60,400) & Transportation Network ($20,100)
Roads Design Sub-total 1,420,700 1,065,100 291,000 64,600
Arnold Crescent - Elizabeth Street to Major Mackenzie
McCachen Street - King Road to Poplar Drive
Maple Grove Avenue - Yonge to Parker
2
TOWN OF RICHMOND HILL 2017 Draft Capital BudgetEnvironment Infrastructure Services - Design
Funding SourceReserves or
Project Reserves or Cash Local Reserve FundCost Res. Fund To Capital Improve. Description
Existing Parks / Open SpaceKings College Park Rehabilitation 299,500 299,500 - - Infrastructure R&RWestview Park Revitalization 85,500 85,500 - - Infrastructure R&R
New Parks / Open SpaceDavid Dunlop Observatory Servicing / Grading Feasibility Study
207,600 207,600 - - Outdoor Rec ($168,100);& Cash in Lieu ($39,500)
Oxford / Direzze Trail 190,500 190,500 - - Outdoor Rec ($154,300);& Federal Gas Tax ($36,200)
Harris Beach Park 143,200 143,200 - - Outdoor Rec ($116,000);& Cash in Lieu ($27,200)
Parks Design Sub-total 926,300 926,300 - -
Other DivisionsPRS - DEVELOPMENT ENGINEERING
Bathurst Street - Gamble Rd to Jefferson SR (east side) 32,100 32,100 - - Transportation NetworkTrench Street - Major Mackenzie Dr to Mill Street 16,000 - - 16,000 Federal Gas TaxMajor Mackenzie Drive East - Yonge Street to Cedar Avenue
15,000 - - 15,000 Federal Gas Tax
Norfolk Avenue - Major Mackenzie Dr E to Palmer Avenue
8,000 8,000 - - Transportation Network
Other Projects - Arnold Crescent; Hendricks Crescent; Paradelle Drive
5,000 5,000 - - Transportation Network
76,100 45,100 - 31,000
Design Total $2,423,100 $2,036,500 $291,000 $95,600
Other Departmental Requests Sub - Total
3
TOWN OF RICHMOND HILL 2017 Draft Capital BudgetEnvironment Infrastructure Services - Construction
Funding SourceReserves or
Project Reserves or Cash Local Reserve FundCost Res. Fund To Capital Improve. Description
Roads Reconstruction Projects
Road 913,100 410,900 410,900 91,300 Transportation Network ($287,600) & Water Quality RF ($123,300)
Watermain / Sanitary 167,100 167,100 - - Watermain R&R Streetlight 44,100 44,100 - - Transportation Network
1,124,300 622,100 410,900 91,300 Watermain Replacement
Castle Rock Drive - Weldrick Road West to Avenue Rd 2,370,100 2,370,100 - - Watermain R&R
Water Resource ProjectsUpper East Don UED13 Block 16 - Elgin Mills Greenway 1,993,100 1,993,100 - - Water Quality Protection RF ($1,693,200) &
Infrastructure R&R ($300,000)Elgin Mills West: 16-5 (Sediment Removal) 1,625,600 1,625,600 - - Water Quality Protection RF ($1,325,600) &
Infrastructure R&R ($300,000)
Sidewalk & Trails 757,500 757,500 - - Federal Gas Tax 148,700 148,700 - - Federal Gas Tax 71,300 71,300 - - Sidewalk RF
62,600 62,600 - - Sidewalk RF
35,600 35,600 - - Sidewalk RF
19,000 19,000 - - Sidewalk RF ($9,300) & Transportation Network ($9,700)
12,500 12,500 - - Sidewalk RF
Illumination & Other Projects 716,100 716,100 - - Federal Gas Tax 132,900 132,900 - - Federal Gas Tax 123,100 123,100 - - Federal Gas Tax 115,400 115,400 - - Federal Gas Tax
92,200 92,200 - - Federal Gas Tax
Roads Construction Sub-Total 9,400,000 8,897,800 410,900 91,300
Doncrest Road - 57m south of Palace to south limit & Hwy #7 to 105 m North
Bayview Avenue - East side: Frontage of 9211 Bayview AvenueWalkview Crescent - Link Walkview Cres. To Bathurst Street West end
Bayview Avenue - Stouffville Road to Bloomington Road
Brightsview Drive - Links North and South end links to Bathurst
Leslie Street - West Elgin Mills Rd to William F. Bell
Trench Street - Major Mackenzie Dr. To Mill StreetNewberry Park - Devonsleigh Blvd to CNR
Major Mackenzie Drive East - Yonge Street to Cedar Avenue
Bayview Avenue - Stoufffville Road to Bloomington Road
Kalmar Crescent - Links North and South end links to BathurstSilverdart Crescent - Link Silverdart Cres. To Bathurst St. West end
Newberry Park - Devonsleigh Blvd to CNR
4
TOWN OF RICHMOND HILL 2017 Draft Capital BudgetEnvironment Infrastructure Services - Construction
Funding SourceReserves or
Project Reserves or Cash Local Reserve FundCost Res. Fund To Capital Improve. Description
Existing Parks / Open Space Baif Pond Landscape Amenities 401,100 401,100 - - Infrastructure R&R ($324,900); Outdoor
Rec DC ($76,200)Facility Repair & Replacement
Humberflats Raintree Play Structure 444,100 444,100 - - Infrastructure R&RGrace Lawrence Parkette Play Structure 294,800 294,800 - - Infrastructure R&R
Lake Wilcox Youth Area 4,870,900 4,870,900 - - Outdoor Rec DC ($3,945,400) & Cash in Lieu ($925,500)
Casa Subdivision Parkette 688,800 688,800 - - Outdoor Rec DC ($557,900) & Cash in Lieu ($130,900)
Oak Ridges Bayview Median (Design & Construction) 286,600 286,600 - - Town Wide Engineering DC
Parks Construction Sub - Total 6,986,300 6,986,300 - -
Other DivisionsPRS - DEVELOPMENT ENGINEERING
6,200,000 6,200,000 - - Town Wide Engineering DC ($4,030,000) & Water Quality Protection RF ($2,170,000)
263,600 263,600 - - Letter of Credit ($209,419) &Transportation Network ($54,200)
145,000 145,000 - - Letter of Credit ($73,625) &Transportation Network ($71,400)
327,800 327,800 - - Letter of Credit (235,766) & Transportation Network ($92,100)
Other Departmental Requests Sub - Total 6,936,400 6,936,400 - -
Construction Total $23,322,700 $22,820,500 $410,900 $91,300
Completion of Subdivision Municipal Servicing - Wellspring Avenue (19T-00012)
Flood Remediation Project - Land Acquisition
New Parks / Open Space
Completion of Subdivision Municipal Servicing - Provence Court & Country Heights Dr. (19T-98009)Completion of Subdivision Municipal Servicing - Servicing Agreement Marsi Road (19T-96004)
5
TOWN OF RICHMOND HILL2017 Draft Capital BudgetEnvironment Infrastructure Services - Facilities
Funding SourceReserves or
Project Reserves or Cash Reserve FundCost Res. Fund To Capital Other Description
Architectural Building Repairs & Replacement - Theatre ($200,000); McConaghy Centre ($460,000); Bayview Hill ($160,000); Oak Ridges CC ($150,000); Centennial Pool ($650,000); Oak Ridges Fire Hall ($120,000); Bayview Glen Fire Hall ($160,000)
2,129,000 2,129,000 - - 225 EBC Revenue Stabilization RF & Capital Asset Continuity RF
Structural - Various Buildings ($40,000) 40,000 40,000 - - Capital Asset Continuity RF
Mechanical including HVAC and Plumbing - 225 EBC ($650,000); Central Library ($580,000); Richvale CC ($360,000); Oak Ridges Fire Hall ($275,000) & 16th Ave. Fire Hall ($275,000)
2,270,000 130,000 - 2,140,000 Capital Asset Continuity RF &Federal Gas Tax
Security & Life Safety - Various Buildings ($280,000) 340,000 340,000 - - Capital Asset Continuity RFElectrical - 225 EBC ($160,000) 220,000 60,000 160,000 Capital Asset Continuity RF &
Federal Gas Tax
Other DivisionsCapital Projects - CSD Public Works - Operations Centre ($1,145,000) & Office of the CAO - Access Richmond Hill ($135,000)
1,280,000 1,280,000 - - Public Works DC RF & Infrastructure R&R
Total Asset Management Projects $ 6,279,000 $ 3,979,000 $ - $ 2,300,000
6
TOWN OF RICHMOND HILL2017 Draft Capital BudgetEnvironment Infrastructure Services - Environment Services
Funding SourceReserves or
Project Reserves or Cash Other Reserve FundCost Res. Fund To Capital Description
$530,000 $530,000 Water Quality Protection RF
$400,500 $400,500 Water Quality Protection RF
315,000 315,000 Water Quality Protection RF
DDO Restoration & Implementation Plan 155,000 155,000 DDO Settlement Funds155,000 155,000 Water Quality Protection RF
Total Environment Services Projects $ 1,555,500 $ 1,400,500 $ - $ 155,000
Richvale valleyland restoration, TRCA-led: Phase 1 (part of ED7 and ED8)
Mill Pond Park valleyland restoration (UED 8 and UED9): Feasibility & EA
Lake Wilcox Management Plan
Mill Pond and Heritage Estates Pond (17-3): Feasibility & EA
7
PLANNING AND REGULATORY SERVICES/DEVELOPMENT ENGINEERING ROB COWIE
BUSINESS CASE – NEW CAPITAL SIDEWALKS
Background Providing safe and continuous sidewalks for pedestrians promotes and encourages active transportation and dramatically improves pedestrian safety. By providing continuous facilities that are more comfortable for pedestrians to use, we can increase the number of trips made by walking and other modes of transportation. Providing sidewalk facilities, particularly when providing access to public transit or in areas with mixed land uses or with facilities serving younger or older residents (i.e. Schools, parks, community centres) can increase the transportation options for individuals who may not be able to drive a car. Additionally, by moving these pedestrians off or further away from the travelled roadway, increases their safety. Furthermore, research indicates that people will walk for recreational purposes if appropriate facilities are provided. Recreational walking is one of the easiest ways for people to get the recommended allotment of physical exercise each day. Moderate exercise, such as walking, contributes to both physical and mental wellbeing.
Project Description The Town’s sidewalk networks have historically evolved through our Ten Year Capital Road Reconstruction Program with guidance from the PCMP and the sidewalk improvement/priority program. However, Town staff has identified the need for a number of additional sidewalk improvements or missing sidewalk links at various locations throughout the Town, through the receipt of a number of resident and Councillor inquiries. None of these projects are presently in the Town’s or York Region’s 10 Year Capital Program. The following is a summary of the identified projects:
• Regent Street @ Ellsworth Av (North Leg); Curb Extension on south-westcorner to address sight line obstruction on north-west corner - Curb extensionsvisually and physically narrow the roadway, creating safer and shorter crossingsfor pedestrians while increasing sight lines for turning vehicles.
• Carrington Drive (South Side): Approximately 90m of new sidewalk fromHeaddon Gate to Cordave Parkette for a direct pedestrian connection to the all-way stop intersection of Headdon Gate and Carrington Crescent providing asafer crossing environment at a controlled crossing for improved pedestriansafety.
• Old Hill Street to Elgin Mills Road adjacent to the CNR Tracks:Approximately 25m of new sidewalk to provide residents with a direct connectionto the sidewalk along the Elgin Mills as the existing situation requires them to
8
PLANNING AND REGULATORY SERVICES/DEVELOPMENT ENGINEERING ROB COWIE
BUSINESS CASE – NEW CAPITAL SIDEWALKS
walk 200m west to an opening in the fence and back track to their transit stop to the east of the CNR Track.
• Mill Street (North side): Approximately 118m of new sidewalk from Pine TreesCourt to west leg of Sugar Maple Lane
• Neighbourly Lane (West Side): Approximately 460m of new sidewalk fromCarrington Crescent to Mill Street
• Fox Run Crescent: Approximately 300m of new sidewalk from Cedar Avenue toCedar Avenue
• Debonair Street: Approximately 117m of new sidewalk from Naughton Avenueto Canyon Hill Avenue
• Angora Street: Approximately 98m of new sidewalk from Yoho Avenue toOlympus Drive
• Bergamot Crescent: Approximately 175m of new sidewalk along the north andwest boulevards
• Garnet Street: Approximately 176m of new sidewalk from Farmstead Road toLibra Avenue
• Portico Street: Approximately 195m of new sidewalk from Farmstead Road toPortico Street
• North Lake Road (South Side): Approximately 50m of new sidewalk fromWestlea Avenue to Wood Rim Drive
• Intersection of Regatta Avenue & Coons Road: provide new sidewalkextensions/curb ramps @ north-west and north-east corners
• Intersection of Baif Boulevard & Hillcrest Gate: provide new sidewalkextension/curb ramp @ north-west corner
• Intersection of Rollinghill Road & Jack Ashton Avenue: provide newsidewalk extension/pedestrian landing pad @ north-east corner
• Intersection of Beresford Drive & Baffin Court (South Leg): provide newsidewalk extension/curb ramp @ south-east corner
• Intersection of Beresford Drive & Baffin Court (North Leg): provide newsidewalk extension/curb ramp @ north-west quadrant and new pedestrianlanding pad @ north-east corner
• Cassandra Crescent: Links – provide new sidewalk from north and south limitsof Cassandra Crescent to Leslie Street
9
PLANNING AND REGULATORY SERVICES/DEVELOPMENT ENGINEERING ROB COWIE
BUSINESS CASE – NEW CAPITAL SIDEWALKS
• Kingmount Crescent: Links – provide new sidewalk from north and south limitsof Kingmount Crescent to Leslie Street
Note that these projects anticipate the design in one year and construction in the subsequent year in accordance with Town of Richmond Hill Standards and Specifications within the defined project limits.
Stakeholders & Impacts The stakeholders for this project include the area residents and property ownerswithin the areas identified for sidewalk improvements.
Strategic Alignment Completion of these sidewalk projects are consistent with the Strategic Plan’s Objective of developing "Stronger Connections in Richmond Hill" by means of:
• Strengthened community connections as a means to enhance community safetyand security.
• Strengthened connections to transit.
• Developing connections for people to access local amenities by means otherthan by car.
Ten Year Capital Forecast These specific project locations were not included in the Town’s Ten Year Capital Forecast as none of these projects are identified through the PCMP or TMP or located on roads or areas identified for reconstruction or new development.
Alternatives The “Do Nothing” scenario is always considered as part of the review of the need for these projects. However, for these particular projects, it was not deemed a feasible alternative as these will either:
• Promote active transportation and transit usage within the Town;
• Improve pedestrian safety in these specific areas;
• Improve pedestrian connectivity within these areas; and/or
10
PLANNING AND REGULATORY SERVICES/DEVELOPMENT ENGINEERING ROB COWIE
BUSINESS CASE – NEW CAPITAL SIDEWALKS
• Complete the Town’s pedestrian network.
Project Costs and Benefit The estimated value of these projects is approximately $623,000 over the next 10 years. Cost estimates for each project are outlined in the Table below:
Project Design Year
Estimated Design Cost
Construction Year
Estimated Construction Cost
Total Cost
Block No.
Proposed Funding Source
Regent Street
2017 $2,449 2018 $17,584 $20,033 17 Transportation Network
Carrington Drive
2017 $2,071 2018 $14,873 $16,944 17 Transportation Network
Oldhill Street
2017 $575 2018 $4,131 $4,706 15 Transportation Network
Mill Street TBD $4560 TBD $33,440 $38,000 17 Transportation Network
Neighbourly Lane
TBD $17,916 TBD $131,384 $149,300 17 Transportation Network
Fox Run Crescent
TBD $11,592 TBD $85,008 $96,600 15 Transportation Network
Debonair Street
TBD $4,524 TBD $33,176 $37,700 16 Transportation Network
Angora Street
TBD $3,792 TBD $27,808 $31,600 19 Transportation Network
Bergamot Crescent
TBD $6,768 TBD $49,632 $56,400 19 Transportation Network
Garnet Street
TBD 6,804 TBD $49,896 $56,700 19 Transportation Network
Portico Street
TBD $7,536 TBD $55,264 $62,800 19 Transportation Network
11
PLANNING AND REGULATORY SERVICES/DEVELOPMENT ENGINEERING ROB COWIE
BUSINESS CASE – NEW CAPITAL SIDEWALKS
North Lake Road
TBD $1,932 TBD $14,168 $16,100 2 Transportation Network
Regatta Avenue & Coons Road
TBD $504 TBD $3,696 $4,200 1 Transportation Network
Baif Boulevard & Hillcrest Gate
TBD $252 TBD $1,848 $2,100 24 Transportation Network
Beresford Drive and Baffin Court (South Leg)
TBD $252 TBD $1,848 $2,100 26 Transportation Network
Beresford Drive and Baffin Court (North Leg)
TBD $504 TBD $3,696 $4,200 26 Transportation Network
Cassandra Crescent
TBD $408 TBD $2,992 $3,400 22 Transportation Network
Kingmount Crescent
TBD $408 TBD $2,992 $3,400 22 Transportation Network
With respect to the first three (3) projects in the Table, EIS (Environment and Infrastructure Services) has identified a budget of $5,095 in 2017 to commence these projects. The remaining projects are to be distributed/prioritized throughout subsequent years as determined by EIS. A budget of $100,000 has been included for each year between 2018 and 2024 as a placeholder for these works.
Funding Sources These projects meet the gas tax criteria for funding through the Transportation Network Reserve Fund.
12
PLANNING AND REGULATORY SERVICES/DEVELOPMENT ENGINEERING ROB COWIE
BUSINESS CASE – NEW CAPITAL SIDEWALKS
Conclusion
The construction of the sidewalk projects identified in this business case will help to address localized pedestrian issues within the Town that would not otherwise be addressed through development projects, growth projects, or the sidewalk improvement program. This will help to improve pedestrian connectivity and safety in these areas, mitigating risk to the corporation and encouraging active transportation in the Town.
13
PLANNING AND REGULATORY SERVICES / DEVELOPMENT ENGINEERING ROB COWIE
BUSINESS CASE – NEW CAPITAL ILLUMINATION
Background Illumination in the form of street lighting and pedestrian lighting provides security in urban areas, allowing and encouraging evening and night time activities in these areas. Illumination also improves visibility safety for drivers, cyclists, and pedestrians at night in less urban areas, thus reducing the Town’s risk and exposure. In addition, it can be used to improve visibility, enhance public safety and reduce the Town’s risk in public spaces. Project Description The Town’s illumination networks have historically evolved through our Ten Year Capital Road Reconstruction Program, in partnership with York Region under its Roads Capital Program, or through new development. However, through the receipt of a number of resident and Councillor inquiries, Town staff has identified the need for a number of street and pedestrian scale lighting improvements and new installations to fill existing gaps at various locations throughout the Town. None of these locations are presently identified in the Town’s or York Region’s 10 Year Capital Program. The following is a summary of the illumination works required for each of the identified Illumination projects:
• Arnold Crescent: Approximately 130 m of new roadway illumination fromHopkins Street to Major Mackenzie Drive West(TRH Block 17)
• Trench Street: Approximately 815m of new roadway illumination from MajorMackenzie Drive West to Mill Street; Partially illuminated urban cross-section;New Infrastructure required to fill existing gaps(TRH Block 17)
• Bathurst Street: Approximately 1600 m of new sidewalk illumination along theEast Side of Bathurst Street to between Gamble Road and Jefferson Sideroad.Non-illuminated rural cross-section (TRH Block 9)
• Major Mackenzie Drive: Approximately 750 m of new road illumination fromYonge Street to Cedar Avenue. Partially Illuminated urban cross-section (TRHBlock 18& 23)
• Norfolk Avenue: Approximately 400 m of new roadway illumination from MajorMackenzie Drive East to Palmer Avenue. Partially illuminated urban cross-section (TRH Block 23)
• Henricks Crescent to Boake Trail: Approximately 90 m of new walkwayIllumination. Non-illuminated (TRH Block 22)
• Paradelle Drive to Bayview Avenue: Approximately 50 m of new walkwayiIllumination. Non-illuminated (TRH Block 2)
14
PLANNING AND REGULATORY SERVICES / DEVELOPMENT ENGINEERING ROB COWIE
BUSINESS CASE – NEW CAPITAL ILLUMINATION
• Bathurst Street: Approximately 800 m of new roadway illumination from ElginMills Drive West to Driveway to Elgin West Community Centre. Partiallyilluminated urban cross-section (TRH Block 16)
• Yonge Street: Approximately 710 m of new- sidewalk illumination along the westside of Yonge Street to Tower Hill Road to Harris Avenue. Non-illuminated ruralcross-section (TRH Block 9) – Not in York Region’s 10 Year CapitalProgram.(2025)
• Yonge Street: Approximately 216 m of new roadway illumination from BensonAvenue to Levendale Road. Partially illuminated urban cross-section (TRHBlock 17)
• Major Mackenzie Drive East: Approximately 800 m of new roadway illuminationfrom Newkirk Road to Bayview Avenue. Partially Illuminated urban cross-section.(TRH Blocks 18 & 23)
• Approximately 62 m of new walkway illumination from Osiris Cres to BalkanRoad. Non-illuminated (TRH Block 18)
• Approximately 67 m of new walkway illumination from Cartier Cres to CartierCres. Partially illuminated (TRH Block 18)
• Approximately 70 m of new walkway illumination from Paliser Cres South toPaliser Cres North. Non-illuminated (TRH Block 23)
• Approximately 90 m of new walkway illumination from Centre Street East toBelvedere Crescent. Non-illuminated (TRH Block 18)
• Approximately 70 m of new walkway illumination from Belvedere Crescent toCrosby Avenue. Non-illuminated (TRH Block 18)
• Niblock Street: Approximately 70 m of new roadway illumination from BalkanRoad to Cartier Crescent. Non-illuminated urban cross-section. (TRH Block 18)
• Approximately 92 m of new walkway Illumination from Gemini Crescent toLeslie Street. Non-illuminated (TRH Block 19)
Note that these projects anticipate the design in one year and construction in the subsequent year in accordance with Town of Richmond Hill and Regional Municipality of York standard practice. It should be further noted that these projects will include LED energy efficient lighting technology as per the Town’s Standards and Specifications.
15
PLANNING AND REGULATORY SERVICES / DEVELOPMENT ENGINEERING ROB COWIE
BUSINESS CASE – NEW CAPITAL ILLUMINATION
Stakeholders & Impacts
The stakeholders for this project include the residents, motorists and businesses and institutions that own properties within the areas identified for illumination improvements. Strategic Alignment Completion of these illumination projects are consistent with the Strategic Plan’s Objective of “responding to the changing needs of the community through adaptive services and programs” and “improving the function of buildings, streets and neighbourhoods”. Ten Year Capital Forecast These specific illumination projects locations were not included in the Town’s Ten Year Capital Forecast as none of these projects are located on roads or areas identified for reconstruction. Alternatives Alternatives that were considered as part of undertaking these projects were:
• Do nothing and assume the increased risk inherent to advancing/improvingpedestrian facilities in the absence of illumination.
• Restrict improvement and extensions of the Town’s existing pedestrian andmulti-use facility network to only those sections of the road network that arecurrently fully illuminated.
None of the above alternatives serve the needs of the public or supports the Town’s existing programs and initiatives.
16
PLANNING AND REGULATORY SERVICES / DEVELOPMENT ENGINEERING ROB COWIE
BUSINESS CASE – NEW CAPITAL ILLUMINATION
Project Costs and Benefit The estimated value of these projects is approximately $1,500,000 over the next 10 years. Cost estimates for each project are outlined in the Table below: Project Design
Year Estimated Design Cost
Construction Year
Estimated Construction Cost
Total Cost
Block No.
Proposed Funding Source
Arnold Crescent – Hopkins Street to Major Mackenzie Drive West
2017 $2,004 2019 $15,622 $17,626 17 Transportation Network
Trench Street – Major Mackenzie Drive West to Mill Street
2017 $16,035 2017 $123,130 $139,165 17 Federal Gas Tax
Bathurst Street – Gamble Road to Jefferson Side Road
2017 $32,070 2019 $249,953 $282,023 9 Transportation Network
Major Mackenzie Drive East – YongeStreet toCedarAvenue
2017 $15,033 2017 $115,434 $130,467 18 & 23
Federal Gas Tax
Norfolk Avenue – Major Mackenzie Drive East to Palmer Avenue
2017 $8,018 2018 $62,488 $70,506 23 Transportation Network
Henricks Crescent
2017 $1,804 2018 $14,060 $15,864 22 Transportation Network
Paradelle Drive
2017 $1,203 2018 $9,373 $10,576 2 Transportation Network
17
PLANNING AND REGULATORY SERVICES / DEVELOPMENT ENGINEERING ROB COWIE
BUSINESS CASE – NEW CAPITAL ILLUMINATION
Bathurst Street - Elgin Mills Dr W to Driveway to Elgin West CC
TBD $20,150 TBD $134,850 $175,000 17 Transportation Network
Yonge Street – Tower Hill Rd to Harris Av
TBD $17,825 TBD $137,175 $155,000 9 Transportation Network
Yonge St – Benson Av to Levendale Rd
TBD $6,325 TBD $48,675 $55,000 17 Transportation Network
Major Mackenzie Dr E – Newkirk Rd to Bayview Av
TBD $23,345 TBD $179,655 $203,000 18 & 23
Transportation Network
Walkway between Osiris Cr & Balkan Rd
TBD $1,610 TBD $12,390 $14,000 18 Transportation Network
Walkway between Cartier Cr & Cartier Cr
TBD $1,725 TBD $13,275 $15,000 18 Transportation Network
Walkway between Paliser Cr S & Paliser Cr N
TBD $2,185 TBD $16,815 $19,000 23 Transportation Network
Walkway between Centre St E & Belvedere Cr
TBD $1,955 TBD $15,045 $17,000 18 Transportation Network
Walkway between Belvedere Cr &
TBD $2,415 TBD $18,585 $21,000 18 Transportation Network
18
PLANNING AND REGULATORY SERVICES / DEVELOPMENT ENGINEERING ROB COWIE
BUSINESS CASE – NEW CAPITAL ILLUMINATION
Crosby Av
Niblock St – BalkanRd to Cartier Cr
TBD $2,185 TBD $16,185 $19,000 17 Transportation Network
Walkway between Gemini Cr & Leslie St
TBD $2,300 TBD $17,700 $20,000 19 Transportation Network
With respect to the first seven (7) projects in the table, EIS (Environment and Infrastructure Services) has identified a budget of $314,731 in 2017 to commence these projects. The remaining projects are to be distributed/prioritized throughout subsequent years as determined by EIS. A budget of $150,000 has been included for each year between 2018 and 2027 as a placeholder for these works.
Other Funding Sources These projects meet the gas tax criteria for funding through the Federal Gas Tax Reserve. Alternative funding sources such as Transportation Network Reserve Fund are available where indicated.
Conclusion Funding the illumination projects identified in this business case will support the objectives of the Pedestrian & Cycling Master Plan, improve pedestrian safety and security, and mitigate the risk to the corporation
19
PLANNING AND REGULATORY SERVICES / DEVELOPMENT ENGINEERING
JEFF WALTERS BUSINESS CASE – GROWTH & NEW CAPITAL
Flood Remediation Improvements
Background The Official Plan has identified the Newkirk Business Park as an Employment Area designation that will continue to function with existing industrial uses and allow for redevelopment as an employment area. The lands adjacent to the Employment Area designation along the Yonge Street corridor permits mixed use development that may occur in accordance with the Regional Mixed Use Corridor designation and the Employment Corridor designation of the Official Plan. The Newkirk Business Park and adjacent Yonge Street Corridor is located within a regulatory flood plain and has been identified as a Flood Vulnerable Area in Schedule A2 of the Official Plan. As such, the policies of the Official Plan state that no new development shall occur within the Flood Vulnerable Area until such time as a Flood Remediation Class EA study is completed. The Town has undertaken a Class Environmental Assessment to select a preferred option to minimize and/or eliminate existing surface flooding during the Regulatory storm in this Flood Vulnerable Area. The study area is located approximately between Levendale Road to the south, Elgin Mills Road to the north, Jacey Anne Drive to the west and Newkirk Road to the east. The study area includes all of the Flood Vulnerable Area identified in the Official Plan. The majority of the study area is currently within the regulatory floodplain which severely restricts the development potential of this area. The scope of the Class EA Study included the review and evaluation of flood mitigation options to reduce the extent of the Regional floodplain and the selection of the preferred alternative. The Study has identified a preferred alternative which consists of improvements to the existing storm water conveyance system to safely convey Regulatory flows through the area. The result is that virtually all of the study area is removed from the floodplain. On July 11, 2016, Council adopted By-law 71-16 as an amendment to the existing Town Wide Development Charge By-law. This amendment included an update to the Engineering Services component of the Town Wide DC to include the Flood Remediation improvements. The supporting Background study for the DC update identifies that a portion of the Flood Remediation improvements are considered a “benefit to existing”. This “benefit to existing” is considered to be a Town cost associated with the improvements. Capital funding needs to be secured for the Town to be in a position to move forward to implement the Flood Remediation improvements.
20
PLANNING AND REGULATORY SERVICES / DEVELOPMENT ENGINEERING
JEFF WALTERS BUSINESS CASE – GROWTH & NEW CAPITAL
Flood Remediation Improvements
Project Description
The Flood Remediation Class EA study has identified infrastructure improvements in order to remediate regulatory flooding within the Flood Vulnerable Area identified in the Town of Richmond Hill Official Plan. These include improvements to the existing storm water conveyance system (German Mills Creek) to safely convey regulatory flows through this area and remediate the existing regulatory flooding. Based on the preferred alternative identified in the study, the infrastructure improvements include a combination of open channels ranging in width from 12 to 20 meters and box culverts ranging in width from 5 to 16 meters. The improvements are located within regional and municipal road allowances and within private properties. The study has identified that land acquisitions in the form of easements or conveyances will be required to construct the improvements on private properties. A portion of the study area centered on Yonge Street is within a growth corridor identified in the Official Plan. In order for redevelopment to occur, the flood remediation improvements need to be implemented to remove this area from the regulatory flood plain. If the improvements do not proceed then growth will not occur in this area and the redevelopment envisioned in the Official Plan will not be realized. To support redevelopment, the Flood Remediation improvements will need to be implemented prior to development proceeding. As such, the Town will be undertaking the improvements as a capital project. The first step towards implementation will require land acquisitions by the Town to obtain the necessary easements/lands to allow construction. This work is proposed to occur from 2017 to 2018. In addition, York Region Rapid Transit is undertaking Bus Rapid Transit (BRT) improvements on Yonge Street within the study area. The Town and York Region are in the process of coordinating the BRT and Flood Remediation improvements to minimize any infrastructure and utility conflicts in the future. There are also ongoing discussions to possibly advance the proposed Flood Remediation improvements within Yonge Street/Elgin Mills road intersection as part of the BRT project in order to eliminate the need to disrupt this intersection in the future and minimize impacts to BRT operations and the residents in the area. To facilitate this coordination and construction within the BRT schedule, a potential Town contribution to the BRT project is anticipated in 2018. Design of the Flood Remediation improvements is proposed for 2019 with construction to proceed from 2020 to 2021.
21
PLANNING AND REGULATORY SERVICES / DEVELOPMENT ENGINEERING
JEFF WALTERS BUSINESS CASE – GROWTH & NEW CAPITAL
Flood Remediation Improvements
Stakeholders & Impacts Stakeholders for the Flood Remediation improvements include the development community within this Flood Vulnerable Area. More specifically the stakeholders are individual land owners within this study area that wish to redevelop their properties in accordance with the new Official Plan or maintain their current land use. Stakeholders also include the general public, Town and Regional forces that make use of the arterial and local roads within the Flood Vulnerable Area. As noted above, if capital funds are not available for the Town implement the Flood Remediation improvements, the impact to land owners will be that redevelopment will not be able to proceed. The other impact is that private land owners within the study area will continue to experience a risk of flooding and potential property damage. The identified flooding on local and arterial roads within the study area has the potential to impact local/regional municipal and emergency services access to properties under a flooding event. Strategic Alignment Implementation of the Flood Remediation improvements relates to the strategic plan in wise management of our resources and servicing as a role model for municipal management. Funding to allow the Town to implement the improvements will support redevelopment in this area by removing properties from the flood plain and minimize flooding impacts to this area in the future. Ten Year Capital Forecast The Flood Remediation improvements are proposed to be included in the 10 year capital plan. Comparative Analysis A comparative analysis to other municipalities was not undertaken. The Flood Remediation infrastructure improvements are specific to the needs of Town based on the recommendations of the Class EA study. Alternatives No other feasible alternatives were identified. The Flood Remediation improvements are necessary to remove this area from the regulatory flood plain to support redevelopment within this growth corridor. The Class EA study identified and evaluated various alternatives including the “Do Nothing” scenario. The study identified a preferred alternative for flood remediation as summarized in the above Project Description. Alternatives such as “Do Nothing” which involves no flood remediation or partial flood remediation were not considered feasible as they would not allow the Town to fully realize the growth objectives of the Official Plan for this area.
22
PLANNING AND REGULATORY SERVICES / DEVELOPMENT ENGINEERING
JEFF WALTERS BUSINESS CASE – GROWTH & NEW CAPITAL
Flood Remediation Improvements
Project Costs and Benefit
The total cost for the Flood Remediation improvements is estimated to be $32,895,000. This cost is based on estimates from the Class EA study as well as input from the ESI –Design section and our Property Manager. As noted previously, the recent amendment to the Town Wide DC included the Flood Remediation improvements. The supporting Background study for the DC amendment identifies the benefit to existing or Town portion as 35% of the total Flood Remediation Cost. A summary of the costs associated with the proposed implementation timeline is provided below.
Year Flood Remediation Component
Total Cost Town Funded Capital Cost
Development Funded Capital Cost
2017 Land Acquisitions $6,200,000 $2,170,000 $4,030,000
2018 Town Contribution to Yonge Street BRT Project for Elgin Mills portion of Flood Remediation
$2,914,000 $1,019,900 $1,894,100
2019 Design $1,381,000 $483,350 $897,650
2020 Construction $11,200,000 $3,920,000 $7,280,000
2021 Construction $11,200,000 $3,920,000 $7,280,000
Totals $32,895,000 $11,513,250 $21,381,750
From the above summary, the total Town funded capital cost associated with implementation of the Flood Remediation improvements is $11,513,250. The recommended capital funding source for the Town portion of the Flood Remediation improvements is the Water Quality Protection Reserve Fund. It is also recommended that capital funding amounts summarized in the above table be included in the 10 year capital plan. The benefit of the Flood Remediation improvements is that the Town will be supporting redevelopment with a growth corridor identified in the Official Plan. These improvements will also benefit existing properties by removing them from the regulatory floodplain which will reduce the risk of property damage due to potential flooding. These improvement also result in removing the Yonge Street/Elgin Mills intersection as well as portions of these arterial roads from the flood plain.
23
PLANNING AND REGULATORY SERVICES / DEVELOPMENT ENGINEERING
JEFF WALTERS BUSINESS CASE – GROWTH & NEW CAPITAL
Flood Remediation Improvements
Other Funding Sources
This type of project is not eligible for Federal Gas Tax Funding or other grants. As noted, on July 11, 2016, Council adopted By-law 71-16 as an amendment to the existing Town Wide Development Charge By-law. With this new By-law in place, development charge funding is available for the growth component of the Flood Remediation improvements. The Town Wide DC funding identified for these improvements is $21,124,127 (2016 dollars) for the time period of 2017 to 2021.
Conclusion Based on the above, Development Engineering recommends allocation of capital funds in the amount of $11,513,250 as the Town funding towards the Flood Remediation improvements with capital funding in the amount of $2,170,000 to be approved for 2017.
24
PLANNING AND REGULATORY SERVICES / DEVELOPMENT ENGINEERING
JEFF WALTERS BUSINESS CASE – GROWTH & NEW CAPITAL Completion of Subdivision Municipal Servicing
Background Development Engineering has identified three subdivisions where the owners have failed to complete subdivision servicing within a reasonable timeframe. These projects are summarized in the Table 1 below. Table 1
Subdivision File Municipal Roads Plan Registration and Building Permits
Inspection and Notice Dates
Resident Complaints
19T-98009 Gareene Homes Ltd.
Provence Court Country Heights Drive
2004 Municipal Inspections in October 2014
Notice Letters issued June 3, 2015 and August 11, 2015
Yes
19T-96004 Mario and Maria DeAngelis
Servicing Agreement Paul and Anna Casalinuovo
Marsi Road 2005 Municipal Inspections in December 2010
Notice Letter issued June 29, 2016
Yes
19T-00012 1519754 Ontario Inc.
Wellspring Avenue
2005 Municipal Inspections in November 2007 February 2008 April and May 2009 September 2011 and June 2012
Notice Letter issued June 29, 2016
No
It should be noted that resident complaints have been received periodically about the current condition of these subdivisions and specifically Marsi Road and Provence Court. Completion of these subdivisions should resolve these complaints and provide the abutting residents with standard levels of service for municipal roads. The completion of municipal servicing will also allow the Town to assume the subdivisions and ensure standard operation and maintenance by the Town.
25
PLANNING AND REGULATORY SERVICES / DEVELOPMENT ENGINEERING
JEFF WALTERS BUSINESS CASE – GROWTH & NEW CAPITAL Completion of Subdivision Municipal Servicing
As such, in accordance with provisions in the applicable subdivision and servicing agreements, the developers have been notified of their obligations to complete the municipal servicing and their failure to satisfy these obligations. The dates of these notifications are summarized in Table 1. As there has been a failure to comply with these notices, it is Town staff’s intention to draw on the remaining securities to complete the servicing. Based on recent inspections by Town staff, detailed deficiency lists for remaining municipal servicing works for each subdivision have been prepared along with supporting cost estimates to complete the works. Project Description: The following is a summary of the municipal servicing works required for each of the identified subdivision projects. 19T-98009 Gareene Homes Ltd. – Provence Court and Country Heights Drive
• Remove and replace concrete curbs • Repairs to base asphalt and driveway aprons • Placement of top asphalt • Restoration of boulevards • Street lighting repairs
19T-96004 Mario and Maria DeAngelis, Paul and Anna Casalinuovo Servicing Agreement – Marsi Road
• Remove and replace concrete curbs • Repairs to base asphalt and driveway aprons • Placement of top asphalt • Restoration of boulevards • Street lighting repairs
19T-00012 1519754 Ontario Inc. – Wellspring Avenue
• Remove and replace concrete curbs and sidewalk • Repairs to boulevards and driveway aprons • Repairs to underground manholes and water boxes • Repairs to stormwater management facility
In addition to the outstanding municipal servicing, there are also some outstanding obligations under the subdivision or servicing agreements to provide specific information to support assumption of the municipal services by the Town. These outstanding items include professional certifications and as-built drawings. These items will be included as part of the work to be completed.
26
PLANNING AND REGULATORY SERVICES / DEVELOPMENT ENGINEERING
JEFF WALTERS BUSINESS CASE – GROWTH & NEW CAPITAL Completion of Subdivision Municipal Servicing
The timeline for completion of these subdivisions would be to tender in the Spring of 2017 and construction over the Summer/Fall of 2017. Stakeholders & Impacts The stakeholders for this project include the existing residents that own properties within the identified subdivisions, the general public, and Town forces that make use of the public roadway. Town forces could include staff or contractors that use the public roadways for waste collection and winter maintenance. These residents currently rely on the existing municipal services for sewage and water connections as well as public highway access to and from their properties. The potential impact to these stakeholders is that the services and public roadways they currently rely upon may not meet the municipal standard or the Town’s duty of care under the Municipal Act.
Strategic Alignment Completion of these subdivisions relates to the strategic plan in wise management of our resources and servicing as a role model for municipal management. Completion of the municipal servicing ensures that the works are completed in a timely fashion, constructed to a Town standard, and are in an acceptable condition prior to assumption by the Town.
Ten Year Capital Forecast These subdivision works are not in the ten year capital forecast as they were intended to be completed by the subdivision owners. It is not feasible to predict or expect that subdivision servicing will not be completed by the owners.
Comparative Analysis A comparative analysis was not undertaken. The Town subdivision or servicing agreements specifically outline the developer obligations with respect to municipal servicing. The obligations for municipal servicing are to conform to Town standards and specifications.
Alternatives Consideration was given to delaying the municipal delivery of these works and to continue to pursue the developers to complete the works. However, this alternative was not considered acceptable as the obligations under the agreements would remain unfulfilled and the standard of care for stakeholders would not be achieved. If the subdivision servicing is not completed at this time, resident complaints will continue to escalate and the condition of the roads could deteriorate since they have not yet been assumed by the Town. The deteriorating condition of the roads could cause safety and operational concerns for both residents and the Town and the amount of repairs and the related costs could continue increase over time.
27
PLANNING AND REGULATORY SERVICES / DEVELOPMENT ENGINEERING
JEFF WALTERS BUSINESS CASE – GROWTH & NEW CAPITAL Completion of Subdivision Municipal Servicing
Project Costs and Benefit The estimated costs for completion of the subdivisions are summarized in Table 2. Table 2
Subdivision
19T-98009 Provence Court and Country Heights Drive
19T-96004 and Servicing Agreement Marsi Road
19T-00012 Wellspring Avenue
Municipal Servicing Works $198,000 $106,000 $250,000
Consulting Fees: - 6% $11,800 $6,400 $15,000
Tendering, Contract Admin, Inspections – 3%
$5,900 $3,200 $7,500
OLS Survey and Certification $10,000 $5,000 $10,000
Geotechnical – 3% $5,900 $3,200 $7,500
As-Built Drawings $8000 $8000 $8000
Sub-Total $239,600 $131,800 $298,000
Contingency (10%) $24,000 $13,200 $29,800
Total Cost $263,600 $145,000 $327,800
Funding from Agreement Securities
$209,419 $73,625 $235,766
Capital Funding Required $54,200 $71,400 $92,100
The estimated cost for the municipal servicing are based on inspections and units costing undertaken by our EIS – Design section. The estimated cost for consulting fees are based on input from EIS – Design section and Development Engineering.
Based on the above summary, the total estimated cost of these works is $736,400. However, in all three cases the estimated cost of the outstanding works exceeds the available securities. As such, captial funding of approximately $217,700 is required to complete these subdivisons. In this particular case, the recommended source of funding is the Engineering Repair and Replacement Reserve.
28
PLANNING AND REGULATORY SERVICES / DEVELOPMENT ENGINEERING
JEFF WALTERS BUSINESS CASE – GROWTH & NEW CAPITAL Completion of Subdivision Municipal Servicing
Other Funding Sources The typical source of funding for completion of servicing subject to a subdivision or servicing agreement is the securities posted by the developer. These agreements also provide the Town the ability to recover the costs that exceed the security amounts from the applicable developer. This option will be further investigated by our Legal department and the appropriate legal actions will be initated to attempt to recover the additional costs. At this point, there is no timing or certainty if the Town will be successful in recovery of the costs. This type of project is not eligible for Federal Gas Tax Funding or other grants. These projects have not been identified for funding in any of our current development charge bylaws. The recommended funding source for this project is the Engineering Repair and Replacement Reserve. Conclusion Based on the above, Development Engineering recommends allocation of capital funds in the amount of $217,700 to complete the municipal servicing in the applicable subdivisions and to fulfill the remaining obligations under the application agreements to allow assumption of these subdivisions by the Town.
29
COMMUNITY SERVICES / PUBLIC WORKS OPERATIONS GRANT TAYLOR, DIRECTOR OF PUBLIC WORKS OPERATIONS
BUSINESS CASE – 10 YEAR WATERMAIN REPLACEMENT PROGRAM
Background In a continuing effort to support the sustainability of Town infrastructure, reduce the frequency of watermain breaks, reduce water pressure complaints and avoid impacts to local residents and businesses resulting from water interruptions, staff is recommending a program to identify and prioritize the replacement of ductile and cast iron watermain. Ductile and cast iron watermain pipes were the materials of choice during the 1950’s. The life cycle of the pipe material was expected to last up to 100 years; however, corrosive soils resulted in the degradation of the pipe wall resulting in a higher frequency of watermain breaks. Reports of early pipe failure, caused by corrosion, is occurring throughout North America affecting communities and creating the need for boil water advisories. One example from hundreds is from upstate New York where cast iron watermain that was supposed to last as long as 100 years is being corroded by soils just 17 years after it was installed. “The clay soils in a particular subdivision are reacting with the pipe material corroding them from the outside in, resulting in major failures even though the ductile iron pipes were designed and built to applicable standards.”1 Prioritization will entail identifying critical infrastructure with consideration of the following criteria:
• Economic impact: collateral damage to neighbouring properties and structures • Operational impact: water supply interruption • Environmental impact: erosion and sedimentation of storm infrastructure • Social impact: disruption and delays to local traffic
The Town maintains and operates approximately 603 km of watermains of which 20 percent is composed of cast or ductile iron material. The cast and ductile iron composition represents the oldest infrastructure within the water distribution system. In reviewing the existing water distribution system metrics between January 2010 and October 2015, the Town experienced 230 failures. This has resulted in water supply shutdowns to residential and commercial properties, disrupting traffic flow, causing other infrastructure damage, and in some cases personal claims for property damage.
Project Description The following list of projects is recommended to be completed over the next 10 years, commencing with detailed design in 2018 and construction in 2019. Although the list is prioritized by need, adjustments in timing may be necessary and will be considered annually.
1 APWA Journal, The Epidemic of Pipe Corrosion, Part 1, Examining Pipe Life, December 2011
30
COMMUNITY SERVICES / PUBLIC WORKS OPERATIONS GRANT TAYLOR, DIRECTOR OF PUBLIC WORKS OPERATIONS
BUSINESS CASE – 10 YEAR WATERMAIN REPLACEMENT PROGRAM
Stakeholders & Impacts Stakeholders include local residents, students attending local school, and
local business Reduce service disruption and inconvenience to customers, maintain
reliability of the distribution supply, and improve water quality
Strategic Alignment The 10 Year Capital Watermain Replacement Program supports the Town’s Strategic Plan through the provision of exceptional public service to the community by aligning important capital investments through Wise Management of Resources; to ensure effective maintenance of the water distribution system and reduce the number of watermain breaks and water disruptions.
Ten Year Capital Forecast This is a new initiative in the ten-year Capital forecast.
Comparative Analysis Basic principles of watermain design standards include specifications to provide adequate flow for domestic and commercial uses and for fire protection, to protect the quality of the public water supply, and to maintain the integrity and reliability of the distribution system.
Whenever possible, all watermain systems are designed to provide a complete system loop with all portions of the system having possible feed from at least two directions.
This proposal seeks to reinstate this condition.
Streets Watermain Length (meters)
Detailed Design Cost
Construction Cost
Trench Street 700 $114,300 $820,600 Laverock Avenue 310 $57,100 $363,400 Kersey Crescent 525 $85,700 $615,400 Taylor Mills North 894 $145,900 $1,048,000 Springhead Gardens 1,200 $195,900 $1,406,700 Taylor Mills South 800 $130,600 $937,800 Neal Drive 960 $156,700 $1,125,400 Levendale Road 460 $75,100 $539,200 Teefy Subdivision 1,475 $240,800 $1,729,100 Wright/Powell St. 333 $53,900 $390,400
31
COMMUNITY SERVICES / PUBLIC WORKS OPERATIONS GRANT TAYLOR, DIRECTOR OF PUBLIC WORKS OPERATIONS
BUSINESS CASE – 10 YEAR WATERMAIN REPLACEMENT PROGRAM
Alternatives The alternative to this project is the “do nothing alternative”; choose not to replace the watermain. The advantage to this is near-term cost avoidance. The disadvantage is that the Town would continue to respond to increased failures in the distribution system, cost of repairs and restoration would continue, including potential property damage and risk of claims.
Project Costs and Benefit The total estimated cost of detailed design for all the listed projects is $1,256,000 and includes subsurface utility investigations, geotechnical investigations, conditional analysis of the existing infrastructure, and engineering surveys. The total estimated cost of construction for all the listed projects is $8,976,000 based on the latest tendered prices and includes the cost of contract administration and inspection. The Watermain Replacement Program will be funded through the Watermain Repair and Replacement Reserve. Fund
Other Funding Sources N/A
Conclusion That Council receives the 10 Year Watermain Replacement Program recommendations and that staff be directed to include the program in the 10 Year Capital Budget Forecast commencing in 2018.
32
COMMUNITY SERVICES/PUBLIC WORKS OPERATIONS Grant Taylor, Director of Public Works Operations
BUSINESS CASE – GROWTH & NEW CAPITAL Phase II – Operations Centre Detailed Design
Background The Operations Centre located at 1200 Elgin Mills Road was constructed in 1983. The facility is attached to a second building at 1150 Elgin Mills Road that was also constructed in 1983 by Richmond Hill Hydro. A Master Development Planning Study for the Operations Centre commenced in 1998 to develop a strategic long range plan to ensure that the Operations Centre is appropriately equipped to handle future growth. It proceeded in two phases. Phase 1, addressed the long term needs, including a review of the facility, its current operations and anticipated future needs. Phase 2, being the recommended strategy, including life cycle costing analysis of the facility expansion options and design concept of the recommended future configuration. Phase 1 was completed in 1999. With the pending sale of Richmond Hill Hydro, the completion of Phase 2 of the Master Development Plan was deferred. In 2001, the facility at 1150 Elgin Mills Road became the property of the Town and was leased to PowerStream until December 2004. PowerStream vacated the property at 1150 Elgin Mills Road at the end of their lease. Phase 2 of the Master Plan was completed in 2004 and capital funding was approved to commence the implementation of the plan. Due to the magnitude and cost commitment required to implement the plan, it was approved that the design and construction would be undertaken in 2 Phases. Phase I, design and construction, included the renovations to the main building, construction of the salt shed, fire training tower and truck wash along with the related site configuration. Phase I construction was substantially completed in 2009. Phase II, design and construction, to build a 13,000 sq. ft. cold storage facility, install a weigh scale, provide storm water quantity and quality management, infiltration/decanting area for wet fill from watermain breaks and infrastructure repairs, dedicated outside material storage, asphalt paving, concrete curbing and landscaping. In 2015, AMEC Foster Wheeler was retained to review the exterior elements of the Master Plan, and re-assess the feasibly of the Phase 2 project. The Master Plan indicated that the Town of Richmond Hill’s infrastructure requirements will grow proportionally with the population projections. It is anticipated that by 2021, the rapid population growth, and infrastructure needs will level off. Once the infrastructure needs level off, the material impact of the growth of the Operations Centre will subside. Therefore, for the purpose of revising Phase 2 of the Master Plan, there is no need to look beyond the 2021 planning horizon.
33
COMMUNITY SERVICES/PUBLIC WORKS OPERATIONS Grant Taylor, Director of Public Works Operations
BUSINESS CASE – GROWTH & NEW CAPITAL Phase II – Operations Centre Detailed Design
Project Description There have been numerous changes to the Operations Centre and surrounding area since the completion of building renovations. The Regional Municipality of York is operating the Community Environmental Centre (CEC) utilizing space on the west side of the building. A new collector road is nearing approval and is expected to be constructed in the near future providing dedicated access to the Region’s CEC and providing secondary access to the Operations Centre. The plan incorporates the closing of the west entrance of the Operations Centre. The need to install a weigh scale to accurately track costs for specific activities has been identified (e.g., rock salt, Thawrox, road maintenance materials, excavated material and waste roll-off bin deliveries). The weigh scale will verify invoicing of materials, and ensure trucks are not over-loaded when leaving the yard. Space needs within cold storage building are important to ensure equipment is secure, stored out of the elements and space use is maximized. Further, there is a need to ensure sufficient space is allocated and that appropriate drainage infrastructure is installed to ensure wet fill material can dry out (e.g., from various watermain repair activities as landfill sites will not accept saturated material). The new soccer dome is stored in six sea containers during the summer months. The proximity to Richmond Green and dedicated space needs are integral to the annual set up and removal.
Stakeholders & Impacts Asset Management will lead the detailed design assignment including geotechnical review and acquisition of approvals in consultation with Public Works Operations.
Strategic Alignment The initiative aligns with the Town’s Strategic Plan Goal #4; Wise Management of Resources. The progression of the Phase 2 Operations Centre Master Plan will ensure that the facility lands are renovated to accommodate current and future growth needs of the Town.
Comparative Analysis N/A
34
COMMUNITY SERVICES/PUBLIC WORKS OPERATIONS Grant Taylor, Director of Public Works Operations
BUSINESS CASE – GROWTH & NEW CAPITAL Phase II – Operations Centre Detailed Design
Alternatives The alternative is to do nothing, however, this will result in significant yard and operational deficiencies including: insufficent dedicated inside storage space and equipment stacking capabilities
(e.g., parks grounds maintenance equipment, sidewalk snow clearing equipment,watermain pipe material); equipment will need to be stored outside resulting inexposure to adverse weather (e.g., precipitation, and extreme heat and cold);watermain pvc pipe must not be exposed to sun and dust.
Inability to decant wet fill material from watermain breaks and other infrastructurerepairs resulting in the inability to remove wet fill from the yard; material is subjectto testing and drying before it can be moved to landfill.
Inability to verify material delivery invoiced weights (e.g., salt, aggregate, asphalt,mulch, top soil etc.); verify load weights leaving the site (waste roll-off bins;invoices paid per tonne); and truck weights leaving the yard ensuring Minstry ofLabour regulation conformance (heavy fines can be levied when trucks areoverloaded).
Inability to effectively manage stormwater flows generated on site; exisitingunderground conveyance infrastructure has declined and is no longer functional.
Inability to properly and securely store streetlight poles to prevent damage fromyard operations.
Inability to securely manage yard operations when contractors mobilize on site(e.g., winter operations - fueling, equipment maintenance etc.);
Inability to use the north yard gate to service Richmond Green; controlled gateaccess/egress would resolve this issue in conjunction with security cameras.
Inability to effectively suppress dust generated on site due to truck andequipment movement.
Project Costs and Benefits The estimated cost to facilitate geotechincal analysis, detailed design, and approvals is $1,145,000.00 (2017). The estimated cost of construction including contract adminstration and inspection is $11,200,000 (2018). The project will be funded from Public Works Development Charges.
Conclusion That funding be allocated in 2017 to facilitate the detailed design of the Phase 2 Operations Centre Master Plan.
35
Office of the CAO / Communication Services Meeta Gandhi
BUSINESS CASE – GROWTH & NEW CAPITAL Access Richmond Hill Re-design
Background Access Richmond Hill, Richmond Hill’s contact centre is located on the ground floor at 225 East Beaver Creek. In 2014, an Access Richmond Hill Operational & Strategic Review was conducted to provide a snapshot of the current state of ARH, highlight what is working well and areas where improvements can be made and to identify further opportunities for improved quality of service and efficiencies. The ARH review reported that the design of the front counter does not provide a good flow for customers waiting in line and the ARH Review Implementation plan includes a complete a review of the layout of the front counter of the contact centre to provide better signage and improve the flow of traffic within the centre. The current design also exposes ARH staff to security risks as there are line of sight issues for some of the front-end workstations and there are no security barriers between staff and public. Given that cash transactions take place which can be extensive on tax due dates, the need to address the ARH redesign and in particular, the need to mitigate the security risks is critical. Ergonomic factors also need to be considered in the design. As a result of several neck, hand strain reports, ergonomic assessments were conducted for the staff. Currently, staff rotate desks every two weeks. This results in a situation whereby adjustments need to be made to their work area on a regular basis to avoid repetitive strain injuries. A design that allows for every person to have their own permanent desk will address this situation. Staff will then rotate to the front counter as needed. A Business Case for the feasibility and design of renovations for the ARH space on the ground floor of 225 East Beaver Creek was submitted and approved as part of the 2016 Capital Budget process. The budget allocation for this work was $20,000 and the feasibility and preliminary designs are complete. A preliminary budget of $337,500 was presented to ELT in October 2016. In addition to the ergonomic and security matters, the budget included requirements such as the expansion of the kitchen area to allow for a meeting space, adding kiosk space for marriage licence applications and the installation of an information screen(s) to provide information to staff about Key Performance Indicators. In the interest of reducing the overall cost of the project, these items were subsequently removed and the budget is now $135,000.
36
Office of the CAO / Communication Services Meeta Gandhi
BUSINESS CASE – GROWTH & NEW CAPITAL Access Richmond Hill Re-design
Project Description This project will be for the design and construction for the renovations to the ARH space and the reception desk area on the ground floor of 225 East Beaver Creek. This space totals 2,500 square feet. The project will commence after funding is approved and will be staged through 2017. Additional requirements as identified in the 2016 design and feasibility study may be brought forth in 2018 if budget permits. Stakeholders & Impacts
• ARH staff• Residents, business owners and others stakeholders who interact with
Richmond Hill• Richmond Hill staff
Impacts: ARH is often the first point of contact with residents, business owners and other stakeholders and it is critical to ensure a positive customer service experience. This begins with an in-person service that is easy to navigate and esthetically pleasing. More important, the proposed design will address security issues so that staff work in a safe environment. Strategic Alignment
This project supports the implementation of recommendations from the Access Richmond Hill Review. It is also linked to the Town’s Strategic Plan: Stronger Connections: A well designed Centre will facilitate stronger connections with residents and businesses in Richmond Hill. This is an opportunity to incorporate current access centre design principles which will allow for better access to the first point of contact. Wise Management of Resources: A well configured and ergonomically sound ARH Centre will result in streamlined service delivery and an improved customer service experience.
Ten Year Capital Forecast
This project was not included in the ten-year capital forecast as the recommendations were released in June 2015.
37
Office of the CAO / Communication Services Meeta Gandhi
BUSINESS CASE – GROWTH & NEW CAPITAL Access Richmond Hill Re-design
Alternatives If the design and feasibility study does not proceed, the status quo will be the alternative. That said, there is considerable risk to staff should there ever be a security breech which is always a risk since cash transactions take place daily. Further, the health and safety concerns will persist.
Project Costs and Benefit Based on the feasibility study, the construction cost for this project is estimated to be approximately $135,000. This includes: - Security measures: Glass partitions installed at all front counter stations, change
alignment of front counters so that there is a clear line of sight to the front door from anystation, under counter cash drawer installation
- Reconfigure workstations to fit with the new front counter alignment- Installation of additional workstations so that every staff member has their own desk- Installation of sound masking equipment/material- Full compliance with AODA requirements
Other Funding Sources
Funding for the feasibility and design work is from the Infrastructure Repair & Replacement Reserve. 1. Strategic Priorities (Design and Construction - minimum threshold of
$50,000)This project is in-line with the Access Richmond Hill Review recommendations.
Conclusion
The first point of contact between an organization and its customers/clients often determines the level of customer satisfaction. An effectively designed customer service centre is key to this. A redesigned Access Richmond Hill Contact Centre will allow for ease of access to front counter services, improved sound barriers, improved ergonomic design, full compliance with AODA requirements and will ensure that security measures are in place.
38
39
40
41
42
43
44
45
46
47
Environment & Infrastructure Services Highlights
Ten-Year Capital Forecast: $371,617,500
Major Projects (greater than $3 million)
Roads - Reconstruction • Coon’s Road
Watermain / Sanitary Replacements • Bathurst Street Reconstruction• Muirhead Crescent and Stouffville Road Area
Storm Water Management & Water Resources • Don Head East Pond (24-2)• Beaver Creek Pond A: 27-2
Repair & Replacement of Existing Parks • Bradstock Park Revitalization• Town Park Rehabilitation (2 Year)• Mill Pond Park Phase 1 & 2 Revitalization (2 year)• Bayview Hill Park Rehabilitation
Growth Related Parks • DDO Trails, Picnic Area & Entrances• Rawlinson / Perryman• Greatlands Developments Park (16th)• North Leslie Trails (1.8 km)
Other Divisional Requests
PRS – Development Engineering • Flood Remediation Project• 404 Flyover Block 21 - Leslie Street to Woodbine Ave. (North of Sixteenth)• 404 Flyover Block 13 (Land Acquisition Costs) - Leslie Street to Woodbine Ave.
(North of Elgin Mills)• 404 Flyover Block 13 - Leslie Street to Woodbine Ave. (North of Elgin Mills)• Weldrick Road East & West - Widening / Grade Separation• Newkirk Road• West Beaver Creek - Road Widening• East Beaver Creek - Road Widening / Intersection Improvement & Transportation
Improvements
48
The T
own
of R
ichm
ond
Hill
2017
Ten
Year
Cap
ital F
orec
ast
Envir
onm
ent &
Infra
stru
ctur
e Ser
vices
2016
2017
2018
2019
2020
2021
2022
Appr
oved
Bu
dget
Budg
et
Requ
est
Fore
cast
Fore
cast
Fore
cast
Fore
cast
Fore
cast
CAPI
TAL
PROJ
ECTS
Desig
n and
Con
struc
tion
30,66
4,500
25
,745,8
00
22,44
3,200
20,01
1,700
38,29
4,700
58,98
3,300
26,73
0,300
Facil
ities
21,62
6,400
6,2
79,00
0
15,47
5,000
5,141
,000
4,125
,000
4,125
,000
4,125
,000
Envir
onme
nt Se
rvice
s12
,485,9
00
1,555
,500
94
0,000
20,00
0
66
5,000
1,609
,500
315,7
00
64,77
6,800
33
,580,3
00
38,85
8,200
25,17
2,700
43,08
4,700
64,71
7,800
31,17
1,000
49
The T
own
of R
ichm
ond
Hill
2017
Ten
Year
Cap
ital F
orec
ast
Envir
onm
ent &
Infra
stru
ctur
e Ser
vices
CAPI
TAL
PROJ
ECTS
Desig
n and
Con
struc
tion
Facil
ities
Envir
onme
nt Se
rvice
s
2023
2024
2025
2026
2027
Tota
l
Fore
cast
Fore
cast
Fore
cast
Fore
cast
Fore
cast
Fore
cast
20,91
3,000
26,38
6,800
20
,226,4
00
16
,846,4
00
61
,859,3
00
31
2,695
,100
4,125
,000
4,125
,000
4,125
,000
4,125
,000
4,125
,000
53,61
6,000
434,7
00
21
4,000
23
3,000
49
7,900
37
6,600
5,3
06,40
0
25,47
2,700
30,72
5,800
24,58
4,400
21,46
9,300
66,36
0,900
371,6
17,50
0
Ten Y
ear T
otal
371,6
17,50
0$
50
Environment & Infrastructure Services
Design & Construction Division Highlights
Ten Year Capital Forecast: $312,695,100 Existing Assets 158,897,100 Growth Assets 153,798,000 Existing Capital Projects (greater than $2 million) Roads Reconstruction (Design & Construction)
• 2018 - Coon’s Road (Humberland to Yonge) 3,825,800 • 2019 - Cynthia Crescent (Coon’s to Coon’s) 2,277,900 • 2020 - Maple Grove Avenue (Yonge to Parker) 2,126,100 • 2018 - 2020 Elm Grove Avenue (Parker to Yonge) 2,471,900 • 2018 - 2020 Blackforest Drive (Yonge to 53m north of Greyfriars) 2,277,500 • 2019 - 2021 Rockport Crescent (Tormore to Bayview) 3,118,400 • 2020 - 2021 Harris Avenue (Yonge to 400m west; 60m west of Beech 2,556,700
to 400m east of Beech) • 2022 - 2023 Rosegarden Crescent (Blackforest to Blackforest) 2,001,200 • 2023 - 2024 Beaufort Hills Road (Coon’s Rd to West Limit & 2,198,100
Coon’s Rd to Blackforest)
Watermain / Sanitary Replacements • 2019 - 2020 Bayview Avenue Reconstruction 2,300,700 • 2020 - 2021 Bathurst Street Reconstruction (York Region) 4,451,800 • 2024 - 2025 Carrville Road Reconstruction 2,181,300
Storm Water Management & Water Resources
• 2020 - 2021 - Don Head East Pond (24-2) Rehabilitation 4,363,400 • 2023 - 2024 Beaver Creek Pond A: 27 – 2 5,226,800
(Rehabilitation & Reconfiguration)
Repair & Replacement of Existing Parks • 2018 - Bradstock Park Revitalization 3,225,800 • 2018 & 2021 Town Park Rehabilitation (2 Year) 4,290,000 • 2020 - 2024 Mill Pond Park Phase 1 & 2 Revitalization (2 Year) 6,470,000 • 2020 - 2022 Lake Wilcox Canoe Club Area Waterfront Activity Zone 2,448,000 • 2022 - North Leslie (Mattamy) Richmond Green addition 2,550,000 • 2022 - 2023 - Pine Farm Park Revitalization 2,961,100 • 2022 - 2023 - Unity Park Design 2,520,000 • 2026 - 2027 Bayview Hill Park Rehabilitation 3,962,700
51
Environment & Infrastructure Services
Design & Construction Division Continued
Growth Capital Projects (greater than $2 million) Growth Related – Parks (Design & Construction)
• 2018 - 2019 North Leslie Community Park West (3.0 ha) 2,565,300 • 2019 - 2020 North Leslie Community Park East (2.93 ha) (TACC) 3,127,400 • 2019 - 2020 West Gormley Community Park 2,166,400 • 2020 - 2021 DDO Trails, Picnic Area & Entrance 5,472,000 • 2022 & 2025 North Leslie West Local Park (Raki) 2,113,500 • 2023 - 2024 Miles Hill Parkette (Palmer Road Allowance) 2,418,400 • 2023 - 2024 North Leslie Lake to Lake 2,500,000 • 2024 - 2026 Rawlinson / Perryman 4,518,000 • 2024 - 2025 Greatlands Developments Park (16th) 5,181,100 • 2026 - 2027 North Leslie Trails (1.8 km) 4,318,100
Other Divisional Requests (PRS – Development Engineering) • 2018 – 2021 Flood Remediation Project 26,695,000 • 2020 - 2021 404 Flyover Block 21 Leslie Street to Woodbine 14,009,300
Avenue (North of Sixteenth); Land Acquisition inclusive • 2023 - 2024 404 Flyover Block 13 Leslie Street to Woodbine 17,272,600
Avenue (North of Elgin Mills); Land Acquisition inclusive • 2026 - 2027 - Weldrick Road East & West Widening / Grade Separation 20,235,600 • 2026 - 2027- Newkirk Road 13,350,400 • 2026 - 2027 - West Beaver Creek Road Widening 11,375,400 • 2027 - East Beaver Creek – Road widening / Intersection & 6,238,300
Transportation Improvements (Highway # 7)
52
Environment & Infrastructure Services
Design & Construction Division Continued
Project Changes from 2016 Forecast (greater than $2 million) Roads
• Coon’s Road postponed from 2017 to 2018 • Cynthia Crescent postponed from 2018 to 2019 • Maple Grove Ave. postponed from 2018 to 2020 • Arnold Crescent postponed from 2018 to 2020 • Elm Grove Avenue postponed from 2019 to 2020 • Blackforest Drive postponed from 2019 - 2020 • Rockport Crescent postponed from 2020 to 2021
Watermain / Sanitary Replacements
• Bathurst Street Reconstruction postponed from 2019 - 2020 to 2020 - 2021 Storm Water Management & Water Resources
• Beaver Creek Pond A: 27-2 (Rehabilitation & Reconfiguration) postponed from 2023 - 2024 to 2025
Repair & Replacement of Existing Parks
• Bradstock Park Revitalization postponed from 2017 to 2018 • Town Park Rehabilitation (2 Year) postponed from 2019 - 2021 to 2018 - 2021 • Mill Pond Park Phase 1 & 2 Revitalization (2 Year) postponed from 2018 - 2020 to 2020 -
2024 • Lake Wilcox Canoe Club Area Waterfront Activity Zone postponed from 2017 – 2018 to
2020 & 2022 • Pine Farm Park Revitalization postponed from 2018 – 2019 to 2023 • Unity Park Design postponed from 2019 – 2021 to 2023 • Bayview Hill Park Rehabilitation postponed from 2024 – 2025 to 2026 - 2027
Growth Related Parks (Design & Construction) • North Leslie Community Park West (3.0 ha) (Richview) advanced from 2019 - 2020 to 2018
- 2019 • North Leslie Park Community Park East advanced from 2020 - 2021 to 2019 - 2020 • West Gromley Community Park postponed from 2018 – 2019 to 2019 - 2020 • Miles Hill Parkette (Palmer Road Allowance) postponed from 2019 - 2020 to 2023 - 2024 • North Leslie Trails (1.8 km) postponed from 2025 - 2026 to 2026 - 2027
Other Divisional Requests (PRS – Development Engineering)
• East Beaver Creek – Road Widening / Intersection Improvements postponed from 2017-2018 to 2027
• Weldrick Road East & West – widening / Grade Separation postponed from 2019 - 2021 to 2027
• Newkirk Road postponed from 2017 - 2018 to 2027 • West Beaver Creek - Road widening postponed from 2021 to 2027
53
The T
own
of R
ichm
ond
Hill
2017
Ten
Year
Cap
ital F
orec
ast
Desig
n &
Cons
truct
ion
2016
2017
2018
2019
2020
2021
2022
Appr
oved
Bud
get
Budg
et
Requ
est
Fore
cast
Fore
cast
Fore
cast
Fore
cast
Fore
cast
Exist
ing
Capi
tal
Road
s - R
econ
stru
ctio
n# o
f con
stru
ctio
n pr
ojec
ts3
2
2
10
5
# o
f met
res o
f con
stru
ctio
n pr
ojec
ts2,1
50
90
0
3,175
3,334
1,005
Lake
land C
resc
ent
4,378
,500
De
maine
Cre
scen
t 1,4
44,60
0
Coon
's Ro
ad
661,3
00
3,8
25,80
0
Cynth
ia Cr
esce
nt38
6,600
2,277
,900
Ma
ple G
rove
Ave
2,126
,100
Am
old C
res
1,750
,500
El
m Gr
ove A
ve2,1
76,70
0
Blac
kfore
st Dr
ive
2,005
,900
Ro
ckpo
rt Cr
esce
nt2,7
03,30
0
Ha
rris A
venu
e2,2
56,40
0
Su
gar M
aple
Lane
& C
ourt
1,357
,900
Ro
sega
rden
Cre
scen
tOx
ford S
treet
Beau
fort H
ills R
oad
Aubr
ey A
venu
e
Othe
r (Se
e Sch
A fo
r deta
il)2,0
06,80
0
913,1
00
60
5,400
-
-
3,980
,300
1,499
,000
De
sign p
rojec
ts (S
ee S
ch A
for d
etail)
131,2
00
64
6,700
566,8
00
59
6,200
645,9
00
36
4,500
39
8,500
9,009
,000
1,5
59,80
0
4,998
,000
2,8
74,10
0
8,705
,100
9,3
04,50
0
3,2
55,40
0
2018
For
ecas
t5,4
92,10
0
7,232
,600
4,6
81,20
0
3,673
,500
4,0
67,40
0
2,4
20,90
0
$ inc
reas
e/(de
creas
e)(3
,932,3
00)
(2
,234,6
00)
(1,80
7,100
)
5,031
,600
5,2
37,10
0
83
4,500
54
The T
own
of R
ichm
ond
Hill
2017
Ten
Year
Cap
ital F
orec
ast
Desig
n &
Cons
truct
ion
2016
2017
2018
2019
2020
2021
2022
Appr
oved
Bud
get
Budg
et
Requ
est
Fore
cast
Fore
cast
Fore
cast
Fore
cast
Fore
cast
Wat
erm
ain / S
anita
ry R
eplac
emen
ts
# of c
onst
ruct
ion
proj
ects
6
3
8
12
8
# of m
etre
s of c
onst
ruct
ion
proj
ects
3,635
1,600
5,733
7,334
4,899
Castl
e Roc
k Driv
e13
9,000
2,370
,100
Co
on's
Road
1,134
,100
Cy
nthia
Cres
cent
527,5
00
Ma
ple G
rove
Ave
492,4
00
Ar
nold
Cres
.40
1,500
Elmw
ood A
ve1,0
08,20
0
Bayv
iew A
venu
e Rec
onstr
uctio
n2,1
11,90
0
Rock
port
Cres
cent
630,1
00
Bathu
rst S
treet
Reco
nstru
ction
3,907
,600
Harri
s Ave
nue
504,1
00
Taylo
r Mills
Driv
e Nor
th1,0
48,00
0
King
Roa
d (Yo
rk Re
gion P
rojec
t)1,2
09,00
0
Suga
r Map
le La
ne &
Cou
rt28
7,200
Sprin
ghea
d Gar
dens
16th
Ave
nue
Beau
fort H
ills R
oad
Carrv
ille R
oad R
econ
struc
tion
Neal
Drive
Aubr
ey A
venu
eSy
lvan C
resc
ent
Teefy
Sub
divisi
onMu
irhea
d Cre
scen
t and
Stou
ffville
Roa
d Are
a50
0,000
2,561
,000
Othe
r (Se
e Sch
A fo
r deta
il)16
7,100
858,7
00
82
0,600
1,555
,600
1,4
35,70
0
1,2
78,70
0
Desig
n pro
jects
(See
Sch
A fo
r deta
il)86
,300
308,2
00
30
9,800
607,8
00
84
6,000
400,8
00
556,1
00
225,3
00
2,8
45,40
0
3,310
,800
1,9
55,90
0
5,907
,400
9,4
39,30
0
4,3
79,00
0
55
The T
own
of R
ichm
ond
Hill
2017
Ten
Year
Cap
ital F
orec
ast
Desig
n &
Cons
truct
ion
2016
2017
2018
2019
2020
2021
2022
Appr
oved
Bud
get
Budg
et
Requ
est
Fore
cast
Fore
cast
Fore
cast
Fore
cast
Fore
cast
Side
walks
# o
f con
stru
ctio
n pr
ojec
ts10
7
5
5
6
# o
f met
res o
f con
stru
ctio
n pr
ojec
ts4,1
85
7,4
98
3,1
95
2,3
69
1,6
40
Lesli
e Stre
et33
0,500
Lesli
e Stre
et - L
ake t
o Lak
e Rou
te (P
CMP)
626,9
00
1,0
33,50
0
639,4
00
Pe
destr
ian &
Cyc
ling M
aster
Plan
(TBD
)67
4,300
67
4,300
Othe
r (Se
e Sch
A fo
r deta
il)1,8
51,50
0
1,107
,200
66
7,700
1,054
,000
48
7,800
488,8
00
197,4
00
De
sign p
rojec
ts (S
ee S
ch A
for d
etail)
20,30
0
21
8,800
22,00
0
64
,900
65
,600
11
8,800
10
4,100
1,871
,800
1,3
26,00
0
1,647
,100
2,1
52,40
0
1,192
,800
1,2
81,90
0
97
5,800
Stor
m W
ater
Man
agem
ent &
Wat
er R
esou
rces
Lake
Wilc
ox B
aif W
est P
ond:
2-2
813,1
00
El
gin W
est P
ond:
16-5
273,8
00
1,6
25,60
0
Uppe
r Eas
t Don
UED
13 B
lock 1
623
1,000
1,993
,100
Be
aver
Cre
ek P
ond B
: 28-
11,1
07,60
0
Don H
ead E
ast P
ond (
24-2
)3,7
70,50
0
Up
per E
ast D
on: U
ED4 B
lock 2
41,1
56,80
0
Tw
icken
ham
Pond
: 16-
41,5
39,10
0
Elgin
Wes
t Pon
d: 16
-8 G
M4W
East
Don R
iver E
D4 B
lock 2
5Be
aver
Cre
ek P
ond A
: 27-
2 Up
per E
ast D
on U
ED3 B
lock 2
4
Othe
r (Se
e Sch
A fo
r deta
il)-
174,6
00
11
6,000
1,349
,000
31
0,800
38
6,200
1,317
,900
3,6
18,70
0
174,6
00
1,2
23,60
0
1,349
,000
5,2
38,10
0
1,9
25,30
0
56
The T
own
of R
ichm
ond
Hill
2017
Ten
Year
Cap
ital F
orec
ast
Desig
n &
Cons
truct
ion
2016
2017
2018
2019
2020
2021
2022
Appr
oved
Bud
get
Budg
et
Requ
est
Fore
cast
Fore
cast
Fore
cast
Fore
cast
Fore
cast
Repa
ir &
Repl
acem
ent o
f Exis
ting
Park
sBr
adsto
ck P
ark R
evita
lizati
on67
5,900
3,225
,800
David
Ham
ilton P
ark R
evita
lizati
on6,2
05,00
0
King
's Co
llege
Par
k Rev
italiz
ation
299,5
0096
8,000
Town
Par
k Reh
abilit
ation
(2 Y
ear)
715,0
003,5
75,00
0Mi
ll Pon
d Par
k Pha
se 1
& 2 R
evita
lizati
on (2
year
)63
5,000
635,0
00La
ke W
ilcox
Can
oe C
lub A
rea W
aterfr
ont A
ctiivt
y Zon
e40
8,000
2,040
,000
North
Lesli
e (Ma
ttamy
) Rich
mond
Gre
en ad
dition
2,5
50,00
0St
aver
t Par
k Re
vitali
zatio
n90
3,900
Pine
Far
m Pa
rk Re
vitali
zatio
nUn
ity P
ark D
esign
Lenn
ox P
ark R
evita
lizati
onCa
rville
Par
k Rev
italiz
ation
Bayv
iew H
ill Pa
rk Re
habil
itatio
nMo
rgan
Boy
le Co
mmun
ity P
ark R
evita
lizati
on4,5
80,00
0
Little
Don
Par
k Rev
italiz
ation
1,280
,100
Prov
ision
for C
apita
l Pro
jects
(TBD
)Ot
her (
see S
ched
ule A
for d
etails
)1,1
33,30
0
1,225
,500
93
7,100
500,0
0068
0,600
1,154
,500
1,276
,800
13,87
4,300
1,525
,000
4,8
77,90
0
1,468
,000
1,7
23,60
0
5,364
,500
6,770
,700
57
The T
own
of R
ichm
ond
Hill
2017
Ten
Year
Cap
ital F
orec
ast
Desig
n &
Cons
truct
ion
2016
2017
2018
2019
2020
2021
2022
Appr
oved
Bud
get
Budg
et
Requ
est
Fore
cast
Fore
cast
Fore
cast
Fore
cast
Fore
cast
Grow
th R
elate
d - P
arks
Lake
Wilc
ox Y
outh
Area
4,8
70,90
0
Casa
Sub
divisi
on P
arke
tte (
0.78 h
a / 2.
0 ac)
(Bay
view
Aven
ue &
Beth
esda
Side
Roa
d)53
,000
688,8
00
Oxfor
d / D
irezz
e Tra
il19
0,500
974,1
00
Ha
rris B
eech
Loca
l Par
k (0.7
0 ha)
143,2
00
73
2,000
North
Lesli
e Com
munit
y Par
k Wes
t (3.0
ha)(R
ichvie
w)2,2
82,80
0
David
Dun
lap &
Picn
ic Ar
ea1,5
00,00
0
Briar
Nine
Res
erve
Exp
ansio
ns &
Tra
il Con
necti
on79
2,500
Gard
en E
ntry F
eatur
e 75
0,000
North
Lesli
e Com
munit
y Par
k Eas
t (2.9
3 ha)
(TAC
C)2,7
82,60
0W
est G
orml
ey C
ommu
nity P
ark
1,927
,800
DDO
Trail
s, Pi
cnic
Area
& E
ntran
ces
572,0
004,9
00,00
0No
rth Le
slie L
ocal
Park
East
(Clea
rpoin
t Lan
ds 1.
3 ha)
57
6,300
Wes
t Gor
mley
Loca
l Par
k 1,1
46,50
0No
rth Le
slie W
est L
ocal
Park
(Rak
i)1,2
22,00
0N.
Lesli
e W. L
ocal
Park
(Man
son L
ands
)18
6,700
Miles
Hill
Parke
tte (P
almer
Roa
d Allo
wanc
e)No
rth Le
slie L
ake T
o Lak
eRa
wlins
on /
Perry
man
Grea
tland
s Dev
elopm
ents
Park
(16th
)No
rth Le
slie T
rails
(1.8
km)
Prov
ision
for C
apita
l Pro
jects
(TBD
)Ot
her (
See S
ched
ule A
for d
etails
)1,1
58,00
0
494,2
00
85
3,900
786,4
0071
,300
293,8
0034
,700
1,211
,000
6,3
87,60
0
2,560
,000
6,1
11,70
0
5,353
,700
5,7
70,10
0
2,5
89,90
0
58
The T
own
of R
ichm
ond
Hill
2017
Ten
Year
Cap
ital F
orec
ast
Desig
n &
Cons
truct
ion
2016
2017
2018
2019
2020
2021
2022
Appr
oved
Bud
get
Budg
et
Requ
est
Fore
cast
Fore
cast
Fore
cast
Fore
cast
Fore
cast
OTHE
R DE
PART
MENT
AL R
EQUE
STS
New
Capi
tal P
rojec
ts (P
RS -
Deve
lopm
ent E
ngin
eerin
g)
Flood
Rem
ediat
ion P
rojec
t6,2
00,00
0
2,914
,000
1,3
81,00
0
11,20
0,000
11,20
0,000
404 F
ly-ov
er B
lock 2
1 (La
nd A
cquis
ition C
osts)
1,626
,100
40
4 Fly-
over
Bloc
k 21
1,873
,400
10
,509,8
00
40
4 Fly-
over
Bloc
k 13 (
Land
Acq
uisitio
n Cos
ts)6,5
04,50
0
404 F
ly-ov
er B
lock 1
3W
eldric
k Roa
d Eas
t & W
est -
wide
ning /
Gra
de S
epar
ation
Newk
irk R
oad
Wes
t Bea
ver C
reek
- Ro
ad w
idenin
g Ea
st Be
aver
Cre
ek -
Road
wide
ning /
Inter
secti
on &
Tr
ansp
ortat
ion Im
prov
emen
ts
Desig
n pro
jects
(See
Sch
A fo
r deta
il)76
,100
-
Othe
rOt
her
1,868
,100
2,2
07,20
0
1,960
,800
1,2
18,90
0
989,7
00
87
5,100
32
9,700
Gorm
ley R
oad C
ulver
t Rep
lacem
ent
1,287
,100
3,155
,200
8,4
83,30
0
4,874
,800
4,2
26,00
0
14,06
3,100
22,58
4,900
6,834
,200
TOTA
L30
,664,5
00
25
,745,8
00
22,44
3,200
20,01
1,700
38,29
4,700
58,98
3,300
26,73
0,300
59
The T
own
of R
ichm
ond
Hill
2017
Ten
Year
Cap
ital F
orec
ast
Desig
n &
Cons
truct
ion
Exist
ing
Capi
tal
Road
s - R
econ
stru
ctio
n# o
f con
stru
ctio
n pr
ojec
ts# o
f met
res o
f con
stru
ctio
n pr
ojec
ts
Lake
land C
resc
ent
Dema
ine C
resc
ent
Coon
's Ro
ad
Cynth
ia Cr
esce
ntMa
ple G
rove
Ave
Amold
Cre
s El
m Gr
ove A
veBl
ackfo
rest
Drive
Ro
ckpo
rt Cr
esce
ntHa
rris A
venu
eSu
gar M
aple
Lane
& C
ourt
Rose
gard
en C
resc
ent
Oxfor
d Stre
etBe
aufor
t Hills
Roa
d Au
brey
Ave
nue
Othe
r (Se
e Sch
A fo
r deta
il)De
sign p
rojec
ts (S
ee S
ch A
for d
etail)
2018
For
ecas
t$ i
ncre
ase/(
decre
ase)
2023
2024
2025
2026
2027
Tota
lFo
reca
stFo
reca
stFo
reca
stFo
reca
stFo
reca
stFo
reca
st
3
4
3
5
5
1,1
36
1,0
90
91
5
650
70
3
-
-
3,8
25,80
0
2,2
77,90
0
2,1
26,10
0
1,7
50,50
0
2,1
76,70
0
2,0
05,90
0
2,7
03,30
0
2,2
56,40
0
1,3
57,90
0
1,763
,300
1,7
63,30
0
997,6
00
99
7,600
1,941
,600
1,9
41,60
0
1,201
,700
1,2
01,70
0
251,8
00
1,0
40,60
0
1,270
,100
1,9
91,10
0
2,121
,800
12,76
0,100
38
8,100
323,8
00
24
4,700
262,8
00
-
3,7
91,30
0
3,400
,800
3,3
06,00
0
2,716
,500
2,2
53,90
0
2,121
,800
42,93
6,100
2,676
,400
2,5
27,80
0
2,085
,500
1,5
55,90
0
724,4
00
77
8,200
631,0
00
69
8,000
60
The T
own
of R
ichm
ond
Hill
2017
Ten
Year
Cap
ital F
orec
ast
Desig
n &
Cons
truct
ion
Wat
erm
ain / S
anita
ry R
eplac
emen
ts
# of c
onst
ruct
ion
proj
ects
# of m
etre
s of c
onst
ruct
ion
proj
ects
Castl
e Roc
k Driv
eCo
on's
Road
Cynth
ia Cr
esce
ntMa
ple G
rove
Ave
Arno
ld Cr
es.
Elmw
ood A
veBa
yview
Ave
nue R
econ
struc
tion
Rock
port
Cres
cent
Bathu
rst S
treet
Reco
nstru
ction
Harri
s Ave
nue
Taylo
r Mills
Driv
e Nor
thKi
ng R
oad (
York
Regio
n Pro
ject)
Suga
r Map
le La
ne &
Cou
rtSp
ringh
ead G
arde
ns16
th A
venu
eBe
aufor
t Hills
Roa
d Ca
rrville
Roa
d Rec
onstr
uctio
nNe
al Dr
iveAu
brey
Ave
nue
Sylva
n Cre
scen
tTe
efy S
ubdiv
ision
Muirh
ead C
resc
ent a
nd S
touffv
ille R
oad A
rea
Othe
r (Se
e Sch
A fo
r deta
il)De
sign p
rojec
ts (S
ee S
ch A
for d
etail)
2023
2024
2025
2026
2027
Tota
lFo
reca
stFo
reca
stFo
reca
stFo
reca
stFo
reca
stFo
reca
st
10
5
8
6
6
4,4
09
1,8
90
4,5
29
1,1
10
2,3
15
-
1,1
34,10
0
527,5
00
492,4
00
401,5
00
1,008
,200
2,111
,900
63
0,100
3,9
07,60
0
504,1
00
1,048
,000
1,209
,000
28
7,200
1,406
,700
1,4
06,70
0
1,620
,100
1,6
20,10
0
427,9
00
42
7,900
1,914
,700
1,9
14,70
0
1,125
,400
1,1
25,40
0
269,6
00
26
9,600
-
1,7
29,10
0
1,7
29,10
0
3,0
61,00
0
665,8
00
1,1
48,90
0
771,9
00
92
0,100
412,0
00
9,868
,000
25
9,700
602,0
00
15
2,000
324,1
00
53
,900
4,112
,200
3,952
,300
2,1
78,80
0
4,233
,600
1,2
44,20
0
2,195
,000
38,79
6,300
61
The T
own
of R
ichm
ond
Hill
2017
Ten
Year
Cap
ital F
orec
ast
Desig
n &
Cons
truct
ion
Side
walks
# o
f con
stru
ctio
n pr
ojec
ts# o
f met
res o
f con
stru
ctio
n pr
ojec
ts
Lesli
e Stre
etLe
slie S
treet
- Lak
e to L
ake R
oute
(PCM
P)Pe
destr
ian &
Cyc
ling M
aster
Plan
(TBD
)
Othe
r (Se
e Sch
A fo
r deta
il)De
sign p
rojec
ts (S
ee S
ch A
for d
etail)
Stor
m W
ater
Man
agem
ent &
Wat
er R
esou
rces
Lake
Wilc
ox B
aif W
est P
ond:
2-2
Elgin
Wes
t Pon
d: 16
-5Up
per E
ast D
on U
ED13
Bloc
k 16
Beav
er C
reek
Pon
d B: 2
8-1
Don H
ead E
ast P
ond (
24-2
)Up
per E
ast D
on: U
ED4 B
lock 2
4Tw
icken
ham
Pond
: 16-
4El
gin W
est P
ond:
16-8
GM4
WEa
st Do
n Rive
r ED4
Bloc
k 25
Beav
er C
reek
Pon
d A: 2
7-2
Uppe
r Eas
t Don
UED
3 Bloc
k 24
Othe
r (Se
e Sch
A fo
r deta
il)
2023
2024
2025
2026
2027
Tota
lFo
reca
stFo
reca
stFo
reca
stFo
reca
stFo
reca
stFo
reca
st
1
1
4
1
1
1,0
00
1,0
00
1,0
00
1,0
00
1,1
90
330,5
00
2,299
,800
67
4,300
674,1
00
67
4,300
674,1
00
4,0
45,40
0
23,40
0
-
-
-
196,7
00
3,115
,800
93
,900
93,90
0
93
,900
124,8
00
-
78
1,900
791,6
00
76
8,000
768,2
00
79
8,900
196,7
00
10,57
3,400
-
-
-
1,1
07,60
0
3,7
70,50
0
1,1
56,80
0
1,5
39,10
0
373,6
00
37
3,600
495,8
00
49
5,800
4,587
,900
4,5
87,90
0
131,6
00
94
5,000
1,076
,600
82,40
0
63
8,900
-
93,00
0
782,9
00
3,933
,800
456,0
00
1,1
34,70
0
4,719
,500
1,0
38,00
0
782,9
00
18,04
1,700
62
The T
own
of R
ichm
ond
Hill
2017
Ten
Year
Cap
ital F
orec
ast
Desig
n &
Cons
truct
ion
Repa
ir &
Repl
acem
ent o
f Exis
ting
Park
sBr
adsto
ck P
ark R
evita
lizati
onDa
vid H
amilto
n Par
k Rev
italiz
ation
King
's Co
llege
Par
k Rev
italiz
ation
Town
Par
k Reh
abilit
ation
(2 Y
ear)
Mill P
ond P
ark P
hase
1 &
2 Rev
italiz
ation
(2 ye
ar)
Lake
Wilc
ox C
anoe
Club
Are
a Wate
rfron
t Acti
ivty Z
one
North
Lesli
e (Ma
ttamy
) Rich
mond
Gre
en ad
dition
St
aver
t Par
k Re
vitali
zatio
nPi
ne F
arm
Park
Revit
aliza
tion
Unity
Par
k Des
ignLe
nnox
Par
k Rev
italiz
ation
Carvi
lle P
ark R
evita
lizati
onBa
yview
Hill
Park
Reha
bilita
tion
Morg
an B
oyle
Comm
unity
Par
k Rev
italiz
ation
Little
Don
Par
k Rev
italiz
ation
Prov
ision
for C
apita
l Pro
jects
(TBD
)Ot
her (
see S
ched
ule A
for d
etails
)
2023
2024
2025
2026
2027
Tota
lFo
reca
stFo
reca
stFo
reca
stFo
reca
stFo
reca
stFo
reca
st
3,225
,800
-
968,0
00
4,290
,000
2,6
00,00
02,6
00,00
06,4
70,00
0
2,4
48,00
0
2,5
50,00
0
903,9
00
2,6
04,30
02,6
04,30
0
2,100
,000
2,100
,000
89
0,200
890,2
00
1,0
20,00
0
1,020
,000
65
9,900
3,302
,800
3,962
,700
-
-
-
-
-
678,5
0062
6,000
1,425
,000
500,0
0090
0,000
8,678
,500
7,982
,800
4,1
16,20
0
1,425
,000
2,1
79,90
0
4,202
,800
40,11
1,400
63
The T
own
of R
ichm
ond
Hill
2017
Ten
Year
Cap
ital F
orec
ast
Desig
n &
Cons
truct
ion
Grow
th R
elate
d - P
arks
Lake
Wilc
ox Y
outh
Area
Ca
sa S
ubdiv
ision
Par
kette
( 0.7
8 ha /
2.0 a
c) (B
ayvie
w Av
enue
& B
ethes
da S
ide R
oad)
Oxfor
d / D
irezz
e Tra
ilHa
rris B
eech
Loca
l Par
k (0.7
0 ha)
North
Lesli
e Com
munit
y Par
k Wes
t (3.0
ha)(R
ichvie
w)Da
vid D
unlap
& P
icnic
Area
Briar
Nine
Res
erve
Exp
ansio
ns &
Tra
il Con
necti
onGa
rden
Entr
y Fea
ture
North
Lesli
e Com
munit
y Par
k Eas
t (2.9
3 ha)
(TAC
C)W
est G
orml
ey C
ommu
nity P
ark
DDO
Trail
s, Pi
cnic
Area
& E
ntran
ces
North
Lesli
e Loc
al Pa
rk Ea
st (C
learp
oint L
ands
1.3 h
a)
Wes
t Gor
mley
Loca
l Par
k No
rth Le
slie W
est L
ocal
Park
(Rak
i)N.
Lesli
e W. L
ocal
Park
(Man
son L
ands
)Mi
les H
ill Pa
rkette
(Palm
er R
oad A
llowa
nce)
North
Lesli
e Lak
e To L
ake
Rawl
inson
/ Pe
rryma
n Gr
eatla
nds D
evelo
pmen
ts Pa
rk (1
6th)
North
Lesli
e Tra
ils (1
.8 km
)
Prov
ision
for C
apita
l Pro
jects
(TBD
)Ot
her (
See S
ched
ule A
for d
etails
)
2023
2024
2025
2026
2027
Tota
lFo
reca
stFo
reca
stFo
reca
stFo
reca
stFo
reca
stFo
reca
st
-
-
974,1
00
732,0
00
2,282
,800
1,500
,000
79
2,500
75
0,000
2,7
82,60
0
1,9
27,80
0
5,4
72,00
0
576,3
00
1,146
,500
89
1,500
2,113
,500
1,4
96,30
01,6
83,00
0
2,152
,200
2,152
,200
2,0
00,00
02,0
00,00
0
678,0
003,8
40,00
04,5
18,00
0
5,145
,400
5,145
,400
72
0,000
3,598
,100
4,318
,100
-
85
5,000
575,3
0020
,400
158,1
00-
3,6
48,90
0
2,351
,300
5,4
05,50
0
6,057
,300
4,7
18,10
0
3,598
,100
44,51
5,700
64
The T
own
of R
ichm
ond
Hill
2017
Ten
Year
Cap
ital F
orec
ast
Desig
n &
Cons
truct
ion
OTHE
R DE
PART
MENT
AL R
EQUE
STS
New
Capi
tal P
rojec
ts (P
RS -
Deve
lopm
ent E
ngin
eerin
g)
Flood
Rem
ediat
ion P
rojec
t40
4 Fly-
over
Bloc
k 21 (
Land
Acq
uisitio
n Cos
ts)40
4 Fly-
over
Bloc
k 21
404 F
ly-ov
er B
lock 1
3 (La
nd A
cquis
ition C
osts)
404 F
ly-ov
er B
lock 1
3W
eldric
k Roa
d Eas
t & W
est -
wide
ning /
Gra
de S
epar
ation
Newk
irk R
oad
Wes
t Bea
ver C
reek
- Ro
ad w
idenin
g Ea
st Be
aver
Cre
ek -
Road
wide
ning /
Inter
secti
on &
Tr
ansp
ortat
ion Im
prov
emen
ts
Desig
n pro
jects
(See
Sch
A fo
r deta
il)
Othe
rOt
her
Gorm
ley R
oad C
ulver
t Rep
lacem
ent
TOTA
L
2023
2024
2025
2026
2027
Tota
lFo
reca
stFo
reca
stFo
reca
stFo
reca
stFo
reca
stFo
reca
st
26,69
5,000
1,626
,100
12,38
3,200
6,504
,500
1,6
29,00
0
9,139
,100
10
,768,1
00
18,61
3,300
18,61
3,300
12,38
5,200
12,38
5,200
10
,448,7
00
10
,448,7
00
5,645
,800
5,645
,800
-
4,2
12,40
0
4,212
,400
349,2
00
33
8,500
306,3
00
40
1,000
1,669
,000
8,438
,200
-
1,978
,200
9,4
77,60
0
306,3
00
4,6
13,40
0
48,76
2,000
117,7
20,50
0
20,91
3,000
26,38
6,800
20,22
6,400
16,84
6,400
61,85
9,300
312,6
95,10
0
65
The Town of Richmond Hill Schedule A2017 Ten Year Capital ForecastDetailed Listing of Other Road Reconstruction and Design ProjectsEnvironment & Infrastructure Services2018
Road ReconstructionMcCachen Street - King Road to Poplar Drive 605,400
605,400Road DesignElm Grove Avenue - Parker to Yonge 295,200Blackforest Drive - Yonge to 53m north of Greyfriars 271,600
566,800Watermain / Sanitary ConstructionCedar Avenue - South limit to 167m north of Palmer 439,600Palmer Avenue - Lennox to CNR 293,100McCachen Street - King Road to Poplar Drive 126,000
858,700Watermain / Sanitary DesignTrench Street - Major Mackenzie Drive to Mill Street 114,300Elm Grove Ave - Parker to Yonge 101,900Blackforest Drive - Yonge to 53m north of Greyfriars 93,600
309,800Sidewalk / Trails ConstructionElgin East Channel Lands (PCMP) - CNR to Rosebranch Drive 494,900Sidewalks (PRS) - Various 91,600Red Maple Avenue - South side 95m S/O 16th to 16th Avenue 31,400Regent Street - Ellsworth Avenue (north leg) 17,600Carrington Drive - Headdon Gate to Cordave Parkette (south side) 14,900Hillhurst Drive - Link - Connections both sides to Major Mackenzie Dr. 6,600Oldhill Street - Connection to Elgin Mills adjacent to CNR 4,100Cameo Drive - Link - Cameo Drive to Bayview Ave. - West end Cameo 3,300Kevi Crescent - Link - Kevi Cres. to 16th Ave - East and Kevi 3,300
667,700Sidewalk / Trails DesignSidewalks (PRS) - Various 10,200Blackforest Drive - 53m north of Greyfriars to Regatta (west side) 6,500
- Windmill Court to Gamble Road 2,300Harvest Court - Link - Carriage House Court to Gamble Road 2,300Windmill Court - Link - Bulb to Gamble Road 700
22,000Water Resource Projects28-1 Beaver Creek Pond B - 174,600
174,600Illumination & Other Rosebranch Drive Culvert - Rosebranch Drive 50m south of Cougar Court 660,900Elgin East Channel Lands (PCMP) - CNR to Rosebranch Drive 443,300Leslie Street - Elgin Mills Rd E to Stouffville Rd. 312,400Coon's Road - Humberland to Yonge 239,800Illumination Construction (PRS) - Various 137,400Norfolk Avenue - Major Mackenzie Dr. E to Palmer Avenue 62,500McCachen Street - King Road to Poplar Drive 33,100Elm Grove Avenue - Parker to Yonge 17,000Blackforest Drive - Yonge to 53m north of Greyfriars 15,600Illumination Design (PRS) - Various 15,300Henricks Crescent - Henricks Crescent to Boake Trail 14,100Paradelle Drive - Paradelle Drive to Bayview Avenue 9,400
1,960,800Repair and Replacement of Existing Parks
Repair and Replacement Design & Construction - Various 500,000Westview Parkette Revitalivation - Construction 437,100
937,100Growth Related Parks & TrailsDavid Dunlap & Picnic Area 293,000
- Design 282,500
Garden Entry Feature - Design 155,000- Design 97,900
Gamble Park Trail Connection - Design 25,500853,900
Harvest Court - Link
Briar Nine Reserve Expansions & Trail Expansion
Rehabilitation - Sediment Removal
North Leslie Community Park West (3.0ha) (Richview)
66
The Town of Richmond Hill Schedule A2017 Ten Year Capital ForecastDetailed Listing of Other Road Reconstruction and Design ProjectsEnvironment & Infrastructure Services2019
Road DesignRockport Crescent - Tormore to Bayview 415,100Tormore Drive - Rockport to Cartier 104,200Fauna Avenue - Centre St. E to Rockport 41,300Millerdale Road - Cartier to Rockport 35,600
596,200Watermain / Sanitary ConstructionTrench Street - Major Mackenzie Drive to Mill Street 820,600
820,600Watermain / Sanitary Design
- Various 318,600Rockport Crescent - Tormore to Bayview 127,400
- Lucas Street to west limit 57,100Bathurst Street Reconstruction - Birch Avenue to Carrville Road 53,100Tormore Drive - Rockport to Cartier 30,800Fauna Avenue - Centre St. E. to Rockport 11,300Millerdale Road - Cartier to Rockport 9,500
607,800Sidewalk / Trails Construction19th Avenue - Bayview to Leslie 664,100Bathurst St. Reconstruction - North side of Hwy #7 to Carville Road 260,300Sidewalks (PRS) - Various 91,600Harvest Court - Link - Windmill Court to Gamble Road 16,500Harvest Court - Link - Carriage House Court to Gamble Road 16,500Windmill Court - Link - Bulb to Gamble Road 5,000
1,054,000Sidewalk / Trails DesignHwy #7 East - Yonge Street to Bayview Avenue 48,500Sidewalks (PRS) - Various 10,200Hunter's Point - Connection both sides to Hwy #7 East 6,200
64,900Water Resource ProjectsMitchell Pond 8-3 DF4 A/B - Rehabilitation 116,000
116,000Illumination & Other 19th Avenue - Bayview to Leslie 627,800Bathurst Street - Gamble Rd to Jefferson SR (east side) 250,000Cynthia Crescent - Coon's to Coon's 138,500Illumination Construction (PRS) - Various 137,400Rockport Crescent - 24,400Arnold Crescent - Hopkins Street to Major Mackenzie Drive W 15,600Illumination Design (PRS) - Various 15,300Tormore Drive - 5,900Fauna Avenue - 2,200Millerdale Road - 1,800
1,218,900Repair and Replacement of Existing Parks
Repair and Replacement Design & Construction - Various 500,000
500,000Growth Related Parks & Trails
- Construction 344,800
- Design 238,600- Construction 203,000
786,400
West Gormley Community Park (Sedgewick)Gamble Park Trail Connection
North Leslie Community Park East (2.93 ha) (TACC)
Bayview Avenue Reconstruction
Laverock Avenue
Rockport to Cartier
Tormore to Bayview
Cartier to RockportCentre St. E to Rockport
67
The Town of Richmond Hill Schedule A2017 Ten Year Capital ForecastDetailed Listing of Other Road Reconstruction and Design ProjectsEnvironment & Infrastructure Services2020
Road DesignHarris Avenue - 60m west of Beech to 400m east of Beech 160,200Harris Avenue - Yonge to 400m west 140,000Maple Grove Avenue - Blyth to Parker 106,300Gallacher Avenue - Blyth to Parker 101,000Beech Avenue - Jefferson SR to Harris 84,400Blyth Street - Gallacher to Maple Grove 54,000
645,900Watermain / Sanitary ConstructionElm Grove Ave - Parker to Yonge 504,100Blackforest Drive - Yonge to 53m north of Greyfriars 463,000Laverock Avenue - Lucas Street to west limit 363,400Bathurst Street Reconstruction - Birch Avenue to Carrville Road - 300mm DI WM 225,100
1,555,600Watermain / Sanitary Design
- Carrville Road to Major Mackenzie Drive W.; Major Mackenzie Drive W. to Elgin Mills Road W.
544,200
Kersey Crescent - Weldrick Road West to May Ave. 85,700Harris Avenue - 60m west of Beech to 400 m east of Beech 54,500Harris Avenue - Yonge to 400 m west 47,400Maple Grove Avenue - Blyth to Parker 35,500Gallacher Avenue - Blyth to Parker 33,700Beech Avenue - Jefferson SR to Harris 27,800Blyth Street - Gallacher to Maple Grove 17,200
846,000Sidewalk / Trails ConstructionHwy #7 East - Yonge Street to Bayview Avenue 308,200Sidewalks (PRS) - Various 91,600Blackforest Drive - 53m north of Greyfriars to Regatta (west side) 48,300Hunter's Point - Connection both sides to Hwy #7 East 39,700
487,800Sidewalk / Trails DesignEdward Avenue - Elgin Mills Road E to 675m north - west side 31,100Timber Valley Avenue - Newbridge Ave. to 285m East - west and south sides 13,100Sidewalks (PRS) - Various 10,200Weldrick Road East - 136m E/O Pagehurst to 136m W/O Essex 7,700Littleside Street - Timber Valley to Bond Crescent 3,500
65,600Water Resource ProjectsDon Head East Pond (24-2) - Rehabilitation 592,800Mitchell Pond 8-3 DF4 A/B - Rehabilitation 574,300Upper East Don: UED4 Block 24 - May Ave. to Kersey Cres. 181,900
1,349,000Illumination & Other Bathurst Street Reconstruction - North of Hwy #7 to Carville Road 295,300Illumination Construction (PRS) - Various 137,400Elm Grove Avenue - Parker to Yonge 132,400Maple Grove Avenue - Yonge to Parker 129,300Blackforest Drive - Yonge to 53m north of Greyfriars 121,600Arnold Crescent - Elizabeth Street to Major Mac. 105,400
- Major Mackenzie Dr. to Elgin Mills Rd. 17,000
Illumination Design (PRS) - Various 15,300Harris Avenue - 60m west of Beech to 400m east of Beech 9,100Harris Avenue - Yonge to 400m west 7,900Maple Grove Avenue - Blyth to Parker 5,900Gallacher Avenue - Blyth to Parker 5,600Beech Avenue - Jefferson SR to Harris 4,600Blyth Street - Gallacher to Maple Grove 2,900
989,700Repair and Replacement of Existing ParksRepair and Replacement Design & Construction - Various 500,000Stavert Park Revitalization - Design 180,600
680,600Growth Related Parks
- Design 71,300
71,300
Bathurst Street Reconstruction (York Region Project)
North Leslie Local Park East (Clearpoint Lands 1.3 ha)
Bathurst Street Reconstruction (York Region)
68
The Town of Richmond Hill Schedule A2017 Ten Year Capital ForecastDetailed Listing of Other Road Reconstruction and Design ProjectsEnvironment & Infrastructure Services2021
Road ReconstructionMaple Grove Avenue - Blyth to Parker 813,000Gallacher Avenue - Blyth to Parker 774,300Tormore Drive - Rockport to Cartier 715,200Beech Avenue - Jefferson SR to Harris 654,100Blyth Street - Gallacher to Maple Grove 434,300Fauna Avenue - Centre St. E to Rockport 313,200Millerdale Road - Cartier to Rockport 276,200
3,980,300Road DesignSugar Maple Lane - Mill to Mill 150,200Westwood Lane - 60m S/O Denham to South Limit 106,300Tampico Road - Laverock to Driscoll 43,900Monteil Road - Laverock to Driscoll 38,800Sugar Maple Court - Sugar Maple Court 25,300
364,500Watermain / Sanitary ConstructionKersey Crescent - Weldrick Road West to May Avenue 615,400Maple Grove Avenue - Blyth to Parker 175,800Gallacher Avenue - Blyth to Parker 166,500Tormore Drive - Rockport to Cartier 152,400Beech Avenue - Jefferson SR to Harris 137,700Blyth Street - Gallacher to Maple Grove 85,100Fauna Avenue - Centre St. E. to Rockport 55,800Millerdale Road - Cartier to Rockport 47,000
1,435,700Watermain / Sanitary DesignTaylor Mills Drive North - Bayview Ave. to Neal Dr. / Kerswell Cres. To Taylor Mills Dr. South 145,900Elgin Mills Road West Road Reconstruction - Bathurst St. to Regent St. 136,000Sugar Maple Lane - Mill to Mill 50,900Westwood Lane - 60m S/O Denham to South Limit 35,500Tampico Road - Laverock to Driscoll 13,600Monteil Road - Laverock to Driscoll 11,800Sugar Maple Court - Sugar Maple Court 7,100
400,800Sidewalk / Trails ConstructionEdward Avenue - Elgin Mills Road E. to 675m north - West side. 223,000Timber Valley Avenue - Newbridge Ave. to 285m East - West and South sides 94,200Sidewalks (PRS) - Various 91,600
- 136m E/O Pagehurst to 136m W/O Essex 55,200Littleside Street - Timber Valley to Bond Cres. 24,800
488,800Sidewalk / Trails DesignPedestrian & Cycling Master Plan - Locations to be determined 93,900Sidewalks (PRS) - Various 10,200Centre Street East - 173m east of Pugsley to Newkirk - South side 10,000Westwood Lane - Denham Drive to Maryvale Crescent 4,700
118,800Water Resource ProjectsTwickenham Pond 16-4 (Des) - Sediment Removal 255,800German Mills Creek GM1 Block 27 - Highway 7 to Castleridge 55,000
310,800Illumination & Other Rockport Crescent - Tormore to Bayview 165,500Bathurst Street Reconstruction - Major Mackenzie Dr. to Elgin Mills Road 140,400Illumination Construction (PRS) - Various 137,400Harris Avenue - 60m west of Beech to 400m east of Beech 74,900Harris Avenue - Yonge to 400m west 65,100Maple Grove Avenue - Blyth to Parker 48,800Gallacher Avenue - Blyth to Parker 46,200Tormore Drive - Rockport to Cartier 40,000Beech Avenue - Jefferson SR to Harris 38,300Bathurst Street Reconstruction - Carrville Road to Major Mackenzie Drive W. - Development Engineering 32,800Blyth Street - Gallacher to Maple Grove 23,600Illumination Design (PRS) - Various 15,300Fauna Avenue - Centre St. E to Rockport 14,600Millerdale Road - Cartier to Rockport 12,300Sugar Maple Lane - Mill to Mill 8,500Westwood Lane - 60m S/O Denham to south limit 5,900Tampico Road - Laverock to Driscoll 2,300Monteil Road - Laverock to Driscoll 2,000Sugar Maple Court - Sugar Maple Court 1,200
875,100
Weldrick Road East
69
The Town of Richmond Hill Schedule A2017 Ten Year Capital ForecastDetailed Listing of Other Road Reconstruction and Design ProjectsEnvironment & Infrastructure ServicesRepair and Replacement of Existing ParksNorth Leslie (Mattamy) Richmond Green add - Design 510,000Design & Construction - Various 500,000Shaw Parkette - Construction 76,300Weldrick Parkette - Construction 68,200
1,154,500
Growth Related ParksNorth Leslie West Local Park (Raki) - Design 152,000West Gormley Local Park - Design 141,800
293,800
70
The Town of Richmond Hill Schedule A2017 Ten Year Capital ForecastDetailed Listing of Other Road Reconstruction and Design ProjectsEnvironment & Infrastructure Services2022
Road ReconstructionWestwood Lane - 60m S/O Denham to South Limit 813,000Tampico Road - Laverock to Driscoll 361,300Monteil Road - Laverock to Driscoll 324,700
1,499,000Road DesignRosegarden Crescent - Blackforest to Blackforest 237,900Oxford Street - Bathurst to Tivoli 131,900Acorn Road - Blackforest to South Limit 28,700
398,500Watermain / Sanitary ConstructionElgin Mills Road West Road Reconstruction - Bathurst St. to Regent St. 976,900Westwood Lane - 60m S/O Denham to South Limit 175,800Tampico Road - Laverock to Driscoll 67,400Monteil Road - Laverock to Driscoll 58,600
1,278,700Watermain / Sanitary Design16th Avenue - Various - Watermain Rplc & Sanitary Sewer 225,500Springhead Gardens - Avenue Road to Weldrick Road West 195,900Rosegarden Crescent - Blackforest to Blackforest 81,800Oxford Street - Bathurst to Tivoli 44,600Acorn Road - Blackforest to South Limit 8,300
556,100Sidewalk / Trails ConstructionSidewalks (PRS) - Various 91,600Centre Street East - 173m east of Pugsley to Newkirk - South side 71,900Westwood Lane - Denham Drive to Maryvale Crescent 33,900
197,400Sidewalk / Trails DesignPedestrian & Cycling Master Plan - Locations to be determined 93,900Sidewalks (PRS) - Various 10,200
104,100Water Resource ProjectsGerman Mills Creek GM1 Block 27 - Highway 7 to Castleridge 330,500Elgin West Pond: 16-8 (Des) GM4W - Rehabilitation 55,700
386,200Illumination & Other Illumination Construction (PRS) - Various 137,300Sugar Maple Lane - Mill to Mill 66,200Westwood Lane - 60m S/O Denham to south limit 46,200Tampico Road - Laverock to Driscoll 17,700Monteil Road - Laverock to Driscoll 15,400Illumination Design (PRS) - Various 15,300Rosegarden Crescent - Blackforest to Blackforest 13,600Sugar Maple Court - Sugar Maple Court 9,200Oxford Street - Bathurst to Tivoli 7,400Acorn Road - Blackforest to south limit 1,400
329,700Repair and Replacement of Existing ParksDesign & Construction - Various 500,000Unity Park Design - Design 420,000Pine Farm Park Revitalization - Design 356,800
1,276,800Growth Related ParksWest Gormley Parkette - Design 34,700
34,700
71
The Town of Richmond Hill Schedule A2017 Ten Year Capital ForecastDetailed Listing of Other Road Reconstruction and Design ProjectsEnvironment & Infrastructure Services2023
Road ReconstructionAcorn Road - Blackforest to South Limit 251,800
251,800Road DesignBeaufort Hills Road - Coon's Road to Blackforest 162,000Black Willow Court - Coon's Road to East Limit 106,300Beaufort Hills Road - Coon's Road to West Limit 94,500Cheval Court - Beaufort Hills to South limit 25,300
388,100Watermain / Sanitary ConstructionRosegarden Crescent - Blackforest to Blackforest 404,400Oxford Street - Bathurst to Tivoli 220,400Acorn Road - Blackforest to South Limit 41,000
665,800Watermain / Sanitary DesignTaylor Mills Drive South - Bayview to Bluegrass 130,600Beaufort Hills Road - Coons' Road to Blackforest 55,100Black Willow Court - Coons' Road to East Limit 35,500Beaufort Hills Road - Coons' Road to West Limit 31,400Cheval Court - Beaufort Hills to South limit 7,100
259,700Sidewalk / Trails ConstructionSidewalks (PRS) - Various 23,400
23,400Sidewalk / Trails DesignPedestrian & Cycling Master Plan - Locations to be determined 93,900
93,900Water Resource ProjectsEast Don River ED4 Block 25 - Upstream of Webster Park 82,400
82,400Illumination & Other Illumination Construction (PRS) - Various 137,400Rosegarden Crescent - Blackforest to Blackforest 106,200Oxford Street - Bathurst to Tivoli 57,900Illumination Design (PRS) - Various 15,300Acorn Road - Blackforest to south limit 10,900Beaufort Hills Road - Coon's Road to Blackforest 9,200Black Willow Court - Coon's Road to east limit 5,900Beaufort Hills Road - Coon's Road to west limit 5,200Cheval Court - Beaufort Hills to south limit 1,200
349,200Repair and Replacement of Existing ParksDesign & Construction - Various 500,000Lennox Park Revitalization - Design 178,500
678,500Growth Related ParksNorth Leslie Lake To Lake - Design 500,000
- Design 266,200Brodie House Park - Design 54,100West Gormley Parkette - Construction 34,700
855,000
Miles Hill Parkette (Palmer Road Allowance)
72
The Town of Richmond Hill Schedule A2017 Ten Year Capital ForecastDetailed Listing of Other Road Reconstruction and Design ProjectsEnvironment & Infrastructure Services2024Road Reconstruction
- Coon's Road to East Limit 813,000Cheval Court - Beaufort Hills to South limit 227,600
1,040,600Road DesignAubrey Avenue - Schomberg Road to Yonge Street 160,200Sylvan Crescent - Lakeland Crescent to Lakeland Crescent 121,400Country Court - Blackforest to north limit 42,200
323,800Watermain / Sanitary ConstructionTaylor Mills Drive South - Bayview to Bluegrass 937,800Black Willow Court - Coon's Road to East Limit 175,800Cheval Court - Beaufort Hills to South limit 35,300
1,148,900Watermain / Sanitary DesignCarrville Road Reconstruction - 300 mm CI WM Bathurst Street to Yonge Street 266,600Neal Drive - Taylor Mills Drive S to Elgin Mills Road E 156,700Bathurst Street - Various - Watermain Rplc 70,300Aubrey Avenue - Schomberg Road to Yonge Street 54,500Sylvan Crescent - Lakeland Crescent to Lakeland Crescent 40,900Country Court - Blackforest to north limit 13,000
602,000Sidewalk / Trails DesignPedestrian & Cycling Master Plan - Locations to be determined 93,900
93,900Water Resource ProjectsBeaver Creek Pond A: 27-2 (Des) - Rehabilitation & Reconfiguration 638,900
638,900Illumination & Other Illumination Construction (PRS) - Various 137,400Beaufort Hills Road - Coon's Road to Blackforest 71,500Black Willow Court - Coon's Road to East Limit 46,200Beaufort Hills Road - Coon's Road to West Limit 40,800Illumination Design (PRS) - Various 15,300Cheval Court - Beaufort Hills to South limit 9,200Aubrey Avenue - Schomberg Road to Yonge Street 9,100Sylvan Crescent - Lakeland Crescent to Lakeland Crescent 6,800Country Court - Blackforest to north limit 2,200
338,500Repair and Replacement of Existing ParksDesign & Construction - Various 500,000Good Brothers Parkette - Design 63,000Chapmen Park Rehabilitation - Design 63,000
626,000Growth Related ParksBrodie House Park - Construction 429,400
- Design 110,200
Greatlands Developments Park (16th) - Design 35,700575,300
N. Leslie West Local Park (Raki North Lands)
Black Willow Court
73
The Town of Richmond Hill Schedule A2017 Ten Year Capital ForecastDetailed Listing of Other Road Reconstruction and Design ProjectsEnvironment & Infrastructure Services2025
Road ReconstructionSylvan Crescent - Lakeland Crescent to Lakeland Crescent 920,900Country Court - Blackforest to north limit 349,200
1,270,100Road DesignStancroft Drive - Leyburn Ave. to west limit 65,800Colston Court - Red Maple to east limit 50,700Shelly Road - Newkirk Road to east limit. 48,900Allen Court - Beaverton to East limit 40,500Cascade Circle - Osiris to South limit 38,800
244,700Watermain / Sanitary ConstructionBathurst Street - Various Watermain Rplc 505,200Sylvan Crescent - Lakeland Crescent to Lakeland Crescent 202,200Country Court - Blackforest to north limit 64,500
771,900Watermain / Sanitary DesignLevendale Road - 75,100Stancroft Drive - 21,300Colston Court - 16,000Shelly Road - 15,400Allen Court - 12,400Cascade Circle - 11,800
152,000Sidewalk / Trails DesignPedestrian & Cycling Master Plan - Locations to be determined 93,900
93,900Illumination & Other Illumination Construction (PRS) - Various 137,300Aubrey Avenue - Schomberg Road to Yonge Street 70,700Sylvan Crescent - Lakeland Crescent to Lakeland Crescent 53,100Country Court - Blackforest to north limit 16,900Illumination Design (PRS) - Various 15,300Stancroft Drive - 3,600Colston Court - 2,700Shelly Road - 2,600Allen Court - 2,100Cascade Circle - 2,000
306,300Repair and Replacement of Existing ParksRepair and Replacement Design & Construction - Various 500,000Chapmen Park - Construction 412,000Good Brothers Parkette Rehabilitation - Construction 309,000Carville Park Revitalization - Design 204,000
1,425,000Growth Related ParksSunnywood Park - Design 20,400
20,400
Red Maple to east limitLeyburn Ave. to west limit
Newkirk Road to east limitBeaverton to east limit
Newkirk Road to east limit.Beaverton to East limit
Yonge to Lucas
Osiris to south limit
Osiris to South limit
Red Maple to east limitLeyburn Ave. to west limit
74
The Town of Richmond Hill Schedule A2017 Ten Year Capital ForecastDetailed Listing of Other Road Reconstruction and Design ProjectsEnvironment & Infrastructure Services2026
Road ReconstructionStancroft Drive - Leyburn Ave. to west limit 520,100Colston Court - Red Maple to east limit 410,900Shelly Road - Newkirk Road to east limit. 397,800Allen Court - Beaverton to East limit 337,600Cascade Circle - Osiris to South limit 324,700
1,991,100Road DesignOhio Road - Elgin Mills to East Limit 70,900Wendy Way - Maplegrove to South Limit 60,800Penny Place - Parker to East Limit 50,700Shaver Street - King to North limit 40,500Hughes Street - King to North limit 39,900
262,800Watermain / Sanitary ConstructionLevendale Road - Yonge to Lucas 539,200Stancroft Drive - Leyburn Ave. to west limit 105,500Colston Court - Red Maple to east limit 79,100Shelly Road - Newkirk Road to east limit. 76,200Allen Court - Beaverton to East limit 61,500Cascade Circle - Osiris to South limit 58,600
920,100Watermain / Sanitary DesignTeefy Subdivision - Udine Crt, Teefy Ave, Moodie Dr, Jenkins Dr, Tennison Rd 240,800Ohio Road - Elgin Mills to East Limit 23,100Wendy Way - Maplegrove to South Limit 19,600Penny Place - Parker to East Limit 16,000Shaver Street - King to North limit 12,400Hughes Street - King to North limit 12,200
324,100Sidewalk / Trails Design
- Locations to be determined 93,900
Weldrick Road West - 25m E/O Bathurst to 73m W/O Yonge 30,900124,800
Water Resource ProjectsOrchard Pond 19-4 (Des) - Rehabilitation & Reconfiguration 93,000
93,000Development Engineering Design ProjectsWeldrick Road East - Yonge Street to Bayview Avenue 1,193,000Newkirk Road - widening to 4 lanes - Newkirk & Crosby / Newkirk & Centre 965,300West Beaver Creek Road - Leslie Street to West Pearce Street 926,700Weldrick Road West - Bathurst Street to Yonge Street 429,300East Beaver Creek Road - East Pearce to East Wilmot Street 342,800
- East Pearce to East Wilmot Street 181,500
Leek Crescent (N leg) at Mural Street - Mural Street & Leek Crescent 105,600- Highway #7 53,700
East Beaver Creek Road - Highway #7 - intersection improvements 14,5004,212,400
Illumination & Other Illumination Construction (PRS) - Various 137,400Weldrick Road East - Yonge Street to Bayview Avenue 101,500Weldrick Road West - 25m E/O Bathurst to 73m W/O Yonge 32,900Stancroft Drive - Leyburn Ave. to west limit 27,700Colston Court - Red Maple to east limit 20,800Shelly Road - Newkirk Road to east limit 19,900Allen Court - Beaverton to east limit 16,100Cascade Circle - Osiris to south limit 15,400Illumination Design (PRS) - Various 15,300Ohio Road - Elgin Mills to east limit 3,900Wendy Way - Maple Grove to south limit 3,300Penny Place - Parker to east limit 2,700Shaver Street - King to north limit 2,100Hughes Street - King to north limit 2,000
401,000Repair and Replacement of Existing ParksDesign & Construction - Various 500,000
500,000Growth Related ParksSunnywood Park - Construction 158,100
158,100
Pedestrian & Cycling Master Plan Implementation
East Beaver Creek Road - Transportation Improvements
East Beaver Creek - Transportation & Intersection Improvements
75
The Town of Richmond Hill Schedule A2017 Ten Year Capital ForecastDetailed Listing of Other Road Reconstruction and Design ProjectsEnvironment & Infrastructure Services2027
Road ReconstructionOhio Road - Elgin Mills to east limit 557,000Wendy Way - Maple Grove to south limit 483,400Penny Place - Parker to east limit 410,900Shaver Street - King to north limit 337,600Hughes Street - King to north limit 332,900
2,121,800Watermain / Sanitary ConstructionOhio Road - Elgin Mills to East Limit 114,300Wendy Way - Maplegrove to South Limit 96,700Penny Place - Parker to East Limit 79,100Shaver Street - King to North limit 61,500Hughes Street - King to North limit 60,400
412,000Watermain / Sanitary DesignWright/Powell Street - Hall Street to Mill Street 53,900
53,900Sidewalk / Trails ConstructionWeldrick Road West - 196,700
196,700
Water ResourceOrchard Pond: 19-4 - Rehabilitation & Reconfiguration 667,600Upper East Don UED10 Block 17 - Regent Street to Oxford Street 115,300
782,900Illumination & Other
- Mural Street & Leek Crescent 776,700
Weldrick Road East - Yonge Street to Bayview Avenue 408,200Weldrick Road West - 25m E/O Bathurst to 73m W/O Yonge 223,100Illumination Construction (PRS) - Various 137,400Ohio Road - Elgin Mills to east limit 30,000Wendy Way - Maple Grove to south limit 25,400Penny Place - Parker to east limit 20,800Shaver Street - King to north limit 16,200Hughes Street - King to north limit 15,900Illumination Design (PRS) - Various 15,300
1,669,000Repair and Replacement of Existing ParksMont Pleasant (Civic Precinct) - Design 400,000Design & Construction - Various 500,000
900,000
Leek Crescent (N leg) at Mural Street (Development Engineering)
25m E/O Bathurst to 73m W/O Yonge
76
Environment & Infrastructure Services
Asset Management Division Highlights
Ten Year Capital Forecast $53,616,000 Existing Assets 41,250,000 Growth Assets 12.366,000 Existing Capital Project
• Facilities Buildings $4,125,000/year
77
The T
own
of R
ichm
ond
Hill
2017
Ten
Year
Cap
ital F
orec
ast
Asse
t Man
agem
ent
2016
2017
2018
2019
2020
2021
2022
Appr
oved
Bu
dget
Budg
et
Requ
est
Fore
cast
Fore
cast
Fore
cast
Fore
cast
Fore
cast
Exist
ing
Capi
tal
Facil
ities B
uildin
gs5,8
33,90
0
5,134
,000
4,1
25,00
0
4,125
,000
4,1
25,00
0
4,125
,000
4,125
,000
Grow
th C
apita
lNe
w Oa
k Ridg
es Li
brar
y15
1,500
Ed S
ackfi
eld A
rena
Twi
nning
13,47
0,000
EBC
Acco
mmod
ation
Pha
se 1,
2, &
3 2,1
71,00
0
150,0
00
1,0
16,00
0
Oper
ation
s Cen
tre M
aster
Plan
Pha
se II
1,145
,000
11
,200,0
00
TO
TAL
21,62
6,400
6,279
,000
15
,475,0
00
5,1
41,00
0
4,125
,000
4,1
25,00
0
4,1
25,00
0
2017
For
ecas
t5,0
00,00
0
6,166
,000
5,000
,000
5,000
,000
5,000
,000
5,000
,000
$ Inc
reas
e/(De
creas
e)1,2
79,00
0
9,309
,000
14
1,000
(875
,000)
(8
75,00
0)
(8
75,00
0)
78
The T
own
of R
ichm
ond
Hill
2017
Ten
Year
Cap
ital F
orec
ast
Asse
t Man
agem
ent
Exist
ing
Capi
tal
Facil
ities B
uildin
gs
Grow
th C
apita
lNe
w Oa
k Ridg
es Li
brar
yEd
Sac
kfield
Are
na T
winn
ingEB
C Ac
comm
odati
on P
hase
1, 2,
& 3
Oper
ation
s Cen
tre M
aster
Plan
Pha
se II TO
TAL
2017
For
ecas
t$ I
ncre
ase/(
Decre
ase)
2023
2024
2025
2026
2027
Tota
lFo
reca
stFo
reca
stFo
reca
stFo
reca
stFo
reca
stFo
reca
st
4,125
,000
4,125
,000
4,125
,000
4,125
,000
4,125
,000
41,25
0,000 -
-
1,166
,000
11
,200,0
00
4,1
25,00
0
4,1
25,00
0
4,1
25,00
0
4,1
25,00
0
4,1
25,00
0
53
,616,0
00
5,000
,000
5,000
,000
5,000
,000
5,000
,000
(875
,000)
(875
,000)
(875
,000)
(875
,000)
79
Environment & Infrastructure Services
Environment Services Division Highlights
Ten Year Capital Forecast $ 5,306,400 Existing Assets 5,306,400 Existing Capital Projects
• 2021 - DDO Restoration & Implementation Plan 1,413,500 • 2022 & 2027 - Lake Wilcox Management Plan 310,000 • 2019 - Long Term Woodlot Restoration – Saigeon Trail, 20,000
Restoration Plan • 2020 - Long Term Woodlot Restoration – Saigeon Trail, 375,000
2 Year Restoration • 2022 - Long Term Woodlot Restoration – Rouge River Headwaters, 20,000
Restoration Plan • 2023 - Long Term Woodlot Restoration – Rouge River Headwaters 230,000
2 Year Restoration Implementation • 2025 - Long Term Woodlot Restoration – Moraine Park & Catfish 20,000
Pond, Restoration Plan • 2026 - Long Term Woodlot Restoration – Moraine Park and 300,000
Catfish Pond, 2 Year Restoration Implementation • 2018 - Richvale valleyland restoration, TRCA – led: 475,000
Phase 2 (ED6 and part of ED7) • 2018 - Mary to Kersey (UED4): Feasibility & EA 275,000 • 2018 - Don Head East Pond (24-2): Feasibility & EA 190,000 • 2020 - Twickenham Pond D1 (16-4): Feasibility & EA 195,000 • 2020 - Hwy 7 to Castleridge (GM1): Feasibility & EA 95,000 • 2021 - Elgin West Pond GM4W (16-8): Feasibility & EA 196,000 • 2022 - Upstream of Webster Park (ED4): Feasibility & EA 140,700 • 2023 - Beaver Creek Pond A: 27-2 Feasibility & EA 204,700 • 2024 - Grist Mill Park (UED3): Feasibility & EA 214,000 • 2025 - Orchard Pond (Minto West Pond 405) (19-4) Feasibility & EA 213,000 • 2026 - Reagent Street to Oxford (UED10): Feasibility EA 197,900 • 2027 - Minto Southeast (Pond 406) (Pond 19-3): Feasibility & EA 221,600
80
The T
own
of R
ichm
ond
Hill
2017
Ten
Year
Cap
ital F
orec
ast
Envir
onm
ent S
ervic
es
2016
2017
2018
2019
2020
2021
2022
Appr
oved
Bu
dget
Budg
et
Requ
est
Fore
cast
Fore
cast
Fore
cast
Fore
cast
Fore
cast
Exist
ing
Capi
tal
Led P
hase
2 - C
onve
rsion
Plan
12,00
0,000
Mi
tchell
Pon
d DF4
A/B
(8-3
) Fea
sibilit
y & E
A17
9,100
Comm
unity
Stew
ards
hip P
rogr
am17
3,400
DDO
Resto
ratio
n & Im
pleme
ntatio
n Plan
75,00
0
155,0
00
1,413
,500
Ri
chva
le va
lleyla
nd re
stora
tion,
TRCA
-led:
Pha
se 1
(par
t of E
D7 an
d ED8
)53
0,000
Mi
ll Pon
d and
Her
itage
Esta
tes P
ond (
17-3
): F
easib
ility &
EA
400,5
00
Mill P
ond P
ark v
alley
land r
estor
ation
(UED
8 an
d UED
9): F
easib
ility &
EA
315,0
00
Lake
Wilc
ox M
anag
emen
t Plan
155,0
00
155,0
00
Lo
ng-T
erm
Woo
dlot R
estor
ation
- Sa
igeon
Tra
il, Re
stora
tion P
lan20
,000
Lo
ng-T
erm
Woo
dlot R
estor
ation
- Sa
igeon
Tra
il, 2 Y
ear R
estor
ation
Im
pleme
ntatio
n37
5,000
Long
-Ter
m W
oodlo
t Res
torati
on -
Roug
e Rive
r Hea
dwate
rs, R
estor
ation
Plan
20,00
0
Long
-Ter
m W
oodlo
t Res
torati
on -
Roug
e Rive
r Hea
dwate
rs, 2
Year
Re
stora
tion I
mplem
entat
ionLo
ng-T
erm
Woo
dlot R
estor
ation
- Mo
raine
Par
k & C
atfish
Pon
d, Re
stora
tion
Plan
Long
-Ter
m W
oodlo
t Res
torati
on -
Mora
ine P
ark a
nd C
atfish
Pon
d, 2 Y
ear
Resto
ratio
n Imp
lemen
tation
Rich
vale
valle
yland
resto
ratio
n, TR
CA-le
d: P
hase
2 (E
D6 an
d par
t of E
D7)
475,0
00
Ma
y to K
erse
y (UE
D4):
Fea
sibilit
y & E
A27
5,000
Don H
ead E
ast P
ond (
24-2
); Fe
asibi
lity an
d EA
190,0
00
Tw
icken
ham
Pond
D1 (
16-4
): F
easib
ility &
EA
195,0
00
Hw
y 7 to
Cas
tlerid
ge (G
M1):
Fea
sibilit
y & E
A95
,000
El
gin W
est P
ond G
M4W
(16-
8): F
easib
ility &
EA
196,0
00
Up
strea
m of
Web
ster P
ark (
ED4)
: Fea
sibilit
y & E
A14
0,700
Beav
er C
reek
Pon
d A: 2
7-2
Feas
ibility
& E
AGr
ist M
ill Pa
rk (U
ED3)
: Fea
sibilit
y & E
AOr
char
d Pon
d (Mi
nto W
est)
(Pon
d 405
) (19
-4) F
easib
ility &
EA
Rege
nt St
reet
to Ox
ford (
UED1
0): F
easib
ility &
EA
Minto
Sou
theas
t (Po
nd 40
6) (P
ond 1
9-3)
: Fea
sibilit
y & E
A
Othe
r Pro
jects
58,40
0
TOTA
L12
,485,9
00
1,555
,500
94
0,000
20,00
0
665,0
00
1,6
09,50
0
315,7
00
2017
For
ecas
t1,7
03,10
01,2
18,30
0
677,1
00
77
1,500
625,7
00
37
5,000
$ Inc
reas
e/(De
creas
e)(1
47,60
0)
(278
,300)
(657
,100)
(106
,500)
983,8
00
(5
9,300
)
81
The T
own
of R
ichm
ond
Hill
2017
Ten
Year
Cap
ital F
orec
ast
Envir
onm
ent S
ervic
es
Exist
ing
Capi
tal
Led P
hase
2 - C
onve
rsion
Plan
Mitch
ell P
ond D
F4 A
/B (8
-3) F
easib
ility &
EA
Comm
unity
Stew
ards
hip P
rogr
amDD
O Re
stora
tion &
Imple
menta
tion P
lanRi
chva
le va
lleyla
nd re
stora
tion,
TRCA
-led:
Pha
se 1
(par
t of E
D7 an
d ED8
)Mi
ll Pon
d and
Her
itage
Esta
tes P
ond (
17-3
): F
easib
ility &
EA
Mill P
ond P
ark v
alley
land r
estor
ation
(UED
8 an
d UED
9): F
easib
ility &
EA
Lake
Wilc
ox M
anag
emen
t Plan
Long
-Ter
m W
oodlo
t Res
torati
on -
Saige
on T
rail,
Resto
ratio
n Plan
Long
-Ter
m W
oodlo
t Res
torati
on -
Saige
on T
rail,
2 Yea
r Res
torati
on
Imple
menta
tion
Long
-Ter
m W
oodlo
t Res
torati
on -
Roug
e Rive
r Hea
dwate
rs, R
estor
ation
Plan
Long
-Ter
m W
oodlo
t Res
torati
on -
Roug
e Rive
r Hea
dwate
rs, 2
Year
Re
stora
tion I
mplem
entat
ionLo
ng-T
erm
Woo
dlot R
estor
ation
- Mo
raine
Par
k & C
atfish
Pon
d, Re
stora
tion
Plan
Long
-Ter
m W
oodlo
t Res
torati
on -
Mora
ine P
ark a
nd C
atfish
Pon
d, 2 Y
ear
Resto
ratio
n Imp
lemen
tation
Rich
vale
valle
yland
resto
ratio
n, TR
CA-le
d: P
hase
2 (E
D6 an
d par
t of E
D7)
May t
o Ker
sey (
UED4
): F
easib
ility &
EA
Don H
ead E
ast P
ond (
24-2
); Fe
asibi
lity an
d EA
Twick
enha
m Po
nd D
1 (16
-4):
Fea
sibilit
y & E
AHw
y 7 to
Cas
tlerid
ge (G
M1):
Fea
sibilit
y & E
AEl
gin W
est P
ond G
M4W
(16-
8): F
easib
ility &
EA
Upstr
eam
of W
ebste
r Par
k (ED
4): F
easib
ility &
EA
Beav
er C
reek
Pon
d A: 2
7-2
Feas
ibility
& E
AGr
ist M
ill Pa
rk (U
ED3)
: Fea
sibilit
y & E
AOr
char
d Pon
d (Mi
nto W
est)
(Pon
d 405
) (19
-4) F
easib
ility &
EA
Rege
nt St
reet
to Ox
ford (
UED1
0): F
easib
ility &
EA
Minto
Sou
theas
t (Po
nd 40
6) (P
ond 1
9-3)
: Fea
sibilit
y & E
A
Othe
r Pro
jects
TOTA
L
2017
For
ecas
t$ I
ncre
ase/(
Decre
ase)
2023
2024
2025
2026
2027
Tota
lFo
reca
stFo
reca
stFo
reca
stFo
reca
stFo
reca
stFo
reca
st
1,413
,500
-
-
-
15
5,000
310,0
00
20
,000
375,0
00
20
,000
23
0,000
230,0
00
20,00
0
20,00
0
300,0
00
30
0,000
475,0
00
27
5,000
190,0
00
19
5,000
95,00
0
19
6,000
140,7
00
204,7
00
20
4,700
21
4,000
214,0
00
213,0
00
21
3,000
19
7,900
197,9
00
221,6
00
22
1,600
-
434,7
00
21
4,000
233,0
00
49
7,900
376,6
00
5,3
06,40
0
384,2
00
38
3,200
368,3
00
39
1,700
50,50
0
(169
,200)
(135
,300)
106,2
00
82