THE INVESTORS ARE ADVISED IN THEIR OWN INTEREST TO … · 2012-06-01 · Bidding Process Starting...
Transcript of THE INVESTORS ARE ADVISED IN THEIR OWN INTEREST TO … · 2012-06-01 · Bidding Process Starting...
THE BOOKBUILDING PORTION COMPRISING OF 20 MILLION ORDINARY SHARES HAS BEEN SUCCESSFULLY CLOSED.
THE PRESENT ISSUE OF 10 MILLION ORDINARY SHARES IS BEING MADE TO THE GENERAL PUBLIC AT A PRICE OF PKR
10.00 PER ORDINARY SHARES (I.E. STRIKE PRICE DETERMINED THROUGH BOOK BUILDING).
TPL TRAKKER LIMITED (Incorporated under the Companies Ordinance, 1984)
P R O S P E C T U S
FOR ISSUE OF 30,000,000 ORDINARY SHARES (13.8 % OF THE POST ISSUE PAID UP
CAPITAL) OF FACE VALUE OF PKR 10.00 EACH
BOOK BUILDING PORTION OF THE ISSUE COMPRISES OF 20 MILLION ORDINARY
SHARES (66.7% OF THE TOTAL ISSUE) AT A FLOOR PRICE OF PKR 10 PER SHARE
GENERAL PUBLIC PORTION OF THE ISSUE COMPRISES OF 10 MILLION ORDINARY
SHARES (33.3% OF THE ISSUE) AT PKR 10.00 PER SHARE
BIDDING PERIOD DATES: FROM 02/5/2012 TO 03/05/2012
(BOTH DAYS INCLUSIVE) DURING BANKING HOURS
DATE OF PUBLIC SUBSCRIPTION: FROM 05/06/2012 TO 06/06/2012
(BOTH DAYS INCLUSIVE) DURING BANKING HOURS
JOINT LEAD MANAGERS AND ARRANGERS
AKD SECURITES LIMITED
JOINT BOOK RUNNERS
AKD SECURITES LIMITED
BOOK BUILDING PORTION
UNDERWRITTEN BY:
- AKD SECURITIES LIMITED
- ARIF HABIB LIMITED
GENERAL PUBLIC PORTION UNDERWRITTEN
BY :
- NATIONAL BANK OF PAKISTAN
- AKD SECURITIES LIMITED
- INVEST CAPITAL MARKETS LIMITED
- PAIR INVESTMENT COMPANY LIMITED
The date of publication of this Prospectus is 23-05-2012
ADVICE FOR GENERAL PUBLIC
INVESTORS ARE STRONGLY ADVISED IN THEIR OWN INTEREST TO CAREFULLY READ THE CONTENTS OF
THIS PROSPECTUS, ESPECIALLY THE RISK FACTORS GIVEN AT SECTION 5.7 BEFORE MAKING ANY
INVESTMENT DECISION
SUBMISSION OF FICTITIOUS AND MULTIPLE APPLICATIONS (MORE THAN ONE APPLICATIONS BY SAME
PERSON) IS PROHIBITED AND SUCH APPLICATIONS’ MONEY IS LIABLE TO CONFISCATION UNDER
SECTION 18A OF THE SECURITIES AND EXCHANGE ORDINANCE, 1969
ADVICE FOR INSTITUTIONAL INVESTORS AND HIGH NETWORTH INDIVIDUAL INVESTORS
A SINGLE INVESTOR CANNOT SUBMIT MORE THAN ONE BIDDING APPLICATION EXCEPT IN THE CASE OF
REVISION OF BID. IF AN INVESTOR SUBMITS MORE THAN ONE BIDDING APPLICATION THEN ALL SUCH
APPLICATIONS SHALL BE SUBJECT TO REJECTION.
Statements on Issuer’s absolute responsibility:
The Issuer, having made all reasonable inquiries, accepts responsibility for the disclosures
made in this prospectus and confirms that:
this prospectus contains all information with regard to the issuer and the issue,
which is material in the context of the issue and nothing has been concealed;
the information contained in the prospectus is true and correct to the best of our
knowledge and belief;
the opinions and intentions expressed herein are honestly held; and
there are no other facts, the omission of which make this document as a whole or
any part thereof misleading.”
S/d
______________________
Mohammad Ali Jameel
Chief Executive Officer
GLOSSARY OF TECHNICAL TERMS
AB Group Ali Bhai Group
ACPF Asia Crime Prevention Foundation
AED Arab Emirates Dirham
AHL Arif Habib Limited
AJ Group Ali Jameel Group
AKDS AKD Securities Limited
APTTA Afghan-Pak Transit Trade Agreement
ATM Automated Teller Machine
BPO Business Process Outsourcing
CCR Central Control Room
CDA Central Depository Act, 1997
CDC / CDCPL Central Depository Company of Pakistan Ltd.
CDC Regulations Central Depository Company of Pakistan Ltd. Regulations
CDS Central Depository System
CMMS Computerized Maintenance Management Systems
CMS Centre Point Management Services (Pvt.) Limited
CNIC Computerized National Identity Card
Commission The Securities and Exchange Commission of Pakistan
Company / TPL Trakker / TPL / Issuer TPL Trakker Limited
CPLC Citizen Police Liaison Committee
CRM Customer Relationship Management
CRO Company Registration Office
DL Digicore International (Pty) Limited
EAC Economic Advisory Council
EBITDA Earnings before interest, tax, depreciation and amortization
ETA Estimated Time of Arrival
EVAC EVAC Pakistan (Pvt.) Limited
FBR Federal Board of Revenue
FFFP Fellowship Fund For Pakistan
FIGs Financial Institutions Groups
FMS Fleet Management Solutions
FPCCI Federation of Pakistan Chambers of Commerce
GLONASS Global Navigation Satellite System
GNSS Global Navigation Satellite System
GoP Government of Pakistan
GPRS General Packet Radio Service
GPS Global Position Systems
Group
Group includes TPL Trakker Limited, TPL Direct Insurance
Limited, TPL Security Services (Pvt) Limited, Trakker
Middle East LLC, TPL Properties (Pvt) Limited and EVAC
Pakistan (Pvt) Limited
HNWI High Net Worth Individual
ICAP Institute of Chartered Accountants of Pakistan
IDN In-Dash Navigation
IPO Initial Public Offering
ISE Islamabad Stock Exchange
Issue Initial Offering of Shares by the Company
ITO Income Tax Ordinance, 2001
IVMS In Vehicle Monitoring Systems
Joint BR Joint Book Runners
Joint Lead Managers & Arrangers AKD Securities Limited
KIBOR Karachi Inter-Bank Offered Rate
KPT Karachi Port Trust
KSE Karachi Stock Exchange (Guarantee) Limited
LSE Lahore Stock Exchange (Guarantee) Limited
MIS Management Information System
MNCs Multinational Companies
NBP National Bank of Pakistan
NICOP National Identity Card for Overseas Pakistanis
NOCs No Objection Certificates
OEM Original Equipment Manufacturer
OPIC Overseas Private Investment Corporation
Ordinance The Companies Ordinance, 1984
PACRA The Pakistan Credit Rating Agency Limited
PAMA Pakistan Automotive Manufacturers Association
PKR Pakistan Rupee(s)
PMCL Pakistan Mobile Communications Limited
PND Personal Navigation Device
PSQCA Pakistan Standards & Quality Control Authority
PTA Pakistan Telecommunication Authority
PTML Pakistan Telecom Mobile Limited
SCRA Special Convertible Rupee Account
SECP Securities and Exchange Commission of Pakistan
SMS Short Messaging Service
TCR Trakker Control Room
TDI TPL Direct Insurance Limited
TEU Twenty-Foot Equivalent Unit
TME Trakker Middle East
TRG The Resource Group
TSS TPL Security Services (Pvt) Limited
TTPL TPL Trakker (Private) Limited
VMS Vehicle Management System
WHT Withholding Tax
WWC Woodrow Wilson International Centre for Scholars.
Definitions
Application Money In case of bidding for shares out of the book building
portion, the total amount of money payable by a
successful bidder which is equivalent to the product
of the strike price and the number of shares to be
allotted.
AND
In case of application for subscription of shares out
of the general public portion, the amount of money
paid along with application for subscription of shares
which is equivalent to the product of the offer price
and the number of shares applied for.
Bid An indication to make an offer during the bidding
period by a bidder to subscribe to the Ordinary
Shares of TPL Trakker Limited at or above the floor
price, including all the revisions thereto.
Bidder Any eligible prospective investor who makes a bid
pursuant to the terms of the Preliminary Prospectus
and the Bidding Form.
Bid Amount The total amount of the bid which is equivalent to
the product of the bid price and the number of shares
bid for.
Bid Collection Centre Pre-determined places where applications for
bidding of shares are collected by the Joint Book
Runners on behalf of the Issuer and may include
offices of Corporate Brokerage Houses, Schedule
Banks, Development Financial Institutions and
Investment Finance Companies, subject to
appointment of these institutions as agent by the
Joint Book Runners through an agreement in writing
for the purpose, with the consent of the Issuer.
Bidding Form The form prepared by the Issuer on the format
mentioned in the Listing Regulations of the
Exchange for the purpose of making bids which will
be considered as the application for subscription of
Ordinary Shares out of the book building portion.
Bidding Period The period during which bids for shares of the
Company shall be made by Institutional Investors
and HNWI Investors. The Bidding Period
commences on May 2nd
, 2012 and ends on May 3rd
,
2012 (daily from 9:00 a.m. to 5:00 p.m.)
Bidding Process Ending Date The date after which Joint Book Runners will not
accept any bid for the book building portion of the
issue.
Bidding Process Starting Date The date on which Joint Book Runners shall start
accepting bids for the book building portion of the
issue
Book Building A mechanism of price determination through which
indication of interest for subscription of shares
offered by the Issuer is collected from Institutional
Investors and HNWI Investors. Through this process
a book is built which gives an idea of demand for the
shares at different price levels. The strike price is
determined based on the price at which demand for
shares at the end of book building period is sufficient
to raise the required amount.
Book Building Account An account opened by the Issuer with the Collection
Bank(s). The bidder will pay the margin money/bid
amount through demand draft, pay order or cheque
in favor of this account and the balance of the
application money, if any, shall be paid through this
account after successful allocation of shares.
Joint Book Runners AKD Securities Limited & Arif Habib Limited
Company Legal Advisor Mohsin Tayebaly & Co
Final Prospectus A document containing all the information and
disclosures as required under the Companies
Ordinance, 1984 together with disclosure of the
strike price, results of the Book Building process, the
date of publication of Prospectus and the date(s) for
subscription of shares out of the general public
portion.
Floor Price The minimum price set by the Issuer for the Issue of
shares which is PKR 10 per share. A bid placed
below the floor price will not be entertained by the
Joint Book Runners.
General Public All individual and institutional investors including
both Pakistani (residents & non-residents) and
foreign investors.
General Public Issue Price The price at which ordinary shares of the Company
are issued to the general public. This price can be at
or below the strike price.
High Net worth Individual (HNWI) Individual investor who applies or bids for shares of
the value of PKR 1,000,000/- or above in the book
building process.
Institutional Investors Both local and foreign institutional investors.
Joint Lead Managers and Arrangers National Bank of Pakistan, AKD Securities
Limited & Arif Habib Limited
Limit Price The maximum price a prospective institutional
investor or HNWI Investor is willing to pay for a
share under the Book Building process.
Margin Money The partial or total amount, as the case may be, paid
by a bidder at the time of making a bid.
Ordinary Shares Ordinary Shares of TPL Trakker Limited having face
value of PKR10 each unless otherwise specified in
the context thereof.
Preliminary Prospectus The preliminary Prospectus containing all the
information and disclosures as required under the
Companies Ordinance, 1984, and Listing Regulation
of the Stock Exchange approved by the Commission
under section 57(1) of the Companies Ordinance,
1984 and circulated amongst the Institutional
Investors and HNWI Investors for bidding of shares
out of the book building portion through the Book
Building Process.
Strike Order A bid for a specified number of shares at the strike
price to be determined through the Book Building
process
Strike Price The price of share determined/discovered on the
basis of book building process in the manner
provided in the Listing Regulations of KSE at which
the shares are issued to the successful bidders. The
Strike Price determined through the Book Building
Process is PKR 10.00 per share
TABLE OF CONTENTS
PART Content Page No.
1. Approvals and Listing on the Stock Exchange Page 1
2. Book Building Procedure Page 3
3. Share Capital and Related Matters Page 18
4. Underwriting, Commissions, Brokerage and other Expenses Page 28
5. Overview, History and Prospects Page 30
6. Financial Information Page 57
7. Management Page 78
8. Miscellaneous Information Page 86
9. Application and Transfer Instructions Page 93
10. Application Form Page 97
11. Signatories to the Prospectus Page 98
12. Memorandum of Association Page 99
Prospectus – TPL Trakker Limited
1
PART 1
1. APPROVALS AND LISTING ON THE STOCK EXCHANGE
1.1 APPROVAL OF THE SECURITIES & EXCHANGE COMMISSION OF
PAKISTAN
Approval of the Securities & Exchange Commission of Pakistan (the "Commission" or the
"SECP") as required under Section 57(1) of the Companies Ordinance, 1984 (the
"Ordinance") has been obtained by TPL Trakker Limited (“TPL or “the Company”) for the
issue, circulation and publication of this Prospectus.
DISCLAIMER:
It must be distinctly understood that in giving this approval, SECP does not take any
responsibility for the financial soundness of the Company and any of its schemes
stated herein or for the correctness of any of the statements made or opinions
expressed with regard to them by the company in this prospectus.
SECP has not evaluated quality of the issue and its approval for issue, circulation
publication of the Prospectus should not be construed as any commitment of the same.
The public/investors should conduct their own independent due diligence and analysis
regarding the quality of the issue before bidding/subscribing.
1.2 CLEARANCE OF THE PROSPECTUS BY THE KARACHI STOCK EXCHANGE
(GUARANTEE) LIMITED.
The Prospectus has been cleared by the Karachi Stock Exchange (Guarantee) Limited, in
accordance with the requirements of the Listing Regulations.
DISCLAIMER:
The KSE has not evaluated the quality of the issue and its clearance should not be
construed as any commitment of the same. The public / investors should conduct
their own independent investigation and analysis regarding the quality of the issuer
before subscribing.
The publication of this document does not represent solicitation by the Karachi
Stock Exchange.
The contents of this document do not constitute an invitation to invest in Shares or
subscribe for any securities or other financial instrument by the Karachi Stock
Exchange, nor should it or any part of it form the basis of, or be relied upon in any
connection with any contract or commitment whatsoever of the Exchange.
It is clarified that Information in this prospectus should not be construed as advice
on any particular matter by the Karachi Stock Exchange and must not be treated as
a substitute for specific advice.
The Karachi Stock Exchange disclaims any liability whatsoever for any loss
howsoever arising from or in reliance upon this document to any one, arising from
any reason, including, but not limited to, inaccuracies, incompleteness and/or
mistakes, for decisions and/or actions taken, based on this document.
The Karachi Stock Exchange neither takes responsibility for the correctness of
contents of this document nor the ability of the Company to fulfill its obligations
thereunder.
Prospectus – TPL Trakker Limited
2
Advice from a suitably qualified professional should always be sought by investors
in relation to any particular investment.
1.3 FILING OF THE PROSPECTUS AND OTHER DOCUMENTS WITH THE
REGISTRAR OF COMPANIES
The Company has filed with the Registrar, Companies Registration Office Karachi, as
required under Section 57(3) and (4) of the Companies Ordinance 1984, a copy of this
Prospectus signed on behalf of the Company, along with the following documents attached
thereto:
a) Letter dated 09 March 2012 from the Auditors of the Company, Ernst & Young
Ford Rhodes Sidat Hyder, Chartered Accountants, consenting to the publication of
their names in the Prospectus, which contains in Part 6 certain statements and
reports issued by them as experts (for which consent has not been withdrawn), as
required under Section 57(5) of the Companies Ordinance 1984.
b) Copies of Material Contracts and Agreements mentioned in Part 8 of this
Prospectus as required under Section 57(4) of the Ordinance.
c) Written confirmations of the Legal Advisor to this issue and Bankers to this issue,
mentioned in this Prospectus consenting to act in their respective capacities, as
required under Section 57(5) of the Companies Ordinance, 1984.
d) Consents of the Directors, the Chief Executive and the Company Secretary of the
Company who have consented to their respective appointments being made and
their having been named or described as such Directors and Chief Executive in this
Prospectus, as required under Section 57(3) of the Ordinance, read with sub-clause
(1) of clause (4) of Section 1 of Part 1 of the Second Schedule to the Ordinance.
1.4 LISTING AT THE KARACHI STOCK EXCHANGE
An Application has been made to the KSE for permission to deal in and for quotation of the
shares of the Company.
If for any reason, the application for formal listing is not accepted by KSE, the Company
undertakes that a notice to that effect will immediately be published in the press and
thereafter the Issuer undertakes to refund the application money to the applicants as
required by the provisions of Section 72 of the Ordinance.
1.5 CERTIFICATE BY CHIEF EXECUTIVE OFFICER AND CHIEF FINANCIAL
OFFICER OF THE ISSUER
“We being the Chief Executive Officer and Chief Financial Officer of the Company certify
that the prospectus constitutes full, true and plain disclosures of all material facts relating to
the shares being offered through this prospectus and that nothing has been concealed.
The information provided and disclosures made in this prospectus contain no misleading
material.
-Sd- -Sd-
__________________ __________________
Mr. Mohammad Ali Jameel Mr. Adnan Khandwala
Chief Executive Officer, Chief Financial Officer
TPL Trakker Limited TPL Trakker Limited
Prospectus – TPL Trakker Limited
3
PART 2
2. BOOK BUILDING PROCEDURE
2.1 BRIEF ISSUE STRUCTURE
The Present Issue
The Issuer is issuing 30,000,000 Ordinary Shares of PKR 10 each for cash at a price of
PKR 10 per share - aggregating to PKR 300 million (the “Issue”).
The Issue is being made through the Book Building process at a floor price of PKR 10 per
share, whereby 66.7% of the total offer size i.e. 20,000,000 Ordinary Shares of PKR 10
each will be offered through the book building process to Institutional Investors and High
Net Worth Individuals (HNWI), while the balance 33.3% of the total Issue size i.e.
10,000,000 Ordinary Shares will be offered to the general public at the Strike Price.
2.2 BOOK BUILDING PROCEDURE
Book building is a process whereby investors bid for a specific number of shares at various
prices. The Joint Lead Managers & Joint Book Runners, with the consent of Issuer, sets a
floor price which is the lowest price an investor can bid at. An order book of bids from
investors is maintained by the Joint Book Runners, which is then used to determine the
strike price through the “Dutch Auction Method”.
Under the Dutch Auction Method, the strike price is determined by lowering the price to
the extent that the total number of shares that the Issuer intends to issue through the Book
Building process is subscribed. However, while determining the strike price the bids
placed through strike order shall not be taken into consideration.
A bid by a potential investor can be a “Limit Bid”, “Strike Bid” or a “Step Bid”, which are
explained below.
Limit Bid: Limit bid is at the limit price, which is the maximum price an investor
is willing to pay for a specified number of shares.
In such a case a bidder explicitly states a price at which he/she/it is willing to
subscribe to a specific number of shares. For instance, a bidder may bid for 2.0
million shares at PKR 15 per share. Since the bidder has placed a limit price of
PKR 15 per share, this indicates that he/she/it is willing to subscribe at or below
PKR 15 per share.
Strike Order: A bid for a specified number of shares at the strike price to be
determined through the Book Building Process.
In Strike Order the bidder explicitly states the number of shares he/she/it is willing
to subscribe at the Strike Price. For instance, a bidder may bid for 2.0 million
shares at the strike price to be determined through the Book Building Process.
Step Bid: A series of limit bids at increasing prices. The aggregate amount of step
bid shall not be less than PKR 1,000,000/- and the amount of any step shall not be
less than PKR 250,000/-.
Under this bidding strategy, bidders place a number of limit bids at different
increasing price levels. The bidders may, for instance, make a bid for 2.0 million
shares at PKR 13 per share, 1.5 million shares at PKR 14 per share and 1.0 million
shares at PKR 15 per share.
Prospectus – TPL Trakker Limited
4
A SINGLE INVESTOR SHALL NOT MAKE MORE THAN ONE BID, HOWEVER,
A BID CAN BE REVISED.
THE INVESTORS SHALL NOT PLACE CONSOLIDATED BIDS. A BID
APPLICATION WHICH IS FULLY OR PARTIALLY BENEFICIALLY OWNED
BY PERSONS OTHER THAN THE ONE NAMED THEREIN IS TO BE
CONSIDERED AS CONSOLIDATED BIDS.
Once the bid period is over and book has been built, the Joint Book Runners shall
determine the strike price.
Successful bidders shall be intimated, within two (2) working days of the closing of the
bidding period, the strike price and the number of shares provisionally allotted to each of
them. The successful institutional bidders shall, within seven (7) working days of the
closing of the bidding period, deposit the balance amount as consideration against allotment
of shares. Where a successful bidder defaults in payment of shares allotted to
him/her/it, the margin money deposited by such bidder shall be forfeited to the Joint
Book Runners under clause 8.11 of Appendix 4 of the Listing Regulations of KSE.
AS PER REGULATION 8.16 OF KSE’S LISTING REGULATIONS, THE
SUCCESSFUL BIDDERS SHALL BE ISSUED SHARES IN THE FORM OF BOOK-
ENTRY SECURITIES TO BE CREDITED IN THEIR CDS ACCOUNTS. ALL THE
INSTITUTIONAL AND HNWI INVESTORS SHALL, THEREFORE, PROVIDE
THEIR CDC ACCOUNT NUMBERS IN THE BID APPLICATION.
2.3 JOINT LEAD MANAGERS AND ARRANGERS
National Bank of Pakistan (“NBP”), AKD Securities Limited (“AKDS”) and Arif Habib
Limited (“AHL”), have been mandated by the Issuer to act as Joint Lead Managers and
Arrangers to this Issue, which is being made through the Book Building process as laid out
in Appendix 4 of the Listing Regulations of the KSE.
2.4 JOINT BOOK RUNNERS
AKD Securities Limited (“AKDS”) and Arif Habib Limited (“AHL”) have been mandated
by the Issuer as the Joint Book Runners to the Issue.
2.5 ROLE AND FUNCTIONS OF JOINT LEAD MANAGERS AND JOINT BOOK
RUNNERS
a) The Joint Lead Managers to the Issue shall:
i. conduct awareness campaigns through presentations, meetings, road
shows etc. jointly with Joint Book Runners;
ii. ensure that all disclosures as required under the Companies Ordinance,
1984 and the Appendix 4 of the Listing Regulations of the Karachi Stock
Exchange have been made in the Prospectus;
iii. ensure that necessary infrastructure and electronic system/software is
available to collect bids and to carry out the Book Building process in a
fair, efficient and transparent manner;
iv. ensure that they have obtained on behalf of the Issuer, all
approvals/consents/NOCs relating to the Issue;
Prospectus – TPL Trakker Limited
5
v. publish an advertisement, approved by the Commission, in at least one
Urdu and one English daily Newspaper having wide circulation in the
Federal and all the provincial capitals, to invite the Institutional investor
and HNWI to participate in the bidding process; and
vi. ensure that the preliminary Prospectus will, after approval of the
Commission, be uploaded on the Joint Book Runners as well as on the
Company‟s website.
b) The Joint Book Runners to the Issue shall:
i. conduct awareness campaigns through presentations, meetings, road shows
etc. jointly with LM;
ii. ensure that necessary infrastructure and electronic system/software is
available to collect bids and to carry out the Book Building process in a
fair, efficient and transparent manner;
iii. collect bid applications and applications‟ money, security, margin as the
case may be from the Institutional Investors and HNWI in the manner as
mentioned in the Appendix 4 of the Listing Regulations of the Karachi
Stock Exchange;
iv. put serial number, date and time on each bidding application at the time of
collection of the same from the bidders;
v. vet the bidding applications;
vi. build an order book showing demand for the shares at various prices;
vii. discover the strike price at the close of the bidding period;
viii. maintain record of the bids received for subscription of the shares;
ix. use the software for Book Building process provided by the Exchange,
which is based on Dutch Auction Methodology for display of the order
book and determination of the strike price, on the terms and conditions as
may be agreed in writing between the Exchange and the Joint Book
Runners;
x. for information of investors, ensure that in addition to live display of the
order book on the website of the Exchange, also live display the same order
book simultaneously on its own website till closing of the bidding period;
xi. ensure that each bid application contains depository account number of the
bidder maintained with CDCPL wherein shares shall be credited in case the
bid is successful;
xii. not accept multiple bids i.e. more than one bid applications by the same
person;
xiii. enter into underwriting agreement with the Issuer;
xiv. circulate copies of the preliminary Prospectus cleared by the Exchange and
approved by the Commission along with the bidding forms to the
prospective Institutional Investor and HNWI;
Prospectus – TPL Trakker Limited
6
xv. BR have established bid collection centers at the following addresses:
Karachi
Contact Officer Mr. Ahmed Zeeshan
Direct No.: +92-21-32462597 Fax No.: +92-21-32429653 Email: [email protected] Postal Address: Arif Habib Limited
Arif Habib Centre
23, M.T. Khan Road, Karachi
Contact Officer: Mr. Syed Khurram Shahid
Direct No.: +92-21-3537-4301
Mobile No.: +92-333-310-4756
PABX No.: +92-21-111-253-111 Ext. 636
Fax No.: +92-21-3586-7992, +92-21-3537-3211
Email: [email protected]
Postal Address: AKD Securities Limited
6th Floor, Continental Trade Centre
Block 8, Clifton, Karachi
Lahore
Contact Officer: Mr. Ehsan Ahmad Qureshi
Direct No.: +92-42-3628-0742, +92-42-3628-0743,
+92-42-3628-0744
Mobile No.: +92-334-411-1253
PABX No.: +92-42-111-253-111
Fax No.: +92-42-3628-0745
Email: [email protected]
Postal Address: AKD Trade
Room No. 512/513, 5th Floor
Lahore Stock Exchange Building, Lahore
Islamabad
Contact Officer: Mr. Khalid Hussain
Direct No.: +92-51-2894325
Mobile No.: +92-332-212-5525, +92-333-532-6580
PABX No.: +92-51-289-4321
Fax No.: +92-51-289-4323
Email: [email protected]
Postal Address: AKD Trade 303, 3
rd Floor, ISE Tower
Jinnah Avenue, Blue Area, Islamabad
xvi. Ensure that all the bids received by the bid collection centers are entered into the
system developed by the Exchange for the purpose of Book Building. The Joint
Book Runners shall not accept and ENTER any bid after 5:00 p.m. during the
days of the bidding period, except the last day when no fresh bid(s) shall be
collected after 5:00 p.m. and the bid(s) collected thus far, shall be entered into
the system by 7:00 p.m. on the same day and thereafter no bid shall be entered
into the system or be revised in any way and for any reason even if the bid
applications have been received from the investor. Online revision will
however be allowed to the bidder between 5:00 pm – 7:00 pm on the last day.
Prospectus – TPL Trakker Limited
7
2.6 OPENING AND CLOSING OF THE BIDDING PERIOD
The bidding period shall remain open for 2 working days commencing from the business
hours at 09:00 a.m. on MAY 02ND
, 2012 and will close at 05:00 p.m. on MAY 03RD
, 2012 at
the close of business hours
BIDDING PROCESS STARTS ON MAY 2ND
, 2012
BIDDING PROCESS ENDS ON MAY 3RD
, 2012
*(Both Days Inclusive)
2.7 ELIGIBILITY TO PARTICIPATE IN BIDDING
Eligible investors who can place their bids in the Book Building process are “Institutional
Investors” and “HNWI”.
Institutional Investors include both local and foreign institutional investors.
HNWI investors are individual investors who bid for shares of value of PKR
1,000,000/- (Pak Rupees One Million Only) or above in the Book Building
Process.
2.8 INFORMATION FOR BIDDERS
The Preliminary Prospectus for issue of shares has been duly cleared by the
Karachi Stock Exchange and approved by SECP.
The preliminary prospectus and the bidding form can be obtained from the
Registered Office of TPL Trakker Limited, AKDS, AHL and the bid collection
centers. Preliminary prospectus and bidding forms can also be downloaded from
the following website of the Joint Book Runners and the Company .i.e.
www.akdsecurities.net, www.arifhabibltd.com and www.tplworld.com.
Eligible investors who are interested in subscribing to the Ordinary Shares should
approach the Joint Book Runners at the addresses provided in clause (xv) of
paragraph 2.5 to register their Bids.
THE BIDS SHOULD BE SUBMITTED ON THE PRESCRIBED BIDDING
FORM IN PERSON OR THROUGH FAX NUMBERS GIVEN IN PARAGRAPH
2.5.
2.9 BIDDING FORM AND PROCEDURE FOR BIDDING
a) Standardized bidding form has been prescribed by the Joint Book Runners. Bids
shall be submitted at the bid collection centers in person or through fax number
given in paragraph 2.5 on the standard bidding form duly filled in and signed in
duplicate. The bidding form shall be serially numbered at the bid collection centers
and date and time stamped, at the time of collection of the same from the bidders.
b) Upon completion and submission of the bidding form, the bidders are deemed to
have authorized the Issuer to make necessary changes in the preliminary prospectus
as would be required for finalizing and filing the final prospectus with the KSE and
SECP, without prior or subsequent notice of such changes to the bidders.
c) The bidding procedure under the Book Building Process is outlined below:
Prospectus – TPL Trakker Limited
8
i. Copy of approved preliminary prospectus shall be circulated by the Issuer through
the Joint Book Runners to a maximum number of institutional investors and
HNWIs, but not less than ten in each category and a copy of the same will also be
placed on the websites of the Company and the Joint Book Runners.
ii. An advertisement, approved by the Commission, shall be published at least in one
Urdu and one English daily newspaper having wide circulation in the Federal and
all the provincial capitals, inviting the institutional investors and HNWI for
participation in the bidding.
iii. A Book Building Account shall be opened by the Issuer for collection of bid
amount.
iv. The bidding form shall be issued in duplicate signed by the bidder and
countersigned by the Joint Book Runners, with first copy for the Joint Book
Runners, and the second copy for the bidder.
v. Bids shall be submitted through the bid collection centers or through fax numbers
(+92-21-32429653, +92-21-35867992; 92-21-35869715, +92-42-36280745, +92-
51-2894323) on the standard bidding form duly filled in and signed in duplicate.
The addresses for the bid collection centers are given in paragraph 2.5.
vi. Bids can be placed at “limit price”, “strike order” or “step bid”.
vii. Bid money/margin money shall be deposited through demand draft, pay order or
cheque in favor of “Initial Public Offering of TPL Trakker Limited Book
Building Account”.
viii. Joint Book Runners shall collect an amount of 100% of the application money as
bid money in respect of bids placed by HNWIs.
ix. Joint Book Runners shall collect an amount of not less than 25% of the application
money as margin money in respect of bids placed by institutional investors.
x. Joint Book Runners may reject a bid placed by an Institutional Investor/HNWI for
reasons to be recorded in writing and the reasons should be disclosed to such
bidder forthwith. Decision of the Joint Book Runners shall not be challengeable by
the bidder or its associates.
xi. Joint Book Runners shall not accept the bids made at a bid price lower than
the Floor Price.
xii. The Issuer and Joint Book Runners shall not accept bids from associated
persons of the Issuer and the Company in excess of five percent (5%) of the
size of the book building portion.
xiii. The bidders will receive back the duplicate form upon submission of their bids
which will be proof of their bid submission. In case of facsimile, a copy of form
with receiving will be faxed back to the bidder.
xiv. Bidders can revise or withdraw their bids during the bidding period (for details
please refer to paragraphs 2.13 and 2.15).
xv. Joint Book Runners shall maintain record of the bids received
/rejected/revised/withdrawn along with identities of the bidder and evidence of
amount received.
xvi. Joint Book Runners shall ensure that all the bids received by the bid collection
centers are entered into the system developed by the Exchange for the purpose
of the book building according to the procedure given in paragraph 2.5 (b)
(xiii) and as per clause 8.6 of Appendix 4 of the Listing Regulations of KSE.
The system shall be capable to display live an order book, in descending order
with respect to the bid price, showing the demand for shares at various prices
and accumulative number of shares bid for along with percentage of the total
Prospectus – TPL Trakker Limited
9
shares offered. The order book should also show the revised bids and the bids
withdrawn.
xvii. At the close of the bidding period, the Joint Book Runners shall determine the
strike price with the consent of the Issuer.
xviii. Successful bidders shall be intimated, within two (2) working days of the closing of
the bidding period, the strike price and the number of shares provisionally allotted
to each of them.
xix. The successful institutional bidders shall, within seven (7) working days of the
closing of the bidding period, deposit the balance amount as consideration against
allotment of shares.
xx. Under rule 8.11 of the Listing Regulation, where a successful institutional
bidder defaults in payment of shares allotted to it, the margin money
deposited by such institutional bidder shall be forfeited by Joint Book
Runners.
xxi. Margin money of unsuccessful bidders will be refunded within three (3) working
days of the close of the bidding period.
xxii. Final allotment of shares out of the Book Building portion shall be made after
receipt of full subscription money from the successful bidders; however, shares to
such bidders shall be issued at the time of issue of shares out of the general public
portion of the issue to successful applicants.
xxiii. An associated person or any other related person or party of the Issuer and the
Company shall not make bid(s) for shares in excess of 5%, in aggregate, of the
book building portion of the Issue.
2.10 BANK ACCOUNT FOR BOOK BUILDING AND PUBLIC PORTION
The Issuer has opened two separate bank accounts for collection of applications‟ money,
one each for the Book Building portion and the General Public portion of the Offer.
The bidders shall draw demand draft, pay order or cheque in favor of “Initial Public Offer
for TPL Trakker Limited – Book Building Account” which has been opened at Faysal
Bank Limited. The collection bank shall keep and maintain the bid money in the said
account. Once the strike price is determined and list of allottees is finalized, the Joint Lead
Managers, after obtaining NOC from KSE, may request in writing to the collection bank
for transfer of the money of successful and accepted applications to the Issuers‟ account(s)
and advise for refund of the bid money to unsuccessful bidders.
2.11 PAYMENT INTO THE BOOK BUILDING ACCOUNT
The bidders shall draw a demand draft, pay order or cheque favoring “Initial Public Offer
for TPL Trakker Limited – Book Building Account” and submit it at the designated bid
collection center either in person or through facsimile along with a duly filled in bidding
form.
CASH MUST NOT BE SUBMITTED WITH THE BIDDING FORM AT THE BID
COLLECTION CENTER. PAY ORDER, BANK DRAFT, CHEQUE OR ANY
OTHER APPROPRIATE INSTRUMENT ACCEPTABLE TO JOINT BOOK
RUNNERS AND DRAWN IN FAVOR OF “INITIAL PUBLIC OFFER FOR TPL
TRAKKER LIMITED – BOOK BUILDING ACCOUNT” ARE ACCEPTABLE.
Since the investors can bid for shares through “limit price”, “strike order” or “step bid”
therefore payment procedure is explained below for all the three (3) methods.
Prospectus – TPL Trakker Limited
10
a) PAYMENT FOR LIMIT BIDS
If investors are placing their bids through “limit price” then they shall deposit the
margin money based on the number of shares they are bidding for at their stated bid
price.
For instance, if an investor is applying for 5 million shares at a price of PKR 17 per
share, then the total application money would amount to PKR 85 million. In such a
case, (i) HNWI shall deposit PKR 85 million in the Book Building account as the
bid amount which is 100% of PKR 85 million; and (ii) Institutional Investors shall
deposit at least PKR 21.25 million in the Book Building account as the margin
money which is at least 25% of PKR 85 million
b) PAYMENT FOR STRIKE ORDERS
If investors are placing a “strike order”, then they shall deposit the margin
money/bid amount equal to the product of the number of shares they are bidding
for and the Floor Price which in this case is PKR 10 per share.
For instance, if an investor is applying for 2.0 million shares then the total
application money would be PKR 20 million. In such a case, (i) HNWI shall
deposit PKR 20 million as bid amount which is 100% of PKR 20 million and (ii)
Institutional Investors shall deposit at least PKR 5 million as margin money which
is 25% of PKR 20 million.
In the event where limit and step orders are insufficient to determine price through
the Book Building mechanism, all strike orders will be considered for allocation of
shares at floor price. For details please refer to paragraph 2.16.
c) PAYMENT FOR STEP BIDS
If investors are placing a “step bid”, which is a series of limit bids at increasing
prices, then they shall deposit the margin money/bid money based on the total
number of shares they are bidding for at their stated bid prices.
For instance, if the investor bids for 0.5 million shares at PKR 13 per share, 0.4
million shares at PKR 14 per share and 0.3 million shares at PKR 15 per share,
then in essence the investor has placed one “step bid” comprising three limit bids at
increasing prices. The application money would amount to PKR. 16.60 million,
which is the sum of the products of the number of shares bid for and the bid price
of each limit bid. In such a case, (i) HNWI shall deposit PKR 16.60 million in the
Book Building Account as bid amount which is 100% of PKR 16.60 million and
(ii) Institutional Investors shall deposit at least PKR 4.15 million in the Book
Building Account as margin money which is 25% of PKR 16.60 million.
2.12 PAYMENT BY FOREIGN INVESTORS
Foreign investors may subscribe using their Special Convertible Rupee Accounts (SCRA),
as set out under Chapter 20 of the State Bank of Pakistan‟s Foreign Exchange Manual
2002.
Payments made by foreign investors shall be supported by proof of receipt of foreign
currency through normal banking channels. Such a proof shall be submitted along with the
Bidding Application by the foreign investors.
Prospectus – TPL Trakker Limited
11
2.13 REVISION OF BIDS BY THE BIDDER
The bidders shall have the right to revise their bids any time during the bidding period upto
05:00 pm and on the last day till 07:00 pm. Online revision of the bids may be allowed to
the bidders through system software. This will however be subject to the condition that the
bidder shall comply with the requirements of bidding as disclosed under Appendix 4 of the
Listing Regulations and any other condition or procedure disclosed in the prospectus.
2.14 REJECTION OF BIDS BY THE JOINT BOOK RUNNERS
In terms of clause 8.4 of Appendix 4 of Listing Regulations of the KSE, Joint Book
Runners may reject a bid placed by an institutional investor/HNWI for reasons to be
recorded in writing and the reasons should be disclosed to such bidder forthwith. Decision
of Joint Book Runners shall not be challengeable by the bidder or its associates.
2.15 WITHDRAWAL OF BIDS BY THE BIDDER
A bidder has the right to withdraw placed bid from the bidding system any time during the
bidding period and on the last day till 05:00 pm. Online withdrawal of the bids may be
allowed to the bidders through system software. This will however be subject to the
condition that the bidder shall comply with the requirements of bidding as disclosed under
Appendix 4 of the Listing Regulations and any other condition or procedure disclosed in
the prospectus.
2.16 WITHDRAWAL OF ISSUE BY THE ISSUER
a) According to clause 3.10 of Appendix 4 of the listing regulations of KSE, in case
the Issuer does not receive bids at or above the floor price for the minimum number
of shares issued, it may withdraw the Issue. The decision of withdrawal shall be
taken within a period not more than three (3) working days of the closing of
bidding period.
b) The Issuer shall withdraw the issue if the total bids received are less than
fifteen.
c) The withdrawal shall be immediately intimated to the Commission and the
Exchange.
d) In case the issue is withdrawn the margin money/bid amount will be refunded
to the bidders within three (03) working days of the decision of withdrawal
without any markup, interest etc.
2.17 MECHANISM FOR DETERMINATION OF STRIKE PRICE
a) At the close of the bidding period, the Issuer, in consultation with the Joint Book
Runners shall determine the strike price on the basis of “Dutch Auction Method”.
Under this Methodology, the strike price is determined by lowering the price to the
extent that the total numbers of shares issued are subscribed. However, while
determining the strike price, the bids placed through strike order(s) shall not be
taken into consideration.
b) The order book shall display the bids in a tabular form in descending order along
with the number of shares bid for and the cumulative number of shares at each
price level. The bids at strike orders shall, however, be displayed in the order book
in the following manner:
Prospectus – TPL Trakker Limited
12
BidderPrice
(PKR /Share)
Quantity
(Shares in Million)
Cumulative
Number of Shares
Category
of orderDay
Institution A 15.00 4.50 4.50 Limit Price Day 1
Institution E 14.50 1.50 6.00 Limit Price Day 3
Institution B 13.50 2.50 7.00 Limit Price Day 2
HNWI A 13.00 4.25 11.25 Step Bid Day 3
Institution C 11.25 3.00 14.25 Step Bid Day 1
HNWI B 11.00 5.75 20.00 Limit Price Day 2
Institution D X 1.00 21.00 Strike bid Day 2
HNWI C X 1.00 22.00 Strike bid Day 3
Institution C 10.50 3.00 25.00 Step Bid Day 1
Institution B 10.25 4.00 29.00 Limit Price Day 2
HNWI A 10.10 2.75 27.75 Step Bid Day 3
Institution C 10.05 6.00 33.75 Step Bid Day 1
Bid
WithdrawnStrike Price
determined through Dutch Auction Method
Bid has been revised
and placed at PKR 13.50/share
Total Shares
Subscribed
i. after the lowest limit bid, in case the limit bids placed are not sufficient for full
allotment of the shares issued, or,
ii. immediately, after the limit bid at which all the shares offered can be allotted, in
case the limit bids placed are sufficient for full allotment of the shares Issued.
c) For the purpose of allotment of shares, the limit bid(s) entered at the price
determined/discovered as Strike Price through Book Building Process and the bids
placed as strike order shall be ranked equally and preference will be given to the
bidder who has made the bid earlier.
Once the strike price is determined all those bidders whose bids have been found successful
shall become entitled for allotment of shares. The bidders, who have made bids at prices
above the strike price, will be issued shares at the strike price and the differential will be
refunded. The bidders, who have made bids below the strike price, shall not qualify for
allotment of shares and their margin money shall be refunded.
The mechanism for determination of strike price can be understood by the following
illustration.
a) Number of shares being Issued through the Book Building: 20.00 million
ordinary shares
b) Floor price: PKR 10 per share
c) Bidding Period: MM DD 2012 – MM DD 2012
Setting Strike Price – On the basis of the figures provided in the above illustration,
according to the Dutch Auction Method, the strike price would be set at PKR 11.00
per share to sell the required quantity of 20 million ordinary shares.
At PKR 15per share, investors are willing to buy 4.50 million shares. Since 15.50
million shares are still available, therefore, the price will set lower.
At PKR 13.50 per share, investors are willing to buy 2.50 million shares. Since
13.00 million shares are still available, therefore, the price will set lower.
At PKR 13.00 per share, investors are willing to buy 4.25 million shares. Since 8.75
million shares are still available, therefore, the price will set lower.
Prospectus – TPL Trakker Limited
13
At PKR 11.25 per share, investors are willing to buy 3.00 million shares. Since 5.75
million shares are still available, therefore, the price will set lower.
At PKR 11.00 per share, investors are willing to buy 5.75 million shares. Since after
bidding for 5.75 million shares at PKR 11.00 per share no shares will be available,
therefore, the strike price will be set at PKR 11.00 per share for the entire lot of 20
million ordinary shares.
The bidders, who have placed bids at prices above the strike price, will be issued
shares at the strike price and the differential would be refunded. Investors, who
have bid below PKR 11.00/- per share, do not qualify for allotment and their money
would be refunded.
2.18 BASIS OF ALLOTMENT OF SHARES
After the closure of bidding period, the Joint Book Runners will analyze the demand
generated at various price levels. Only successful bidders shall be eligible for allotment and
issue of shares. Final allotment of shares out of the Book Building portion shall be made
after receipt of full subscription money from the successful bidders; however, shares to
such bidders shall be dispatched or credited, as the case may be, at the time of issue of
shares out of the public portion of the issue to successful applicants.
2.19 REFUND OF MARGIN MONEY
Investors who have bid lower than the strike price are not eligible for allotment of shares.
Margin money of the unsuccessful bidders shall be refunded within three (3) working days
of the close of the bidding period as required under clause 8.12 of Appendix 4 of the KSE
Listing Regulations.
2.20 UNDERWRITING
After determination of the strike price the Joint Book Runners shall within two (2) working
days of the closing of the bidding period enter into an underwriting agreement with the
Issuer indicating the number of shares that the Joint Book Runners would underwrite at the
strike price and the underwriting Commission/Fee to be charged.
2.21 PUBLICATION OF THE FINAL PROSPECTUS
The underwriting agreement for the public portion shall be finalized within ten (10)
working days from closing of the bidding period.
Upon finalization of the underwriting agreements, the Joint Lead Managers shall, within
ten (10) working days from the date of closing of the bidding period, submit an application
to KSE for allocation of dates for publication of the final prospectus and subscription of
shares by the general public.
The final prospectus in full or in abridged form must be published within seventeen (17)
working days of the closing of the bidding period in the manner as specified in Section 53
of the Companies Ordinance, 1984.
Public subscription for the shares shall be held at any date(s) within thirty days (30) of the
publication of the final prospectus but not earlier than seven (7) days of such publication.
Prospectus – TPL Trakker Limited
14
2.22 ADDRESSES OF BID COLLECTION CENTRES
Bid Collection Centers have been established at Karachi, Lahore and Islamabad to collect
the bids for the Book Building portion of TPL Trakker Limited in order to provide
convenient access to bidders to participate in the bidding process. Addresses, detail of
contact persons and fax numbers of the Bid Collection Centers are given in paragraph 2.5.
Prospectus – TPL Trakker Limited
15
2.23 STATEMENT BY THE ISSUER
7th March, 2012
The General Manager,
Karachi Stock Exchange (Guarantee) Limited,
Stock Exchange Building,
Stock Exchange Road,
Karachi.
On behalf of the Company, I confirm that all material information as required under the
Companies Ordinance, 1984 and the Listing Regulations of the Karachi Stock Exchange
(Guarantee) Limited has been disclosed in the Prospectus and that whatever stated in the
Prospectus and the supporting documents is true and correct to the best of our knowledge
and belief and that nothing has been concealed.
For and on behalf,
TPL Trakker Limited
-Sd-
____________________
Mohammad Ali Jameel
Chief Executive Officer
Prospectus – TPL Trakker Limited
16
2.24 STATEMENT BY THE JOINT LEAD MANAGERS
Dated: 13th April 2012
The General Manager,
Karachi Stock Exchange (Guarantee) Limited,
Stock Exchange Building,
Stock Exchange Road,
Karachi.
Being mandated as Joint Lead Managers and Joint Arrangers to this Initial Public Offering
of TPL Trakker Limited through the Book Building process, we confirm that all material
information as required under the Companies Ordinance, 1984 and Appendix 4 of the
Listing Regulations of the Karachi Stock Exchange (Guarantee) Limited have been
disclosed in this Prospectus and that whatever stated herein and in the supporting
documents is true and correct to the best of our knowledge and belief and that nothing has
been concealed.
On behalf of:
-Sd- - Sd-
______________________ _____________________
Faisal Qamar Umair A. Shaikh
Vice President, SVP & Head, Investment Banking
Corporate & Investment Banking AKD Securities Limited
National Bank of Pakistan
-Sd-
______________________
Rafique Bhundi
Head, Investment Banking
Arif Habib Limited
Prospectus – TPL Trakker Limited
17
2.25 STATEMENT BY THE JOINT BOOK RUNNERS
Dated: 13th April 2012
The General Manager,
Karachi Stock Exchange (Guarantee) Limited,
Stock Exchange Building,
Stock Exchange Road,
Karachi.
Being mandated as Joint Book Runners to this Initial Public Offer of TPL Trakker Limited
through the Book Building process, we confirm that all material information as required
under the Companies Ordinance, 1984 and Appendix 4 of the Listing Regulations of the
Karachi Stock Exchange (Guarantee) Limited have been disclosed in this Prospectus and
that whatever stated herein and in the supporting documents is true and correct to the best
of our knowledge and belief and that nothing has been concealed.
On behalf of:
-Sd- -Sd-
____ ___ ___________________
Umair Aijaz Shaikh Rafique Bhundi
Head, Investment Banking Head, Investment Banking
AKD Securities Limited Arif Habib Limited
Prospectus – TPL Trakker Limited
18
PART 3
3. SHARE CAPITAL AND RELATED MATTERS
3.1 SHARE CAPITAL
No. of
Shares
Face Value
(PKR)
Premium
(PKR) Total (PKR)
AUTHORIZED CAPITAL
230,000,000 Ordinary Shares of PKR10/- each 2,300,000,000 - 2,300,000,000
ISSUED, SUBSCRIBED & PAID UP
CAPITAL OF THE COMPANY
9,900 Issued for Cash: Ordinary shares of PKR10/-
each
99,000 - 99,000
187,239,063 Issued for consideration other than Cash:
Ordinary shares of PKR10/- each*
1,872,390,630 - 1,872,390,630
187,248,963 Total 1,872,489,630 - 1,872,489,630
No. of
Shares
Face Value
(PKR)
Premium
(PKR) Total (PKR)
THE EXISTING SUBSCRIBED, ISSUED &
PAID UP CAPITAL OF THE COMPANY IS
HELD AS FOLLOWS
Shares held by Sponsors
131,074,273 TPL Holdings (Private) Limited 1,310,742,730 - 1,310,742,730
1 Mr. Mohammad Ali Jameel 10 10
131,074,274 Sub Total 1,310,742,740 - 1,310,742,740
Shares Held by other Shareholders
56,174,689 Digicore International (Pty) Limited
South Africa 561,746,890 - 561,746,890
56,174,689 Sub Total 561,746,890 - 561,746,890
187,248,963 Total 1,872,489,630 - 1,872,489,630
PRESENT OFFER*
No. of
Shares
Face Value
(PKR)
Premium
(PKR) Total (PKR)
The Present issue of 30,000,000
ordinary shares (13.81% of the post
IPO paid-up capital) having par value
of PKR10/- each is being made as
under:
20,000,000 Allocation to Institutions/HNWIs
investors through book building
process at a strike price of PKR10/-
each
200,000,000 - 200,000,000
10,000,000 General Public 100,000,000 - 100,000,000
30,000,000 Total Present Offer 300,000,000 - 300,000,000
217,248,963 GRAND TOTAL 2,172,489,630 - 2,172,489,630
* The total Capital issued against consideration other than cash amounted to PKR
1,872,390,630/- out of which the Capital allotted for consideration other than cash to the
sponsor company includes goodwill amount of PKR 1,319,736,192 in accordance with
Scheme of Arrangement executed on March 31, 2009 (the salient features of the scheme may
be seen at Para 5.1.1.of the prospectus ) among the Company, TPL Holding (Pvt.) Limited and
its members for transfer of entire business and undertaking of TPL Holding (Pvt.) Limited
[formerly Trakker (Pvt.) Limited] to the Company, except for the interest of TPL Holding
(Pvt.) Limited in Trakker Energy (Pvt) Limited. The Scheme was approved / sanctioned by the
Honorable High Court of Sindh vide its Order dated May 07, 2009.
Prospectus – TPL Trakker Limited
19
For further detail, investor may refer to Para 2 of the Auditor Certificate dated 21 March 2012
given in Part 6 of the Prospectus.
Under Rule 8 of Issue of Capital Rules 1996, it is required that goodwill and other intangible assets
shall be excluded from consideration for Issuance of Shares otherwise than in cash. However, the
shares were issued pursuant to the decision of High Court dated May 07, 2009. For further details,
please refer paragraph 5.1.1.
Notes:
(i) As per Issue of Capital Rules. 1996 Rule No. 3(1) iv , the sponsors of the
Company shall at all times retain at least twenty five percent (25%) of the
capital of the company;
(ii) As per Regulation No. 67(7)(i) of KSE’s listing regulations, sponsor’s
shareholding in excess of 25% shall not be saleable for a period of six months
from the date of public subscription;
(iii) As per Regulation IIIA 6(6) KSE has relaxed the requirement of quantum of
public offering (Regulation IIIA 6(2)) which has also been approved by SECP
vide letter No. SMD/CO 57(1)/06/2009 dated April 23rd, 2012.
3.2 OPENING AND CLOSING OF THE SUBSCRIPTION LIST
The subscription list will open at the commencement of banking hours on 05-06-2012 and
will close on 06-06-2012 at the close of banking hours.
3.3 INVESTOR ELIGIBILITY FOR PUBLIC ISSUE
Eligible investors include:
a) Pakistani citizens resident in or outside Pakistan or persons holding two
nationalities including Pakistani Nationality;
b) Foreign nationals whether living in or outside Pakistan;
c) Companies, bodies corporate or other legal entities incorporated or established in or
outside Pakistan (to the extent permitted by their respective constitutive documents
and existing regulations, as the case may be);
d) Mutual funds, provident/pension/gratuity funds/trusts (subject to the terms of their
respective Trust Deeds and existing regulations); and
e) Branches in Pakistan of companies and bodies corporate incorporated outside
Pakistan.
3.4 FACILITIES AVAILABLE TO NON-RESIDENT PAKISTANI AND FOREIGN
INVESTORS
Non-resident Pakistani investors and foreign investors may subscribe for the shares being
issued through this Prospectus by using their Special Convertible Rupee Account
(“SCRA”) as set out in Chapter 20 of the Foreign Exchange Manual of the State Bank of
Pakistan.
3.5 MINIMUM AMOUNT OF APPLICATION AND BASIS FOR ALLOTMENT OF
SHARES
The basis and conditions of allotment to the general public shall be as follows:
(a) Application of shares below the total value of PKR 5,000 (Issue Price x 500
Prospectus – TPL Trakker Limited
20
Shares) shall not be entertained.
(b) The minimum amount of application for subscription is of 500 ordinary shares is
PKR 5,000 (Issue Price x 500 Shares)
(c) Application for shares must be made for 500 shares or in multiples of 500 shares
only. Applications which are neither for 500 shares nor for multiples of 500 shares
shall be rejected.
(d) SUBMISSION OF FICTITIOUS AND MULTIPLE APPLICATIONS
(MORE THAN ONE APPLICATIONS BY SAME PERSON) IS
PROHIBITED AND SUCH APPLICATIONS’ MONEY SHALL BE LIABLE
TO CONFISCATION UNDER SECTION 18-A OF THE SECURITIES AND
EXCHANGE ORDINANCE, 1969.
(e) If the shares issued to the general public are sufficient to accommodate all
applications, all applications shall be accommodated.
(f) If the share applied for are in excess of the shares issued, the distribution shall be
made by computer balloting, in the presence of the representative(s) of KSE in the
following manner:
i. If all applications for 500 shares can be accommodated, then all such
applications shall be accommodated first. If all applications for 500 shares
cannot be accommodated then balloting will be conducted among applications
for 500 shares only.
ii. If all applications for 500 shares have been accommodated and shares are still
available for allotment, then all applications for 1,000 shares shall be
accommodated. If all applications for 1,000 shares cannot be accommodated
then balloting will be conducted among applications for 1,000 shares only.
iii. If all applications for 500 shares and 1,000 shares have been accommodated
and shares are still available for allotment, then all applications for 1,500 shares
shall be accommodated. If all applications for 1,500 shares cannot be
accommodated then balloting will be conducted among applications for 1,500
shares only.
iv. If all applications for 500 shares, 1,000 shares and 1,500 shares have been
accommodated and shares are still available for allotment, then all
applications for 2,000 shares shall be accommodated. If all applications for
2,000 shares cannot be accommodated then balloting will be conducted
among applications for 2,000 shares only.
(g) After the allotment in the above mentioned manner, the balance shares, if any, shall
be allotted in the following manner:
i. If the remaining shares are sufficient to accommodate each application for
over 2,000 shares, then 2,000 shares shall be allotted to each applicant and the
remaining shares shall be allotted on pro-rata basis.
ii. If the remaining shares are not sufficient to accommodate all the remaining
applications for at least 2,000 shares, then balloting shall be conducted for
allocation of 2,000 shares to each of the successful applicants.
(h) If the issue is oversubscribed in terms of amount only then the allotment of shares
Prospectus – TPL Trakker Limited
21
shall be made on the following basis:
i. First preference will be given to the applicants who applied for 500 shares;
ii. Next preference will be given to the applicants who applied for 1,000 shares;
iii. Next preference will be given to the applicants who applied for 1,500 shares;
and then;
iv. Next preference will be given to the applicants who applied for 2,000 shares;
(i) After allotment of the above, the balance shares, if any, shall be allotted on a pro-
rata basis to the applicants who applied for more than 2,000 shares.
(j) Allotment of shares will be subject to scrutiny of the applications for subscription
of shares.
(k) Applications, which do not meet with the above requirements or which are
incomplete will be rejected.
3.6 REFUND OF SUBSCRIPTION MONEY TO UNSUCCESSFUL APPLICANTS
The Company shall take a decision within ten (10) days of the closure of subscription list as
to which applications have been accepted or are successful and refund the money in cases
of unaccepted or unsuccessful applications within ten (10) days of the date of such
decision, as required under Section 71 of the Ordinance.
As per sub-section (2) of Section 71 of the Ordinance, if refund as required under sub-
section (1) of Section 71 of the Ordinance is not made within the time specified therein, the
Issuer shall be liable to repay the money with surcharge at the rate of 1.5% for every month
or part thereof from the expiration of the 15th day and, in addition, to a fine not exceeding
PKR 5,000/- and in case of continuing offense to a further fine not exceeding PKR 100/-
per day after the said 15th day on which the default continues. Provided that the Issuer shall
not be liable if he/she proves that the default in making the refund was not due to any
misconduct or negligence on his/her part.
3.7 ISSUE AND DISPATCH OF SHARE CERTIFICATES
The Company will dispatch share certificates to successful applicants through their Bankers
to the Issue or by crediting the respective Central Depository System ("CDS") accounts of
the successful applicants within thirty (30) days of the close of public subscription, as per
Listing Regulations of KSE.
Shares will be issued either in scrip-less form in the CDS of CDCPL or in the shape of
physical scripts on the basis of option exercised by the successful applicants. Shares in the
physical scripts shall be dispatched to the Bankers to the Issue within thirty (30) days from
the date of close of subscription list, whereas scrip less shares shall be directly credited
through book entries in the respective accounts maintained with the CDCPL.
The applicants who opt for receipt of shares in scrip-less form in CDS should fill in the
relevant columns of the Application Form. In order to exercise the scrip-less option, the
applicant(s) should have CDS account at the time of subscription.
If the Company makes a default in complying with the above requirements, it shall pay the
Stock Exchange a penalty of PKR 5,000/- per day for every day during which the default
continues. The Stock Exchange may also notify the fact of such default and the name of the
Company by notice and also by publication in the Daily Quotation of the Stock Exchange.
Prospectus – TPL Trakker Limited
22
The name of the Company will also be notified to the members of the Stock Exchange and
placed on the web site of the Stock Exchange.
3.8 TRANSFER OF SHARES
(a) PHYSICAL SCRIPTS
Under the provisions of Section 77 of the Ordinance, the Directors of the Company
shall not refuse to transfer any fully paid share unless the transfer deed is, for any
reason, defective or invalid or is not accompanied by the relevant share certificate.
Provided that the Company shall within thirty (30) days from the date on which the
instrument of transfer was lodged with it, notify the defect or invalidity to the
transferee who shall, after the removal of such defect or invalidity, be entitled to re-
lodge the transfer deed with the Company.
(b) TRANSFER UNDER BOOK ENTRY SYSTEM
The shares maintained with the CDS in the book entry form shall be transferred in
accordance with the provisions of the Central Depositories Act, 1997 and the CDC
Regulations.
3.9 SHARES ISSUED IN PRECEDING YEARS
Sr.
No.
No. of
Shares
Issued
Par
Value
Amount
(PKR)
Consideration Date of Issue
1 100 10 1,000 Cash 4th Dec 2008
2 9,800 10 98,000 Cash 18th Dec 2008
3 131,064,374 10 1,310,643,740 Other than Cash 29th June 2009
4 56,174,689 10 561,746,890 Other than Cash 29th June 2009
Total 187,248,963 1,872,489,630
Shares issued for consideration other than cash have been issued pursuant to a scheme of
arrangement as sanctioned by High Court of Sindh by reference number J.M No. 21/2008
dated 07 May 2009. The Scheme of Arrangement has been discussed in detail in section
5.1.1 (For details please refer para 6.1, note no. 2 & 3). Other than the above mentioned
shares, there has been no other issue of shares since its incorporation.
3.10 PRINCIPAL PURPOSE OF THE ISSUE
The principal purpose of the public issue is the partial repayment of short term running
finance and to finance the working capital requirement of “Safe transportation
Environment” project (For detail of project please refer para 3.10.2(a) as well as expansion
of vehicle tracking and navigation operations. The IPO Proceeds will be utilized as follows:
a) repayment of short term running finance PKR 150 million ( the Company‟s short term
running finance under mark-up arrangements stood at around PkR387 million as at
December 31st, 2011) b) working capital of PKR 150 million for expansion of Container
Tracking, Vehicle Tracking and Navigation Solutions in Pakistan and Internationally.
Further the management has decided to list the shares of the Company at the Karachi Stock
Exchange to broaden its investor base and invite general public to participate in the profits
of the Company by providing them with an avenue of investment in the Company.
3.10.1 Repayment of Short Term Running Finance
The Company had obtained short term running finance from National Bank of Pakistan,
Standard Chartered Bank and Habib Metropolitan Bank Limited amounting to PKR 150
Prospectus – TPL Trakker Limited
23
million, PKR 60 million and PKR 175 million respectively at a mark-up rate which range
from 15.25% to 16%. The repayment of loan will reduce the burden of interest cost on the
company thereby improving profitability.
3.10.2 Working Capital for Existing and Future Operations
a. Expansion of Container Tracking Operations:
As Pakistan is one of the major ports of the region, many shipments destined for
other nations come into and through Pakistan as “trans-shipments” or “in-transit
shipments.” FBR, since the last several years, has been working to monitor the
movement of cargo transit to Afghanistan. Recently, Government of Pakistan
signed the APTTA agreement which requires the installation of tracking device in
all containers that carry goods from one port to another to reduce pilferage and to
ensure smooth flow of goods. Based on this, FBR invited tenders in February 2011
for provision of tracking service.
TPL Trakker Ltd was among several other companies which participated in the bid
for the solution requested.
The bids were evaluated considering the financial and technical feasibility and after
several stages of evaluation; TPL Trakker was selected to undertake the project in
February 2012 and currently the licensing rules are being formulated.
The Project called “Safe transportation Environment” requires all cargo moving
from ports of Karachi to Afghanistan to have GPS satellite tracking systems
installed. Approximately around 8,500 containers a month use this trade route This
project requires tracking of over 100,000 containers each year. Under the license
with Pakistan customs, TPL Trakker will provide the monitoring of all containers
(reusable tracking units). The company will establish a Central Control Room
(“CCR”) at Pakistan Customs headquarters where they will monitor movement
themselves for exception based monitoring, escalation and reporting. The
containers will be fitted with sensor-equipped tracking units that transmit precise
location and condition information to the CCR for secure, real-time monitoring,
data management and communication unit access to enable customers to make
split-second decisions. Through this service TPL Trakker will provide an end-to-
end solution from product design to monitoring and reporting. TPL Trakker will
monitor each container leaving Karachi & Port Qasim Ports and monitor each truck
carrying the container. TPL Trakker will not only be using container tracking
through a modern satellite in addition to GPRS/SMS which provides real-time total
tracking anytime, anywhere, they will also be using Global Track reusable radio
frequency identification tags which will constantly be gathering data and
transmitting information through radio frequency. The Company will provide a 24-
hour on-line monitoring including:
Door open
Plunger switch to indicate unhinged container. Plunger switch is a
combination of mechanical and electrical functions and is designed for
rugged environments to sense the position of mechanical linkages and
controls.
Light inside container when doors have been opened (saddle or Covert
version)
Noise inside container if acoustic levels increase
Devise removal tamper if unit is removed
Prospectus – TPL Trakker Limited
24
Tamper evidence seals (optional) indicates visually if hinge was removed
temperature change in cargo
The above mentioned project will not only benefit the company but also result in
significant benefits to the Country. Some of the benefits of the above mentioned
project to Pakistan as a whole have been highlighted below:
a) Compliance:
Comply with APTTA rules and regulations.
b) Enforce Trade Tariffs:
Monitoring these containers will significantly reduce or eliminate illegal
entry of unauthorized goods into Pakistan.
c) Contraband Prevention:
Reduce or eliminate the illegal entry of contraband such as arms, narcotics,
or other illegal cargo into Pakistan.
d) Eradicate pilferage enroute:
Through a combination of sensors and tracking/tracing the cargo enroute,
on a 24/7 basis, the company will provide a system that will minimize
pilferage.
e) Eliminate theft of transit cargo in Pakistan:
A series of door seals and other intrusion-prevention and detection means
will be provided, for installation on every container, to alert the security
personnel immediately upon intrusion.
g) Attain transport efficiencies:
The reporting capability will provide adequate information to manage any
routing, any necessary cargo re-routing, report on delays, and generally
provide all logistics information necessary to monitor and control
movement of cargo.
b. Vehicle Tracking Business Expansion :
TPL with its success in Pakistan and UAE now plans to further grow its operations
in Sri Lanka, the Middle East and Afghanistan. Sri Lanka has emerged as a new
destination for many IT investments and TPL Trakker plans to setup its operations
to cater to the vehicle tracking requirements for the growing tourism industry. New
security initiatives by the Sri Lankan Government have further raised more
opportunities for vehicle tracking business.
In the Middle East, TPL Trakker plans to setup its operations to access customers
in the region. Operations expansion in following countries planned Qatar, Jordan,
Egypt and Oman.
c. Location and Navigation Business Coverage Expansion:
As the demand for navigation service is increasing TPL requires working capital to
further enhance its map coverage to over 1000 cities/ Towns in Pakistan. With this
TPL will maintain its legacy as the leader in providing the most advanced and
comprehensive navigation solution for Pakistani consumers.
Prospectus – TPL Trakker Limited
25
Current Data Expansion Plan
POI (Points of Interest) 600,000
2 Million
Road Network Coverage 98,000 Kilometer
500,000 Km‟s
House Addresses 400,000
1 Million
3D Models 3000
5000
2D Models 46,822 250,000
Cartography Data 4599 10,000
3.11 INTEREST OF SHAREHOLDERS
None of the holders of the issued shares of the Company have any special or other interest
in the property or profits of the Company other than as holders of the ordinary shares in the
capital of the Company.
3.12 (a) DIVIDEND POLICY
The rights in respect of capital and dividends attached to each share are and will be the
same. The Company in its general meeting may declare dividend but no dividend shall
exceed the amount recommended by the Directors. Dividend, if declared in the general
meeting, shall be paid according to the terms of the provisions of the Ordinance.
The Directors may from time to time pay to the members such interim dividends as appear
to the Directors to be justified by the profits of the Company. No dividend shall be paid
otherwise than out of the profits of the Company for the year or any other undistributed
profits.
No unpaid dividend shall bear interest or mark-up against the Company. The dividends
shall be paid within the period laid down in the Ordinance.
(b) ELIGIBILITY FOR DIVIDEND
The shares issued by the Company shall rank pari-passu with the existing shares in all
matters, including the right to such bonus or right issues, and dividend as may be declared
by the Company subsequent to the date of issue of such shares.
Prospectus – TPL Trakker Limited
26
3.13 DEDUCTION OF ZAKAT
Dividend distribution will be subject to deduction of Zakat at source, pursuant to the
provisions of Zakat and Ushr Ordinance, 1980. (XVIII of 1980) as may be applicable from
time to time.
3.14 CAPITAL GAINS TAX
Capital gains derived from the sale of listed securities are taxable in the following manner
under section 37A of Finance Act 2011;
Holding Period of Securities
S.No Tax Year Less than 6
months
More than 6 months
but less than 12 months
More than 1 year
1. 2011 10.0% 7.5% 0%
2. 2012 10.0% 8.0% 0%
3. 2013 12.5% 8.5% 0%
4. 2014 15.0% 9.0% 0%
5. 2015 17.5% 9.5% 0%
3.15 WITHHOLDING TAX ON DIVIDEND
Dividend distribution to shareholders will be subject to withholding tax under section 150
of the Income Tax Ordinance, 2001 at the rate of 10% specified in Part 1 Division III of the
First Schedule of the said Ordinance or any time to time amendments therein. In terms of
the provision of Section 8 of the said Ordinance, said deduction at source, shall be deemed
to be full and final liability in respect of such profits.
3.16 DEFERRED TAXATION
Deferred tax is accounted for using the liability method in respect of all temporary
differences at the balance sheet date between the tax base of assets and liabilities and their
carrying amount. Deferred tax liabilities are recognized for all taxable temporary
differences. Deferred tax assets are recognized for all deductible temporary differences to
the extent that it is probable that the temporary difference will reverse in the future and the
taxable profits will be available against which the temporary differences can be utilized.
The carrying amount of deferred tax asset is reviewed at each balance sheet date and
reduced to the extent that it is no longer probable that sufficient taxable profit will be
available to allow deferred tax asset to be utilized.
Deferred tax assets and liabilities are measured at the tax rates that are expected to apply to
the period when the asset is realized or the liability is settled, based on the tax rates that
have been enacted or subsequently enacted at the balance sheet date.
The company has booked deferred tax asset of PKR 5.325 million as at 31st December
2011.
3.17 SINDH SALES TAX & WITHHOLDING TAX ON SALE/PURCHASE OF SHARES
(a) Under the constitution of Pakistan and Articles 49 of the 7th NFC Award the
Government of Sindh has promulgated the Sindh Sales Tax on Service Act, 2011
(Sindh Act No. XII of 2011) (the Act) which has taken effect from July 2011. The
Sindh Revenue Board Constituted under the Act (Sindh Act No. XI of 2010)
administers and regulates the levy and collection of the Sindh Sales Tax (SST) on
the taxable services provided or rendered in Sindh.
Prospectus – TPL Trakker Limited
27
The value of taxable services for the purpose of levy of sales tax is the gross
commission charged from clients in respect of purchase or sale of shares in a Stock
Exchange under section 41(1) of the Sindh Sales Tax Rules, 2011, dated 30th June
2011 The Second Schedule of the Act levies a sales tax on Brokerage at the rate of
16%. The sales tax is withheld as per the requirements of Sindh Sales Tax Special
Procedure (Withholding) Rules, 2011.
(b) Withholding Tax of 0.01% will be charged on purchase/sale value on the
purchase/sale of shares/Modaraba certificates / instruments of redeemable
capital.
3.18 TAX CREDIT FOR INVESTMENT IN IPO
Under Section 62 of the Income tax Ordinance, 2001, a resident person other than a
company shall be entitled to a tax credit for a tax year in respect of the cost of acquiring in
the year new shares offered to the public by a public company listed on a stock exchange in
Pakistan, provided the resident person is the original allottee of the shares or the shares are
acquired from the Privatization Commission of Pakistan.
Time Limit for holding shares has been designated as 36 months to avail tax credit. The
amount of investment, eligible for tax credit, is prescribed in section 62 of the said
Ordinance.
3.19 TAX CREDIT FOR ENLISTMENT
Under Section 65C of the Income tax Ordinance, 2001, tax credit at 15% of the tax payable
shall be allowed for the tax year in which a Company is listed on a Stock Exchange in
Pakistan.
Prospectus – TPL Trakker Limited
28
PART 4
4. UNDERWRITING, COMMISSIONS, BROKERAGE AND OTHER EXPENSES
4.1 UNDERWRITING
BOOK BUILDING PORTION
AKD Securities Limited and Arif Habib Limited have been mandated as the Joint Book
Runners to the issue. The Joint Book Runners will underwrite the Book Building
portion of the issue which comprise of 20.0 million Ordinary Shares within two (2)
working days of the closing of the bidding period as required under clause 5 of
Appendix 4 of the listing regulations of the Karachi Stock Exchange at the strike price
determined through the book building process.
In the opinion of the Directors, the resources of the Underwriter are sufficient to
discharge its underwriting commitments/obligations.
PUBLIC PORTION
As required under clause 6 of Appendix 4 of the listing regulations of the Karachi
Stock Exchange, the public portion of the issue 10.0 million ordinary shares will be
underwritten as follows:
Name of Underwriter Number of Shares
Underwritten Amount (PKR)
National Bank of Pakistan 500,000 5,000,000
AKD Securities Limited 5,000,000 50,000,000
Invest Capital Markets Limited 3,500,000 35,000,000
PAIR Investment Company Limited 1,000,000 10,000,000
TOTAL 10,000,000 100,000,000
4.2 UNDERWRITING COMMISSION
BOOK BUILDING PORTION
The Joint Book Runners will be paid book running and underwriting commission at the
rate of 1.5% of the Book Building portion of the issue i.e. 1.5 % of PKR 20.0 million.
In addition to the underwriting commission, the Joint Book Runners will be paid a take-up
commission at the rate of 2% of the amount taken up.
GENERAL PUBLIC PORTION
The underwriters have been an underwriting commission at the rate of 1.5% of the
amount underwritten by them. In addition, a take-up commission at the rate of 2% shall
be paid to the underwriters on the value of the shares to be taken-up by virtue of their
respective underwriting commitments/obligations.
4.3 BUY BACK/REPURCHASE AGREEMENT
THE UNDERWRITERS HAVE NOT ENTERED INTO ANY BUY BACK/RE-
PURCHASE AGREEMENT WITH THE COMPANY OR ANY OTHER PERSON IN
RESPECT OF THIS PUBLIC ISSUE.
ALSO, NEITHER THE COMPANY NOR ANY OF ITS ASSOCIATES HAVE
ENTERED INTO ANY BUY BACK/RE-PURCHASE AGREEMENT WITH THE
Prospectus – TPL Trakker Limited
29
UNDERWRITERS OR THEIR ASSOCIATES. THE COMPANY AND ITS
ASSOCIATES SHALL NOT BUY BACK/RE-PURCHASE SHARES FROM THE
UNDERWRITERS AND THEIR ASSOCIATES.
4.4 COMMISSION TO THE BANKERS TO THE ISSUE
Commission at the rate of 0.50% of the amount collected on allotment in respect of
successful applicants will be paid by the company to the Bankers to the Issue for services to
be rendered by them in connection with the public issue, plus out-of-pocket expenses, if
any.
4.5 BROKERAGE
For this Issue, brokerage shall be paid to the members of KSE, LSE and ISE at the rate of
1.0% of the value of shares (including premium if any) actually sold through them. No
brokerage shall be payable in respect of shares taken up by the Underwriters by virtue of
their underwriting commitments.
4.6 ESTIMATED EXPENSES OF THE ISSUE
Expenses to the issue are estimated not to exceed PKR 29.5 million. The break-up of these
preliminary expenses is given below:
Expenses to the Public Issue Rate Amount
(PKR)
Underwriting Commission - Book Building 1.00% 2,000,000
Underwriting Commission - General Public 1.50% 1,500,000
Take up commission - Book Building* 2.00% 4,000,000
Take up commission - General Public* 2.00% 2,000,000
Commission to Bankers to the issue including the out of pocket
expense
0.50% 550,000
Brokerage to the members of Stock Exchanges 1.00% 3,000,000
Book Runners Fee 0.50% 1,000,000
Lead Management and Arrangement Fee 3.00% 9,000,000
Printing, publication of prospectus/application forms 2,000,000
KSE listing fee and charges:
- Initial Listing Fee* 2,172,490
- Annual Listing Fee 379,312
KSE software charges
250,000
CDC annual fees for Eligible Security 67,500
CDC Fresh Issue Fees 300,000
SECP application and processing Fees 200,000
Legal & Professional Charges 500,000
Balloters and Share registrars fees etc 150,000
Miscellaneous costs 500,000
Total 29,569,302
* These amounts represent the maximum possible costs under these heads.
Prospectus – TPL Trakker Limited
30
PART 5
5. THE ISSUER
5.1 COMPANY HISTORY
TPL Trakker Limited (“TPL Trakker” or the “Company”) was incorporated as a private
company under the Companies Ordinance, 1984 on December 4, 2008. Pursuant to a
scheme of arrangement approved and sanctioned by the Honorable High Court of Sindh,
TPL Trakker Limited acquired the businesses and assets of TPL Holdings (Pvt) Limited.
The Company was subsequently converted into a public company on September 16, 2009.
5.1.1. BRIEF ON SCHEME OF ARRANGEMENT:
During the period ended 30 June 2009, a Scheme of Arrangement was executed on 31
March 2009 among the Company, TPL Holding (Private) Limited (TPL Holdings) and the
shareholders of TPL Holdings for transfer of entire business and undertakings of TPL
Holdings to the Company, except for the interest in Trakker Energy (Private) Limited
(here-in-after referred to as “Excluded Asset” ). The shareholders of TPL Holdings in their
extra ordinary general meeting held on 06 March 2009 approved a Scheme of Arrangement
(the Scheme) under section 284 to 287 of the Companies Ordinance, 1984. The Scheme
was approved/ sanctioned by the Honorable High Court of Sindh vide its order reference
number J.M No. 21/2008 dated 07 May 2009 as approved by the Honorable High Court of
Sindh. Accordingly:
a) the entire undertaking of TPL Holdings including all the properties, assets,
receivables, liabilities and all the rights and obligations except for the
Excluded Asset have been transferred into and vested in the Company as
on the effective date;
b) in consideration for the restructuring under the Scheme, the Company
issued and allotted 131,074,274 ordinary shares of PKR 10/- each, as fully
paid-up, to registered ordinary shareholders of TPL Holdings equivalent to
seventy per cent (70%) of the issued and paid up capital of the Company as
on the effective date; and
c) Digicore transferred its shareholdings in TPL Holdings to AB Group and
AJ Group in their existing shareholding ratio in the paid up share capital of
TPL Holdings. Simultaneously, the Company issued 56,174,689 shares
equivalent to thirty per cent (30%) of the issued and paid up share capital
of the Company to Digicore
d) The Total Purchase Consideration under the scheme was PKR1,872.49
million and the total fair value of assets transferred to the Company was
PKR1,890.80 million and the fair value of liabilities transferred to the
Company was PKR1,338.05 million. The difference was recognized as
goodwill on acquisition.
Prospectus – TPL Trakker Limited
31
Note: TPL Trakker Limited as appearing in the new strcuture in the above chart, was
incorporared in December 2008 and at that time the shareholding of TPL Trakker Limited
was held by Ali Jameel Group (99%) and Trakker Holdings (Pvt) Limited (1%).
5.2 COMPANY HISTORY
TPL Trakker Ltd is Pakistan‟s number one Satellite Vehicle Tracking Company in terms of
market share, corporate profile and branding. TPL Trakker is the pioneer of vehicle
tracking Services in Pakistan.
TPL Holdings (Pvt) Limited launched the vehicle security and fleet management concept in
Pakistan in the year 2000 as a joint venture with the South African multinational DigiCore
Holdings Limited which has 30% shareholding in the Company. The businesses and assets
of TPL Holdings were transferred pursuant to the scheme of arrangement to TPL Trakker
Limited on March 31, 2009.
With its head office in Karachi and branch offices in Lahore, Islamabad / Rawalpindi,
Faisalabad & Multan, Sialkot, Gujranwala & Peshawar, TPL Trakker Ltd is providing car
tracking services in over 320 cities all over Pakistan. The Company currently has a staff
strength of over 520 personnel.
TPL Trakker has exclusive rights to use DigiCore‟s signature C-track technology which
merges GPS technology with GSM service providers‟ SMS & GPRS data service to bring
information directly from the vehicle to the TPL Trakker control room. C-track has been
developed specifically to assist with the management of commercial fleets, sales vehicles,
car rental, security transportation and individual car owner applications. It has the ability to
provide vehicle position within 4 meters accuracy. Components of C-track technology are
provided by world renowned technology companies such as Mitsubishi, Trimble, U-Blox,
Wavecom, and Schlumberger and therefore ensure reliable performance. DigiCore‟s C-
track is used by over 550,000 customers internationally and it enjoys market leader status in
South Africa, Africa, Pakistan, United Kingdom, Europe, Australia and Brazil. According
to ABI Research (telematics USA) C-track was ranked 2nd globally based on
implementation, relative costs, installed base, regional deployment, and range of solutions.
Prospectus – TPL Trakker Limited
32
TPL Trakker utilizes this information to deliver to clients a comprehensive analysis of their
vehicle in order to aid their efforts to increase efficiency and productivity as well as prevent
fraud.
The Company has a 24 hour call centre which has two sections that work around the clock,
and answer calls within 10 seconds. On average, these call centers receive up-to 2,000
calls, and make 4,500 calls, and monitor an average 2,000 alarms on daily basis. The
alarms when required are dealt with by the Trakker Response Team (managed by TPL
Security Services) which ensures the recovery and return of stolen cars from an area
including the most remote regions of the country. TPL Trakker‟s high level of performance
is essentially due to its own dedicated licensed security Company exclusively for vehicle
recovery.
TPL Trakker Achievements At Glance – 13 Years of Excellence
TPL Trakker has established a solid platform based on which it continues to expand its
product portfolio and build on its customer base. TPL Trakker‟s initial target market was
the retail segment, where it has now established itself as the dominant player. Based on this
success, TPL Trakker is now expanding into higher margin institutional clients.
Additionally along with its core asset tracking services, TPL Trakker has launched related
products and services which supplement its core asset tracking service offering and
provides its customers with a complete portfolio of services to choose from.
5.2.1 JOINT VENTURE PARTNER DIGICORE HOLDINGS:
The Company‟s Joint venture partner DigiCore Holdings specializes in the research,
design, development, manufacture, sales and support of technologically advanced
GPS/GSM fleet management and vehicle tracking solutions. Digicore has operations in
over 30 countries globally with 350 employees providing support to over 550,000
customers.
Prospectus – TPL Trakker Limited
33
Brief Financial Overview of DigiCore for the last three years:
Source Digicore Holdings Website
Source Digicore Holdings Website
DigiCore works in partnership with its customers to develop solutions that deliver
measurable business and operational benefits by providing total Tracking and control of
mobile assets and mobile work forces.
A wide range of vehicle location, fleet management, satellite navigation, workflow, mobile
job planning and security tools are utilized to provide commercial vehicle, van and car fleet
operators with scalable solutions that offer flexibility, reliability and functionality.
DigiCore has significant global operations and these are detailed below:
5.2.2 DIGICORE GLOBAL OPERATIONS
Europe and United Kingdom
Digicore presence in Europe and UK has further shown signs of growth and in the
past 2-3 years they have recorded reasonable sales activity during the year 2010 -
11. Five regional branches were opened during the year plus new contracts were
signed.
Asia and Middle East
DigiCore established regional headquarters in late 2010 in Kuala Lumpur. This
region is viewed as one of the markets with the biggest growth potential for C
Prospectus – TPL Trakker Limited
34
track. Digicore is well positioned in the region, with key distributors, joint venture
partners and a strong management team in place. UAE and Pakistan are the leaders
in this region and have shown consistent growth over the past many years despite
economic challenges.
Australia and New Zealand
In August 2010 DigiCore acquired a 25% stake in Vehicle Management Systems
(VMS) which, in turn, took over the Minorplanet Asia Pacific business. DigiCore is
finalizing the purchase of a further equity stake to increase its holding in VMS to
69%.
Australia-listed mining giant BHP Billiton renewed its contract for a further three
years.
Latin and Central America
The C track Latin America regional headquarters was established in August 2010
in Mexico City. Key customers such as BHP Billiton (Colombia), Nestlé (Chilé)
and Cusaem (Mexico), SABMiller (Peru) and Falabella (Colombia) provide a solid
customer base from which to grow. A joint venture with Spanish group Tecnocom
has been established in selected markets.
5.3 BUSINESS OVERVIEW AND PRODUCTS
TPL Trakker‟s business portfolio can be divided into three broad categories i.e. Asset
Tracking Solutions, Container Tracking Solution and Location and Navigation Solution.
5.3.1 ASSET TRACKING SOLUTIONS:
These are business lines that utilize asset tracking and location technology to
provide security, safety and fleet management solutions. Our customer base
includes financial institutions group (FIG‟s), multinational companies (MNC‟s)
and individuals. From tracking assets like vehicles, trucks, generators to people, the
asset tracking solution is continuously expanding.
5.3.1.1 Global Asset Tracking Industry
Asset tracking services have been around since the 1970‟s under the name of
Global Positions Systems (GPS) developed by the United States Department of
Defense, but it was only in the next decade that the U.S government decided to
make the system positioning data freely available to other industries around the
world. These industries use this information to enhance their products and services.
GPS fleet management industry is expected to show healthy growth in 2012 as the
market dynamics and trends shift to scalable end-to-end solutions, driver
management applications, and regional strategic ecosystems. FMS revenues are
expected to reach $9.5 billion in 2015, according to forecasts just released by ABI
Research dated 8th April 2010
5.3.1.2 Asset Tracking Services in Pakistan
Just as the global asset tracking service market is growing, the market in Pakistan is
also growing exponentially. TPL Trakker is the only company in Pakistan which
has been offering quality asset tracking and fleet management systems. Since its
inception the asset tracking service market has grown gradually as the demand for
Prospectus – TPL Trakker Limited
35
these systems has shown tremendous growth mainly due to its usage by logistic
companies, fleet operators and retail and corporate customers. Total companies
providing vehicle tracking service in Pakistan are almost 50.
This industry is driven by a number of components which includes:
i) Rising disposable incomes;
ii) higher cellular penetration;
iii) greater mobility;
iv) the general level of law and order in the country;
v) an increasing number of large businesses using extensive transportation
fleets; and
vi) growth in the automobile sector.
The growing market of automobile is also increasing the sales of tracking products
as more and more insurance companies are persuading customers to install tracking
devices. In addition they are insuring the vehicles, which reduce their claim ratio to
a significant extent. The following chart depicts the growth of cars sales over the
last three years.
Source PAMA (Pakistan Automotive Manufactures Association)
Further, fleet customers have increased their demands from simple tracking of the
vehicles to intelligent monitoring and reporting of their assets at regular intervals.
The reporting required for each fleet vehicle requires detailed analysis which our
fleet management information system provides.
5.3.1.3 Asset Tracking Solutions offered by TPL Trakker
The following is a description of the services offered by the TPL Trakker Asset
Tracking Solutions:
Vehicle Tracking Security - The vehicle tracking services of TPL Trakker employ
a state of the art command and control center, and Digicore‟s C-track technology,
through which TPL Trakker is able to monitor the movements and location of
vehicles. Since our inception in 2000, we have recovered over 7000 vehicles and
cargo worth Rs.11 billion.
Prospectus – TPL Trakker Limited
36
The Company offers different products under its Vehicle Tracking and Security
services as detailed below:
C-track Secure – Stolen Vehicle Recovery
C-track Secure is designed primarily for those customers who want to secure their
vehicles without requiring any online navigation, location, or historical data
support. This uses the same GPS/GSM as its other products.
As an add-on to this product, Anti Jamming device was introduced in 2010 with the
aim to counter the effects of jamming device being used by criminals to
temporarily disable the system and to subsequently frisk the vehicle to remove the
unit.
C-track Secure Plus – Stolen Vehicle Recovery – With Added Features
C-track Secure Plus is a value added extension of the functions of C-track Secure
with the following additional features:
Watch Mode – By sending an SMS to the vehicle‟s unit, the customer can activate
“Watch Mode” which enables the unit to send an SMS to the customer, if the
ignition of the vehicle is switched on.
Remote Polling /Location Status – Users can send an SMS to their car‟s unit to
obtain the real time location of the vehicle. It allows the customers to further
communicate directly with their car‟s unit, and allowing customers to use their
mobile phones as security monitors for their cars.
C-track Assist– For Vehicle Tracking and Security
This product utilizes GPS technology, to provide vehicle positioning within 4
meters average accuracy and GSM networks to transmit information real time, 24
hours a day all year round. C-track Assist is a product suited for both individual car
owners, as well as commercial fleet and car rental vehicle security applications.
This enables customers to keep track of their vehicles at all times. Additionally all
of TPL Trakker‟s C-track Assist customers can avail its Web Track service to
connect to the TPL Trakker‟s website and view their vehicles exact location.
As part of the vehicle tracking and security services, TPL Trakker also provides
services to deal with crimes such as kidnapping and associated white collar crimes
such as fraud. TPL is responsible for having prevented several cases of kidnappings
and extortion and assisting customers in crime related emergencies. Its Emergency
Response Teams respond to live status data monitoring which includes vehicle
movement, restricted area alarms, tampering with batteries and emergency
response alerts – services other tracking companies do not provide.
Initially TPL Trakker‟s Asset Tracking Service products were taken up by retail
customers primarily for vehicle security and tracking. The product saw tremendous
success and TPL Trakker‟s products acquired a generic quality. Subsequently the
Company‟s product was utilized by leading commercial banks such as Dubai
Islamic Bank, United Bank Limited, NIB Bank etc for monitoring their auto
Prospectus – TPL Trakker Limited
37
finance customers to create a risk profile as well as enhance security and prevent
fraud (portfolio management).
C-track Solo – For Fleet Management Services
TPL Trakker engages in comprehensive fleet data reporting and analysis to provide
improved fleet utilization, productivity and security using its C-track Solo–
Comprehensive Vehicle Tracking and Security product. Designed as a solution for
the region‟s Fleet Management requirements and recognized as an essential part of
every modern transportation fleet C-track Solo is being adopted by leading
multinationals and local companies including Shell, Chevron and British
Petroleum. C-track Solo is a full featured scalable, remotely upgradeable product
for haulers, logistics & supply chain management, mobile workforce management
& emergency services application. C-track Solo is based on a hardware platform
which utilizes the GPS technology to provide vehicle positioning within 4 meters
average accuracy and the Mobilink GSM network to transmit real time information,
24 hours a day, all year round.
Using C-track Solo, TPL Trakker uses the key indicators for fleet performance
such as mileage, fuel consumption, employee productivity, trip route analysis, and
driver performance analysis in order to improve fleet efficiency. These services
allow customers to benefit from decreased vehicle maintenance and repair costs,
and provide an accident analysis, driver performance and an improved bottom line.
Power Generators Monitoring
Another innovation of TPL Trakker Limited is the introduction of C track Solo for
remote monitoring of power generators. The monitoring unit is installed in the
generator and the software delivers location and status reports, engine run hour
reports, alert notifications, maintenance reminders, service logs, history logs and
various other services.
The product will assist in monitoring fuel consumption of power generators,
improve effectiveness, efficiency and reduce cost by eliminating extra time and
labor involved to collect the meter reading.
Trakker has addressed the issue of utilization; fuel level monitoring and pilferage
with this product. By monitoring the fuel lid, secured by a sensor, the time of
opening is compared with the arrival of the refueling vehicle, and discrepancies are
notified. Moreover, fuel levels are pre-marked in the system, which are also sensed
and monitored.
This product is ideal for banks & financial institutions, generator rental companies,
telecommunication, oil & gas and corporate sector operating large and scattered
inventory of generators across the country and can now be easily monitored
through C-track Solo.
5.3.2 CONTAINER TRACKING SOLUTIONS
This segment of TPL business covers cargo tracking requirements of commercial
and military transporters. Our scope includes tracking and protecting transit,
Prospectus – TPL Trakker Limited
38
transshipment or any high value cargo against intrusion or pilferage. The product
used for container tracking utilizes both GSM and Satellite technology to provide
Estimated Time of Arrival (ETA) and location even in the remotest part of the
world. To date, the Company has provided tracking service to over 24,000
consignments.
5.3.2.1 Global Industry Overview:
Shipping container tracking is a subset of asset tracking and aims at securing assets
and increase operational efficiency. After 9/11, the tracking and monitoring of
shipping containers came in focus and now with the advancement in technology,
more than 80% of the international trade goods are carried by sea. The number of
tracking systems with GPRS or satellite communication for intermodal containers
in active use is forecasted to grow at a compound annual growth rate of 66.9
percent from 77,000 units at the end of 2011 to 1.0 million by 2016. The
penetration rate of remote tracking systems in the total population of intermodal
containers is estimated to increase from 0.4 percent in 2011 to 3.6 percent in 2016.
The container tracking solution incorporates data logging, satellite positioning and
data communication to back office application. At a high level, the infrastructure
for container tracking can be divided into four segments:
i. Container segment – All containers connected to the tracking solution need
to have a combined satellite positioning and wireless communication unit. The
unit can be of a range of form factors and may be connected to various sensors
and peripherals inside and outside of the container.
ii. GNSS segment – The real-time container tracking solution relies on public
global navigation satellite systems such as GPS, GLONASS, or in the near
future Galileo for accurate positioning of containers.
iii. Network segment – Wireless wide area networks are employed by the
container tracking solution for data transmission. GPRS mobile networks and
satellite communication are currently the most widely used systems.
iv. Back office segment – Behind a data communication gateway, a wide range
of standard and third party applications may have access to data from the
containers.
Through the tracking of containers, the inventory of goods is managed in real time
environment, cost of insurance premium is reduced, criminal, theft and other similar
incidents during transportation are transmitted to back office.
5.3.2.2 Container Tracking Solution in Pakistan
Pakistan Container Market Overview:
The Container port traffic (TEU: 20 foot equivalent units) in Pakistan was
2,058,056 in 2009, according to a World Bank report, published in 2010. Port
container traffic measures the flow of containers from land to sea transport modes.,
and vice versa, in twenty-foot equivalent units (TEUs), a standard-size container.
Data refer to coastal shipping as well as international journeys. Transshipment
traffic is counted as two lifts at the intermediate port (once to off-load and again as
an outbound lift) and includes empty units.
Prospectus – TPL Trakker Limited
39
The Container port traffic is expected to boost with the FBR taking keen interest in
monitoring the movement of containers from the port. TPL Trakker Limited has
been awarded the contract for providing the container monitoring service by FBR
and approximately 100,000 containers will be monitored annually through this
project, which will boost the container port traffic simultaneously.
5.3.2.3 Container Tracking Solution offered by TPL Trakker
Shippers/transporters want the ability to give their customers accurate information
on the whereabouts of their containers, in a seamless and efficient way.
Additionally, governments also want to ensure that duty-free and bonded cargo
destined to local dry ports or neighboring countries is safely and securely delivered
and that no „leakage‟ occurs during transit.
Importers also want the ability to ensure that goods they are importing into the
country arrive securely, complete and intact, with the ability to know WHEN they
will arrive and be ready for pick up.
TPL Trakker believes that container tracking is an exciting area for growth and has
thus entered into an agreement with GlobalTrak, a leader in the deployment of
container tracking and asset tracking solutions. Through this partnership, TPL
Trakker enhances its asset management and security solutions by incorporating
GlobalTrak world leading line of products and software to its existing product
portfolio. In 2010, TPL Trakker in partnership with GlobalTrak launched its in-
transit Tracking solutions for all container movements in Pakistan and Afghanistan.
Through this agreement TPL Trakker will provide 24x7 support, installation and
monitoring of container movement destined to Afghanistan. To date, TPL
Trakker has provided Tracking for over 24,000 consignments.
In 2011, TPL Trakker expanded its Container Tracking Solutions coverage to
Middle East providing companies associated with Marine industry the most
advanced solutions to meet the tracking requirements of the region.
5.3.3 LOCATION AND NAVIGATION SOLUTIONS
This segment of TPL business uses GPS technology for navigation products and
services. Products include portable navigation devices, in-dash infotainment
systems, Maps and advance location based services.
5.3.3.1 Global Industry Overview:
i. Overall Navigation Market:
Shipments of navigation devices worldwide have shown an increase from
2007 to 2012, with a compound annual growth rate (CAGR) of 22.5%,
according to a new forecast released by ABI Research1. Europe commands a
53% share of the global market since 2007, and has remained the primary
navigation devices market. However the Asian market shows the most rapid
growth with a CAGR of 27%.
1 http://www.berginsight.com/ShowReport.aspx?m_m=3&id=133
Prospectus – TPL Trakker Limited
40
ii. Personal Navigation Devices Market:
Recent research by In-Stat found the following: Worldwide unit
shipments of PNDs are expected to grow from 30.7 million units in 2007
to 68 million units in 2012.
PND manufacturers are integrating advanced functionality in PNDs in
order to improve the price/performance value.
iii. Mobile Navigation Market:
According to a new research report from the analyst firm Berg Insight, the
number of mobile subscribers using a turn-by-turn navigation service or
application on their handset grew 57 percent from H1-2009 to H1-2010 and
reached 44 million worldwide. The subscriber base is forecasted to grow at a
compound annual growth rate (CAGR) of 33.1 percent to reach 195 million
users worldwide in 2015.
5.3.3.2 Navigation Services Offered by TPL Trakker
TPL Trakker has recently introduced TrakkerNAV navigation software. The
product was first launched in 2009 for providing mobile navigation services.
Trakker has a well-experienced and qualified GIS team and field surveyors who
collect data and process it according to a well-defined specification. Due to the
dynamic nature of content, the team keeps the data updated with high frequency of
data collection. The constant feedback from our vehicle-tracking customers also
contributes to the data update process. TPL Trakker mapping team will be
constantly updating every map in every city making sure that the customer has the
most up to date map of the city. The data quality is in compliance to ISO 19100
(19113, 19114, 19115) quality standards with established set of quality plan.
Map Coverage:
With rigorous efforts of over so many years, the map coverage includes major
highways of Pakistan and road/street network of 120+ cities of Pakistan with over
150 more cities to be added shortly. Points of Interest data is currently over
600,000 and by end of the year 2012 will increase to 2 Million. Currently we have
3000 3D landmarks and will increase this to over 5000 by the end of this year.
TrakkerNAV offers an all-inclusive navigation experience and is a pioneer of
navigation in Pakistan.
TrakkerNAV extends its functionality outside the vehicle and allows pre-planning
of trips and sharing of information on the web and can also be used without GPS.
TrakkerNAV can be installed on a wide range of mobile phones (IPhone, Nokia,
Sony Ericsson, Motorola, Blackberry, HTC, HP) and PDA‟s. With high-end GPS
mobile navigation, 3D navigation view and clear voice instructions makes
TrakkerNAV a perfect navigation product. Trakker Nav and Sygic have partnered
to provide the application for online stores and for the past 2-3 months the
application has been on the top 10 ranking for Pakistan. TrakkerNAV also offers
corporate clients an opportunity to have their business location placed on the
Prospectus – TPL Trakker Limited
41
navigation map. For example one of the applications of TrakkerNAV is the ATM
finder, which directs the user to the closest ATM in the area.
TPL Trakker in February entered into an agreement with Toyota Pakistan to
become the supplier of OEM in dash navigation software. Under this agreement
TPL will provide Toyota training, KIOSKS, 24x7 hotline plus dedicated help desks
in each showroom. Toyota has given TPL a committed volume Purchase Order for
6,000 navigation installation to be done at Toyota Plant.
Navigation Solutions by TPL
In Dash ( In car Navigation)
PND ( Personal Navigation Device)
Mobile (Smart Phone Navigation Application)
a. In Dash Navigation:
TPL Trakker entered in IDN market 6 years ago and since has pioneered in
bringing in the latest technology in this segment. Some of the key features are:
Complete Navigation System and in-car entertainment system.
Advanced Search System
Optimal Route Calculation (Based on different algorithms)
Points of Interest search
Turn by Turn voice guidance
Covers 120 cities and all major highways in Pakistan.
Constant Data updates and inclusion on new POIs
b. Personal Navigation Device:
Personal Navigation Device segment is growing fast and for individuals or small
car owners who cannot afford the complete infotainment solution have opted for a
more economical PND. PND includes the same features and is mobile and can be
used in all vehicles.
c. Mobile Navigation:
TPL started its mobile navigation with Mobitrack in 2009 and since have managed
to lead this segment in Pakistan. The application is currently available on 2
platforms Android and IOS. Some of the features of the mobile applications are:
Live updates using mobile internet
Weather
Detailed 3D maps
Social Media sharing
Elevation model
Prospectus – TPL Trakker Limited
42
Apple Application Store:
The application is sold under the name of “Sygic & Trakker Nav “and is one of
most famous applications for Pakistan users of IPhone and IPad. This application
has been on the top 5 charts of app store for many months now. Some key
highlights on app store have been.
Top Paid application
Top Grossing
Top Most Reviews
Top Navigation Application in Pakistan
Top Most downloads by a paid application in Pakistan within a month.
Brief Financial Overview
TPL Trakker brief financial overview since its inception is illustrated in the
diagrams below:
Source: Annual Audited Accounts
*The Company incurred after tax loss of Rs. 9 million in 2009 due to deferred tax amounting to Rs. 16
million.
Source: Annual Audited Accounts
Prospectus – TPL Trakker Limited
43
Financial results from 2000 to March 2009 pertains to Trakker (Pvt.) Ltd, which in
pursuance to the Scheme of Arrangement described earlier, was converted into TPL
Trakker Limited and the Profit and Loss of 2009 is being considered on an
aggregate basis.
5.4 GROUP STRUCTURE (SUBSIDIARIES AND ASSOCIATE COMPANIES):
TPL Trakker Limited has the following subsidiaries and associates:
TPL Trakker owns
- 67.39% of TPL Direct Insurance Limited.
- 29% of Trakker Middle East LLC.
- 41% of TPL Properties (Pvt.) Limited.
- 99.99% of TPL Security Services (Pvt.) Limited.
5.4.1 TPL DIRECT INSURANCE LIMITED
TPL Direct Insurance Ltd (TDI) was launched in 2005, when TPL Trakker Ltd
(sponsor of TDI) acquired Jupiter Insurance Company Limited. TDI is the first
direct insurance company in Pakistan that differs with conventional companies by
offering 24 hour claims and underwriting services through a team of highly skilled
Call Centre officials, pioneering the concept of web based services to allow
customers to interact and retrieve progress of their insurance policies and claims.
Underwriting services includes providing premium quotations and explaining the
various products of motor and travel to the inbound call customers. TDI offers fair
and equitable premium rates that are determined on the basis of risk profiling done
by the leading firm of actuaries. The Company has the fastest claim settlement and
processing time and possesses a strong in-house risk inspection and survey
capability and therefore maintains the lowest claims processing and settlement time
in the entire industry – 60 seconds claims lodging, 45 minutes claim processing and
7 days claims settlement. It has strong rapport with the 3S dealers (authorized by
Prospectus – TPL Trakker Limited
44
the manufactures as dealers for sales, services and spare parts) and workshops that
ensures quality and timely repairs.
TDI started its operations with a focused approach towards increasing its business,
initially focusing on niches where it has an advantage. The car insurance sector
provides excellent synergies with its parent entity, providing a clear advantage to
the Company in this sector. This strategy coupled with the growth prospects of the
car insurance sector allowed the Company to accumulate critical mass. The
Company employs an actuarial based risk profiling mechanism for developing
customized rates for every customer. This not only helps the Company in arriving
at a judicious quote but also allows it to have a much better understanding of the
quality of risk being acquired. The use of tracking device as mandatory for most of
the current products allows the Company to have one of the lowest vehicle theft-
related claims in the industry.
The insurance industry is predominantly agency based. The agents are the main
source of business. TDI took a bold step by launching a direct company. This is
cost effective as well as allows the company to have a direct rapport with the
customer.
The Company recently got listed on the Karachi Stock Exchange (KSE) on 22
September 2011.
Direct insurance concept with value additions
The direct insurance concept offers the customers to interact directly with the
company for buying the insurance policy or lodging of claims. This eliminates the
need for the insurance broker or agent that is a common trait in the insurance
market. Further the direct operation also facilitates the customer to get insurance
quotes then and there, whether by calling at the Call Centre or the underwriters
directly.
5.4.1.1. Value Added Services for TDI Customers
TDI promotes Innovation and strives for service excellence. TDI has engineered
certain value added services that are not offered by any other insurance company in
Pakistan. The unprecedented services include, where applicable:
I. Free Usage of C Track Facility
As a part of risk management and also to render safety of the customers, TDI
installs C Track Unit in the insured vehicles that are under 3 years old. The
service is free of any charge or annual monitoring fees. TDI has chosen its
parent company i.e. TPL Trakker Ltd to be the service and product provider as
they are the best and largest tracking company in Pakistan.
II. 24 Hour Call Centre
TDI is the first insurance company to have launched a 24 hour Call Centre
manned by highly trained insurance officials. This is outsourced to TRG who
were the pioneers in introducing the Call Centre industry in Pakistan. The Call
Centre is fully equipped to handle sales, conduct outbound calls, fastest and
easiest claims recording, and arrangement for emergency services in Karachi
for free tow services.
Prospectus – TPL Trakker Limited
45
III. Instant Survey Capability
TDI has its own team of highly skilled in-house surveyors that renders instant
inspections and surveys, whilst other insurance companies heavily rely on third
party surveyors. TDI therefore registers fastest claims processing and
settlement capability.
IV. Authorized Workshops
All authorized workshop commonly known as 3S (dealers for sales, service and
spare parts) by the leading vehicle manufacturers are TDI‟s business partners.
This gives TDI‟s customers a priority treatment in the vehicle repairs and the
company ensures proper repairs with replacement of genuine parts, if any.
V. Free EVAC Membership (for Karachi)
TDI has recently introduced value added service by providing Road Side
Assistance through its wholly owned subsidiary EVAC Pakistan (Pvt) Ltd.
This service includes roadside assistance in the event of an Accident,
Mechanical Breakdown, Flat Tyre or Vehicle Running out of Petrol. EVAC
offers mobile workshop and tow service.
5.4.1.2. Strengths & achievements
First direct insurance company of Pakistan with over 15,000 customers.
First company to launch insurance cover with free usage of C-track.
First company to have 24 hour service manned by highly qualified Call Centre
outsourced to TRG.
First company to launch the Web Based policy
First company to launch policy that covers Theft and Third Party Liability
commonly known as 3T policy.
Fastest claim processing time in the industry i.e. 60 seconds claims lodging, 45
minutes processing and settlements within 7 days.
Only company in Pakistan using Risk Profiling specially developed by Actuaries
Sidat Hyder for premium rating.
New motor products introduced in the market
Big financial institutions have reposed trust in TDI and have joint label
agreements for providing cover to the customers of Dubai Islamic Bank,
Standard Chartered Bank and United Bank Ltd.
TDI is consecutively being conferred with the Brands of the Year Award for
best vehicle insurance company since 2007 by The Exhibitor with support from
FPCCI, PSQCA (Ministry of Science & Technology) and other bodies.
One of the lowest claims ratio at around 40%
Credit period remarkably at lowest < 10 days
A- rating by PACRA
Overseas Reinsurance with A rated companies.
Most comprehensive MIS and Actuarial analysis done for premium pricing.
Prospectus – TPL Trakker Limited
46
5.4.1.3. Products
TDI is a progressive insurer with reputation for creating better ways to understand
customers‟ needs. Many new products were introduced in the Auto insurance these
are detailed below:
TDI Auto Direct offers wide range of auto insurance solution especially tailored for
safety of vehicle and family. TDI Home Direct Insurance is designed to give
comfort and peace of mind. Home Direct plan provides wide range of insurance
packages covering fire to the personal property, with household items, furniture,
fixture and other valuables. TDI Travel Direct provides most affordable
comprehensive travel insurance packages that will make the trip hassle-free. With
just one phone call, TDI provides a complete range of products directly at doorstep.
TDI also offers multiple Bancassurance Direct options.
a) Auto Direct
TDI‟s Auto Direct offers wide range of auto insurance products as set-forth below:
i) Comprehensive Insurance:
This product covers vehicle on a comprehensive basis, covering damage, theft and
third party. This product offers free usage of C-Track Secure with no additional
charge of Annual Monitoring fee, and offers free use of EVAC services. ii) Comprehensive Insurance for used vehicles:
This product is specially tailored for 3 years or above old vehicles (excluding 4X4
& imported vehicles) with comprehensive cover at low rates. This product carries
special offer of Depreciation waiver on the first claim on parts applicable on the
first claim.
iii) Self Insurance:
This is comprehensive policy under which the customer assumes the claim if any
upto PkR.10,000 and avails discount upto 25% of the gross premium. Safe drivers
and those who use their vehicles sparingly can take advantage of Self Insurance.
iv) Executive Cover for vehicles having tracking device already installed:
This is comprehensive policy designed exclusively for existing Trakker customers
with “C-track” already installed in their vehicles. Such customers can get
refund/adjustment / discount of Annual Monitoring.
v) 3T Insurance:
The most affordable way to get auto insured at the lowest premium rates. The triple
covers include Theft cover, Third Party Insurance and Free usage of C-Track
Secure services.
vi) TDI – Senior Citizens:
TDI values senior citizens between (age group of 60 to 75 years) and offer special
discount of 20%. Option of any of the auto product can be taken, where applicable.
Prospectus – TPL Trakker Limited
47
vii) TDI – Lady Drivers (Comprehensive Policy for Working Women) Lady
Drivers:
This product is designed especially for working women in recognition of their
invaluable contribution to our economy and society. TDI offers 15% discount on
the auto products, where applicable.
b) TDI's Home Direct
It caters for protection of home from the peril of fire and burglary. Home Direct
Plan provides wide range of packages for every person. Cover offered from
Rs.0.5m to Rs.20m.
c) Cash and Jewellery Insurance
TDI offers three packages namely Silver, Gold and Platinum that provides
burglary, fire, atmospheric damage and snatch of cash and jewellery in the house as
well as outside the premises. The cover ranges from Rs.350,000 to 1,000,000 with
limits set forth for snatch cover outside the premises.
d) Bancassurance Direct
i. Secure Wallet Plan:
Secure Wallet Plan is a valuable insurance protection scheme. It is specifically
designed for customers holding Credit Cards to cater for unforeseen eventualities
such as:
Loss or theft of credit card(s) Loss or theft of keys and identification papers Death or disability (due to theft/robbery) ATM Cash Withdrawal Cover (due to theft/robbery)
ii. ATM Cash Withdrawal:
The insurance plan covers financial losses, damages and claims arising due to
snatching and robbery of cash withdrawn from any ATM, within the vicinity
iii. Credit Personal Accident Plan:
Provides insurance coverage for credit card holders, in case of permanent total
disability or accidental death of the Insured Person.
iv. Family Protection Plan:
This is a value added personal accident product which provides accidental death,
temporary and permanent total disability and limited medical coverage to bank‟s
account holders.
v. Purchase Protection Plan
When a Card member charges a covered purchase with his or her card account, the
Purchase Protection Plan protects that item for 60 days from the date of purchase if
it is stolen or accidentally damaged including vandalism.
Prospectus – TPL Trakker Limited
48
Brief Financial Overview
Source: Annual Audited Accounts for last five years ended December 2007-11.
5.4.1.1 EVAC PAKISTAN (PRIVATE) LIMITED
The company was incorporated on 5th December 2007 as a private limited company under
the Companies Ordinance, 1984. EVAC is the first company to render round the clock road
side assistance service in Karachi. This includes towing of the vehicle through its high tech
tow trucks. It also renders unique service of providing on the spot road assistance to the
vehicle in case of accident, mechanical or electrical breakdown, flat tyre, loss of keys,
drained battery etc. through a fully equipped Mobile Workshop. During the year 2009, TPL
Direct Insurance Limited acquired 100% shareholding of the Company. Authorized capital
of the company is Rs. 20 million with paid-up capital of Rs. 17.3m.
EVAC service is currently offered in Karachi only. Its operations are centered out of a
control room which is manned by trained call center official. EVAC has responder vehicles
and team on standby 24/7. The team comprises of well qualified technicians who not only
diagnose the problem but do their best to resolve it right there.
5.4.2 TPL SECURITY SERVICES (PVT.) LIMITED
TPL Trakker provides security and repossession services through its Company TPL
Security Services as an extension of its vehicle security and tracking services. TPL Security
Services benefits from significant synergies with TPL Trakker. TPL Security Services was
established in 2000. TPL Security Services maintains 38 Recovery Teams for immediate
nationwide deployment in response to customer needs. These teams provide comprehensive
coverage of Karachi, Hyderabad, Multan, Lahore, Faisalabad, Islamabad, Peshawar and all
motorways & highways. TPL Security Services teams are well armed and equipped with
state-of-the-art communication technology and IT tools, guided from TCR to exact
locations for repossession and recovery of vehicles.
TPL Security Services has witnessed a considerable growth in its business, as insurance
companies and financial institutions with auto finance divisions are increasingly seeking to
validate claims of theft and/or snatching. TPL Security Services‟ speedy recoveries and
analysis of missing vehicle claims lodged by clients have made it a popular resource for
many corporations attempting to deal with the growing menace of white collar crime. TPL
Security Services works hand in hand with repossession teams from financial institution to
identify the current location of the client‟s vehicle and subsequently its repossession.
Prospectus – TPL Trakker Limited
49
5.4.3 TRAKKER MIDDLE EAST LLC
Industry Overview:
Middle East still promises to be an increasing market for the fleet management and vehicle
tracking industry. Not only does the booming regional economy host many large
corporations owning vehicle fleets, it is also the place of origin for several oil and gas
companies which rely on light and heavy commercial vehicles to transport fuel. Such
entities require efficient and safe handling of their mobile assets. Additionally the Middle
East‟s many car rental companies are fitting their cars with GPS/GPRS satellite tracking
units to prevent car theft. These car rental companies are increasingly relying on fleet
management and tracking devices as cost effective and efficient methods in the monitoring
and recovery of vehicles.
Trakker Middle East:
After its success in Pakistan, in 2005 TPL Trakker launched its vehicle tracking, vehicle
recovery, fleet management and portfolio management services in UAE as Trakker Middle
East (“TME”). TME was established in partnership with two prominent Middle Eastern
groups; UAE Offsets Group/Mubadala and Al Jaber Group. TME is the sole distributor for
DigiCore International (South Africa) in the Middle East (excluding Saudi Arabia) and has
been given the responsibility to establish the required infrastructure to sell and support C-
track products in United Arab Emirates. Further strength is achieved from Trakker Middle
East, offering state-of-the-art mobile asset tracking and fleet management services to
customers since 2005 and today proudly managing over 18,000 in UAE and growing. Since
2005, more than 20 players have entered the market, but only a few have become active
due to TME‟s strong market position. Although TME‟s products are more expensive than
competitors it has been successful primarily due to the fact that TME has kept its
commitment in providing top quality industry standards in the following areas:
24x7x365 call center
Round the clock installation options
Customized reports
Good brand equity with corporate customers
Approximately 30 car hire companies in the UAE have already installed C-track in their
vehicles (100 units on average per client). Sharjah-based Solo Rent-a-Car, for example, has
employed their C-track systems in the recovery of three of their stolen vehicles. The
increased incidents of thieves posing as clients in the Middle East is one of the driving
factors leading to a greater number of car rental companies using tracking devices. There
have been many reported occurrences of rented cars that are stolen and then subsequently
shipped to places such as Russia, North Africa and Eastern Europe, and tracking devices
such as C-track provide effective solutions to such security concerns.
Private clients in the United Arab Emirates are also resorting to C-track tracking systems to
protect their luxury cars and trucks. Sharjah Municipality and Al Wathba have been
supplied with C-track units for over 3000 vehicles. As a result insurance companies are also
beginning to offer special rates to individuals or companies that have C-track devices
installed, as tracking devices have the potential to reduce car theft and vandalism claims
from customers.
Prospectus – TPL Trakker Limited
50
Being the sole distributor of C-track in the Middle East (excluding Saudi Arabia), TME is
looking to expand to a number of countries in the GCC and is planning to enter the Saudi
market in 2013. Through the success that TME has had in the UAE, Abu Dhabi Company
for Onshore Oil Operations, Aman Municipality and Abu Khatar Group of Jordan are
negotiating orders for approximately 2,000-3,000 units from TME over the next two years.
Going forward TME plans to aggressively target 4 main areas to gain market share:
Dealer network - TME will launch a comprehensive dealer strategy which will involve
training sessions for dealers, commission based sales, dedicated sales staff at
dealerships, constant feedback and monthly refresher training to be conducted for the
first 6 months
Insurance Network - TME will target the larger players in the auto insurance, and
work with them to reduce the chance of theft and fraud. Additionally, Insured clients‟
list to be targeted for outbound marketing by TME Sales Team. Target will be vehicles
worth above AED 100,000
Financial Institutions - With tough financial conditions, Auto loans are now taking
longer for approval and disbursement. Right time to offer C-track as an asset tracker as
well as innovative source of recovery of monthly rentals. Banks can lower their lending
rate as with C-track, their asset is less exposed to delinquency / fraud.
Free Trial Offer - Free trial offers to corporate over a 2 month period. TME expects to
generate substantial positive feedback and increased awareness.
Additionally TME will launch a complete marketing campaign including; traffic updates on
radio, front page banner ads, C-track articles in print media, advertisements in malls, mail
shots, internet marketing and SMS marketing to increase sales and awareness.
Brief Financial Overview
Source: Annual Audited Accounts for last five years ended December 2007-11
5.4.4 TPL PROPERTIES (PVT) LIMITED
TPL Properties is the real estate arm of TPL Holdings. Currently, TPL Properties is
constructing a project at KPT Interchange on Shaheed-e-Millat Expressway, Karachi,
namely Centre Point.
Prospectus – TPL Trakker Limited
51
Centrepoint is designed by the region‟s leading team of professionals as a 385 ft high,
landmark in Karachi‟s architecture. The 28 storeys project is being constructed on 26,226
sq.ft. (2,914 sq.yds.) of land and it will offer 196,618 sq.ft. of rentable space (total project
area: 352,662 sq.ft.) The building offers state of the art facilities, including built in IT
infrastructure, international standards of security and fire safety, 9 floors of dedicated
parking, and in-house independent power generation. Additionally, Centrepoint will feature
a health club, swimming pool, coffee bar, cafeteria and luxurious reception spaces making
it an ideal rental choice for high end corporations.
For the construction of the project, a $20 million loan was received from the Overseas
Private Investment Corporation (OPIC). With this loan, TPL Properties expects to complete
construction of the Centrepoint office building in central Karachi in 2012, and will then
begin leasing space to large local and multinational organizations.
The Company has completed 92% of the structural work of Centrepoint, its first real estate
project. The project is designed exclusively as a modern office complex with the latest in-
house infrastructure facilities ideal for large local and multinational corporations.
TPL Properties has formed a wholly owned subsidiary under the proposed name of
Centrepoint Management Services (Pvt.) Limited (“CMS”), which will be the owner of
power generating facilities and will be responsible for building maintenance, whereas, TPL
Properties will own the land and building structure and other equipment. TPL Properties
and CMS will enter into separate agreements with tenants for rental and provision of
building maintenance services/electricity respectively.
TPL Properties has engaged the leading local and international team of consultants to
ensure timely completion of the project which has been graded “PG3+” jointly by PACRA
(formerly Fitch IBCA) and NESPAK. This is the highest grading given by them to a real
estate project in Pakistan and implies good project execution capability and good prospects
of timely completion and transfer of ownership as per terms.
TPL Properties is following a build, rent out and operate model and intends to exit through
REIT or listing of the development company within 4 - 5 years.
Brief Financial Overview:
Source: Annual Audited Accounts for year ended June 2010-11 and interim review of six months ended
December 2011.
Prospectus – TPL Trakker Limited
52
5.5 GROUP FINANCIAL OVERVIEW
The chart below depicts the audited consolidated group revenue; profit before and after tax
and EBITDA for the year ended 30 June2011 and group equity and assets as at 30 June
2011.
Source: Annual Consolidated Audited Accounts for the year ended 30 June 2011
5.6 FUTURE PROSPECTS
5.6.1 ASSET TRACKING SOLUTIONS
New advance Fleet Management Solution for Oil & Gas sector:
TPL after the success of the world renowned fleet management solution has now launched
IVMS (In vehicle Monitoring System) for oil and gas industry. This new product complies
with HSSE standards and is one of the most advance systems for monitoring driver
behavior and ensuring safety while delivering highly flammable products.
Personnel Tracking:
TPL Trakker is bringing in the smallest personnel tracking system in Pakistan for tracking
field force for efficiency and safety. This product is currently being tested in TPL Labs and
promises to bring the most advanced tracking technology in a small enclosure. This product
will be launched in July 2012.
5.6.2 CONTAINER TRACKING SOLUTION
Container Tracking Solution Business Expansion:
After the success in Pakistan TPL will be opening up new markets to cater to the increasing
demand for tracking cargo in middle east and Afghanistan . Offices will be setup in
Afghanistan to assist both commercial and military projects. Furthermore CIS region
expansion has become vital to support Afghan Transit Trade from northern routes.
TPL with its tracking solution for custom agencies has already been approached by Dubai
Customs and Afghanistan Custom Agency. Both have shown interest in solutions offered
Prospectus – TPL Trakker Limited
53
by TPL to monitor duty evasion, pilferage of transit cargo and ensure compliance by
transporters and importers.
5.6.3 LOCATION AND NAVIGATION SOLUTIONS
After the success of Trakker Nav, TPL plans to expand its product portfolio and coverage
to reach out to the masses and bringing in innovative products and coverage expansion to
the remotest places of the country.
4th
Generation connected Navigation:
With the world moving towards connected technology inside the car TPL is the first one to
be there and currently testing the most advanced computer technology to provide drivers
with the real time internet, email, weather, traffic and maps even on the move. TPL plans to
launch its connected navigation technology by September 2012.
Launch with Urdu and local languages:
For the first time in Pakistan TPL will be launching its navigation with Urdu and other
famous local languages. After detailed research and development TPL believes it will bring
in the features of a localized version which will be able to cater to all types of drivers. The
Urdu version will be available in June 2012.
Coverage Expansion:
Pakistan‟s land area is 803,940 Sq Km and TPL Plans on Mapping 80% of land mass by
end of year 2013. The largest database of POI‟s of over 2 Million by end of this year will
make TPL the strongest player in the country.
5.6.4 INTERNATIONAL OPERATIONS
TPL Trakker plans to expand its operations in Qatar, Jordan, Egypt, Oman, Afghanistan
and Sri Lanka.
5.7 RISK FACTORS
The Company wishes to highlight the following major risk factors, which may affect the
profitability of the Company:
5.7.1 BUSINESS RISK
The Company‟s performance outlook, market activity and the larger economic picture
influence the price of its stock. When the economy is expanding, the outlook for many
companies will be good and the value of their stocks should rise. The opposite is also true.
Usually, the greater the potential reward, the greater would be the risk. For small
companies, startups, resource companies and companies in emerging sectors, the risks and
potential rewards are usually greater. Performance of the Company may also be affected
due to unexpected shortfalls in the information technology infrastructure and inadequate
risk management by the back office.
MITIGANT
The Company is expected to mitigate the impact of business risk by employing adequate
risk management measures to ensure that exposures remain within prudent limits. In
addition, disaster recovery plans should help mitigate the impact of risk arising from failure
Prospectus – TPL Trakker Limited
54
of information technology infrastructure. Corporate governance measures shall also be
employed to further facilitate this effort.
5.7.2 EXPANSION RISK
The Company‟s strategy includes expansion by continuing to develop products to
supplement its existing core and related businesses. These include; vehicle tracking
services, asset tracking service, container tracking products for Pakistan Customs and
navigation products for automobile and mobile sector. The risk is that the Company may be
expanding too fast.
MITIGANT
Management is cautious of the risks associated with the aggressive expansion plans set
forth by the Company. To mitigate the risk, the management has taken appropriate
measures.
5.7.3 COMPETITION RISK
TPL Trakker currently dominates the asset tracking service industry in Pakistan and is the
leading service provider in the areas of vehicle tracking, fleet management, portfolio
management and vehicle recovery services. Notwithstanding the market leader position of
the Company, the entry of a new player(s) with the direct or indirect support of an
international player might enhance the level of competition in the industry in the long run
and affect Company‟s market share in future.
MITIGANT
While there is threat of new entrants, TPL Trakker‟s strong brand recognition, market
know-how and superior IT and support infrastructure which has enabled it to beat the
competition and enjoy a dominant position in the asset tracking service market in Pakistan.
Any new entrant into asset tracking service market in Pakistan at this stage or in future will
have to make substantial investment of resources and of time to match Company‟s
infrastructure.
5.7.4 INFLATION RISK
The Company is open to inflation risk like that of the whole economy. Inflation risk may be
translated to erosion of values vis-à-vis foreign currency exchange fluctuations. There is a
possibility that the value of assets or income of the Company may decline as increasing
inflation shrinks the purchasing power of the Pakistan Rupee.
MITIGANT
The anticipated inflation is not likely to be a serious risk to the operations of the Company.
The Company is well placed to manage its inflation risk due to effective risk management,
future expansion plans in international markets and introduction of innovative products.
5.7.5 SHARE MARKET PRICE RISK
This is the risk that the share price of the Company may decline due to bearish trends at the
Stock Exchange. In addition, the risk can get amplified if the Company fails to maintain
satisfactory growth.
Prospectus – TPL Trakker Limited
55
MITIGANT
This risk is mitigated by impressive growth performance of the Company. Expansion of
Company‟s asset tracking services will ensure that the growth momentum is maintained
and the share price offers an attractive return to potential investors.
5.7.6 LIQUIDITY RISK
The investors assume the risk that they will not be able to sell the shares in the secondary
market without adversely affecting the market price.
MITIGANT
Ordinary shares are proposed to be listed on KSE which would enable the investors to trade
their shares.
5.7.7 CAPITAL MARKET RISK
The shares of TPL Trakker will be listed on the KSE and the shareholders of the Company
will be able to sell or buy shares only through the members of the KSE subsequent to the
Public Issue. Price of shares will depend on the stock market behavior and performance of
the Company. Hence, price may rise or fall and result in increase or decrease in the value of
shares.
MITIGANT
The Company is likely to perform well in the future due to its growing client base, strong
brand name, experienced management and use of superior technology. Improvement in
overall performance of the Company will result in higher returns to investors.
5.7.8 UNDER SUBSCRIPTION RISK
This is the risk that the Public Issue may get under-subscribed on account of lack of
investors‟ interest.
MITIGANT
The issue is attractively priced at PKR 10/- per share. The Company has an impressive
brand image. The probability of under-subscription is therefore considered low. The public
issue is fully underwritten by commercial banks and other financial institutions.
5.7.9 TECHNOLOGY OBSOLESENCE RISK
This is the risk that the technology being used by the Company for asset tracking becomes
obsolete due to continuous advancement in the technological sector globally.
MITIGANT
The company has established a Research and Development department which is
continuously developing new products to meet the needs of the tracking. Further, the
Company is in the business of tracking for more than a decade and has always developed
new products to cater the tracking needs of the customers.
5.7.10 REGULATORY RISK
This is the risk that the Company does not adhere to the regulatory requirements of the
regulatory bodies.
Prospectus – TPL Trakker Limited
56
MITIGANT
The Company always ensures that it complies with the regulatory requirements. However,
Pakistan has witnessed a continued phase of economic growth, supported inter alia, by
continuity in investment & economic growth friendly policies. This regime is expected to
continue and adverse shift in the regulatory and policy framework is considered unlikely.
5.7.11 LAW AND ORDER RISK
This is the risk that the law and order situation deteriorates due to any unforeseen event in
the Country.
MITIGANT
The industry that the business operates in is fairly insulated from law and order issues. On
the contrary, worsening law and order has to date not reduced business.
5.7.12 RISK DUE TO PENDING LITIGATION
This is the risk that the petitions filed against the Company are decided against it and the
Company has to pay monetary claims to the petitioner.
MITIGANT
The financial quantum of the risk is kept at Rs. 12 million. The Company through its
internally generated resources can easily meet this commitment if the cases are decided
against it.
NOTE: IT IS STATED THAT ALL MATERIAL RISK FACTORS HAVE BEEN
DISCLOSED AND THAT NOTHING HAS BEEN CONCEALED IN THIS
RESPECT.
Prospectus – TPL Trakker Limited
57
PART 6
6 FINANCIAL INFORMATION
6.1 AUDITORS REPORT UNDER SECTION 53(1) READ WITH CLAUSE 28(1) OF
SECTION 2 OF PART I OF THE SECOND SCHEDULE TO THE COMPANIES
ORDINANCE, 1984 FOR THE PURPOSE OF INCLUSION IN THE PROSPECTUS
OF TPL TRAKKER LIMITED
Prospectus – TPL Trakker Limited
58
Prospectus – TPL Trakker Limited
59
Prospectus – TPL Trakker Limited
60
Prospectus – TPL Trakker Limited
61
Prospectus – TPL Trakker Limited
62
Prospectus – TPL Trakker Limited
63
Prospectus – TPL Trakker Limited
64
Prospectus – TPL Trakker Limited
65
Prospectus – TPL Trakker Limited
66
Prospectus – TPL Trakker Limited
67
Prospectus – TPL Trakker Limited
68
Prospectus – TPL Trakker Limited
69
Prospectus – TPL Trakker Limited
70
Prospectus – TPL Trakker Limited
71
Prospectus – TPL Trakker Limited
72
Prospectus – TPL Trakker Limited
73
Prospectus – TPL Trakker Limited
74
6.2 SHARE BREAK-UP VALUE CERTIFICATE
Prospectus – TPL Trakker Limited
75
Management Note
The revised break-up value of the Company on the basis of post-IPO paid up capital is
given below:
Issued, subscribed & paid-up capital 2,172,489,630
Revenue reserve – un-appropriated profit 199,135,798
Total Shareholders‟ Equity 2,371,625,428
Number of Ordinary Shares 217,248,963
Breakup Value per Share of PKR 10/- 10.92
Prospectus – TPL Trakker Limited
76
6.3 AUDITORS CERTIFICATE ON ISSUED, SUBSCRIBED, AND PAID-UP-
CAPITAL OF THE COMPANY
Prospectus – TPL Trakker Limited
77
6.4 SUMMARY FINANCIAL HIGHLIGHT FOR THE PRECEDING YEARS
*Note: The Company was incorporated on December 04, 2008, therefore highlights from FY 09, to
Dec 2011, have been disclosed.
6.5 FINANCIAL RATIOS FOR THE PRECEDING YEARS
in 000’s FY09* FY10 FY11
Half year
ended
Dec. 2011
Total Paidup Capital 1,872,489 1,872,489 1,872,489 1,872,489
Reserves 27,481 86,286 178,555 199,136
Total Equity 1,899,970 1,958,775 2,051,044 2,071,625
Current Assets 827,406 939,798 1,100,433 1,090,655
Non-Current Assets 2,470,348 2,459,660 2,491,397 2,474,809
Total Assets 3,297,755 3,399,459 3,591,830 3,565,465
Total Liabilities 1,397,784 1,440,683 1,540,785 1,493,839
Net Sales 213,773 821,546 832,523 440,723
Profit / (Loss) Before Tax 38,841 89,853 125,466 31,973
Profit / (Loss) After Tax 27,480 58,805 92,268 20,580
FY09 FY10 FY11 Dec. 2011 (HY)
RoE (%) 1.45 3.00 4.50 1.00
RoA (%) 0.83 1.73 2.57 0.58
EPS (PKR) 0.34 0.31 0.49 0.11
BVPS (PKR) 10.15 10.46 10.95 11.06
Prospectus – TPL Trakker Limited
78
PART 7
7 MANAGEMENT
7.1 BOARD OF DIRECTORS OF THE COMPANY
Sr.
No. Name & Address Designation Directorship in Other Companies
1)
Mr. Jameel Yusuf S.St.
39-K, Block-6, PECHS, Karachi
Chairman / Director
TPL Holdings (Pvt) Ltd
TPL Direct Insurance Ltd
TPL Properties (Pvt.) Ltd
2)
Mr. Mohammad Ali Jameel
39-K, Block-6, PECHS, Karachi
CEO / Deemed
Director
TPL Holdings (Pvt.) Ltd
TPL Direct Insurance Ltd
TPL Properties (Pvt.) Ltd
TPL Security Services (Pvt.) Ltd
TPL Financial Consultancy (Pvt.)
Ltd
Trakker Energy (Pvt.) Ltd
Habib Asset Management Limited
TRG Pakistan Limited
Genco Holdings (Pvt) Ltd
3)
Mr. Saad Nissar
172-B Tariq Road,
2nd floor, Najeeb Centre, Karachi
Director TPL Direct Insurance Limited
EVAC Pakistan (Pvt.) Limited
4)
Mr. Hussein Mohammad Ali
Bhai
Razaque Limited
255 Duncan Mill Road, Suite #
605, Don Mills Ontario M3B 3H9,
Toronto, Canada
Director
Razzaque Limited, Canada
Razzaque Razno Trading (Pvt.) Ltd
5)
Mr. Murtaza Ali Bhai
255 Duncan Mill Road, Suite #
605, Don Mills Ontario M3B 3H9,
Toronto, Canada
Director Razzaque Limited, Canada
Razzaque Razno Trading (Pvt.) Ltd
6)
Mr. Barend Christoffel
Esterhuyzen
Digicore International (Pty) Ltd
9 Regency Drive, Route 21
Corporate Park, Irene Ext 30,
Centurion, South Africa
Director
DigiCore Holdings Ltd, South
Africa
Luna Holdings, United States
7)
Mr. Stuart Aberdein
Digicore International (Pty) Ltd
9 Regency Drive, Route 21
Corporate Park, Irene Ext 30,
Centurion, South Africa
Director
DigiCore Holdings Ltd, South
Africa
DigiCore Electronics (Pty) Ltd,
South Africa
8)
Mr. Mustafa Ali
39-K, Block-6, PECHS, Karachi
Company Secretary
/ Director
TPL Direct Insurance Ltd
TPL Properties (Pvt.) Ltd
Prospectus – TPL Trakker Limited
79
7.1.1 Out of 7 elected directors, 5 directors (mentioned at Sr. no. 1, 3 to 5 & 8) are nominees of
TPL Holdings (Pvt) Ltd and 2 directors (mentioned at Sr no 6 & 7)are nominees of
Digicore International (Pty) Limited, South Africa.
7.2 OVER DUE LOANS
There are no overdue loans (local or foreign currency) on the Company or its Directors.
7.3 DIVIDEND PAYOUT BY GROUP LISTED COMPANIES
TPL Direct Insurance Limited is the only Group Company of TPL Trakker which is listed
on the Karachi Stock Exchange. TPL Direct Insurance Limited was listed at KSE in
September 2011. TPL Direct Insurance has announced a 5% cash dividend in the board
meeting held on March 5th, 2012. The book closure of the company is 20
th April, 2012. The
market price of TPL Direct Insurance Limited stood at Rs. 11.23.as on 19th April 2012..
7.4 PROFILE OF DIRECTORS
Mr. Jameel Yusuf S.St. – Chairman
Mr. Jameel Yusuf Ahmed is a businessman by profession and is the chairman of TPL
Holdings. He was the founder Chairman of Citizen-Police Liaison Committee (CPLC), and
remained its Chairman from 1st September 1989 to 22
nd March 2003. The CPLC was
established by the Sindh Government after amending the Police Rules. It is a non-political
statuary institution, operationally independent and managed by dedicated and concerned
citizens offering their honorary services, invested with powers of Magistrate (Honorary) of
the first class. Since its inception in 1989 it has made credible strides with envious
achievements in assisting the victims of crime in the provision of justice and combating /
detecting criminal cases successfully with the help of the community and access to modern
scientific techniques. He is also the Director of Asia Crime Prevention Foundation (ACPF), Japan since 1997 and
is the founding trustee of “PANAH” a shelter home established for women in distress
within the Ida-Rieu premises and now within the Ex-Darul-Aman premises handed over to
Panah Trust by the Government of Sindh, Karachi. Mr. Yusuf is a member, Advisory
council Fellowship Fund for Pakistan (FFFP), Woodrow Wilson International Centre for
Scholars (WWC) since 2004.
Mr. Yusuf was awarded Presidential Award “Sitar-e-Shujaat (S.St.)” for gallantry services
on 14th August, 1992. He was awarded many National and International awards, as well as
being nominated for the First United Nations Vienna Civil Society Award in 1999.
Mr. Mohammad Ali Jameel – CEO & Deemed Director
Mr. Ali Jameel is the CEO of TPL Trakker Ltd., Pakistan's first vehicle tracking Company.
He is also the Director of TRG Pakistan Limited. Formerly, Mr. Jameel was the Chief
Executive of Jahangir Siddiqui Investment Bank. He is a also member of Executive
Committee, Board of Investment, Economic Advisory Council (EAC), the Reform Co-
ordination Group (TRCG) of FBR, Advisory Committee of the Federal Tax Ombudsman
and Genco Holding Company. He has also held several advisory posts in the Pakistan‟s
information technology and telecommunication sectors, including appointments on the
Task Force on Telecom Deregulation, the Fiscal Incentives group on the IT Commission
and the Task Force on Venture Capital.
Mr. Jameel received his B.Sc. degree in Economics from the London School of Economics.
He is also an Associate Member of the Institute of Chartered Accountants in England &
Wales and qualified in 1994 at KPMG Peat Marwick in London.
Prospectus – TPL Trakker Limited
80
Mr. Saad Nissar – Director
Mr. Saad Nissar is an experienced marketing professional. He joined TPL Trakker Limited
in the year 2000 as National Sales Manager. Mr. Nissar has been instrumental in the setting
up and executing retail network nationwide, successful packaging and promoting of fleet
management and portfolio management services in the corporate sector and Financial
Institution Group (FIG) of Pakistan respectively. Mr. Nissar was appointed as Director of
TPL Direct Insurance Limited effective July 2005 and assumed the position of CEO of TPL
Direct Insurance Limited. Mr. Nissar holds MBA degree in Marketing from Institute of
Business Administration.
Mr. Mustafa Ali – Director
Mr. Mustafa Ali is a qualified Cost and Management Accountant with over 10 years of
experience in construction and automobile sector. He started his career in 1991 as Manager
Finance & Administration in Baltistan Trading & Contracting Co. (Pvt.) Ltd. In 2000, he
joined, Ghandhara Nissan Diesel Ltd. as Manager Finance before joining Trakker Group in
2001 as Finance Manager. Under his supervision, Trakker has maintained a sound financial
position despite the multifaceted nature of its services. Currently he is serving as Vice
President Finance in TPL Holdings.
Mr. Murtaza Ali Bhai - Director
Mr. Murtaza Ali Bhai is a Cost and Management accountant from UK and Canada. He is a
businessman by profession and has valuable experience for trading and transportation
business since 1970. Mr. Ali Bhai was born in Africa and then migrated to Pakistan,
associated with various types of businesses which includes imports and industrial
commodities, he is also the Director of Razzaque Limited and Razzaque Razno Trading
(Pvt) Limited.
Mr. Hussein Ali Bhai - Director
Mr. Hussein Ali Bhai, a businessman by profession since 1969, born in Africa and then
migrated to Pakistan. Mr. Ali Bhai is associated with various types of businesses which
includes imports and industrial commodities, he is also the Director of Razzaque Limited
and Razzaque Razno Trading (Pvt) Limited.
Mr. Stuart Robin Aberdein - Director
Mr. Stuart is bachelors in Business Science. After completing his studies at the University
of Cape Town, Stuart served articles with Spencer Steward in Cape Town. He then worked
for 10 months as an audit senior for Binder Hamlyn in London in 1984 and 1985. He joined
Kivtronics as Managing Director in 1986 and was appointed a director of DigiCore
Holdings after Kivtronics was bought by that company prior to its listing on the JSE in
1998.
He is currently working as Managing Director of DigiCore Electronics (Pty) Ltd. and an
Executive Director of DigiCore Holdings Ltd.
Mr. Barend Christoffel - Director
Mr. Barend as an entrepreneur established, controlled and actively managed various
companies in diverse industries over the past 30 years. He has chaired and/or served on
boards of various companies over the years; including the JSE & Luxembourg listed SAIL
Prospectus – TPL Trakker Limited
81
Group Limited for which he was executive Chairman until 2003 and JSE listed companies,
DigiCore Holdings Limited and Sallies Limited, amongst other.
Mr. Barend has in chief executive capacity successfully led various management teams of
different cultures in the day to day management of businesses spanning various countries
over the years.
He currently serves as the Group managing director for DigiCore, with special focus on
acquisitions and building the international business.
7.5 PROFILE OF OTHER KEY MANAGEMENT PERSONNEL
Mr. Ahsan Sarwar – Executive Director
Mr. Ahsan Sarwar has been associated with TPL Trakker Limited since April 2000. He is
currently heading the Operations of TPL Trakker as Executive Director. Having extensive
experience of Customer Services and Call Centre, he also holds a Bachelor degree in
Commerce.
Mr. Sarwar is skilled in analyzing existing operations and implementing the strategies,
processes and technologies for improved efficiency. An energetic, multi-tasking manager
with extensive knowledge in directing operations, his expertise are in developing strong
customer / employee relationships leading to increased business productivity and
profitability.
Mr. Adnan Khandwala – Chief Financial Officer (CFO)
Mr. Adnan Khandwala is a qualified Chartered Accountant with over 10 years of
experience in automobile, textile and service sector. He completed his articles from Ernst &
Young Ford Rhodes Sidat Hyder Chartered Accountants and started his career in 2005 as
Manager Finance in AB Engineering. (Pvt.) Ltd. In 2006, he joined Artistic Garment
Industries (Pvt) Ltd. as Chief Internal Auditor before joining TPL Trakker in 2007 as AVP
Finance.
Mr. Muhammad Umair – Head of IT
Mr. Muhammad Umair oversees Company‟s IT team for major IT Projects, providing
strategic direction and management for the company‟s IT infrastructure. He leads a team of
IT professionals who are delivering the long term solutions of software and networks for
TPL.
Mr. Umair has more than 12 years of experience leading large-scale IT Organization.
Before joining TPL, Muhammad Umair was S. Manager of Takaful Pakistan, where he
oversaw corporate information technology services for the company‟s national and
international offices.
Mr. Umair holds a bachelor‟s degree from Sir Syed University of Engineering &
Technology in electronics and MS Networking.
Mr. Faheem Ur Rehman – Head of Technical
Mr. Faheem ur Rahman is a highly skilled and dedicated engineering professional having
15 years of experience in Quality Management, Computerized Maintenance Management
System (CMMS), Plant Erection and Production Management in Hino Motors, Phillips
Whirlpool, Unilever Pakistan Ltd. and TPL Trakker Ltd. He holds a 4 years specialized
diploma from Pak Swiss Training Centre with the capacity of Instrumentation and Dies &
Mould Technology. Also he has done a Bachelor degree in Computer Sciences, Strong
desire to work and excel further using professional and analytical expertise.
Prospectus – TPL Trakker Limited
82
Mr. Waqar Mohammad – Head of Sales
Mr. Waqar Mohammad holds a degree in Mechanical Engineering and MBA. He has over
16 years of diversified sales experience. A result oriented sales professional with talent to
identify gaps and develop relevant strategies to maximize growth and company's top line.
He has been part of two successful launch teams in Telenor and wi-tribe. Before joining
TPL trakker, he was head of retail sales in wi-tribe.
Mr. Furqan Saeed Khan – Vice President Operations
Mr. Furqan Saeed Khan has been associated with TPL Trakker since April 2008. He is
bachelors in Business Studies. As an Operations / Customer Care professional for over 18
years, with high-level management experience in various industries including BPO,
Insurance , Manufacturing and Services in Pakistan, UAE and UK, Mr. Khan specializes in
process re-engineering and adept at managing all levels of operations and infrastructure
from needs assessment through implementation with an aptitude for strategic thought and
planning, and the ability to enhance services through automation processing which has
allowed him to achieve consistent and significant successes in multiple industries.
He further specializes in Call Center Solutions, CRM‟s and Data Management Tools which
gives him a cutting edge in backend and front end operational management
7.6 NUMBER OF DIRECTORS
Pursuant to Section 174 of the Companies Ordinance, 1984 the Company shall not be less
than seven directors. At present the Board consists of 7 Directors, and the Chief Executive
Officer.
7.7 QUALIFICATION OF DIRECTORS
No qualification shares are prescribed for becoming a director of the Company. However,
as per section 187 of the Ordinance, the director is to be a member of the Company. This
condition does not apply to the nominee directors.
7.8 REMUNERATION OF THE DIRECTORS
No remuneration is payable to non-Executive Directors. However, Executive Directors,
performing whole time duties, are paid remuneration as per the approval by the Board of
Directors.
7.9 BENEFITS TO PROMOTERS AND OFFICERS
No amount of benefits has been paid or given during the last year or is intended to be paid
or given to any promoter or to any officer of the Company other than as remuneration for
services rendered as whole-time executive of the Company.
7.10 INTEREST OF DIRECTORS
The directors may be deemed to be interested to the extent of fees payable to them for
attending Board meetings. The Directors performing whole time services in the Company
may also be deemed interested in the remuneration payable to them by the Company.
The nominee directors have interest in the Company to the extent of representing the
sponsors in the capital of the Company.
Prospectus – TPL Trakker Limited
83
7.11 INTEREST OF DIRECTORS IN PROPERTY ACQUIRED BY THE COMPANY
None of the Directors of the Company had or has any interest in any property acquired by
the Company or proposed to be acquired by the Company.
7.12 ELECTION OF DIRECTORS
The Directors of the Company are elected for a term of three years in accordance with the
procedure laid down in section 178 of the Ordinance.
The Directors shall comply with the provisions of Sections 174 to 178 and Sections 180
and 184 relating to the election of Directors and matters ancillary thereto.
Subject to the provisions of the Ordinance, the Company may from time to time increase or
decrease the number of Directors.
Any casual vacancy occurring on the Board of Directors may be filled up by the Directors,
but the person so appointed shall be subject to retirement at the same time as if he/she had
become a Director on the day on which the Director in whose place he/she is chosen was
last elected as Director.
The Company may remove a Director in accordance with the provisions of the Ordinance.
Three Directors of the Company were elected on 29 June, 2009 for term of three (3) years
(when the Company was a private Company). Four directors have been co-opted on 19
October, 2009, to comply with the requirement of the Ordinance. The term of the Board of
Directors will expire on June 28, 2012.
7.13 VOTING RIGHTS
At any general meeting, a resolution put to the vote of the meeting shall, unless a poll is
demanded, be decided on a show of hands unless a poll is (before or on the declaration of
the result of the show of hands) demanded. Unless a poll is so demanded, a declaration by
the chairman that s resolution has, on a show of hands, been carried, or carried
unanimously, or by a particular majority, or lost, and an entry to that effect in the book of
the proceedings of the Company shall be conclusive evidence of the fact, without proof of
the number or proportion of the votes recorded in favour of, or against, that resolution.
A poll may be demanded only in accordance with the provision of section 167 of the
Ordinance. If a poll is duly demanded, it shall be taken in accordance with the manner laid
down in section 168 of the Ordinance and the result of the poll shall be deemed to be
resolution of the meeting at which the poll was demanded
7.14 AUDIT COMMITTEE / CONSTITUTION OF AUDIT COMMITTEE
Audit Committee of the Board will be constituted after listing on KSE to comply with the
Code of Corporate Governance which requires that:
(a) The Audit Committee meeting shall be held after the Company is listed on KSE, as
per provisions of the Code of Corporate Governance.
(b) The Audit Committee will have its terms of reference as determined by the Board of
Directors in accordance with the guide lines provided in the Listing Regulations.
Prospectus – TPL Trakker Limited
84
7.15 INTERNAL AUDIT
The Board of Directors has setup an effective internal audit function managed by suitable
qualified and experienced personnel who are conversant with the policies and procedures of
the Company and are involved in the internal audit function on a full time basis.
7.16 BORROWING POWERS
The Directors may from time to time at their discretion borrow and secure the payment of
any sum or sums of money for the purposes of the Company and may themselves lend to
the Company on security or otherwise subject to the provisions of Companies Ordinance,
1984.
7.17 POWERS OF DIRECTORS
The business of the Company shall be managed by the Directors, who may pay all expenses
incurred in promoting and registering the Company, and may exercise all such powers of the
Company as are not by the Ordinance or by the Articles, required to be exercised by the
Company in General Meeting.
7.18 INVESTMENTS IN ASSOCIATED COMPANIES
The Company has made an investment of PKR 85,030,449 in 1,644 ordinary shares of
AED 1,000 each in Trakker Middle East LLC, representing 29% of the share capital. The
Company has also made an investment of PKR 450,000,000 in 45 million ordinary shares
of Rs. 10 each in TPL Properties (Pvt.) Limited, representing 41% of the share capital.
Digicore International (Pty) Limited, South Africa, (Digicore) is an associated company by
virtue of common directorship only. The Company does not have any investment in the
said company. Digicore holds 30% share capital of the Company.
7.19 ADVANCE TO ASSOCIATED COMPANIES
The Company has extended advance to its associated companies under section 208 of the
Companies Ordinance 1984. In this regard, an Extra Ordinary General Meeting was held on
January 7, 2012 and in the meeting, it was resolved as under:
1) The Company may make advance to TPL Holdings (Pvt) Limited subject to maximum
amount of Pak Rs. 150 Million. The advance will be subject to the following terms &
conditions:
a) The investment period will expire on 30-06-2020.
b) Such advance shall be unsecured and shall be given from time to time as per
requirement of TPL Holdings (Pvt.) Ltd. in a way that maximum amount must not
increase Pak Rs. 150 Million. Thus the advance shall be a floating advance.
c) The mark-up will be charged equivalent to the borrowing cost of company on the
outstanding balance. This markup will be revised / reviewed in case any change
occurs in the borrowing cost of M/s. TPL Trakker Limited.
2) Further RESOLVED that the Company may make advance to TPL Properties (Pvt.)
Limited subject to maximum amount of Pak Rs. 200 Million. The advance will be
subject to the following terms & conditions:
a) The investment period will expire on 30-06-2020.
Prospectus – TPL Trakker Limited
85
b) Such advance shall be unsecured and shall be given from time to time as per
requirement of TPL Properties (Pvt.) Ltd. in a way that maximum amount must not
increase Pak Rs. 200 Million. Thus the advance shall be a floating advance.
c) The mark-up will be charged equivalent to the borrowing cost of company on the
outstanding balance. This markup will be revised / reviewed in case any change
occurs in the borrowing cost of M/s. TPL Trakker Limited
7.20 INVESTMENT IN SUBSIDIARIES
The Company has made investments in following subsidiary companies as at 31st
December, 2011:
Name of Company %age Shareholding Amount Invested
(PKR)
TPL Direct Insurance Limited 67.39% 635,583,541
TPL Security Services (Pvt) Ltd 99.9% 37,749,000
Prospectus – TPL Trakker Limited
86
PART 8
8. MISCELLANEUOS INFORMATION
8.1 REGISTERED OFFICE / CORPORATE OFFICE
TPL Trakker Limited
39/k, Block-6, P.E.C.H.S. Karachi, Pakistan
Phone: (021) – 3439 0300
Fax: (021) - 3452 9429
8.2 BANKER TO THE ISSUE FOR BOOK BUILDING
Faysal Bank Limited
8.3 BID COLLECTION CENTRE
Karachi
Contact Officer: Mr. Ahmed Zeeshan Direct No.: +92-21-32462597 Fax No.: +92-21-32429653 Email: [email protected] Postal Address: Arif Habib Limited Arif Habib Centre 23, M.T. Khan Road, Karachi
Contact Officer: Mr. Syed Khurram Shahid Direct No.: +92-21-35374301 Mobile No.: +92-333-310-4756 PABX No.: +92-21-111-253-111 Ext: 636 Fax No.: +92-21-35867992; 92-21-35869715 Email: [email protected] Postal Address: AKD Securities Limited 6
th Floor, Continental Trade Centre
Block 8, Clifton, Karachi Lahore
Contact Officer: Mr. Ehsan Ahmad Qureshi Direct No.: +92-42-36280742, +92-42-36280743, +92-42-36280744 Mobile No.: +92-334-411-1253 PABX No.: +92-42-111-253-111 Fax No.: +92-42-36280745 Email: [email protected]
Postal Address: AKD Trade Room No. 512/513, 5
th Floor,
Lahore Stock Exchange Building, Lahore.
Islamabad
Contact Officer: Mr. Khalid Hussain Direct No.: +92-51-2894325 Mobile No.: +92-332-2125525 PABX No.: +92-51-111-253-111 Fax No.: +92-51-2894323 Email: [email protected]
Postal Address: AKD Trade 303, 3
rd Floor, ISE Towers, Jinnah Avenue
Blue Area, Islamabad
Prospectus – TPL Trakker Limited
87
8.4 MAJOR BANKS OF THE COMPANY
Standard Chartered Bank
National Bank of Pakistan
Habib Metropolitan Bank
8.5 AUDITORS OF THE COMPANY
Ernst & Young Ford Rhodes Sidat Hyder
Chartered Accountants
Progressive Plaza, Beaumont Road
P.O.Box 15541, Karachi, Pakistan
8.6 BANKERS TO THE ISSUE
Faysal Bank Limited
KASB Bank Limited
Habib Metropolitan Bank Limited
Bank Al-Habib Limited
Standard Chartered Bank
Habib Bank Limited
JS Band Limited
Muslim Commercial Bank
NIB Bank Limited
United Bank Limited
8.7 LEGAL ADVISOR OF THE COMPANY
Mohsin Tayebaly & Co,
2nd
Floor Dine Centre, BC-4
Block 9, Kehkashan, Clifton, Karachi
Phone: (021) – 3537 5658-59
Fax: (021) – 3587 70240
8.8 LEGAL ADVISOR TO THE ISSUE
Mohsin Tayebaly & Co
2nd
Floor Dine Centre, BC-4
Block 9, Kehkashan, Clifton, Karachi
Phone: (021) – 3537 5658-59
Fax: (021) – 3587 70240
8.9 JOINT BOOK RUNNERS
AKD Securities Limited
6th Floor, Continental Trade Centre,
Block 8, Clifton
Karachi
Prospectus – TPL Trakker Limited
88
Arif Habib Limited
2nd Floor, Arif Habib Centre,
23 M.T. Khan Road,
Karachi
8.10 JOINT LEAD MANAGERS & ARRANGERS
National Bank of Pakistan
1st Floor, NBP Head Office,
I.I.Chundrigar Road,
Karachi
AKD Securities Limited
6th Floor, Continental Trade Centre,
Block 8, Clifton
Karachi
Arif Habib Limited
2nd Floor, Arif Habib Centre,
23 M.T. Khan Road,
Karachi
8.11 SHARES REGISTRAR
THK Associates (Pvt.) Limited
Ground Floor, State Life Building No. 3,
Dr. Ziauddin Ahmed Road,
Karachi
8.12 MATERIAL CONTRACTS/ DOCUMENTS
8.12.1 DETAILS OF SHORT TERM FINANCE FACILITIES
Running Finance Facility
S.No Bank
Facility
Amount
(PKR 000)
Rate
Date
Sanctioned
1 Habib Metropolitan Bank
Limited
175,000 3 Month KIBOR +
2.1%
02
February
2007
2 Standard Chartered Bank
(Pakistan) Limited
60,000 3 Month KIBOR +
3%
11 June
2009
3 National Bank of Pakistan 150,000 3 Month KIBOR +
3.5%
23 June
2010
Total 385,000
Prospectus – TPL Trakker Limited
89
8.12.2 DETAILS OF LONG TERM FINANCING FACILITY
Ijarah / Leasing Facility
S.No Bank
Facility
Amount (PKR
000)
Rate
Expir
y
Date
1 Habib Bank Limited 20,000 6 Month KIBOR + 2.5% 2014
2 First Habib Modarba Limited 32,072 6 Month KIBOR + 2.5% to
3%
2013
3 NBP Leasing 37,570 6 Month KIBOR + 2.5% to
3%
2014
4 Standard Chartered Modarba 8,800 6 Month KIBOR + 2.7% 2014
Total 98,442
Term Loan Facility
S.No Bank Facility Amount
(PKR 000) Rate
1 Habib Metropolitan Bank Ltd 100,000 3 Month KIBOR + 1.5%
Total 100,000
\
8.13 UNDERWRITING AGREEMENTS
S.No Underwriters No. of Shares Date of Agreement
1 National Bank of Pakistan 500,000 May 15, 2012
2 AKD Securities Limited 5,000,000 May 15, 2012
3 Invest Capital Markets Limited 3,500,000 May 15, 2012
4 PAIR Investment Company Limited 1,000,000 May 10, 2012
Total 10,000,000
8.14 DUE DILIGENCE REPORTS
S.No Underwriters Date of Agreement
1 National Bank of Pakistan May 15, 2012
2 AKD Securities Limited May 15, 2012
3 Invest Capital Markets Limited May 15, 2012
4 PAIR Investment Company Limited May 10, 2012
8.15 COMPANY RELATED AGREEMENTS
Contractor/Vendor Date Description
Pakistan Telecom Mobile
Limited (PTML)
1-Oct-2009
Renewal Date
13-Feb-2012
Under this agreement TPL utilizes the PTML
connections in their tracking devices and
provide tracking services to its customers
through GSM/ GPRS services being availed.
Pakistan Mobile 1-July-2011 Under this agreement TPL utilizes the PMCL
Prospectus – TPL Trakker Limited
90
Communication Limited
(PMCL)
connections in their tracking devices and
provide tracking services to its customers
through GSM/ GPRS services being availed.
GlobalTrak 1-July-2010 GlobalTrak is an information services
company that utilizes mobility technologies
and advanced cargo sensors to deliver real-
time situational awareness and intelligence to
help companies perform better and improve
business processes and operations.
The agreement grants TPL exclusive authority
to resell the globaltrak units.
DigiCore International
(Proprietary) Limited
23-May-1999 This is a shareholders agreement between the
Pakistani promoter, namely Mr. Ali Jameel,
Mr. Jameel Yusuf, Mr. Muslim Hassan Ali,
Mr. Hussein Ali Bhai and Digicore
International (Pty) Limited, South Africa
(Digicore). Under this agreement Pakistani
promoters hold 70% and Digicore holds thirty
percent (30%) of the total issued capital of the
Company. The agreement gives pre-emptive
rights in proportion to the number of shares of
the Company held by these shareholders.
Under the agreement, Digicore provides the
following products and services to the
Company;
1. C-track units
2. Technical facilities
3. Training facilities
Scheme of Arrangement
with TPL Holdings (Pvt.)
Limited
7-May-2009 On March 31, 2009, the Company entered
into a Scheme of Arrangement with TPL
Holdings (Pvt) Limited The Scheme was
approved / sanctioned by the Honorable High
Court of Sindh vide its Order preference
number J.M.No. 21/2008 dated May 07, 2009
and was in accordance with section 284 to
287 of the Companies Ordinance, 1984.
Accordingly:
- The entire undertaking of
TPL Holdings (Pvt) Limited,
including assets, liabilities,
rights and obligations, other
than Trakker Energy (Pvt)
Limited were transferred to
and vested in the Company
- In consideration for the
restructuring under the
Scheme, the Company issued
and allotted 131,074,274
ordinary shares of PKR 10/-
each as fully paid up to TPL
Holdings Pvt Limited
equivalent to 70 % of the
issued and paid up capital the
Company and 56,174,689
Prospectus – TPL Trakker Limited
91
ordinary shares to Digicore,
equivalent to 30% of the
issued and paid up capital of
the Company.
8.15.1 REGULATORY APPROVAL
Company has been granted approval by Pakistan Telecommunication Authority (PTA),
Government of Pakistan, for vehicle tracking facility vide license no. DIR (L)/CVAS-
105/PTA/2006 dated: June 06, 2006.The license is valid upto 22nd
November 2014 and is
renewable for a period of 15 years. The Company has obtained no objection on the change
of management from PTA for utilization of license via letter PTA/Wireline
Licensing/Trakkers/25/2009 dated 25 August 2011.
8.16 INSPECTION OF DOCUMENTS AND CONTRACTS
Copies of the Memorandum and Articles of Association, the audited financial statements,
the Auditor‟s Certificates, Information Memorandum and copies of agreements referred to
in this Prospectus may be inspected during usual business hours on any working day at the
registered office of the Company from the date of publication of this Prospectus until the
closing of the subscription list.
8.17 LEGAL PROCEEDINGS
There are ordinary routine litigation incidental to the business, to which the Company or its
subsidiary/ (ies) is a party. However, none of them are any material except for the matters
disclosed in Auditor‟s Report under section 53(1) produced in Para 5 of this document. In
all the matters the Company expect positive outcome.
In addition to the litigations disclosed in the Audited Report, the Company is also party to
following litigation proceedings (which is fully provided for in the Audited Financial
Statements)
a. Geoflzyka Krakow Limited vs M/s TPL Trakker Limited
This is a winding up petition (No 14 Dated 2011.) filed against the company in the
High Court of Sindh wherein the petitioner has stated that an agreement was
executed between the parties for supply, installation and commissioning of vehicle
tracking equipment on the petitioner‟s designated vehicles and also for providing
monitoring services. Equipment was installed on the vehicles, however, after some
time the petitioner returned the equipment installed on its vehicles and asked the
Company for reimbursement of Rs. 10,929,526/- being the price paid for
equipment in respect of returned units as well as unutilized monitoring charges.
The petitioner filed this petition alleging that the company is insolvent and unable
to pay its debts. Counter-affidavit to the petition has been filed by the Company
and the matter is pending for hearing.
It is pertinent to mention herein that TPL is very well known in Pakistan and it is
the first and largest vehicle tracking company established since 1999 as a joint
venture with South Africa‟s multinational Digicore, which ranks Number 2 for
GPS based tracking and Management solutions, and operates in almost 32
countries worldwide. TPL is the most trusted name in this sector with a client base
over a 100,000 and has until now recovered over 7000 stolen vehicles and
expensive cargo worth over PKR 8 billion. TPL has paid up share capital of PKR
1,872 billion. As at June 30, 2011, TPL total assets were worth over PKR 3.59
Prospectus – TPL Trakker Limited
92
billon. TPL achieved gross revenue of PKR 832 million and post net profit after tax
of PKR 92.00 million for year ended June, 2011.
TPL maintains 100% compliance status with the Federal Board of Revenue.
Regarding its ability to pay the debts this can be substantiated with the latest report
by PACRA , as per which, our long term and short term rating are A- (A minus)
and A2 (A Two) respectively.
b. Abdullah Shahid vs M/s TPL Trakker Limited
Petition filed against the company for the compensation claims due to theft of
petitioner‟s vehicle in which tracking device was installed. However, petitioner car
was snatched and Company was not able to recover the same due to non-reporting
issue. Consumer Court granted the compensation to petitioner and Company has
filed an appeal in honorable high court of Lahore on the grounds that compensation
granted by Consumer Court is unreasonable and outside the scope of section 31 of
the Punjab Consumer protection Act 2005.
c. Muhammad Farooq Khan vs Trakker Private Limited
Petition filed by the terminated employee of the Company for his salary along with
increment and bonuses. Court of Authority under Payment of Wages Act, Multan
has passed a degree of Rs. 375,800/- against the Company for compensation.
However, Company has filed an appeal in honorable high court on the grounds that
compensation granted by Court of Authority under Payment of Wages Act, Multan
is unreasonable.
8.18 MEMORANDUM OF ASSOCIATION
The Memorandum of Association, inter alia, contains the objects for which the Company
was incorporated and the business which the Company is authorized to undertake. A copy
of the Memorandum of Association is annexed to this Prospectus and with every issue of
the Prospectus except the one that is released in newspapers as advertisement.
8.19 FINANCIAL YEAR OF THE COMPANY
The financial year of the Company commences from 1st day of July and ends on the 30th
day of June each year.
Prospectus – TPL Trakker Limited
93
PART 9
9 APPLICATION AND TRANSFER INSTRUCTIONS
9.1 GENERAL INSTRUCTIONS
9.1.1 ELIGIBLE INVESTORS INCLUDE:
a. Pakistani citizens resident in or outside Pakistan or Persons holding two
nationalities including Pakistani nationality;
b. Foreign Nationals whether living in or outside Pakistan
c. Companies, bodies corporate or other legal entities incorporated or established in or
outside Pakistan (to the extent permitted by their constitutive documents and
existing regulations, as the case may be);
d. Mutual Funds, Provident/pension/gratuity funds/trusts, (subject to the terms of the
Trust Deed and existing regulations); and
e. Branches in Pakistan of companies and bodies corporate incorporated outside
Pakistan.
9.1.2 APPLICATION MUST BE MADE ON THE COMPANY’S PRINTED
FORM
9.1.3 Copies of this Prospectus and applications forms can be obtained from
members of Karachi Stock Exchange (Guarantee) Limited, Lahore Stock
Exchange (Guarantee) Limited and Islamabad Stock Exchange (Guarantee)
Limited, the Bankers to the issue and their Branches, the Joint Lead Manager
& Arrangers & the Joint Book Runners, and the registered office of the
Company. The Prospectus and the application form can also be downloaded
from the following website: www.akdsecurities.net and www.tplworld.com
9.1.4 The applicants opting for scripless form of shares are required to complete the
relevant sections of the application. In accordance with the provisions of the
Central Depositories Act, 1997 and the CDC Regulations, credit of such shares is
allowed ONLY in the applicant‟s own CDC account. In case of discrepancy
between the information provided in the application form and the information
already held by CDS, the Company reserves the right to issue shares in physical
form.
9.1.5 Name(s) and address (es) must be written in full block letters, in English and
should not be abbreviated.
9.1.6 All applications must bear the name and signature corresponding with that recorded
with the applicant's banker. In case of difference of signature with the bank and
CNIC or NICOP or Passport both the signatures should be affixed on the
application form.
9.1.7 APPLICATIONS MADE BY INDIVIDUAL INVESTORS
(i) In case of individual investors, an attested photocopy of CNIC (in case of
Resident Pakistanis)/Passport (in case of Non-Resident Pakistanis) as the
case may be, should be enclosed and the number of CNIC/Passport should
be written against the name of the applicant. Copy of these documents can
be attested by any Federal/Provincial Government Gazetted Officer,
Councilor, Oath Commissioner or Head Master of High School or bank
manager in the country of applicant's residence.
Prospectus – TPL Trakker Limited
94
(ii) Original CNIC/Passport, along with one attested photocopy, must be
produced for verification to the banker to the issue and the applicant‟s
banker (if different from the banker to the issue) at the time of presenting
the application. The attested photocopy will, after verification, be retained
by the bank branch along with the application.
9.1.8 APPLICATIONS MADE BY INSTITUTIONAL INVESTORS
(i) Applications made by companies, corporate bodies, mutual funds,
provident/pension/gratuity funds/trusts and other legal entities must be
accompanied by an attested photocopy of their Memorandum and Articles
of Association or equivalent instrument/document. Where applications are
made by virtue of Power of Attorney, the same should also be submitted
along with the application. Any Federal/Provincial Government Gazetted
Officer, Councilor, Bank Manager, Oath Commissioner and Head Master
of High School or bank manager in the country of applicant's residence can
attest copies of such documents.
(ii) Attested photocopies of the documents mentioned in 8(i) must be produced
for verification to the banker to the issue and the applicant's banker (if
different from the banker to the issue) at the time of presenting the
application. The attested copies, will after verification, be retained by the
bank branch along with the application.
9.1.9 Only one application will be accepted against each account, however, in case
of joint account, one application may be submitted in the name of each joint
account holder.
9.1.10 Joint application in the name of more than two persons will not be accepted. In case
of joint application each applicant must sign the application form and submit
attested copies of their CNICs/Passport. The Shares will be dispatched to the
person whose name appears first on the application form while in case of CDS, it
will be credited to the CDS account mentioned on the face of the form and where
any amount is refundable, in whole or in part, the same will be refunded by cheque
or other means by post, or through the bank where the application was submitted,
to the person named first on the application form, without interest, profit or return.
Please note that joint application will be considered as a single application for the
purpose of allotment of Shares.
9.1.11 Subscription money must be paid by cheque drawn on applicant's own bank
account or pay order/bank draft payable to one of the Bankers to the issue “A/C
Initial Public Offering of TPL Trakker Limited” and crossed “A/C PAYEE
ONLY”.
9.1.12 For the applications made through pay order/bank draft, it would be permissible for
a banker to the issue to deduct the bank charges while making refund of
subscription money to unsuccessful applicants through pay order/bank draft
individually for each application.
9.1.13 The applicant should have at least one bank account with any of the
commercial banks. The applicants not having a bank account at all (non-
account holders) are not allowed to submit application for subscription of
Shares.
9.1.14 Applications are not to be made by minors and/or persons of unsound mind.
Prospectus – TPL Trakker Limited
95
9.1.15 Applicants should ensure that the bank branch, to which the application is
submitted, completes the relevant portion of the application form.
9.1.16 Applicants should retain the bottom portion of their application forms as
provisional acknowledgement of submission of their applications. This should not
be construed as an acceptance of the application or a guarantee that the applicant
will be allotted the number of Shares for which the application has been made.
9.1.17 Making of any false statements in the application or willfully embodying
incorrect information therein shall make the application fictitious and the
applicant or the bank shall be liable for legal action.
9.1.18 Bankers to the issue are prohibited to recover any charges from the subscribers for
collecting subscription applications. Hence, the applicants are advised not to pay
any extra charges to the bankers to the issue.
9.1.19 It would be permissible for a Banker to the issue to refund subscription money to
unsuccessful applicants having an account in its bank by crediting such account
instead of remitting the same by cheque, pay order or bank draft. Applicants
should, therefore, not fail to give their bank account numbers.
9.1.20 Submission of Fictitious and multiple applications (more than one application by
same person) is prohibited and such application money shall be liable to
confiscation under section 18A of the Securities and Exchange Ordinance, 1969.
ADDITIONAL INSTRUCTIONS FOR FOREIGN/NON-RESIDENT INVESTORS
9.1.21 In case of foreign investors who are not individuals, applications must be
accompanied with a letter on applicant's letterhead stating the legal status of the
applicant, place of incorporation and operations and line of business. A copy of
memorandum of association or an equivalent document should also be enclosed, if
available. Where applications are made by virtue of Power of Attorney, the same
must be lodged with the application. Copies of these documents can be attested by
the bank manager in the country of applicant's residence.
9.1.22 Applicants may also subscribe using their Special Convertible Rupee
Account (SCRA) as set out under the State Bank of Pakistan's Foreign Exchange
Manual.
BASIS OF ALLOTMENT
9.1.23 The basis and conditions of transfer of shares to the general public shall be as
follows:
a) The minimum amount of application for subscription of 500 Shares is PKR 5,000/-.
Application for Shares below the total value of PKR 5,000/- shall not be entertained.
b) Application for Shares must be made for 500 Shares or in multiple thereof only.
Applications, which are neither for 500 Shares nor for multiple thereof, shall be
rejected.
c) Allotment/Transfer of Shares to successful applicants shall be made in accordance
with the allotment criteria/ instructions disclosed in the Prospectus.
Prospectus – TPL Trakker Limited
96
d) Allotment of Shares shall be subject to scrutiny of applications in accordance with
the criteria disclosed in the Prospectus and/or the instructions by the Securities &
Exchange Commission of Pakistan.
e) Applications, which do not meet the above requirements, or applications which are
incomplete will be rejected. The applicants are, therefore, required to fill in all data
fields in the Application Form.
f) The Company will dispatch Shares to successful applicants through their Bankers
to the issue or credit the respective CDS accounts of the successful applicants (as
the case maybe).
9.2 BANKERS TO THE ISSUE
Code No. Bank
01 Faysal Bank Limited
02 Bank Al-Habib Limited
03 NIB Bank Limited
04 Habib Metropolitan Bank Limited
05 Habib Bank Limited
06 KASB Bank Limited
07 JS Bank Limited
08 United Bank Limited
09 MCB Bank Limited
10 Standard Chartered Bank
9.3 CODE OF OCCUPATION
Code No. Occupation Code No. Occupation
01 Business 06 Professional
02 Business Executive 07 Student
03 Service 08 Agriculturist
04 Housewife 09 Industrialist
05 Household 10 Others
9.4 NATIONALITY CODE
Code No. Name of country Code No. Name of country
001 U.S.A 006 Bangladesh
002 U.K 007 China
003 U.A.E 008 Bahrain
004 K.S.A 009 Other
005 Oman
Prospectus – TPL Trakker Limited
97
PART 10
11. BIDDING FORM OF TPL TRAKKER LIMITED
(this space has been left intentionally)
Prospectus – TPL Trakker Limited
98
PART 11
12. SIGNATORIES TO THE PROSPECTUS
Mr. Jameel Yusuf
-Sd-
Mr. Mohammad Ali Jameel
-Sd-
Mr. Saad Nissar -Sd-
Mr. Hussein Mohammad Ali Bhai -Sd-
Mr. Murtaza Ali Bhai
-Sd-
Mr. Barend Christoffel Esterhuyzen
-Sd-
Mr. Stuart Aberdein
-Sd-
Mr. Mustafa Ali
-Sd-
Signed by the above in the presence of witnesses :
Sd/-
Name: Adnan Khandwala
CNIC: 42201-4970473-7
Address:39-K, Block-6, PECHS Karachi
Designation: Chief Financial Officer
Date: 21 April 2012
Place:Karachi
Sd/-
Name: Muhammad Abbas
CNIC: 42301-5321910-7
Address: 39-K, Block-6, PECHS Karachi
Designation: Manager Finance
Date: 21 April 2012
Place: Karachi
Prospectus – TPL Trakker Limited
99
PART 12
13. MEMORANDUM OF ASSOCIATION
Prospectus – TPL Trakker Limited
100
Prospectus – TPL Trakker Limited
101
Prospectus – TPL Trakker Limited
102
Prospectus – TPL Trakker Limited
103
Prospectus – TPL Trakker Limited
104