IR Requirements Comparison Table

Item BCD from VC

Surf. Asm.

CCR

SiD LDC GLD

IR Shaft Crane 1kt x 2 2kt x 2 600t 120t ?(1.2kt)

Surface Assembly Crane

80t x 2 400t ?(400t) 2kt 400t

IR Hall Crane 20t x 4 400t x 2 ?(400t) 80t 400t

Largest Piece for Surf. Asm.

600t 490t ~350t

IR Hall Size

(w x l x h)

32x72x42m 30x100x35m 30x48x28m 30x82x?m

30x45x?m

32x72x?m

IR Shaft Size 15m 15m 9m may work 15m (14x8) 20m Full Surface

16m Hybrid

Surface Assembly Building Size

30x100m TBD TBD TBD

Other Shafts 9m service

cavern

Amann – 09/12/06

Page 3: The ILC IR John Amann ILC Mechanical Engineering 09/12/06.

About Cranes

• Cranes >100t are custom engineered = $$$.• Cranes <100t are off the shelf standard = $.• Cranes have a duty rating = +/- $.• Crane support structure cost scales with capacity.• A 400t crane will require a support structure and

foundation on the scale of a steel mill = $$$.

Amann – 09/12/06

Page 4: The ILC IR John Amann ILC Mechanical Engineering 09/12/06.

SLC Collider Hall 100 ton Bridge Crane

Hook Height = Runway Height

5-10m Additional Clearance Needed Above Runway

Amann – 09/12/06

Page 5: The ILC IR John Amann ILC Mechanical Engineering 09/12/06.

SLC Collider Hall 100 ton Bridge CraneBridge Crane has an Effective Area Due to Size of Trolley and Cross Beam

100 ton > Effective Area > 400 ton

Amann – 09/12/06

Page 6: The ILC IR John Amann ILC Mechanical Engineering 09/12/06.

PEPII IR2 50 ton Bridge Crane

Amann – 09/12/06

Page 7: The ILC IR John Amann ILC Mechanical Engineering 09/12/06.

About Curtain Walls

• It has been proposed to use a single collider hall separated into two detector regions by a removable 3m concrete wall.

• In order to accomplish this, a combination of stacked concrete blocks topped with a retractable curtain wall will be required.

Amann – 09/12/06

Page 8: The ILC IR John Amann ILC Mechanical Engineering 09/12/06.

PEPII IR2 Curtain WallCurtain Wall Fully Retracted Into IR Hall

Amann – 09/12/06

Page 9: The ILC IR John Amann ILC Mechanical Engineering 09/12/06.

PEPII IR2 Curtain Wall• Curtain walls need a runway.

• Runway rail is embedded into concrete support.

• To maintain small gap between curtain wall and the IR hall surfaces the bridge crane runway should be embedded and not a freestanding steel structure.

• The above will require a IR hall with a robust concrete structure.

• In general, a curtain wall will require a smooth finished IR cavern to maintain a small gap between the curtain wall and the IR hall walls and ceiling.

Amann – 09/12/06

Page 10: The ILC IR John Amann ILC Mechanical Engineering 09/12/06.

PEPII IR2 Curtain WallClose-up of Runway Support Structure

Amann – 09/12/06

Page 11: The ILC IR John Amann ILC Mechanical Engineering 09/12/06.

IR Hall and Surface Assembly BuildingCutaway View of IR Hall/Surface Assembly Building

Amann – 09/12/06

Page 12: The ILC IR John Amann ILC Mechanical Engineering 09/12/06.

IR Hall and Surface Assembly BuildingRight Side View

Amann – 09/12/06

Page 13: The ILC IR John Amann ILC Mechanical Engineering 09/12/06.

Other IR Hall Needs• Compressed Air - need required PSI, CFM, moisture content, locations

• H2O supply – potable, non-potable

• AC Power Distribution – welding sockets 500 amp, other 480/240V sockets.

• Machine Shop, Welding Area, and Tool Crib

• VESDA and Fire Suppression

• IR Hall Lighting

• O2 Deficiency Monitors

• Clean Room – how big, what class?

• Materials Storage Area

Amann – 09/12/06

Page 14: The ILC IR John Amann ILC Mechanical Engineering 09/12/06.

Questions to Think About

• IR Hall - rectangular box or curved cavern?

• Surface assembly building - size and orientation?

• BDS tunnel height above IR Hall floor – what constrains this?

• Curtain Wall – required thickness?

Amann – 09/12/06