The Edward L Kelly Leadership Center
description
Transcript of The Edward L Kelly Leadership Center
![Page 1: The Edward L Kelly Leadership Center](https://reader035.fdocuments.us/reader035/viewer/2022062315/5681606e550346895dcf9549/html5/thumbnails/1.jpg)
THE EDWARD L KELLY LEADERSHIP CENTER
Ryan PletzStructuralDr. Hanagan
The Pennsylvania State UniversityDepartment of Architectural Engineering
Senior Thesis
April 14, 2008
![Page 2: The Edward L Kelly Leadership Center](https://reader035.fdocuments.us/reader035/viewer/2022062315/5681606e550346895dcf9549/html5/thumbnails/2.jpg)
Project Team Owner: Prince William County Schools Architect: Jim Pociluyko, Moseley Architects Structural Engineer: Jeff O’beirne, Moseley Architects Mechanical Engineer: Jim Miller , Moseley Architects Electrical Engineer: Russell Roundy , Moseley
Architects Plumbing Engineer: Jeffry Mortensen , Moseley
Architects Civil Engineer: Ross, France, Ratliff, Ltd. Construction: V.F. Pavone
Pletz - Structural
![Page 3: The Edward L Kelly Leadership Center](https://reader035.fdocuments.us/reader035/viewer/2022062315/5681606e550346895dcf9549/html5/thumbnails/3.jpg)
Where We’re Going…
Existing Conditions Problem / Proposal Research Goals Architectural Study Structural Study Conclusions
Pletz - Structural
![Page 4: The Edward L Kelly Leadership Center](https://reader035.fdocuments.us/reader035/viewer/2022062315/5681606e550346895dcf9549/html5/thumbnails/4.jpg)
Where We’re Going…
Existing Conditions Problem / Proposal Research Goals Architectural Study Structural Study Conclusions
Pletz - Structural
![Page 5: The Edward L Kelly Leadership Center](https://reader035.fdocuments.us/reader035/viewer/2022062315/5681606e550346895dcf9549/html5/thumbnails/5.jpg)
Existing Conditions
Location: Manassas, Virginia
Pletz - Structural
![Page 6: The Edward L Kelly Leadership Center](https://reader035.fdocuments.us/reader035/viewer/2022062315/5681606e550346895dcf9549/html5/thumbnails/6.jpg)
Existing Conditions
Location: Manassas, Virginia Administration building for Prince
William County Schools 150,000 square feet One 1-story wing, two 3-story wings Original building height: 46’-0”
Pletz - Structural
![Page 7: The Edward L Kelly Leadership Center](https://reader035.fdocuments.us/reader035/viewer/2022062315/5681606e550346895dcf9549/html5/thumbnails/7.jpg)
Existing Conditions
Location: Manassas, Virginia
Pletz - Structural
![Page 8: The Edward L Kelly Leadership Center](https://reader035.fdocuments.us/reader035/viewer/2022062315/5681606e550346895dcf9549/html5/thumbnails/8.jpg)
Existing Conditions
Pletz - Structural
![Page 9: The Edward L Kelly Leadership Center](https://reader035.fdocuments.us/reader035/viewer/2022062315/5681606e550346895dcf9549/html5/thumbnails/9.jpg)
Existing Conditions
Pletz - Structural
![Page 10: The Edward L Kelly Leadership Center](https://reader035.fdocuments.us/reader035/viewer/2022062315/5681606e550346895dcf9549/html5/thumbnails/10.jpg)
Where We’re Going…
Existing Conditions Problem / Proposal Research Goals Architectural Study Structural Study Conclusions
Pletz - Structural
![Page 11: The Edward L Kelly Leadership Center](https://reader035.fdocuments.us/reader035/viewer/2022062315/5681606e550346895dcf9549/html5/thumbnails/11.jpg)
Problem / Proposal
Owner wants more building space Where to expand?
Impact on the existing structural system Foundations Gravity Columns Lateral System
Alternative and possibly more efficient system Gravity Lateral Pletz - Structural
![Page 12: The Edward L Kelly Leadership Center](https://reader035.fdocuments.us/reader035/viewer/2022062315/5681606e550346895dcf9549/html5/thumbnails/12.jpg)
Where We’re Going…
Existing Conditions Problem / Proposal Research Goals Architectural Study Structural Study Conclusions
Pletz - Structural
![Page 13: The Edward L Kelly Leadership Center](https://reader035.fdocuments.us/reader035/viewer/2022062315/5681606e550346895dcf9549/html5/thumbnails/13.jpg)
Research Goals
Add additional space and maintain good aesthetics throughout
Create more efficient structural system
Save money and scheduling time
Pletz - Structural
![Page 14: The Edward L Kelly Leadership Center](https://reader035.fdocuments.us/reader035/viewer/2022062315/5681606e550346895dcf9549/html5/thumbnails/14.jpg)
Where We’re Going…
Existing Conditions Problem / Proposal Research Goals Architectural Study Structural Study Conclusions
Pletz - Structural
![Page 15: The Edward L Kelly Leadership Center](https://reader035.fdocuments.us/reader035/viewer/2022062315/5681606e550346895dcf9549/html5/thumbnails/15.jpg)
Architectural Study
2 preliminary options Expand Outward Expand Upward
Pletz - Structural
![Page 16: The Edward L Kelly Leadership Center](https://reader035.fdocuments.us/reader035/viewer/2022062315/5681606e550346895dcf9549/html5/thumbnails/16.jpg)
Architectural Study
2 options Expand Outward Expand Upward
Minimize site impact Increase site usable space (Parking, …) One construction sequence
Pletz - Structural
![Page 17: The Edward L Kelly Leadership Center](https://reader035.fdocuments.us/reader035/viewer/2022062315/5681606e550346895dcf9549/html5/thumbnails/17.jpg)
Architectural Study
Pletz - Structural
![Page 18: The Edward L Kelly Leadership Center](https://reader035.fdocuments.us/reader035/viewer/2022062315/5681606e550346895dcf9549/html5/thumbnails/18.jpg)
Architectural Study
Pletz - Structural
![Page 19: The Edward L Kelly Leadership Center](https://reader035.fdocuments.us/reader035/viewer/2022062315/5681606e550346895dcf9549/html5/thumbnails/19.jpg)
Architectural Study
Additional 2 stories (15’-4” story height) New Height: 76’-8” 37,770 additional square feet 116 additional open workstations 36 additional private offices
Pletz - Structural
![Page 20: The Edward L Kelly Leadership Center](https://reader035.fdocuments.us/reader035/viewer/2022062315/5681606e550346895dcf9549/html5/thumbnails/20.jpg)
Architectural Study Landscaped Roof
Pletz - Structural
Occupant experience New Stories 4-5
Views of rooftop Mechanical units
Greater aesthetics Connect the occupant to outside
![Page 21: The Edward L Kelly Leadership Center](https://reader035.fdocuments.us/reader035/viewer/2022062315/5681606e550346895dcf9549/html5/thumbnails/21.jpg)
Architectural Study
30,000 square feet Intensive-type Aesthetic and psychological benefits Ecological and economic benefits
Landscaped Roof
Pletz - Structural
![Page 22: The Edward L Kelly Leadership Center](https://reader035.fdocuments.us/reader035/viewer/2022062315/5681606e550346895dcf9549/html5/thumbnails/22.jpg)
Architectural Study Landscaped
Roof
Typical Intensive Roof Garden Details
Typical Hardscape to Softscape Transition
Pletz - Structural
![Page 23: The Edward L Kelly Leadership Center](https://reader035.fdocuments.us/reader035/viewer/2022062315/5681606e550346895dcf9549/html5/thumbnails/23.jpg)
Where We’re Going…
Existing Conditions Problem / Proposal Research Goals Architectural Study Structural Study Conclusions
Pletz - Structural
![Page 24: The Edward L Kelly Leadership Center](https://reader035.fdocuments.us/reader035/viewer/2022062315/5681606e550346895dcf9549/html5/thumbnails/24.jpg)
Structural Study
Existing System Non-Composite Steel W-shape main beams and girders
24’-0” width, 31’-0” length OWSJ bay fillers
6 per bay, 4’-0” on center Spread footing foundation
Pletz - Structural
![Page 25: The Edward L Kelly Leadership Center](https://reader035.fdocuments.us/reader035/viewer/2022062315/5681606e550346895dcf9549/html5/thumbnails/25.jpg)
Structural Study
New System Composite
Steel W-shapes at 3 per bay, 8’-0” on center
No joists 4” Composite concrete slab
Pletz - Structural
![Page 26: The Edward L Kelly Leadership Center](https://reader035.fdocuments.us/reader035/viewer/2022062315/5681606e550346895dcf9549/html5/thumbnails/26.jpg)
Structural Study
Roof Framing Typical Size: W14x22 Original Design: 20KCS2 30% reduction in depth
Pletz - Structural
![Page 27: The Edward L Kelly Leadership Center](https://reader035.fdocuments.us/reader035/viewer/2022062315/5681606e550346895dcf9549/html5/thumbnails/27.jpg)
Structural Study
Floor Framing Typical Sizes: W14x22, W12x19, and
W21x44 Original Design: 28K8 50-57% reduction in depth
Pletz - Structural
![Page 28: The Edward L Kelly Leadership Center](https://reader035.fdocuments.us/reader035/viewer/2022062315/5681606e550346895dcf9549/html5/thumbnails/28.jpg)
Column Redesign for Floors 1 and 2 Size spliced at second story
Column Redesign for Floors 3, 4, and 5
Structural StudyGravityLateral
Pletz - Structural
![Page 29: The Edward L Kelly Leadership Center](https://reader035.fdocuments.us/reader035/viewer/2022062315/5681606e550346895dcf9549/html5/thumbnails/29.jpg)
Structural Study Foundation Redesign Column M-17
(Highest Moment)
Column S-17(Highest Axial Load)
Pletz - Structural
![Page 30: The Edward L Kelly Leadership Center](https://reader035.fdocuments.us/reader035/viewer/2022062315/5681606e550346895dcf9549/html5/thumbnails/30.jpg)
Structural Study Foundation Redesign Footing M-17 P = 228.3 kips (106.5 Dead, 121.8 Live) M = 291 ft-kips
Pletz - Structural
![Page 31: The Edward L Kelly Leadership Center](https://reader035.fdocuments.us/reader035/viewer/2022062315/5681606e550346895dcf9549/html5/thumbnails/31.jpg)
Structural Study Foundation Redesign Footing M-17 11’-0”x11’-0” (49% larger) 25” thick (11)#7 bars each way
Original Redesign Footing M-17 9’-0”x9’-0” 25” thick (10)#7 bars each
way
Pletz - Structural
![Page 32: The Edward L Kelly Leadership Center](https://reader035.fdocuments.us/reader035/viewer/2022062315/5681606e550346895dcf9549/html5/thumbnails/32.jpg)
Structural Study Foundation Redesign Footing S-17 P = 475.6 kips (212.4 Dead, 258.2 Live) M = 255.2ft-kips
Pletz - Structural
![Page 33: The Edward L Kelly Leadership Center](https://reader035.fdocuments.us/reader035/viewer/2022062315/5681606e550346895dcf9549/html5/thumbnails/33.jpg)
Structural Study Foundation Redesign Footing S-17 13’-6”x13’-6” (65% increase) 25” thick (13)#8 bars each way
Original Design Footing S-17 10’-6”x10’-6” 25” thick (10)#7 bars each
way
Pletz - Structural
![Page 34: The Edward L Kelly Leadership Center](https://reader035.fdocuments.us/reader035/viewer/2022062315/5681606e550346895dcf9549/html5/thumbnails/34.jpg)
Structural Study Existing Lateral System
Moment Frames 11 in N-S Direction 3 in E-W Direction
102 fixed connections framing level
Pletz - Structural
![Page 35: The Edward L Kelly Leadership Center](https://reader035.fdocuments.us/reader035/viewer/2022062315/5681606e550346895dcf9549/html5/thumbnails/35.jpg)
Structural Study Redesign possibilities
Braced Framing Shear Walls Dual System Reduction in Moment Frames
Pletz - Structural
![Page 36: The Edward L Kelly Leadership Center](https://reader035.fdocuments.us/reader035/viewer/2022062315/5681606e550346895dcf9549/html5/thumbnails/36.jpg)
Pletz - Structural
![Page 37: The Edward L Kelly Leadership Center](https://reader035.fdocuments.us/reader035/viewer/2022062315/5681606e550346895dcf9549/html5/thumbnails/37.jpg)
Structural Study
Pletz - Structural
![Page 38: The Edward L Kelly Leadership Center](https://reader035.fdocuments.us/reader035/viewer/2022062315/5681606e550346895dcf9549/html5/thumbnails/38.jpg)
Structural Study Redesign possibilities
Braced Framing Shear Walls Reduction in Moment Frames
3 north-south frames 6 north-south frames
1 east-west frame
Pletz - Structural
![Page 39: The Edward L Kelly Leadership Center](https://reader035.fdocuments.us/reader035/viewer/2022062315/5681606e550346895dcf9549/html5/thumbnails/39.jpg)
Structural Study Redesigned Moment Frame Plan
Pletz - Structural
![Page 40: The Edward L Kelly Leadership Center](https://reader035.fdocuments.us/reader035/viewer/2022062315/5681606e550346895dcf9549/html5/thumbnails/40.jpg)
Structural Study Wind
Controlling Lateral Load for North-South Frames
Story Drift (in.) Load Combination % of Height H/4001 0.33 Wind 0.18 0.46"2 0.46 Wind 0.25 0.46"3 0.45 Wind 0.25 0.46"4 0.42 Wind 0.23 0.46"5 0.33 Wind 0.18 0.46"
Story Drift of North South Frame
Pletz - Structural
![Page 41: The Edward L Kelly Leadership Center](https://reader035.fdocuments.us/reader035/viewer/2022062315/5681606e550346895dcf9549/html5/thumbnails/41.jpg)
Structural Study Seismic
Controlling Lateral Load for East-West Frame
Story Drift (in.) Load Combination Cd/I δCd/I 0.015H1 0.54 Seismic 3 1.617 2.76"2 0.75 Seismic 3 2.241 2.76"3 0.63 Seismic 3 1.899 2.76"4 0.47 Seismic 3 1.413 2.76"5 0.30 Seismic 3 0.909 2.76"
Story Drift of East West Frame
Pletz - Structural
![Page 42: The Edward L Kelly Leadership Center](https://reader035.fdocuments.us/reader035/viewer/2022062315/5681606e550346895dcf9549/html5/thumbnails/42.jpg)
Structural Study Green Roof Framing
Loading
MaterialHeight/
Thickness (inches)
dry wetHydroflex RB 3/8 2.5 2.5Dow STYROFOAM (R=5/inch) 3 0.5 0.5Moisture Mat SSM45 3/16 0.2 1FD60 w/ mineral soil 2 1/4 5 7.4Pea Gravel 6 54 60Intensive Soil 6 30 45Intensive Plants (<5'-0") 4Conrete Pavers 18-30
Weight (psf)Description Type Location Load
Green Roof Weight Dead Full 80 PSFSuperimposed Dead Load Dead Full 20 PSFFlat Roof Snow Load Snow Full 21 PSFDrift Snow Load Snow Radial 28 PSFDrift Snow Load Snow Atrium 51 PSFLive Load Live Full 20 PSF
Green Roof Loading
Pletz - Structural
![Page 43: The Edward L Kelly Leadership Center](https://reader035.fdocuments.us/reader035/viewer/2022062315/5681606e550346895dcf9549/html5/thumbnails/43.jpg)
Structural Study Green Roof Framing
Design Radial: W18x40 Atrium:W8x10 to W16x31
Pletz - Structural
![Page 44: The Edward L Kelly Leadership Center](https://reader035.fdocuments.us/reader035/viewer/2022062315/5681606e550346895dcf9549/html5/thumbnails/44.jpg)
Structural Study Green Roof Framing
Pletz - Structural
![Page 45: The Edward L Kelly Leadership Center](https://reader035.fdocuments.us/reader035/viewer/2022062315/5681606e550346895dcf9549/html5/thumbnails/45.jpg)
Where We’re Going…
Existing Conditions Problem / Proposal Research Goals Architectural Study Structural Study Conclusions
Pletz - Structural
![Page 46: The Edward L Kelly Leadership Center](https://reader035.fdocuments.us/reader035/viewer/2022062315/5681606e550346895dcf9549/html5/thumbnails/46.jpg)
Conclusions New Architecture provides needed
additional space requirements for future growth
Green Roof aesthetically pleasing and provides potential economic benefits
Structural floor framing more efficient than original
Decreased number of lateral frames Frames much bigger than original Original design still adequate
Construction costs very close to original
Pletz - Structural
![Page 47: The Edward L Kelly Leadership Center](https://reader035.fdocuments.us/reader035/viewer/2022062315/5681606e550346895dcf9549/html5/thumbnails/47.jpg)
Acknowledgments Prince William County Schools for permission Moseley Architects for sponsorship American Hydrotech for all the green information
that I could want V.F. Pavone Construction for multiple site visits Dr. Hanagan and the structural faculty for
everything you have taught me Professor Holland and all the consultants and
mentors for all the guidance through this research All 2008 AE students for always being around to help Friends and family for support, inspiration, and
encouragementPletz - Structural
![Page 48: The Edward L Kelly Leadership Center](https://reader035.fdocuments.us/reader035/viewer/2022062315/5681606e550346895dcf9549/html5/thumbnails/48.jpg)
Thank you for your attention
Questions?
Pletz - Structural