THE BRICKWORKS€¦ · CENTRAL LONDON M25 & HEATHROW Retail / Cinem a s s O WN SQUARE Hotel Pub...

9
A NEW GRADE A OFFICE OPPORTUNITY - THE BRICKWORKS -

Transcript of THE BRICKWORKS€¦ · CENTRAL LONDON M25 & HEATHROW Retail / Cinem a s s O WN SQUARE Hotel Pub...

Page 1: THE BRICKWORKS€¦ · CENTRAL LONDON M25 & HEATHROW Retail / Cinem a s s O WN SQUARE Hotel Pub Retail / Offic e - THE BRICKWORKS - PHASE B. J4B ... Heating and Cooling By ceiling

A NEW GRADE A OFFICE OPPORTUNITY

- THE BRICKWORKS -

Page 2: THE BRICKWORKS€¦ · CENTRAL LONDON M25 & HEATHROW Retail / Cinem a s s O WN SQUARE Hotel Pub Retail / Offic e - THE BRICKWORKS - PHASE B. J4B ... Heating and Cooling By ceiling

developmentoverview

DEVELOPMENT OVERVIEW

LOCATION: SOUTHALL UB2, LONDON BOROUGH OF EALING - ‘THIRD LARGEST BOROUGH BY POPULATION’.

SOUTHALL STATION TO CENTRAL LONDON: CROSSRAIL SERVICES COMMENCE LATE 2019.

WORK TO LEISURE: ADJACENT TO 90 ACRE MINET COUNTRY PARK AND GRAND UNION CANAL.

MODERN LIVING: 3,750 NEW HOMES.

BRANDS TO THEIR AUDIENCES: 500,000 SQ FT OF COMMERCIAL SPACE.

HGVACCESSROUTE TO

A312

PHASE AResidential occupancy begins Q4 2018

1,600 residents expected by 2021

PHASE BBuild begins Q3 2018

Commercial occupancy begins Q1 2020Expected 1,600 residents by 2023

SOUTHALL STATIONPHASE B: 4 MINUTES WALK

Overview of Southall Waterside Development

SOUTHALL WATERSIDEWest London’s largest mixed use single regeneration site

Page 3: THE BRICKWORKS€¦ · CENTRAL LONDON M25 & HEATHROW Retail / Cinem a s s O WN SQUARE Hotel Pub Retail / Offic e - THE BRICKWORKS - PHASE B. J4B ... Heating and Cooling By ceiling

SITE PLANDEVELOPMENT OVERVIEW

THE BRICKWORKS New Grade A Office Opportunity

LOCATION: AT THE HEART OF THE SITE’S COMMERCIAL CENTRE, INCORPORATING LEISURE LED RETAIL WITH CINEMA, RESTAURANTS AND SHOPS.

ACCOMMODATION: FLEXIBLE MODERN OFFICE FLOOR PLATES OF CIRCA 10,500 SQ FT / 1,000 SQM.*

ASPECT: SOUTH FACING, WITH FAR REACHING VIEWS.

SUSTAINABILITY: TARGETTING EPC ‘B’ RATING, AND BREEAM ‘VERY GOOD’ / ‘EXCELLENT’.

WHEN: CONSTRUCTION TO COMMENCE Q3 2018 AVAILABLE FOR OCCUPATION FROM Q1 2020.(Subject to planning)

View of office reception from Southall Waterside Town Square (CGI)

* Refer to Areas Schedule

Southall

WESTERN ROAD

THE

PA

RK

WAY

A31

2

GRAND UNION CANAL

PAD

DIN

GTO

N A

RM

CA

NA

L

MINETCOUNTRY

PARK

UXBRIDGE ROAD

HAYES ROAD

SOU

TH R

OA

D

A4020 SOUTHALL BROADWAY

M4J3

HAMMERSMITH &CENTRAL LONDON

M25 &HEATHROW

Retail / Cinema

Restaurants

Restaurants

TOWN SQUARE

Hotel Pub

Retail / Office

- THE BRICKWORKS -

PHASE B

Page 4: THE BRICKWORKS€¦ · CENTRAL LONDON M25 & HEATHROW Retail / Cinem a s s O WN SQUARE Hotel Pub Retail / Offic e - THE BRICKWORKS - PHASE B. J4B ... Heating and Cooling By ceiling

J4B

J1A J1

J1J3 J2J4M4 M4

M40

M25 (S)

M25 (N)

HEATHROW AIRPORT

READING

A40

A40

A4020

A312

A4

A30

M25

M25

OXFORD

to Canary Wharf with Crossrail.31

MINUTES

to HeathrowAirport with Crossrail.8

MINUTES

to Paddington with Crossrail.13

MINUTES

Rail Network Bakerloo Line

Jubilee LineCentral Line

Circle LineDistrict Line

Hammersmith and City Line

Rail Network Central LineDistrict Line

Jubilee LineDLR

CENTRALLONDON

CENTRALLONDON

ABBEYWOOD

SHENFIELD

Rail Network Central Line

StanstedSouthend

Rail Network Jubilee Line Central Line

DLR

West Drayton

HeathrowCentral

Southall

HanwellHayes & Harlington

HeathrowTerminal 4

EalingBroadway

ActonMain Line

Paddington

Stratford

Liverpool Street

Canary Wharf

Bond Street ROAD

M4 Junction 3 2 mile

Heathrow 5 miles

A40 (Junction) 4 miles

M25 6 miles

RAIL

Heathrow 8 minutes

Paddington 13 minutes

Canary Wharf 31 minutes

J4B

J1A J1

J1J3 J2J4M4 M4

M40

M25 (S)

M25 (N)

HEATHROW AIRPORT

READING

A40

A40

A4020

A312

A4

A30

M25

M25

OXFORD

to Canary Wharf with Crossrail.31

MINUTES

to HeathrowAirport with Crossrail.8

MINUTES

to Paddington with Crossrail.13

MINUTES

Rail Network Bakerloo Line

Jubilee LineCentral Line

Circle LineDistrict Line

Hammersmith and City Line

Rail Network Central LineDistrict Line

Jubilee LineDLR

CENTRALLONDON

CENTRALLONDON

ABBEYWOOD

SHENFIELD

Rail Network Central Line

StanstedSouthend

Rail Network Jubilee Line Central Line

DLR

West Drayton

HeathrowCentral

Southall

HanwellHayes & Harlington

HeathrowTerminal 4

EalingBroadway

ActonMain Line

Paddington

Stratford

Liverpool Street

Canary Wharf

Bond Street ROAD

M4 Junction 3 2 mile

Heathrow 5 miles

A40 (Junction) 4 miles

M25 6 miles

RAIL

Heathrow 8 minutes

Paddington 13 minutes

Canary Wharf 31 minutes

CROSSRAIL

Page 5: THE BRICKWORKS€¦ · CENTRAL LONDON M25 & HEATHROW Retail / Cinem a s s O WN SQUARE Hotel Pub Retail / Offic e - THE BRICKWORKS - PHASE B. J4B ... Heating and Cooling By ceiling

SOUTH EASTERN VIEW (CGI)

buildingvisuals

Page 6: THE BRICKWORKS€¦ · CENTRAL LONDON M25 & HEATHROW Retail / Cinem a s s O WN SQUARE Hotel Pub Retail / Offic e - THE BRICKWORKS - PHASE B. J4B ... Heating and Cooling By ceiling

VIEW TO OFFICE ENTRANCE (CGI)

accommodation& floor plansAPPROXIMATE AREAS - IPMS 3

sqm sqft

Reception (GF) 295 3,175

First Floor 983 10,581

Second Floor 983 10,581

Third Floor 983 10,581

Fourth Floor 983 10,581

Fifth Floor 983 10,581

Sixth Floor 983 10,581

Seventh Floor 983 10,581

TOTAL 7,176 m² 77,242 ft²

PARKING

Car Parking – spaces available by separate agreement

Cycle Parking – 82

Note:Please note these areas are approximate and are subject to measurement on completion. These areas relate to the likely areas of the building at the current state of design. The areas have been calculated as IPMS3 in accordance with the International Property Measurement Standards (IPMS), 1st Edition. Any decisions to be made on the basis of these predictions, whether as to project viability, pre-letting, lease agreements or otherwise, should include due allowance for the increases and decreases inherent in the design development and construction processes. Areas and drawings based on preliminary information, and are subject to Design Development from MEP/ Fire/ Structure consultant input, and changes required to secure planning consent and all other statutory approvals.

SCHEDULE OF ACCOMMODATION

Page 7: THE BRICKWORKS€¦ · CENTRAL LONDON M25 & HEATHROW Retail / Cinem a s s O WN SQUARE Hotel Pub Retail / Offic e - THE BRICKWORKS - PHASE B. J4B ... Heating and Cooling By ceiling

TYPICAL FLOOR PLAN 1ST TO 3RD TYPICAL FLOOR PLAN 4TH TO 7TH

Single tenancy - indicative office layout showing a workspace density of 1:8 persons/ sqm

(122 workstations shown)

CINEMA

Multi-let tenancy - indicative demise line and layout showing an overall workspace

density of 1:9 persons / sqm(108 workstations shown)

CINEMA ROOF

Page 8: THE BRICKWORKS€¦ · CENTRAL LONDON M25 & HEATHROW Retail / Cinem a s s O WN SQUARE Hotel Pub Retail / Offic e - THE BRICKWORKS - PHASE B. J4B ... Heating and Cooling By ceiling

GROUND FLOOR PLAN

CINEMA / RETAIL outline specificationTYPICAL FLOOR:

Assumed Occupancy 1:8 persons/sqm single tenant work space density1:9 persons/sqm multi-let work space density

Tenancy Splits Flexible floor plates for single tenancy and multi-let

Distance from external wall to core Varies 11.5m to 22.5m

Washrooms Calculated on 1:8 persons/sqm at 60:60% male female split. Separate male/female WC blocks

Disabled WCs 1 per floor

Clear Floor to Ceiling height 2.8m on upper floors (3.9m at ground level)

Planning grid 1.5m x 1.5m

Floor and Ceiling voids 150mm raised floor750mm shared service / structural ceiling zone

GROUND FLOOR:

Primary Entrance Western elevation, accessed from Town Square

Servicing Entrance Ground floor via eastern elevationBasement floor via central basement

Security Security barriers in reception

BASEMENT BACK OF HOUSE:

Bike storage Provided at 1 space per 10 staff at basement level in accordance to BCO guidance

Lockers 1 locker per cycle space at basement level

Showers 10 showers (50/50 male / female split) and 1 accessible shower

Cleaners Cupboards 1 per floor

Central Post Room Basement level

Staff / Building manager’s office Ground (reception) level, with table, chairs, kitchenette and WC

Please note: the figures within this outline specification and accompanying floor plans are illustrative and subject to confirmation by Statutory approval, such as Planning Approval and Building Control Approval. The assumptions made in this specification and on the drawings are subject to change as a result of the design development process and verification by MEP, Structural, Fire Engineering/ LFB, and BREEAM input.

SCHEDULE OF ACCOMMODATION

BUILDING SERVICES:

Assumed Occupancy 1:8 persons/sqm

EPC target ‘B’ Rating

BREEAM rating ‘Very Good’ or ‘Excellent’ targeted

Heating and Cooling By ceiling mounted fan coil units

STRUCTURE:

Building Grid Typical from 9m to 12m

Principle structure Concrete frame. Piled walls to basement levels with drained cavity construction.

LIFTING:

Passenger lifts 3no. 17 person liftsShaft size: 2950mm x 2450mm

Goods Lift1no. 2100kg goods liftsShaft size: 2950mm x 2450mmLift to open on both sides allowing for servicing of all levels.

FIRE:

Assumed regulations

BS 9999:2017 - Code of practice for fire safety in the design, management and use of buildings.

Single stair fire strategy to be developed in detail with Fire engineer. Sprinklers, Mechanical smoke extract at all floors above first level to be assumed.

RECEPTION

Page 9: THE BRICKWORKS€¦ · CENTRAL LONDON M25 & HEATHROW Retail / Cinem a s s O WN SQUARE Hotel Pub Retail / Offic e - THE BRICKWORKS - PHASE B. J4B ... Heating and Cooling By ceiling

A L L E N Q U I R I E SWill Foster: [email protected] 0207 861 1293 Jack Riley: [email protected] 0207 861 5375

ARCHITECTS

The information in this document is indicative and is intended to act as a guide only as to the finished product. All floor areas are approximate. All computer generated images and lifestyle photography are indicative only. These particulars should not be relied upon as statements of fact or representations and applicants must satisfy themselves by inspection or otherwise as to their correctness. This information does not constitute a contract or warranty. Southall Waterside and The Brickworks are marketing names and will not necessarily form part of the approved postal address. Date of preparation July 2017 .