• ENERCON and our marketshare
• ENERCON Products and
Technology
• ENERCON in Japan
• Service, ENERCON Partner Concept (EPK) and EPK NIHON
© Copyright ENERCON GmbH. All rights reserved. Filename:
3
ENERCON production facilities worldwide II
• Rotor blade production, 10 factories worldwide
• Generator production, 4 factories worldwide
• Electrical components, 3 factories worldwide
• Tower production, 9 factories worldwide
• Machine house assembly, 4 factories worldwide
• Foundry, 1 factory worldwide
Total production area 684,000 m2
= approx. 91 football fields
© Copyright ENERCON GmbH. All rights reserved. Filename:
4
ENERCON production facilities worldwide I
Brazil (São Paulo/Fortaleza) Wobben Windpower Ltda. • Rotor blade production
Sweden (Malmö) ENERCON Windtower Production A.B. • Tower production
Turkey (Izmir) ENERCON AERO Turkey • Rotor blade production
Germany (Aurich / Emden / Magdeburg) • Head office (Aurich) • Research & Development • Production
Portugal (Viana do Castelo) • Rotor blade production, concrete towers, E-modules and generators • Production & assembly
Canada (Matane/Québec) WEC Tours • Tower production
© Copyright ENERCON GmbH. All rights reserved. Filename:
5
Market share in Germany 2011
Compared to 2010
ENERCON 59,2 %
Vestas 14,6 %
REpower 10,3 %
Nordex 4,5 %
Bard 3,9 %
Siemens 3,9 %
e.n.o. energy 1,0 %
Others 2,6 %
Source: DEWI 2012
Others 3,8%
© Copyright ENERCON GmbH. All rights reserved. Filename:
6
Market share worldwide 2011
Compared to 2010
Vestas 14,8 %
Sinovel 11,1 %
GE Wind 9,6 %
Goldwind 9,5 %
ENERCON 7,2 %
Suzlon Group 6,9 %
Dongfang 6,7 %
Gamesa 6,6 %
Siemens 5,9 %
United Power 4,2 %
Others 20,9%
Source: BTM 2012
United Power 7,1 %
Mingyang2.9 %
Siemens6.3 %
Sinovel7.3 % Suzlon Group
7.7 %Gamesa
8.2 %
GE Wind 9.4 %
Goldwind9,4 %
Vestas 12.9 %
ENERCON7.9 %
Others21.5 %
© Copyright ENERCON GmbH. All rights reserved. Filename:
7
© Copyright ENERCON GmbH. All rights reserved. Filename:
8
Product overview I
E-33 Rated power: 330 kW Hub height: 44 – 50 m
E-44 Rated power: 900 kW Hub height: 45 m / 55 m
E-48 Rated power: 800 kW Hub height: 50 – 76 m
© Copyright ENERCON GmbH. All rights reserved. Filename:
9
Product overview II
E-53 Rated power: 800 kW Hub height: 73 m
E-70 Rated power: 2,300 kW Hub height: 57 – 113 m
E-82 Rated power: 2,000 – 3,000 kW Hub height: 78 – 138 m
© Copyright ENERCON GmbH. All rights reserved. Filename:
10
Product overview III
E-101 Rated power: 3,050 kW Hub height: 99 / 135 / 149 m
E-92 Rated power: 2,350 kW Hub height: 85 – 138 m
E-126 Rated power: 7,580 kW Hub height: 135 m
© Copyright ENERCON GmbH. All rights reserved. Filename:
11
ENERCON concept
When it comes to performance, ENERCON's gearless generator concept is superior to conventional generators.
Advantages: • Less wear due to slower
rotation • Very little machine stress due
to high level of speed variability • Yield optimized control system
High grid compatibility
ENERCON annular generator
© Copyright ENERCON GmbH. All rights reserved. Filename:
12
Japan
© Copyright ENERCON GmbH. All rights reserved. Filename:
Timeline, ENERCON in Japan
13
1998
6 WEC‘s
1999 2000 2001 2003 2002
4 WEC‘s
ENERCON settles in Japan
8 WEC‘s 30 WEC‘s 3 WEC‘s 4 WEC‘s
2004
4 WEC‘s
2005
2006 2007
11 WEC‘s
43 WEC‘s 33 WEC‘s
2008
10 WEC‘s
2009
33 WEC‘s
2010
9 WEC‘s
2012 2011 2013
Dated May 30th, 2012 34 WEC‘s 11 WEC‘s 16 WEC‘s
36800 kW
1650 kW 1190 kW 8730 kW 17630 kW 1800 kW 2400 kW 2400 kW 10800 kW
80400 kW 44800 kW 20000 kW 62400 kW 18000 kW 22600 kW 68000 kW
© Copyright ENERCON GmbH. All rights reserved. Filename:
Market Share
Total installed Capacity Japan all Competitors: 2.442 M
© Copyright ENERCON GmbH. All rights reserved. Filename:
ENERCON Turbines‘ location
Dated: May 30th, 2012
ENERCON TOTAL: 291,95 MW
© Copyright ENERCON GmbH. All rights reserved. Filename:
Installed WEC‘s
WEC Typ Number MW
E-26 (0,245) 2 0,49 E-30 (0,230) 10 3,20
E-40 (0,28) 2 0,56
E-40 (0,5) 3 1,5
E-40 (0,6) 60 36
E-44 (0,9) 4 3.60
E-66 (1,5) 5 7,5
E-66 (1.8) 2 3,6
E-66 (2.0) 1 2,0
E-70 (2 MW) 56 112
E-70 (2,3 MW) 5 11,5
E-82 (2 MW) 55 110
E-82 (2,3 MW) 0 0
Total: 205 291,95
Dated: May 30th, 2012
© Copyright ENERCON GmbH. All rights reserved. Filename:
Upcoming projects in 2013
17
Project name
WEC Typ
Number of
WEC‘s
MW
S. E-82 E2 12 27,6
S.
E-82 E2 8 34,5
E-82 E2 7
H. E-82 E2 1 2
N. E-82 E2 1 2
N. E-82 E2 1 2
Y. E-82 E2 1 2
Y. E-82 E2 1 2
M. E-82 E2 1 2
M. E-82 E2 1 2
Total
34
76,1
© Copyright ENERCON GmbH. All rights reserved. Filename:
Installed and geneated power in 2012
18
Energy
FY2010 FY2011 FY2011
Hokkaido 5.790 5.680 32.145 257 450 1,40%
Tohoku 15.570 13.620 75.304 583 1.021 1,36%
Tokyo 59.990 49.220 268.230 310 543 0,20%
Chubu 27.090 25.200 127.897 217 380 0,30%
Hokuriku 5.730 5.330 28.898 146 256 0,89%
Kansai 30.950 27.840 146.028 115 201 0,14%
Chugoku 12.010 10.830 60.070 271 475 0,79%
Shikoku 5.970 5.440 28.444 124 217 0,76%
Kyushu 17.500 15.440 85.352 398 698 0,82%0
Okinawa 1.382 1.437 7.440 22 38 0,51%
Total 181.982 160.037 859.808 2.442 4.278 0,50%
unit MW MW Million kWh MW Million kWh
Total EU 5,50%
Maximum electrical demand Presumed Energyfrom wind(Load factor : 0.2)
Installed Wind Power
( Mar., 2012 )
© Copyright ENERCON GmbH. All rights reserved. Filename:
Among our biggest projects
W- 01393, 14,4 MW, Noshiro, HESCO, 24xE40
W- 02801, 20 MW, Toyoura, 10xE70
Nunobiki,68,98MW,33E-70
© Copyright ENERCON GmbH. All rights reserved. Filename:
20
ENERCON Partner Konzept (EPK) / EPK NIHON
ENERCON warrants constantly high technical availability for 15 years at predictable operating costs.
© Copyright ENERCON GmbH. All rights reserved. Filename:
21
Guarantee of 95 % technical availability
Term of contract up to 15 years Remote control (24 h) by ENERCON SCADA
Scheduled Maintenance Unscheduled maintenance (Repairs)
Profit-oriented cost structure
EPK NIHON - Scope of Supply and Services
© Copyright ENERCON GmbH. All rights reserved. Filename:
22
In case technical availablity drops below 95 % within one calendar year, the operator/customer receives a credit note for the production loss based on this technical unavailability.
Guarantee of technical availability
© Copyright ENERCON GmbH. All rights reserved. Filename:
23
x x x x x
Error
Dispatch from the customer
Inspection
Estimate
Insurance?
Placing of order
Service
U n n e c e s s a r y p r o d u c t i o n l o s s !!
x x
From error message receipt to repair
The way without EPK
© Copyright ENERCON GmbH. All rights reserved. Filename:
24
x
Error
x
Automatic manpower planning
Repair
with EPK NIHON
Carry time of supply !!
x
From error message receipt to repair
© Copyright ENERCON GmbH. All rights reserved. Filename:
25
Thank you for attention!
Publisher: ENERCON GmbH ▪ Dreekamp 5 ▪ 26605 Aurich ▪ Germany Phone: +49 4941-927-0 ▪ Fax: +49 4941-927-109
Copyright: © ENERCON GmbH. Any reproduction, distribution and utilisation of this document as well as the communication of its contents to third parties without express authorisation is prohibited. Violators will be held liable for monetary damages. All rights reserved in the event of the grant of a patent, utility model or design.
Content subject to change: ENERCON GmbH reserves the right to change, improve and expand this document and the subject matter described herein at any time without prior notice.