Taklimat PLC July 2008
Transcript of Taklimat PLC July 2008
![Page 1: Taklimat PLC July 2008](https://reader038.fdocuments.us/reader038/viewer/2022102710/5466b005b4af9fc6288b4932/html5/thumbnails/1.jpg)
Welcome to Politeknik Tuanku Sultanah Bahiyah.
For PLC And CX-ProgrammerTraining Course.
![Page 2: Taklimat PLC July 2008](https://reader038.fdocuments.us/reader038/viewer/2022102710/5466b005b4af9fc6288b4932/html5/thumbnails/2.jpg)
Duration : 2 Days courseTime : 8.30a.m - 4.30p.m Instructor : Koh Foo Hin
En. Mohd Elias
![Page 3: Taklimat PLC July 2008](https://reader038.fdocuments.us/reader038/viewer/2022102710/5466b005b4af9fc6288b4932/html5/thumbnails/3.jpg)
Development of The Course
Day 1
8.30a.m -9.00a.m : Your understanding about PLC
9.00a.m -10.00a.m : Introduction of PLC
10.00a.m -11. 00a.m : System Configuration &
Features & Function &
Unit Specification & Components
11.00p.m - 12.00p.m : Basic Command with Basic Programming method.
2.30p.m - 4.30p.m : Exercise With Actual Application
![Page 4: Taklimat PLC July 2008](https://reader038.fdocuments.us/reader038/viewer/2022102710/5466b005b4af9fc6288b4932/html5/thumbnails/4.jpg)
Development of The Course
Day 2
8.30a.m -9.00a.m : Overview of PLC
9.00a.m -12.00a.m : Continue with new Exercise
2.30p.m - 4.30p.m : Exercise With Actual Application and briefing about the intermediate for PLC
![Page 5: Taklimat PLC July 2008](https://reader038.fdocuments.us/reader038/viewer/2022102710/5466b005b4af9fc6288b4932/html5/thumbnails/5.jpg)
What kind of control system in a plant
Start & StopOperation
![Page 6: Taklimat PLC July 2008](https://reader038.fdocuments.us/reader038/viewer/2022102710/5466b005b4af9fc6288b4932/html5/thumbnails/6.jpg)
What kind of control system in a plant
Contactors, relays, timers & countersin the control panel
![Page 7: Taklimat PLC July 2008](https://reader038.fdocuments.us/reader038/viewer/2022102710/5466b005b4af9fc6288b4932/html5/thumbnails/7.jpg)
ControllingControlling
Motor pump
Valve
Mixer
![Page 8: Taklimat PLC July 2008](https://reader038.fdocuments.us/reader038/viewer/2022102710/5466b005b4af9fc6288b4932/html5/thumbnails/8.jpg)
Read & DisplayRead & Display
Flow Rate
Float Level
Oxygen Level
![Page 9: Taklimat PLC July 2008](https://reader038.fdocuments.us/reader038/viewer/2022102710/5466b005b4af9fc6288b4932/html5/thumbnails/9.jpg)
Hardwire logic control circuit
Relay 1
StartStart StopStop
Relay 1
PumpTimer
TimerRelay 1 Solenoid
![Page 10: Taklimat PLC July 2008](https://reader038.fdocuments.us/reader038/viewer/2022102710/5466b005b4af9fc6288b4932/html5/thumbnails/10.jpg)
A picture of hardwire relay logic
![Page 11: Taklimat PLC July 2008](https://reader038.fdocuments.us/reader038/viewer/2022102710/5466b005b4af9fc6288b4932/html5/thumbnails/11.jpg)
What is PLC ?
ProgrammableProgrammableLogicLogicControllerController
A solid-state device used to control machine or process operation by means of a stored program and feedback from input and output devices
Introduction to PLCIntroduction to PLC
![Page 12: Taklimat PLC July 2008](https://reader038.fdocuments.us/reader038/viewer/2022102710/5466b005b4af9fc6288b4932/html5/thumbnails/12.jpg)
BrainBrainSense Action
You
See
Listen
Taste
Touch
Smell
Hand
Leg
Mouth
HumaHumann
![Page 13: Taklimat PLC July 2008](https://reader038.fdocuments.us/reader038/viewer/2022102710/5466b005b4af9fc6288b4932/html5/thumbnails/13.jpg)
CPU
MemoryInput
Output
ProgrammingDevice
Power Supply
SignalsfromSwitches,Sensors,etc
Signals tosolenoids,motor,lamps,etc.
Operate by monitoring input signals and providing output signals. When changes are detected in the input signals, the PLC reacts, through the user-programmed
internal logic, to produce output signalsIt continuously scans the program in its memory to
achieve this control
PLC
![Page 14: Taklimat PLC July 2008](https://reader038.fdocuments.us/reader038/viewer/2022102710/5466b005b4af9fc6288b4932/html5/thumbnails/14.jpg)
PLCPLC HardwireHardwireLogicLogic
![Page 15: Taklimat PLC July 2008](https://reader038.fdocuments.us/reader038/viewer/2022102710/5466b005b4af9fc6288b4932/html5/thumbnails/15.jpg)
Control Device
Specific Purpose
General Purpose
Wired LogicWired Logic PLCPLC
Control sequence isControl sequence isfixed for one designfixed for one design
Control sequence can beControl sequence can bechange from time to timechange from time to time
without need to rewirewithout need to rewire
![Page 16: Taklimat PLC July 2008](https://reader038.fdocuments.us/reader038/viewer/2022102710/5466b005b4af9fc6288b4932/html5/thumbnails/16.jpg)
Wired LogicWired LogicPLCPLC
Control Scale
Small & Medium Medium & Large
![Page 17: Taklimat PLC July 2008](https://reader038.fdocuments.us/reader038/viewer/2022102710/5466b005b4af9fc6288b4932/html5/thumbnails/17.jpg)
Modification
An example for hard wire logic
Relay 1
StartStart StopStop
Relay 1
Pump
Timer
Timer
Relay 1Solenoid
Relay 1
StartStart StopStop
Relay 1
Pump
Counter
SolenoidRelay 1
Counter
#30StopStop
Hardwire logic will need to rewire everything
![Page 18: Taklimat PLC July 2008](https://reader038.fdocuments.us/reader038/viewer/2022102710/5466b005b4af9fc6288b4932/html5/thumbnails/18.jpg)
Modification
The same example for PLC
Relay 1
StartStart StopStop
Relay 1
Pump
Timer
Timer
Relay 1Solenoid
LD STARTOR RELAY 1AND NOT STOPOUT RELAY1OUT SOLENOIDLD RELAY 1TIM 000
#0020LD TIM 000OUT PUMP
![Page 19: Taklimat PLC July 2008](https://reader038.fdocuments.us/reader038/viewer/2022102710/5466b005b4af9fc6288b4932/html5/thumbnails/19.jpg)
Modification
The same example for PLC
Only need to change the ladder program
Relay 1
StartStart StopStop
Relay 1
Pump
Counter
SolenoidRelay 1
Counter
#30StopStop
LD STARTOR RELAY 1AND NOT STOPOUT RELAY1OUT SOLENOIDLD RELAY 1LD STOPCNT 000
#0030LD CNT 000OUT PUMP
![Page 20: Taklimat PLC July 2008](https://reader038.fdocuments.us/reader038/viewer/2022102710/5466b005b4af9fc6288b4932/html5/thumbnails/20.jpg)
Wired LogicWired Logic PLCPLC
Delivery Period
Several days Almost Immediate
![Page 21: Taklimat PLC July 2008](https://reader038.fdocuments.us/reader038/viewer/2022102710/5466b005b4af9fc6288b4932/html5/thumbnails/21.jpg)
MaintenanceDifficult Easy
LED indicator
Wired LogicWired LogicPLCPLC
Input/output connectorcan be remove easily
without using screw driver
ProgrammingConsole
![Page 22: Taklimat PLC July 2008](https://reader038.fdocuments.us/reader038/viewer/2022102710/5466b005b4af9fc6288b4932/html5/thumbnails/22.jpg)
Economic Efficiency
Advantage onsmall scale
Advantage onsmall, medium
and large
$$$$$$Wired LogicWired Logic PLCPLC
![Page 23: Taklimat PLC July 2008](https://reader038.fdocuments.us/reader038/viewer/2022102710/5466b005b4af9fc6288b4932/html5/thumbnails/23.jpg)
Power Consumption
High Low
0.2 Amp> 2 Amp
WiredWired LogicLogic PLCPLC
![Page 24: Taklimat PLC July 2008](https://reader038.fdocuments.us/reader038/viewer/2022102710/5466b005b4af9fc6288b4932/html5/thumbnails/24.jpg)
What PLC can doWhat PLC can do
Sequence ControlSequence ControlSequence ControlSequence Control
Relay 1
StartStart StopStop
Relay 1
Pump
Timer
Timer
Relay 1Solenoid
Relays
Timers & Counters
![Page 25: Taklimat PLC July 2008](https://reader038.fdocuments.us/reader038/viewer/2022102710/5466b005b4af9fc6288b4932/html5/thumbnails/25.jpg)
Sophisticated ControlSophisticated ControlSophisticated ControlSophisticated Control
+-x/
2
1
3 4
5
Prod Pass RejectAA 33 4BB 27 3CC 43 8
Arithmetic Operation
Analog ControlInformation Handling
![Page 26: Taklimat PLC July 2008](https://reader038.fdocuments.us/reader038/viewer/2022102710/5466b005b4af9fc6288b4932/html5/thumbnails/26.jpg)
Supervisory ControlSupervisory Control
PLC
Computer
PrinterFA
Network
Process Monitoring
Pager
![Page 27: Taklimat PLC July 2008](https://reader038.fdocuments.us/reader038/viewer/2022102710/5466b005b4af9fc6288b4932/html5/thumbnails/27.jpg)
Why & When to use PLCWhy & When to use PLC
Dramatically increase in population and housing developmentLimited landLimited land for plant
Upgrading of small plant to run higher capacity would involve complicated controlcomplicated control system, Intermittently Decanted Extented Aeration (IDEA).
A higher capacityhigher capacity of plant with high efficiency required
For that purpose, PLCPLC can do the job
![Page 28: Taklimat PLC July 2008](https://reader038.fdocuments.us/reader038/viewer/2022102710/5466b005b4af9fc6288b4932/html5/thumbnails/28.jpg)
Nation-wide Coverage
ElcompTradingElcompTrading
AutovationAutovation
RobomaticsRobomatics
OmmuraOmmura
EM SystemEM System
OMRON ELECTRONICS SDN.BHD
SALES NETWORK IN MALAYSIA
![Page 29: Taklimat PLC July 2008](https://reader038.fdocuments.us/reader038/viewer/2022102710/5466b005b4af9fc6288b4932/html5/thumbnails/29.jpg)
Waste Water Treatment Article
Reliable Control Solution For Waste Water TreatmentAnd Environmental Processes
In 1990, Omron controls were selected for a central FloridaWater treatment plant to ease capacity, productivity,efficiencyand reliability. The facility performed :
• Raw Water Pumping• Softening• Filtering • Storage / Distribution
![Page 30: Taklimat PLC July 2008](https://reader038.fdocuments.us/reader038/viewer/2022102710/5466b005b4af9fc6288b4932/html5/thumbnails/30.jpg)
The system included a PLC based station at each major processing stages, tied together with a triple-redundant network.The PLC / Computer network improved efficiency at the Water Treatment facility for about one-third the cost of a distributed control system.
One PLC control and monitors the softener systems ; two more PLCs control the filter systems; another PLC, located in the control room, controls the main storageand distribution system
![Page 31: Taklimat PLC July 2008](https://reader038.fdocuments.us/reader038/viewer/2022102710/5466b005b4af9fc6288b4932/html5/thumbnails/31.jpg)
Two independent host computer link networks connect the PLCs to the Computers. A peer to peer network provides a shared memory area to all PLCs on the network so that critical data - valve position, tanklevels, motor status and various plant flows are communicated automatically. This communicationis transparent to the users
Operator interface terminalssimplify control and monitoring of the entire operation. Fiber optic cables were installed for all communications networks to protect againstlightning
![Page 32: Taklimat PLC July 2008](https://reader038.fdocuments.us/reader038/viewer/2022102710/5466b005b4af9fc6288b4932/html5/thumbnails/32.jpg)
Data acquisition was automated by gathering all parameters from the PLCs data memories and printing
daily and monthly reports. Chemical and turbidity test results
were input into the computer byoperators for report generation
![Page 33: Taklimat PLC July 2008](https://reader038.fdocuments.us/reader038/viewer/2022102710/5466b005b4af9fc6288b4932/html5/thumbnails/33.jpg)
Future Expansion & Upgrading
DA
AD
Humidity Sensors
OC
OC
IDIDID
Inverter
Pumps House: 2
Pressure Interlock,
Power monitor
RS232 C
ModemDistance : 5km ~
8km
Maintenanceoffice(SCADA) Modem
RS232CPumps House: 1
Inverter
Pump 2 Pump 1 Jockey Pump
C1 C2
DA
AD
OC
OC
IDIDID
C1 C2
Pump 2 Pump 1 Jockey Pump