System Operation Changes – Interaction with ELEXON APEx Conference: Leipzig October 2004.
-
Upload
donald-lawson -
Category
Documents
-
view
213 -
download
1
Transcript of System Operation Changes – Interaction with ELEXON APEx Conference: Leipzig October 2004.
![Page 1: System Operation Changes – Interaction with ELEXON APEx Conference: Leipzig October 2004.](https://reader035.fdocuments.us/reader035/viewer/2022081700/56649efa5503460f94c0c8c9/html5/thumbnails/1.jpg)
System Operation Changes – Interaction with ELEXON
APEx Conference: Leipzig October 2004
![Page 2: System Operation Changes – Interaction with ELEXON APEx Conference: Leipzig October 2004.](https://reader035.fdocuments.us/reader035/viewer/2022081700/56649efa5503460f94c0c8c9/html5/thumbnails/2.jpg)
Content
• System Operator Changes– BETTA - what is it?
• System Operator Interaction with ELEXON– The Role of the SO
![Page 3: System Operation Changes – Interaction with ELEXON APEx Conference: Leipzig October 2004.](https://reader035.fdocuments.us/reader035/viewer/2022081700/56649efa5503460f94c0c8c9/html5/thumbnails/3.jpg)
BETTA and the SO
• Single GB wide market – GB wide settlement
• Single Deep ISO
![Page 4: System Operation Changes – Interaction with ELEXON APEx Conference: Leipzig October 2004.](https://reader035.fdocuments.us/reader035/viewer/2022081700/56649efa5503460f94c0c8c9/html5/thumbnails/4.jpg)
Now
England and Wales :1 SO/TO, NETA
GeneratorsSuppliers
12 Distributors
Scotland2 SO/TO/Generators/ Suppliers/Distributors
Nuclear Generators(Long term contract)Some independent Generation and Supply
Settlement based on NETA prices
![Page 5: System Operation Changes – Interaction with ELEXON APEx Conference: Leipzig October 2004.](https://reader035.fdocuments.us/reader035/viewer/2022081700/56649efa5503460f94c0c8c9/html5/thumbnails/5.jpg)
A Single Market
England and Wales Scotland NETA Now
BETTA
![Page 6: System Operation Changes – Interaction with ELEXON APEx Conference: Leipzig October 2004.](https://reader035.fdocuments.us/reader035/viewer/2022081700/56649efa5503460f94c0c8c9/html5/thumbnails/6.jpg)
The Big Change
• System and Transmission Operation
England and Wales
TO
GB System Operator
Scotland TO Scotland TO
NGC Scottish PowerScottish and
Southern
How deep?
![Page 7: System Operation Changes – Interaction with ELEXON APEx Conference: Leipzig October 2004.](https://reader035.fdocuments.us/reader035/viewer/2022081700/56649efa5503460f94c0c8c9/html5/thumbnails/7.jpg)
How Deep?
• Very Deep– System control– Outage planning– Connection agreements– Balancing services
• Transmission Operators – asset owners
![Page 8: System Operation Changes – Interaction with ELEXON APEx Conference: Leipzig October 2004.](https://reader035.fdocuments.us/reader035/viewer/2022081700/56649efa5503460f94c0c8c9/html5/thumbnails/8.jpg)
Market Timescales
Rolling half hour trades
Balancing Mechanism
Forward Markets
Year Ahead - T(or earlier)
1hr - T
Imbalance Settlement
T+ 14 months
Bilateral contracting
OTC
Power Exchanges
T- 48 hrs
Generation & demand
balanced by National Grid
as SO
Real time reportingwww.bmreports.com
Post event settlement
![Page 9: System Operation Changes – Interaction with ELEXON APEx Conference: Leipzig October 2004.](https://reader035.fdocuments.us/reader035/viewer/2022081700/56649efa5503460f94c0c8c9/html5/thumbnails/9.jpg)
Information Required from NGCfor Market settlement
•Bids and Offers Accepted in the Balancing Mechanism–Used in the calculation of energy imbalance prices–Settlement of Bids and Offers with counterparties
•Two categories of data on Balancing Services procured outside of the Balancing Mechanism–one used in the calculation of energy imbalance prices
–one removes provider’s imbalance exposure when delivering certain Balancing Services
![Page 10: System Operation Changes – Interaction with ELEXON APEx Conference: Leipzig October 2004.](https://reader035.fdocuments.us/reader035/viewer/2022081700/56649efa5503460f94c0c8c9/html5/thumbnails/10.jpg)
Forecast Data Provided by NGC
• Demand Forecast• National and zonal
generation availability (in timescales up to 52 weeks ahead)
• Forecast Imbalance • BM Unit Specific Info
– Generation scheduled to run
– Bids / Offers available to SO
![Page 11: System Operation Changes – Interaction with ELEXON APEx Conference: Leipzig October 2004.](https://reader035.fdocuments.us/reader035/viewer/2022081700/56649efa5503460f94c0c8c9/html5/thumbnails/11.jpg)
Outturn Data Provided by NGC• Initial Demand
Outturn• Bids/Offers
Accepted in BM• BM Unit import /
export limits• Balancing Services
Adjustment Data
Allows indicative imbalance prices to be calculated within 15 mins of settlement period end
![Page 12: System Operation Changes – Interaction with ELEXON APEx Conference: Leipzig October 2004.](https://reader035.fdocuments.us/reader035/viewer/2022081700/56649efa5503460f94c0c8c9/html5/thumbnails/12.jpg)
Progress towards BETTA
• The new codes are Active now• Connection agreements transferring
to NGC• Outage Planning Transferring to NGC• Settlement in testing phase• SO transfer on time but challenging
Go Live 1 April 2004